project list - southern california association of governments

232
SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS RTP Making the Connections REGIONAL TRANSPORTATION PLAN 2008

Upload: others

Post on 27-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project List - Southern California Association of Governments

SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS

RTPMaking the Connections

REGIONAL TRANSPORTATION PLAN2008

Page 2: Project List - Southern California Association of Governments

PROJECT L IST

RTIP Projects 1

Imperial County RTIP Projects 2

Los Angeles County RTIP Projects 4

Orange County RTIP Projects 45

Riverside County RTIP Projects 55

San Bernardino County RTIP Projects 71

Ventura County RTIP Projects 87

Financially Constrained RTP Projects 95

Imperial County RTP Projects 95

Los Angeles County RTP Projects 96

Orange County RTP Projects 99

Riverside County RTP Projects 104

San Bernardino County RTP Projects 147

Ventura County RTP Projects 188

Regional RTP Projects 194

Strategic Plan Projects 197

Imperial County Strategic Plan Projects 197

Los Angeles County Strategic Plan Projects 199

ORANGe County Strategic Plan Projects 221

Riverside County Strategic Plan Projects 222

San Bernardino County Strategic Plan Projects 223

VentUra County Strategic Plan Projects 226

Regional Strategic Plan Projects 227

Page 3: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 1

The project list is divided into three sections, consistent with the frame-

work provided in Figure 1. At the center is the Regional Transporta-

tion Improvement Program (RTIP), which forms the foundation of the

RTP project investment strategy and represents the first six years of

already-committed funding. The RTP contains an additional financially con-

strained set of transportation projects above and beyond the RTIP. Finally, the

Strategic Plan represents an unconstrained, illustrative list of potential projects

that the region would pursue given additional funding and commitment.

FIGURE 1 RTP FRAMEWORK

RTIP

Financially

Constrained

RTP

Reasonable Available Funding

for O&M and Committed

Projects

Additional

Investments

New

Funding

Source of

Future Amendments

Strategic

Plan

RTIP Projects

The adopted 2006 RTIP is incorporated into the 2008 RTP, and the following

tables present the RTIP projects and their estimated total project costs. For

more detailed information on the RTIP projects, refer to the complete 2006

RTIP project list available at www.scag.ca.gov.

Projects are sorted by system (S = state highway, L = local highway, T = transit).

State highways are further sorted by route number, while local highways and

transit projects are sorted by RTP ID number.

Project costs are presented in nominal dollars.

Page 4: Project List - Southern California Association of Governments

2 P R O J E C T L I S T I N G R E P O R T

IMPERIAL COUNTY RTIP PROJECTS

IMPERIAL COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S 0051Y 7 NEAR CALEXICO FROM SR 98 TO I-8 - 4 LANE EXPRESSWAY PLANTING MITIGATION $2,494

S 0515 8 IN EL CENTRO FROM 0.8 KM WEST TO 0.6 KM EAST OF IMPERIAL AVE RECONSTRUCT INTERCHANGE AT I-8 AND IMPERIAL AVE $37,212

S IMP030310 8AT CALIFORNIA/ARIZONA BORDER CONSTRUCT A NEW PORT OF ENTRY INCLUDING A COMMERCIAL VEHICLE ENFORCEMENT FACILITY AND AGRICULTURAL INSPECTION STATION

$2,034

S IMP0021 78BRAWLEY BYPASS CORRIDOR -- IN AND NEAR BRAWLEY FROM 0.5 MILES SOUTH OF BAUGHMAN ROAD TO MEAD RD - 4 LANE EX-PRESSWAY ON SR 86 TO 0.3 MILES NORTH OF MEAD RD. ON SR 111

$229,252

S 8020 98CALEXICO FROM 0.5 KM WEST OF DOGWOOD RD. TO 0.3 KM EAST OF ROCKWOOD AVE., WIDEN HWY FROM 1 TO 2 LANES IN EACH DIRECTION WITH TURN POCKETS AT MAJOR INTERSECTIONS CONSTRUCTED IN TWO PHASES

$57,927

S IMP0042A 98IN AND NEAR CALEXICO FROM 0.6 KM WEST OF SR 111 EASTERLY TO ALAMO RIVER BRIDGE WIDEN TO 4 LANE HWY (ENV. WORK & DOC. FOR SR98) ENVIRONMENTAL WORKAND DOCUMENTATION FOR SR 98"

$82,860

S IMP0581 186ANDRADE COMMERCIAL VEHICLE ENFORCEMENT FACILITY WIDEN NORTHBOUND SHOULDER OF SR186 (STATE INSPECTION FACILITY PROGRAM GRANT)

$1,025

L 0520A 0NEAR EL CENTRO; DOGWOOD CORRIDOR - WIDEN & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ' NORTH OF MCCABE & INSTALL 2 SIGNALS AB 3090 REIMBURSMENT FOR 11-IMP0520

$276

L IMP020801 0BAUGHMAN ROAD RECONSTRUCTION 0.3 MILE OF COUNTY RD. FUNDS TRANSFERRED FROM 11-IMP990308

$951

L IMP050501 0 REMOVAL AND RECONSTRUCTION OF EXISTING 2 LANE BEST RD (1.25) FROM SR78 TO (. 25) MILES SOUTH OF SHANK RD. $2,000

L IMP050502 0 REMOVAL AND RECONSTRUCTION OF EXISTING 4 LANE DOGWOOD RD (1.3 MILES) FROM I-8 BRIDGE TO MAIN ST - PHASE I $906

L IMP050503 0 REMOVAL AND RECONSTRUCTION OF THE EXISTING 4 LANE DOGWOOD RD. (.7 MILES) FROM MAIN ST TO VILLA RD. - PHASE II $314

L IMP050504 0 REHABILITATION AND OVERLAY OF IMPERIAL AVE. (.5 MILE) PHASE III FROM ORANGE TO ADAMS AVE. $563

L IMP050505 0ORANGE AVE. IMPROVEMENTS TO EXISITING 2 LANE FROM WATERMAN AVE TO LA BRUCHERIE RD. (.25 MILE) OVERLAY, PARKING AND DRAINAGE

$193

L IMP050506 0IMPROVEMENT OF INTERSECTION OF 4TH AND SR 115 AND REALIGNMENT OF ROUTE CONVERGENCE OF ORCHARD, PALM RDS AND 4TH ST

$858

L IMP050507 0 REHABILITATION OF ATEN RD. (2.25 MILES) FROM VALORE WAY TO CROSS RD AND SIGNALIZATION OF TWO INTERSECTIONS $1,857

L IMP050508 0 VARIOUS LOCATIONS; ASPHALTIC CONCRETE OVERLAYS $1,136

Page 5: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 3

IMPERIAL COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L IMP050509 0COLE RD. CORRIDOR IMPROVEMENTS; EXPANSION OF 2 LANE ROAD INTO 4 LANE PRINCIPAL ARTERIAL (.5 MILES) FROM BOWKER RD EAST TO SR 98

$2,031

L IMP050901 0 MALAN RD; 2.25 MILES OF ROAD SURFACE AND SAFETY IMPROVEMENTS, FROM THE WATER PLANT TO 18TH STREET $1,400

L IMP050902 0 KEYSTONE RD NEAR IMPERIAL, RECONSTRUCTION OF 6 MILES TO CREATE TRUCK LANE FROM SR 111 TO AUSTIN RD $2,500

L IMP050905 0 IN HEBER; CONSTRUCTION OF SIDEWALKS $500

L IMP051101 0IN WESTMORLAND- SOUTH CENTER STREET; ROADWAY SURFACE IMPROVEMENTS, STREET LIGHTING AND STORM DRAIN IMPROVE-MENTS FROM BAUGHMAN RD. TO SR 78/86

$800

L IMP051201 0NEAR EL CENTRO; DOGWOOD CORRIDOR - WIDEN & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ' NORTH OF MCCABE & INSTALL 2 SIGNALS ROW AND CON

$3,024

L IMP991102 0RECONSTRUCTION AND WIDENING OF COLE ROAD FROM 2 LANES TO 4 LANES; FROM RAILROAD TRACKS EAST TO KLOKE ROAD (.33) MILES

$860

T IMP051104 0IN EL CENTRO; REGIONAL PUBLIC BUS TRANSFER TERMINAL AND PASSENGER WAITING AREA AT 7TH AND STATE STREETS, WITH MISC OTHER BUS STOP IMPROVEMENTS ON FIXED ROUTE SYSTEM

$3,687

T IMP33000 0 COUNTY WIDE TRANSIT SYSTEM - OPERATING AND CAPITAL ASSISTANCE $25,761

T IMP33003 0 ADA PARATRANSIT SERVICE OPERATING ASSISTANCE $5,052

T IMP33004 0 BRAWLEY DIAL-A-RIDE - OPERATING ASSISTANCE $1,458

T IMP33006 0 CITY OF IMPERIAL DIAL-A-RIDE - OPERATING ASSISTANCE $756

T IMP33021 0 CALEXICO DIAL-A-RIDE OPERATING ASSISTANCE $2,326

T IMP33023 0 MED-EXPRESS SHUTTLE OPERATIONAL ASSISTANCE $1,432

T IMP43000 0 WEST SHORES DIAL-A-RIDE OPERATIONAL ASSISTANCE $1,125

T IMP990401 0 EL CENTRO DIAL-A-RIDE OPERATING ASSISTANCE $1,420

* S=State Highway, L=Local Highway, T=Transit

Page 6: Project List - Southern California Association of Governments

4 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S LA0D462 0 I-5 PARKER RD INTERSECTION IMPROVEMENTS INCLUDING BRIDGE WIDENING AND LANE ADDITIONS $500

S LA0D463 0I-5 LAKE HUGHES RD- INTERSECTION IMPROVEMENTS & WIDENING TO PROVIDE ADDITIONAL LANES ON EASTBOUND AND WESTBOUND APPROACHES

$500

S LA0D479 0 LOS ANGELES COUNTY ITIP TRANSPORTATION ENHANCEMENT PROJECT LUMP SUM (PPNO 3546, 3547, 3548, 3550) $11,243

S LA998410 0 LUMP SUM:SOUNDWALLS - PHASE I, PRIORITY 1, CONSTRUCTION $88,000

S 16606 1NEAR MARINA REY ON LINCOLN BL FRM JEFFERSON BL TO FIJI WAY - WIDEN FROM 3 TO 4 THRU LNES IN EA. DIR. & RPLCE CULVER BL OC &CNSTRCT NEW BRDG OVR BALLONA CREK (EA 1661C, PPNO 0027P).

$3,232

S LA0C8080 1IN MANHATTAN BEACH: ON ROUTE 1 BETWEEN 33RD STREET & ROSECRANS AV; ADD ONE THROUGH LN TO NORTH BOUND SEPULVEDA BLVD. TO WIDEN EXISTING STRUCTURE FROM 6 TO 7 THROUGH LANES PPNO 3236

$13,464

S LA962214 1PACIFIC COAST HIGHWAY TRAFFIC MANAGEMENT SYSTEM FROM MCCLURE TUNNEL TO TRANCAS CANYON RD TRAFFIC MAN. & BUS SPEED IMPROVEMNT(TEA21-#707). LACDPW LEAD AGENCY INSTEAD CALTRANS.

$5,809

S LA000274 2FROM SEPULVEDA TO MORENO CONSTRUCT DIVIDED PKWY WITH TRANSIT PKWAY IMPROVEMENTS, BIKE LANES & RT. 2/405 INTER-CHANGE (94CFP; CAT. 2, 210, 98STIP00027) TEA21-#1531

$76,222

S LA000357 5RTE 5 FROM ROUTE 170 TO ROUTE 118 HOV LANES (10 TO 12 LANES) (CFP 345) (2001 CFP 8339; CFP2197). (EA# 121901, PPNO 0158K) (TCRP#41.2)

$310,800

S LA000358 5--- FROM ROUTE 134 TO ROUTE 170 HOV LANES (8 TO 10 LANES) (CFP 346)(2001 CFP 8355). (EA# 121801, PPNO 0142F) SAFETEA LU # 570, RTE 5 / EMPIRE AVE - ACCESS IMP.

$609,800

S LA0D192 5 GARVEE DEBT SERVICE PAYMENTS: RT 5 FROM RT 118 TO RT 14 FROM 10 TO 12 LANES HOV LANES. EA# 122001, PPNO 0162P. $28,895

S LA0D73 5LA MIRADA, NORWALK & SANTA FE SPRINGS-ORANGE CO LINE TO RTE 605 JUNCTION. WIDEN FOR HOV & MIXED FLOW LNS, RECON-STRUCT VALLEY VIEW (EA 2159A0, PPNO 2808). TCRP#42.2&42.1

$1,155,300

S LA0D73B 5IN NORWALK: FROM ORANGE COUNTY LINE TO ROUTE 605: CARMENITA INTERCHANGE IMPROVEMENT (EA 2159C0, PPNO 2808A) (TCRP 42.3, & 43)

$251,500

S LA0D74 5IN LOS ANGELES FROM CHAMBERLAIN STREET TO LARKSPUR STREET SOUNDWALL CONSTRUCTION PART OF RTE 5 FR 118 TO 14 HOV PROJECT. EA# 23550 .PPNO 3236.

$41,664

S LA996134 5RTE. 5/14 INTERCHANGE & HOV LNS ON RTE 14 - CONSTRUCT 2 ELEVATED LANES - HOV CONNECTOR (DIRECT CONNECTORS) (EA# 16800)(2001 CFP 8343) (PPNO 0168M)

$157,000

S LA996138 5 RTE.5 HOV LNS. FROM FLORENCE AVE TO RTE.19 - ADD ONE LANE IN EACH DIRECTION $197,709

Page 7: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 5

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S LAE0465 5 IN L.A./SANTA CLARITA ON RTE 5 FROM SR14 TO PARKER RD, HOV, TRUCK LANE, AND AUXILIARY LANE IMPROVEMENTS $410,000

S LAE2577 5STUDY NORWALK, SANTA FE SPRINGS, DOWNEY, MONTEBELLO, & COMMERCE: ON I-5, CONDUCT PLAN'G, ENV. & ENG. STUDIES FOR WIDEN'G W/HOV & MIXED FLOW LNS FROM I-605 TO I-710.

$4,160

S 0309S 10 BALDWIN PARK AND WEST COVINA - PUENTE AVE TO CITRUS STREET SOUNDWALL PROJECT (95 STIP-IIP) (EA# 111720, PPNO# 0309S) $10,865

S LA000548 10 FROM PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES (C-ISTEA 77720) (EA# 117080, PPNO# 0309N) $182,000

S LA01342 10 RT 10 FROM RT 605 TO PUENTE AVE HOV LANES (8+0 TO 8+2) (EA# 117070, PPNO 0306H) PPNO 3333 3382 AB 3090 REP (TCRP #40) $191,000

S LA0B875 10 HOV LANES FROM CITRUS TO ROUTE 57/210 - (EA# 11934, PPNO# 0310B) $191,500

S LA0F098 10L.A. COUNTY I-10 AND I-605 IC;CONSTRUCT ONE/TWO LANE BRIDGE STRUCTURE, BRANCHING OFF SB OF RTE 605 TO EB OF RTE 10 AT-GRADE CONNECTOR RAMP (EA 24540, PPNO 3529)

$70,460

S LA0C8102 14SR-14 FREEWAY/AVENUE I INTERCHANGE IMPROVEMENTS-WIDENING AVE I FROM 2 TO 3 LANES IN EACH DIRECTION, ADDING DUAL LEFT TURN LANES, AND WIDENING A BRIDGE STRUCTURE. PPNO 3123.

$10,581

S LA0D45 47SR-47 EXPRESSWAY - SCHUYLER HEIM BRIDGE REPLACEMENT (2 MF + 1 AUX NB, 3 MF + 1 AUX SB); CONSTRUCT EXPRESSWAY (4 TO 7 LNS) FROM OCEAN BLVD TO ALAMEDA ST/PCH; CONSTRUCT NEW 2-LANE FLYOVER FROM EB NAVY WAY TO NB SR-47

$687,000

S LA0B412 60 ROUTE 57/60 INTERCHANGE MIS (E/P, PS/E ONLY) $1,191

S LA0D399 60 CONSTRUCTION OF NEW PARTIAL DIAMOND INTERCHANGE FOR STATE ROUTE 60 (SR-60) AT LEMON AVE (SAFETEA-LU # 587). $19,000

S LA996137 60RTE. 60 HOV LNS. FROM RTE. 605 TO BREA CANYON RD. -- CONSTRUCT ONE HOV LANE IN EACH DIRECTION) (CFP: 358, 4262, 6137=67,150+IIP: 5,100) (EA#129410, 129421, PPNO 0482R,0482RA)

$153,300

S LA0B951 71ROUTE 10 TO ROUTE 60 - EXPRESSWAY TO FREEWAY CONVERSION - ADD 1 HOV LANE AND 1 MIXED FLOW LANE EACH DIRECTION . (2001 CFP 8349, TCRP #50) (EA# 210600, PPNO 2741) SAFETEA-LU # 3771 (TCRP #50)

$445,000

S LA0D31 101CONSTRUCT ONE ADDITIONAL LANE FOR BOTH NORTH AND SOUTH BOUND OFF-RAMPS AT VAN NUYS BLVD. (RIP 1 M, IIP 8 M) (EA # 199630) (PPNO 2789) (DEMO= NAT. CORRIDOR PLANNING AND BORDER DEV.)

$4,064

S 17850 105LOS ANGELES - SEPULVEDA BLVD TO NASH STREET - WIDEN N/B OFF-RAMP @ SEPULVEDA BL FROM W/B RTE 105. FROM 1 LANE TO 2 LANES. (PPNO# 2119, EA# 17850K) (IIP $7,394)

$28,160

S LA0F073 105 PROJECTS WITHIN LOS ANGELES INTERNATIONAL AIPORT TO ELIMINATE TRAFFIC BOTTLENECKS. (LAWA) (SEC.336 FUNDING) $5,067

S LA0D328 110IN LOS ANGELES-SB HARBOR FREEWAY FROM 8TH STREET ON RAMP TO I-110/I-10 CONNECTOR, CONSTRUCT AUXILIARY LANE AND MODIFY RAMPS (EA 24110, PPNO 3343)

$54,932

Page 8: Project List - Southern California Association of Governments

6 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S LA0D329 110IN LOS ANGELES; NB HARBOR FREEWAY FROM THE NORTH END OF 12TH STREET UC TO THE NORTH END OF THE 7TH STREET UC; ADD AUXILIARY LANE AND RECONSTRUCT RAMP(EA24120, PPNO 3344)

$48,447

S LA0D76 110IN DOWNTOWN LA-ON ROUTE 110-TEMPLE STREET. ACCESS IMPROVEMENTS MODIFYING TEMPLE ST OFF-RAMP (NON-CAPACITY) (EA 22240 PPNO 2961)

$18,200

S LAE2713 110IN L.A. ON ROUTE 110 -CONDUCT NECESSARY PLANNING, ENGINEERING AND IMPLEMENT COMPREHENSIVE CORRIDOR MANAGEMENT PLAN FOR ARROYO SECO HISTORIC PKWAY (E/P, PS/E ONLY)

$1,400

S LA0C8099 126SR-126/COMMERCE CTR DR NEW IC. CONSTRUCT A PARTIAL CLOVERLEAF, GRADE SEPARATED IC AND WIDEN ST 126 FROM .76 KM EAST OF IC TO .85 KM WEST 4-6 LANES. (2001 CFP 8099) (PPNO 3118)

$37,600

S LA0D480 126SR-126 IMPROVEMENTS - LOS ANGELES COUNTY LINE TO CASTAIC CREEK BRIDGE: IMPROVE 5 INTERSECTIONS ADD LT & RT LANES, ADD 1 SB AUX LANE FROM LONG CANYON RD TO WOLCOTT WAY

$35,500

S 17870 134RTE 134 BETWEEN I-5 & PACIFIC AVE MODIFY 134/SAN FERNANDO RD I/C & GRADE SEP AT UPRR SAN FERNANDO/FLOW- ER (WIDEN 1 BRIDGE & 1 OFF RAMP) NON-CAPACITY INCREASING (PPNO 9814 )

$55,462

S LA0D174 138ROUTE 138 WIDENING FROM 2 LANES TO 4 LANES-WIDENING AT TWIN BRIDGES (SEG.11B) EA# 127261, PPNO 3330 (SAFETEALU # 2542)

$14,365

S LA0D180 138ROUTE 138 WIDENING FROM 2 TO 4 LANES WITH MEDIAN TURN LANE-175TH STREET EAST TO LARGO VISTA ROAD (SEG.12). EA# 127271, PPNO 0694Q.

$37,695

S LA0D451 138ROUTE 138 FROM AVE. T TO ROUTE 18-WIDEN 2 TO 4 THRU LANES WITH MEDIAN TURN LANE. EA# 12721,12722,12723,12724,12725,12728. PPNO# 3325,3326,3327,3328,3329,3331

$52,819

S LA962212 138IN PALMDALE @ AVENUE P-8 FROM ROUTE 14 TO 50TH STREET - ACQUISITION OF ROW FOR FUTURE RTE 138 (TIER 2 ENV) (CFP 2212 $3540 2001 CFP 8021)(EA# 116720,PPNO 0393F)

$88,970

S LA963724 210IN LA VERNE AND CLAREMONT, FROM FOOTHILL BOULEVARD TO SAN BERNAR- DINO COUNTY LINE - CONSTRUCT 8-LANE FREEWAY INCLUDING 2-HOV LANES (12620, 12640, 12630, 10501, 17210) 24270

$5,643

S LAE0219 210 CONSTRUCT SOUND WALLS ALONG PORTIONS OF THE I-210 FREEWAY BETWEEN ARROYO BLVD AND ORANGE GROVE $1,800

S 49160 405 IN INGLEWOOD AT ARBOR VITAE AVENUE-CONSTRUCT SOUTH HALF OF INTER-CHANGE. EA# 491601, PPNO 0831) $53,080

S LA0B408 405IN LA FROM RTE 10 TO RTE 101 WIDEN FOR HOV LANE & MODIFY RAMPS, ADD NEW WB ON RAMP AT SUNSET & HOV INGRESS/EGRESS AT SANTA MONICA BLV(EA 12030, PPNO 0851G, SAFETLU # 1302, 1934)

$950,000

S LA0D193 405GARVEE DEBT PAYMENTS RTE. 405 - WATERFORD AV. TO RTE 10 - AUX LNE:LOS ANGELES - WATERFORD AV. TO RTE 10 - CNSTRCT S/B AUX LNE & S/B HOV LNE (2001 CFP 8354) (EA 195900 ,PPNO 2333).

