LOS ANGELES 1 Pointe Dr. Suite 320 Brea, CA 92821 714.388.1800 HOUSTON 15590 N. Barkers Landing Rd. Suite 325 Houston, TX 77079 713.468.5004 www.projectnavigator.com Project Navigator, Ltd. Key Contact: Matt Jackson [email protected] Project Navigator, Ltd. Construction Management Services Procurement, Field Oversight, Administration.

Upload: others

Post on 25-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

LOS ANGELES 1 Pointe Dr. Suite 320 Brea, CA 92821 714.388.1800

HOUSTON 15590 N. Barkers Landing Rd. Suite 325 Houston, TX 77079 713.468.5004

www.projectnavigator.com

Project Navigator, Ltd. Key Contact: Matt Jackson [email protected]

Project Navigator, Ltd. Construction Management Services Procurement, Field Oversight, Administration.

Page 2: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Outline

2

• Introductions • Safety Moment

• Procurement • Field Oversight • Project Administration

Page 3: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Introductions

3

Deg

ree

of D

ecis

ion-

mak

ing

Labor-Hours Applied to Project

Strategic

Tactical

Task-driven

PRPs

Traditional Environmental

Project Resources (e.g. consulting, EPC)

Project Navigator, Ltd. works to manage, align, and coordinate project resources and strategy for cost-effective project execution.

Project Navigator, Ltd. (PNL) is expert at working alongside existing project resources to provide third-party technical input to project owners.

Page 4: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Introductions

4

Newark Bay Study Area Newark, New Jersey

Confidential Site Hawaii

Purity Oil Sales Fresno, CA

Waste Disposal, Inc. (WDI) Santa Fe Springs, CA

Operating Industries, Inc. (OII) Monterey Park, CA

McColl Superfund Site Fullerton, CA

SEMOU South El Monte, CA

Rialto Site Rialto, CA

BKK Landfill Site West Covina, CA

Cal Compact Landfill Site Carson, CA

Cranbury Brickyard New Jersey

Omega Superfund Site Whittier, CA

Confidential Site New Jersey

Chapin Road Landfill Montebello, CA

Hookston Station Pleasant Hill, CA

Sherwin Williams Emeryville, CA

San Diego Sediment Site San Diego, CA

Ascon Landfill Site Huntington Beach, CA

National Zinc Site Cherryvale, KS

Piney Point Phosphates, Inc. Manatee County, FL

Kerr McGee Site Hendry County, FL

PAB Oil & Chemical Abbeville, LA

Gulf Coast Vacuum Abbeville, LA

Tex Tin Superfund Site Texas City, TX

Bayou d’Inde Calcasieu Parish, LA

Combustion Inc. Denham Springs, LA

MAR Services Cankton, LA

NORM Sites Remediation New Orleans, LA

Cox Road Landfill Dayton, TX

Brine Service Company Corpus Christi, TX

Malone Service Superfund Site Texas City, TX

Patrick Bayou Superfund Site Deer Park, TX

Johnson Bayou Oilfield Cameron County, LA

Ward Transformer Trust Site Raleigh, NC

ASARCO Smelter Site El Paso, TX

Mississippi Phosphates Corp. Pascagoula, MS

PNL Houston Office PNL Los Angeles Office

Reichhold, Inc. Gulfport, MS Milliken Sanitary Landfill

Ontario, CA

Somerdale Road Landfill Gloucester Township, NJ

Site Redevelopment Projects

PNL Major Project Experience

Page 5: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Introductions

5

Information Mgmt. & Data Analysis

Political Savvy, Diplomacy, Relationships Multi-party PRP

Project Management

Reporting

Strategy Development, Options Creation

Regulatory Agencies Interface

Consulting Resources Oversight

Tasking, Scheduling, Action Item Control

Financial Controls Risk

Management Construction Management

Community Relations

PNL’s Project Coordinators Services Encompass Varied Tasks and Stakeholders

Page 6: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Introductions

6

Malone Superfund Site – Pre-RD/RA

Page 7: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Introductions

7

Malone Superfund Site – Post RD/RA

Page 8: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

8

Procurement • Prospective Contractors • Contracting Methods • Request for Proposal • Bid Evaluation • Contractor Selection

Page 9: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Procurement

§ List of Prospective Contractors • Typically developed from PRP input, PNL experience, including specialty

contractors if needed. • Pre-Qualify Contractors

o Safety Record – Last 3 years Total Recordable Incident Rate (TRIR) and Experience Modification Rate (EMR)

o List developed based on type of project – Dirt work, solidification, Water work, etc.

