project management - hsi-llc.com management hsi is a fully integrated single source manufacturer of...

1
Mailing address: Heater Specialists, LLC, P.O. Box 582707, Tulsa, OK 74158 Corporate Headquarters: 3171 North Toledo, Tulsa OK 74115 Phone - 918-835-3126 • Fax - 918-835-3179 • Email: [email protected] Project Management HSI is a fully integrated single source manufacturer of refrac- tory lined vessels and equipment for the oil refining, chemi- cal process, power generation and incineration industries. Our unique turnkey approach to manufacturing gives HSI project management personnel complete control over every aspect of a project. This eliminates inherent scheduling, quality control and manufacturing problems associated with using several different subcontractors. This fully integrated approach simplifies project execution by eliminating conflict and delays associated with managing multiple sub-vendors. Efficiencies gained in manufacturing are passed along to customers in the form of lower prices and more reliable deliveries. Scheduling is greatly simplified since the entire project scope is controlled by a single com- pany and a single project manager.

Upload: hoangliem

Post on 09-May-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Mailing address: Heater Specialists, LLC, P.O. Box 582707, Tulsa, OK 74158Corporate Headquarters: 3171 North Toledo, Tulsa OK 74115 Phone - 918-835-3126 • Fax - 918-835-3179 • Email: [email protected]

Project ManagementHSI is a fully integrated single source manufacturer of refrac-tory lined vessels and equipment for the oil refining, chemi-cal process, power generation and incineration industries.Our unique turnkey approach to manufacturing gives HSIproject management personnel complete control over everyaspect of a project. This eliminates inherent scheduling,quality control and manufacturing problems associated withusing several different subcontractors.

This fully integrated approach simplifies project execution byeliminating conflict and delays associated with managingmultiple sub-vendors. Efficiencies gained in manufacturingare passed along to customers in the form of lower pricesand more reliable deliveries. Scheduling is greatly simplifiedsince the entire project scope is controlled by a single com-pany and a single project manager.