110 PIEDMONT AVE, DURHAM NC 27707 NEW HOME CONSTRUCTION PROJECT MANUAL OWNER: DURHAM COMMUNITEE LAND TRUSTEES 1208 W. Chapel Hill Street Durham, NC 27701 Contact: Karl Hammond, Project Manager – 919-490-0063 ARCHITECT: JODY BROWN ARCHITECTURE, pllc. 2532 Wrightwood Avenue Durham, NC 27705 www,jodybrownarchitecture.com Contact: Jody Brown, Architect – 919-624-6007 1

Upload: lyminh

Post on 03-Aug-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

110 PIEDMONT AVE, DURHAM NC 27707 NEW HOME CONSTRUCTION

PROJECT MANUAL

OWNER: DURHAM COMMUNITEE LAND TRUSTEES 1208 W. Chapel Hill Street Durham, NC 27701 Contact: Karl Hammond, Project Manager – 919-490-0063

ARCHITECT: JODY BROWN ARCHITECTURE, pllc. 2532 Wrightwood Avenue Durham, NC 27705 www,jodybrownarchitecture.com Contact: Jody Brown, Architect – 919-624-6007

1

Page 2: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

TABLE OF CONTENTS:

Pg 3-4 ADVERTISEMENT FOR BIDS

Pg 5-6 BIDDING INSTRUCTIONS

Pg 7-9 BID FORM

Pg 10-11 EO/EA CONSTRUCTION MANUAL

Pg 12-13 STATEMENT NONCOLLUSION AFFIDAVIT

Pg 14-18 SAFETY QUESTIONAIRE

Pg 19-20 UBE GOALS MEMO

Pg 21-37 APPENDIX A CITY OF DURHAM EQUAL BUSINESS OPPORTUNITY PROGRAM – CONSTRUCTION FORMS

Pg 38-45 APPENDIX B SLBE BUILDING CONTRACTORS & UBE LISTING SUB-CONTRACTORS

Pg 46-50 PROJECT SPECIFICATIONS

2

Page 3: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

ADVERTISEMENT FOR BIDS

3

Page 4: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

ADVERTISEMENT FOR BID

110 East Piedmont Avenue, Durham, NC Single Family Construction Project

Durham Community Land Trustees, Inc. (DCLT) will open sealed formal bids submitted by qualified bidders at 2:00 PM, local time, on Tuesday, June 27, 2017, at the office of Durham Community Land Trustees, Inc. located at 1208 W. Chapel Hill Street, Durham, NC 27701 (“DCLT office”). The project involves the construction of a new 3 bedroom, 2 bath, wood frame house located at 110 East Piedmont Avenue, Durham, NC 27707, with a concrete driveway. DCLT will conduct a Pre-Bid conference at 1:00 PM Monday, June 12, 2017, at the DCLT office. Beginning immediately, plans and specifications will be open for inspection in the office of Durham Community Land Trustees, Inc. on Monday – Friday, 10:00 AM – 4:00 PM except holidays or can be downloaded from the following website of Jody Brown, Architect at:

http://www.jodybrownarchitecture.com/piedmont-bid-documents

Plans also can be viewed at The North Carolina Institute of Minority Economic Development, 114 West Parrish Street, 6th Floor, Durham, NC 27701 (919-956-8889) and the Department of Equal Opportunity and Equity Assurance (EO/EA), Annex, 101 City Hall Plaza, Durham, NC, 919-560-4180 ext. 17241. The City of Durham Equal Business Opportunity Program- Construction Forms and additional information are available in Appendix A of this Project Manual.

NOTE: Form E-101 MUST be submitted with the sealed bid. A list of pre-qualified minority and women general contractors and subcontractors are available in Appendix B of this Project Manual. Both are also available from the EO/EA web site at: http://durhamnc.gov/606/Equal-Opportunity-Equity-Assurance . The established goals of this project are 11% minority participation and 7% for women participation.

Each bidder must show evidence that it is licensed under Chapter 87 of the General Statutes of North Carolina. The bids will be evaluated and contracts awarded in accordance with law, including the City of Durham’s Small Disadvantaged Business Enterprise Program. All bids must include a non-collusion affidavit.

Durham Community Land Trustees, Inc. reserves the right to reject any or all bids, to waive any and all informalities, and to disregard all nonconforming or conditional bids or counter bids, and to accept the bid that will be in the best interest of the DCLT, the City of Durham and the residents of the Southside community.

Eligible Section 3 businesses as defined in the Housing and Urban Development Act of 1968, as amended are encouraged to apply. Any questions regarding this project can be directed to the project manager (Karl Hammond 919-490-0063) and/or architect (Jody Brown 919-624-6007).

Notice Under the Americans with Disabilities Act A person with a disability may receive an auxiliary aid or service to effectively participate in City government activities by contacting the ADA Coordinator, voice 919-560-4197, fax 919-560-4196, TTY 919-560-1200, or [email protected], as soon as possible but no later than 48 hours before the event or deadline date.

Page 5: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

BIDDING INSTRUCTIONS

5

Page 6: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Durham Community Land Trustees, Inc. 110 East Piedmont Avenue New Construction Project Bidding Instructions

Bid packages are available online at http://www.jodybrownarchitecture.com/piedmont-bid-documents and hardcopies are available at the office of the Durham Community Land Trustees, 1208 West Chapel Hill Street, Durham, NC - Phone 919-490-0063, the office of the NC Institute of Minority Economic Development (NCIMED), 114 West Parrish Street, Durham, NC - Phone 919-956-8889 and the state office for Historically Underutilized Businesses (HUB), 116 W. Jones Street, Suite 4109, Raleigh, N.C. – 919-807-2330.

All bidders shall have a current North Carolina Building Contractors License, a copy of which should be included with the Bid Form submittal. The name on the Bid Form must be the same as the name on the license. Submittals should include a Schedule of Values indicating the break- down of costs among the various divisions of the construction work.

All bidders shall have in force at the time a contract is signed, General liability insurance in the amount of one million dollars ($1,000,000.00) per occurrence, Builders risk insurance in an amount sufficient to cover the entire completed project, Workers Compensation Insurance on all employees, and Automobile insurance on all company vehicles.

The City of Durham Equal Business Opportunity Program- Construction Forms and answers to additional questions are available in Appendix A and a list of pre-qualified minority and women general contractors and subcontractors are available in Appendix B of the Project Manual and available from the EO/EA web site at http://durhamnc.gov/606/Equal-Opportunity-Equity-Assurance . The established goals of this project are 11% Minority Underutilized Business Enterprise (MUBE) participation and 7% for Women's Underutilized Business Enterprise (WUBE) participation.

A Pre-Bid Conference will be held at 1:00 PM on Monday, June 12 in the office of the Durham Community Land Trustees at 1208 W. Chapel Hill St., Durham, NC 27701.

Sealed bids are due by and will be opened at 2:00 PM, local time, on Tuesday, June 27, 2017 in the office of the Durham Community Land Trustees at 1208 W. Chapel Hill St., Durham, NC 27701.

The following information MUST be included in the sealed Bid packet: Bid Form – Fully signed, dated, and witnessed. A Non-Collusion Affidavit Bidder's Safety Questionnaire Form E-101 – UBE Participation on Base Bid - See Appendix A A current North Carolina Building Contractors License. A Schedule of Values for each housing unit.

All bidders will be notified of the bid tally. We expect to accept the lowest responsible bid, DCLT reserves the right to reject a bid without cause. A winning bid(s) will be selected and the winning bidder(s) will be asked to submit references and negotiate a contract for the work within three weeks. We are hopeful that the work could begin during the month of July 2017. All questions should be addressed to Karl Hammond, Project Manager at 919-490-0063, or Jody Brown, Architect, 919-624-6007.

6

Page 7: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

BID FORM

7

Page 8: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Durham Community Land Trustees, Inc. 110 East Piedmont Avenue New Construction Project

BID FORM

Sealed Bid Opening: Tuesday June 27, 2017 at 2:00 p.m.

1. I, the undersigned, have inspected the above referenced properties and have familiarized myself withthe plans and specifications with attachments. I am also familiar with the UBE requirements of theproject, and understand the character and scope of the work to be performed.

2. I propose to furnish all labor, materials, equipment, supervision and permits necessary to complete theconstruction of 110 E. Piedmont Avenue according to the specifications and prevailing professionalstandards for the sum of:

TOTAL Dollars. $ .00

3. I have included a copy of my NC General Contractors License, Form E-101, a Non- CollusionAffidavit, a Bidder's Safety Questionnaire and a Schedule of Values indicating the various costs ofconstruction.

4. If I am offered the contract for this project, I am available to begin work on , and would expect to complete the project within calendar days.

5. I propose to employ the following subcontractors on this project:

HVAC

Plumbing

Electrical

6. I will honor the above bid amount for a period of 30 days. If a contract is not executed before that time,I may, at my discretion, decline the contract or propose a re-negotiation of the contract amount.

7. By signing below, I certify that I have not colluded with or conspired with any other person or firmregarding the submission of this bid.

Principal or Owner: ____________________________________ Date: _____________

Company: Telephone:______________

Address:_________________________________________________________________

Witnessed By: ____________________________________________________________

Page 9: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Durham Community Land Trustees, Inc. 110 East Piedmont Avenue New Construction Project

Schedule of Values

Description Cost Comments

Site Work

Foundation

Framing

Roof

Siding

Gutters

Windows

Exterior Doors

Painting

Plumbing

Electrical

HVAC

Insulation

Drywall

Interior Trim

Cabinets

Floors

Landscaping

Driveway

Total Cost

Page 10: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

EO/EA CONSTRUCTION MANUAL STATEMENT

10

Page 11: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

REVISED EO/EA CONSTRUCTION PROJECT MANUAL STATEMENT It is the policy of the City to provide equal opportunities for City contracting to underutilized businesses owned by minorities and women doing business in the City’s Contracting Marketplace. It is further the policy of the City to prohibit discrimination against any firm in pursuit of these opportunities, to conduct its contracting activities so as to prevent such discrimination, to correct the present effects of past discrimination and to resolve complaints of discrimination. This policy applies to construction contracting. The City’s Department of Equal Opportunity / Equity Assurance Department has reviewed this proposed project and established Underutilized Business Enterprise (UBE) participation goals: Minority Business Enterprise (MUBE)-11% and Woman Business Enterprise (WUBE)-7%. A listing of firms from the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T. and the SBA 8(a) Program to meet the participation requirements.