o Location – Geographic area

o Regulatory Experience – RCRA, CERCLA, etc.

o Agency Experience – Federal vs State

– OSHA vs MSHA

o Union vs Non-Union

9

Page 10: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Procurement § Contracting Methods

• Design/Build v Design-Bid-Build • Lump Sum (LS), Unit Rate (UR), Time & Material Not To Exceed (T&M NTE, Cost Plus Fixed

Fee (CPFF), Time & Material o Most projects have a combination of these o LS – more risk for contractor – generally higher cost for owner o UR – shared risk for contractor and owner o T&M NTE – more risk for owner, but contract amount limit is stated o CPFF – more risk for the owner, but cost are more controlled o T&M – more risk for the owner without a contract limit set

• Future Considerations o Establish rates for extra T&M work now o Rate increases, if allowable

– Labor, Equipment and Materials – Fuel escalation

o Markup on materials and subs – minimize or direct pay

o Quantify and track number of standby/delay days

10

Page 11: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Procurement

Design/Bid Construction Integrated Design/Build

Positives

§ Greater ability to lock in RA costs § Enhances competition for the work § Avoids need for continued commitment

to a poorly performing RD firm

§ Shortened schedule, and most likely, decreased costs § Gain constructability validation since

appropriate construction personnel are involved from day one § Greater ability to achieve contractual

performance guarantees § Reduced number of deliverables

Negatives

§ Lengthens schedule § More deliverables § Need for separate constructability

review § Possible contractual squabbles if

designer and constructor are different firms

§ Not yet globally accepted within EPA § Early commitment required to RD/RA

firm § Accurate cost predictions are not known

until “engineers cost estimate” can be produced at about 75% RD stage

Design/Build: Decoupled Vs Integrated - Advantages and Disadvantages

11

Page 12: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Procurement

Risk Allocation by Contract Type

Lump Sum Unit Cost T&M, NTE CPFF* T&M

0 %

100 %

100 %

0 %

Risk

Allo

catio

n

* Cost Plus Fixed Fee

Reference: Havranek, T.J., Modern Project Management Technologies for the Environmental Remediation Industry, St. Louis Press, Boca Raton, FL, 1999

Environmental Service

Company

Clients

12

Page 13: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Procurement

§ Request for Proposal • Constructability Review of design/remedy • Detailed List of assumptions and quantities

o Strive for apple to apple comparisons in schedule of values o Detailed specifications

• Include Draft Contract o Notice Provisions o Differing Site Conditions o Time Extensions o Disputes Clause o Warranty/Protection of Work Clause

• Contractor to include a Critical Path Method (CPM) schedule with proposal • Encourage contractors to provide Value Engineering and Cost Saving

Alternatives • Project References for similar work • Subcontractor qualification process 13

Page 14: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Procurement

§ Review submitted proposals and manage a detailed

analysis • PNL will analyze all proposals based on key metrics.

All data and information are entered into side-by-side spreadsheets which permit objective analysis.

• Metrics and criteria which are evaluated include:

o Average labor rate as a function of job time. (Should decrease and maybe increase slightly when project close out is occurring)

o Cost per percent of project complete

o Cost savings initiatives

Comparative Analysis

§ Provide a written recommendation for selection of contractor

• At the completion of the evaluation, PNL will submit a formal recommendation, along with a bid analysis. The analysis describes the evaluation process and will have objectively screened. candidates. Many of the evaluation criteria will have previously been supplied to the bidders so that they clearly submit the information which will allow PNL to differentiate between the bids.

• Sometimes some bids may look equally attractive. In such circumstances PNL, with the clients’ agreement, has gone back to the vendor to ask for a “best and final offer”.

• For example at the Operating Industries Site, PNL assisted the RP group through a best and final offer process, which resulted in reduced labor rates from the labor union who were supplying equipment operators.

14

Page 15: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Procurement

§ Getting the right design and scope is paramount for project success. § PNL leans on the experience of our diverse staff and their involvement early on in

the design and planning phases to help ensure: • Streamlined and implementable design • Complete and succinct scope

§ PNL coordinates getting the key players (engineers, contractors, owners, etc.) involved in the reviews to use their Best Practices/Lessons Learned from previous projects.

§ Focusing on these components of the project in its infancy saves time and money once field activities begin.

