Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved.
Project Management at Cisco Jose Solorio, Ben Rus, Ali Ataei
![Page 2: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/2.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 2
Background
Cisco
Project Management
Career Paths
![Page 3: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/3.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 3
![Page 4: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/4.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 4
• Project Manager 2.5 Years Project Management Experience
Software Development User Centered Design
• Certifications
Certified In Progress
In Progress Certified
• UCSC Alumn Information Systems Management, B.S., 2008 Former Information Systems Management Association – ISMA – Officer
![Page 5: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/5.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 5
• Project Manager/Scrum Master 1.5 Years of Project Management Experience
• Certifications
Certified
In Progress
• UCSC Alumni Information Systems Management, B.S., 2009 Information Systems Management Association – ISMA – Admin
![Page 6: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/6.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 6
• Experience Project Manager - Cisco
1.5 Years Project Management Experience
Started as Project Management Intern
• Education Information Systems Management, B.S., 2009 - UCSC
Focus on Software Development and Network Administration Former Member of ISMA
![Page 7: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/7.jpg)
Cisco Confidential 7 © 2010 Cisco and/or its affiliates. All rights reserved.
![Page 8: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/8.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 8 8
When customers think of Cisco, they think of a company that brings people together by removing the barriers to communication. By connecting people Cisco can transform our lives, making us more productive, engaged, and powerful.
![Page 9: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/9.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 9
Enterprise Small Business
Home
Routers
Switches
Security
Supporting Software
Voice Systems
TelePresence
WebEX
Cius
Home Networking
Flip Video
ūmi
![Page 10: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/10.jpg)
Cisco Confidential 10 © 2010 Cisco and/or its affiliates. All rights reserved.
Routers
Switches
Security
Supporting Software
![Page 11: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/11.jpg)
Cisco Confidential 11 © 2010 Cisco and/or its affiliates. All rights reserved.
Voice Systems
TelePresence
WebEx
Cius
![Page 12: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/12.jpg)
Cisco Confidential 12 © 2010 Cisco and/or its affiliates. All rights reserved.
Home Networking
Flip Video
ūmi
![Page 13: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/13.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 13 13
Our Team
![Page 14: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/14.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 14
• Security Specializing in security based applications and intelligence sold to internal and external customers and partners.
• Analytics Specializing in extracting useful information out of raw data and turning it into business intelligence.
• Visualization Works across Cisco to help develop and deliver a standards-based, consistent user experience.
• Supporting Groups: PMO QA Infrastructure
![Page 15: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/15.jpg)
Cisco Confidential 15 © 2010 Cisco and/or its affiliates. All rights reserved.
![Page 16: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/16.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 16
• A project is a temporary endeavor undertaken to create a unique product, service, or result.
• A project is finite (a definite beginning and end)
• There are typically 3 main constraints and risks for any given project Scope, Time, Budget
Source: Project Management Body of Knowledge 4th Edition, PMI
![Page 17: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/17.jpg)
Cisco Confidential 17 © 2010 Cisco and/or its affiliates. All rights reserved.
• Project management is a set of principles, practices, and techniques applied to lead project from start to finish while managing the project's resources and controlling the risks and constraints.
• Different methodologies Traditional (Waterfall) Agile (Iterative)
• No methodology is better than all
Project Management Body of Knowledge (PMBOK) 4th Edition, Project Management Institute
![Page 18: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/18.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 18
• Micro-Level Manager
• Responsible for monitoring the tasks of a project from start to finish
• Fully accountable for success or failure of a project
• Macro-Level Manager
• Responsible for managing a collection of projects that form a program
• Set overall direction for teams and future projects they will work on
• Engineering Manager
• Responsible for ensuring the product requirements are satisfied
• Technical leads, former engineers, directors
![Page 19: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/19.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 19
Project 1 Project 2 Project 3
Project Manager
Product Manager Program Managers
![Page 20: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/20.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 20 20
Applying Project Management: Using Traditional (Waterfall) Methodology
![Page 21: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/21.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 21
Source: Cisco Product Development Methodology (CPDM), GEM Version II
Conceptualization Planning Development Validate Launch Sustain End of Life
Concept Commit
Execute Commit
General Availability
Conceptualization
Planning
Development
Validation
Deployment
Maintenance
Execution
Readiness Review
End of Life
![Page 22: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/22.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 22
Concept Commit
• Define Project and obtain authorization to start the project
• Define Scope and commit initial financial resources
• Identify Stakeholders
• Outcome: Project is officially authorized.