1. The bids will be evaluated and the contract awarded in accordance with statutory publiccontract requirements and as supplemented by the City of Durham’s Equal BusinessOpportunity Program Construction Forms included with this bid. The following formsare mandatory and must be filled out and returned with the bid proposal.

A. Bid FormsB. Non-Collusion AffidavitC. Bidder Safety Evaluation QuestionnaireD. *** BID BOND IF applicable****E. Equal Business Opportunity Program Construction Forms

1. Forms E-101(UBE Participation On Base Bid) and/or E-102(UBE ParticipationOn Bid Alternate)

2. Employee Breakdown.

Any bids submitted without these completed forms may be deemed as “non-responsive”. If there are any questions or problems in filling out the SDBE forms, please contact:

City of Durham Equal Opportunity/Equity Assurance Department

(919) 560-4180

11

Page 12: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

NONCOLLUSION AFFIDAVIT

12

Page 13: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

NON-COLLUSION AFFIDAVIT OF BIDDER

State of County of , being first duly sworn, deposes and says that:

1. He is of , the Bidder that has submitted the attached Bid;

2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinentcircumstances respecting such Bid;

3. Such Bid is genuine and is not a collusive or sham Bid;

4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees orparties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly orindirectly with any other Bidder, firm or person to submit a collusive or sham Bid in connection with theContract for which the attached Bid has been submitted or to refrain from Bidding in connection with suchContract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication orconference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any otherBidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any other Bidder, or tosecure through any collusion, conspiracy connivance or unlawful agreement any advantage against the

(Local Public Agency) or any person interested in the proposed Contract; and

5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion,conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives,owners, employees, or parties in interest, including this affiant.

(Signed)

Title Subscribed and sworn to before me this

day of ,

Title My Commission Expires

13

Page 14: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

SAFETY QUESTIONAIRRE

14

Page 15: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

City of Durham Finance Policy 603

Bidder Safety Record Review Form

A. Bidder Safety Qualifications

The following safety information shall be requested of all contractors submitting bids to the City as part of the solicitation and advertising for construction and repair work with the City when the total construction and repair contract amount is expected to equal or exceed the minimum contract amount requiring compliance with State bidding laws.

The City requires that all bidders provide the following information regarding their safety history: 1. OSHA DART Incident Rate

Provide the bidder’s DART Incident Rate calculated from OSHA’s Form 300A for thelast three years and the other required information in the table below. The bidder mustattach all supporting documentation and calculations including certified OSHA forms.

2. Experience Modification Rate (EMR)

Provide the Bidder’s most recent Experience Modification Rate (EMR) based on insurance claims history. The bidder must provide the source of the EMR information and contact information of insurer entity providing the EMR.

3. Answer the following OSHA Specific Questions:(a) Within the last 2 years, has the bidder received any citations classified by OSHAas being (1) serious, (2) willful and/or (3) repeat violations where your companyoperates?

Yes _____ No ________ If yes, attach a copy of each such citation and violation.

(b) Has the Bidder experienced any work-related fatalities within the last five years?

Yes ______ No ______

15

Page 16: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

(c) Has the Bidder had any citations issued by OSHA as a result of work relatedfatalities within the past 5 years?

Yes ______ No ______

(d) Is the Bidder under investigation for any work-related fatalities?

Yes ______ No ______

(e) If your answer is “yes” to 3(b), (c) or (d), please provide a copy of the citation(s),list of number(s) of fatalities and documented explanation of the fatality.

4. Safety Plan:(a). Does the company have a written safety program that includes responsibility for all aspects of safety management?

Yes ______ No ______

(b) Does the company have a written plan for safety training of new employees andongoing training of existing employees?

Yes_________ No _______

(c) Does the company have documented evidence of safety training that they haveconducted?

Yes_________ No _______

(d) If the company has employees with limited English ability, does the companyhave a written plan for ensuring that their employees understand the training they arebeing given?

Yes_________ No _______

(e) Do all supervisors have an appropriate documented level of OSHA training (e.g., aminimum of 30 hour OSHA construction safety training)?

Yes_________ No _______

(f) Do employees have documented basic OSHA 10 hour construction safety training?

Yes_________ No _______

(g) Does the company have a documented Hazard Communication Program?

Yes_________ No _______

16

Page 17: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

5. Required Written Explanation of Safety RecordIf the bidder has any of the following:

(a) DART Incident Rate greater than its industry average,(b) an EMR greater than 1.0,(c) answered “yes” to any of the OSHA Specific Question above, or(d) answered “no” to any of the Safety Plan questions, the bidder shall provide the City,in its bid, a detailed written explanation of its safety record and the reasons why suchsafety history is NOT representative of its future performance and what specific actions ithas taken to improve its overall safety record. Failure to provide a written explanation ofits safety record pursuant to this paragraph may be deemed as non-responsive by theCity.

B. Evaluation of Safety Information

1. No Further Evaluation is required of the lowest bidder if the following responses are provided:(a) Bidder has a 3-year average DART Incident Rate equal to or better than the industryaverage;(b) Bidder has an EMR rating equal to or less than 1.0;(c) Bidder response is “no” for all OSHA Specific Questions; and(d) Bidder answers “yes” to all of the Safety Plan questions.

2. If any of the following applies to the lowest bidder:(a) it has a 3-year average DART Incident Rate worse than the industry average;(b) an EMR greater than 1.0;(c) the bidder responds “yes” to any or all of the OSHA Specific Questions, or,(d) the bidder response “no” to any or all of the Safety Plan questions,

then the bidder’s documentation shall be referred to the City’s Risk Management Division together with the bidder’s written explanation of its safety record. If, after reviewing the bidder’s documentation, the City’s Risk Management Division and the department issuing the bid believes the lowest bidder’s safety record is sufficiently poor such that it is reflective of the bidder’s overall performance and quality of work, the bid shall be considered non-responsive and staff shall recommend rejection of the bid to the City Manager or City Council as appropriate according to their contract approval and award authority. If, however, after reviewing the bidder’s documentation, the City’s Risk Management Division and the department issuing the bid believes the past safety record of the lowest bidder is not representative of the work that it can perform and/or it would be in the best interest of the City to enter into such contract, staff shall recommend award of the contract by either the City Manager or City Council as appropriate according to their contract approval and award authority.

17

Page 18: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

THIS PAGE INTENTIONALLY LEFT BLANK

18

Page 19: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

UBE GOALS MEMO

19

Page 20: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

20

Page 21: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

APPENDIX A CITY OF DURHAM EQUAL BUSINESS

OPPORTUNITY PROGRAM – CONSTRUCTION FORMS

21

Page 22: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

CITY OF DURHAM

EQUAL BUSINESS

OPPORTUNITYPROGRAM

CONSTRUCTION FORMS

Revised 3/2016

*

Phone: 919-560-4180

Facsimile: 919-560-4513

Street Address:

101 City Hall Plaza (Annex)

Durham, North Carolina 27701

22

Page 23: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

INSTRUCTIONS ON UBE REQUIREMENTS

FOR USE IN BIDDING ON CONSTRUCTION PROJECTS WITH THE CITY OF DURHAM

These instructions summarize the provisions of the City of Durham’s Equal Business Opportunity Ordinance as it applies to the bid process. Of course, as with any summary, it cannot reflect all of the ordinance.

QUESTIONS AND ANSWERS ON UBE REQUIREMENTS

1. What is the purpose of the City’s Equal Business Opportunity (EBO) program? The City Managerhas set UBE goals for certain contract classifications. There will be a goal for UBEs owned by minoritiesand a goal for UBEs owned by women. For the bid to be fully considered by the City, the bid needs tomeet the established goals or the bidder needs to have made good-faith efforts to subcontract withUBEs in order to meet the goals. In order to be given credit for making those good-faith efforts, thebidder must provide written documentation of those good-faith efforts. That written documentation mustbe submitted to the City within 2 days after the bid opening unless a different time is stated by the City.See the instructions below regarding Form E-107.

2. What is an ―UBE‖? It means an Underutilized Business Enterprise. An UBE is a business, certifiedby the N. C. Department of Administration HUB Office, N.C. Department of Transportation or theU.S. Small Business Administration Section 8(a) Business Development Program as a minority orwomen business enterprise. The qualifying UBE needs to have its certification from one of theabove named entities before the bid opening if it is to count toward meeting the goals. Failure toprovide evidence of UBE status may disqualify the firm’s participation for the purpose of meeting

UBE goals

For purposes of this document and associated forms, any reference to an “UBE,” or similar reference shall

include reference to a qualified women or minority owned firm certified and approved in accordance with the above paragraphs.

3. What UBE forms must a bidder or contractor turn in to the City, and when?

Name or description of form Necessary to submit this form? When to submit it?

E-101 (UBE PARTICIPATIONON BASE BID)

Always With the bid

E-102 (UBE PARTICIPATIONON BID ALTERNATE)

Yes, if there are alternates. Use a separate form for each alternate.

With the bid

E-103 reserved for future use) n/a n/a

E-104 (EMPLOYEEBREAKDOWN)

Yes or a EEO-1 form if large enough to report employment statistics to the federal government.

With the bid

23

Page 24: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

UBE forms continued

E-105 (STATEMENT OFINTENT TO PERFORM ASSUBCONTRACTOR)

Yes, if the bidder proposes to count any subcontracts with UBEs towards the UBE goals

Within 5 days after bid opening unless a different time is stated by the City.

E-106 (REQUEST TO CHANGEUBE PARTICIPATION AFTERBID OPENING)

Yes, if the bidder or contractor proposes certain changes in its subcontracting

Not with the bid. Once the bidder is identified as the apparent lowest responsible bidder, this form is due before the bidder/contractor can make the proposed change.

E-107 (QUESTIONNAIRE ONBIDDER’S GOOD-FAITHEFFORTS)

Yes, if the bidder fails to meet the UBE goals. Do not turn in if the bidder met the goals.

Within 2 days after bid opening unless a different time is stated by the City

Good-faith documentation Yes, if the bidder failed to meet the UBE goals.