15

Constructability Reviews

Page 16: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

16

Field Oversight • Safety • PRP On-Site Rep • Monitor Compliance • Decision Making • Verification of Quantities/Progress

Page 17: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Field Oversight

• Safety o Contractor Plan review and comment o Ensure plan is implemented as written o Audits o Incident investigation assistance o Metrics tracking and reporting

• PRP On-Site Representative o Eyes and Ears for clients with contractors, agencies and other stakeholders o Compliance with approved work plans/design/specifications o Timely decision making at appropriate level o Verification of quantities/progress o Schedule compliance o Reporting

17

Page 18: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Field Oversight

18

PNL promotes the uses of behavioral-based safety practices. Safety compliance is accomplished by input and engagement of all project personnel to include: § Risk Management

§ Leadership

§ Accountability

§ Employee Involvement

§ Stop work authority

§ Training

§ Hazard Analysis

§ Working with Others

§ Reporting and Communication

1. Leadership

2. Policies and Objectives • Set Policy • Develop site specific HSE Program

3. Organization, Resources and Documentation

4. Risk Evaluation and Management

5. Planning • Identify Legal and Other Requirements • Conduct HSE Evaluation of Activities • Establish HSE Objectives, Targets and Action

Plans

6. Implement and Monitor • Operational Controls • Manage Contractors • Emergency Response • Manage Document and Records • Monitor and Evaluate • Take Corrective and Preventative Actions

7. Audit and Review • Review by Senior Management • Perform Audits

§ Organize and Modify, as appropriate

§ Foster a Continuous Improvement Culture

§ Establish Accountabilities and Responsibilities

§ Ensure Competence, Training and Awareness

§ Establish Communication Channels

Project Safety Stats

Total Hours

Worked

OSHA Recordable

Injuries

OSHA Recordable

Rate

Lost Work Day Incidents

Near Misses

Waste Disposal, Inc. Santa Fe Springs, CA 47,682 0 0.00 0 3

Ascon Landfill Site Huntington Beach, CA 6,920 0 0.00 0 2

Operating Industries, Inc. Monterey Park, CA

138,000 0 0.00 0 0

Malone Services Co. Superfund Site Texas City, TX

136,421 0 0.00 0 6

ASARCO Smelter Site El Paso, TX (for 2017) 258,573 0 0.00 0 0

Tex Tin Superfund Site Texas City, TX

120,000 0 0.00 0 0

Visit www.SafetyMoment.org.

Page 19: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Field Oversight

19

n PNL ensures that QA procedures are followed in compliance with any regulatory orders

n PNL reviews all technical work, plans, reports, field activities, and the results of other contractors

n PNL is experienced at providing the appropriate level of owners’ oversight

n PNL maintains a project risk register, which we use to proactively monitor any project concerns

n Clients receive weekly/monthly “eyes-on-the-ground” photo reports to ensure project performance, health & safety, and QA goals are met

n PNL Construction Managers can be the clients direct point of contact at anytime

PNL Represents the Owner in Ensuring That the Design is Cost-Effectively Constructed. Work Quality Management.

Page 20: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Field Oversight

PNL is committed to the belief that all incidents are preventable through proper planning, and compliant work of plans and procedures. To achieve this, PNL implements an integrated approach to safety, quality and operations planning that emphasizes: § Behavior-based processes designed to integrate safety and quality procedures into all

activities and at all levels of work. § Individual employee involvement and accountability in risk identification, quality

assurance processes, and monitoring for changing conditions intended to foster a project safety culture.

§ Daily observation of work processes conducted by work crews designed to ensure ongoing management of change.

§ Establishing a safe plan of action for work tasks through: • Health and Safety Plans

• Task Plans

• Crew Activity Plans

• Hazard Analysis

• Job Safety Analysis

• Daily Safety Meetings 20

Site Specific Plans Compliance Management

Page 21: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Field Oversight

21

PNL Efficiently Collects, Manages, and Mines Project Information to Promote Informed Options Development and Decision-Making

Before After

PNL’s “Eyes-and-Ears” Oversight for Malone Participating Parties.

Clients’ & EPA’s Consultants

Borrow area

Private property

Monitoring well

Injection well

Injection well

Solidified sludge to

cell

Laydown area soil handling

Tank sludge to pit

Pond (no action)

Levees graded and used for fill

RCRA cell

Tank, API sludge, residual soil to mixing area, tank

demo and scrap Impacted water to

well Waste

Slurry wall and dewatering system

Groundwater extraction

wells

Metal scrap, building demolition debris disposal and

recycle

Lab pack demo

Demo

Earthen sludge pit and oil pit – Dewater and solidify with track hoe,

place in RCRA cell

Backfill Oil pit

Sludge pit

Groundwater

Sludge pit bottom

Berm

§ Complex technical projects generate large amounts of data and information that need to be analyzed and explained to stakeholders.

