Reporting – GridPP3 metrics
GridPP Quarterly Report OKArea Operations Close to targetQuarter Q2 2008 Not OKReported by Jeremy Coles Not yet able to be measured
Suspended
Metric no. Description Source Owner Target Q-2 Q-1 Q Comment
2.1.1Fraction of UK sites in Production
Manual - Information available from GOCDB Jeremy Coles
Number of GridPP sites in certified status. Require 100% 95%
Taking sites as distinct entites (19/20)
2.1.2 Number of supported VOsManual - Tier-2 quarterly reports and Tier-1 Jeremy Coles
Sum of unique VOs supported across GridPP sites - target 4 LHC + 5 other 40 Includes regional VOs
2.1.3Proportion of available jobslots used From APEL accounting Jeremy Coles
Jobslots used/ jobslots provided - 80% 37.40%
Misleading given that some shared sites are >100%
2.1.4 GridPP KSI2K AvailableManual sum over entries in quarterly reports Jeremy Coles
Total GridPP KSI2K nominally available at the end of the last quarter. Target WLCG pledge 14418.7
Is this hrs or raw KSI2K. Assuming raw. Also it is at the end not an average.
2.1.5 GridPP disk storage availableManual sum over entries in quarterly reports Jeremy Coles
Total TB of disk storage nominally available from GridPP at the end of the last quarter. Target WLCG pledge 2382.5
Tier-1 entry from http://www.gridpp.rl.ac.uk/stats/dac/RAL/year.shtml (includes buffers and hot spares). T2 figure = 1262.3. T1 = 1120.2 TB.
2.1.6 Job success rates
Based on the user jobs submitted by Steve (http://pprc.qmul.ac.uk/~lloyd/gridpp/uktest.html) Jeremy Coles 95% 95.50%
2.1.7UK contribution to LHC experiments
Manual sum over data provided by accounting portal Jeremy Coles
Percentage of jobs run by LHC V0s processed in UK in last quarter. Target is as pledged shares (11%?) 14.80%
2.1.8 Deployment team meetings Manual review of UK agenda page Jeremy Coles
Deployment team meetings take place on average biweekly Ok Take place weekly
2.1.9UK wide deployment support active
Manual review of UK agenda page Jeremy Coles 10 per year Ok
2.1.10GridPP deployment web-pages up-to-date
Web-page time stamps indicate updates Jeremy Coles
Static deployment web-pages updated within last 6 months Not ok
Not all pages have been updated within last 6 months.
2.1.11 Training needs addressed Jeremy Coles
Sysman meetings and Training events held. - 2 per year currently Ok
WLCG workshop had tutorials. HEPSYSMAN has training on Nagios.
2.1.12 GridPP site response to tickets Jeremy Coles Number of flagged tickets <3
As far as I can tell this is functioning. As yet GGUS does not have metrics available.
2.1.13 Number of sites on VO blacklists Jeremy ColesLess than 10 site days per quarter 3.40%
Based on 29 CE entries. (88+210+0)/87 = 3.4. Note that LHCb may not currently blacklist sites!
2/9/08 4GridPP21 Swansea
Reporting – GridPP3 milestones
GridPP Quarterly Report CompleteArea Security OverdueQuarter Q2 2008 Not yet dueReported by Tony Doyle Suspended
Milestone no. Description Owner Due date Date complete Evidence Comment2.2.3 Complete SSC3 at UK Tier 2s Mingchao Ma 31-Oct-082.2.4 Security review of Tier 2 sites Mingchao Ma 31-Mar-092.2.5 GridPP security workshop Mingchao Ma 31-Jul-09
2.2.6GridPP Tier 2 security survey and report Mingchao Ma 31-Jul-10
2.2.8 Security Assessment plan Linda Cornwall 31-Jul-08
2.2.9Security Vulnerability and risk management strategy Linda Cornwall 31-May-09
2.2.10 Security Policy integration Dave Kelsey 31-Jan-102.2.11 Review of GridPP Security Dave Kelsey 30-Jun-10
2.2.12Security recommendations for the future Dave Kelsey 31-Jan-11
2.2.13 GridSite software report Andrew McNab 30-Mar-092.2.14 Security report Sergey Dolgobrodov 30-Mar-092.2.15 GridSite software report Andrew McNab 30-Mar-102.2.16 Security report Sergey Dolgobrodov 30-Mar-102.2.17 GridSite software report Andrew McNab 30-Mar-112.2.18 Security report Sergey Dolgobrodov 30-Mar-11
2/9/08 5GridPP21 Swansea
Reporting – GridPP3 manpower
GridPP Tier-2 Quarterly ReportTier-2QuarterReported by
Effort (FTE)
Site Name Month 1 Month 2 Month 3 Month 1 Month 2 Month 3
Durham P RoffeDurham D Ambrose-GriffithEdinburgh S SkipseyEdinburgh S ThornEdinburgh M BakerEdinburgh G CowanGlasgow D MartinGlasgow A ElwellGlasgow M KenyonGlasgow G Stewart
Total
GridPP Funded Unfunded
ScotGrid2008Q2Graeme Stewart
2/9/08 6GridPP21 Swansea
GridPP 3 reporting - narrative
GridPP Quarterly ReportArea LHCbQuarter Q2 2008Reported by Glenn Patrick/ Raja Nandakumar
Progress over last Quarter
Work area
CASTOR
Note:To get multiple lines per box use Alt-Return
General Risks
Insitute or area specific risks
Problems/Issues
Ran well for a long period of time through CCRC08Concerns with reliability, especially when running many jobs (> about 500) at the same time.
