project manager p. paolucci m. tytgat & g. pugliese run coordinator l. benussi deputy run...

8
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C. Carillo Upgrade Resp. deputy Istitution Board chairman Resource manager P. Paolucci Steering committee Conferen ce Committe e chairman Editoria l board chairman 7/12/10 1 RPC IB - Pigi Paolucci Tech. Coordination S. Buontempo A. Dimitrov

Upload: carter-reynolds

Post on 28-Mar-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C

RPC IB - Pigi Paolucci 1

Project Manager P. Paolucci

M. Tytgat & G. Pugliese

Run Coordinator L. Benussi

deputy

DPG D. Piccolo

K. BunkowskiC. Carillo

Upgrade Resp.deputy

Istitution Boardchairman

Resource manager P. Paolucci Steering committee

Conference Committee

chairman

Editorial board

chairman

7/12/10

Tech. CoordinationS. Buontempo

A. Dimitrov

Page 2: Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C

RPC IB - Pigi Paolucci

Project Manager P. Paolucci

M. Tytgat & G. Pugliese

Run Coordinator L. Benussi

deputy

DPG D. Piccolo

K. BunkowskiC. Carillo

Tech. Coordinator S. Buontempo

A. Dimitrov

Physic Valid ToolS. Costantini

CAFA. Cimmino

P5L. Benussi

Maint & reparA. Dimitrov

OfflineD. Piccolo

OnlineK. Bunkowski

Detector & trigger analysis

C. Carillo

Resource manager P. Paolucci Steering committee

new

7/12/10 2

Upgrade Resp.deputy

new

new

new

new

Page 3: Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C

RPC IB - Pigi Paolucci 3

DPG D. Piccolo

K. Bunkowski

Run Coordinator L. Benussi

deputy

SoftwareValidation/Data Certification

J. Gho

Detector perfomance

Calabria

OnlineK. Bunkowski

OfflineD. Piccolo

Detector & trigger analysisC. Carillo

Phys Valid ToolS. Costantini

Trigger perfomance

Resp.

Calibration Streams

Maggi

WBM

Berzano

Run QualityKorea

Noise tools Costantini

DQM Cimmino

Skims Tupputi

Upgrade Simulation

Simulation Pavlov

Local RecoC. Carrillo

DataBase

Trigger DBM Szlepper

Configuration K. Bunkowski

DCS

Detector DB

Manpower needed

Not covered

Covered

7/12/10

Page 4: Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C

4

Technical CoordinationS. BuontempoA. Dimitrov

Mainten. & repair. (RE,RE)

Anton & Hassan

7/12/10

Upgraderesponsable

deputy

Bakelite CERN test site

Gap production

mechanics

cooling

Ghent site

India site

CERN site

Chamber test

Front-end electronic

Link boardelectronic

Equipment DB

installation

commissioning

cooling

GasBenussi

TriggerWarsaw

Test beamNicolas

DocumentationDimitrov

Equipment DB

Electronics

DCS

Preliminar version

Page 5: Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C

RPC IB - Pigi Paolucci 5

DPG Not covered tasks

7/12/10

DPG 2011 (FTE) 2012 (FTE)

WBM 0.7 0.3 Berzano*

Offline DB 1.0 0.5 ?

DCS 0.7 0.3 ?

Upgrade Sim 0.5 0.5 ?

Run quality 0.5 0.3 Korea

Detector perf. 2 2 Calabria

Trigger perf. 2 2 Warsaw

DQM 1 1 A. Cimmino

Noise 0.3 + 0.5 0.3 + 0.5 S. Costantini

Page 6: Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C

RPC IB - Pigi Paolucci 6

TC covered tasks

7/12/10

DPG 2011 (FTE) 2012 (FTE)

TC Buontempo

RB 1.0 1.0 Anton

RE 1.0 1.0 Hassan

Gas 0.5 0.5 Luigi

Cooling 0.3 0.3 Ian

Trigger 2 2 Karol + ?

Electronic 0.4 0.4 Pigi + ?

DB 0.7 0.3 ?

Test Beam 0.3 + 0.5 0.3 + 0.5 ?

Page 7: Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C

RPC IB - Pigi Paolucci 7

2011 Manpower/ExpertResident at CERN (>40%)

1. Korea Univ: Taejong (70%), Mee Hee Cho (50%), Hyung Chul Kim (30%)

2. SKK Univ: Hyunkwan Seo (50%), Min Suk Kim (70%), Junghwan Goh (30%)3. Chandigar:4. Mumbai BARC:5. Pavia:6. China:7. Sofia Univ: Dimitrov8. INRNE: Stoianov9. Egypt:10. Ghent: Costantini, Cimmino, Zaganidis, Phd ?11. Napoli: Buontempo, Carrillo, Paolucci12. LNF: Benussi, Piccolo13. Uniandes: Ocampo, Gomez, Phd ?14. Pakistan: Shahzad15. Brussels: Van Doninck, Luc Van Lancker16. Bari: Pugliese, Maggi, Colaleo, Calabria, Lusito, Tupputi

7/12/10

Page 8: Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C

RPC IB - Pigi Paolucci 8

2011 Manpower/Expert(not resident)

1. Korea Univ:2. SKK Univ:3. Chandigar:4. Mumbai BARC:5. Pavia: Vitulo, Belli6. China:7. Sofia Univ: Litov, Pavlov, Petkov, Hadjiisk8. INRNE: Stoianov, Genchev, Sultanov9. Egypt:10. Ghent: Tytgat11. Napoli: Fabozzi12. LNF: Bianco13. Uniandes:14. Pakistan: Horani, Saleh15. Brussels:16. Bari: Abbrescia, Iaselli

7/12/10