![Page 1: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/1.jpg)
PMC 1
Established on 1st April, 2003Office: FF-4, Center Point,
Nr.GIDC Police Station,GIDC, Ankleshwar-393002
Branch: 135, Jaynarayan Complex,Near Hotel Lords Inn,
Dahej, Dist.Bharuch.E mail: [email protected] Fax: (O)02646 226579
(M)+91 98 243 97443+91 93 757 08271
PROJECT MANAGEMENT CONSULTANTS
![Page 2: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/2.jpg)
PMC 2
NITESH PATEL, Proprietor
B E Civil with 24 yrs field experience in various Infrastructure Industrial, Residential, Commercial, Designing, Detailing, Execution
Chartered Engineer ( MIE No. M/105070/7), Member of Institution of Engineers (India)
Member of India Chapter of American Concrete Institute.
Competent Person for issuing Stability Certificate under rule 3-C of Factories Act. ( Regn. No GUJ/DISH/CPT/A/0171/2007), by Director of Industrial Safety & Health, Gujarat.
Competent Person for issue of Stability Certificate under Petroleum Rules 2002 (Regn No.P3(9)241/97/XIV), by Chief Controller of Explosives, Nagpur.
Govt Approved Valuer ( Regn. No Cat.I/47/06-07)
Secretary of Bharuch Civil Engineers Forum.
![Page 3: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/3.jpg)
PMC 3
• Architectural Planning for Industrial, Residential, Commercial Buildings.
• Industrial Layouts Preparation.
• Structural Designing.
• Master Plan—Site Layout Development.
ARCHITECTURAL & STRUCTURAL DESIGNING
![Page 4: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/4.jpg)
PMC 4
PROJECT MANAGEMENT & CO ORDINATION SERVICES
• Planning, Scheduling and Monitoring of Project.• Budgeting, Estimation.• BOQ Preparation.• Value Addition and Cost Saving, Cost Control.• Site Supervision.• Quality Control.• Bills Certification. • Tender Preparation, Tender Scrutiny.• Review of Drawings.• Third Party Quality Assurance.• Third Party Bills Varification.
![Page 5: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/5.jpg)
PMC 5
INDUSTRIAL MODIFICATIONS DETAILING
• GMP Upgradation of Pharmaceutical Plants.• Modifications in Existing Plants.• Trouble Shooting in Repair Works.• Special Problems Solving in Project & Maintenance Work.
INFRASTRUCTURE DETAILING• Roads.• Storm Water Drainage.
• Plumbing and Drainage Systems.
![Page 6: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/6.jpg)
PMC 6
PREPARATION OF GOVT. APPROVAL DRAWINGS
• Preparation and approval of drawings for GIDC approvals.• Preparation and approval of drawings for Factory Inspector
approvals.• Preparation and approval of drawings for Chief Controller of
Explosives approvals.• Preparation and approval of drawings for FDA approvals.
OTHERS• Laboratory set up at Dahej for Material Testing, Quality
Assurance, Soil Investigation.• Asset Valuation for Various Purposes Like Insurance,
Finance.• Feasibility Study for New Projects.
![Page 7: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/7.jpg)
PMC 7
Resources- Infrastructure
Office Premises:• Approx. 380 sft. Built up area office located at GIDC
Ankleshwar.• Approx. 270 sft. Built up area office located at GIDC
Dahej• Quality Assurance Lab set up at Dahej
Office set up:• Eight computers, with AutoCad for drawings
preparation and STRUDS soft ware for str.designing.• A0+ size plotter. (Hp T- 610 , print upto 44” width)• A3 size printer
![Page 8: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/8.jpg)
PMC 8
RESOURCES-- TECHNICAL MANPOWER
NAME QUALIFICATION EXPERIENCE1. Mr. N K Patel – --- B E Civil 25 Years 2. Mr. Maksood Patel – D C E 16 Years 3. Mr. Kruten Patel-- B E Civil 5 Years4. Mr. Maksud Shaikh -- D C E 10 Years5. Mr. Vaibhav Tandel -- D C E 2 Years6. Mr. Viren Dodiya D C E 1 Years7. Mr. D D Patel--- Supervisor 30 Years8. Mr. Mayur Jadav – Drafts man 5 Years9. Mr. Sanjay Patel-- Drafts man 5 Years 10. Mr. Haresh Rathod – Drafts man 2 Years 11. Mr. Prakash Gohil – Drafts man 2 Years 12. Mr. Mukesh Prajapati-- Drafts man 2 Years13. Mr. Zaheer --- Drafts man 2 Years14. Mr. Palak Kaptan --- Drafts man 1 Years