$34,470

Page 9: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 7

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S LA0D194 405GARVEE DEBT SERVICE PAYMENTS: IN LOS ANGELES ON ROUTE 405/101 CONNECTOR GAP CLOSURE (2001 CFP 7248, 2001 CFP 8347) (EA# 20120K, PPNO 2336). (BOTH RIP & IIP)

$30,787

S LA0D332 405 IN LOS ANGELES: FROM LA TIJERA BLVD TO JEFFERSON BLVD; ADD AUXILIARY LANE PPNO: 3348 EA: 24130 $38,711

S LA0D77 405CITY OF L.A.-AT ROUTE 405 & US 101 INTERCHANGE. CONSTRUCT FREEWAY CONNECTOR FROM SB RTE 405 TO NB&SB US 101 & ADD AUX LANE FROM BURBANK TO NB 101 CONNECTOR (EA# 199610, PPNO 2787)

$246,180

S LAE0574 605 STUDY - CONSTRUCT I-605 INTERCHANGE CAPACITY IMPROVEMENTS IN IRWINDALE $1,920

S 2009 710NEAR SOUTH PASADENA FROM ROUTE 10 TO ROUTE 210 - PARTIAL RIGHT OF WAY FOR NEW 6 LANE FREEWAY WITH 2 HOV LANES (EA# 020090, PPNO 0219M) (PROPERTY MANAGEMENT)

$4,185

S 18790 710RTE 10 TO DEL MAR BLVD OVERCROSSING FOR THE 710 FWY - WORK ON ENVIRONMENTAL CLEARANCE ISSUES & FUND INITIAL DESIGN. (EA# 187901, PPNO# 2215) (IIP) SAFETEA #2193

$15,352

S LA0B952 710ROUTE 710 EXPANSION BETWEEN THE PORTS IN THE CITY OF LONG BEACH TO CESAR CHAVEZ O/C IN EAST LOS ANGELES (EA 24990 PPNO 3612)

$40,500

S LA996143 710 RTE 710 PCH TO DOWNTOWN L.B., PAVEMENT RECON, MEDIAN, LANDSCAPING IMPROVE (EA 2203U, 23640, PPNO: 2945,3248) $6,600

S LA996347 710I-710/FIRESTONE BLVD.OVER LA RIVER BRIDGE WIDEN ON-RAMP MOD. & SNDWALL ALONG I-710 FROM FIRESTONE BLVD. TO SOUTH-ERN AVE. PHASE IV (HBRR: 53C1972) WIDEN FROM 4.7M TO 6.4M.

$19,000

S LAE3773 710RECONSTRUCT I-710 INTERCHANGES AS PART I-710 CORRIDOR IMPRVMNT PRGRM PROPOSING 4-TRUCK LNS (PORTS- RAIL YARDS), 10 GENERAL LNS (PORTS- SR60), & ARTERIAL IMPRVMNTS

$6,875

L LA000373 0AVIATION BLVD FROM MANHATTAN BEACH BLVD TO ARBOR VITAE WIDEN FROM 4 TO 6 LANES (ISTEA, 102-240, 1991)

$13,984

L LA000389 0DEL AMO BLVD FROM MADRONA AVE TO CRENSHAW BLVD CONSTRUCT 0 TO 4 LANES NEW GRADE SEPARATION (CFP 6361, 4314; PPNO 2371).

$30,084

L LA000512 0 GERALD DESMOND BRIDGE REPLACEMENT (SAFETEA-LU PNRS #14 - SEC 1301B) ( ALSO LA0F011) $824,000

L LA000720 0ROSECRANS/AVIATION INTERSECTION (AVIATION WIDEN TO 3 LANES IN EACH DIRECTION) RAILROAD BRIDGE WIDENING (C-I:44419) SAFETEA-LU # 3799 AND # 563

$12,553

L LA000800 0HBRR LOCAL BRIDGE LUMP SUM FOR 2004/2005 - (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$394,000

L LA002738 0 BIKEWAY/PEDESTRIAN BRIDGE OVER LA R RIVER AT TAYLOR YARD CLASS I (CFP 738, 2077) (PPNO# 3156) $5,000

L LA0B100 0LUMP SUM TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCLUDING CATEGORY 7) (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$84,273

Page 10: Project List - Southern California Association of Governments

8 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0B103 0CONSTRUCT GOLDEN VALLEY ROAD FROM SOLEDAD CANYON TO NEWHALL RANCH ROAD.0 TO 6 LANES. LESS THAN 0.5 MILES- IN-CLUDES BRIDGE OVER SANTA CLARA RIVER SAFETEA-LU # 3786 AND # 216

$35,300

L LA0B104 0 GOLDEN VALLEY ROAD - NEWHALL RANCH ROAD TO PLUM CANYON ROAD. 0 TO 4 LANES APPROXIMATELY 1.5 MILES. (E/P, PS/E ONLY) $11,000

L LA0B106 0 NEWHALL RANCH ROAD FROM GOLDEN VALLEY ROAD TO BOUQUET CANYON ROAD. 0 TO 6 LANES APPROXIMATELY 1.5 MILES $38

L LA0B414 0 NEAR PASADENA - ARROYO SECO PARKWAY - SCENIC BEAUTIFICATION OF HISTORIC CORRIDOR (PPNO# 3403) (MTA CFP 4128) $3,345

L LA0B7050 0GATEWAY CITY FORUM/CARSON STREET SIGNAL SYNCHRONIZATION-VARIETY OF MULTI-JURISDICTIONAL TRAFFIC SIGNAL IMPROVE-MENT, INCREASE MOBILITY & RELIEVE EXSTNG CNGESTN ON CARSON. PPNO2845.

$1,909

L LA0B7061 0EAGLE ROCK ATSAC/ATCS PRJCT-TIE THE IMPROVEMENT ALONG HOLLYWOOD W & OLIVE AV, FORMING A CONTI. SYSTM FRM SR-134 TO I-5 AND CONCT SEVRL BURBANK AREAS. PPNO 2858.

$8,725

L LA0B7065 0NORTH HOLLYWOOD ATSAC/ATCS PRJCT-BOUNDED BY ROSCOE BLVD & TUXFORD ST, AND VICTORY & VAN NUYS BLVD WILL REPLACE OBSOLETE TRAFFIC SIGNAL CNTRLLERS, INSTL CONDUIT & CABLES. PPNO 2859.

$12,289

L LA0B7096 0CROSS VALLEY CONNECTOR GAP CLOSURE-I-5 TO COPPER HILL DR.-INCL.ENVIRONMENTAL STUDIES & PREPARATION OF PLANS, SPEC., & ESTIMATES FOR A FWY CONNECT. 0 TO 8 LANES (E/P & PS/E ONLY)

$925

L LA0B7234 0OVERLAND BRIDGE -- OVER I-10 FREEWAY -WIDEN W SIDE OF OVERLAND AVE BRIDGE OVER THE I-10 FROM NATIONAL BLVD/I-10 WESTBOUND RAMPS TO NATIONAL BLVD/NATIONAL PLACE. PPNO 2863

$6,641

L LA0B7322 0WHITTIER GREENWAY TRAIL-ACQUISITION, DESIGN, AND CONSTRUCTION MANAGEMENT OF 2 MILES CLASS I BIKE/PED PATH ON AN ABANDONED RAIL ROW FROM NORWALK TO FIVE POINTS.PPNO 2872

$3,805

L LA0B7335 0SANTA CLARA RIV. REGIONAL TRAIL-DESIGNING OF 7 MILES OF CLASS I BIKE/PED PATH ALONG THE NORTH SIDE OF THE RIVER FROM I-5 ON THE WEST TO DISCOVERY PARK ON THE EAST (E/P & PS/E ONLY)

$700

L LA0C40 0VALLEY BLVD/WEST MISSION ROAD I-710 CONNECTOR: CONSTRUCT FRONTAGE RD IN I-710 ALIGNMENT FROM VALLEY BLVD & WEST MISSION RD IN THE EXIS.T STATE ROW & BUILD GRADE SEP, 2 LN EA DIR.

$15,796

L LA0C51 0RANCHO VISTA BLVD/AVE P WIDENING FROM FAIRWAY DR. TO 30TH ST. EAST - 4 TO 6 LANES; W/SIDEWALKS, BIKE LNS, LANDSCAPING, SIGNAL MODIFICATION, DRAINAGE IMPROVE. (E/P,PS/E ONLY)

$893

L LA0C53 0HOLLYWOOD INTERMODAL TRANSPORTATION AND PUBLIC PARKING CENTER ON HAWTHORNE AVE. BETWEEN HIGHLAND AVENUE AND NORTH ORANGE DRIVE (EXIST 500 SP PARK STRUCTURE).TCRP#49.2

$48,150

L LA0C57 0ACE/GATEWAY CITIES-CONSTRUCT GRADE SEP. AT PASSONS BLVD IN PICO RIVERA (& MODIFY PROFILE OF SERAPIS AV,)(PART OF ALAMEDA CORR EAST PROJ.)SAFETEA-LU HPP # 1666 (TCRP #54.3)

$44,530

Page 11: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 9

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0C8009 0TORRANCE BLVD. AT MAPLE AVE. INTERSECTION ; CONSTRUCT EASTBOUND LEFT-TURN LANE, WESTBOUND RIGHT-TURN LANE, AND NORTHBOUND THROUGH-LANE.

$717

L LA0C8012 0ROUTE 5: I-5 WESTERN AVENUE I/C PHASE I -REALIGNMENT OF I-5 NB OFF & ON RAMPS @ WESTERN. NB EXIT RAMP BEGINS AS 2 AND WIDENS TO 4 LANES AT FLOWER ST. (EA# 1786A0, PPNO 2120)

$31,087

L LA0C8024 0GARFIELD AV WIDENING AT GLENDON WAY. ON EASTSIDE OF GARFIELD FRM I-10 W/B OFFRAMP WIDEN RAMP 1 LN TO APPRX 600' N. OF GLENDON. PROVIDES ADDT'L LNE FOR TRAFFIC MERG ONTO GARFIELD

$779

L LA0C8026 0FREMONT AVE WIDENING AT E/B I-10. WIDEN EAST SIDE OF FREMONT FROM I-10 E/B OFF-RAMP TO HELLMAN AVE TO PROVIDE TRAF-FIC MERGING ONTO HELLMAN. WIDEN RAMP 1 LANE.

$1,066

L LA0C8031 0TAMPA AVE BRDGE WIDENING. WIDEN RIVER CROSSING FROM 4 LNS TO 6 LNS ON TAMPA AVE BRDGE, CONSTRUCT BIKE UNDERPASS PPNO 3090 3376 REP (BRIDGE # 53C1335)

$7,300

L LA0C8036 0HYPERION AV UNDR WAVERLY DR BRDGE RPLCEMNT. WILL REMVE & REPLACE WAVERLY BRIDGE W/ A LONGER SPAN STRCTR, PROVIDE SAFTY SHLDERS, BIKE LNES & SIDEWKS ALONG HYPERION. PPNO 3092.

$14,422

L LA0C8037 0SOTO ST BRIDGE OVER MISSION RD & HUNTINGTON DR DEMOLITION PROJECT WILL REALIGN THE STREET TO INCREASE TRAFFIC FLOW ADDING A BIKE LANE. PPNO 3093 3380 ( BRIDGE #53C0013)"

$20,981

L LA0C8038 0LAUREL CANYON BLVD BRDGE OVER TUJUNGA WASH WIDENING. PROJECT WILL WIDEN LAUREL CANYON BRDGE FROM 4 TO 6 LANES TO IMPROVE LOS. ADD SHOULDERS & 6 FT BIKE LNES. PPNO 3094 3379 AB 3090

$3,700

L LA0C8042 0VANOWEN ST BRDGE WIDENING & REHAB. PRJCT WILL WIDEN EXISTING BRIDGE TO MATCH THE STREET IT WILL ALLOW INC TRAFFIC FLOW AND SAFETY. CONSTRUCT BIKE PATH UNDER. PPNO 3095 3378 AB 3090

$14,917

L LA0C8046 0BURBANK BLVD WIDENING-LANKERSHIM BLVD TO CLEON AVE. FROM VARYING ROADWAY WIDTH TO FULL SECONDARY HIGHWAY STAN-DARDS. FROM 1 LN TO 2 LNS IN EACH DIRECTION. PPNO 3097.

$15,417

L LA0C8047 0BALBOA BL & VICTORY BL INTERSECTION IMPROVEMENTS; INSTALL A 2ND LEFT TURN TURN. SOUTHBOUND 600 LINEAR FT., NORTH-BOUND 300 FT. PPNO 3098.

$2,420

L LA0C8048 0CAHUENGA BLVD WIDENING - MAGNOLIA BLVD TO LANKERSHIM BLVD. -2 PARKING LANES & CONTINOUS MEDIAN TURNING LANE. NON-CAPACITY ENHANCING. PPNO 3099.

$12,998

L LA0C8049 0ANAHEIM ST WIDENING-FARRAGUT AVE TO DOMINGUEZ CHANNEL. PROJECT WILL WIDEN THE EXISTING ROADWAY FROM 4 TO 6 LANES AND UPGRADE THE HIGHWAY TO MAJOR HIGHWAY STANDARDS. PPNO 3100.

$2,000

L LA0C8050 0WILSHIRE BL CORRDR IMPRVMNTS-SELBY AV TO COMSTOCK AV WIDEN WILSHIRE BL INTERSECT IN WESTWOOD AT KEY SIGNALIZED INTERSECT & INSTALL RAISED LANDSCAPE MEDIAN. PPNO 3101.

$7,479

L LA0C8052 0 SAN FERNANDO ROAD WIDEN BETWEEN AVE 26TH & UNION PACIFIC DR. PROVIDE LEFT TURN LANEA AT 12 INTERSECTION. PPNO 3102. $1,131

Page 12: Project List - Southern California Association of Governments

10 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0C8053 0SAWTELLE BLVD WIDENING AT VENICE BLVD. WIDEN WEST SIDE OF SAWTELLE BLVD, RESTRIPE TO PROVIDE A N-BOUND LEFT TURN LANE FROM SAWTELLE BLVD TO W-BOUND VENICE BLVD. (PPNO 3131).

$864

L LA0C8054 0SKIRBALL CNTR DR WIDENG FRM I-405 FWY TO MULHOLLAND DR. OVERPASS, PRVIDE ADDN'L S/B LNE, RESTRIPE SKIRBALL CTR DR. FRM 1 S/B, 2 N/B LANES TO 2 LANES IN EACH DIRECTN. (PPNO 3132).

$2,200

L LA0C8055 0MOORPARK AVE WIDENING - WOODMAN AVE TO MURIETTA AVE.- EXISTING 1 LN EA. DIR. ADD 1 LANE IN EA. DIR. & UPGRADE HIGHWAY TO SECONDARY HWY STANDARDS. PPNO 3103.

$6,788

L LA0C8056 0NASH ST/DOUGLAS ST, & ROSECRANS AVE. INTERSECTION IMPROVEMENTS. PROVIDES A 2ND W-BOUND L- TURN LANE & SEPARATE E-BOUND R- TURN LANE ON ROSECRANS AVE AT NASH ST/PRKWAY. (PPNO 3129).

$5,382

L LA0C8057 0REHAB. 1ST ST BRIDGE TO MAINTAIN 4 TRAFFIC LANES AND STRENGTHEN EXISTING GIRDERS (UNDER A SEPARATE CONSTR PHASE) TO ACCOMODATE THE LIGHT RAIL.PPNO 3104 (53C1166)

$67,000

L LA0C8058 0LA TIJERA BRIDGE WIDENING OVER I-405 FREEWAY; PROVIDE SIDE-BY-SIDE DUAL LEFT -TURN LANES IN EAST & WESTBOUND DIREC-TION ONTO FREEWAY RAMPS.

$14,515

L LA0C8063 0RIVERSIDE DR. VIADUCT REPLACEMENT. REPLACEMENT OF EXISTING 2-LANE BRIDGE WITH A 4 LANE FLARE NEW ROUNDABOUT & BIKE PATH - WILL RESULT IN INCR. CIRCULATION. PPNO 3105 (53C0160)

$18,000

L LA0C8064 0 SAN FERNANDO MISSION BLVD WIDENING BET SEPULVEDA BLVD & I-5 FWY. FROM 1 LANE TO 2 LANES IN EACH DIRECTION.PPNO 3106. $2,471

L LA0C8075 0CESAR CHAVEZ / LORENA / INDIANA INTRSCTN IMPRVMNT - RECNSRTRCTN OF COMPLICATED 5-LEGGED SIGNAL-CONTROLLED, FOR TRAFFIC SAFETY AND TRAFFIC FLOW IMPROVEMENT PPNO 3107.

$10,933

L LA0C8079 0 NASH ST/DOUGLAS ST ONE-WAY TO TWO-WAY CONVERSION. CONVERT ONE-WAY COUPLET SYSTEM TO A TWO-WAY STREET. $5,000

L LA0C8082 0HAWTHORNE AT SEPULVEDA INTERSECTION ; INSTALL WESTBOUND RIGHT-TURN LANE TO MITIGATE PEDESTRIAN CONFLICTS AND TO IMPROVE OPERATION OF INTERSECTION.

$465

L LA0C8083 0190TH ST AT ANZA AVE & INGLEWOOD AVE INTERSECTION ENHANCEMENT; INSTALL ADD'L LEFT-TURN LANES TO PROVIDE DUAL LEFT-TURN LANES.

$405

L LA0C8084 0WINNETKA AVE BRDGE WIDEN & REHAB. - WIDEN THE RIVER CROSSING FROM 4 TO 6 LANES, & ADD BIKE ROUTE ON SHOULDER, CONSTRUCT BIKE UNDERPASS. PPNO 3108 3377 AB 3090 REP (53C1388)

$6,100

L LA0C8086 0NORTH SPRING ST BRIDGE WIDENING & REHABILITATION. INCLUDES WIDENING THE STRUCTURE & THE WEST APPROACH FROM 4 TO 6 LANES, BIKE ROUTES WILL BE MADE PART OF THE SHOULDERS (53C0859).

$41,000

L LA0C8087 0MAGNOLIA BLVD WIDENING-CAHUENGA BLVD TO VINELAND AVE. FROM THE EXISTING ROADWY STANDARD TO SECONDARY HWY STAN-DARD. FROM 1 LANE TO 2 LANES IN EACH DIRECTION. (PPNO 3110).

$4,030

L LA0C8089 0 BARHAM / CAHUENGA / INTERSECTION WIDEN IMPROVEMENT, FOR LEFT/RIGHT TURN IMPROV. PPNO 3111. $1,495

Page 13: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 11

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0C8090 0VERMONT AV BRIDGE WIDENING N/B ACCESS FREEWAY. WIDEN VERMONT AV BRIDGE AT RTE 101 FWY BY PROVIDING ADDTNL LEFT-TURN LANE ON N/B VERMONT AV ONTO N/B RTE. (PPNO 3112).

$11,109

L LA0C8092 0VALLEY VIEW AVE GRADE SPARATN AT BNSF RAILWAY SOUTH OF SAGE RD. CONSTRUCT A GRADE SPARATN FOR VALLEY VIEW AVE FROM EXSTNG BNSF TRACKS BY CONSTRCTNG A HWY UNDERPASS PPNO 3117 (3022)

$79,084

L LA0C8094 0PIER B ST INTERMODAL RAILYARD EXPANSION PROJECT. REALIGNMENT AND WIDENING OF PIER B STREET. (FOR EXPANSION OF PIER B ST INTERMODAL RAILYARD PHASE SEE PLAN PROJECT 1O0701)

$11,988

L LA0C8095 0CHERRY AVE. WIDENING PROJECT. BET 19TH ST AND PACIFIC COAST HIGHWAY BY WIDENING THE ARTERIAL FROM ONE TO TWO LANES IN EACH DIRECTION.(PPNO 3128). SAFETEA-LU #3203

$6,721

L LA0C8096 0CROSS VALLEY CONNECTOR GAP CLOSURE; I-5 TO COPPER HILL DR - INCLUDES THE CONSTRUCTION OF AN 8-LANE DIVIDED ARTERIAL, OUTSIDE CURB AND GUTTER, & DRAINAGE IMPROVEMENTS.

$25,957

L LA0C8098 0 SANTA MONICA BLVD WIDEN FROM DOHENY DR TO WILSHIRE BLVD (WIDEN FROM 4 TO 5) $2,550

L LA0C8114 0LA CNTY RIDESHARE SERVICES; PROVIDE COMMUTE INFO, EMPLOYER ASSISTANCE AND INCENTIVE PROGRAMS THROUGH CORE & EMPLOYER RIDESHARE SERVICES & MTA INCENTIVE PROGRAMS. PPNO 9003

$21,000

L LA0C8120 0SOUTH BAY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT. DESIGN & CONSTRUCTION OF MULTI JURISDICTIONAL, SIGNAL SYSTEM IMPROVEMENTS ON REGIONAL ARTERIALS & ADVANCED ITS TECHNOLOGY.

$8,627

L LA0C8121 0SAN GABRIEL VALLEY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT OF MULTI JURISDICTION- AL, SIGNAL SYS IMPRVMENT ON RE-GIONAL ARTERIALS USING CONVENTNAL & ADVANCED ITS.

$10,369

L LA0C8122 0CANOGA PARK ATSAC/ATCS PROJ. PROVIDE ATSAC/ATCS RELATED IMPRVMNTS TO 105 SIGNALIZED INTERSCTIONS THRU IMPLEMEN-TATION OF A COMPUTER BASED REAL TIME TRFFIC SIGNAL MONITORING CTRL SY

$12,593

L LA0C8123 0SAN PEDRO ATSAC/ATSC PROJ. PROVIDE ATSAC/ATCS RELATED IMPRVMNTS TO 57 SIGNALIZED INTERSECTIONS THRU IMPLEMENTA-TION OF A COMPUTER-BASED REAL TIME TRFFC SIGNAL MONITORING CNTRL SYS.

$8,600

L LA0C8124 0WILMINGTON ATSAC/ATCS PROJECT; IMPROVEMENTS TO 70 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF COMPUTER BASED REAL TIME TRAFFIC SIGNAL MONITORING AND CONTROL SYSTEM.

$9,000

L LA0C8126 0HARBOR-GATEWAY ATSAC/ATCS PROJECT; IMPROVEMENTS TO 109 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTROL SYSTEM.

$11,142

L LA0C8127 0 GATEWAY CITIES FORUM TRAFFIC SIGNAL CORRIDORS PHASE IV $10,412

Page 14: Project List - Southern California Association of Governments

12 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0C8128 0FOX HILLS AREA TRAF SIG SYNCH EFFORT & CITY-WIDE AUTO TRAF SIGNAL CONTROL AND MONITORING PROJECT. INCORPORATE 11 SIGNALIZED INTERSECTIONS INTO AN ATSAC / ADAPTIVE TRAF CONTROL SYS.