Within 2 days after bid opening unless a different time is stated by the City

24

Page 25: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

4. If a bidder fails to meet the UBE goals, can it still be awarded the contract? Bidders that do notmeet the goals but demonstrate good-faith efforts are treated equally to those that meet the goals.Awarding a contract is ultimately the decision of the City Council, which considers compliance with theEBO ordinance along with other matters.

5. In making good-faith efforts, what UBEs should a potential bidder contact? The City provides alist of UBEs that have been certified by the N. C. Department of Administration HUB Office, as aminority or women business enterprise for particular trades, services, goods, etc. Potential biddersshould contact UBEs listed for the work that can be subcontracted.

6. Our firm already has employees who can do the work and does not want to subcontract that

work. How does this fit in? The purpose of the EBO ordinance is to change business practices thatwould otherwise occur, by giving opportunities to under-used segments of the economy. If the bidderdoes not meet the goals, its good-faith efforts will be examined as with any other bidder that did not meetthe goals.

7. If the bidder contacts an underutilized business enterprise owned by a minority or woman that

could become a UBE, will that count toward good-faith efforts? This contact will not count unless thefirm that you contact is certified by the N. C. Department of Administration HUB Office, N.C. Departmentof Transportation or the U.S. Small Business Administration Section (a) Business Development Programas a minority or women business enterprise before the bids are opened. In making good-faith efforts, letus suppose that a potential bidder contacts firms that could qualify to be UBEs. If those firms have theircertification from the previously identified authorities at the time of the bid opening, those contacts willcount towards good-faith efforts. But there is a risk, because getting certification takes time.

8. Do all subcontracts with UBEs count? The City will count as UBE participation only expenditures to anUBE that performs a commercially-useful function in the relevant work. An UBE performs such a functionwhen the minority or women business owners themselves are actually involved in performing, managing,and supervising a distinct element of the work. To determine whether those requirements are met, theCity takes into account the amount of work subcontracted, industry practices, the adequacy of theresources of the UBE for the work, the qualifications, such as possession of licenses, permits, andprofessional designations of the minority and women owners, and other relevant factors. For example, ifan UBE lacks substantially all of the resources equipment and personnel to do the work it shall bepresumed not to perform a commercially-useful function. The EBO ordinance includes more points toconsider on this issue.

9. May an UBE enter into subcontracts? This question arises in two situations: (1) the bidder is anUBE and (2) the bidder is subcontracting with an UBE. Consistent with normal industry practices, anUBE may enter into subcontracts. If an UBE subcontracts a significantly greater portion of the work ofthe contract than would be expected on the basis of normal industry practices, the UBE shall bepresumed not to be performing a commercially-useful function. The UBE may present evidence torebut this presumption to the City.

10. What does it mean to say that information must be submitted ―with the bid‖? Unless bidders aregiven other written instructions from the City, it means that the information must be in a sealed envelope,delivered to the same place where a bid can be delivered, and before the time set for the bid opening.Unless bidders are given other written instructions from the City, the information can be either in thesame envelope as the bid or in a separate envelope. If it is a separate envelope, the outside of theenvelope must state the same information that is required on the bid envelope, and that it contains UBE

forms.

25

Page 26: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

11. When the chart in question 3 says that a form can be submitted 2 days or 5 days after the bid

opening, exactly when is it due? Where is it to be submitted?

. The form must be submitted to the City’s EOEA Department, located at 101 City Hall Annex or faxed/emailed to (919) 560-4513, so that it is received within 2 days or 5 days (whichever applies according to the chart) after the bid opening. If the form is faxed/emailed, it must be received before midnight on that 2nd or 5th day. If it is delivered by any other means, it must be received before 5:00 PM. In counting these 2 days or 5 days, exclude the following: the day of the bid opening, Saturday, Sunday, and holidays observed by city government of the City of Durham. For instance, for a form due in 2 days, if the bid opening is on a Thursday, the due date for the form would be on the following Monday (midnight if faxed, otherwise 5:00 PM). If the day after the bid opening or that Monday is a City holiday, the form would be due on Tuesday. For a form due in 5 days, if the bid opening were on Tuesday, the due date for the form would be on the following Tuesday (midnight if faxed, otherwise 5:00 PM). If any weekday between those Tuesdays is a City holiday or if the Tuesday on which the form would be due is a City holiday, the form would be due on Wednesday. It is best to place the documents inside an envelope, and to write on the outside of the envelope the same information that is required on the bid envelope, and that it contains UBE forms. Holidays observed by city government are New Years' Day, Dr. Martin Luther King, Jr., Day; Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the day after Thanksgiving Day, Christmas Day; two days (varying from year to year) during the week of Christmas Day; and other times as may be authorized by City Council.

12. When there are bid alternates how is UBE participation counted? The total amount of the awardactually made by the City is the key. For instance, assume the following made-up example:

Base bid is $200,000Alternate A bid is $50,000Alternate B bid is $22,000Minority-owned UBE goal is 11%.

The bidder proposes Minority-owned UBE participation as follows: $22,000 on the base bid, $4,000 onAlternate A, and $10,000 on Alternate B.

In this fictional example, the bidder may or may not meet the goal, depending on the actual award by Council. This chart illustrates:

26

Page 27: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

A W A R D B Y C I T Y C O U N C I L

Only the base bid

Base bid + Alternate A Base bid + Alternate B Base bid + Alternates A & B

Bid total $200,000 $250,000 (200,000 + 50,000)

$220,000 (200,000 + 20,000)

$270,000 (200,000 + 70,000)

Total UBE participation

$22,000 $26,000 (22,000 + 4,000)

$32,000 (22,000 + 10,000)

$36,000 (22,000 + 14,000)

Minority‐owned UBE

percentage

11% 10.4% 14.5% 13.3%

Meet 11%

Minority‐ owned UBEgoal?

Yes No Yes Yes

14. How is the lease of equipment by an UBE counted? If the UBE leases equipment for the work of thecontract, the value of the lease payments is included as part of the UBE’s participation. However, it is notproper to include such lease payments if they are to be made to the prime contractor or the primecontractor’s “Affiliate.” To understand what an “Affiliate” is, see section 26‐3 of the EBO ordinance.

15. How is the purchase of goods from an UBE counted? If the bidder is buying goods from an UBE, thecost of the goods can be considered UBE participation only if (a) the UBE operates or maintains a factorythat produces the goods, or (b) the UBE has an establishment where the goods of the general characterdescribed by the specifications or required under the Contract are regularly sold or leased to the public inthe usual course of business. If (b) applies, the UBE’s principal business must be selling or leasing thosegoods and the UBE must operate under its own name

INSTRUCTIONS FOR INDIVIDUAL UBE BID FORMS FOR CONSTRUCTION

Form E-101 (UBE PARTICIPATION) On this form, “participation” is the dollar amount of subcontracts for

significant goods and services to be used to perform the contract. For instance, if the bidder would enter into subcontract with UBEs for a total of $30,000, that would be the UBE participation amount. The sum of UBE participation and non-UDBE participation should equal the amount of the bid. Form E-101 is required for the base bid

Form E-102 (UBE PARTICIPATION ON BID ALTERNATE) This form is essentially the same as Form E-101, except that it is used for the alternate bids instead of the base bid. Use a separate Form E-102 for each alternate bid.

Form E-103 reserved for future use

27

Page 28: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Form E-104 (EMPLOYEE BREAKDOWN) Complete Part A for the primary location where the goods and services that are the subject of the bid are to be made or provided. If the parent company or other locations of the bidder are providing any substantial portion of the goods or services, then the bidder must also complete Part B, for the consolidated company. If the bidder has an EEO-1 Report that provides the same information as required on the Form E-104, the EEO-1 Report may be used instead. On whether to submit Form E-104, see question 3 above. See questions 3 and 11 above on when and where to turn in this form.

Form E-105 (STATEMENT OF INTENT TO PERFORM AS SUBCONTRACTOR) The bidder must provide a Form E-105 (Statement of Intent) for each UBE firm that the bidder would subcontract with if the City awards the contract to the bidder. See questions 3 and 11 above on when and where to turn in this form.

On Form E-105, what happens if column 2 (dollar amount) disagrees with column 3 (percentage)? If there is a conflict between the dollar amount in Column 2 and the percentage of base bid in Column 3, the percentage stated in Column 3 will control. For instance, if Column 2 if $10,000, Column 3 is 10%, and the base bid is $200,000, there is an error, because ten percent of $200,000 is $20,000, not $10,000. In that example, the form will be read as a commitment for $20,000. If the UBE both (i) is doubtful of its arithmetic and (ii) wants Column 2 to control in case of disagreement, it may say that Column 2 will control over Column 3, but to do so, it must write that on Form E-105.

E-106 (REQUEST TO CHANGE UBE PARTICIPATION AFTER BID OPENING) When is thisform used? Beginning with the time that the City Manager identifies a bidder as the apparent lowest responsible bidder and continuing as that bidder is awarded the contract and continuing until that bidder/contractor reaches the point of final completion of the work, Form E-106 is to be used when the following occurs: If the bidder/contractor proposes to do any of the following ;

to replace a subcontractor, to perform subcontracted work with the bidder/contractor’s own forces, to increase the quantity of subcontracted work, to decrease the quantity of subcontracted work, or to change the allocation of work among subcontractors,

then the bidder/contractor must make good-faith efforts to attain the goals that it has shown on the E-101 and applicable E-102 forms, and the bidder/contractor must fill out Form E-106. Substitutions of subcontractors in these circumstances, both before and after the awarding of a contract, are subject to City approval. Consult the City’s EO/EA Department on the procedures to follow in order to comply with City Code 26- 10(c).

E-106 (QUESTIONNAIRE ON BIDDER’S GOOD-FAITH EFFORTS) Bidders that do not attain the UBE goalshave the responsibility to make good-faith efforts and to demonstrate to the City that they have made suchefforts. In determining a bidder’s good-faith efforts to engage UBEs, the City Manager shall consider theinformation supplied by the bidder to answer the questions in Form E-107, along with other criteria that theCity Manager deems proper. Form E-107 is an optional tool that bidders may use to show that they havemade good-faith efforts. See questions 3 and 11 above on when and where to turn in this form. Even whenthis form may be submitted after the bid opening, it cannot include information on efforts made after the bidopening. Even if a bidder does not use Form E-107, the City will nevertheless attempt to answer the questionson the E-107 using good-faith documentation supplied by the bidder. Bidders who do not turn in Form E-107will still find it helpful to know how the City will determine whether good-faith efforts have been made.