![Page 9: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/9.jpg)
PMC 9
Our Associate
• Globle Survey, Vadodara --Mr. Kedar Gaddu for Surveying Jobs• Geo Engineering Services, Vadodara – Mr. Manish Sharma for Soil
Investigation jobs• Structural Consultants –
1) M/S Shyam Enginers, Anand – Mr. Sumant Patel, M.E. Str. Engg with 20 years experience
2) M/S K. M Thakkar, Vadodara – Mr. Kamlesh Thakkar, B. E. Civil with 17 years experience
3) M/S Rumadri Associate, Vadodara – Mr. Hemant Surti, B. E. Civil with 15 years experience
4) M/S Apoorva Parikh, Ahmedabad– Electrical Consultants5) M/S Viraj Sanitation, Ahmedabad– Plumbing & Drainage6) M/S Pramod Kumar, Ahmedabad-- Piping & Mechanical
![Page 10: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/10.jpg)
PMC 10
Our Associate
4) M/S Apoorva Parikh, Ahmedabad– Electrical Consultants5) M/S Viraj Sanitation, Ahmedabad– Plumbing & Drainage6) M/S Pramod Kumar, Ahmedabad-- Piping & Mechanical
Support for Quality Assurance• Unique Testing Services, Surat• Geostruct Testing Services, Vadodara• K J Polytechnique, Bharuch• Gayatri Geotechniq, Bharuch• Shah Associates, Surat• Geo Engineering Services (Vadodra, Dahod, Adipur-Kutch)• Accurate Testing Laboratory Pvt. Ltd. Ahmdavad
![Page 11: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/11.jpg)
PMC 11
0
10
20
30
40
50
60
70
80
2003 2004 2005 2006 2007 2008
Turn Over in Rs. Lacs
Consistent Growth (Annual Turn Over in Rs. Lacs)
![Page 12: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/12.jpg)
PMC 12
0
2
4
6
8
10
12
14
2003 2004 2005 2006 2007 2008
Consistent Growth (Technical Manpower Employed)
![Page 13: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/13.jpg)
PMC 13
Projects Executed & Projects on HandSr. no.
Name of Client Type of work executed/under execution Approx. Value of
work done.
1 Asian Paints Ltd., Ankleshwar
♦Arch., Str. Designing, project management for --Warehouse, Tank farm, Drum storage etc.♦Designing of Process Engg. Lab up gradation.♦Structural Designs, detailing for modifications job.♦Structural stability calculations for dyke walls.♦Quantity surveying.♦Preparation of Drawings & Approval of Plans, amendment of license from Chief Controller of Explosives., GIDC, Factory Inspector.♦RCC Roads, Parking with Pavers Blocks♦GIDC Liaison work.♦Valuation
♦Rs. 1000Lacs
![Page 14: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/14.jpg)
PMC 14
2 AnkleshwarAnalytical Research & Infrastructure Ltd., Ankleshwar
♦ Arch., Str. Designing, project management for --
♦ Analytical & Process Lab,♦ Pilot plant, ♦ Infrastructure—Drainage, Roads, Retaining
wall, Compound wall,
♦ Rs.500 Lacs
3 Aventis PharmaLtd. Ankleshwar
♦ Architectural Designing/Project Management for API quality control lab, process water plant.
♦ Detailing and Project Management for GMP up gradation for DP plant.
♦ Detailing and Project Management for GMP up gradation for API final processing area, plant modifications.
♦ CCOE approval for HCl Cylinder shed.
♦ Rs.125 Lacs
![Page 15: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/15.jpg)
PMC 15
4 Bayer Crop Science Ltd.
♦Arch/str.design, Project Management for 1. Waste Water treatment plant2. Drum Crushing Plant3. Day Tank Farm4. Power Plant♦Arch Drgs for AC-I revamping♦Quality assurance management for ACIV Project work./ U G tank/ AC-I♦Non destructive testing of structures and issuing stability certificates.♦Detailing for effluent disposal.♦Land survey and storm water drain designing.♦Crack repair/ soil stabilization detailing for warehouse.♦Misc. modification projects.♦GIDC Liaison work♦Bills Checking (Third Party)♦Valuation of property
♦Rs. 700 Lacs
![Page 16: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/16.jpg)