Successes
Data redundancy, different T1 sites have very different configurations
Risk Mitigating Action
SE not stable at various T1 sites
Risk Mitigating Action
Security incidents compromising VOUser isolated using LHCb and site logs and quick action taken. Computing shifters and supervisors
identified to monitor LHCb and grid systems
RAL CE / batch system problemsDepends on nature of problem. Take action as appropriate either on LHCb or T1 (or both) side.
RAL Castor problemsWait for problems to be solved / backup solution to be
in place. Meanwhile, use other T1s as failovers
2/9/08 7GridPP21 Swansea
GridPP3 reporting – Tier2s
Tier-2QuarterReported by
Current Site Status Data Availability Measures Potential (CPU and wall-clock)
SiteService Nodes
Worker Nodes
Local Network
ConnectivitySite
Connectivity SRM
Hours in scheduled
maintenance
Steve Lloyd SAM availability
Steve Lloyd SAM reliability
SLL targeted ATLAS (UK test) 04/2008 05/2008 06/2008
quarter total
Lancaster Glite3.1 Glite3.1 1Gb 1Gb 2.2 19 93% 93% 92% 348624 360244.8 348624 1057492.8Liverpool Glite3.1 Glite3.1 1Gb 1Gb 2.2 0 96% 96% 91% 622800 643560 622800 1889160Manchester Glite3.1/glite3.0Glite3.1/glite3.01Gb 10Gb 2.2 24 (1 cluster) 86% 86% 79% 1555200 1607040 1555200 4717440Sheffield Glite3.1 Glite3.1 1Gb 1Gb 2.2 7 95% 95% 92% 131400 135780 131400 398580
Current Resources Available
SiteCPU
(kSI2K)Storage
(TB) CPU (kSI2K) Storage (TB) CPU (kSI2K) Storage (TB) CPU (kSI2K) Storage (TB) CPU (%) Storage (%)Lancaster 8 2 476.2 80 484.2 82 510 86.7 93% 95%Liverpool 270 10 595 34.5 865 44.5 604 80.3 99% 55%Manchester 0 0 2160 162 2160 162 1340 372.5 161% 43%Sheffield 0 0 182.5 4.5 182.5 4.5 182.5 3 100% 150%
Total 3413.7 281 3691.7 293 2636.5 542.5 129% 52%
GridPP Tier-2 Quarterly ReportNorthGrid08Q2A. Forti
Promised (GridPP MoU)Non LCG GridPP Total Available Promised (GridPP MoU)
GridPP Tier-2 Quarterly ReportTier-2 NorthGridQuarter 08Q2Reported by A. Forti
Q-2 Q-1 Current Q-2 Q-1 Current Q-2 Q-1 Current Q-2
4.x.1% of promised (by that time) disk available to GridPP 100% 95% 55% 43%
4.x.2 % of promised (by that time) CPU available 100% 93% 99% 161%
4.x.3Average SAM (SLL page) availability performance over the last quarter
95% averaged over sites in Tier-2 93% 96% 86%
4.x.4Average SAM (SLL page) reliability performance over the last quarter
95% averaged over sites in Tier-2 93% 96% 86%
4.x.5Average SLL targeted ATLAS test performance (UK test)
95% averaged over sites in Tier-2 92% 91% 79%
4.x.6 Average SLL SE test performance95% averaged over sites in Tier-2
4.x.7 Approx. CPU utilisation (wall clock time) 50% 46% 46% 15%
4.x.8 Approx. CPU utilisation (CPU time) 50% 48% 35% 17%
4.x.9 Percentage of disk used 50% 48% 5% 22%
4.x.10 Number of technical meetings held in last quarter 200% 0 0 0
4.x.11Number of management meetings held in last quarter 100% 0 0 0
4.x.12 Tier-2 meeting LCG MoU service levels