28

Page 29: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

For Section 2 of Form E-107 -- To make the best good-faith efforts as described under Section 2 on E-107, your firm should have sent a written letter, email, phone call or fax to all UBEs on the City’s list that perform

the kind of work to be subcontracted. Your firm needs to keep a record of all of these attempts to reach UBEs. That letter would say, in effect, as follows: (Of course, your firm would need to write appropriate words where italicized instructions are used below.)

Our firm is interested in bidding on a contract with the City of Durham for [describe the project]. We are interested in subcontracting, to your firm, the following work [describe specific work, for example,

painting of interiors of 5 rooms, including prep work; or supplying 20 circuit breakers of type XJE‐R or

equivalent]. You may inspect the applicable plans and specifications and descriptions of items to be purchased at our office located at the address shown above, or at the City of Durham’s EO/EA

Department, 101 City Hall Plaza Annex , Durham, N.C., 27701 , 919‐560‐ 4180[, or at the AGC plan

room in (specify the locations)]. You may obtain a copy [explain how and from whom (the City,

architect, engineer, etc.) the potential subs can obtain a copy].

If applicable, tell the UBEs at which offices of the AGC the plans and specifications may be seen, possibly from the following AGC list.

1100 Euclid Avenue Charlotte, NC 28203-1868 Phone: (704)372-1450

Caswell Bldg., Glenwood Place 3700 National Drive, Ste. 201 Raleigh, NC 27612 Phone: (919)781-3270

2713 Breezewood Avenue Fayetteville, NC 28303 Phone: (910)484-0184

2527 S. 17th St. Wilmington, NC 28401 (McGee CADD Reprographics Bldg.) Phone: (910)791-5533

Other AGC locations if they have the plans and specifications

GOOD-FAITH DOCUMENTATION. This is not a City form but is documentation to be supplied by the bidder. See the instructions on Form E-107 above. Unless the bidder meets the UBE goals, the bidder must demonstrate that it made good-faith efforts. To do so, it can use a combination of providing answers to Form E-107 and documentation, such as copies of the notices to UBEs that are described in question 1(c) on FormE-107. See questions 3 and 11 above on when and where to turn in this form. Even when this documentationmay be submitted after the bid opening, it cannot include information on efforts made after the bid opening.

29

Page 30: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Form E‐101 UBE PARTICIPATION ON BASE BID

Name of Bidder:

Total dollar amount of UBE participation in base bid work:

or each row, check one column: E or F

Column A Column B Column C Column D Column E Column FName of proposed subcontractor for base bid work

Goods and services to be provided for base bid work

Subcontract amount, in dollars, for base bid work

Percentage of total base bid (Column C divided by total base bid)

Minority-owned UBE

Women- owned UBE

$ %

$ %

$ %

$ %

Attach extra sheets as needed.

Do the above participation amounts meet the goals on this contract, assuming only the base bid is counted?

Yes No. If the answer is No: (1) the bidder must have made good-faith efforts; (2) the bidder must provide, within 2 business days after bid opening, documentation of good-faith efforts; and (3) the bidder must sign below.

As an authorized representative of the Bidder, I swear or affirm under penalty of fraud that the good-faith efforts documentation submitted with this bid, pertaining to the base bid and all alternates, if any, is correct and not intended to defraud or mislead. After the contract between the City and the Bidder is signed, except to the extent that the City gives prior written approval for changes, the Contractor agrees that it shall engage the subcontractors listed on this E-101 and on all applicable E-102 forms, to perform the work for the dollar amounts or percentages described on this E-101 and applicable E-102s.

Signature of Individual authorized to sign for Bidder

30

Page 31: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Form E­102 UBE PARTICIPATION ON BID ALTERNATE

This form pertains to the following bid alternate: (Speciify the alternate, in the way that it is designated in the bid docments)

Name of Bidder:

Total dollar amount of UBE participation in work on this alternate:

For each row, check one column: E or FColumn A Column B Column C Column D Column E Column FName of proposed subcontractor for this alternate

Goods and services to be provided for this alternate

Subcontract amount, in dollars, for this alternate

Percentage of total bid for this alternate (Column C divided by total bid for this alternate)

Minority- owned UBE

Women- owned SDBE

$ %

$ %

$ %

$ %

Attach extra sheets as needed.

31

Page 32: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

E-104 EMPLOYEE BREAKDOWN

Part A – Employee statistics for the primary location

M——a——l——e——s F——e——m——a——l——e——s Employment

category

Total

Employees

Total

males

Total

females

White Black Hispanic Asian or

Pacific

Islander

Indian or

Alaskan

Native

White Black Hispanic Asian or

Pacific

Islander

Indian

or

Alaskan

Native

Project

Manager

Professional

Technical

Clerical

Labor

Totals

Part B – Employee statistics for the consolidated company. (See

instructions for this form on whether this part is required.)

M——a——l——e——s F——e——m——a——l——e——s Employment

category

Total

Employees

Total

males

Total

females

White Black Hispanic Asian or

Pacific

Islander

Indian or

Alaskan

Native

White Black Hispanic Asian or

Pacific

Islander

Indian

or

Alaskan

Native

Project

Manager

Professional

Technical

Clerical

Labor

Totals

32

Page 33: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Form E‐105 STATEMENT OF INTENT TO PERFORM AS SUBCONTRACTOR

Name of Bidder:

Name of Project:

The undersigned firm meets the City of Durham’s criteria as a UBE.

The undersigned UBE represents that it will enter into a formal contract with the Bidder to perform the following work in connection with the Project, in the dollar amount or percentage listed below, if the Bidder signs a contract with the City of Durham for the Project.

Describe the work in sufficient detail so that it can be determined whether the UBE’s work is a substantial and necessary part of the Project. Column 1 - description of work to be done by undersigned UBE

Column 2 -dollar amount of the proposed subcontract between the bidder and the undersigned UBE

Column 3 - percentage of Bidder’s base bid represented

by the proposed subcontract between the Bidder and the undersigned UBE

The undersigned -UBE will be ready to begin work on the subcontract on the following date:

Name of UBE: Telephone No. Fax No.

Address: Zip Code: Signature of authorized representative of UBE

Title of the person who signed above:

What persons with the UBE should the City contact with questions about this form or the proposed subcontract?

Name of individual: Telephone No.

Title of Individual:

Email address:

By submitting this form to the City of Durham, the Bidder represents that if the Bidder signs the contract with the City of Durham for the Project, the Bidder will enter into the subcontract described above with this UBE.

33

Page 34: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

E-106 REQUEST TO CHANGE UBE PARTICIPATION AFTER BID OPENING

Project:

Name of bidder or contractor:

Name and title of representative of bidder or contractor:

Address : Zip Code:

Telephone No.: Fax Number:

Email address:

Total amount of original contract, before any change orders or amendments:

Total amount of the contract, including all approved change orders and amendments to date, but not counting the changes proposed in this form:

Dollar amount of changes proposed in this form:

The proposed change (check one) increases decreases the dollar amount of the bidder’s/contractor’s

contract with the City.

Does the proposed change decrease the UBE participation? (check one) yes no

If the answer is yes, complete the following:

This form is used only if the conditions described in the instructions are present.

BOX A

For the subcontract proposed to be changed (increased, reduced, or eliminated): Name of subcontractor:

Goods and services to be provided before the proposed change:

Is it proposed to eliminate this subcontract? yes no

If the subcontract is to be increased or reduced, describe the nature of the change (such as adding $5,000 in concrete work and deleting $7,000 in grading):

Dollar amount of this subcontract before this proposed change:

Dollar amount of this subcontract after this proposed change:

This subcontractor is (check one): -owned UBE-Owned UBE

34

Page 35: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

BOX B. Proposed subcontracts other than the subcontract described in Box A above (continued)

Name of sub-contractor for the new work:

Goods and Services to be provided by this proposed subcontractor:

Dollar amount proposed of this proposed subcontract: This sub-contractor is:

-owned UBE

-Owned UBE

Add additional sheets as necessary.

This form is used only if the conditions descried in the instructions are present.

35

Page 36: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

E-107 QUESTIONNAIRE ON BIDDER’S GOOD-FAITH EFFORTS

Name of Bidder:

If you find it helpful, feel free to attach pages to explain your answers. How many pages is your

Firm attaching to this questionnaire?__________________(Don’t count the 2 pages of this questionnaire.)

If a yes or no answer is not appropriate, please explain the facts. All of the answers to these questions

relate only to the time before your firm submitted its bid or proposal to the City. In other words,

actions that your firm took after it submitted the bid or proposal to the City cannot be mentioned or

used in any answers.

1. SOLICITING UBEs.

(a) Did your firm solicit, through all reasonable and available means, the interest of all UBEs (that is, inthe list provided by the City) in the scopes of work of the contract? yes no

(b) In such soliciting, did your firm advertise? yes no Are you attaching copies to this questionnaire, indicating the dates and names of newspaper or other publication for each ad if that information is not already on the ads? yes no

(c) In such soliciting, did your firm send written (including electronic) notices or letters? Are you attachingone or more sample notices or letters? yes no

(d) Did your firm attend the pre-bid conference? yes no

(e) Did your firm provide interested UBEs with timely, adequate information about the plans,specifications, and requirements of the contract? yes no

(f) Did your firm follow up with UBEs that showed interest? yes no

(g) With reference to the UBEs that your firm notified of the type of work to be subcontracted -- Did yourfirm tell them?