Conceptualization
![Page 23: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/23.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 23
Concept Commit
Execute Commit
Planning
• Establish scope of project
• Define and refine objectives
• Develop a course of action required to attain objective(s)
• Explore all aspects of the scope, time, costs, quality, communication, and risks.
Conceptualization
![Page 24: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/24.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 24
Conceptualization Planning Development Validate Launch Sustain End of Life
Concept Commit
Execute Commit
Planning
Development
• Complete the work defined in the project plan
• Coordinate people and resources • Direct and manage the project team • QA Testing • Readiness Review
Validation
Readiness Review
Conceptualization
![Page 25: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/25.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 25
Source: Cisco Product Development Methodology (CPDM), GEM Version II
Concept Commit
Execute Commit
General Availability
Planning
Development
Validation
Deployment
Maintenance
Execution
Readiness Review
End of Life
Conceptualization
![Page 26: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/26.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 26
Scenario: You have been assigned to manage the development of a new word processing application
![Page 27: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/27.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 27
![Page 28: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/28.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 28
![Page 29: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/29.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 29
![Page 30: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/30.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 30
![Page 31: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/31.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 31
![Page 32: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/32.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 32
![Page 33: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/33.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 33
![Page 34: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/34.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 34
Defects Discovered
![Page 35: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/35.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 35
All defects fixed All requirements met
![Page 36: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/36.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 36
External Release 1.0
![Page 37: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/37.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 37 37
Traditional: Once you complete a phase, you never repeat it.
![Page 38: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/38.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 38 38
Applying Project Management: Using Agile (Iterative) Methodology
![Page 39: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/39.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 39
Release 0.1
Release 0.5
Release 1.0
Sprint Planning
Sprint Work
Sprint Review Sprint Retrospective
Update Product Backlog
1 2 3 1 2 3 1 2 3
Iteration X
![Page 40: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/40.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 40
Release 0.1
Sprint Planning
1
Iteration 1
![Page 41: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/41.jpg)
Common questions: What do you want this application to do?
![Page 42: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/42.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 42
• Write text
• Save a File
• Open a File
• Insert a picture
• Format text
• Have a scroll bar
• Close the application
• Insert a hyperlink
• Adjust the font
• Find / Replace / Select
• Check spelling
![Page 43: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/43.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 43
• Write Text
• Have a scroll bar
• Save a File
• Open a File
• Find / Replace / Select
• Format text
![Page 44: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/44.jpg)
Cisco Confidential 44 © 2010 Cisco and/or its affiliates. All rights reserved.
Close the application
Insert a hyperlink
Adjust the font
Check Spelling
Insert a picture
Write Text
Have a scroll bar
Save a file
Open a file
Find / Replace / Select
Format Text
![Page 45: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/45.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 45
Release 0.1
Sprint Planning
Sprint Work
1
Iteration 1 Perform Testing
![Page 46: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/46.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 46
The quick brown fox jumps over the…
![Page 47: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/47.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 47
Release 0.1
Sprint Planning
Sprint Work
Sprint Review
1
Iteration 1
Perform a Demo
![Page 48: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/48.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 48
The quick brown fox jumps over the…
Approved Product Manager
![Page 49: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/49.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 49
• Write Text
• Have a scroll bar
• Save a File
• Open a File
• Find / Replace / Select
• Format text
![Page 50: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/50.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 50
Release 0.1
Sprint Planning
Sprint Work
Sprint Review Sprint Retrospective
1
Iteration 1
![Page 51: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/51.jpg)
![Page 52: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/52.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 52
Release 0.1
Sprint Planning
Sprint Work
Sprint Review Sprint Retrospective
Update Product Backlog
1
Iteration 1
![Page 53: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/53.jpg)
Cisco Confidential 53 © 2010 Cisco and/or its affiliates. All rights reserved.