Tier-2 responded to all LCG problems covered by the GridPP MoU in the agreed times over the last quarter
4.x.13 Quarterly operational performance review
Tier-2 quarterly reports available by one month after the end of the quarter 1 1 1
4.x.14 Middleware upgrading
100% of sites in Tier-2 upgrade to the timetable agreed by the DB
4.x.15 Network is OK at all sites TBD 1 1 1
OKClose to targetNot OKNot yet able to be measuredSuspended
Metric no. Description TargetLancaster Liverpool Manchester Sheffield
Tier-2QuarterReported by
Supported VOs
Site alic
e
atla
s
bab
ar
bio
med
calic
e
cam
on
t
cdf
ced
ar
cms
dte
am
dze
ro
esr
Lancaster 1 1 1 1 1 1 1 1 1 1 1Liverpool 1 1 1 1 1 1 1 1 1 1 1 1Manchester 1 1 1 1 1 1 1Sheffield 1 1 1 1 1
Total 3 4 3 4 2 2 2 2 4 4 3 2Place a 1 in the relevant cells. Extend as necessary
Storage resource in use per VO (TB)
Site alic
e
atla
s
bab
ar
bio
med
calic
e
cam
on
t
cdf
ced
ar
cms
dte
am
dze
ro
esr
Lancaster 39 0.12 0.5Liverpool 1.9 0 0.2Manchester 25.2 10.8 0.2Sheffield 0.7 0 0Total 0 66.8 10.9 0 0 0 0 0.9 0 0 0 0
GridPP Tier-2 Quarterly ReportNorthGrid08Q2A. Forti
2/9/08 8GridPP21 Swansea
Project Map GridPP2
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.100 0.101 0.102 0.103 0.104 0.105 0.106 0.107 0.108 0.109 0.110 0.111 0.112 0.113 0.114 0.115 0.116
0.18 0.19 0.20 0.21 0.22 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30 0.31 0.32 0.33 0.34 0.117 0.118 0.119 0.120 0.121 0.122 0.123 0.124 0.125 0.126 0.127 0.128 0.129 0.130 0.131 0.132 0.133
0.35 0.36 0.37 0.38 0.39 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.134 0.135 0.136 0.137 0.138 0.139 0.140 0.141 0.142 0.143 0.144 0.145 0.146 0.1470.52 0.53 0.54 0.55 0.56 0.57 0.58 0.59 0.60 0.61 0.62 0.63 0.64 0.65 0.66 0.67 0.68
2.1 3.1 4.1 5.1 6.1 1.1.1 1.1.2 1.1.3 1.1.4 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5
1.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 6.1.6 6.1.7 6.1.8 6.1.9
2.1.11 2.1.12 3.1.11 3.1.12 3.1.13 4.1.11 4.1.12 5.1.11 5.1.12
2.2 3.2 4.2 5.2 6.2 1.2.1 1.2.2 1.2.3 1.2.4 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5
1.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10 3.2.6 3.2.7 4.2.6 4.2.7 4.2.8 4.2.9 4.2.10 5.2.6 5.2.7 5.2.8 5.2.9 5.2.10 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10
2.2.11 2.2.12 2.2.13 2.2.14 2.2.15 4.2.11 4.2.12 4.2.13 4.2.14 4.2.15 5.2.11 5.2.12 5.2.13 5.2.14 5.2.15 6.2.11 6.2.12 6.2.13 6.2.14
2.3 3.3 4.3 6.3 1.3.1 1.3.2 1.3.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5
2.3.6 2.3.7 2.3.8 2.3.9 2.3.10 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10
2.3.11 3.3.11 3.3.12 3.3.13 4.3.11 4.3.12 4.3.13
2.4 3.4 4.4 6.4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 6.4.1 6.4.2 6.4.3 6.4.4
2.4.6 2.4.7 2.4.8 2.4.9 2.4.10 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 4.4.6 4.4.7 4.4.8 4.4.9 4.4.10
2.4.11 2.4.12 2.4.13 2.4.14 2.4.15 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15