$1,851

L LA0C8129 0PORTS OF LONG BEACH AND LOS ANGELES ATMS/ATIS PROJ.. ADDT'N OF UP TO 16 CLOSED CIRCUIT TV CAMERAS & 9 CHANGEABLE SIGNS TO IMPROVE TRAFFIC OPERATIONS ON THE: I-710, I-110, SR47/103.

$11,499

L LA0C8130 0INCIDENT MANAGEMENT - TRAVELER INFORMATION SUBSYSTEM; INSTALLATION CONSISTS OF 4 STATIONARY ELECTRONIC CHANGE-ABLE MESSAGE SIGNS & A HIGHWAY ADVISORY RADIO SYSTEM.

$2,559

L LA0C8133 0RESEDA ATSAC/ATCS PROJ.PROVIDE ATSAC/ATCS TYPE IMPROVEMENTS TO 107 SIGNALIZED INTERSECTIONS THRU IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTRL SYS

$13,204

L LA0C8135 0INGLEWOOD ITS DEPLOYMENT AND INTEGRATION PROJECT. CITYWIDE IMPLEMENTATION AND INTEEGRATION OF VARIOUS ITS TECH-NOLOGIES AND ELEMENTS.

$3,350

L LA0C8147 0SIERRA BIKEWAY RAILROAD OVERCROSSING. PROPOSE A .34 MILE CLASS 1 BIKE PATH PROVIDE A GRADE SEPARATION AT AVE. Q OVER THE UNION PACIFIC/METROLINK RAILS.(PPNO3456)"

$2,226

L LA0C8156 0SANTA CLARITA REG'L COMUTR TRAIL - I-5 TO FAIRWAYS DRIVE- CONSTRUCT & ACQUISITION OF 1.0 MI OF CLASS I BIKE PATH & BRIDGE RESTORATN ADJACENT TO SANTA CLARA.(PPNO 3127). NON-CAP.

$2,346

L LA0C8159 0LA CANADA FLINTRIDGE EAST/WEST BIKEWAY CORRIDOR. DESIGN AND CONSTRUCTION OF 3.42 MILES OF EAST/WEST DIRECTIONAL CLASS II BIKE LANES IN THE CITY OF LA CANADA FLINTRIDGE.

$49

L LA0C8161 0WHITTIER GREENWAY TRAIL: PICKERING BRIDE SEG 1 DEVT& SEG 3 P/E & DEVT. DESIGN, CONST& ACQUIST OF 2.86 MLES CLASS I BIKE/PED FAC ON ABANDONED ROW IN WHITTIER PPNO#3440-EA07-932045

$6,587

L LA0C8163 0BIKEWAY AND PEDESTRIAN IMPROVEMENTS. 1.2 MILE CLASS I BIKE/PED PATH FROM WALNUT AVE TO WILLOW ST AT THE BLUE LINE STATION. (PPNO# 3408)

$4,641

L LA0C8164 0EXPOSITION BLVD RIGHT-OF-WAY BIKE PATH-WESTSIDE EXTENSION. DESIGN AND CONSTRUCTION OF 2.5 MILES OF CLASS 1 BIKEWAY, LIGHTING, LANDSCAPING & INTERSECTION IMPROVEMENTS. (PPNO# 3184)

$2,567

L LA0C8171 0GAYLEY AVE BIKE LANES & STREET WIDENING. DESIGN AND CONSTRUCTION OF .25 MILES OF CLASS II BIKE LANES ON GAYLEY AVE FROM EXISTING BIKE LANES AT LEVERING AVENUE TO THE UCLA CAMPUS

$872

L LA0C8209 0HOLLYWOOD MEDIA DISTRICT-PED IMPRV. STRETTSCAPE ELEMNTS: LANDSCAP, PED LIGHT STAMPED XWALK, ON SANTA MONICA BVD F/M VINE ST TO HIGHLAND & HIGHLAND F/M MELROSE TO FOUNTAIN

$810

L LA0C8993 0SYSTEM PRESERVATION NEEDS ASSESMENT STUDY-TO WORK WITH SUB-REGIONS AND IND. JURISDICTIONS TO EVA. LOCAL SYSTEM PRESERVATION & CAPACITY ENHANCING(NEEDS/ISSUES.

$263

L LA0D108 0L.A RIVER BIKE PATH PHASE 1C- CLASS 1 BIKEWAY ALONG WEST BANK OF LA RIVER- FLETCHER DR TO BARCLAY ST INCLUDES LIGHT-ING, SIGNAGE, PAVEMNT MARKINGS & FENCING (LA996245)(PPNO 5006)

$2,536

Page 15: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 13

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0D118 0HIGHWAY BEAUTIFICATION PROJECT ALONG THE VENTURA FWY CORRIDOR IN AGOURA HILLS (NATIONAL SCENIC BYWAY PROJECT) AT KANAN ROAD INTERCHANGE INCLUDES LANDSCAPING

$1,243

L LA0D119 0PRELIMINARY ENGINEERING (PE) & CONSTRUCT THE WIDENING OF WASHINGTON BLVD. BRIGES OVER SAN GABRIEL RIVER & UPRR. BRIDGES WILL BE WIDENED FROM 4 LNS TO 6 LNS. (53C0122 & 53C0082)

$7,095

L LA0D120 0ARTESIA TRAFFIC ENHANCEMENT PROJECT FOR ARTESIA BLVD, PIONEER BLVD AND 183RD STREET RESURFACING, STREETSCAPING, TRAFFIC CALMING, ANGLE-PARKING SIGNALS, ETC.

$1,192

L LA0D129 0SAN GABRIEL BLVD REHAB PHASE II - FROM BROADWAY TO LAS TUNAS: PVEMNT RECONSTRCT & OVERLAY, CONCRT REPRS, MEDIAN ISLND INSTALL W/LANDSCAPING AND TREES. SAFETEA-LU HPP # 2811

$2,000

L LA0D145 0TIERRA SUBIDA WDENG FRM AV S TO PALMDALE BL. 2 TO 4 LNES FRM AV S TO AV Q-8; 4 TO 6 LNS FRM AV Q-8 TO PALMDALE BL; WITH SDWLKS, BIKE LNS, LNDSCAPNG, DRANGE IMPRVMNTS & TRAFC SGNLS.

$16,000

L LA0D167 0BROADWAY IMPRVMNTS FRM 168TH ST. TO NORTH CITY LIMIT (ALONDRA BLVD). CNSTRCT RAISED CNCRTE MEDIANS W/ LANDSCAPE & HARDSCAPE, ADD CURB & GUTTER & SIDEWLK ,RECNSTRUCT EXSTNG PAVEMNT.

$1,070

L LA0D168 0FIGUEROA ST IMPROVEMENT, VICTORIA ST TO ALONDRA BLVD.RECONSTRUCT EXISTING ASPHALT PAVEMENT,CURB & GUTTER & SIDE-WALK; ST WIDEN NON-CAPACITY W/IN EXIST R/W NEXT TO CURB & GUTTER.

$3,450

L LA0D169 0BROADWAY IMPROVEMENTS FROM MAIN ST TO GRIFFITH ST. CONSTRUCT RAISED CONCRETE MEDIANS W/ LANDSCAPE, HARDSCAPE,CURB & GUTTER & SIDEWALK. ADD 1 LANE EA DIR.FOR 2 EA. DIR.

$1,203

L LA0D170 0BROADWAY IMPROVEMENTS FROM GRIFFITH ST TO ALBERTONI. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT.

$1,980

L LA0D171 0BROADWAY IMPROVEMENTS FROM ALBERTONI TO 168TH ST. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND HARD-SCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT.

$1,540

L LA0D173 0SEPULVEDA BLVD, ALAMEDA ST. TO EAST CITY LIMIT. STREET WIDENING, MEDIAN ISLANDS, WIDEN FROM 2 LANES TO 4 LANES.(53C0652)

$5,500

L LA0D188 0ARBOR VITAE STREET FROM LA BREA AVENUE TO PRAIRIE AVENUE BY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDE-WALKS, DRIVEWAYS, PEDESTRIAN RAMPS, LANDSCAPING AND STREET LIGHTING.

$3,532

L LA0D189 0PARAMOUNT BLVD AND GREENWOOD AVE. IMPROVEMENT; PROVIDE ADDTIONAL TURNING LANES AT SR 60 ON/OFF RAMP AT PARA-MOUNT BLVD INTERSECTION, FREEWAY ACCESS IMPROVEMENT

$2,445

L LA0D190 0NO. ATLANTIC BLVD - NEWMARK AVE TO HILLMAN AVE - CHANNELIZATION WIDEN TO SIX LANES OF OPERATION TO INCLUDE ACCEL-ERATION & DECELARATION LANE OPRTN MDIFCTION; FROM 4 TO 6 LNS.

$686

Page 16: Project List - Southern California Association of Governments

14 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0D209 0LA BREA AVENUE, FROM FLORENCE AVE TO CENTURY BLVD AND IMPERIAL HIGHWAY, FROM PRAIRIE AVE TO VAN NESS AVE BY RECON-STRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS.

$5,977

L LA0D260 0STATE ROUTE 90 CONNECTOR ROAD TO ADMIRALTY WAY/ ADMIRALTY WAY WIDENTHE ROAD TO 5-LANES (NORTHBOUND) FROM VIA MARINA TO BALI WAY (8,000 FEET), WIDEN THE ROAD TO 6-LANES (

$6,000

L LA0D279 0ATLANTIC BLVD. BRIDGE OVER THE L.A RIVER 5/8 MILE N SLAUSON AVE, WIDEN 6 LANE BRIDGE TO ADD RIGHT TURN LANE (BRIDGE #53C0252)

$8,334

L LA0D293 0 MEYER ROAD IMPERIAL/LEFFINGWELL ET AL. ROAD REHABILITATION $1,200

L LA0D313 020TH & CLOVERFIELD STREETSCAPE, PEDESTRIAN AND TRAFFIC IMPROVEMENTS. INCLUDES STREET RESURFACING, NEW CURBS, SIDEWALKS, LANDSCAPING, CROSSWALKS, BUS STOP IMPROVMENTS ETC.

$5,217

L LA0D318 0ESPLANADE STREESTCAPE IMPROVEMENTS INCLUDES RESURFACING, RELOCATING CURB & GUTTER FOR ADDITIONAL LANDSCAPING, STREET GUTTER AND STORM DRAINS SAFETEA HPP# 1662

$3,500

L LA0D323 0ACQUISITION AND CONSERVATION OF APPROXIMATELY 15 ACRES OF UNDEVELOPED OPEN SPACE LANDS TO PROVIDE FOR WILDLIFE HABITATS AND IMPROVED NONMOTORIZED RECREATIONAL TRAIL OPPORTUNITIES

$350

L LA0D324 0I-5 CORRIDOR ARTERIES-LAKEWOOD IMPROVEMENT BETWEEN I-105 FWY NEAR DALEN ST. & GARDENDALE ST. IMPRVMNTS INCL RECONSTRUCTION OF RDWAY PAVEMNT, WIDEN EXISTING LANE WIDTH.

$2,637

L LA0D326 0DEPARTMENT OF PARKS & RECREATION-KENNETH HAHN TRAIL/WALKWAY PROJECT RT 19-021 PROJECT WILL PROVIDE A ONE MILE TRAIL CONNECTING THE PARK ACCESS BRIDGE WITH VISTA PACIFICA;"

$89

L LA0D330 0RIO HONDO TRAIL-GARVEY ST. BRIDGE RT19-022. REFURBISHMENT OF A 160X12 BRIDGE & CONSTRUCT 3 FT CONCRETE RETAINING WALL & ADDITION OF COMPACTED GRANITE (NON-CAPACITY PROJECT).

$200

L LA0D333 0 ANAHEIM STREET PLANNING, COORDINATION AND DESIGN OF OPERATIONAL & STREETSCAPE (NON-CAPACITY IMPROVEMENTS). $566

L LA0D336 0SR14/AVENUE K INTERCHANGE IMPROVEMENTS. WIDEN NORTHBOUND OFFRAMP AND 15TH STREET WEST. WIDEN NB OFFRAMP & 15TH STREET WEST& WIDEN N/B OFFRAMP FROM 3 TO 4 LANES AT AVE K/15TH ST-W.

$8,600

L LA0D344 0WIDENING OF THE REYES ADOBE ROAD OVERCROSSING OF THE 101 FREEWAY FROM 3 LANES TO 6 LANES, ALONG WITH BIKE LANES AND SIDEWALKS

$12,118

L LA0D388 0PARAMOUNT BLVD BETWEEN COVEN ST. AND CANDLEWOOD ST-PAVEMENT REHAB. RAISED MEDIAN AND LANDSCAPE SAFETEALU # 2288

$1,350

L LA0D390 0ARTERIAL STREET AND FREEWAY-TO-FREEWAY INTERCHANGE IMPROVEMENTS AT SR-47 (VINCENT THOMAS BRIDGE) AND I-110; AND MODIFICATION TO I-110 NB ON-OFF RAMPS TERMINI AT JOHN S. GIBSON BLVD

$67,800

Page 17: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 15

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0D391 0VINCENT THOMAS BRIDGE STUDY - DEVELOP AND ANALYZE ALTERNATIVES TO INCREASE NEEDED CAPACITY. SAFETEA-LU HPP # 297 NON-CAPACITY

$1,600

L LA0D392 0 GRAND AVE BEUTIFICATION/BETTERMENT PHASE II $1,587

L LA0D393 0GRAND AVENUE/SR 57/60 INTERCHANGE RECONSTRUCTION MODIFY GRAND AVENUE TO ADD ADDITIONAL LANES FOR NH AND SB TRAFFIC, WIDEN THE EXISTING GRAND AVE OVERPASS

$33,000

L LA0D420 0SUNSET OVERLOOK TRAILHEAD AREA IN HAHAMONGNA WATERSHED PARK NEAR THE DEVIL'S GATE DAM (GRANT FROM RECREATIONAL TRAILS PROGRAM)

$271

L LA0D434 0SHERMAN WAY MEDIAN ISLAND INSTALLATION-DE SOTO TO TOPANGA CANYON: THIS SAFETY ENHANCEMENT PROJECT WILL PROVIDE FOR CONCRETE MEDIAN ISLANDS ALONG THE PROJECT LIMITS TO DETER VEHICLE

$318

L LA0D439 0INTELLIGENT TRANSPORTATION SYSTEM LOGISTICS & SYSTEMS MANAGEMENT, WILL PRODUCE AN ITS MASTERPLAN FOR THE GATE-WAY CITIES SUBREGION WITH AN EMPHASIS IN GOODS MOVEMENT

$513

L LA0D440 0 RETROFIT THE EXISTING CROSSROAD PARKWAY BRIDGE OVER THE UPRR RAILROAD TRACKS AT ROUTE 605 FREEWAY AREA. $1,050

L LA0D441 0RECONFIGURATION OF VALLEY BLVD ON-AND-OFF-RAMPS TO THE 605 FREEWAY TO IMPROVE MOBILITY, CIRCULATION, AND RELIEF THE CURRENT CONGESTION AT VALLEY BLVD.

$28,012

L LA0D442 0RETROFITING THE EXISTING TWO-LANE WIDE PECK ROAD BRIDGE OVER THE SAN GABRIEL RIVER FWY (ROUTE 605) & WIDEN IT TO AC-COMODATE 4 LANES (2 EACH DIRECTION) TO ELIMINATE BOTTLENECK

$12,000

L LA0D443 0REHABILITATING THE EXISTING AZUSA AVE. BRIDGE OVER THE UPRR TRACKS AND VALLEY BLVD, APPLY NEW PAINT TO THE EXISTING STEEL BRIDGE TO AVOID FURTHER WEATHER CORROSION.

$1,600

L LA0D445 0 10TH STREET WEST GAP CLOSURE FROM AVENUE L TO AVENUE M. WIDEN GAPS FROM 1 TO 3 LANES. $4,000

L LA0D446 0 AVENUE K GAP CLOSURE FROM 60TH STREET WEST TO SR14. WIDEN GAPS FROM 1 TO 2 LANES OR 3 LANES. $7,390

L LA0D447 0 AVENUE L GAP CLOSURE FROM 60TH STREET WEST TO SR14, WIDEN GAPS FROM 1 TO 2 LANES TO 3 LANES $6,690

L LA0D448 0MAJOR ARTERIAL GAP CLOSURES. AVENUE J, 36TH TO 32TH WEST. 2OTH WEST, LANCASTER BLVD TO NEWGROVE ST. 20TH STREET EAST, AVENUE J-4 OT J-8

$2,902

L LA0D449 0AVENUE M AND SR14 OVERCROSSING IMPROVEMENTS. WIDENING AVENUE M FROM 2 TO 7 LANES FROM 10TH STREET WEST TO 15TH STREET WEST.

$13,650

L LA0D450 0GRAND AV/SR 57/60 INTERCHANGE RECONSTRUCTION- WIDEN GRAND AV WB RAMP:SB ADD 1 RT & 1 THROUGH LN (2 EXSTNG) & 2 LT (2 EXSTNG); NB ADD 1 LT,1 THROUGH LN (2 EXSTNG) & 1 RT (1 EXSTNG)

$200,000

Page 18: Project List - Southern California Association of Governments

16 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0D458 0 PROJECT WILL PROVIDE FOR THE CONSTRUCTION OF A 3,25 MILE BIKEWAY ALONG THE RESTORED BANKS OF THE PACOIMA WASH. $2,000

L LA0D459 0AV. N- 45TH ST WEST TO ANTELOPE VALLEY FWY RECONSTRUCTION; WIDENING, ADD 12' RTL POCKETS AT INTERSECTION AV. O AND 20TH ST WEST & TWO 12' LTL AT INTRSECTN OF AV. N- 45TH ST WEST

$3,354

L LA0D460 0AV. O -- 30TH ST WEST TO 10TH ST WEST- RECONSTRUCT & WIDEN, INCLUDING EXIST BRIDGE WIDEN 1 TO 2 ; ADD 12' RT ONLY POCKETS @ INTERSECTION AV. O & 20TH ST WEST & 12' 2-WAY LTL ONLY

$2,520

L LA0D461 0RECONSTRUCT- THE OLD ROAD FROM HILLCREST PARKWAY TO LAKE HUGHES RD & WIDEN FROM 40' TO 68', 2 LANES & A 5' CLASS II BIKELANE IN EA DIR & STRIPPED MEDIAN (FROM 2 TO 4 LNS 2 EA DIR)

$10,700

L LA0D464 0IMPROVEMENTS AT INTERSECTION OF COLIMA RD & HACIENDA BLVD: RECONSTRUCT/ RESTRIPE FOR 3ED THROUGH LANE ON WB & EB APPROACHES; RESTRIPE FOR 3ED THROUGH LANE ON NB APPROACH

$314

L LA0D465 0COLIMA RD- HALIBURTON RD/ CITY OF DIAMOND BAR CB ROAD WIDENING: RESTRIPE FOR 3ED THROUGH LANE ON EB APPROACH (HACIENDA BLVD- FULLERTON RD) & WB APPROACH (FULLERTON- CAMINO DEL SUR)

$600

L LA0D466 0FULLERTON RD AND PATHFINDER RD INTERSECTION IMPROVEMENTS: NB APPROACH CONVERT RTL TO FREE RTL; SB APPROACH RESTRIPE FOR 3ED THROUGH LANE AND TO ADD SECOND LTL AT INTERSECTION

$482

L LA0D467 0HACIENDA BLVD & GALE AV INTERSECTION IMPROVEMENTS: RESTRIPE FOR 2ND LTL ON EB & WB APPROACHES; RECONSTRUCT/ RESTRIPE FOR 2ND LTL ON NB AND SB APPROACHES & ADD RTL NB APPROACH

$429

L LA0D468 0 GOODS MOVEMENT NHS TRUCK IMPACTED INTERSECTIONS PHASE IV (CFP # 7193) $13,164

L LA0D469 0 SOUTH BAY TRAFFIC SIGNAL SYNCHRONIZATION $18,406

L LA0D472 0INTELLIGENT TRANS. SYSTEM LOGISTICS & SYSTEMS MANAGEMENT FOR GATEWAY CITIES (PROJ VII.J.5.1) THAT WILL PRODUCE A REG. ITS MASTERPLAN W/EMPHASIS ON GOODS MOVEMENT (E/P & PS/E ONLY)

$500

L LA0D473 0DOCKWEILER DR EXTENSION FROM LYONS AV TO LEONARD TREE LANE: CONSTRUCT A 4-LANE FACILITY (2 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, AND DRAINAGE IMPROVEMENTS

$11,126

L LA0D474 0 REHABILITATION OF ARTESIA BLVD. FORM KNOTT AV. TO VALLEY VIEW AV. PRIOR TO I-5 IMPROVEMENTS $616

L LA0D476 0VIA PRINCESSA EXTENSION FROM MAGIC MOUNTAIN PKWY TO GOLDEN VALLEY RD: CONSTRUCT APPROXMTLY A 1-MILE FACILITY (3 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, & DRAINAGE IMPRVMT

$22,602

L LA0D477 0CONSTRUCT IMPROVEMENTS FOR SR-14 INTERCHANGE AT GOLDEN VALLEY ROAD. DIAMOND CONFIRGURATION, TWO RAMPS, IM-PROVEMENTS INCLUDE WIDENING OF BRIDGE OVERCROSSING, NEW SIGNALS, RAMP MOD

$7,370

L LA0D478 0RECONSTRUCT OF WASHINGTON BLVD FROM I-5 FWY TO THE WEST; UPGRADE TRAFFIC SIGNALS AND IMPROVE THE EXISITING PAVE-MENT

$1,200

Page 19: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 17

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0F003 0LOS ANGELES STREET, OVER BIG DALTON WASH, 0.5 MI S IRWINDALE AVE. WIDEN 2-LANE BRIDGE TO 4-LANE BRIDGE, ADD SHOUL-DERS, UPGRADE BRIDGE RAILING (# 53C0676)

$11,649

L LA0F004 0DELL AVE, OVER CARROLL CANAL, 0.2 KM S OF VENICE BLVD. REHABILITATE 1 LANE BRIDGE AND WIDEN TO 2 LANE BRIDGE, ADD SIDEWALKS, UPGRADE BRIDGE RAILINGS. (# 53C1688)

$3,500

L LA0F005 0DELL AVENUE, OVER LINNIE CANAL, 0.25 KM S OF VENICE BLVD. REHABILITATE 1 LANE BRIDGE & WIDEN TO 2 LANE BRIDGE, ADD SIDE-WALKS, UPGRADE BRIDGE RAILINGS (# 53C1689)

