July 19, 2019
Memorandum To: Gene TarascioProject Management Team – Div 7, 9 & 10NCDOT Project Management Unit
From: Tim Padgett, PEKimley-Horn and Associates, Inc.
Subject: Traffic Forecast Update for I-3306A (I-40 widening) in Durham andOrange Counties
This forecast has been reviewed and approved for delivery by the NCDOT Transportation PlanningDivision as of July 18, 2019.
Please find attached the 2019 traffic estimates and 2045 traffic forecasts for I-3306A in Durhamand Orange Counties. The project studies the widening of I-40 from I-85 to US 15-501. Thefollowing scenarios are provided:
· Base Year 2019 No-Build· Base Year 2019 Build 1 – widening to 6 lanes· Base Year 2019 Build 2 – widening to 8 lanes· Future Year 2045 No-Build· Future Year 2045 Build 1 – widening to 6 lanes· Future Year 2045 Build 2 – widening to 8 lanes
David Keilson and Julie Bogle of NCDOT were contacted during the development of this forecastalong with Keith Dixon.
Certain assumptions were made in the development of the forecast:
Fiscal Constraint. Within the Metropolitan Planning Organization (MPO) area, future forecastsare based on projects included in the Financial Plan for the 2045 Durham – Chapel Hill –Carrboro Metropolitan Planning Organization (DCHC MPO) Metropolitan Transportation Plan(MTP). This information, along with the same for the Capital Area Metropolitan PlanningOrganization (CAMPO) is included in the official version of the Triangle Regional Model(TRMv6).
Future Conditions and Development Activity. The forecast was developed using output fromthe Triangle Regional Model (TRMv6). Assumptions about future development activity andchanges in the distribution of population and employment in the forecast study area are implicit inthe model.
Forecast Methodology. Base year 2019 estimates and Horizon Year 2045 forecasts provided inthe attached forecast were developed using a method under which observed traffic data as well as2013 and 2045 model output were considered.
421 Fayetteville St.Suite 600Raleigh, North Carolina27601
To determine any intermediate years, straight-line interpolation may be used. AADT volumes maybe extrapolated for up to two years immediately following 2045. If it is determined that any ofthese assumptions have become inconsistent with the project and surrounding area activity,please request updated projections at this location.
Cc: Keith Dixon, Transportation Planning DivisionScott Walston, Transportation Planning DivisionDoumit Ishak, Congestion Management SectionClark Morrison, PhD, PE, Pavement Management UnitBrenda Moore, PE, CPM, Roadway Design UnitDavid Keilson, PE, Division Planning EngineerFelix Nwoko, DCHC MPOTraffic Forecasting GIS Support
TEL: 919-677-2000FAX: 919-677-2050
2019
I-3306A
No Build (AM)Without Widening
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )AM
DDHV
DHV Design Hourly Volume (%) = K30AM AM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