(i) the specific work your firm was considering for subcontracting? yes no

(ii) that their interest in the contract is being solicited? yes no

(iii) how to obtain and inspect the applicable plans and specifications and descriptions of items tobe purchased? yes no

36

Page 37: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

2. BREAKING DOWN THE WORK.

(a) Did your firm select portions of the work to be performed by UBEs in order to increase thelikelihood that the goals would be reached? yes no

(b) If yes, please describe the portions selected. ANSWER:

3. NEGOTIATION. In your answers to 3, you may omit information regarding UBEs for which you areproviding Form E-105.

(a) What are the names, addresses, and telephone numbers of UBEs that you contacted? ANSWER:

(b) Describe the information that you provided to the UBEs regarding the plans and specificationsfor the work selected for potential subcontracting. ANSWER:

(c) Why could your firm not reach agreements with the UBEs that your firm made contact with?Be specific. ANSWER:

4. ASSISTANCE TO UBEs ON BONDING, CREDIT, AND INSURANCE.

(a) Did your firm or the City require any subcontractors to have bonds, lines of credit, or insurance?yes no (Note: In most projects, the City has no such requirement for subcontractors.)

(b) If the answer to (a) is yes, did your firm make efforts to assist UBEs to obtain bonds, lines ofcredit, or insurance? yes no If yes, describe your firm’s efforts. ANSWER:

(c) Did your firm provide alternatives to bonding or insurance for potential subcontractors? yes noIf yes, describe. ANSWER:

5. GOODS AND SERVICES. What efforts did your firm make to help interested UBEs to obtaingoods or services relevant to the proposed subcontracting work? ANSWER:

6. USING OTHER SERVICES.

(a) Did your firm use the services of the City to help solicit UBEs for the work? yes noPlease explain.ANSWER:

(b) Did your firm use the services of available minority/women community organizations, minority andwomen contractors' groups, government-sponsored minority/women business assistance agencies,and other appropriate organizations to help solicit UBEs for the work? yes noPlease explain. ANSWER:

37

Page 38: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

APPENDIX B SLBE BUILDING CONTRACTORS & UBE LISTING SUB-CONTRACTORS

38

Page 39: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Nam

eMailin

g Ad

dress

City

State

Zipcod

eGen

der

/Race 

ID

Contact

Phon

eEm

ail

Services

Licenses

ABTA

K of Durha

m, 

Inc.

11 Log

ging

 Trail

Durham

NC

2770

7M

Eli B

rown; Amos 

Coop

er91

9259

‐009

1ab

[email protected]

Gen

eral 

Contractor; 

concrete; 

land

scap

ting; 

grad

ing; utilities; 

carpen

try

NC Gen

eral 

Contractor;s 

License#

7193

0 Limite

d Bu

ilding 

PU (W

ater Lines & 

Sewer Lines)

ARC Co

ntracting,LLC

400 W. R

osem

ary 

Street

Chap

el 

Hill

NC

2751

6NM

Bran

don Ha

rt91

9‐99

5‐13

61Bran

don@

arcagc.com

Gen

eral 

Contracting; 

Gen

eral 

Contractor

NC Gen

eral 

Contractor 

License#

7497

4 Unlim

ited Bu

ilding

Atlantic Corpo

rate 

Contracting

5204

 Strathm

ore Dr.Ra

leigh

NC

2761

3NM

Micha

el Higgins

984‐24

4‐77

00mhiggins@

acc‐gc.com

Gen

eral 

Contractor

NC Gen

eral 

Contactor 7

5643

Bordea

ux 

Constructio

n Co

.10

0 East Britan

ia 

Street

Durham

NC

2770

4NM

Rachel Sayre

(919

)220

‐114

1rachel@bo

rdea

uxconstructio

n.com

Gen

eral 

Contractor

NC GC#

9266

Bridgepo

int G

eneral 

Contracting, In

c.PO

 Box 336

Durham

NC

2770

1NM

Shelly 

McPha

tter

(919

)530

‐500

0sm

cpha

tter@bridgepo

intnc.com

Gen

eral 

Contracting/Co

nstructio

n

State of NC # 

6842

7

C.T. W

ilson

PO Box 201

1Du

rham

NC

2770

5NM

Chuck Wilson

(919

)383

‐253

5chuck@

ctwilson

.com

Gen

eral 

Constructio

n, 

Constructio

n Man

agem

ent 

(Agency & At 

Risk), Co

ncrete 

Work, 

Demolition

, Mason

ry, Strom

 Draina

ge, 

Form

ing, 

Hardware 

Installatio

n, 

Carpen

try an

d Sh

eetrock.

GC License # NC 

2443

39

Page 40: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

Calamar, Inc.

P O Box 520

58Du

rham

NC

2771

3W

Pam Lan

e91

9‐49

1‐92

16pLan

ep1@

aol.com

Utility

 (Water & 

Sewer) 

Installatio

n; 

Draina

ge (R

oof 

and Storm W

ater 

Installatio

n); 

Side

walk an

d AD

A Ra

mp 

Installatio

n; 

Material Sup

plier

NC Gen

eral 

Contractor's 

License#

5814

5

Callis C

ontractors, 

Inc.

1306

 Broad

 Stree

tDu

rham

NC

2770

5M

F Tyler; Jesse 

Callis

919‐41

6‐61

91projman

g@calliscon

tractorsinc.com

Gen

eral 

Contracting an

d Co

nstructio

n Man

agem

ent; 

High

way and

 Pu

blic Utilities; 

Demolition

NC Gen

eral 

Contractors 

License#

5916

7

D. W

ashing

ton 

Group

, LLC

P O Box 120

73Du

rham

NC

2770

9M

LIsa Sim

ms

919‐79

4‐59

48lisa@

dwashing

tong

roup

.com

gene

ral 

contracting;concr

ete; se

lective 

demolition

; mason

ry; 

misc

ellane

ous 

metals; carpe

ntry 

fram

ing;gypsum

 bo

ard system

s

NC Gen

eral 

Contractor''s 

License#

6982

9

D.W. W

ard 

Constructio

n Co

.10

06 

Commun

ications 

Drive

Durham

NC

2770

4NM

Andy

 Ward

(919

)477

‐047

1an

dy@dw

ward.com

Gen

eral 

Contractor 

Constructio

n

NC Gen

eral 

Contractor''s 

License #7

244

Incline Co

nstructio

n Incorporated

2503

 E. P

ettig

rew 

Street

Durham

NC

2770

3NM

Chris Spa

rks; 

Tracey Pop

e91

9‐59

8‐80

06cspa

rks@

inclinecon

struction.com

Gen

eral 

Contractor

NC Gen

eral 

Contractor''s 

License#

5589

6

40

Page 41: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

McQ

ueen

 Co

nstructio

n, In

c.61

9 Pa

trick Ro

adBa

hama

NC

2750

3NM

Harvey 

McQ

ueen

919‐69

7‐06

14hg

mcque

en@gm

ail.com

Gen

eral 

Contractor,site

 work, clearing, 

grad

ing, erosio

n control, "abc" 

placem

ent, 

paving

, strea

restoration, 

storm drainage, 

pond

 and

 dam

 constructio

n an

d mainten

ance, 

pede

stria

n bridge 

installatio

n, 

concrete flat and

 vertical

NC Gen

eral 

Contractor's 

License#

3698

2 Unlim

ited 

Build

ing/High

way

Riggs‐Ha

rrod

 Bu

ilders, In

c.PO

 Box 111

00Du

rham

NC

2770

3NM

Bruce Ha

rrod

(919

)687

‐011

1Gen

eral@rig

gsha

rrod

.com

; bh

arrod@

riggsha

rrod

.com

Gen

eral 

Constructio

n. 

New

 Co

nstrucction, 

Reno

vatio

n an

d ad

ditio

ns, 

Sitework, Facility 

Repa

irs.

State of NC GC 

License #1

8667

SGS Co

ntracting, LLC

4407

 Hop

son Rd

.Morrisvill

eNC

2756

0M

Bran

dt Smith

919‐39

1‐85

15sgscon

tractin

gllc@gm

ail.com

Small 

reno

vatio

ns, 

specialty

 item

s, 

interio

r blocking

Gen

eral 

Contractor

Structure Bu

ilding 

Compa

ny, Inc.

P O Box 135

03Du

rham

NC

2770

9M

Jona

than

 Farrar91

9‐73

0‐68

21jfa

rrar@structureb

uildingcom

pany

us.com

Gen

eral 

Contracting; 

Constructio

n Man

agem

ent; 

Consultin

g; 

paintin

g; ro

ofing; 

concrete flat 

work; cab

inetry; 

woo

d an

d metal 

fram

ing

NC Gen

eral 

Contractor's 

License#

4799

4

41

Page 42: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

WAS

PCO 

Corporation

4628

 Indu

stry Lan

eDu

rham

NC

2771

7W

Susan Ha

rmon

919.48

9.68

91susanh

armon

@waspco.com

Metal Studs, 

Insulatio

n an

d Dryw

all Insulation

NC Gen

eral 

Contractor's Lic. 

#138

13

42

Page 43: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

UBE

 Listing DC

LT New

 Con

struction Unit

Compa

ny Nam

eCo

ntact N

ame

Address

City, State

Zip

Phon

eFax

Email

Hub

 Ce

rtificatio

nCo

nstructio

n License/Limita

tion

360 Pa

intin

g Watson, Ja

mes

203 Westridge Driv

eHigh

 Point, N

C27

262

336‐77

4‐70

19jwatson@

360p

ainting.com

BA & H In

sulatio

n Inc.