Close the application
Insert a hyperlink
Adjust the font
Check Spelling
Insert a picture
Write Text
Have a scroll bar
Save a file
Open a file
Find / Replace / Select
Format Text
Insert a picture (Iteration 2)
![Page 54: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/54.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 54
• Write Text
• Have a scroll bar
• Save a File
• Open a File
• Insert a picture
• Find / Replace / Select
• Format text
![Page 55: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/55.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 55
Release 0.1
Sprint Planning
1
Iteration 2
2
![Page 56: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/56.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 56
Release 0.1
Sprint Planning
Sprint Work
1
Iteration 2
2
![Page 57: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/57.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 57
The quick brown fox jumps over the…
![Page 58: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/58.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 58
• Write Text
• Have a scroll bar
• Save a File
• Open a File
• Insert a picture
• Find / Replace / Select
• Format text
![Page 59: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/59.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 59
Release 0.1
Sprint Planning
Sprint Work
Sprint Review Sprint Retrospective
Update Product Backlog
1 2
Iteration 2
![Page 60: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/60.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 60
Release 0.1
Sprint Planning
Sprint Work
Sprint Review Sprint Retrospective
Update Product Backlog
1 2 3
Iteration 3
![Page 61: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/61.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 61
The quick brown fox jumps over the…
Approved Product Manager
![Page 62: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/62.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 62
Release 0.1
Release 0.5
Sprint Planning
Sprint Work
Sprint Review Sprint Retrospective
Updated Product Backlog
1 2 3 1 2 3
Iteration X
![Page 63: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/63.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 63
Release 0.1
Release 0.5
Release 1.0
Sprint Planning
Sprint Work
Sprint Review Sprint Retrospective
Updated Product Backlog
1 2 3 1 2 3 1 2 3
Iteration X
![Page 64: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/64.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 64
External Release 1.0
Approved Product Manager
![Page 65: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/65.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 65 65
Agile: You repeat the same cycle to get closer and closer to your final product
![Page 66: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/66.jpg)
Cisco Confidential 66 © 2010 Cisco and/or its affiliates. All rights reserved.
• Sequential
• Linear
• Fixed Time / Costs / Scope
• Appropriate for predictable
projects
• Follows formal processes
• Infrequent or single releases
• Iterative
• Cyclical
• Adjusts to change
• Development focuses on
functionality
• Process allows flexibility
• New releases often
![Page 67: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/67.jpg)
Cisco Confidential 67 © 2010 Cisco and/or its affiliates. All rights reserved.
![Page 68: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/68.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 68
CAPM PMI-RMP
Name Certified Associate
in Project Management
PMI – Risk Management Professional
Project Management Professional
Certified Scrum Master
Offered By
Discipline Traditional Traditional Traditional Agile
Education Associated Degree Bachelors Bachelors Associates Degree
Work Experience
1500 Hrs 3000 Hrs 4500 Hrs + 3 Yrs Pass Exam
Source: Project Management Institute (PMI) and Scrum Alliance
![Page 69: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/69.jpg)
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 69
• Construction
• Engineering
• Quality Assurance
• Industrial Design
• High-Tech
• Manufacturing
• Visual Design
• Pharmaceutical
• Process Automation
![Page 70: Project Management at Cisco Systems-2](https://reader036.vdocuments.us/reader036/viewer/2022081800/55cf8c6c5503462b138c3772/html5/thumbnails/70.jpg)
Q & A