project management present 1

13
TITLE:SPEED BUMP TITLE:SPEED BUMP Group Member: Group Member: MOHD NORSHAHRIN MOHD NORSHAHRIN AHMAD SYAHIR BIN YAZID AHMAD SYAHIR BIN YAZID SHAFINAZ BINTI MAT JUZAH SHAFINAZ BINTI MAT JUZAH NUR SYAZWANI BINTI MANSOR NUR SYAZWANI BINTI MANSOR HASIF BIN NOR AZMAN HASIF BIN NOR AZMAN

Upload: tengku-syahir-yllc

Post on 06-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 1/13

TITLE:SPEED BUMPTITLE:SPEED BUMPGroup Member:Group Member:

MOHD NORSHAHRINMOHD NORSHAHRIN

AHMAD SYAHIR BIN YAZIDAHMAD SYAHIR BIN YAZID

SHAFINAZ BINTI MAT JUZAHSHAFINAZ BINTI MAT JUZAH

NUR SYAZWANI BINTI MANSORNUR SYAZWANI BINTI MANSOR

HASIF BIN NOR AZMANHASIF BIN NOR AZMAN

Page 2: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 2/13

IntroductionIntroduction

What is speed bump?What is speed bump?-- speedspeed--reducing feature of road design to slowreducing feature of road design to slow

traffic or reduce through traffic, via verticaltraffic or reduce through traffic, via verticaldeflection .deflection .

-- Speed bumps can be made of recycled plastic,Speed bumps can be made of recycled plastic,

asphalt or rubber asphalt or rubber 

Page 3: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 3/13

Activities week2 Week 3 Week 4 Week 5

Brainstorm : Idea

Meeting of Group Member 

Division of tasks between team

members

-construct the project objective

- Search about our project

-Determine the suitable location

for our project

Presentation for the project

- Project Objective

- Design project WBS

- Communication plan

Design project WBS

Page 4: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 4/13

WHAT

INFORMATION

TARGET

AUDIENCE

WHEN METHOD OF

COMMUNICATION

PROVIDER

Milestone report Senior management

and project

manager 

Weekly E-mail and hardcopy Project office

Project status report

& agendas

Student and staff Weekly E- mail and

hardcopy

Project manager 

Issues report Student and staff Weekly Hardcopy Team recorder  

Outsourcing

performance

Staff and student Bimonthly Meeting Project manager  

 Accepted change

requests

Project manager ,

student and staff 

  Anytime E-mail and hardcopy Design machine

Escalation reports Staff and student When needed Meeting and

hardcopy

Project manager 

Oversight gate

decisions

Senior management

and project manager 

 As required E-mail meeting

report

Project office

Page 5: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 5/13

OBJECTIVEOBJECTIVE To test and evaluate their level of To test and evaluate their level of 

understanding of the coaches of all task or understanding of the coaches of all task or 

duty that they have learned during theduty that they have learned during the

period of study in universitiesperiod of study in universities Examine the level of understanding of theExamine the level of understanding of the

student in producing projectstudent in producing project

Students show creativity in designing andStudents show creativity in designing andimplementing the project and tested theimplementing the project and tested the

ability of trainees to solve all problemsability of trainees to solve all problems

Page 6: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 6/13

To strengthen self-confidence in making judgments

on a problem and is responsible for every decisiontaken

To cultivate the spirit of cooperation, especially

among members of the group that planned thework to be implemented as required

Page 7: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 7/13

Characteristic of speed bumpCharacteristic of speed bump

-- The speed bump can made from rubber,The speed bump can made from rubber,

tar and metaltar and metal

-- speed bump is a bump in a roadway withspeed bump is a bump in a roadway withheights typically ranging between 5 and 6heights typically ranging between 5 and 6

inches (16 cm).inches (16 cm).

-- The depth of speed bumps is typically lessThe depth of speed bumps is typically less

than or near to 1 foot (30than or near to 1 foot (30 cm); contrastingcm); contrasting

with the wider speed bumwith the wider speed bum..

Page 8: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 8/13

Suitable location at UniKL MITECSuitable location at UniKL MITEC

In front of caféIn front of café

Behind the BKM blockBehind the BKM block

In front of hostelIn front of hostel In front of admin buildingIn front of admin building

Guard postGuard post

Page 9: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 9/13

 Advantage of speed bump Advantage of speed bump

consistently will keep the original bright color, warning driversconsistently will keep the original bright color, warning drivers

of their approach without fading or having paint chip off.of their approach without fading or having paint chip off.

Can avoid an accident if doing the speed bum. (compare to theCan avoid an accident if doing the speed bum. (compare to the

speed breaker)speed breaker) Effect to the driver etc more discipline when using the roadEffect to the driver etc more discipline when using the road

Advantage for the pedestrians when they want across the road.Advantage for the pedestrians when they want across the road.

Keeping vehicle speed down, their use is sometimesKeeping vehicle speed down, their use is sometimes

controversial as they can cause noise and possibly vehiclecontroversial as they can cause noise and possibly vehicledamage if taken at too great a speeddamage if taken at too great a speed

Speed bumps are self Speed bumps are self--enforcingenforcing

Page 10: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 10/13

Disadvantage of speed bumpDisadvantage of speed bump

The response time for emergency vehicles may be increasedThe response time for emergency vehicles may be increased by speed bumps. by speed bumps.

Some residents may object to the visual impact of speedSome residents may object to the visual impact of speed bumps bumps²  ²the signs and the markings that accompany them.the signs and the markings that accompany them.

There will be an increase in vehicle emissions and noise near There will be an increase in vehicle emissions and noise near speed bumps.speed bumps.

Inconvenient access as a result of speed bumps may beInconvenient access as a result of speed bumps may beimposed on some parts of the neighborhood.imposed on some parts of the neighborhood.

Speed bumps may displace traffic to neighboring streets.Speed bumps may displace traffic to neighboring streets. Although speeds will be reduced immediately next to them,Although speeds will be reduced immediately next to them,

drivers tend to speed up after passing or traveling betweendrivers tend to speed up after passing or traveling betweenspeed bumps.speed bumps.

Page 11: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 11/13

Comparison between speed bumpComparison between speed bump

and speed breaker and speed breaker  Speed bumpSpeed bump

-- More thicknessMore thickness

-- People must slowPeople must slow

down their vehicledown their vehiclewhen to pass thewhen to pass thespeed bumpspeed bump

-- More effective toMore effective to

speed down thespeed down thevehiclevehicle

Speed breaker Speed breaker 

-- More thinnessMore thinness

-- Driver and rider noDriver and rider no

need to slow downneed to slow downtheir vehicle.their vehicle.

-- Not effectivenessNot effectivenessbecause the driver because the driver 

and riders can speedand riders can speedup on the speedup on the speedbreaker.breaker.

Page 12: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 12/13

Type of Speed bumpType of Speed bump

Page 13: Project Management Present 1

8/3/2019 Project Management Present 1

http://slidepdf.com/reader/full/project-management-present-1 13/13

ConclusionConclusion

Student and staff must control their speedStudent and staff must control their speed

when driving or riding in unikl mitecwhen driving or riding in unikl mitec

Speed bump can avoid an accident inSpeed bump can avoid an accident inunikl mitecunikl mitec

Can give more disciplined to staff andCan give more disciplined to staff and

student.student.