PMC 16
5 Chiron Vaccines Ltd. Ankleshwar.
♦Value added Project Management for vaccine plant extension project.♦For QC Expansion project.♦Underground water tank detailing
♦Rs.500 Lacs
6 CadilaHealthCare Ltd. Ankleshwar & Dabhasa
♦Detailing for existing effluent drainage up gradation.♦Arch/ Str. Designing for 1.Hydogenation plant 2. Incinerator plant 3. Cooling tower-Utility Building♦Detailing for Infrastructure-Road, drainage
♦Rs.275 Lacs
7 Cadila PharmaLtd.
♦Modification & up gradation of old plant ♦Rs.100 Lacs
8 Universal Chemicals Dahej
♦Arch/str.design, Project Management for 1. Power Plant2. Admn cum Engg. Block
♦Rs. 150 Lacs
9 SBS Colours & Chemiques Pvt. Ltd, Ankleshwar
♦Arch/str.design, Project Management for Solid Dyes plant
♦Rs.250 Lacs
10 Notified Area Office Ankleshwar
♦Third Party Quality Assurance for Infrastructure Projects
♦Rs.800 Lacs
![Page 17: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/17.jpg)
PMC 17
11 Jhagadia Industries Association
♦Third Party Quality Assurance for Road work ♦Rs.600 Lacs
12 Bharuch EnviroInfrastructure Ltd.
♦Arch/ Str. Designing for storage sheds♦GIDC/ Factory Inspector Approval drgs♦Third Party Quality Assurance.
♦Rs.700 Lacs
13 Gwalior Chemicals Industries Ltd. Ankleshwar, Nagda
♦Arch/ Str. Designing for GMP warehouse♦GIDC/ FI Approval drgs
♦Rs.150 Lacs
14 Hikal Ltd.Panoli
♦Value added Project Management for plant extension project, trouble shooting.♦Checking stability of the structural steel erection work for done for equipments erection.♦Factory Inspector/ GIDC Dgr. approvals
15 Wockhardt Ltd.Ankleshwar.
♦GIDC/ Factory Inspector approval drawings making and getting approval from GIDC.♦Non destructive testing of structures and issuing stability certificates.♦Plant modification detailing.
16 Panoli Industries Association Panoli
♦Emergency Response Center ♦Rs.40 Lacs
17 Rusan Pharma Ltd. ♦Arch.,str. Designing/ Project Management for API Expansion Project.
♦Rs.65 Lacs
![Page 18: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/18.jpg)
PMC 18
18 Cheminova Ltd.Panoli
♦Architectural and structural design for Canteen building, Security building.♦GIDC approval drawings making and getting approval from GIDC.
19 Ewac Alloys Ltd. (L & T ) Ankleshwar
♦Checking stability of the existing structural steel trusses and designing structure for gantry.♦Extension of shed, GIDC, FI Drgs
20 Gujarat Glass Ltd. Kosamba
♦Modifications in existing plant & Arch. Str. Designing of Administrative building,
♦Rs.80 Lacs
21 Huber Chemicals, Jhagadia
♦Detailing for plant modifications.
22 United Phosphorous Ltd-III, Ankleshwar
♦Plant Modifications♦Stability Certification
23 United Phosphorous Ltd-V Jhagadia
♦Stability Certification
24 Isagro (Asia) Ltd. Panoli.
♦NBA distillation facility. Structural details.
![Page 19: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/19.jpg)
PMC 19
25 Heubach Colours, Ankleshwar
♦Plant Building extension♦NDT & issuing stability certificate.♦Pipe bridge strengthening detailing
26 Sajjan India, Ankleshwar
♦Arch. Structural detailing for 1.Boiler House,2. Chemical Shed3. Plant Extn
27 Daxesh Petrochem ♦Detailing for Plant expansion♦Drawing preparation and approval of Plans from Explosives department.
28 Dynemic Products Ltd. Ankleshwar
♦Arch., str. Designing/ Project Management for Food colour plant. (including developing site layout, plant equipment layout.)—project not done♦Ware House♦Plant Building extension♦Bills Checking (third party)
29 Indian Oil Corporation Ltd., Amod
♦Non Destructive testing of structures and issuing stability certificates
30 GNFC Ltd., Bharuch
♦Non Destructive testing of structures and issuing stability certificates♦Study on water consumption of town ship and recommending conservation measures.♦Rehabilitation of corporate building walls.
![Page 20: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/20.jpg)
PMC 20
31 Maldeep Catalyst Pvt. Ltd. Panoli
♦Arch.,str. Designing/ Project Management for paints intermediate plant. (including developing site layout, plant equipment layout.)
32 Ratnamani Biochem & Phrma Pvt. Ltd., Ankleshwar.
♦Detailing –Arch./Str. for old factory to convert to API Plant.