AM
(4,4
)14
55
9
48
3
6
5
1
AM
(2,1
1)
1060
52
0
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
AM
(2,1
)8
60
67
32
18
78
6
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
3
6
39
20
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
5
105
24
126
7
NC 86
SR 1732(Sunrise Road)
84
50
182
132
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
33
50
26
309
13
NC 54
NC 54
Mat
chlin
eA
Mat
chlin
eA
512 8
3
AM
(2,1
)9
55
15
3
AM
(3,1
)7
75
36
AM
(3,1
)8
60
52
AM
(2,1
)7
55
54
0
AM(2,9) 855
1270AM(2,9) 855
1230AM(2,9) 855
1230AM(2,8) 865
726AM(2,8) 865
726AM(2,7) 765
760AM(2,7) 760
810
AM(2,7) 760
810AM(3,6) 760
850AM(3,6) 760
850AM(2,5) 765
1030AM(2,5) 765
1030AM(2,5) 755
1282
AM
(2,3
)11
55
55
AM
(3,1
)9
55
31
0A
M(3
,1)
855
10
8
AM
(2,1
)7
60
45
6
AM
(2,1
)8
55
50
0A
M(2
,1)
1055
20
0
AM
(5,1
)10
55
11
AM
(3,1
)9
60
45
AM
(3,1
)11
55
29
AM
(2,1
)12
55
66
AM
(2,1
)11
55
99
AM
(2,1
)11
55
90
2019
I-3306A
No Build (PM)Without Widening
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )PM
DDHV
DHV Design Hourly Volume (%) = K30PM PM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
PM(2,9)8 55
1230
48
3
6
5
1PM
(2,9)8 55
1270PM
(2,9)8 55
1230
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
32
18
78
6
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
3
6
39
20
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
PM(3,6)8 60
850
5
105
24
126
7PM
(2,7)8 60
810PM
(3,6)8 60
850
NC 86
SR 1732(Sunrise Road)
PM(2,5)8 60
1030
84
50
182
132
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
PM (2,1
)11
55
99
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
PM(2,5)8 60
1030
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
PM(2,5)8 60
1282
33
50
26
309
13
NC 54
NC 54
PM(2,8)8 60
726PM
(2,8)8 60
726PM
(2,7)8 60
760PM
(2,7)8 60
810
Mat
chlin
eA
Mat
chlin
eA
512 8
3
PM (3,1
)9
60
45
PM (3,1
)11
55
29
PM (2,1
)12
55
66
PM (2,1
)11
55
90
PM (5,1
)10
55
11
PM (2,1
)8
55
15
3
PM (3,1
)11
60
36
PM (3,1
)9
60
52
PM (3,1
)10
55
10
8PM (3,1
)9
60
31
0
PM (2,1
)8
55
54
0PM (2,1
)8
60
45
6
PM (2,1
)8
55
50
0
PM (2,3
)9
60
55
PM (4,4
)8
75
9
PM(2
,11
)7
65
52
0
PM (2,1
)9
55
67
PM (2,1
)10
55
20
0
2019
I-3306A
Build 1 (AM)Widening I-40 to 6-lanes
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )AM
DDHV
DHV Design Hourly Volume (%) = K30AM AM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
AM
(4,4
)14
55
9
47
2
7
6
1
AM
(2,1
1)
1060
50
8
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
AM
(2,1
)8
60
64
34
13
80
7
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
3
12
39
24
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
6
105
22
133
7
NC 86
SR 1732(Sunrise Road)
84
50
179
126
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
33
51
25
304
13
NC 54
NC 54
Mat
chlin
eA
Mat
chlin
eA
500 8
3
AM
(2,1
)9
55
15
8
AM
(3,1
)7
75
44
AM
(3,1
)8
60
50
AM
(2,1
)7
55
53
7
AM(2,9) 855
1271AM(2,9) 855