2.5 3.5 90 Days2.5.1 2.5.2 2.5.3 2.5.4 2.5.5 3.5.1 3.5.2 3.5.3 3.5.4 3.5.5
2.5.6 2.5.7 2.5.8 2.5.9 2.5.10 3.5.6 3.5.7 3.5.8 3.5.9 Monitor OK 1.1.1 2.5.11 2.5.12 2.5.13 2.5.14 Monitor not OK 1.1.1 Milestone complete 1.1.1
2.6 3.6 Milestone overdue 1.1.1
2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 Milestone due soon 1.1.1
2.6.6 2.6.7 2.6.8 2.6.9 2.6.10 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10 Milestone not due soon 1.1.1
2.6.11 2.6.12 2.6.13 Item not Active 1.1.1
Workload
6
1.2
Development
Dissemination
Project Execution
BaBarMetadata
Storage
GridPP2 Goal: To develop and deploy a large scale production quality grid in the UK for the use of the Particle Physics community
2 3
Knowledge Transfer
LHCb
GANGA
ATLAS
InteroperabilitySamGrid
Engagement
Production Grid Milestones Production Grid Metrics
1LCG External
4M/S/N
5Non-LHC Apps Management
Navigate downExternal link
PhenoGrid
LHC Apps
1.1
1.3
Security
InfoMon
Design
Service Challenges
Other Link Network LHC Deployment
Project Planning
CMS
Portal
Status Date - 01/Apr/08 + next
UKQCD
Update
Clear
2/9/08 9GridPP21 Swansea
Project Map GridPP3
Date
99ATLAS LHCb CMS 24
1.1 1.2 1.3 1.4 411.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 271.1.6 1.1.7 1.1.8 1.1.9 1.1.10 1.2.6 1.2.7 1.2.8 1.2.9 1.2.10 1.3.6 1.3.7 1.3.8 1.3.9 1.3.10 1.4.6 1.4.7 1.4.8 1.4.9 1.4.10 111.1.11 1.1.12 1.1.13 1.1.14 1.1.15 1.2.11 1.2.12 1.3.11 1.3.12 1.3.13 1.3.14 1.3.15 1.4.11 21.1.16 1.1.17 1.1.18 1.1.19 1.1.20 101
034
339
2.1 3.1 4.1 5.1 6.1 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 6.1.1 6.1.2 6.1.3 6.1.4 6.1.52.1.6 2.1.7 2.1.8 2.1.9 2.1.10 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 5.1.6 5.1.7 5.1.8 6.1.6 6.1.7 6.1.8 6.1.92.1.11 2.1.12 2.1.13 3.1.11 3.1.12 3.1.13 3.1.14 3.1.15 4.1.11 4.1.12 4.1.13 4.1.14 4.1.15
3.1.16 3.1.17 3.1.18 3.1.19 3.1.203.1.21 3.1.22
2.2 3.2 4.2 5.2 6.2 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 6.2.1 6.2.2 6.2.3 6.2.4 6.2.52.2.6 2.2.7 2.2.8 2.2.9 2.2.10 3.2.6 3.2.7 3.2.8 3.2.9 3.2.10 4.2.6 4.2.7 4.2.8 4.2.9 4.2.10 5.2.6 5.2.7 5.2.8 5.2.9 5.2.10 6.2.6 6.2.7 6.2.8 6.2.9 6.2.102.2.11 2.2.12 2.2.13 2.2.14 2.2.15 3.2.11 3.2.12 3.2.13 3.2.14 3.2.15 4.2.11 4.2.12 4.2.13 4.2.14 4.2.15 5.2.11 5.2.12 6.2.11 6.2.12 6.2.13 6.2.142.2.16 2.2.17 2.2.18 2.2.19 2.2.20 3.2.16 3.2.17 3.2.18 3.2.19 3.2.202.2.21 3.2.21 3.2.22 3.2.23 3.2.24 3.2.25
3.2.26
2.3 3.3 4.3 6.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 6.3.1 6.3.2 6.3.3 6.3.4 6.3.52.3.6 2.3.7 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 6.3.6 6.3.7 6.3.8 6.3.9 6.3.10
3.3.11 3.3.12 3.3.13 3.3.14 3.3.15 4.3.11 4.3.12 4.3.13 4.3.14 4.3.153.3.16 3.3.17 3.3.18 3.3.19 3.3.203.3.21 3.3.22 3.3.23 3.3.24 3.3.253.3.26 3.3.27 3.3.28 3.3.29 3.3.30