Coleman

, Sha

ron

1902

 Sha

rpe Ro

adGreen

sboro, NC

2740

6(336

)379

‐068

6(336

)379

‐054

5ah

insulat@

aol.com

WGen

eral Trade

s/Su

b Co

ntractor  

A Be

tter View Glass & 

Mirror,

Fuqu

ay, K

im15

11 Holbroo

k St

Green

sboro, NC

2740

3(336

)271

‐841

0(336

)271

‐695

2ab

etterviewglassm

irror@yaho

o.com

WGen

eral Trade

s/Su

b Co

ntractor  

A.I.C

. Insulation, In

c.Co

ltran

e, Ja

net

P.O. B

ox 162

32Green

sboro, NC

2741

6(336

)674

‐161

3(336

)676

‐944

8rghu

ndley@

bellsou

th.net

WGen

eral Trade

s/Su

b Co

ntractor  

Accu Painters o

f NC LLC

Ayscue

, Rocio

201 So

uthe

rn Style Dr

Holly Springs, N

C27

540

(919

)376

‐602

5accupa

[email protected]

HAGen

eral Trade

s/Su

b Co

ntractor  

Activ

e Co

nstructio

n Services LLC

stevon

s, sh

ante

631 United Drive Su

ite# 

100‐B

DURH

AM, N

C27

713

(919

)206

‐444

0(919

)206

‐447

4shan

te@activ

econ

structionllc.com

BGen

eral Trade

s/Su

b Co

ntractor  

Adam

 She

lton Electric 

Inc

Shelton, Lori

PO Box 229

2Ad

vance, NC

2700

6(336

)998

‐519

8(336

)998

‐783

[email protected]

WElectrical Con

tractor 2

4291

‐U 

Adkins Qua

lity Pa

intin

g Inc

Adkins, C

arol

2740

 Park Ro

adMayod

an, N

C27

027

(336

)427

‐546

1(336

)427

‐769

1cw

[email protected]

tW

Gen

eral Trade

s/Su

b Co

ntractor  

Advanced

 Framing & 

Interio

rsWoo

dson

, Julie

6201

 River Lan

ding

s Drive

Raleigh, NC

2760

4(919

)876

‐990

5(919

)890

‐049

6Jules@

AFIcon

struction.com

WGen

eral Trade

s/Su

b Co

ntractor  

Alexan

der H

eatig

n an

d Air C

onditio

ning

Alexan

der, Ch

ristin

e30

0 Ca

pesid

e Av

eHo

lly Springs, N

C27

540

919‐88

6‐48

2291

9‐55

7‐48

22christin

e@alexhv

ac.com

WElectrical Con

tractor 3

1115

 ;M

echa

nical/H

eatin

g  Con

tractor 

3260

8 All Systems R

estored 

HVAC

 & Electric

alCu

rrie, K

elvin

2832

‐H3 Ra

ndleman

 Rd

Green

sboro, NC

2740

633

6‐38

2‐52

19asrhvacele@ho

tmail.com

BElectrical Con

tractor 2

1941

‐U 

;Gen

eral  C

ontractor  

Non

e;Gen

eral Trade

s/Su

b  

Contractor  ;Mecha

nical/H

eatin

g Co

ntractor  219

71  

;Plumbing

/Fire

 Sprinkler Systems  

Contractor 219

71 

ALSTON YAR

D LA

NDS

APING

 & Patric

ia Jo

hnson, 

John

ny  A

lston

1304

 Wise

 Avenu

eGreen

sboro, NC

2740

7(336

)987

‐448

8alston

sland

@ho

tmail.com

BGen

eral Trade

s/Su

b Co

ntractor  

B an

d B Triang

le 

Lawncare

Bond

, And

reP.O. B

ox 250

06Du

rham

, NC

2770

2(919

)423

‐141

7(919

)384

‐930

0ab

ond@

band

btria

nglelawncare.com

B

Bowde

n Electrical In

cBo

wde

n, Bob

by14

51 Sou

th Elm

 Eug

ene 

Street

Green

sboro, NC

2740

6(336

)987

‐905

9(336

)510

‐278

2bo

wde

nelectric

alinc820

6@yaho

o.com

BElectrical Con

tractor 2

8348

BREEDL

OVE

 ELECT

RIC, 

INC.

Bree

dlov

e, Tom

my

Post Office Box 649

Hend

erson, NC

2753

7(252

)438

‐342

1(252

)438

‐298

8tbreed

love@bree

dlov

eelectric

.com

AAElectrical Con

tractor 1

6871

 

C&C Lawn an

d Garde

ning

 Service

Carpen

ter, Jane

lle77

6 Ru

nning broo

k lane

Rural H

all, NC

2704

533

6‐35

4‐91

54jane

llec96@

gmail.com

BGen

eral Trade

s/Su

b Co

ntractor  

Cana

dy's Land

scap

e & 

Erosion Co

ntrol

Cana

dy, Stefanie

Penn

y Ca

nady

Lexing

ton, NC

2729

533

6‐23

6‐11

8233

6‐24

9‐81

65cana

dyserosio

n@gm

ail.com

WGen

eral Trade

s/Su

b Co

ntractor  

Capp

s Con

struction & 

Plum

bing

, Inc.

Dillo

, Deb

ra28

52 Old Buies Creek 

Road

Angier, N

C27

501

(919

)639

‐406

0(919

)639

‐010

6ccpi4u

@ea

rthlink.ne

tW

Plum

bing

/Fire

 Sprinkler Systems 

Contractor  139

46 

CARO

LINA GLA

SS & 

MIRRO

R INC

Fitche

tt, Lisa

P O Box 143

9Garne

r, NC

2752

991

9‐66

2‐90

5091

9‐66

2‐90

83lfitche

tt@carolin

aglass.com

WArchite

ctural Service  ;Gen

eral 

Trad

es/Sub

  Con

tractor  

Carolin

a Green

scap

es 

Land

scap

ing

Smith

, Kim

112 Su

ndial D

rive

Lexing

ton, NC

2729

533

6‐34

5‐12

98cgreen

scap

es@yaho

o.com

WGen

eral Trade

s/Su

b Co

ntractor 

0506

 CA

ROLINA PLUMBING 

SUPP

LY IN

CHa

ggis, Geo

rge

4601

 Trade

mark Drive

Raleigh, NC

2761

025

2‐40

7‐77

3391

9‐87

6‐86

78george@carolin

aplumbing

supp

ly.com

B

Carpet One

 Floor & 

Home

Clayton, She

ila50

0 A Old Durha

m Roa

dRo

xboro, NC

2757

333

6‐59

9‐13

3 933

6‐59

9‐07

34sheilaclayton@

emba

rqmail.com

W

43

Page 44: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

UBE

 Listing DC

LT New

 Con

struction Unit

Chap

a's D

rywall &

 Paint 

CO.

CHAP

A, ANGEL

po box 746

3Green

sboro, NC

2741

7(336

)285

‐545

3(336

)638

‐232

9acha

pas@

triad.rr.com

HAGen

eral Trade

s/Su

b Co

ntractor  

CHAV

EZ IN

TERIORS

 LLC

Chavez, Yaritza

480 FO

RUM PAR

KWAY

RURA

L HA

LL, N

C27

045

336‐96

9‐26

6933

6‐96

9‐04

99ycha

vez@

chavezinterio

rs.com

HAGen

eral Trade

s/Su

b Co

ntractor  

CMC FLOORING 

ENTERP

RISES INC

MEN

DOZA

, RAU

L52

28 N ROXB

ORO

 RD

DURH

AM, N

C27

712

919‐26

7‐20

1191

9‐26

7‐20

36info@cm

cflooringent.com

HAArchite

ctural Service  ;Gen

eral 

Contractor  763

49 

Limite

d;Gen

eral Trade

s/Su

b Co

ntractor  

Commercial Doo

rs & 

More LLC

Wilson

, Steph

anie

1091

 Anjan

ette Lan

e.cree

dmoo

r, NC

2752

291

9‐22

9‐11

95sw

ilson

@commercialdo

ors.co

WGen

eral Trade

s/Su

b Co

ntractor  

Crow

n Floo

ring LLC

Harrell, Tany

a58

39 Fayetteville Rd

Raleigh, NC

2760

3(919

)773

‐497

3(919

)773

‐497

4crow

nflooringllc@be

llsou

th.net

WGen

eral Trade

s/Su

b Co

ntractor  

Crow

n Po

wer Electric

Lee, Darmel

1025

 Alston

 Village Ln

Cary, N

C27

519

704‐27

7‐39

48crow

npow

erelectric@gm

ail.com

BElectrical Con

tractor 2

8519

 

Danco Electrical, Inc.

Dodrill, M

issy

890 Pa

rk Avenu

eYo

ungsville, N

C27

596

(919

)562

‐319

1(919

)562

‐850

3miss

y@da

ncoe

lectric

al.com

WElectrical Con

tractor 2

4384

‐U 

DAVIDS

ON SAS

H & 

DOOR INC

Worley, Ja

ne13

58 Piedm

ont D

rive

Lexing

ton, NC

2729

5(336

)249

‐027

6(336

)249

‐775

0jworley@

davidson

sash.com

WGen

eral Con

tractor 9

502 

Unlim

ited

Divisio

n 9 Pa

intin

g Group

Parker, D

aphn

e29

10‐101

 Calvary Dr.

Raleigh, NC

2760

4‐28

5491

9‐27

2‐00

8691

9‐74

7‐42

70dp

arker329

@yaho

o.com

BGen

eral Trade

s/Su

b Co

ntractor 

1517

59 

DLT RO

OFING ,INC.

TEDD

ER, TER

ESA

7065

 us h

wy 30

1kenly, NC

2754

291

9‐33

9‐79

5591

9‐28

4‐67

68dltroo

fing@

yaho

o.com

AIGen

eral Con

tractor 7

1227

 Limite

dDS

 Doo

r & Spe

cialtie

s, 

LLC

Schw

artz, Joy

cePO

 Box 448

3Ashe

boro, N

C27

204‐

4483

(336

)736

‐888

033

6‐73

6‐88

80dsdo

[email protected]

WGen

eral Trade

s/Su

b Co

ntractor  

Dunlap

 Law

n Service, 

Inc.

Mills, Karen

PO Box 395

97Green

sboro, NC

2743

8(336

)282

‐363

6(336

)282

‐363

7dlsin

c@du

nlap

lawnservice.com

WGen

eral Trade

s/Su

b Co

ntractor  

Dunlap

 Paint Con

tracts, 

Inc.

Mills, Karen

P.O. B

ox 395

97Green

sboro, NC

2743

8(336

)282

‐363

6(336

)282

‐363

7Du

nlap

.Paint@yaho

o.com

WGen

eral Trade

s/Su

b Co

ntractor  

Electric One

, Inc.

Mayhe

w, Ton

yPO

 Box 167

63Green

sboro, NC

2741

6(336

)545

‐099

0(866

)362

‐384

[email protected]

BElectrical Con

tractor 2

4590

‐U 

Fresh Start P

ainting 

Service LLC

Plum

mer, Trene

shia

1115

 Herita

ge M

anor 

Drive

Raleigh, NC

2761

025

2‐76

7‐35

98fspa

intin

g15@

gmail.com

BGen

eral Trade

s/Su

b Co

ntractor  

Gen

esis Pa

intin

gJackson, Richa

rd13

60 Jo

hn Rosser R

dSanford, NC

2733

2(919

)258

‐536

5(919

)258

‐048

5ric

hard_a

_jackson

2001

@yaho

o.com

BGuilfo

rd Glass & M

irror, 

Inc.