§ These concepts must be communicated in a succinct and clear manner.

§ PNL’s GIS and visual engineering allows information and data to become clear, concise and understandable to Clients.

§ When clients understand, they make better, faster, higher quality decisions, resulting in a focused RI/FS

Page 22: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

22

Administration · Tracking of Quantities/Progress · Schedule Compliance · Change Orders · Invoices · Cash Flow Projections

Page 23: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Administration

• Tracking of Quantities/Progress o For total project and for invoice verification

• Schedule Compliance o For overall completion date o For interim and major milestones o For recovery if delays have been encountered

• Change Orders o Review/Approval/Rejection o Negotiate for the client

• Invoices o Review/Approval/Rejection

• Cash Flow Projections

23

Page 24: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Administration

24

§ Ensure that what is being paid for is actually being executed

● PNL roves the work site to make sure the design is being constructed in the field.

● We interact with the independently retained QA/QC contractor in this function.

§ Manage financial performance

● We perform this function on all our projects. Our systems are set up to measure the cost and schedule productivity of all retained resources.

§ Manage schedule performance and provide regular updates to Responsible Parties

● To assist the client not being overloaded with paperwork, we use succinct information-dense summary sheets which allow the client to provide feedback after a very quick review.

● PNL’s role is to provide information to the clients so they can make informed decisions, with minimal analysis and questioning.

Budget Tracking and Management

Schedule Management

Page 25: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Administration

§ Review invoices and manage payment process • At all projects we manage we also assist the Responsible

Parties in the review, processing and payment of invoices.

• For example, at the Tex-Tin site we established and now manage an electronic invoice payment process.

§ Manage Change Orders (C/O) • PNL has a standard process we would ask the contractor

to follow. C/Os are based on changed conditions, proper and timely notification

• PNL is rigorous and objective in our evaluation of C/Os. Experience and onsite observations allow us to determine if C/Os are appropriate. We work closely with the clients on matters like these.

• Project schedules may require timely C/O approvals. PNL establishes prudent C/O field approval thresholds with the client.

• All change orders are discussed with clients, major C/Os are subject to a formal review process to verify changed conditions and submitted for client’s approval. All C/Os are field recorded and documented in a monthly report to the clients.

Invoice Review

25

Page 26: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Administration

PNL Reviews and Updates Forecasts

Each Quarter

Based Upon Account Balance PNL Prepares

Cash Call Amount

PNL Sends Forecasts and Cash Call to RPs

for Approval

Forecast and Cash Call Approved?

RPs and PNL Revise Forecast

PNL Sends Out Quarterly Cash Call

Invoices to RPs

RPs Send Cash Call Funds to Bank or

Escrow Agent

Checks Deposited into Group Account

Group Account

Invoices Received and Reviewed by PNL

PNL Prepares Authorization Sheets*

PNL Sends Invoice and Payment Authorization

Sheet to Group Members

Approval Granted

Chairman / Members Specify Amount to be

Paid

PNL Updates Account Tracking

Escrow Disburses Funds

Contractors

Yes

ACCOUNT FUNDING INVOICE PROCESSING

LEGEND

PNL Function

RP Function

Escrow Function

No No

Yes

Group Members Approve Pmt. PNL Coords with Bank

* For illustration purposes, flow diagram assumes invoices are not questioned.

Project Payment Flow

26

Page 27: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Administration

FORECAST / ACTUAL PROJECT TRACKING

Forecast made yearly. Remedial and transactional costs by vendor tracked monthly.

Components: • Remedial Action

Response • Project Coordination • Community Relations • Accounting • Legal • EPA, Past Cost, etc.

Estimated

Actual

Current Month Previously Approved and Paid

CASH FLOW ANALYSIS

Cash Flow Forecasting

27

Sum of transactional and response cost tracked through life of project. Forecast used for cash call.

Page 28: Project Navigator, Ltd. Construction Management Servicesprojectnavigator.com/downloads/PNL-Remedy...§ Review submitted proposals and manage a detailed analysis • PNL will analyze

Project Navigator, Ltd. Appreciates your Time Today

28

n PNL has a “best in class” team with members who have more than 25 years of relevant experience.

n The PNL team has experience working with multi-party sites nationwide.

n PNL thinks strategically and excels as creative problem solvers.

n We are proactive in the management of project risk.

n PNL excels at data and site information management

n PNL staff are excellent project negotiators and project/client advocates.

n PNL conducts/facilitates strategy review to assess challenges, risks and mitigation measures.

n PNL directs and manages consultants and contractors to ensure a safe, cost-effective and on-time project.