$4,000

L LA0F006 0DELL AVENUE, OVER SHERMAN CANAL, 0.25 MI S VENICE BLVD. REHABILITATE 1 LANE BRIDGE & WIDEN TO 2 LANE BRIDGE ADD SIDE-WALKS, UPGRADE BRIDGE RAILINGS. (# 53C1691)

$4,000

L LA0F007 0HYPERION AVE. OVER GLENDALE BL SB, LA RIVER, SOUTHBOUND GLENDALE. SEISMIC RETROFIT & RECONFIGURE SIDEWALKS, RE-STORE HISTORIC BRIDGE RAILINGS (NO BRIDGE WIDENING) (# 53C1881)

$12,719

L LA0F008 0GLENDALE BLVD. OVER L.A RIVER, REHABILITATE 2 LANE BRIDGE & WIDEN TO INCLUDE SHOULDERS, SIDEWALKS, AND RESTORE HIS-TORIC BRIDGE RAILINGS (NON CAPACITY) # 53C1883)

$12,000

L LA0F009 0GLENDALE BLVD. - OVER LA RIVER. REHABILITATE 2 LANE BRIDGE & WIDEN TO INCLUDE SHOULDERS, SIDEWALKS, RESTORE HISTORIC RAILINGS (NON-CAPACTIY PROJECT) (# 53C1884)

$10,000

L LA0F010 0OLD ROAD, OVER SANTA CLARA RIVER, 1/4 MI N MAGIC MTN PKWY. REPLACE 4 LANE BRIDGE W/ 6 LANE BRIDGE (HBRRP PAY FOR 4 LANE, & NEWHALL LAND &FARMING PAYS FOR 2 ADDIT. LANES) (# 53C0327

$21,500

L LA0F011 0OCEAN BLVD. OVER ENTRANCE CHANNEL, UP RR, 1.0 MI E STATE ROUTE 47. REPLACE EXISTING 5 LANE GERALD DESMOND BRIDGE WITH NEW 6 LANE BRIDGE (BRIDGE #53C0013) (ALSO LA000512)

$26,500

L LA0F016 0PURCHASE, INSTALL, AND INTEGRATE OPTICOM PRIORITY CONTROL SYSTEM TO EXISTING TRAFFIC CONTROLLERS AT VARIOUS LOCA-TIONS WITHIN CITY LIMITS. (SAFETEA-LU#2345)

$217

L LA0F019 0 PURCHASE OF BUS BENCHES, TRASH CANS, AND SMALL SHELTERS FOR VARIOUS TRANIST STOPS THROUGHOUT CITY OF LAKEWOOD. $493

L LA0F020 0 LOWER ARROYO SECO TRAIL AND TRAILHEAD IMPROVEMENT PROJECT (GRANT FROM RECREATIONAL TRAILS PROGRAM) $258

L LA0F030 0 I-110 FREEWAY/ 'C' STREET INTERCHANGE IMPROVEMENTS- MODIFICATION OF EXISTING INTERCHANGE $24,798

L LA0F033 0PLANNING SERVICES ARROYO SECO PARKWAY SCENIC CORRIDOR & IMPLEMENTATION OF CORRIDOR MGMT PLAN. SCENIC BYWAY ORGZN & VISTOR INTERPRETATION & MARKETING PLAN.FHWA PRJ SB-2004-CA-51312

$372

L LA0F038 0 IMPROVEMENTS TO THIS INTERSECTION INCLUDE DURATHERM DECORATIVE CROSSWALKS AND RESURFACING ON WESTERN AVE. $151

Page 20: Project List - Southern California Association of Governments

18 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA0F039 0NORTH BROADWAY IS A MAIN COMMERCIAL CORRIDOR IN THE INNER NEIGHBORHOOD OF LINCOLN HEIGHTS. PROJ. WILL REVITALIZE THIS THROUGH FARE & COMMUNITY BY INST. SIGNIFICANT ST. ENHANCEMENTS

$97

L LA0F040 0ANGELS FLIGHT RAILWAY, IN THE CITY OF L.A. ALONG AN EASEMENT FROM HILL ST. TO ABOVE OLIVE ST. BETWEEN 3RD AND 4TH ST. FOR THE DESIGN OF A NEW FABRICATION PROPULSION SYSTEM

$203

L LA0F041 0WILL ADD STREETLIGNTS ON LEMON GROVE RECREATION CENTER ON THE EAST HOLLYWOOD COMMUNITY, MAKING PROPERTY OWN-ERS, COMMUNITY MEMBERS, PEDESTRIANS AND MOTORISTS FEEL SAFER

$293

L LA0F042 0MOBILITY SOURCE AIR POLLUTION REDUCTION REVIEW (MSRC)-FLORENCE AVE - THE OLD RIVER/TECUM RD TO OVAL DR/HAWES ST. DESIGN & CONSTRUCT MULTIJURIDICTION SIGNAL SYS IMPROVEMENTS

$823

L LA0F043 0 MOBILITY SOURCE AIR POLLUTION REDUCTION REVIEW COMM (MSRC)-LOS ANGELES COUNTY/SANTA CLARITA ITS $1,142

L LA0F062 0DESIGN AND CONST. OF REAL-TIME PARKING INF./GUIDANCE SYSTEM. PHASE I COVERS SANTA MONICA AREA, BOUNDED BY COLORADO AVE., OCEAN AVE., WILSHIRE BLVD AND LINCOLN BLVD.

$700

L LA0F063 0LA-FULLERTON TRIPLE TRACK & GRADE SEP (ROSECRANS) (IN SANTA FE SPRINGS, LA ON THE BNSF LINE. CONSTRUCT TRIPLE TRACK & GRADE SEPARATION AT ROSECRANS AND MARQUARDT AVE. (PPNO 2002A)

$20,700

L LA29202N 0MTA TIP ADMINISTRATION PLANNING, PROGRAMMING AND MONITORING FOR STIP PROJECTS THROUGH OUT LA COUNTY (200 CFP 7116 STATE ONLY 3594,2001 CFP 8401, PPNO 9001)

$43,152

L LA450022 0LUMP SUM PROJECT FOR HIGHWAY SAFETY, REHABILITATION & RECONSTRUCTION, OPERATION, AND SYSTEM BETTERMENTS ACTIVI-TIES.

$246,324

L LA57000 0 OCEAN BLVD/TERMINAL ISLAND FREEWAY INTERCHANGE (PORT OF LONG BEACH -- PADP #30) (T21-#742) $28,371

L LA960001 0 ANAHEIM ST FROM FARRAGUT AVE TO DOMINGUEZ CHNL WIDENING WIDEN FROM 4 TO 6 LANES (E/P,PS/E ONLY) $480

L LA960002 0BARRINGTON AVE - ALLEY NORTH OF GORHAM AVE TO DARLINGTON AVE WIDENING TO PROVIDE LEFT TURN LN WIDEN FROM 2 TO 4 LANES

$750

L LA960005 0 FIGUEROA ST N/O 146TH ST TO W COMPTON BL WIDENING, CURB & GUTTER WIDEN FROM 4 TO 6 LANES $706

L LA960018 0 BEVERLY BOULEVARD MONTEBELLO BLVD TO W/O REA DRIVE RECONSTRUCT & WIDEN WIDEN FROM 4 TO 6 LANES $3,650

L LA960021 0 PECK ROAD OVER 605 FWY WIDEN BRIDGE WIDEN FROM 2 TO 4 LANES $3,675

L LA960134 0 AVENUE S HIGHWAY 14/DOWNING ST (WIDEN 4 TO 6 LANES) 3 LANES IN EA. DIR.). $7,200

L LA960142 0LINDERO CANYON ROAD FROM AGOURA RD TO VIA COLINAS RAMP WIDENING, RAMP/BRIDGE RECONFIGURATION, CONSTRUCT BIKE PATH, RESTRIPE STREET, INTERSECTION WIDENING, SIGNAL COORDINATION (TEA21-#65). FROM 3 NB/2 SB TO 3 NB&SB.

$16,788

Page 21: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 19

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA960170 0MAGIC MOUNTAIN PARKWAY EXTENSION FROM SAN FERNANDO RD TO VIA PRINCESSA: CONSTRUCT A NEW ROAD WITH 3 LANES IN EACH DIRECTION

$21,101

L LA960176 0HARRY S BRIDGES BLVD RELOCATION/CONSOLIDATION OF STREETS, STREET INTERSECTIONS, TRAFFIC CHANNELIZATION AND SIGNAL-IZATION (TEA21-#978)

$51,050

L LA960179 0 SOUTH WILMINGTON GRADE SEPARATION $61,500

L LA962314 0 EAST SAN GABRIEL VALLEY SOM PILOT PROJECT TRAFFIC SIGNALS INTERCONNECT PROJECT $9,071

L LA962316 0 SELAC-TRAFFIC SIGNAL SYNCH. CORRIDORS PROJECT SIGNAL SYNCH & BUS SPEED IMPROVEMENT PROJECT $30,309

L LA9708004 0 SANTA CLARITA PARKWAY FROM BOUQUET CYN RD/SOLEDAD CYN INSTALL NEW ROADWAY (0 TO 4 LANES) (2.5 MILE) $17,550

L LA9708289 0AVE G, FROM RT 14 TO 25TH ST WEST WIDEN FROM 2 TO 6 LANES (0.2 MIME) (TOTAL 6 LANES BOTH DIR). INCLUDES INTER CHANGE IMPROVEMENTS.

$10,800

L LA9711031 0CASTAIC CUTOFF FROM LAKE HUGHES RD TO SAN FRANCISQUITO CANYON RD CONTRUCT NEW ROAD 4 12-FOOT LANES AND 10-FOOT SHOULDERS

$7,600

L LA974083 0CHANDLER/BURBANK BIKE PATH-WHITEOAK TO PIERCE COLLEGE A 3.2 MILE CLASS I BIKEWAY ON MTA'S CHANDLER/BURBANK RAIL RIGHT-OF-WAY WILL IMPROVE NON-MOTORIZED ACCESS (COMBINED W/LA974078)

$3,749

L LA974100 0U.S. 101 INTERJURISDICTIONAL BIKE LANE GAP CLOSURE CONSTRUCTION 4.5 MILES OF BIKEWAY IMPROVEMENTS TO CLOSE SEVERAL GAPS WITHIN A 12 MILE CORRIDOR(TEA21-#69)(PPNO# 3147)

$1,569

L LA974221 0GATEWAY CITIES TRAFFIC SIGNAL CORRIDORS PROJECT PHASE II IMRPOVE REGIONAL TRAFFIC MOBILITY REDUCE CONGESTION ALONG 7 MAJOR TRAVEL CORRIDOR

$16,756

L LA974242 0 SOUTH BAY SIGNAL SYNCHRONIZATION IMPROVEMENTS PHASE III INSTALLATION OF COMMUNICATIONS INFRASTRUCTURE $10,612

L LA974243 0WEST SAN GABRIEL VALLEY SIGNAL SOM AND BUS SPEED IMPROVEMENTS PROVIDE LOCAL INTERSECTION IMPRVMNT SIGNAL SYN-CHRONIZATION PASSIVE TRABSIT PRIORITY IMPRVEMENT

$5,872

L LA974244 0SAN GABRIEL VALLEY TRAFFIC FORUM PROJECT PHASE III TRAFFIC SIGNAL SYNCHRONIZATION IMPROVEMENTS ON SELECTED ARTERI-ALS IN THE 12 CITY FORUM AREA

$5,109

L LA974245 0POMONA VALLEY SIGNAL SOM AND BUS SPEED IMPROVEMENTS TRAFFIC SIGNAL SYNCHRONIZATION FAIRPLEX TRAFFIC MANAGEMENT PLAN

$3,859

L LA9811102 0 AVENUE S RAIROAD OVERPASS WEST OF SIERRA HIGHWAY WIDEN BRIDGE FROM 4 TO 6 LANES. $56,800

L LA9811103 0 SR 14 AND AVENUE S INTERCHANGE IMPROVEMENTS; UPGRADE TO RAMP $5,691

L LA990351 0 IMPROVE GLENDALE BLVD/FWY RT 2 STREET RECONFIG/REDSIGN, TRAFFIC MGMT. NEIGHORHOOD SAFETY MEASURES (TEA21-#413) $14,916

Page 22: Project List - Southern California Association of Governments

20 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA990352 0 PALISADES BLUFF STABILIZATION PROJ. (TEA21-#453) $10,800

L LA990353 0 ALAMEDA CORRIDOR EAST - NOGALES ST GRADE SEP (T21-491, SGVCG) $7,800

L LA990358 0 EL SEGUNDO EMPLOYMENT CTR ITS PRJ (T21-1477) $5,721

L LA990359 0GRADE SEP XINGS SAFETY IMPR; 35- MI FREIGHT RAIL CORR. THRGH SAN.GAB. VALLEY - EAST. L.A. TO POMONA ALONG UPRR ALHAM-BRA &L.A. SUBDIV - ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318

$531,412

L LA990360 0LA LOMA BRIDGE CONTRUCTION (TEA21-#1208) THE LENGHT OF THE PROJECT IS 379 FT. RECONSTRUCT THE ONE LANE IN EACH DIRECTION.

$11,500

L LA990361 0 RECREATIONAL TRAIL CREATION (TEA21-#779) $7,391

L LA990764 0 JOB ACCESS & REVERSE COMMUTER PROGRAM OPERATIONS, CAPITAL ACQUISITION $67,768

L LA990926 0 SCHABARUM TRAIL USDOT RECREATIONAL TRAIL PROGRAM $110

L LA990927 0 WALNUT CREEK BRIDGE USDOT RECREATIONAL TRAIL PROGRAM $87

L LA9910008 0BOUQUET CYN OVER SANTA CLARA RIVR TO 500 FT FROM VALENCIA BL - REHAB, WIDEN, LINING RESTORATION FROM 6 TO 8 LANES AND A BIKE LANE -- 525 FT.

$5,502

L LA9910012 0SAN GABRIEL BLVD REHAB PHASE I - FROM MISSION TO BROADWAY: PVEMNT RESONSTRCT & OVERLAY, CONCRT REPRS, MEDIAN ISLND INSTALL W/ LANDSCAPNG AND TREES. SAFETEA-LU HPP # 471

$2,000

L LA9910013 0 VIA PRINCESSA FROM GOLDEN VALLEY RD TO RAINBOW GLEN FROM 0 - 6 LANES; LESS THAN ONE MILE $46,935

L LA9910014 0 VIA PRINCESSA FROM CIRCLE J TO MAGIC MTN PRKWAY. FROM 0 - 6 LANES; LESS THAN ONE MILE. $11,650

L LA9910016 0 SANTA CLARITA PKWY FROM SOLEDAD CYN RD TO VIA PRINCESSA (1.6 MILES); FROM 0 TO 6 LANES. $13,100

L LA9910017 0 SANTA CLARITA PKWY FROM VIA PRINCESSA TO STATE HWY 14 (1 MILE) FROM 0 TO 6 LANES. $11,100

L LA996168 0 TRANSIT CTR. STAT LANDSCAPING LANDSCAPE NEW PARCEL CREATED BY REALIGNMENT OF FRONT STREET (PPNO 3628) $179

L LA996174 0 HISTORIC DEPOT SURF. TRANS MUSEUM DEV SURFACE TRANS MUSEUM, MEETING ROOMS, AND ARTIFACTS (PPNO #3633) $106

L LA996275 0WEST BRANCH GREENWAY MULTI-MODAL TRANS. CORRIDOR DESIGN AND CONSTRUCT 2.5 MILE CLASS I BIKE PATH ALONG MTA-OWNED SANTA ANA BRANCH ROW INCL. PEDESTRIAN AND LANDSCAPING (3145)

$2,141

L LA996282 0 REGIONAL CENTER CORRIDOR/GAP CLOSURE SIGNAL INTERCONNECT $1,335

Page 23: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 21

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA996283 0 AUTOMATED INCIDENT MANAGEMENT SYSTEM $2,115

L LA996285 0SOUTH BAY BIKE TRAIL RECONSTRCT AT PLAYA DEL REY - DESIGN AND RECONSTRCT SEGMENT OF THE TRAIL AT DOCKWEILER STATE BEACH.

$459

L LA996288 0 SAN GABRIEL RVR. BIKE TRAIL REHAB PHASE I - FROM WHITTIER NARROWS DAM TO FLORENCE AVE. $449

L LA996289 0SOUTH BAY BIKE TRAIL PED. ACCESS RAMPS/SIDEWALKS - DESIGN OF RAMPS, WALKWAYS TO PROVIDE ACCESS TO THE STH. BAY TRAIL AT DOCKWEILER STATE BEACH (2006 STIP)

$2,221

L LA996292 0SOUTH BAY FORUM TRAFFIC SIGNAL CORRIDORS - DESIGN AND CONSTRCT. MULTIJURISDICT. TRAFFIC SIGNAL SYNCH. ON REGIONAL ARTERIALS IN THE SOUTH BAY AREA

$8,633

L LA996294 0SAN GABRIEL VALLEY FORUM TRAFFIC SIGNAL CORRIDORS: DESIGN AND CONSTRCT OF MULTIJURISDICT. TRAFFIC SIGNAL SYNCH. ON REGIONAL ARTERIALS IN THE SAN GAB. VALLEY AREA OF L.A. CNTY.

$9,047

L LA996295 0GATEWAY CITIES TRAFFIC SIGNAL CORRIDORS PHASE III: DESIGN & CONSTRUCT MULTIJURIS. SIGNAL SYSTEM IMPROVMENTS ON REGIONAL ARTERIALS IN THE GATEWAY CITIES

$12,132

L LA996299 0WESTCHESTER TRANSPORTATION MGMT. ENHANCEMENTS (ATCS) - UPGRADE THE EXISTING AUTOMATED TRAFFIC SURVEILLANCE AND CONTROL SYSTEM

$4,127

L LA996304 0 ATSAC HYDE PARK EAST: APPROX 63 SIGNALIZED INTERSECTIONS $8,952

L LA996305 0 ATSAC HYDE PARK WEST: APPROX. 69 SIGNALIZED INTERSECTIONS $10,564

L LA996322 0DWNTWN. SHORELINE DR. TRAFFIC MGMT. SYSTEM: DEPLOYMENT OF ITS ELEMENTS IN THE DWNTWN AREA TO RESPOND TO SPECIAL GENERATOR TRAFFIC.

$3,000

L LA996324 0 ITS IMPROVEMENTS: LAKE AVENUE AND DEL MAR BLVD. $963

L LA996328 0 CCTV CAMERA INSTALLATION $461

L LA996330 0SBCOG - DOUGLAS ST. GAP CLOSURE/RAILROAD GRAD`E SEPARATION.PPNO 2377. (HP # 46) (91 APP ACT, 101-516, 1990)

$37,924

L LA996340 0MISSION BLVD. GRADE SEPARATION AT SR. 71(FROM UPRR UNDERCROSSING TO 9TH ST. MISSION BLVD FROM WESTERN TO CURRAN PLACE (CFP 6340, 8400). PPNO 2232. SAFETEA-LU # 511 (PPNO 2232)

$47,983

L LA996343 0 U.S. 101 FWY/KANAN RD. INTERCHANGE IMPROVEMENTS - ADD 1 LANE TO NB OFF RAMP (1 TO 2). SAFETEA-LU # 3099 $24,460

L LA996348 0WIDEN FIRESTONE BLVD BRDGE OVER THE RIO HONDO CHANNEL AND MINOR STREET WIDENING BETWEEN THE BRIDGE AND GARFIELD AVE.PPNO 2362. (53C1973)

$15,686

L LA996363 0I-5/MAGIC MT. PKWY (SR-126) INTERCHANGE RECONSTRUCTION: CONSTRCT. S/B AUXILLARY LANE TO THE OFF-RAMP. WDN MAG. MTN PKWY AT FREEWAY (FROM 6 TO 8 LANES). (PPNO 2364 3705).

$34,857

Page 24: Project List - Southern California Association of Governments

22 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LA996390 0 SEPULVEDA BLVD. FROM CENTINELA AVE. TO LINCOLN BLVD - WIDEN SEPUL BLVD. BET. LINCOLN AND CENTINELA $11,621

L LA996393 0EAST DOWNTOWN TRUCK ACCESS IMPROVEMENTS: WIDENINGS, IMPRVMNTS, STRIPING, AT 6 LOCATIONS IN THE EAST DOWNTOWN L.A. AREA

$2,153

L LA996415 0UPPER 2ND ST- ENHANCE CIRCULATION W/IN THE BUNKER HILL AREA FROM GRAND AVE TO OLIVE ST (FROM 0 TO 2 LANE IN EACH DIRECTION -- 350 FT.). PPNO 2375.

$5,550

L LA996418 0WIDEN NORTH LEG OF SEPULVEDA BLVD/BURBANK BLVD. INTRSECTION TO ALLOW FOR STRPING TWO EXCLSVE R- TURN LNS & WDN W. LEG OF INTRSCTN TO ALLOW STRIPING FOR TWO R- TURN LNES. PPNO 2369.

$2,459

L LA996425 0 SEPULVEDA BLVD. REVERSIBLE LANE, BIKE LANE, AND INTERSECTION IMPROVEMENT $8,301

L LA996427 0 VALLEY BLVD. GRADE SEPARATION $54,285

L LA996500 0 SIGNAL SYSTEM TECHNICAL TRAININGS $575

L LAE0001B 0CONSTRUCT SAFE ACCESS TO STREETS FOR BICYCLISTS AND PEDESTRIANS INCLUDING CROSSWALKS, SIDEWALKS, AND TRAFFIC CALMING MEASURES

$500

L LAE0076 0CONSTRUCT ADD'L VEHICLE PARKING (200 TO 400 SPACES), BICYCLE PARKING LOT AND PEDESTRIAN REST AREA AT THE TRANSIT CENTER

$2,006

L LAE0084 0 ADAMS STREET REHABILITATION PROJECT $372

L LAE0134 0 INTERSECTION AT BALBOA BLVD & SAN FERNANDO RD.MINOR WIDEN TO PROVIDE TURN LANES, & REALIGNMENT OF BALBOA RD.RIGHT-TURN LANE AT BALBOA BLVD.

$500

L LAE0180 0LAUREL CANYON BLVD BETWEEN HAMLIN STREET AND VICTORY BLVD. PROJECT WILL PROVIDE FOR PEDESTRIAN SAFETY AND BEAUTI-FICATION TREATMENT. ELEMENTS INCLUDE LANDSCAPED MEDIAN ISLANDS.