Crud

up, R

uth

301 S. Elm

 St.

Green

sboro, NC

2740

1(336

)373

‐092

0(336

)379

‐877

7gu

ilfordg

lassan

dmirror@ne

tzero.ne

tB

Gen

eral Trade

s/Su

b Co

ntractor 

1645

77 

GUILFO

RD PLU

MBING 

SUPP

LY, INC.

McCraw, Sam

mie

3309

 ANVIL PLAC

ERA

LEIGH, NC

2760

391

9‐66

2‐71

1091

9‐66

2‐81

88sm

ccraw@gu

ilfordp

lumbing

supp

ly.com

W

Harry Lawrence,LLC 

Lawrence Pa

intin

g Pro

Lawrence, Elizab

eth

1223

 Cha

mpion

s Pointe 

Drive

Durham

, NC

2771

2(919

)861

‐682

8(919

)861

‐682

9be

thlawrence1

@gm

ail.com

W

Hoggard Electric Co. LLC

Hoggard, Tim

othy

PO Box 28

Durham

, NC

2770

2‐00

28(919

)423

‐823

1t_ho

ggard@

yaho

o.com

BElectrical Con

tractor 2

5461

‐L 

JC Electric

 Inc.

Coates, C

hristine

4900

 Hillsborou

gh Roa

dDu

rham

, NC

2770

5(919

)309

‐900

0(919

)309

‐992

7christin

e@jcen

c.com

WElectrical Con

tractor 1

7202

‐U 

JOHN

SON ELECT

RICA

L SERV

ICES LLC

JOHN

SON, B

RIAN

70 ADL

ER COURT

FRAN

KLINTO

N, N

C27

525

(919

)728

‐801

8STAY

WIRED

@YA

HOO.COM

BElectrical Con

tractor 2

8471

‐L 

Kenn

a Cu

stom

 Painting, 

Inc.

Kenn

a, Nan

cy25

17‐115

 Nob

lin Roa

dRa

leigh, NC

2760

4(919

)855

‐008

2(919

)855

‐007

3estim

ating@

kenn

acustompa

intin

g.com

WGen

eral Trade

s/Su

b Co

ntractor  

KMT He

ating & Air 

Cond

ition

ing Co

rporati

Aal A

nubia, Doctor

756 Saint G

eorge Rd

.Ra

leigh, NC

2761

091

9‐72

3‐18

97do

ctor@km

t‐hv

acpros.com

BMecha

nical/H

eatin

g Co

ntractor 

3288

Locklear Roo

fing iNC.

Locklear, Jackie

2019

 Produ

ction dr 

ste1

07Ap

ex, N

C27

539

(919

)387

‐952

7(919

)387

‐935

[email protected]

AIGen

eral Trade

s/Su

b Co

ntractor  

M & M

 Flooring, In

c.Clary, M

arcelle

6010

 Tria

ngle Driv

e, 

Suite

 CRa

leigh, NC

2761

791

9‐88

1‐28

85man

dmflo

oring@

hotm

ail.com

B

MCB

RIDE

 LAW

N SER

VICE

MCB

RIDE

,SR, HER

MAN

2003

 RAN

DLEM

AN 

ROAD

GRE

ENSB

ORO

, NC

2740

6(336

)378

‐687

5(336

)378

‐162

5mcbrid

etaxservic@be

llsou

th.net

B

44

Page 45: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

UBE

 Listing DC

LT New

 Con

struction Unit

Meticulou

s painting an

d dryw

all

With

row, Leroy

1125

 Bristoe dr

Knighd

ale, NC

2754

5(919

)638

‐033

2metpa

int40@

gmail.com

BGen

eral Trade

s/Su

b Co

ntractor  

Midsouth Irrigation

Parker, Tina

PO Box 297

Lewsville, NC

2702

3(336

)765

‐747

5(336

)765

‐747

6shaw

[email protected]

WGen

eral Con

tractor 5

6989

 Limite

d;Gen

eral  Trade

s/Su

b Co

ntractor  

Moss E

lectric

Moss, Herbe

rt10

1 seym

our C

reek dr.

Cary, N

C27

519

716‐20

8‐45

70h.mosselectric

@yaho

o.com

BElectrical Con

tractor 2

9072

‐I 

Paintm

aster L

LCEb

erha

rdt, De

bra

4101

 Edg

emon

t Rd

Wen

dell, NC

2759

1(919

)365

‐320

1(919

)365

‐320

2de

bra@

paintm

asterllc.com

WGen

eral Trade

s/Su

b Co

ntractor  

Performan

ce Glass, Inc.

John

son, Lisa

2840

 NC HW

Y 42

 West

Clayton, NC

2752

0(919

)782

‐800

1(919

)783

‐849

4accoun

ting@

performan

ceglassin

c.com

WGen

eral Trade

s/Su

b Co

ntractor  

Prod

uctio

n Pa

intin

gRo

chelle, K

eisha

8411

 Garvey Drive

Raleigh, NC

2761

6(919

)676

‐550

5(919

)847

‐399

3gene

ral@

prod

uctio

npaintingo

nline.com

BGen

eral Trade

s/Su

b Co

ntractor  

Professio

nal C

ommercial 

Floo

rmen

ius, Lisa

3720

 Allian

ce Dr

Green

sboro, NC, NC27

407

(336

)299

‐613

6(336

)299

‐613

7lisap

rocom@be

llsou

th.net

W

S&L PA

INTING & 

DECO

RATING, INC.

HAYES‐CA

LVER

T, LIDA

1011

 NORT

HWEST BLVD

WINSTON‐SAL

EM, 

NC

2710

133

6‐77

7‐34

4233

6‐77

7‐11

06lid

asl@

aol.com

WGen

eral Trade

s/Su

b Co

ntractor  

SANTIS FLOORING 

SERV

ICE, IN

CCE

RDA SA

NTIS, 

RODO

LFO

P O BOX 70

25GRE

ENSB

ORO

, NC

2741

733

6‐67

4‐59

7233

6‐67

4‐53

74santisflooringserviceinc@

gmail.com

HAGen

eral Con

tractor  Unlim

ited

Seagroves E

lectric

al 

Service, In

cSeagroves, Thu

rman

8517

 App

lecross C

ircle

Apex, N

C27

539

(919

)772

‐712

4(919

)772

‐441

2seagroves@

bellsou

th.net

DElectrical Con

tractor 1

1000

‐U 

SUNRISE ROOFING, INC.

WILSO

N, P

ATRICIA

448 BE

NT FA

RM ROAD

STONEV

ILLE, N

C27

048

(336

)627

‐588

8(336

)627

‐942

4pw

ilson

[email protected]

WGen

eral Trade

s/Su

b Co

ntractor 

5734

7 Triang

le Com

mercial 

Paintin

gSans, Ton

i54

08 Cum

berla

nd Plain 

DrRa

leigh, NC

2761

6(919

)961

‐101

7(919

)877

‐008

2tonisans@triang

lecommercialpa

intin

g.co

mW

Gen

eral Trade

s/Su

b Co

ntractor  

Villanu

eva Pa

intin

g Co

 Inc

Villanu

eva, Patric

k83

11 Brie

r Creek 

Parkway 105

‐416

Raleigh, NC

2761

791

9‐82

5‐88

47(919

)516

‐076

5villanu

evap

aint@ao

l.com

HAGen

eral Con

tractor  

Limite

d;Gen

eral  Trade

s/Su

b Co

ntractor  

45

Page 46: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

PROJECT SPECIFICATIONS

46

Page 47: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

110 PIEDMONT – NEW HOME SPECIFICATIONS

DIVISION 1 - ALLOWANCES

• CARPET ALLOWANCE - $9.20 / SQUARE YARD• VINYL ALLOWANCE - $1.00 / SQUARE FOOT• ENGINEERED FLOORING ALLOWANCE - $4.00 / SQUARE FOOT

DIVISION 2 - EARTHWORK AND SITEWORK

• PROVIDE NEW RETAINING WALL AT STREET - 12"X4" RETAINING WALL BLOCKS FROMALLEN+ROTH.

• REGRADE AS REQUIRED TO PROVIDE POSITIVE DRAINAGE AWAY FROM HOUSE ONALL SIDES.

DIVISION 3 - CONCRETE

• DRIVEWAY - 4" CONCRETE SLAB WITH BROOM FINISH• SIDEWALKS - PROVIDE NEW 4'-0' WIDE SIDEWALK ALONG STREET AND LEADING TO

THE PORCH. 4" CONCRETE SLAB WITH BROOM FINISH• SIDE STOOP - POUR 4" SLAB ON GRADE. THICKEN SLABS FOUNDATION PERIMETER

TO A MINIMUM OF 8" BELOW GRADE.

DIVISION 4 - BRICK AND MASONRY

• FOUNDATION STEM WALLS - 8X16" NOMINAL CMU WALL WITH STUCCO FINISH.

DIVISION 5 - METALS

• NOT USED

DIVISION 6 - WOOD AND PLASTIC

• EXTERIOR WALL FRAMING - 2X4 #2 GRADE SPF. LUMBER AT 16" O.C.• SILL PLATE - PROVIDE PRESSURE TREATED 2X SILL PLATES WHERE IN CONTACT

WITH CONCRETE OR CMU.• INTERIOR WALL FRAMING - 2X4 #2 GRADE SPF. LUMBER AT 16" O.C.• EXTERIOR SHEATHING - 7/16" OSB SHEATHING.• ROOF SHEATHING - 7/16" OSB SHEATHING.• NEW ROOF FRAMING - 2X8 #2 GRADE SPF AT 16" O.C.• NEW DORMER FRAMING - 2X8s #2 GRADE SPF AT 16" O.C.• EXTERIOR SIDING - CEMENT FIBER BOARD SIDING, JAMES HARDI - "HARDI PLANK"

SIDING OR APPROVED EQUAL.

47

Page 48: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

• EXTERIOR TRIM - CEMENT FIBER BOARD TRIM, JAMES HARDI "HARDITRIM" BOARDSOR APPROVED EQUAL.

