2712 Bull Street, Suite A, Beaufort, SC 29902 Phone (843) 379-2222 Fax (843) 379-2223 www.andrews-sc.com PROJECT NARRATIVE September 24, 2019 #140016 – St. Andrew by the Sea TMP: R610 030 000 0712 0000 Street Address: 335 Buckwalter Parkway Zoning District: Buckwalter PUD Proposed Use: Religious Assembly (Church) FEMA Flood Zone: C The proposed project consists of developing the site to serve the needs of St. Andrew By the Sea UMC on approximately 10 acres. The project is in compliance with the Town UDO and the Buckwalter PUD. The development will be completed in phases and will include several buildings and an athletic field. Phase 1 of the proposed development includes the construction of a new 11,000-sf building along with pervious parking areas, a connecting access drive to Buckwalter Parkway, concrete sidewalks/walking trail, and an athletic field. Phase 2 will include construction of the main sanctuary, conversion of the Phase 1 sanctuary into a youth programs building, a gymnasium, and a cookout pavilion with restroom and storage. Final development conditions will result in buildings totaling approximately 44,750-sf. The parking required for this project was determined based on church seating at 1 space/3 seats @ 312 seats (Phase 1) for a total of 104 spaces. 97 spaces (93% of required) are proposed for Phase 1. At full buildout, including the Phase 2 Main Sanctuary, available church seating will equal 500 seats which would require 167 spaces. An additional 82 spaces will be constructed in Phase 2 for a total of 179 spaces (107% of required). All parking spaces are to be constructed of pervious material except for the handicap parking. The stormwater infrastructure for the final development has been master-planned and will include pervious pavement, wet detention, and irrigation reuse. The proposed design is in compliance with the Town of Bluffton Stormwater Design Manual. Sanitary sewer service will be provided by connecting to the existing pump station located on the adjacent property to the south. Water will be provided by connecting to the water which is also located on the adjacent property to the south. Fire protection service falls under the Bluffton Fire District. BJWSA will provide water and sewer service. Palmetto Electric will provide electricity and likely site lighting assistance. Hargray will provide telephone service.

Upload: others

Post on 17-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT NARRATIVE September 24, 2019 #140016 – St. Andrew

2712 Bull Street, Suite A, Beaufort, SC 29902 Phone (843) 379-2222 Fax (843) 379-2223

www.andrews-sc.com

PROJECT NARRATIVE September 24, 2019

#140016 – St. Andrew by the Sea

TMP: R610 030 000 0712 0000

Street Address: 335 Buckwalter Parkway

Zoning District: Buckwalter PUD

Proposed Use: Religious Assembly (Church)

FEMA Flood Zone: C

The proposed project consists of developing the site to serve the needs of St. Andrew By the Sea UMC on

approximately 10 acres. The project is in compliance with the Town UDO and the Buckwalter PUD. The

development will be completed in phases and will include several buildings and an athletic field. Phase 1

of the proposed development includes the construction of a new 11,000-sf building along with pervious

parking areas, a connecting access drive to Buckwalter Parkway, concrete sidewalks/walking trail, and an

athletic field. Phase 2 will include construction of the main sanctuary, conversion of the Phase 1 sanctuary

into a youth programs building, a gymnasium, and a cookout pavilion with restroom and storage. Final

development conditions will result in buildings totaling approximately 44,750-sf.

The parking required for this project was determined based on church seating at 1 space/3 seats @ 312

seats (Phase 1) for a total of 104 spaces. 97 spaces (93% of required) are proposed for Phase 1. At full

buildout, including the Phase 2 Main Sanctuary, available church seating will equal 500 seats which would

require 167 spaces. An additional 82 spaces will be constructed in Phase 2 for a total of 179 spaces (107%

of required). All parking spaces are to be constructed of pervious material except for the handicap

parking. The stormwater infrastructure for the final development has been master-planned and will

include pervious pavement, wet detention, and irrigation reuse. The proposed design is in compliance

with the Town of Bluffton Stormwater Design Manual.

Sanitary sewer service will be provided by connecting to the existing pump station located on the adjacent

property to the south. Water will be provided by connecting to the water which is also located on the

adjacent property to the south. Fire protection service falls under the Bluffton Fire District. BJWSA will

provide water and sewer service. Palmetto Electric will provide electricity and likely site lighting

assistance. Hargray will provide telephone service.