2.4 3.4 4.4 6.4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 6.4.1 6.4.2 6.4.3 6.4.4 6.4.52.4.6 2.4.7 2.4.8 2.4.9 2.4.10 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 4.4.6 4.4.7 4.4.8 4.4.9 4.4.102.4.11 2.4.12 2.4.13 2.4.14 2.4.15 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15 4.4.11 4.4.12 4.4.13 4.4.14 4.4.152.4.16 3.4.16 3.4.17 3.4.18 3.4.19 3.4.20
3.4.21
2.5 2.5.1 2.5.2 2.5.3 2.5.4 2.5.52.5.6 2.5.7 2.5.8
Milestone achievedMilestone overdueMilestone not due / metric n/aSuspended
EGEE
Metric close to targetMetric not OK
4 5
Hardware procurement
Storage systems
Total
Other experiments
Operations
Security
Front end systems LondonGrid
ScotGridResource delivery
External
Metric OK
6
To provide UK computing for the Large Hadron Collider
Grid services Tier-13
02/09/2009
Not able to be measured
Awaiting input
Middleware support
SouthGrid
NorthGridData and storage
GridPP3 Goal
2
NGI
LCGNetwork
Planning
Execution
Outreach
Tier-2 Management
2/9/08 10GridPP21 Swansea
Experiments red metrics
ATLAS1.1
1.1.1 1.1.2 1.1.3 1.1.4 1.1.51.1.6 1.1.7 1.1.8 1.1.9 1.1.101.1.11 1.1.12 1.1.13 1.1.14 1.1.151.1.16 1.1.17 1.1.18 1.1.19 1.1.20
ATLAS
• 1.1.4 – Tier 1- Job success rate in batch system
•1.1.8 - Tier 1 - Data availability in storage system.
• 1.1.12 - Tier 2 - Data acceptance from Tier 1
• 1.1.15 - Tier 2 - Job success rates in batch system
LHCb
• 1.2.2 - MC production (generation) efficiency
• 1.2.11 - LHCb SAM tests uptime T1
CMS
• 1.3.6 - Time between Data arriving at RAL and being processed
• 1.3.13 - Failed analysis jobs
• 1.3.15 - Provide an appropriate level of resources to CMS
Other experiments
• 1.4.3 - % of jobs reported by any experiment as failing due to Grid (MINOS – 45%)
LHCb1.2
1.2.1 1.2.2 1.2.3 1.2.4 1.2.51.2.6 1.2.7 1.2.8 1.2.9 1.2.101.2.11 1.2.12
CMS 1.3
1.3.1 1.3.2 1.3.3 1.3.4 1.3.51.3.6 1.3.7 1.3.8 1.3.9 1.3.101.3.11 1.3.12 1.3.13 1.3.14 1.3.15
1.41.4.1 1.4.2 1.4.3 1.4.4 1.4.51.4.6 1.4.7 1.4.8 1.4.9 1.4.101.4.11
Other experiments
2/9/08 11GridPP21 Swansea
Grid services
2.12.1.1 2.1.2 2.1.3 2.1.4 2.1.52.1.6 2.1.7 2.1.8 2.1.9 2.1.102.1.11 2.1.12 2.1.13
OperationsOperations red metrics
• 2.1.1 - Fraction of UK sites in Production (UCL)
• 2.1.3 - Proportion of available jobslots used
•2.1.10 - GridPP deployment web-pages up-to-date
•2.1.13 - Number of sites on VO blacklists
Network red metrics
• 2.3.5 - Maintenance of Gridmon nodes and associated software
Data and storage orange metrics
• 2.4.1 - Correctly defined space tokens as per experiments' requirements
2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.52.3.6 2.3.7
Network
2.4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.52.4.6 2.4.7 2.4.8 2.4.9 2.4.102.4.11 2.4.12 2.4.13 2.4.14 2.4.152.4.16
Data and storage
2/9/08 12GridPP21 Swansea
Tier-1
3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.53.1.6 3.1.7 3.1.8 3.1.9 3.1.103.1.11 3.1.12 3.1.13 3.1.14 3.1.153.1.16 3.1.17 3.1.18 3.1.19 3.1.203.1.21 3.1.22
Front end systems Front end systems – red metrics