1235AM(2,9) 855
1235AM(2,8) 865
743AM(2,8) 865
743AM(2,7) 765
783AM(2,7) 760
831
AM(2,7) 760
831AM(3,6) 760
875AM(3,6) 760
875AM(2,5) 765
1046AM(2,5) 765
1046AM(2,5) 755
1291
AM
(2,3
)11
55
55
AM
(3,1
)9
55
31
3A
M(3
,1)
855
10
3
AM
(2,1
)7
60
45
0
AM
(2,1
)8
55
49
6A
M(2
,1)
1055
19
9
AM
(2,1
)11
55
93
AM
(2,1
)12
55
73
AM
(3,1
)11
55
28
AM
(3,1
)9
60
45
AM
(5,1
)10
55
11
AM
(2,1
)11
55
98
2019
I-3306A
Build 1 (PM)Widening I-40 to 6 lanes
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )PM
DDHV
DHV Design Hourly Volume (%) = K30PM PM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
PM(2,9)8 55
1235
47
2
7
6
1PM
(2,9)8 55
1271PM
(2,9)8 55
1235
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
34
13
80
7
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
3
12
39
24
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
PM(3,6)8 60
875
6
105
22
133
7PM
(2,7)8 60
831PM
(3,6)8 60
875
NC 86
SR 1732(Sunrise Road)
PM(2,5)8 60
1046
84
50
179
126
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
PM (2,1
)11
55
98
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
PM(2,5)8 60
1046
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
PM(2,5)8 60
1291
33
51
25
304
13
NC 54
NC 54
PM(2,8)8 60
743PM
(2,8)8 60
743PM
(2,7)8 60
783PM
(2,7)8 60
831
Mat
chlin
eA
Mat
chlin
eA
500 8
3
PM (3,1
)9
60
45
PM (3,1
)11
55
28
PM (2,1
)12
55
73
PM (2,1
)11
55
93
PM (5,1
)10
55
11
PM (2,1
)8
55
15
8
PM (3,1
)11
60
44
PM (3,1
)9
60
50
PM (3,1
)10
55
10
3PM (3,1
)9
60
31
3
PM (2,1
)8
55
53
7PM (2,1
)8
60
45
0
PM (2,1
)8
55
49
6
PM (2,3
)9
60
55
PM (4,4
)8
75
9
PM(2
,11
)7
65
50
8
PM (2,1
)9
55
64
PM (2,1
)10
55
19
9
2019
I-3306A
Build 2 (AM)Widening I-40 to 8-lanes
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )AM
DDHV
DHV Design Hourly Volume (%) = K30AM AM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
AM
(4,4
)14
55
9
46
2
9
6
1
AM
(2,1
1)
1060
50
8
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
AM
(2,1
)8
60
64
35
13
81
8
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
4
12
39
25
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
5
105
22
135
7
NC 86
SR 1732(Sunrise Road)
85
50
178
125
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
34
52
26
303
13
NC 54
NC 54
Mat
chlin
eA
Mat
chlin
eA
499 9
3
AM
(2,1
)9
55
15
9
AM
(3,1
)7
75
45
AM
(3,1
)8
60
51
AM
(2,1
)7
55
53
7
AM(2,9) 855
1271AM(2,9) 855
1238AM(2,9) 855
1238AM(2,8) 865
748AM(2,8) 865
748AM(2,7) 765
789AM(2,7) 760
837
AM(2,7) 760
837AM(3,6) 760
884AM(3,6) 760
884AM(2,5) 765
1052AM(2,5) 765
1052AM(2,5) 755
1295
AM
(2,3
)11
55
56
AM
(3,1
)9
55
31
5A
M(3
,1)
855
10
2
AM
(2,1
)7
60
44
9
AM
(2,1
)8
55
49
6A
M(2
,1)
1055
20
1
AM
(5,1
)10
55
11
AM
(2,1
)11
55
97
AM
(3,1
)9
60
45
AM
(3,1
)11
55
28
AM
(2,1
)12
55
73
AM
(2,1
)11
55
93
2019
I-3306A
Build 2 (PM)Widening I-40 to 8 lanes
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )PM
DDHV
