1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification No.1 Q1. If it is possible to provide the layout drawing of existing cameras and its schematic, as it will facilitate for design and work-out the appropriated solution. A1. Due to security reason, we will not provide the floor plans/layout drawing of existing cameras during the tendering stage. Q2. Requesting all the floor plans with IDF room, closet room, server room and operation room location? A2: Please refer to the enclosed drawings (attachment 1) for reference. Q3. If camera end require additional power socket, then power is provided by which parties? A3. The power of the IP Cameras shall be provided by Power Over Ethernet (POE). If the camera end require additional power, the power should be provided by the existing camera power source or new power source created by the Contractor. Q4. Which area require microphone? A4. According to tender document Section 5 Clause 3.10, all Cameras shall be audio ready (Audio interface: 1 x mono line in, 1 x mono line out). Users can select to enable/disable this function according the operational requirement. Q5. How about the coming maintenance service for existing Bosch IP CAM (need include in the quotation)? A5. The Contractor should consider the method for the existing Bosch IP CAM to have proper operation after integration. Q6. Please confirm all containment and cables are new installation. Please confirm whether existing trunking can be reused. A6. The existing containment and trunking can be reused but the Contractor should make new if required. All cables (except the backbone fiber from IDF to Server Room) should be new installation by the Contractor. Q7. Please provide the specification about the New Main CCTV Room. A7. The specification of the room is as following: Room area (m2): 101.94 No of Occupants: 5

Upload: others

Post on 18-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

1/2

Project: MIA - Supply and Installation of IP CCTV System (RFQ-222)

Subject: Tender Clarification No.1

Q1. If it is possible to provide the layout drawing of existing cameras and its schematic, as it will facilitate for

design and work-out the appropriated solution.

A1. Due to security reason, we will not provide the floor plans/layout drawing of existing cameras during the

tendering stage.

Q2. Requesting all the floor plans with IDF room, closet room, server room and operation room location?

A2: Please refer to the enclosed drawings (attachment 1) for reference.

Q3. If camera end require additional power socket, then power is provided by which parties?

A3. The power of the IP Cameras shall be provided by Power Over Ethernet (POE). If the camera end require

additional power, the power should be provided by the existing camera power source or new power

source created by the Contractor.

Q4. Which area require microphone?

A4. According to tender document Section 5 Clause 3.10, all Cameras shall be audio ready (Audio interface:

1 x mono line in, 1 x mono line out). Users can select to enable/disable this function according the

operational requirement.

Q5. How about the coming maintenance service for existing Bosch IP CAM (need include in the quotation)?

A5. The Contractor should consider the method for the existing Bosch IP CAM to have proper operation after

integration.

Q6. Please confirm all containment and cables are new installation. Please confirm whether existing trunking

can be reused.

A6. The existing containment and trunking can be reused but the Contractor should make new if required. All

cables (except the backbone fiber from IDF to Server Room) should be new installation by the

Contractor.

Q7. Please provide the specification about the New Main CCTV Room.

A7. The specification of the room is as following:

Room area (m2): 101.94

No of Occupants: 5

Page 2: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

2/2

Floors: 600x600mm high pressure laminated raised floor

Skirting: ---

Walls: Emulsion paint on 6mm thk. Internal plaster up to false ceiling/full height

Ceiling: 600x600mm acoustic ceiling tile with exposed grid".

False Ceiling Height from A.F.F.L.: 3.70m

-End-

Page 3: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification
Page 4: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

�&�'����� �� (��� �� &���� ��� �� ���� )����* �� ��*�����

'� 456 789:

; 9 <;; 4; =; >;; 9;; ?

@�A� B < B <4 9;;

�I6D �FF�E�@J �J��#JEA" ���!�� A��� �"��# 6D ��" 6D

������� �� %�6�D &�*����*

6D ��"

6 K;; ?

��� � �� ���6 >4; ?=>

<K 4> * A��J!#

4> * A��J!#

��&

8;; ?

4LK9 ?M

48=; ?M

6 44L; ?D K;; ?6 4=>; ?D K;; ?

L A��J!#

K A��J!#

K; ?

K; ?

> A��J!#

> A��J!#

M���� #!��"��" @EAE� @E"������� B 6D <K B >>4 ? N�E? �� <K

6D => B >;K ? N�E? �� =>

�6D �

<

�6D�

6D =>

��&�� � �����

��C� ( ��C� � ��C�

6D <K

������� �

4;<94;O94;O9

49=;498;498;

=<;;=<K;=<K;

��C� *�

���*�H��

'�H��

(�� ������ � 6��(

6D H �6D K; � 6D H �6D K; ?