$1,200

L LAE0191 0 DESIGN AND CONSTRUCT 2.5 MILE BIKEWAY AND PEDESTRIAN PATH FROM MILLS AVE. TO VALLEY HOME IN WHITTIER $5,040

L LAE0266 0RECONSTRUCT I-710 SOUTHERN TERMINUS OFF RAMP.CURRENT FUNDING APPLIED ONLY TOWARDS THE P/E & PRELIMINARY DESIGN PHASE.CONSTRUCTION FUNDING TO BE SOUGHT LATER (E/P,PS/E ONLY)

$158,849

L LAE0284 0SOUTHWEST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS. PROJECT WILL NOT ENHANCE TRAFFIC CAPACITY.

$2,300

L LAE0319 0NEIGHBORHOOD TRAFFIC SAFETY IMPROVEMENTS, INCLUDING STREET LIGHTING AND OTHER PEDESTRIAN & TRANSIT ENHANCEMENT. ELYSIAN VALLEY NEIGHBORHOOD FROM QUEEN ST. ON THE NORTH, BARCLAY ST.

$1,400

Page 25: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 23

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LAE0326 0CREATION OF A RAISED MEDIAN ON ALONDRA BLVD.BETWEEN CLARK AND WOODRUFF TO IMPROVE TRAFFIC SAFETY AND EFFICIENCE. THE MEDIAN WILL PROVIDE LANDSCAPING, LIGHTING AND IRRIGATION

$385

L LAE0340 0SANTA ANITA AVE CORRIDOR IMPROVEMENTS PRJ. INSTALL NEW RIGHT AND LEFT TURN POCKETS, NEW TRAFFIC SIGNALS, INTERSEC-TION WIDEN AND NEW STRIPING AT FOOTHILL BLVD, LIVE OAK AVE, DUARTE

$3,000

L LAE0346 0CONSTRUCT BIKE PATH, LIGHTING AND SAFETY IMPROVEMENTS ON ROAD LEADING TO HANSEN DAM RECREATIONAL AREA (OSBORNE ST. BETWEEN SAN FERNANDO RD AND FOOTHILL BLVD.

$6,500

L LAE0357 0THE ADDITION OF A SECONDARY LEFT TURN LANE AND TRAFFIC SIGNAL AT THE INTERSECTION OF ROSEMEAD BLVD (STATE) AND TELSTAR AVE

$1,400

L LAE0388B 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF INDEPENDENCE AVE. AND SHERMAN WAY. $142

L LAE0401 0 SILENT NIGHT GRADE CROSSING $904

L LAE0427 0IN CITY OF LOS ANGELES, ON 103RD STREET FROM CENTRAL TO GRAHAM & CENTRAL AV. FROM 103RD STREET TO IMPERIAL HWY. PROJECT WILL PROVIDE STREETSCAPE, TRANSIT, AND PEDESTRIAN AMENITIES.

$4,000

L LAE0479 0FIRESTONE BLVD. FROM RYERSON AVE AND STEWART & GRAY RD. WIDEN SECTIONS OF FIRESTONE (BOTTLENECK FOR TURN LANES; ST RECONSTRUCTION, REHAB, & RESURFACE; & UPGRADE HANDICAP RAMPS

$2,000

L LAE0485 0LAKEWOOD BLVD BETWEEN TELEGRAPH AND 5TH STREET. WIDEN SECTIONS OF LAKEWOOD FOR TURN LANES, STREET RECON-STRUCTION, REHABILITATION, AND RESURFACING; AND UPGRADE HANDICAP RAMPS

$11,500

L LAE0489 0 PASADENA AVE / MONTEREY RD PARTIAL GRADE SEPERATION - PRELIMINARY ENGINEERING - FEASABILITY $288

L LAE0509 0SCENIC PRESERVATION AND RUN-OFF MITIGATION IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA NEAR PCH AND US101

$1,440

L LAE0518 0IN THE CITY OF LOS ANGELES, ON BROADWAY W/S FROM 4TH ST. TO 235 N/O 4TH ST, AND 4TH ST FROM BROADWAY TO 120 W/O BROADWAY. REMOVE AND REPLACE SIDEWALKS INCLUDING PORTIONS THAT SPAN.

$2,500

L LAE0550 0REHABILITATE STREET SURFACE OF CEDROS AVE BETWEEN BURBANK BLVD AND MAGNOLIA BLVD. WILL PROVIDE FOR ASPHALT CON-CRETE RESURFACING. NON CAPACITY ENHANCING AND ALL ON LA ROW

$49

L LAE0595 0STREET CLOSURE AT CHEVY CHASE DRIVE. SAFETY IMPROVEMENTS AT THE CHEVY CHASE AND AT-GRADE CROSSING AT DORAN, BROADWAY, GRANDVIEW AND SONORA AT-GRADE CROSSING.

$919

L LAE0688 0WIDEN WILMINGTON AVE. FROM 223RD ST. INCLUDING I-405 RAMP MODIFICATION. IMPROVE WILMINGTON AVE./I-405 INTERCHANGE BY ADDING A NEW NORTHBOUND ON-RAMP AND WIDENING OF WILMINGTON.

$28,000

Page 26: Project List - Southern California Association of Governments

24 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LAE0701 0 DEVELOP AND IMPLEMENT TRAFFIC CALMING MEASURES FOR TRAFFIC EXITING THE I-710 INTO LONG BEACH $1,920

L LAE0726 0THIS PROJECT WILL STUDY A POSSIBLE GRADE SEPARATION AT THE VANOWEN/EMPIRE/CLYBOURN RAILROAD CROSSING. (E/P & PS/E ONLY)

$1,000

L LAE0732 0 RIVERSIDE DRIVE NON-CAPACITY IMPROVEMENTS BETWEEN VAN NUYS BLVD AND TILDEN AVE. $400

L LAE0881 0STUDY, ENVIRONMENTAL REVIEW, PERMITS AND PRELIMINARY ENGINEERING FOR A PEDESTRIAN BRIDGE OVER ATLANTIC BLVD IN THE CITY OF MONTEREY PARK (E/P,PS/E ONLY)

$600

L LAE0882 0WIDEN PORTION OF THE STREET 5 FT. TO MATCH EXISTING ULTIMATE WIDTH OF 84 FT. 2-INCH ASPHALT RUBBER OVERLAY & RECON-STRUCTION, RAISED LANDSCAPED MEDIANS, CONCRETE BUS PADS.

$2,333

L LAE0884 0IMPROVEMENTS TO THE SOUTH AZUSA AVE./AMAR RD. INTERSECTION (500 FEET IN ALL DIRECTIONS FROM INTERSECTION) IMPROVE-MENTS INCLUDE WIDENING, ADDING LEFT LANE, TRAFFIC SIGNAL MODIFICATI

$1,200

L LAE0891 0 ROSEMEAD BLVD/HWY 19 RENOVATION PROJECT - NON-CAPACITY $104

L LAE0896 0 COLIMA RD TO FULLERTON RD INTERSECTION IMPROVEMENT - RIGHT AND LEFT TURN LANES $1,500

L LAE0937 0REHABILITATE STREET SURFACES IN SHERMAN OAKS; PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE SHERMAN OAKS AREA. PROJECT WILL NOT ENHANCE TRAFFIC CAP.

$137

L LAE0938 0 DESIGN AND CONSTRUCT REALIGNMENT OF BRAHMA DRIVE AT WINNETKA TO ELIMINATE HAZARDOUS CONDITION $300

L LAE0971 0 REALIGN FIRST ST BETWEEN MISSION RD. AND CLARENCE ST. $1,250

L LAE1023 0IMPLEMENT VAN NUYS RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN AND AROUND THE VAN NUYS AREA OF THE CITY. NO TRAFFIC CAPACITY

$500

L LAE1093 0SAN FERNANDO RD NORTH - PROVIDE AMENITIES FOR VEHICULAR TRAFFIC, PEDESTRIAN & BICYCLES FROM ASTORIA ST. TO SAYRE ST. CONSTRUCTION OF CONCRETE CURB, GUTTER, SIDEWALK - NON-CAPACITY

$1,060

L LAE1138 0CONSTRUCT VALLEY BLVD DRAINAGE IMPROVEMENTS: FROM WEST CITY LIMITS TO SANTA ANITA AV- INCLUDING NO CAPACITY IN-CREASE STREET RESURFACING

$2,710

L LAE1142 0IMPLEMENT ITS SUBREGIONAL MASTERPLAN: FOCUS INTEGRATING STATE, LOCAL, & PRIVATE SYSTEMS FOR REAL TIME TRAFFIC CON-TROL & FREIGHT TRAVELER INFO, TRUCK SAFETY, SECURITY, & EMISSIONS

$4,800

L LAE1148 0LOS ANGELES REGIONAL DIESEL EMISSIONS REDUCTION PROGRAM FOR ENGINE RETROFIT PROVIDES INCENTIVE GRANTS TO OWNER OPERATORS OLD DIESEL TRUCKS TO UPGRADE EQUIPMENT TO REDUCE EMISSIONS

$800

Page 27: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 25

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LAE1181 0 BURBANK BLVD AND WOODLEY AVE INTERSECTION IMPROVEMENTS - NON CAPACITY $160

L LAE1228 0 REPAIR ROSECRANS AND ALONDRA BRIDGES PER THE COUNTY OF LOS ANGELES TRIENNIAL INSPECTION REPORT. $53

L LAE1274 0UPGRADE INTERSECTION ON BELLFLOWER @ ALONDRA AND ROSECRANS TO INSTALL LEFT-TURN PHASING (NORTH AND SOUTH BOUND)

$337

L LAE1280 0STUDY - ROADWAY IMPROVEMENTS WITHIN THE SOUTH BAY CITIES COASTAL CORRIDOR. (LEAD AGENCY SBCCOG) SAFETEA - LU # 1286

$6,392

L LAE1285 0 REHABILITATE PAVEMENT ON AZUSA AVE AND SAN GABRIEL AVE $480

L LAE1296 0 LONG BEACH INTELLIGENT TRANSPORTATION SYSTEM $2,880

L LAE1321 0 COMPTON ARTERIAL RECONSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY). $3,840

L LAE1388 0BLOOMFIELD ST IMPROVEMENT FROM CARSON ST TO N CITY LIMIT. RESURFACE EXISTING AC PAVEMENT, SIGNING AND STRIPING, CON-CRETE REPAIR, CONCRETE BUS PAD, LANDSCAPED MEDIAN, LOOP DETECTER

$460

L LAE1390 0 RECONSTRUCT PARAMOUNT BLVD WITH MEDIANS AND IMPROVE DRAINAGE FROM ARTESIA BLVD TO CANDLEWOOD STREET $575

L LAE1401 0 RECONSTRUCT LONG BEACH BLVD WITH MEDIANS AND IMPROVED DRAINAGE FROM PALM AVENUE TO TWEEDY BLVD $2,915

L LAE1407 0PLAZA DRIVE FROM VINCENT AVE. TO CALIFORNIA AVE. INCLUDING INSTALLATION OF TRAFFIC SIGNAL SYS AT INTERSECTION OF PLAZA DR. & CALIF. THE SYNC. OF TWO TRAFFIC SY, & ADD TURN LANES.

$721

L LAE1440 0 RECONFIGURE SAN FERNANDO RD. FROM FLETCHER DR. TO I-5 FWY. $6,450

L LAE1509 0CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. SOUTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. VICTORY BLVD (OAKLAND TO RESEDA) TAMPA AVE

$1,000

L LAE1531 0 CONSTRUCTION OF A SMART CROSSWALK SYSTEM AT THE INTERSECTION OF ARMINTA ST. AND MASON AVE. $57

L LAE1579 0BROADWAY & LAS TUNAS INTERSECTION IMPROVEMENTS. REHAB BOTH INTERSECTIONS ACQUIRE CORNER CUTOFFS AND MAKE EVERYTHING ADA COMPLIANT.

$3,260

L LAE1601 0 TRANSPORTATION ENHANCEMENT TO CHILDREN'S MUSEUM OF LOS ANGELES. $1,200

L LAE1609 0STUDY REPORT FOR A NEW I-105 INTERCHANGE AT LAX. INTERCHANGE STUDY WOULD PROVIDE DIRECT TRAFFIC MOVEMENTS FROM THE WESTBOUND I-105 FWY OVER IMPERIAL HIGHWAY (E/P, PS/E ONLY)

$400

Page 28: Project List - Southern California Association of Governments

26 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LAE1610 0 RECONSTRUCT WHITTIER BLVD AND IMPROVE PARKWAY DRAINAGE FROM PHILIDELPHIA AVE TO FIVE POINTS IN WHITTIER $1,632

L LAE1633 0STUDY REPORT FOR THE INTER. OF OLD RIVER SCHOOL RD, FIRESTONE BLVD & UNION PACIFIC RAILROAD. REVIEW/ANALYZE OPERA-TIONS & SAFETY ASPECTS, DESIGN OPTIONS ETC.(E/P & PS/E ONLY)

$500

L LAE1655 0 LANDSCAPE AND IRRIGATE EAST BOUND 91 FREEWAY ON AND OFF RAMPS AT BELLFLOWER BL. $260

L LAE1696 0RECONSTRUCTION OF THE STRAND STAIRWAYS IN THE CITY OF MANHATTAN BEACH TO IMPROVE BEACH ACCESS AND ACCOMMODATE INCREASED PEDESTRIAN TRAFFIC.

$1,920

L LAE1697 0CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. NORTHEAST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. DEVONSHIRE STREET (LANGDON TO WOODMAN), SEPULVEDA BLV

$500

L LAE1703 0NORTHEAST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE NORTHEAST SAN FERNANDO VALLEY.

$211

L LAE1816 0 BURBANK BLVD AND HAYVENHURST AVE INTERSECTION IMPROVEMENT - NON CAPACITY $400

L LAE1867 0 CONSTRUCTION OF SMART CROSSWALK AT THE INTERSECTION OF TOPANGA CANYON AND GAULT ST. $57

L LAE1883 0STUDY - ORANGELINE CORRIDOR DEVELOPMENT PROJ - HIGH SPEED MAGLEV & STATION AREA DEVLOPMENT FROM NORTH LA TO SOUTH OC FOLLOWING SR14 AND FORMER PACIFIC RAILRD CORRIDOR

$336

L LAE1903 0 RANDOLPH STREET IMPROVEMENTS BETWEEN WILMINGTON AVENUE AND FISHBURN FEASIBILITY STUDY . $1,200

L LAE1904 0 RECONSTRUCT AZUSA AVE AND SAN GABRIEL AVE FOR TWO WAY TRAFFIC IN AZUSA $2,400

L LAE1915 0CONSTRUCT AND IMPROVE MEDIANS AND DRAINAGE ON IMPERIAL HIGHWAY FROM WEST BORDER TO EAST BORDER OF CITY OF LA MIRADA

$5,503

L LAE1920 0DEL AMO BLVD - FROM NORMANDIE AVE AND NEW HAMPSHIRE - RECONSTRUCT AND WIDEN . FROM 1 LANE EA. DIR TO 2 LANES IN EA DIR.

$3,000

L LAE1933 0ENHANCE BYZANTINE LATINO QUARTER TRANSIT PLAZAS AT NORMANDIE AND PICO, AND HOOVER AND PICO, LOS ANGELES BY IM-PROVING STREETSCAPES, INCLUDING EXPANDING CONCRETE AND PAVING

$500

L LAE1934A 0 CENTURY BLVD PEDESTRIAN SAFETY AND TRANSPORTATION IMPROVEMENTS. $3,600

L LAE1955 0 TRAFFIC SIGNAL UPGRADES ALONG THE US-101 FREEWAY RAMPS BETWEEN WINNETKA AVE AND VAN NUYS BLVD. $400

L LAE2024 0REALIGNMENT LA BREA AV TO REDUCE CONGESTION: IMPROVEMENTS AT INTERSECTION WITH HILLCREST BLVD (6-LEG TO 4-LEG/SIGNALIZED) & WITH TAMARACK AV (ADD SIGNAL)-

$3,168

Page 29: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 27

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LAE2147 0CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. LINDLEY AVE. (STRATHERN TO CHASE), ROSCOE BLVD

$1,000

L LAE2157 0 CRENSHAW BLVD REHABILITATION. BETWEEN 182 ND ST & 190TH RIGHT TURN LANES NEAR I-405 RAMPS - NO NEW TRAVEL LANES. $3,953

L LAE2194 0GREENLEAF ROW COMMUNITY ENHANCEMENT PROJECT DESIGN AND CONSTRUCTION OF BIKEWAY PED WALK WAY AND UPGRADE SIGNALIZATION

$3,840

L LAE2198 0AVALON BLVD INTERCHANGE MODIFICATION AT I-405 IMPROVING AVALON/I-405 INTERCHANGE BY CONSTRUCTING A NEW SOUTH-BOUND ON-RAMP, WIDENING NORTHBOUND OFF-RAMP AND ON-RAMP, PROVIDING ACCES

$21,150

L LAE2246 0RANCHO VIST BLVD -FROM 3RD ST EAST TO 8TH ST. WIDEN FROM 2 TO 3 EA. DIRTO ITS MAX AT-GRADE WIDTH @ INTERSECTION W/ METROLINK & UP RR CROSS & SIERRA HWY INTERSCTN. EAST/LOCKHEED WY.

$7,300

L LAE2279 0STREETSCAPE IMPROVMENTS ALONG CENTRAL AVE FROM WASHINGTON TO VERNON. INCLUDING PED LIGHTING, NEW BUS STOPS AND STREET FURNITURE, SIDEWALK WIDENING, TREES ETC.

$4,000

L LAE2293 0PARAMOUNT BLVD FROM GARDENDALE ST AND TELEGRAP RD -- ITS IMPROVEMENTS AS WELL AS MINOR WIDENING AT CRITICAL INTERSECTIONS TO ALLOW FOR SAID IMPROVEMENTS (NON-CAPACITY).

$1,000

L LAE2299 0 HASKELL AVE FROM CHASE ST. TO ROSCOE BLVD IMPROVEMENTS - WIDEN FROM 2 TO 4 LANES . $200

L LAE2333 0 CONSTRUCT AND REPAIR LINING IN FOUR TUNNELS ON KANAN, KANAN DUME, AND MALIBU ROADS BETWEEN US-1 AND US-101 $3,000

L LAE2378 0ATLANTIC BLVD STREET IMPROVEMENTS FROM 52ND DRIVE TO 57TH STREET. RESURFACING EXISTING PAVEMENT, SIGNING AND STRIPING, MINOR CONCRETE REPAIRS, LANDSCAPING, TRAFFIC LOOPS.

$560

L LAE2389 0 LAS TUNAS PED ENHANCEMENTS. INSTALL AND REPLACE ADA RAMPS. UPDATE CROSSING MARKING AND SIGNALS $166

L LAE2476 0ENHANCE PEDESTRIAN ENVIRONMENT AND INCREASE SAFETY ALONG OLYMPIC BL BETWEEN VERMONT AVE AND WESTERN AVE. PROJ-ECT WILL PROVIDE VARIOUS STREETSCAPE IMPROVEMENTS ALONG LIMITS.

$2,000

L LAE2515 0 WIDEN BUNDY DR. BETWEEN WILSHIRE AND SANTA MONICA BLVD - WIDEN FROM 2 LANES TO 4 LANES. $4,250

L LAE2517 0 WIDEN MAINE AVE. IN BALDWIN PARK ADD 1 THRU LN & 1 RIGHT TURN AND 1 LEFT TURN ONLY LANE (2517) $360

L LAE2538 0 KOREATOWN PAVILION GARDEN-TO ENHANCE THE NORTHEAST CORNER OF NORMANDIE AND OLYMPIC BL. $250

L LAE2591 0 INSTALL TRAFFIC SIGNAL ON BALBOA BL. AT KNOLLWOOD SHOPPING CENTER $130

Page 30: Project List - Southern California Association of Governments

28 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LAE2617 0GALE AVENUE --FROM FULLERTON ROAD TO NOGALES ST, WIDEN FROM 4 TO 6 LANES AND NOGALES ST INTERSECTION WIDENING AT GALE AVE. TO ADD LEFT TURN LANE.

$600

L LAE2634 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF HAMLIN ST. AND CORBIN AVE. $142

L LAE2651 0CONSTRUCT CROSSWALK BUMP-OUTS AND RELATED STREETSCAPE IMPROVEMENTS ON TEMPLE ST BETWEEN HOOVER ST & GLEN-DALE. PROJECT WILL PROVIDE FOR VARIOUS STREETSCAPE IMPROVEMENTS.

$500

L LAE2663 0ROSEMEAD BLVD SAFETY ENHANCEMENT AND BEAUTIFICATION: NON- CAPACITY INCREASE ACTIVITIES BETWEEN TENTLAND ST/ RAILROAD TRACKS AND ROSEMEAD/ CALLITA RD, INCLUDING ROW ACQUISITION

$960

L LAE2690 0SAN GABRIEL MISSIN INTERSECTION IMPROVEMENT. REHAB INTERSECTION AND ACQUIRE CORNER CUT OFFS. RESTRIPE INTERSEC-TION AND MODIFY SIGNAL. NEW CURB,GUTTER AND SIDEWALK TO ADA.

$1,650

L LAE2699 0CONSTRUCTION OF NEW MULTI-USE PATH/TRAIL ALONG RIVER BANK BETWEEN SEPULVEDA BLVD & KESTER AVE INCLUDING ACCESS RAMPS, REATAINING WALLS, LANDSCAPING ETC.

$574

L LAE2750A 0 PAVEMENT AND INTERSECTION IMPROVEMENT AT LA MIRADA BLVD AND ALONDRA BLVD PRIOR TO I-5 IMPROVEMENTS $1,945

L LAE2750B 0 VALLEY VIEW AVE AND ALONDRA BLVD INTERSECTION IMPROVEMENTS IN ADVANCE OF I-5 FREEWAY IMPROVEMENTS $2,235

L LAE2819 0 ROSECRANS AVE AND BRIDGE ARTERIAL RECONSTRUCTION PROJECT(NON-CAPACITY). $3,840

L LAE2828 0IMPLEMENT STREETSCAPE IMPROVEMENTS ALONG WILBUR AVE TO ENHANCE TRAFFIC AND PEDESTRIAN TRAFIC. ALL WORK SHALL BE COMPLETED IN CITY OF LA ROW

$114

L LAE2835 0 ATHERTON ST ENCLOSE AND LANDSCAPE EXISTING OPEN CULVERT $1,440

L LAE2843 0 CRENSHAW BLVD REHABILITATION, MARICOPA ST TO SEPULVEDA BLVD, CITY OF TORRANCE $3,730

L LAE2883 0INSTALLATION OF NEW AND THE REMOVE/REPLACE OF EXISTING DAMAGED OR SUBSTANDARD SIDEWALKS AND ADA RAMPS. PROJECT AREA IS BOUNDED BY FOSTER RD TO ROSECRANS AVE AND LAKEWOOD BLV.