DHV Design Hourly Volume (%) = K30PM PM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
PM(2,9)8 55
1238
46
2
9
6
1PM
(2,9)8 55
1271PM
(2,9)8 55
1238
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
35
13
81
8
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
4
12
39
25
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
PM(3,6)8 60
884
5
105
22
135
7PM
(2,7)8 60
837PM
(3,6)8 60
884
NC 86
SR 1732(Sunrise Road)
PM(2,5)8 60
1052
85
50
178
125
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
PM (2,1
)11
55
97
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
PM(2,5)8 60
1052
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
PM(2,5)8 60
1295
34
52
26
303
13
NC 54
NC 54
PM(2,8)8 60
748PM
(2,8)8 60
748PM
(2,7)8 60
789PM
(2,7)8 60
837
Mat
chlin
eA
Mat
chlin
eA
499 9
3
PM (3,1
)9
60
45
PM (3,1
)11
55
28
PM (2,1
)12
55
73
PM (2,1
)11
55
93
PM (5,1
)10
55
11
PM (2,1
)8
55
15
9
PM (3,1
)11
60
45
PM (3,1
)9
60
51
PM (3,1
)10
55
10
2PM (3,1
)9
60
31
5
PM (2,1
)8
55
53
7PM (2,1
)8
60
44
9
PM (2,1
)8
55
49
6
PM (2,3
)9
60
56
PM(2
,11
)7
65
50
8
PM (4,4
)8
75
9 PM (2,1
)9
55
64
PM (2,1
)10
55
20
1
2045
I-3306A
No Build (AM)Without Widening
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )AM
DDHV
DHV Design Hourly Volume (%) = K30AM AM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
AM
(4,4
)14
55
20
48
2
49
15
1
AM
(2,1
1)
1060
11
00
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
AM
(2,1
)8
60
10
5
48
25
117
9
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
6
10
49
35
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
10
145
33
170
7
NC 86
SR 1732(Sunrise Road)
100
63
200
171
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
35
130
101
462
13
NC 54
NC 54
Mat
chlin
eA
Mat
chlin
eA
1090 10
3
AM
(2,1
)9
55
23
6
AM
(3,1
)7
75
56
AM
(3,1
)8
60
66
AM
(2,1
)7
55
67
1
AM(2,9) 855
2002AM(2,9) 855
2016AM(2,9) 855
2016AM(2,8) 865
936AM(2,8) 865
936AM(2,7) 765
989AM(2,7) 760
1057
AM(2,7) 760
1057AM(3,6) 760
1105AM(3,6) 760
1105AM(2,5) 765
1313AM(2,5) 765
1313AM(2,5) 755
1711
AM
(2,3
)11
55
10
0
AM
(3,1
)9
55
43
0A
M(3
,1)
855
15
8
AM
(2,1
)7
60
60
5
AM
(2,1
)8
55
72
5A
M(2
,1)
1055
26
9
AM
(2,1
)11
55
21
2
AM
(3,1
)11
55
50
AM
(2,1
)12
55
91
AM
(3,1
)9
60
68
AM
(5,1
)10
55
13
AM
(2,1
)11
55
12
2
2045
I-3306A
No Build (PM)Without Widening
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )PM
DDHV
DHV Design Hourly Volume (%) = K30PM PM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
PM(2,9)8 55
2016
48
2
49
15
1PM
(2,9)8 55
2002PM
(2,9)8 55
2016
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
48
25
117
9
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
6
10
49
35
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
PM(3,6)8 60
1105
10
145
33
170
7PM
(2,7)8 60
1057PM
(3,6)8 60
1105
NC 86
SR 1732(Sunrise Road)
PM(2,5)8 60
1313
100
63
200
171
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
PM (2,1
)11
55
12
2
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