� *

�)

�&)

�)

�&)

''

''

����

)

( �)

�&)�&)

''

�)�

�)

�&)

�)H�&)

�=

����

� �&&I

� �

�6D �4

�)

�)

(�� ������

�6

-

R

����

��##��������?���A

*�����A�S��!�E��������

Patricks
Typewritten Text
MACAU INTERNATIONAL AIRPORT - AERODROME CHART
Page 5: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

� ��

� ��

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� �

� ��

� ��� �

� ��� ��

� �� ��

� � ��

� �� ��

� �� ��

� �� ��

� �� �

� ��

� ��

� ��

� ��

� �

� �

� �

� �

� ��

� ��

� ��

� ��

� ��

�������������

����

������

����

����

�� ����

�����

!���

"��������������!���

#� $��� ���%

���� � � �#�

����#&���$#���

'��

����

�(��

�#�

���%

���

�#� $��� ���%

'��

����

)��

�����

��(

�� �#

���

� ��

����

��

�#� �#� �#*��

� � �� ��� �� �� ��� �

�B��� C � C ����

D"'"A

�E�E��� ���A ���F&�G D'����FH�IDA' �I��I�E"��I ���� E&GIH�E"��I ���� E&G

"D"M��I� �""�

M�E �Q& J��K

Patricks
Typewritten Text
MACAU INTERNATIONAL AIRPORT - APRON FLOOR PLAN
Page 6: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

T/A

T/B

T/A

TO CONTROL TOWERIDF-RADAR WORKSHOP(ROOM 37018)

×1

×28

×4

NOTE:

Patricks
Typewritten Text
Patricks
Text Box
Patricks
Text Box
Patricks
Polygon
Patricks
Text Box
IDF ROOM
Page 7: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

T/B

T/A

T/B

NOTE:

Patricks
Polygon
Patricks
Text Box
Patricks
Text Box
Patricks
Text Box
Page 8: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

NEW COMPUTERROOM

設計

校對

審核

審定

專業負責人

工程負責人

設計編號

版 次

圖紙名稱

圖號

日期比例

2

階段

工程名稱

項目名稱

DETAIL DESIGN

A3

A/S@A3 2013.07.22

100mmX100mmTrunking

Riser

FB Fiber CableD Data cable

T/A To Above

T/B To Below

Legend:

25mm G.I.Conduit

20mm G.I.Conduit

75X75Junction Box

DATA OUTLET

TELPHONE OUTLET

ACCESS POINT OUTLET

139-SCS-401

×38

×11

×22

CAT6 UTP CABLE

×

×

NOTE: RED FONTPTB-Arrival-RMXXXX-APXXXAP NAME

Patricks
Text Box
Patricks
Polygon
Patricks
Polygon
Patricks
Polygon
Patricks
Polygon
Patricks
Polygon
Page 9: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

設計

校對

審核

審定

專業負責人

工程負責人

設計編號

版 次

圖紙名稱

圖號

日期比例

2

階段

工程名稱

項目名稱

DETAIL DESIGN

A3

A/S@A3 2013.07.22

100mmX100mmTrunking

Riser

FB Fiber CableD Data cable

T/A To Above

T/B To Below

Legend:

25mm G.I.Conduit

20mm G.I.Conduit

75X75Junction Box

DATA OUTLET

TELPHONE OUTLET

ACCESS POINT OUTLET

139-SCS-402

200mmX200mmTrunking

NOTE: RED FONTPTB-Departure-RMXXXX-APXXXAP NAME

Patricks
Text Box
Patricks
Polygon
Patricks
Polygon
Patricks
Polygon
Page 10: Project: MIA - Supply and Installation of IP CCTV System (RFQ … · 2016. 7. 29. · 1/2 Project: MIA - Supply and Installation of IP CCTV System (RFQ-222) Subject: Tender Clarification

MEZZANINE LEVEL

設計

校對

審核

審定

專業負責人

工程負責人

設計編號

版 次

圖紙名稱

圖號

日期比例

2

階段

工程名稱

項目名稱

DETAIL DESIGN

A3

A/S@A3 2013.07.22

100mmX100mm Trunking

Riser

FB Fiber CableD Data cable

T/A To Above

T/B To Below

Legend:

25mm G.I. Conduit

20mm G.I. Conduit

75X75 Junction Box

DATA OUTLET

TELPHONE OUTLET

ACCESS POINT OUTLET

139-SCS-403

×10

×52

×52NOTE: RED FONT

PTB-Mezzanine-RMXXXX-APXXXAP NAME

Patricks
Text Box
Patricks
Polygon
Patricks
Polygon
Patricks
Polygon