$480

L LAE2906 0INGLEWOOD AV/MARINE AV INTRSCTN IMPRVEMNT- PURCHASE ROW FOR WIDENING; ADD 1 THRU NB LN INGLEWOOD AV (2 LN EX-STNG) &1 THRU WB LN MARINE AV (1 LN EXSTNG); ADD LIGHTNG, SIGNLS,SIDEWLK

$4,515

L LAE2932 0213TH ST. PEDESTRIAN SIDEWALK BRIGE OVER DOMINGUEZ CHANNEL. CONSTRUCT 213TH ST. PEDESTRIAN BRIDGE TO PROVIDE SAFE PASSAGE FOR PEDESTRIANS & WHEELCHAIRS OVER DOMINGUEZ CHANNEL.

$2,200

L LAE2978 0 DEVELOP CONCEPTUAL MASTER PLAN TO IMPROVE THE EFFICIENCY OF TRANSPORTATION FACILITIES (E/P & PS/E ONLY) $233

Page 31: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 29

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LAE3000 0GRAND AV PHASE III: MODIFICATION OF EXIST MEDIANS, AESTHETIC ENHANCEMENTS, REPLACEMENT OF EXIST IRRIGATION SYSTEM, LANDSCAPE, & CONCRETE, STRIPING & DRAINAGE IMPRVTS (NON-CAPACITY)

$2,070

L LAE3018 0VALLEY BLVD CAPACITY IMPROVEMENTS BETWEEN 710 AND MARGUERITA. INVOLVES TRAFFIC FLOW AND CAPACITY IMPROVEMENTS INCLUDING RAISED MEDIANS.

$3,724

L LAE3069 0CULVER BLVD AND SEPULVEDA BLVD IMPROVEMENTS. DESIGN AND CONSTRUCT. SEPULVEDA 1 S BOUND LANE 5/8 MILE FROM JEF-FERSON PLAYA TO GREEN VALLEY. ON CULVER .5 MILE SEPULVEDA TO ELENDA

$4,219

L LAE3085 0WIDEN AND RECONSTRUCT WASHINGTON BLVD FROM WESTERLY CITY BOUNDARY AT VERNO TO I-5 FWY AT TELEGRAPH RD. WIDEN FROM 2 TO 3 LANES IN EACH DIRECTION.

$23,437

L LAE3126 0ROSECRANS AVE STREET IMPROVMENTS FROM GARFIELD AVE TO CENTURY BLVD. RESURACING PAVEMENT SIGNING AND STRIPING, INSTALLING CONCRETE BUS PADS, CONCRETE REPAIR, CROSSWALK REPLACMENT

$690

L LAE3157 0REHABILITATE ADDISON ST BETWEEN KESTER AVE AND LEMONA AVE: PROVIDE ASHALT CONCRETE RESURFACING ON THE PROPOSED PROJECT LIMITS. WILL NOT ENHANCE TRAFFIC CAPACITY.

$51

L LAE3175 0 SR 91 I-605 NEEDS ASSESSMENT STUDY (E/P, PS/E ONLY) $22

L LAE3201 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF OSO AVE. AND VANOWEN ST. $142

L LAE3229 0 CONSTRUCTION AND ENHANCEMENTS OF TRAILS IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA $960

L LAE3239 0RECONSTRUCT ATLANTIC AVE AND IMPROVE DRAINAGE FROM ARDMORE ST TO IMPERIAL HWY. PAVEMENT REHABILITATION, RAISED MEDIANS, DRAINAGE, SIGNAL, PARKWAY, AND MISC. IMPROVEMENTS.

$3,120

L LAE3269 0NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENTS; WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE NORTHWEST SAN FERNANDO VALLEY AREA.WILL NOT INCREASE CAP

$3,056

L LAE3284 0 WEST ADAMS BLVD STREETSCAPE-INSTALL STREETSCAPE AND COMMUNITY GATEWAY IMPROVEMENTS ALONG WEST ADAMS BLVD. $250

L LAE3308 0WALNUT GROVE AT BROADWAY INTERSECTION IMPROVEMENT. REHAB INTERSECTION; ACQUIRE CORNER CUT OFF TO INCREASE CURB RETURN RADII TO ADD LEFT TURN LANE IMPROVE PED SAFETY

$1,675

L LAE3439 0EXPAND DIESEL EMISSIONS REDUCTION PROGRAM OF GATEWAY CITIES COG THAT PROVIDES INCENTIVE GRANTS TO OWNERS OF OLDER DIESEL TRUCKS TO UPGRADE TO NEWER ONES TO REDUCE EMISSIONS

$4,080

L LAE3764 0ITS & INTERSECTION IMPV. AT LAX. RESTRIPING, SIGNAL PHASING, OR THE ADDITION OF INTELLIGENT SYSTEM EQUIPMENT.(ITS ONLY, NON-CAPAICTY INCREASE)

$1,250

L LAE3768 0 COMPTON ARTERIAL REONCSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY). $3,000

Page 32: Project List - Southern California Association of Governments

30 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L LAE3790 0THE PASADENA ITS INTEGRATES 3 COMPONENTS; TRAFFIC SIGNAL COMMUNICATION AND CONTRL, TRANSIT VEHICLE ARRIVAL INFO AND PUBLIC PARKING AVAILABILITY INFO. SAFETEA-LU PRJ #3790 AND #399

$3,545

L LAE3793 0CALIFORNIA AVE WIDENING: FROM WILOW AVE AND SPRING ST WIDEN CALIFORNIA AVE TO SECONDARY MODIFIED HIGHWAY STREET STANDARDS (NON-CAPACITY).

$1,200

L LAE3805 0PLANNING, DESIGN AND PRELIMINARY ENGINEERING OF ON/OFF RAMP SYSTEM AT INTERSECTION OF I-10 AND ROBERTSON/NATIONAL BLVD.

$2,500

L LAE3807 0 DIESEL EMISSION REDUCTION PROGRAM OF SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT $2,400

L LAOB7326 0COMPTON CREEK BIKEWAY EXTSN - PHASE III.DSIGN & CNSTRUCT .6 MI OF CLAS 1 BIKE/PED PATH FRM GREENLEAF BL TO ARTESIA FWY.WILL INC BIKE PATH, PED WALKWAY SIGNAGE, STRPNG. (PPNO 2869).

$464

T LA000507 0 SECURITY/SURVEILLANCE EQUIPMENT. PART OF SAFETEA-LU TRANSIT PROJECT #260 ALONG WITH LA0D308, LA0D340, AND LA0D307 $357

T LA000665 0 LINE #8 - OPERATING SUBSIDY $5,046

T LA000666 0 LINE #6 - BLUE LINE FEEDER SERVICE $3,310

T LA01B111 0 BUS SYSTEM - PREVENTIVE MAINTENANCE $8,560

T LA01B112 0 BUS SUPPORT EQUIPMENT (ENGINES AND TRANSMISSIONS) $800

T LA01B120 0EXPANSION OF DIVISION 1 TO ADD ADDITIONAL CAPACITY OF APPROX 67 BUSES AND ADDITIONAL PARKING SPACE OF EMPLOYEES. ACQUISITION OF A VACANT PARCEL SOUTH OF DIV 1

$6,088

T LA0B0825 0 BUS SYSTEM OPERATING EQUIPMENT - FUEL DISPENSING/MONITORING SYSTEM AND NON-REVENUE AND SECURITY VEHICLES. $1,900

T LA0B203 0 PURCHASE OF SUPPORT EQUIPMENT - TIRES $462

T LA0B308 0 FOOTHILL TRANSIT ADMINISTRATIVE/ OFFICES AND EQUIPMENT $18,001

T LA0B309 0 CNG FUELING STATION - POMONA AND IRWINDALE $3,600

T LA0B310 0 REPLACE (125) BUSES (CNG) - 50 IN FY07 AND 75 IN FY08 $44,500

T LA0B311 0"PARK AND RIDE FACILITY TRANSIT ORIENTED NEIGHBORHOOD PROGRAM SAFETEA-LU # 341 (E-2006-BUSP-092) (E-2006-BUSP-173)"

$16,442

T LA0B358 0 PREVENTATIVE MAINTENANCE FOR THE CULVER CITYBUS OPERATION $10,000

T LA0B400 0 PROCUREMENT OF FIVE (5) 40' CNG EXPANSION BUSES/420K PER BUS $2,211

T LA0C10 0 MID-CITY/EXPOSITION CORRIDOR LIGHT RAIL TRANSIT PROJECT PHASE I TO VENICE-ROBERTSON STATION $862,000

T LA0C15 0 PURCHASE TWO REPLACEMENT TRANSIT SUPPORT VEHICLES $62

T LA0C37 0 BUS STOP IMPROVEMENTSCONSTRUCTION OF PASSENGER SHELTERS AND INFORMATION KIOSKS $686

Page 33: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 31

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0C61 0 TRANSIT DATA AND COMMUNICATION SYSTEMS; ITS (RADIO, AVL, DISPATCHING, AND OTHER ADVANCED TECHNOLOGY) ONGOING. $1,161

T LA0C63 0 PURCHASE OF MISC OFFICE EQUIPMENT- (ONGOING) $700

T LA0C64 0 ASSOCIATED CAPITAL MAINTENANCE (ENGINES, TRANSMISSIONS, PARTICULATE TRAPS, KITS, ETC) (ONGOING) $1,759

T LA0C65 0 PURCHASE OF SUPPORT SERVICE EQUIPMENT - MISC EQUIPMENT (ONGOING) $725

T LA0C72 0 CAPITALIZATION OF MAINTENANCE COST (TIRE LEASE) (ONGOING) $317

T LA0C8173 0NORTHRIDGE METROLINK STN PARKING IMPRVMENT. CONSTRCT ADDT'L 100 PRKING SPCS & RECONFIGURE SOUTHERN PRTION OF EXISTNG PRKNG LOT TO YIELD AN ADDT'L 40 NET PRKING SPCES TOTAL 400 SPC.

$3,263

T LA0C8217 0PURCHASE EXPANSION OVER THE ROAD COMMUTER COACHES (6) (FUNDS FROM LA UZA). RELIEVE OVERCROWDING ON THE 40-FOOT BUSES WILL ALLOW AVTA TO OPERATE TWO NEW ROUTES IN SFV/GLEN./PAS.

$3,600

T LA0C8219 0SOUTH BAY PAVILION REGIONAL TRANSIT CTR. CONSTRUCTION OF A TRANSIT CTR AT THE SOUTH BAY PAVILION SHOPPING CTR TO BE SERVED BY ALL 8 CARSON CIRCUIT RTES & MTA LINES #205 & #446-447.

$5,637

T LA0C8223 0COMPTON MLK TRANSIT CENTER EXPANSION AND MULTI-MODAL/WILL ALLOW THE TRANSIT SYSTEM TO REDUCE OPERATING COST BY PROVIDING THE TRANSIT CONTRACTOR WITH A BUS YARD AND MAINT. CENTER.

$4,934

T LA0C8232 0ANTELOPE VALLEY LINE CHANGES AT SANTA CLARITA-ALIGNMENT CHANGES WILL PERMIT HIGHER SPEEDS OF OPERATION AND RE-DUCE MAINTENANCE COST- (SCRRA). (PPNO 3202).

$3,693

T LA0C8237 0FIRST ST PARKING STRUCTURE-LONG BEACH REDEVELOPMENT AGENCY. BUILD A PARKING STRUCTURE NEAR SOUTHERLY TERMINUS OF THE LONG BEACH BLUE LINE IN DOWNTOWN LONG BEACH.

$3,902

T LA0C8241 0PICO UNION/ECHO PARK DASH VEHICLE PROCUREMENT. PURCHASE (3) LOW-FLOOR, PROPANE-POWERED 30' BUSES FOR THE PICO/UNION ECHO PARK SHUTTLE SERVICE.

$835

T LA0C8242 0BUS STOP IMPROVEMENTS ON SAN FERNANDO ROAD & TC LIGHTING; ENHANCE PASSENGER FACILITIES AT THREE BUS STOPS WITH GREATEST NUMBER OF DAILY BOARDINGS ON EAST SIDE OF SAN FERNANDO ROAD.

$505

T LA0C8250 0MONROVIA RAILROAD DEPOT MULTI-MODAL TRANSIT CENTER: STABILIZING STRUCTURE AND THEN OVERALL STRUCTURAL ELEMENTS WILL BE REPAIRED FOLLOWED BY RESTORING KEY ARCHITECTURAL . PPNO# 3415

$2,053

T LA0C8331 0LONG BEACH WAYFINDING/TRANSIT CONNECTION PROGRAM OF SIGNS WILL BE PEDESTRIAN, VEHICULAR, A PARKING AND WILL IN-CLUDE MAPPING THAT DISPLAYS DESTINATIONS AND TRANSIT OPTIONS.

$584

Page 34: Project List - Southern California Association of Governments

32 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0C8362 0 EL MONTE STATION IMPROVEMENT PROJECT AND TRANSIT STORE EQUIPMENT $650

T LA0C8364 0NORTH LA COUNTY NON-ADVERTISING BUS STOP SHELTERS. INSTALLATION OF BUS SHELTERS WITH SEATING AT BUS STOPS WITH GREATEST # OF DAILY BOARDING IN NORTH LOS ANGELES COUNTY. PPNO 3229.

$180

T LA0C8369 0ROLLING STOCK MAINTENANCE FACILITY IN SAN BERNARDINO- FUNDING BUILD NEW COMMUTER TRAIN STORAGE & MAINTENANCE FACILITIES & CONNECTING TRACKS IN INLAND EMPIRE.(SCRRA).PPNO 3201, 3366

$17,782

T LA0C8380 0CHINATOWN/COLLEGE STREET GOLD LINE STATION - INTERMODEL TRANS. CENTER ENHANCE MENT ( PEDESTRIAN WALKWAY BRIDGE, BUS STATION, AND A BIKE STATION)

$18,190

T LA0C8382 0SEPULVEDA BLVD BUS STOP IMPROVEMENT PROGRAM. BUS STOP AMENITIES INC LIGHTING SIGNAGE, LANDSCAPING, SHELTERS, SEAT-ING, LANDINGS AND TRASH RECEPTACLES.

$147

T LA0C8383 0LONG BEACH TRANSIT: BUS STOP IMPROVEMENT PROJ. ENHANCE 9 OF RAIL STATION FEEDER BUS STOPS TO EASE TRANSFERS, MAKE PUBLIC TRANSIT MORE AESTHETICALLY PLEASING & SAFER, INC RIDERSHIP.

$1,200

T LA0C8385 0EL SERENO DASH PROCUREMENT. PURCHASE (2) LOW-FLOOR, PROPANE POWERED, 30' FOOT BUSES FOR THE EL SERENO DASH SERVICE.

$540

T LA0C8386 0 BUS SYSTEM ALTERNATE FUEL FACILITY (FY 2001 CALL-FOR-PROJECTS)-CROSS STREETS: 139TH ST & WESTERN AVE. $2,235

T LA0C8413 0 METRO RAPID BUS STATIONS-PHASE II: INCLUDES COMMUNICATIONS & EQUIPMENT $110,000

T LA0D03 0 PHASE II FACILITY ALT FUEL CONVERSION/ON-SITE FUELING STATION $550

T LA0D07 0 UNIVERSAL FARE SYSTEM REGIONAL PROJECT $21,363

T LA0D08 0 UNIVERSAL FARE SYSTEM MTA PROJECT - (PROGRAMMING APPROVED BOD 11/2001) $55,844

T LA0D103 0THE CITY AND THE REDEVELOPMENT AGENCY WILL EXPAND ON AN EXISTING PARKING FACILITY (500 PARKING SPACE) FOR ADDITIONAL USE BY TRANSIT PATRONS.

$6,616

T LA0D109 0 PURCHASE LAND FOR VEHICLE MAINTENACE TRANSIT FACILITY $2,062

T LA0D11 0 TRANSIT - ENHANCEMENTS $311

T LA0D112 0ACQUISITION OF (2) ALTERNATIVE FUELED TRANSIT VEHICLE FOR EXISTING INTRA-CITY CIRCULATOR ROUTE FOR THE MISSION MERD-IAN METRO GOLD LINE LIGHT RAIL STATION (LOCAL TDM)

$185

T LA0D116 0 REPLACEMENT OF HVAC SYSTEM AT TORRANCE TRANSIT FACILITY $513

T LA0D12 0 FACILITY IMPROVEMENTS - POMONA, IRWINDALE, TRANSIT STORES AND W. COVINA OFFICE. $3,755

T LA0D123 0CAPITAL PREVENTIVE MAINTENANCE: SPARE PARTS AND LABOR EXPENSES RELATED TO VEHICLE MAINTENANCE UNDER THE FTA POLI-CIES GOVERNING CAPITAL PROJECTS.

$6,071

T LA0D125 0 BUS STOP AMENITIES PROJECT $1,860

T LA0D127 0 CONSTRUCT CNG FUELING STATION ON EXISTING FACILITY $1,300

Page 35: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 33

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0D13 0 REPLACE FAREBOX/UFS $1,100

T LA0D132 0 PURCHASE 8 ARTICULATED HYBRID VEHICLES FOR LOCAL TRANSIT. (LA UZA) - $4,303

T LA0D134 0 PURCHASE 4 EXPANSION VEHICLES FOR LOCAL TRANSIT. (LANCASTER / PALMDALE UZA) $1,600

T LA0D135 0PURCHASE PROPERTY/CONSTRUCT TRANSFER FACILITIES AT 47TH ST. EAST AND AVE S. (LA UZA FY06/07 $268 AND LANCASTER / PALMDALE UZA FY07/08 $1072)

$1,000

T LA0D136 0 CNG STATION CONSTRUCTION AND OPERATION $600

T LA0D137 0 TRANSIT STATION RIGHT OF WAY PROCUREMENT FOR LAND AT THE EXISTING SANTA CLARITA METROLINK STATION. $4,517

T LA0D141 0 BICYCLE RACKS FOR NINE (9) BUSES, STAINLESS STEEL. $24

T LA0D142 0 CONSTRUCT COMPRESSED NATURAL GAS FUELING STATION ON EXISTING FACILITY. $195

T LA0D191 0PURCHASE THREE 18- 25 PASSENGER FULLY ACCESSIBLE ALTERNATIVE FUEL VANS FOR DEMAND RESPONSIVE SERVICE TO REPLACE THE EXISTING FLEET OF THREE 1994 GASOLINE VANS.

$279

T LA0D196 0 BUS OPERATION ASSISTANCE- SAN FERNANDO VALLEY RAPIDWAY(METRO ORANGE LINE) $18,691

T LA0D197 0 MID-CITY/EXPOSITION CORRIDOR LRT OPERATING ASSISTANCE $114,801

T LA0D198 0 CRENSHAW CORRIDOR (SAFETEA- LU #140): PE & SHORT TERM CATEGORICALLY EXEMPT IMPROVEMENTS (SHELTERS, AMENITIES, ETC) $1,057,000

T LA0D199 0 PURCHASE OF 5 REPLACMENT BUSES. GASOLINE-ELECTRIC HYBRID LOW FLOOR 40' COACH. $2,625

T LA0D205 0 BUS STOP AMENITIES (LA UZA) $585

T LA0D207 0REHABILITATION IMPROVEMENT OF PARKING LOT LOCATED AT THE MADISON CAMPUS. (LEAD AGENCY SANTA MONICA COLLEGE)

$1,900

T LA0D210 0 CONSTRUCT TRANSIT MANAGEMENT AND INFORMATION CENTER. TIC2 $2,255

T LA0D224 0 PREVENTATIVE MAINTENANCE AND CAPITALIZATION OF EQUIPMENT MAINTENANCE EXPENSES. $5,853

T LA0D233 0 FLEET REPLACEMENT 9600'S UP TO 25 HEAVY DUTY HYBRID FUEL BUSES. $8,479

T LA0D235 0 TRAINING AND EDUCATIONAL REIMBURSEMENT 2006/07 $41

T LA0D236 0 SUPPORT VEHICLES 2006/07 $328

T LA0D237 0 MISC SHOP EQUIPMENT 2006/07 $154

T LA0D238 0 MISC SAFETY AND SECURITY PROJECTS 2007/08 $154

T LA0D239 0 TIRE LEASE 2006/07 $770

T LA0D240 0 OFFICE EQUIPMENT, MONEYROOM COUNTING EQUIPMENT AND FURNITURE 2006/07 $39

Page 36: Project List - Southern California Association of Governments

34 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0D241 0 BUS COMPONENTS 2006/07 ENGINES, TRANSMISSIONS, REPOWER ARTICULATED BUSES $2,515

T LA0D242 0 BUS STOP AMENITIES 2006/07 SHELTERS, BENCHES, TRASH RECEPTACLES, PUBLIC ART AND OTHER MISC AMENITIES. $103

T LA0D243 0 INFORMATION SYSTEMS EQUIPMENT 2006/07 SOFTWARE AND HARDWARE. $1,523

T LA0D244 0MISC FACILITY IMPROVEMENTS 2006/07 INCLUDING FUEL TANK UPGRADE PHASE III, FALL PROTECTION SYSTEMS, TICII AND OTHER GENERAL FACILITY PROJECTS

$616

T LA0D272 0SOUTH SAN FERNANDO VALLEY REGIONAL PARK AND RIDE. ADD 50 NEW PARKING SPACES TO EXISTING COMMUTER EXPRESS PARK AND RIDE LOT WITHIN EXISTING AREA.

$767

T LA0D282 0LANDSCAPE,STREETSCAPE & PASSENGER AMENITY IMPRVMENTS AT & ADJACENT LOS ANGELES CITY COLLEGE TO IMPROVE PEDES-TRAN MOBILITY & ACCESSIBILITY TO EXSTG MULTIMDAL CONN. SAFETEA-LU # 223

$9,564

T LA0D283 0 ACQUISITION OF 7 REPLACEMENT TRANSIT VEHICLES $1,921

T LA0D287 0PURCHASE OF 29 REPLACEMENT BUSES. GASOLINE-ELECTRIC HYBRID LOW FLOOR 40' COACH. PURCHASE OF 6 EXPANSION BUSES. GASOLINE-ELECTRIC HYBRID LOW FLOOR 40' COACH

$20,214

T LA0D29 0HEART OF THE CITY BUS TRANSFER STATION AMENITIES - CONSTRUCTION IN CITY REDEVELOPMENT AREA - (SERVICE BY 5 LACMTA LINES, 2 TORRANCE LINES & 1 LADOT COMMUTER EXPRESS LINE).