PM(2,5)8 60
1313
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
PM(2,5)8 60
1711
35
130
101
462
13
NC 54
NC 54
PM(2,8)8 60
936PM
(2,8)8 60
936PM
(2,7)8 60
989PM
(2,7)8 60
1057
Mat
chlin
eA
Mat
chlin
eA
1090 10
3
PM (3,1
)9
60
68
PM (3,1
)11
55
50
PM (2,1
)12
55
91
PM (2,1
)11
55
21
2
PM (5,1
)10
55
13
PM (2,1
)8
55
23
6
PM (3,1
)11
60
56
PM (3,1
)9
60
66
PM (3,1
)10
55
15
8PM (3,1
)9
60
43
0
PM (2,1
)8
55
67
1PM (2,1
)8
60
60
5
PM (2,1
)8
55
72
5
PM(2
,11
)7
65
11
00
PM (2,3
)9
60
10
0PM (4
,4)
875
20
PM (2,1
)9
55
10
5
PM (2,1
)10
55
26
9
2045
I-3306A
Build 1 (AM)Widening I-40 to 6 lanes
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )AM
DDHV
DHV Design Hourly Volume (%) = K30AM AM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
AM
(4,4
)14
55
21
45
3
53
16
1
AM
(2,1
1)
1060
95
7
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
AM
(2,1
)8
60
95
59
20
132
10
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
6
10
53
38
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
7
163
30
202
7
NC 86
SR 1732(Sunrise Road)
123
72
200
170
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
32
95
47
436
13
NC 54
NC 54
Mat
chlin
eA
Mat
chlin
eA
945 12
3
AM
(2,1
)9
55
25
6
AM
(3,1
)7
75
64
AM
(3,1
)8
60
75
AM
(2,1
)7
55
68
2
AM(2,9) 855
2016AM(2,9) 855
2037AM(2,9) 855
2037AM(2,8) 865
1104AM(2,8) 865
1104AM(2,7) 765
1167AM(2,7) 760
1242
AM(2,7) 760
1242AM(3,6) 760
1304AM(3,6) 760
1304AM(2,5) 765
1479AM(2,5) 765
1479AM(2,5) 755
1835
AM
(2,3
)11
55
10
0
AM
(3,1
)9
55
45
3A
M(3
,1)
855
12
5
AM
(2,1
)7
60
60
1
AM
(2,1
)8
55
72
0A
M(2
,1)
1055
26
8
AM
(5,1
)10
55
13
AM
(2,1
)11
55
12
2
AM
(3,1
)9
60
68
AM
(3,1
)11
55
45
AM
(2,1
)12
55
93
AM
(2,1
)11
55
21
0
2045
I-3306A
Build 1 (PM)Widening I-40 to 6 lanes
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )PM
DDHV
DHV Design Hourly Volume (%) = K30PM PM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
PM(2,9)8 55
2037
45
3
53
16
1PM
(2,9)8 55
2016PM
(2,9)8 55
2037
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
59
20
132
10
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
6
10
53
38
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
PM(3,6)8 60
1304
7
163
30
202
7PM
(2,7)8 60
1242PM
(3,6)8 60
1304
NC 86
SR 1732(Sunrise Road)
PM(2,5)8 60
1479
123
72
200
170
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
PM (2,1
)11
55
12
2
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
PM(2,5)8 60
1479
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
PM(2,5)8 60
1835
32
95
47
436
13
NC 54
NC 54
PM(2,8)8 60
1104PM
(2,8)8 60
1104PM
(2,7)8 60
1167PM
(2,7)8 60
1242
Mat
chlin
eA
Mat
chlin
eA
945 12
3
PM (3,1
)9
60
68
PM (3,1
)11
55
45
PM (2,1
)12
55
93
PM (2,1
)11
55
21
0
PM (5,1
)10
55
13
PM (2,1
)8
55
25
6
PM (3,1
)11
60
64
PM (3,1
)9
60
75
PM (3,1
)10
55
12
5PM (3,1
)9
60
45
3
PM (2,1
)8
55
68
2PM (2,1
)8
60
60
1
PM (2,1
)8
55
72
0
PM (2,3
)9
60
10
0
PM(2
,11