• EXTERIOR SOFFIT - CEMENT FIBER BOARD PERFORATED SOFFITS, JAMES HARDIPERFORATED SOFFIT PANELS OR APPROVED EQUAL

• NEW PORCH FLOOR FRAMING TO BE 2X8 #2 GRADE SPF PRESSURE TREATED AT 16"O.C.

• PROVIDE NEW PORCH COLUMNS - 4X4 PT COLUMN CLAD WITH 1X TRIM - PAINTED• PORCH RAILINGS - 2X4 PT RAILS, 2X2 PT BALLUSTERS, 4X4 PT POSTS - PAINTED• PORCH DECKING - 5/4 X 6 TREATED DECKING. FRONT PORCH DECKING TO BE

PAINTED.

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

• PROVIDE NEW EXTERIOR WALL INSULATION - R-15 TO BE BATT INSULATION ORSPRAYED INSULATION AT CONTRACTORS OPTION

• PROVIDE NEW ATTIC INSULATION - R-43 TO BE BATT INSULATION, CELLULOSEBLOWN INSULATION, OR SPRAY INSULATION AT CONTRACTORS OPTION.

• PROVIDE NEW CRAWLSPACE INSULATION - R-19 TO BE BATT INSULATION,CELLULOSE BLOWN INSULATION, OR SPRAY INSULATION AT CONTRACTORSOPTION.

• PROVIDE ALL NEW VAPOR BARRIERS - 6ML VAPOR BARRIER AT INTERIOR OFEXTERIOR STUD WALLS & FLOOR OF CRAWLSPACE

• PROVIDE NEW EXTERIOR AIR BARRIER / BUILDING WRAP - TYVEK OR EQUAL• PROVIDE ALL NEW ROOFING UNDERLAYMENT - TO BE 30# ROOFING FELT• PROVIDE NEW PRE-FINISHED METAL ROOFING SYSTEM - TO BE ADVANTAGE LOC II

STANDING SEAM METAL ROOFING FROM UNION CORRUGATING OR APPROVEDEQUAL. COLORS WILL BE CHOSEN BY OWNER FOR EACH HOME, BUT WILL BE FROMTHE LIST OF COLORS APPROVED FOR ENERGYSTAR CERTIFICATION.

• PROVIDE NEW RIDGE CAP COMPATIBLE WITH METAL ROOFING SYSTEM.• SHEET FLASHING - PROVIDE PREFINISHED ALUMINUM FLASHINGS

DIVISION 8 - WINDOWS AND DOORS

• PROVIDE NEW CRAFTSMAN SYTLE STEEL ENTRY DOOR - JELD-WEN CRAFTSMAN 3-LITE OR APPROVED EQUAL.

• PROVIDE ALL NEW INTERIOR PASSAGE DOORS - 6 PANEL HOLLOW CORE DOORS.• PROVIDE ALL NEW INTERIOR CLOSET DOORS - 6 PANEL HOLLOW CORE BI-FOLD

DOORS.• PROVIDE ALL NEW ATTIC ACCESS HATCH IN SECONDARY CLOSET OR LAUNDRY

ROOM, COORDINATE LOCATION WITH OWNER.• PROVIDE ALL NEW VINYL DOUBLE HUNG WINDOWS WITH WELDED CORNERS, 1"

LOW-E INSULATED GLASS, SHGC OF 0.3 OR LESS, AND A U-VALUE OF 0.35 OR LESS.• PROVIDE SCREENS AT ALL OPERABLE WINDOWS.

48

Page 49: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

DIVISION 9 - INTERIOR FINISHES

• PROVIDE ALL NEW INTERIOR GYPBOARD - 1/2" WALL BOARD AT INTERIOR WALLS• PROVIDE ALL NEW WATER RESISTANT GYPBOARD - 5/8" WATER RESISTANT WALL

BOARD AT TUB AREAS, AND LAUNDRY ROOM AREAS.• PROVIDE ALL NEW KITCHEN COUNTERTOPS - TO BE POST-FORMED PLASTIC

LAMINATE. COLOR AND FINISH TO BE SELECTED BY OWNER.• PROVIDE ALL NEW KITCHEN CABINETS TO HAVE SOLID WOOD FRONTS AND DOORS,

WITH PLYWOOD BOXES. NO PARTICLE BOARD OR FIBERBOARD CABINETS WILL BEAPPROVED.

• PROVIDE ALL NEW BATHROOM COUNTERTOPS - TO BE 22" DEEP CULTERED MARBLEWITH INTEGRAL SINK.

• PROVIDE ALL NEW BATHROOM CABINETS TO HAVE SOLID WOOD FRONTS ANDDOORS, WITH PLYWOOD BOXES. NO PARTICLE BOARD OR FIBERBOARD CABINETSWILL BE APPROVED.

• PROVIDE ALL NEW BASE TRIM - TO BE 4.25" MDF BASE.• PROVIDE ALL NEW WINDOW AND DOOR CASEMENT - TO BE 1X4 PAINTED WOOD

WITH EASED CORNERS• PROVIDE AN ALLOWANCE OF - $4.00/SF FOR ENGINEERED WOOD FLOORING IN

LIVING ROOM, DINING ROOM, AND KITCHEN AS INDICATED ON FINISH SCHEDULE ONSHEET A500

• PROVIDE AN ALLOWANCE OF - $9.20 / SQ.YD. FOR CARPET AS INDICATED ON FINISHSCHEDULE ON SHEET A500.

• PROVIDE AN ALLOWANCE OF - $1.00 / SF FOR SHEET VINYL FLOORING IN BATHROOMAND LAUNDRY AREAS AS INDICATED ON FINISH SCHEDULE ON SHEET A500.

• PROVIDE ALL NEW INTERIOR AND EXTERIOR PAINT - USE LOW VOC INTERIOR PAINT• PROVIDE ALL NEW PORCH CEILINGS - TO BE HARDI PANEL WITH HARDITRIM FROM

JAMES HARDI

DIVISION 10 - APPLIANCES

• KITCHEN APPLIANCES - ALL REFRIGERATORS, DISHWASHERS, RANGES, AND OVENSWILL BE PROVIDED AN INSTALLED BY OWNER.

• WASHER AND DRYER WILL BE PROVIDED AND INSTALLED BY OWNER.• PROVIDE ALL NEW ENERGY STAR CERTIFIED 40 GALLON ELECTRIC WATER HEATER

SYSTEM.

HVAC SYSTEMS

• PROVIDE AND INSTALL A GOODMAN HEAT PUMP CENTRAL HEAT AND AIRCONDITIONING SYSTEM OR APPROVED EQUAL, INCLUDING A SEALED ANDINSULATED TO R-8 DUCT SYSTEM. USE A UNIT WITH A MINIMUM SEER RATING OF14.0 AND A HSPF OF 8.2.

49

Page 50: PROJECT MANUAL - Jody Brown Architecture, pllc. · the HUB database is included in this project manual. Bidders may also use firms currently certified as MUBES and WUBES by N.C. D.O.T

• PROVIDE AND INSTALL A 30" RANGE HOOD VENT WITH LIGHT. HOOD TO BEDIRECTLY VENTED TO THE OUTSIDE WITH A WEATHER PROOF DAMPER. THEEXHAUST HOOD WILL BE SELECTED BY THE OWNER.

• INSULATE ALL VENTILATION DUCTS EXCEPT FOR KITCHEN EXHAUST.

ELECTRICAL AND LIGHTING

• LIGHTING FIXTURES, INCLUDING FLOODLIGHTS, PENDANTS, WALL LIGHTS, CEILINGFIXTURES, BATHROOM FANS, AND CLOSET LIGHTS WILL BE PROVIDED BY THEOWNER.

• THE DOOR BELLS, SMOKE DETECTORS, DEVICES AND WIRING ARE THERESPONSIBILITY OF THE CONTRACTOR.

• PROVIDE ALL NEW ELECTRICAL SERVICE, PANEL, AND WIRING THROUGH OUTENTIRE HOME.

• PROVIDE OUTLETS SPACED TO MEET BUILDING CODE REQUIREMENTS.• PROVIDE GFI OUTLETS IN KITCHEN COUNTER BACKSPLASH.• PROVIDE GFI OUTLETS NEAR VANITIES.• PROVIDE ONE SWITCHED OUTLET IN EACH BEDROOM AND LIVING ROOM• PROVIDE 4 NEW GFI EXTERIOR OUTLETS

PLUMBING FIXTURES - IN THE BATHROOMS

• PROVIDE (2) NEW 21 INCH DEEP VANITY CABINET WITH CULTURED MARBLE SINKTOP AND A DELTA 520 RPU DST SINGLE LEVER FAUCET.

• PROVIDE A NEW DELTA 134900 MONITOR 13 SINGLE LEVER TUB AND SHOWERFAUCET, SHOWER EXTENSION ARM, SHOWER HEAD, AND ESCUTCHEON FORBATHTUB AND MASTER SHOWER

• PROVIDE A NEW WHITE AQUA GLASS 60" FIBERGLASS BATHTUB SHOWER UNIT ORSTERLING TWO-PIECE UNIT.

• PROVIDE NEW WHITE DREAMLINE SLIMLINE 48"X36" ACRYLIC SHOWER PAN FORMASTER BATH.

• PROVIDE A NEW 1.6 GALLON PER FLUSH COMMODE - FROM TOTO OR APPROVEDEQUAL

• PROVIDE (2) NEW ONE-PIECE CHROMED SHOWER ROD WITH FIXED BRACKETSANCHORED WITH SCREWS INTO THE FRAMING.

PLUMBING FIXTURES - IN THE KITCHENS AND LAUNDRY

• INSTALL A NEW 7 INCH DEEP, 33 INCH WIDE DOUBLE BOWL 22 GUAGE STAINLESSSTEEL SINK WITH A DELTA 400-DST-L SINGLE LEVER FAUCET.

• INSTALL AN ICE MAKER WATER CONNECTION BOX RECESSED INTO WALL.• PROVIDE A WASHER CONNECTION AND DRAIN BOX FOR CLOTHES WASHER.• INSTALL A DRYER VENT, VENTED DIRECTLY TO THE OUTSIDE.

50