$5,470

T LA0D291 0 PURCHASE REPLACEMENT SUPPORT VEHICLES (9 TOTAL WITH 3 IN EA IN 07,08 & 09) (LANCASTER/ PALMDALE UZA) $450

T LA0D292 0 REFURBISH COMMUTER COACHES (3-FY06), (3-FY07), (4-FY08). (LANCASTER / PALMDALE UZA) $1,000

T LA0D295 0 BUS SUPPORT - ADP SOFTWARE (TRANSTRAK) ONGOING $103

T LA0D296 0 BUS STOP IMPROVEMENTS (ONGOING) $300

T LA0D297 0 CAPITALIZED COST OF CONTRACTING $1,000

T LA0D299 0 ACQUISITION OF (6) ALTER FUEL TRANSIT/PARATRANSIT VEHICLES NOT TO EXCEED 35' SAFETEA-LU TRANSIT #251 $2,106

T LA0D300 0 ACQUISITION OF TELEPHONE UPGRADES FOR TRANSIT DIVISION. $62

T LA0D307 0PURCHASE FIVE (5) ALTERNATIVE FUEL BUSES FOR SERVICE EXPANSION. PART OF SAFETEA-LU TRANSIT PROJECT #260 ALONG WITH LA000507, LA0D340, AND LA0D308

$2,875

T LA0D308 0 DRIVER TRAINING SIMULATOR. PART OF SAFETEA-LU TRANSIT PROJECT #260 ALONG WITH LA000507, LA0D340, AND LA0D307 $400

T LA0D316 0 BIKE RACKS ON BUSES. THESE ARE FY05 BOS 1% TEA (5307) FUNDS. $85

T LA0D320 0 BETWEEN NORWALK AND LA MIRADA: CONSTRUCT 5.6 MILES OF NEW THIRD MAIN TRACK. PPNO# 2002 EA# R889SA $102,661

Page 37: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 35

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0D322 0TRANSIT FACILITY TO INCLUDE BUS MAINTENANCE STRUCTURE, BUS STORAGE, TRANSIT HUB, PARK-N-RIDE, TRAIL HEAD AND A VISI-TOR SERVING KIOSK.

$620

T LA0D337 0 TRANSIT ENHANCEMENT ACTIVITIES: 1% FORMULA FUNDS - LOS ANGELES COUNTY $14,750

T LA0D338 0METRO GOLD LINE EASTSIDE EXTENSION ENHANCEMENTS INCLUDING ADDITIONAL TVM'S; PEDESTRIAN SAFETY, LANDSCAPING AND MULTI-MODAL INTERFACE ELEMENTS; ADDITIONAL TRACTION POWER SUBSTATION,

$14,000

T LA0D340 0PURCHASE SIX (6) 40 FT. ALTERNATIVE FUEL BUSES FOR SERVICE EXPANSION. PART OF SAFETEA-LU TRANSIT PROJECT #260 ALONG WITH LA0D308, LA000507, AND LA0D307

$3,000

T LA0D342 0 BEAUDRY AVE TERMINAL STREETSCAPE $509

T LA0D343 0 VEHICLE MAINTENANCE FACILITY $9,627

T LA0D345 0 ASSOCIATED CAPITAL MAINTENANCE FOR REVENUE VEHICLE FLEET (ONGOING) $41

T LA0D348 0 PURCHASE REPLACEMENT VANS WITH ALTERNATE FUEL VANS; FY 08=4, FY 10=3 $1,320

T LA0D349A 0 REPLACEMENT BUSES - 25FT VANS/BUSES - PURCHASE QTY OF 3 GASOLINE-22 PASSENGER CAPACITY EACH $616

T LA0D350 0 MID LIFE REFURBISHMENT OF 27 40' LOW FLOOR TRANSIT BUSES. (12 REFURBISHMENTS IN 2006 AND 15 REFURBISHMENTS IN 2007) $4,106

T LA0D352 0 REPLACEMENT OF THREE (3) DIAL-A-RIDE VEHICLES WITH THREE (3) 21 PASSENGER CNG VEHICLES $225

T LA0D353 0 PURCHASE LOCAL TRANSIT BUSES-EXPANSION (6) (LANCASTER/PALMDALE UZA) $2,100

T LA0D355 0 BUS CAPITAL ITEMS--ENGINGE REBUILDS AND ENGINE COMPONENTS 32 BUSES @ 50K $343

T LA0D356 0PROVIDE HARDSCAPE, LANDSCAPE AND STREETSCAPE IMPROVEMENTS AT EAST LOS ANGELES COLLEGE TO PROVIDE A OFF-STREET TRANSIT CENTER TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL

$2,836

T LA0D357 0PROVIDE HARDSCAPE, LANDSCAPE AND STREETSCAPE IMPROVEMENTS AT LOS ANGELES TRADE TECHNICAL COLLEGE TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS.SAFETEA-LU # 307

$5,925

T LA0D358 0PROVIDE HARDSCAPE, LANDSCAPE, AND STREETSCAPE IMPROVEMENTS AT LOS ANGELES VALLEY COLLEGE TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS

$3,429

T LA0D362 0 COMPREHENSIVE OPERATIONAL ANALYSIS TRANSIT PLANNING $415

T LA0D363 0 SANTA CLARITA TRANSIT PHASE 2 - EXPANSION BUSES - (9) LOCAL TRANSIT CNG BUSES & (4) OVER THE ROAD COMMUTER BUSES. $1,018

T LA0D364 0 CARB RETROFIT PROGRAM $400

T LA0D371 0 REDONDO BEACH ESPLANADE INTERMODAL IMPROVEMENT PROJECT - A DEDICATED OFF-STREET BIKE PATH. $3,500

Page 38: Project List - Southern California Association of Governments

36 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0D375 0DESIGN & CONSTRUCTION OF PEDESTRIAN ACCESS AT COVINA METROLINK STATION, AT THE SAN BERNARDINO LINE ROW, & DOUBLE TRACKING APPROACHING STATION. PROJECT IS IN LA COUNTY

$642

T LA0D384 0 BUS SUPPORT EQUIPMENT-DIESEL EXHAUST NOX AFTER-TREATMENT DEVICES (50) $770

T LA0D389 0FEDERAL GRANT WILL BE USED TO PURCHASE TWO (2) PARATRANSIT VEHICLES FOR THE CITY'S DIAL-A-RIDE SERVICE USED BY EL-DERLY AND HANDICAPPED RESIDENTS

$150

T LA0D396 0 1ST STREET TRANSIT MALL ENHANCEMENTS $332

T LA0D400 0 CITY OF AZUSA, FOUR REPLACEMENT MEDIUM BUSES, SEATS TWELVE AMB PASSENGERS AND TWO W/C. $224

T LA0D401 0 LANTERMAN DEVELOPMENTAL CENTER, ONE REPLACEMENT MODIFIED VAN, SEATS EIGHT AMB PASSENGERS $48

T LA0D402 0ALTA MED HEALTH SERVICES CORPORATION, REPLACEMENT OF ONE MODIFIED VAN WHICH SEATS EIGH AMB PASSENGERS AND TWO MEDIUM BUS TYPE II , WHICH SEATSTWELVE AM AND PASSENGERS EACH.

$160

T LA0D403 0 THE INSTITUTE FOR THE REDESIGN OF LEARNING, ONE, REPLACEMENT MODIFIED VAN, SEATS EIGHT AMB PASSENGERS AND W/C $48

T LA0D404 0 MENTAL HEALTH ASSOCIATION IN LOS ANGELES (THE VILLAGE), ONE EXPANSION MINI VAN, TYPE IV, SEATS FIVE AMB PASSENGERS. $41

T LA0D405 0 GRANDVIEW FOUNDATION INC. THREE REPLACEMENT MODIFIED VANS, SEATS EIGHT AMB PASSENGERS, AND ONE W/C $137

T LA0D406 0 SOCIAL VOCATIONAL SERVICES INC. REPLACEMENT THREE MODIFIED VANS, SEATS EIGHT AMB PASSENGERS EACH $144

T LA0D407 0 CITY OF PASADENA, REPLACEMENT FIVE MEDIUM BUS (TYPE 11) WICH SEATS TWELVE AMB PASSENGERS AND TWO W/C $280

T LA0D408 0 TARZANA TREATMENT CENTERS, TWO EXPANSION MODIFIED VANS SEATS EIGHT AMB PASSENGERS AND ONE W/C $96

T LA0D409 0 TARZANA TREATMENT CENTERS, 8 COMPUTERS, 8 PRINTERS AND GPS TRACKING SYSTEM $40

T LA0D410 0 IMOSA, INC., ONE EXPANSION SMALL BUS TYPE 1, SEATS EIGHT AMB PASSENGERS AND TWO W/C $45

T LA0D411 0 MOTION PICTURE AND TELEVISION FUND, ONE EXPANSION MEDIUM BUS TYPE II, SEATS TWELVE AMB PASSENGERS AND TWO W/C $56

T LA0D412 0 ALTAMED HEALTH SERVICES CORPORATION, COMPUTER SOFTWARE $40

T LA0D413 0ASIAN REHABILITATION SERVICES INC. ONE EXPANSION MINIVAN TYPE IV, SEATS FIVE AMB PASSENGERS AND CAPABLE OF CARRYING TWO W/C

$41

T LA0D414 0 STEELWORKERS OLDTIMERS FOUNDATION, DISPATCHING SOFTWARE, ONE SERVER, AND THREE COMPUTERS $34

T LA0D415 0EAST LOS ANGELES REMARKABLE CITIZEN'S ASSOCIATION INC., (EL ARCA) ONE BASE STATION, COMPUTER EQUIPMENT AND SOFT-WARE

$10

Page 39: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 37

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0D416 0EAST LOS ANGELES REMARKABLE CITIZENS ASSOCIATION, INC. (EL ARCA) FIVE EXPANSION MEDIUM BUS TYPE II AND 5 MOBILE RA-DIOS.

$288

T LA0D417 0ACCESS SERVICES INC., 13 MINIVAN TYPE IV REPLACEMENT VEHICLES, SEATS FIVE AMB PASSENGERS AND CAPABLE OF CARRYING TWO W/C

$533

T LA0D418 0 O.P.I.C.A ADULT DAY CARE CENTER, ONE EXPANSION SMALL BUS, SEATS EIGHT AMB PASSENGERS AND TWO W/C $45

T LA0D419 0CITY OF INGLEWOOD, 2 EXPANSION LARGE BUS TYPE III AND MOBILE RADIOS, SEATS SIXTEEN AMB (PASSENGERS AND TWO W/C) FOR PARATRANSIT DIAL A RIDE SERVICE.

$123

T LA0D424 0 PURCHASE OF ADMINISTRATIVE SUPPORT AND MAINTENANCE EQUIPMENT $1,120

T LA0D425 0 MID-LIFE REFURBISHMENT OF THREE COMMUTER COACHES $294

T LA0D426 0 PURCHASE REPLACEMENT (9) DAR VEHICLES $727

T LA0D427 0 FACILITY MAINTENANCE $104

T LA0D428 0 PURCHASE PROPERTY/CONSTRUCT PASSENGER TRANSFER STATION $880

T LA0D429 0 ONE ADDITIONAL OPERATIONAL SUPPORT VEHICLE $35

T LA0D43 0 CAPITALIZATION OF PREVENTIVE MAINTENANCE (ONGOING) $3,925

T LA0D430 0 CENTRALIZED MAINTENANCE AND OPERATIONS FACILITY UPGRADES $9,295

T LA0D431 0 VEHICLE MAINTENANCE: REBUILD SERIES 40 AND SERIES 50 ENGINES $660

T LA0D432 0 ADDITIONAL TRANSIT INFORMATION SYSTEM INTEGRATION $1,219

T LA0D433 0 TICKET VENDING MACHINES $568

T LA0D435 0 PURCHASE OF REPLACEMENT CNG BUSES AND EXPAND NATURAL GAS FUELING FACILITY. SAFETEA-LU TRANSIT # 207 $3,867

T LA0D436 0 ELEVEN (11) ALTERNATE FUEL 40 FT. TRANSIT BUSES TO REPLACE ELEVEN (11) 1995 MODEL YEAR BUSES. $6,375

T LA0D437 0 TEN (10) ALTERNATE FUEL 40 FT. TRANSIT BUSES TO REPLACE:THREE (3) 1995 MODEL & (7) SEVEN 1997 MODEL YEAR BUSES. $6,000

T LA0D438 0MISCELLANEOUS FACILITY IMPROVEMENTS TO THE NORWALK TRANSIT ADMINISTRATIVE, OPERATIONS, MAINTENANCE AND PUBLIC SERVICE BUILDING LOCATED AT 12650 E. IMPERIAL HWY NORWALK.

$2,852

T LA0D452 0REGIONAL ITS INTEGRATION PROJECT; INTEGRATION OF VARIOUS REGIONAL TRAFFIC AND TRANSPORTATION OPERATIONS SYSTEM ELEMENTS

$7,246

T LA0D453 0 PURCHASE 5 REPLACEMENT ALTERNATIVE FUEL 40' BUSES $3,000

T LA0D454 0 REHAB TRANSIT ADMINISTRATIVE OFFICES $200

Page 40: Project List - Southern California Association of Governments

38 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0D455 0 REPLACE RELIEF AND SUPERVISOR VEHICLES $160

T LA0D456 0ARCHITECTRAL/ ENG DESIGN & CONSTRTN ENHANCMNTS AT 4 ON-STREET TRANSIT HUBS IN SOUTH BAY AREA, INCLDNG SECRTY LIGHTNG, BENCHES, TRASH CANS, SIGNS, ADA CURB RAMPS, INFO AIDS & PHONES

$698

T LA0D457 0 BUS REPLACEMENT $912

T LA0D471 0 NEW FREEDOM PROGRAM OPERATIONS AND CAPITAL ACQUISITIONS $45,668

T LA0D481 0 ASSOCIATED CAPITAL MAINTENANCE-FIVE YEAR TIRE LEASE $5,559

T LA0D83 0 PURCHASE/INSTALL MOBILE DATA COMPUTER (MDC) SYSTEM IN PARATRANSIT REVENUE VEHICLES (LANCASTER/PALMDALE UZA) $200

T LA0D84 0 PURCHASE/INSTALL AVL/GPS/APC/ANUNCIATORS/BUSINESS MANAGEMENT AND MONITORING SYSTEMS (LANCASTER/PALMDALE UZA) $3,000

T LA0D87 0SCRRA -ROLLING STOCK STORAGE FACILITY IN THE PACIFIC SURFLINER CORRIDOR NEAR LA UNION STATION AND CONTROL POINT SAN DIEGO JUNCTION AT KELLER STREET YARD. 2002 STIP IIP, 2023.

$5,270

T LA0D89 0 UPGRADE FAREBOX SYSTEM TO UNIVERSAL FARE SYSTEM-FUNDS TO BE REPROGRAMMED FROM TIP# LA990313. (LA UZA) $881

T LA0D92 0 COUNTYWIDE UNIVERSAL FARE SYSTEM (UFS) PROJECT $1,420

T LA0D93 0IMPLEMENTATION OF UNIVERSAL FARE SYSTEM (UFS) PROJECT AT NORWALK TRANSIT. REFERENCE TIP# LA990313 MUNICIPAL UFS PROGRAM COORDINATION THROUGH SANTA MONICA'S BIG BLUE BUS. (ONGOING)

$103

T LA0D94 0PURCHASE OF AUTOMATED FARE COLLECTION SYSTEM FOR PARTICIPATION IN THE LOS ANGELES COUNTY UNIVERSAL FARE SYSTEM PROGRAM. PREVIOUSLY TIP# LA0D07

$2,271

T LA0F001 0AFMS TRANSIT ENHANCEMENTS (CHANGEABLE MESSAGE SIGNS/REAL TIME TRANSIT INFORMATION-AT BUS SHELTERS & COMMUNITY LOCATIONS)

$144

T LA0F002 0 REPLACEMENT OF OMS SYSTEM (HARDWARE AND SOFTWARE) $1,200

T LA0F013 0 S. CALIF HIGH SPEED RAIL GRADE CROSSING IMPROVEMENTS (FFY 06 APPROPRIATIONS) $2,087

T LA0F014 0 SCRRA HWY/RAIL SEALED CORRIDOR PROJECT (FFY 06 APPROPRIATIONS) $522

T LA0F015 0 LOS ANGELES GRADE CROSSING IMPROVEMENTS (FFY 06 APPROPRIATION OF HSR SEC 1103 FUNDS) $446

T LA0F018 0 PURCHASE (2) EXPANSION BUSES FOR ROUTE 8 TO THE SAN FERNANDO VALLEY $794

T LA0F021 0 EXPOSITION LIGHT RAIL TRANSIT SYSTEM PHASE II - TO SANTA MONICA $1,632,000

T LA0F022 0 BUS SHELTER PROGRAM (INSTALLATION OF BUS SHELTERS AND REAL TIME TRANSIT INFORMATION) $7,000

T LA0F023 0 PEAK-HOUR BUS-ONLY LANES ON LINCOLN BLVD. BETWEEN PICO BOULEVARD AND THE SOUTH CITY LIMIT (IN BOTH DIRECTIONS) $170

Page 41: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 39

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA0F024 0 SECURITY SURVEILLANCE SYSTEM AND OTHER SECURITY ENHANCEMENTS $2,372

T LA0F048 0 PREVENTATIVE MAINTENANCE - OPERATING $7,500

T LA0F049 0MONTEBELLO TRANSPORTATION FACILITY EXPANSION BASED ON FACILITY MASTER PLAN: FINAL ARCHITECTURE, ENGINEERING, CON-STRUCTION

$8,000

T LA0F050 0 FACILITY MASTER PLAN FOR TRANSPORTATION FACILITY EXPANSION: PRELIMINARY ENGINEERING AND ARCHITECTUAL SERVICES ONLY $75

T LA0F051 0 PURCHASE EXPANSION DAR VEHICLES (4) 30' - 18 PASSENGER CUTAWAY VEHICLES. (L/P UZA) $300

T LA0F052 0PURCHASE REPLACEMENT DAR VEHICLES (9) - REPLACE EXISTING DAR VEHICLES AT END OF LIFE CYCLE WITH ALTERNATIVE FUEL VEHICLES. (L/P UZA)

$810

T LA0F053 0MAINTENANCE MANAGEMENT SYSTEM SOFTWARE PURCHASE AND IMPLEMENTATION AT THE LANCASTER BUS MAINTENANCE FACILITY. (L/P UZA)

$1,000

T LA0F054 0 ITS SOFTWARE IMPLEMENTATION MODIFICATIONS AT LANCASTER MAIN FACILITY. (L/P UZA) $1,900

T LA0F055 0REPLACE OUTDATED FAREBOXES TO CURRENT TECHNOLOGY THAT WILL INTERFACE WITH THE ITS AND UNIVERSAL FARE SYSTEM. (L/P UZA)

$1,200

T LA0F056 0PURCHASE SERVICE EXPANSION BUSES (6) EXPRESS ROUTE BETWEEN PALMDALE TRANSPORTATION CENTER AND LANCASTER CITY PARK TRANSFER FACILITIES. (L/P UZA)

$3,240

T LA0F057 0PURCHASE (8) 32' - 22 PASSENGER ALTERNATIVE FUEL TROLLEY STYLE BUSES SERVICE EXPANSION: PALMDALE RETAIL CORRIDOR SERVICE AND LANCASTER SENIOR MOBILITY SERVICE. (L/P UZA)

$2,700

T LA0F058 0 PURCHASE (6) 30' - 18 PASSENGER SERVICE EXPANSION BUSES FOR LAKE LOS ANGELES, ROUTE 6. (L/P UZA) $576

T LA0F059 0 UPGRADE SECURITY CAMERA SYSTEMS (L/P UZA) $1,200

T LA0F064 0SECURITY MEASURES (OAKLAND & LA FACILITIES) (IN THE CITY OF OAKLAND, ALAMEDA CO. & L.A., L.A. CO. AT THE 8TH ST. RAIL YARD, REDONDO JUNCTION MAINT FACILITIES. CONST. SEC. PPNO#2061

$3,540

T LA0F099 0TRANSIT CENTER AND PARK AND RIDE; CONSIST OF BUS STOP AMENITIES INCLUDING NEW BUS SHELTER, BENCHES, LANDSCAPING ETC.THE TRANSIT CENTER WILL BE SUPPORTED BY A 283 SPACE PARK & RIDE

$800

T LA29202U1 0SAN FERNANDO VALLEY E/W BRT (FROM TERMINUS OF METRO RED LINE IN NO HOLLYWOOD TO WARNER CTR)14-MILE EXCLUSIVE BUS LANES AT FORMER RAIL RD ROW (PPNO 3333 AB3090REP ) SAFETEA-LU # 326

$21,129

T LA29202U3 0SAN FERNANDO VALLEY NORTH/SOUTH BRT EXTENSION PHASE I: METRO RAPID SERVICE ALONG RESEDA BLVD. AND SEPULVEDA BLVD. SAFETEA-LU # 183

$11,702

T LA29202U4 0SAN FERNANDO VALLEY NORTH/ SOUTH BRT EXTENSION PHASE II: BUS SPEED IMPROVEMENTS ALONG METRO RAPID CORRIDORS AND EXPANSION OF EXISTING PARK & RIDE FACILITY.

$29,046

Page 42: Project List - Southern California Association of Governments

40 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA29202U5 0SAN FERNANDO VALLEY NORTH/ SOUTH BRT EXTENSION PHASE III: STATION ACCESSIBILITY AND PEDESTRIAN ENHANCEMENTS ON RESEDA BLVD., SEPULVEDA BLVD., AND LANKERSHIM BLVD.

$88,000

T LA29202U6 0SAN FERNANDO VALLEY NORTH/ SOUTH BRT EXTENSION PHASE IV: COMPLETION OF A NORTHBOUND BUS ONLY LANE ON A PORTION OF SEPULVEDA BLVD. AND OTHER IMPROVEMENTS.