)7
65
95
7
PM (4,4
)8
75
21
PM (2,1
)9
55
95
PM (2,1
)10
55
26
8
2045
I-3306A
Build 2 (AM)Widening I-40 to 8 lanes
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )AM
DDHV
DHV Design Hourly Volume (%) = K30AM AM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
AM
(4,4
)14
55
21
46
3
54
18
1
AM
(2,1
1)
1060
92
0
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
AM
(2,1
)8
60
93
64
20
140
11
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
7
10
53
41
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
6
164
29
206
7
NC 86
SR 1732(Sunrise Road)
125
73
199
169
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
30
100
40
427
13
NC 54
NC 54
Mat
chlin
eA
Mat
chlin
eA
905 15
3
AM
(2,1
)9
55
26
6
AM
(3,1
)7
75
67
AM
(3,1
)8
60
76
AM
(2,1
)7
55
68
3
AM(2,9) 855
2019AM(2,9) 855
2042AM(2,9) 855
2042AM(2,8) 865
1152AM(2,8) 865
1152AM(2,7) 765
1219AM(2,7) 760
1296
AM(2,7) 760
1296AM(3,6) 760
1361AM(3,6) 760
1361AM(2,5) 765
1531AM(2,5) 765
1531AM(2,5) 755
1868
AM
(2,3
)11
55
10
0
AM
(3,1
)9
55
45
7A
M(3
,1)
855
12
2
AM
(2,1
)7
60
60
1
AM
(2,1
)8
55
72
6A
M(2
,1)
1055
26
9
AM
(5,1
)10
55
13
AM
(3,1
)9
60
68
AM
(2,1
)11
55
21
0
AM
(2,1
)12
55
93
AM
(3,1
)11
55
44
AM
(2,1
)11
55
12
2
2045
I-3306A
Build 2 (PM)Widening I-40 to 8 lanes
Orange County andDurham County Division 7
WBS# 47537.1.1
July 17, 2019
I-85 (Exit 163) to NC 54(Exit 273)
EXTENTS
Widening of I-40 in Durham andOrange Counties from I-85
to NC 54
PROJECT
## Vehicles Per Day in 100s
1- Less than 50VPD
( d, t )PM
DDHV
DHV Design Hourly Volume (%) = K30PM PM Peak PeriodD Peak Hour Directional Split (%) Indicates Direction of D(d,t) Dual, TT-STs (%)
Existing RoadwayRoad WideningProposed Roadway
PM(2,9)8 55
2042
46
3
54
18
1PM
(2,9)8 55
2019PM
(2,9)8 55
2042
I-85 ConnectorSR1134
(Dimmocks Mill Rd)
SR 1006(Orange Grove Rd)
40
85SR 1006
(Orange Grove Rd)
SR1134(Dimmocks Mill Rd)
I-85 Connector
64
20
140
11
5
SR 1009(Old NC 86)
SR 1009(Old NC 86)
7
10
53
41
6
SR 1723(New Hope Church
Road)
SR 1723(New Hope Church
Road)
PM(3,6)8 60
1361
6
164
29
206
7PM
(2,7)8 60
1296PM
(3,6)8 60
1361
NC 86
SR 1732(Sunrise Road)
PM(2,5)8 60
1531
125
73
199
169
10
US 15-501 (DurhamChapel Hill Blvd)
40
US 15-501 (DurhamChapel Hill Blvd)
SR 1732(Sunrise Road)
NC 86
PM (2,1
)11
55
12
2
SR 2220 (OldChapel Hill Road)
SR 2220 (OldChapel Hill Road)
PM(2,5)8 60
1531
SR 1109 (FarringtonRoad)
SR 1109 (FarringtonRoad)
SR 1734(Erwin Road)
SR 1734(Erwin Road)
PM(2,5)8 60
1868
30
100
40
427
13
NC 54
NC 54
PM(2,8)8 60
1152PM
(2,8)8 60
1152PM
(2,7)8 60
1219PM
(2,7)8 60
1296
Mat
chlin
eA
Mat
chlin
eA
905 15
3
PM (3,1
)9
60
68
PM (3,1
)11
55
44
PM (2,1
)12
55
93
PM (2,1
)11
55
21
0
PM (5,1
)10
55
13
PM (2,1
)8
55
26
6
PM (3,1
)11
60
67
PM (3,1
)9
60
76
PM (3,1
)10
55
12
2PM (3,1
)9
60
45
7
PM (2,1
)8
55
68
3PM (2,1
)8
60
60
1
PM (2,1
)8
55
72
6
PM(2
,11
)7
65
92
0
PM (2,3
)9
60
10
0PM (4
,4)
875
21
PM (2,1
)9
55
93
PM (2,1
)10
55
26
9