• 3.1.5 - Availability of LHCb, ALICE and CMS VO boxes
Resource delivery – red metrics/ milestones
• 3.2.9 - % met of normalised UB allocation for CPU
• 3.2.10 - Job Efficiency (CPU/Wall)
• 3.2.11 - Farm Occupancy
• 3.2.12 - Percentage of GRIDPP3 Staff in Post
• 3.2.16 - Disaster and Business Continuity Plan Available
•3.2.21 - Recruitment of additional GridPP3 posts complete
Storage systems – red metrics
• 3.3.4 - % met of UB Allocation for Disk
• 3.4.8 - CASTOR SAM tests: LHC VOs
3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.53.2.6 3.2.7 3.2.8 3.2.9 3.2.103.2.11 3.2.12 3.2.13 3.2.14 3.2.153.2.16 3.2.17 3.2.18 3.2.19 3.2.203.2.21 3.2.22 3.2.23 3.2.24 3.2.253.2.26
Resource delivery
3.43.4.1 3.4.2 3.4.3 3.4.4 3.4.53.4.6 3.4.7 3.4.8 3.4.9 3.4.103.4.11 3.4.12 3.4.13 3.4.14 3.4.153.4.16 3.4.17 3.4.18 3.4.19 3.4.203.4.21
Storage systems
2/9/08 13GridPP21 Swansea
Tier-2s
Red/orange metrics
4.x.1 - % of promised disk available to GridPP (red for ScotGrid 49% and NorthGrid 86%)
4.x.3 - Average SAM (SLL page) availability performance over the last quarter (70-93%, all Tier-2s)
4.x.4 - Average SAM (SLL page) reliability performance over the last quarter (81-93%, all Tier2-s)
4.x.5 – Average SLL untargeted ATLAS test performance (UK test) (86-94%, all Tier-2s)
4.x.6 - Average SLL SE test performance (70%)
4.x.7/8 - CPU utilisation (wall clock time/ CPU time) (London, SouthGrid and NorthGrid, 23-45%)
4.x.9 - % of disk used (21-39%, all Tier-2s)
4.x.10 – number of technical meetings held (ScotGrid, NorthGrid)
4.x.11 – number of management meetings held (London, SouthGrid)
4.14.1.1 4.1.2 4.1.3 4.1.4 4.1.54.1.6 4.1.7 4.1.8 4.1.9 4.1.104.1.11 4.1.12 4.1.13 4.1.14 4.1.15
4.24.2.1 4.2.2 4.2.3 4.2.4 4.2.54.2.6 4.2.7 4.2.8 4.2.9 4.2.104.2.11 4.2.12 4.2.13 4.2.14 4.2.15
4.34.3.1 4.3.2 4.3.3 4.3.4 4.3.54.3.6 4.3.7 4.3.8 4.3.9 4.3.104.3.11 4.3.12 4.3.13 4.3.14 4.3.15
4.44.4.1 4.4.2 4.4.3 4.4.4 4.4.54.4.6 4.4.7 4.4.8 4.4.9 4.4.104.4.11 4.4.12 4.4.13 4.4.14 4.4.15
LondonGrid
ScotGrid
SouthGrid
NorthGrid
2/9/08 14GridPP21 Swansea
Management and external
Project execution• 5.2.1 – GridPP staff in post• 5.2.4 - 100% of quarterly reports received
by Project Manager within 2 months of quarter end
Outreach• Number of GridPP publications
5.25.2.1 5.2.2 5.2.3 5.2.4 5.2.55.2.6 5.2.7 5.2.8 5.2.9 5.2.105.2.11 5.2.12
Execution
6.16.1.1 6.1.2 6.1.3 6.1.4 6.1.56.1.6 6.1.7 6.1.8 6.1.9
Outreach
2/9/08 15GridPP21 Swansea
ProjectMap figures
99244127112
1010
34339
Milestone achievedMilestone overdueMilestone not due / metric n/aSuspended
Metric close to targetMetric not OK
Total
Metric OK
Not able to be measured
Awaiting input
2/9/08 16GridPP21 Swansea
Next steps
• Finalise Q2 (April – June) quarterly reports and ProjectMap
• Revise quarterly report template and some metrics• Q3 quarterly reports
– Request at start of October– First version middle of October– Final version end of October