33 AtriChemoPharmaAnkleshwar
♦Arch.,str. Designing of API plant
34 Element Chemilink Pvt. Ltd. Ankleshwar
♦ Arch.,str. Designing/ Project Management for Chemical Plant—Distillation plant
35 Gulshan PolyolsLtd. Jhagadia
♦ Boiler Structure, Turbine foundations, WET structure—Structural detailing
36 Samrat Pharmaltd. Ankleshwar
♦ Arch, Structural detailing for API Plant
37 Amsal Chem Ltd. Ankleshwar
♦ Arch, Str. detailing for API Plant
![Page 21: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/21.jpg)
PMC 21
38 Apar Industries Ltd. Valia
♦Structural design, detailing for Powder plant extension.♦Plant modification detailing.
39 Bhanu Dyes Pvt. Ltd. Jhagadia
♦Arch. Structural detailing for chemical plant.
40 Residential ♦Bungalows—Arch, planning, str. designing
41 Skova Pharma, Ankleshwar
♦Industrial Plant detailing (work to start)
42 Snehal Pharma, Ankleshwar
♦Office Building, Industrial Plant detailing
43 Sky & Skylark, Ankleshwar
♦Office Building
44 Steel case Industries, Vapi
♦Industrial Plant detailing
45 Samip Chemicals ,Ank ♦Industrial Plant detailing
46 Bhavi BulkPack, Ankleshwar
♦Industrial Plant detailing
47 Ankleshwar Rubber, Ank
♦Industrial Plant detailing
48 ONGC Gandhar ♦Chemical shed,office Building
![Page 22: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/22.jpg)
PMC 22
48 ONGC Gandhar ♦ Chemical shed,office Building
49 Shree GattuVidyalaya, Ankleshwar.
♦ Value added project management, quality management for school building extn.
Misc. modifications
50 SanskardeepSchool
♦ Misc. modifications
51 AnkleshwarEnvironment Preservation Society
♦ Phytology lab—Arch/ Str. designing
52 Binaykia Synthetics ♦ Plant upgradation, modification, New Plant Building
53 Heat Treaters & Engineers, Ankleshwar
♦ New Plant Building
54 Option Oxides, Jhagadia
♦ New Plant Building
55 SewaRural,Jhagadia
♦ Training Centre
![Page 23: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/23.jpg)
PMC 23ELEMENT CHEMILINK PVT. LTD. RUSAN PHARMA LTD.
![Page 24: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/24.jpg)
PMC 24BAYER CROPSCIENCE LTD. AC – IV & AC-I –(Project Co ordination, Quality Assurance)
![Page 25: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/25.jpg)
PMC 25
BAYER CROPSCIENCE LTD.
![Page 26: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/26.jpg)
PMC 26ANKLESHWAR RESEARCH & ANALYTICAL INFRASTRUCTURE LTD.
![Page 27: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/27.jpg)
PMC 27ANKLESHWAR RESEARCH & ANALYTICAL INFRASTRUCTURE LTD.
![Page 28: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/28.jpg)
PMC 28ANKLESHWAR RESEARCH & ANALYTICAL INFRASTRUCTURE LTD.
![Page 29: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/29.jpg)
PMC 29ASIAN PAINTS LIMITED
![Page 30: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/30.jpg)
PMC 30BHARUCH ENVIRO INFRA LTD.
![Page 31: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/31.jpg)
PMC 31
![Page 32: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/32.jpg)
PMC 32
![Page 33: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/33.jpg)
PMC 33
![Page 34: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/34.jpg)
PMC 34
![Page 35: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/35.jpg)
PMC 35
![Page 36: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/36.jpg)
PMC 36
![Page 37: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/37.jpg)
PMC 37
![Page 38: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/38.jpg)
PMC 38
![Page 39: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/39.jpg)
PMC 39
![Page 40: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/40.jpg)
PMC 40
![Page 41: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/41.jpg)
PMC 41
![Page 42: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/42.jpg)
PMC 42
![Page 43: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/43.jpg)
PMC 43
![Page 44: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/44.jpg)
PMC 44
![Page 45: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/45.jpg)
PMC 45
![Page 46: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/46.jpg)
PMC 46
![Page 47: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/47.jpg)
PMC 47
![Page 48: PROJECT MANAGEMENT CONSULTANTSpmcank.com/pmc_intro.pdfMaksud Shaikh -- D C E 10 Years 5. Mr. Vaibhav Tandel -- D C E 2 Years 6. Mr. Viren Dodiya D C E 1 Years 7. Mr. D D Patel--- Supervisor](https://reader034.vdocuments.us/reader034/viewer/2022042513/5ad717fd7f8b9a98098c561f/html5/thumbnails/48.jpg)
PMC 48