$90,000

T LA29202V 0EASTSIDE TRANSIT CORRIDOR - UNION STATION TO ATLANTIC VIA 1ST ST. TO LORENA, THEN 3RD ST. VIA 3RD/BEVERLY BLVD. TO ATLANTIC (EASTSIDE LRT PPNO 3358)

$899,000

T LA29202W 0MID -CITY TRANSIT CORRIDOR: WILSHIRE BLVD. FROM VERMONT TO SANTA MONICA DOWNTOWN- MID-CITY WILSHIRE BRT INCL. DIV. EXPANSION

$200,000

T LA29212XY 0METRO RAIL GOLD LINE EXTENSION SEGMENT 1- PASADENA TO AZUSA-CITRUS STATION (COST INCLUDES O&M AT 29% OF TOTAL COST)

$720,464

T LA29228 0 METROLINK COMMUTER RAIL OPERATING ASSISTANCE $94,913

T LA50200 0 PREVENTIVE MAINTENANCE (LANCASTER/PALMDALE UZA). $33,379

T LA50300 0 OPERATING ASSISTANCE - TRANIST OPERATIONS AND DIAL-A -RIDE $4,061

T LA51600 0 OPERATING ASSISTANCE TRANSIT OPERATIONS: DIAL-A-RIDE $442

T LA52100 0 OPERATING ASSISTANCE $20,530

T LA52101 0 COP DEBT SERVICE LOCAL MATCH IS IN-KIND THROUGH REAL ESTATE $4,860

T LA52105 0 TIRE LEASING $320

T LA52107 0 PURCHASE ENGINES, TRANSMISSIONS, & OTHER SUBSTANTIAL BUS COMPONENTS. $200

T LA52600 0 FY 2006/07 OPERATING ASSISTANCE - TRANSIT OPERATIONS $13,146

T LA52603 0 ANNUAL TIRE PURCHASE $389

T LA55201 0 CONTINUING PROJECT - BUS STOP IMPROVEMENTS ,AMENITIES ,SHELTERS ,ETC $2,385

T LA55205 0 ASSOCIATED CAPITAL MAINTENANCE ITEMS (ONGOING) $7,361

T LA55207 0 TRANSIT COACH TIRE (LEASE) (ONGOING) $1,064

T LA55216 0ONGOING CORPORATE YARD MISCELANEOUS IMPROVEMENTS FOR THE TRANSIT FACILITY AT THE EXISTING LOCATION: 311 SOUTH GREENWOOD AVE. MONTEBELLO & 400 S. TAYLOR AVE. MONTEBELLO

$2,487

T LA56702 0 BUS VEHICLE LEASE $2,886

T LA57101 0 BUS FACILITY IMPROVEMENTS $77,124

T LA57110 0BUS REPLACEMENT: FIVE ALTERNATIVE FUELED BUSES (20 OR 30 FT WITH ASSOCIATED INFRASTRUCTURE) AND TEN ALTERNATIVE FU-ELED BUSES (40 FT)

$11,500

Page 43: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 41

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA62407 0 LAND ACQUISITION AND FACILITY EXPANSION/BUS SHELTER AND_WAREHOUSE CONSTRUCTION (IRWINDALE FACILITY). $3,150

T LA65406 0 ONGOING BUS REPLACEMENT: 2006-QTY 1- NEW FLYER HYBRIDS & 2008 - QTY 9 -NEW FLYER HYBRIDS. SAFETEA-LU # 92 $8,491

T LA900520 0PURCHASE OF ADD'L 386 REPLACEMENT VEHICLES FROM FY06 TO FY09. 100 VEHICLES IN FY06, 114 VEHICLES IN FY07; 110 IN FY08 AND 62 IN FY09.

$35,869

T LA960202 0PHASE II OF MAINTAINANCE AND OPERATIONS FACILITY CONSTRUCTION (UZA-LA) LOCATED AT 42210 6TH STREET WEST, LANCASTER(LA UZA)

$6,000

T LA960203 0 ADMINISTRATIVE CAPITAL AND MAINTENANCE CAPITAL (LANCASTER/PALMDALE UZA) $510

T LA963505 0 METROLNK REHABILITATION/RENOVATION (TRACK, SIGNAL, STRUCTURE AND ROLLING STOCK) $47,700

T LA963526 0 BUS STOP ENHANCEMENT $397

T LA963542 0ACQUISTION REVENUE VEHICLES - 2,513 CLEAN FUEL BUSES: LEASED VEH, FY02 (370) FY03 (30 HC) + FY04 (70 HC) + (200 ARTICS); FY05-FY10 TOTAL OF 1000 BUSES.

$409,250

T LA963543 0 PREVENTIVE MAINTENANCE (CAPITAL & OPERATING MAINTENANCE ITEMS ONLY) $1,360,250

T LA963546 0 BUS & RAIL CAPITAL, INCLUDES FACILITY UPGRADE, EQUIP, SPARE PARTS, NON-REV VEHICLES, MAINTENANCE SUPPORT, ITS, ETC. $345,022

T LA963550 0 SECURITY OF L.A. COUNTY RAIL ROW ON WHICH SCRRA OPERATES. SERVICES PROVIDED BY L.A. CO. SHERIFF $9,872

T LA963580 0 RADIO SYSTEM; REPLACEMENT OF EXISTING RADIO/DISPATCH SYSTEM / ADVANCED BUS TECHNOLOGY $10,300

T LA970501 0ANNUAL EXPENDITURES INCLUDING SERVICE PROVIDER CONTRACTS & CAPITAL EXPENSES. UPDATE ADDING ADDITIONAL 4-YEAR OPERATING AND CAPITAL EXPENSE.

$178,640

T LA973010 0 ENGINE REBUILDS FOR SERVICE FLEET $805

T LA973018 0 TRANSMISSION REBUILDS FOR SERVICE FLEET $250

T LA973503 0 DOWNTOWN TRANSIT MALL ENHANCEMENTS; REMODEL EXISTING SPACE TO OPEN A TRANSIT CUSTOMER SERVICE CENTER $1,511

T LA974165 0MACARTHUR PARK STATION IMPROVEMENTS INCLUDE DESIGN AND CONSTRUCTION OF A PLAZA TO ACCOMODATE PUBLIC ACCESS (PEDESTRIAN ENTRABCES, WALKWAYS, BICYCLE FACILITIES) PPNO# 3417

$1,931

T LA9811004 0PURCHASE OF TEN (10) DIAL-A-RIDE VANS FOR THE ARCADIA TRANSIT SYSTEM REPLACEMENT VEHICLES (MODEL YEAR 1998) RTAA PROJECT

$618

T LA9811007 0 AVL SYSTEM, ARRIVAL SIGNS, FUEL MGMT. SYSTEM (SMART BUS PROJECT) $14,000

T LA9811008 0 CONSTRUCTION OF A NEW ADMIN. & MAINTENANCE TRANSIT FACILITY. CROSS STREETS ARE 139TH ST AND WESTERN AVE.. $48,114

Page 44: Project List - Southern California Association of Governments

42 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LA982252 0CONSTRUCT OPERATIONS SUPPORT FACILITY TRANSPO ADMIN, OPERATIONS, MAINTENCE PUBLIC SERVICE TRANSIT CTR AT CIVIC CENTER DR. (CONTINUING)

$2,419

T LA990305 0LIGHT RAIL TRANSIT FLEET- 50 NEW RAIL CAR (26 EXP (10 FOR METRO GOLD LINE EASTSIDE & (16) FOR EXPOSITION LRT) 24 RE-PLACEMENT CARS - .PPNO 3225.

$207,810

T LA990716 0 BUS FLEET REPLACEMENT OF 2 VEHICLES. THE VEHICLES WILL HOLD 21 PASSENGERS AND COST $124K $124

T LA990724 0 RADIOS ON BUSES 72 VEHICLES TO INCLUDE AVL SYSTEM $2,917

T LA996012 0 DNTWN SAN PEDRO TRAN HUB DEV DEV MIXED TRANSIT HUB IN SAN PEDRO (LOCATION TO BE DETERMINED) P/E ONLY. $6,455

T LA996054 0 MULTI-MODAL TRANSPORTATION CENTER AT THE SO WEST CORNER OF 6TH ST AND TECHNOLOGY DR (2000 CFP 7039). PPNO 2907. $9,979

T LA996086 0 REPLACMENT - 3 ALTERNATIVE FUEL SHUTTLES $376

T LAE0001A 0 PURCHASE OF CNG BUSES FOR GLENDALE BEELINE TRANSIT SYSTEM $786

T LAE0036 0 WILSHIRE/ VERMONT PEDESTRIAN PLAZA IMPROVEMENTS AND INTERMODAL PEDESTRIAN LINKAGES $1,960

T LAE0039 0TRANSIT VILLAGE - PROVIDE A TRANS. FACILITY FOR SATELLITE PARKING FOR SIERRA MADRE VILLA GOLD LINE STA, P-N-R FOR COM-MUTERS, A FOOTHILL TRANSIT STORE.

$3,009

T LAE0085 0 ACQUISITION OF EPA AND CARB CERTIFIED LOW EMISSION REPLACEMENT BUSES, SAFETEA-LU ID NO. 85 $6,508

T LAE0108 0PURCHASE TWO TRIPPER BUSES TO RELIEVE OVERCROWDING DURING PEAK PERIODS. ROUTE G AND D, BLUELINE STATION AT DEL AMO BLVD/I-710 TO SOUTH BAY PAVILION MALL, DEL AMO BLVD

$502

T LAE0119 0 CNG TRANSIT VEHICLES PURCHASE FOR LOCAL TRANSIT NETWORK EXPANSION $640

T LAE0121 0 IMPROVE TRANSIT SHELTERS, SIDEWALKS, LIGHTING AND LANDSCAPING AROUND CEDARS-SINAI MEDICAL CENTER $1,566

T LAE0127 0PROCUREMENT OF (3) CNG TRANSIT VEHICLES AND RELATED INFRASTRCTURE EQUIPMENT FOR FIXED ROUTE PUBLIC TRANSPORTA-TION.

$3,178

T LAE0132 0PURCHASE OF ONE BUS.REPLACEMENT OF A 1983 CROWN DIESEL FUEL SCHOOL BUS WITH THE PURCHASE OF A NEW CNG-POWERED SCHOOL BUS. BUS WILL REDUCE EMISSIONS & CONTINUE TO PROVIDE TRANSPORTA

$250

T LAE0158 0 PARKING AND ELECTRONIC SIGNAGE IMPROVEMENTS AT COVINA, EL MONTE, BALDWIN PARK AND UPLAND. $1,829

T LAE0172 0 PURCHASE REPLACEMENT LNG BUSES FOR SANTA MONICA'S BIG BLUE BUS TRANSIT SERVICE $20,100

T LAE0191B 0SAFETY IMPROVEMENTS AT BUS STOPS, INCLUDING BUS LOADING AREAS, LIGHTING, PASSENGER AMENITIES, BUS PADS & TURNOUTS, IMPROVED DRAINAGE, & APPURTENANT WORK (SAFETEA-LU # 191 & # 321)

$2,731

Page 45: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 43

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LAE0195 0DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN LINKAGES BETWEEN LOS ANGELES PIERCE COLLEGE AND MTA'S RAPID BUS TRAN-SIT STOPS TO INCLUDE PASSENGER AMENITIES

$4,049

T LAE0200 0PURCHASE OF BUS FLEET REPLACEMENT PROJECTS. GASOLINE HYBRID ELECTRIC LOW FLOOR 40' & 35' BUSES. PURCHASING A TOTAL OF 40 BUSES.(SAFETEALU # 200)

$702

T LAE0212 0 FEASIBILITY STUDY - CONSTRUCTION OF DOWNTOWN STREETCAR PROJECT $1,002

T LAE0276 0 MUSEUM OF LATIN AMERICAN ART, LONG BEACH TO BUILD INTERMODAL PARK AND RIDE FACILITY $2,006

T LAE0295 0PURCHASE ONE LARGER (75 PASSENGERS) AND TWO SMALLER (40 PASSENGERS) FERRYBOATS AND CONSTRUCT RELATED DOCK WORK TO FACILITATE THE USE & ACCESSIBILITY OF THE FERRYBOATS

$3,135

T LAE0332 0LONG BEACH PARK AND RIDE FACILTY AT 3RD STREET AND PACIFIC AVE SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 300 TO 500 SPACE AND INCLUDE RESIDENTIAL AND COMMERICAL DEVELOPMENT

$1,002

T LAE0364 0CONSTRUCT INTERMODAL PARK AND RIDE FACILITY AT SANTA MONICA COLLEGE CAMPUS ON SOUTH BUNDY DRIVE NEAR AIRPORT AVENUE

$2,000

T LAE0388A 0DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN LINKAGES BETWEEN LOS ANGELES MISSION COLLEGE AND PUBLIC TRANSIT SER-VICES TO INCLUDE LIGHTING, LANDSCAPIND, AND PASSENGER AMENITIES

$263

T LAE0396 0UPGRADE EXIST - REG,L TRANSIT & LAYOVER FACILITY ADJACENT TO THE BURBANK-GLENDALE-PASADENA AIRPORT. WILL FACILITATE TRANSFER OF PASSENGERS TO & FROM MANY GROUND TRANS. (PE ONLY)

$1,146

T LAE0407 0PURCHASE ONE TROLLEY BUS VEHICLE FOR EXISTING SERVICE ALONG CARSON ST. BETWEEN THE HARBOR TRANSIT WAY STATION AND THE CARSON CIVIC CENTER AT AVALON BLVD

$271

T LAE0410 0 PURCHASE TEN CLEAN FUEL (HYBRID ELECTRIC), LARGE CAPACITY, ADA COMPLIANT, REPLACEMENT BUSES (SAFETEA-LU # 410) $3,022

T LAE0443 0 CAPITAL IMPROVEMENTS TO SUPPORT AND ENHANCE THE CAL STATE UNIVERSITY NORTHRIDGE TRAM SYSTEM $340

T LAE0566 0EXPANSION OF LAX REMOTE TERMINAL FLYAWAY SHUTTLE BUS SYSTEM. LAWA AIRPORTS WILL OPERATE BUSES BETWEEN THESE PARK-N-RIDE LOTS AND L.A. INTERNATIONAL AIRPORT. SITES BEING CONSIDERED

$3,124

T LAE0567 0LAX INTERMODAL TRANSPORTATION CENTER RAIL & BUS FACILITIES AT THE NORTHEAST CORNER OF AVIATION BLVD AND IMPERIAL HWY. INCLUDES PEDESTRIAN CONNECTION TO THE EXISTING GREEN LINE .

$3,125

T LAE1306 0PILOT SHUTTLE TRAIN PROJECT FROM THE PORTS OF LOS ANGELES AND LONG BEACH TO THE INLAND EMPIRE UTILIZING THE ALAMEDA CORRIDOR

$10,823

Page 46: Project List - Southern California Association of Governments

44 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T LAE5314 0SOUTHERN CALIFORNIA REGIONAL TRANSIT TRAINING CONSORTIUM. PART OF SECTION 5314 NATIONAL RESEARCH AND TECHNOLOGY PROGRAMS THROUGH SAFETEA-LU

$1,480

T LA0D372 0SOUTH ACCESS PEDESTRIAN BRIDGE TO SIERRA MADRE VILLA LIGHT RAIL STATION. THIS PEDESTRIAN BRIDGE OVER THE ROUTE 210 FREEWAY WILL PROVIDE A DIRECT AND SAFE APPROACH FOR PEDESTRIANS

$6,500

* S=State Highway, L=Local Highway, T=Transit

Page 47: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 45

ORANGE COUNTY RTIP PROJECTS

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S ORA040607 0 ORANGE COUNTY - COUNTYWIDE ACTIVITIES: PLANNING, PROGRAMMING AND MONITORING (PPM) $9,557

S ORA010200 1PACIFIC COAST HWY @ DEL OBISPO, WIDEN INTERSECTION, ADD A WB RIGHT TURN LANE ON PCH AND A SECOND NB THROUGH LANE ON DEL OBISPO STREET. FRM 2 TO 3. (00-DPNT-IIP-3059)

$1,417

S 10167 5I-5 FROM SR-91 TO LA COUNTY LINE IN BUENA PARK - ADD 1 MIXED FLOW LN AND 1 HOV LN IN EACH DIRECTION FROM 6+0 TO 8+2 LANES.

$323,805

S ORA000100 5GENE AUTRY WAY WEST @ I-5 (I-5 HOV TRANSITWAY TO HASTER) ADD OVERCROSSING ON I-5 (S)/MANCHESTER AND EXTEND GENE AUTRY WAY WEST FROM I-5 TO HASTER (3 LANES IN EA DIR.)

$62,724

S ORA000122 5 I-5 @ LA PAZ INTERCHANGE IMPROVEMENTS. EXPAND LA PAZ RD. FROM 4 TO 6 LANES TOTAL. (99-LHILL-GMA-1125) $5,708

S ORA020108 5 I-5 AT CULVER DRIVE S/B OFFRAMP WIDENING FROM ONE TO TWO LANES $3,206

S ORA020109 5 I-5 AT CAMINO CAPISTRANO INTERSECTION IMPROVEMENT. WIDEN S/B OFFRAMP FROM 2 TO 3 LANES. $22,845

S ORA020111 5I-5 AT AVENIDA PICO SOUTHBOUND OFF RAMP WIDENING FROM 1 TO 2 LANES AND EXTEND THE EXISTING AUX LANE TO CONNECT WITH S/B AUX LANE VISTA HERMOSA ON RAMP.

$10,419

S ORA020112 5I-5 SOUTHBOUND AT OSO PARKWAY EXIT LANE AND INTERCHANGE IMPROVEMENTS. WIDEN FROM 1 TO 2 LANES AND ADD AN EXIT/STORAGE LANE. PLUS SIGHT DISTANCE IMPROV. TO N/B OFF RAMP.

$29,478

S ORA030602 5IN SAN CLEMENTE - SB CAMINO DE ESTRELLA - WIDEN OFF RAMP FROM 1 TO 2 LANES AND WIDEN OVERCROSSING FROM 5 TO 7 LANES (1 W/B LEFT TURN LANE AND 1 E/B LANE)

$12,113

S ORA030604 5 IN THE CITY OF MISSION VIEJO SB OFFRAMP AT CROWN VALLEY PARKWAY - WIDEN OFF RAMP FROM 4 TO 5 LANES $2,396

S ORA110607 5 IN ORANGE COUNTY, ON ROUTE 5 FROM CALLE JUANITA TO 4TH STREET. PROVIDE ENHANCED PAVING AND LANDSCAPING $1,499

S ORA120326 5 AT I-5 AND SR-74/ORTEGA HWY - REBUILD INTERCHANGE INCLUDING WIDENING OF SR-74 OVERCROSSING $82,063

S ORA120359 5I-5 @ JAMBOREE - CONSTRUCT AUX LN ON I-5 SB; WIDEN SB OFF-RAMP FROM 1 TO 2 LANES; AND WIDENING JAMBOREE RD EB UNDERCROSSING TO CREATE A TURN LANE TO NB ON-RAMP

$9,990

S ORA120401 5 SOUTHBOUND INTERSTATE 5 FROM EL CAMINO REAL TO AVENIDA RAMONA - SOUNDWALL DESIGN AND CONSTRUCTION $4,498

S ORA120402 5 IN SAN CLEMENTE NORTHBOUND INTERSTATE 5 AT AVENIDA VAQUERO - SOUNDWALL DESIGN AND CONSTRUCTION $3,196

S ORA55059 5ARTESIA @ I-5 (KNOTT TO BOTRYOIDES) INTERSECTION IMP REALIGN N/B OFFRAMP AND S/B ONRAMP; IN CONJ W/ I-5 WIDENING. FROM 2 TO 3 LANES. I-5 E TO BOTRYOIDES BLVD. (PS&E ONLY)

$2,875

S ORA55063 5I-5 @ AVERY PARKWAY (MARGUERITE TO CAMINO CAPISTRANO) INTERCHANGE IMPROVEMENTS. WIDEN FROM 4 TO 5 LANES (FOR TURN LANE) UNDER FREEWAY BRIDGE.

$840

Page 48: Project List - Southern California Association of Governments

46 P R O J E C T L I S T I N G R E P O R T

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S ORA000193 22HIOV CONNECTORS ON 22/405 BTWN SEAL BEACH BLVD & VALLEY VIEW & ON 405/605 BTWN KATELLA AVE & SEAL BEACH BLVD WITH 2ND HOV LNE IN EACH DIRECTION ON 405 BTWN CONNECTORS EA 071631

$469,525

S ORA000195 22ON SR-22 (I-405 TO SR55) ADD 2 HOV LANES/1 EA DIR (FRM 0 - 2) & 2 AUX LANES/1 EA DIR (FRM 0- 2) (I-5 TO BEACH) & OPERATING IMPROVMENTS (SEE COMMENTS) TCRP PAYBACK WHEN AVAILABLE

$546,587

S ORA100510 22 REPLACE SR22 INTERCHANGES, CONSTRUCT HOV LANES AND LENGTHEN BRIDGES IN GARDEN GROVE $13,520

S ORA981104 22RECONSTRUCT HARBOR BLVD INTERCHANGE. 4 LANES EACH DIRECTION (1/4 MILE BEFORE AND AFTER SR-22 RAMPS) 2 HOV LNES(1 E/B & 1 W/B) AND PROPOSED SR-22 HOV LANES.

$4,794

S 550 55 ALTON AVE IN SANTA ANA CONSTRUCT A NEW 4-LANE (2E/B AND 2W/B) OVERCROSSING & HOV ACCESS RAMPS @SR-55 - $76,988

S ORA000146 55 MEATS AVE @ SR55 INTERCHANGE. CONSTRUCT ON-RAMP/OFF-RAMPS. PART OF SR-55 ENHANCEMENT PROJECTS.(0 TO 2 LANES) $154,041

S ORA015 55 BAKER STREET AND SR-55; N/B & S/B FRONTAGE ROAD IMPROVEMENTS. S/B FREE RIGHT TURN, N/B LEFT-TURN AND 2ND E/B LEFT. $900

S ORA016 55PAULARINO AVE (SR-55 @ PAULARINO AVE) IN COSTA MESA INTERSECTION IMPROVEMENT. ADDING A N/B RAMP AND W/B RIGHT-TURN-LANE.

$505

S ORA017 55 PAULARINO AVE IN COSTA MESA. INTERSECTION IMPROVEMENT ADD S/B RIGHT-TURN LANE. $270

S ORA030603 55 CONSTRUCT 1 AUX LANE ON S/B SR-55 BETWEEN E EDINGER AVE OFF RAMP AND DYER RD ON RAMP $34,617

S ORA030610 55 ADD SOUTHBOUND AUXILIARY LANE FROM DYER TO MACARTHUR $2,619

S ORA000107 57 AT LAMBERT IN CITY OF BREA. FWY/ARTERIAL (FROM 2 TO 3 LANES) ON RAMP $4,985

S ORA120320 57SR-57/LAMBERT RD INTERCHANGE IMPROVEMENTS - RECONFIG EXISTING DIAMOND INTERCHANGE TO LOOP RAMP, ADD SB LN ON OFFRAMP

$35,000

S ORA120332 57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) $181,730

S ORA120333 57 EXIST 4 MF N/B; WIDEN TO 5 MF LANES N/B FROM 0.3 MI S/O KATELLA TO 0.3 MI N/O LINCOLN (2.92 MILES) -- 0F0400 $41,086

S 10254 73SJHTC, 15 MI TOLL RD BETWEEN I-5 IN SAN JUAN CAPISTRANO AND RTE 73 IN IRVINE, EXISTING 3 MF EA. DIR. 1 ADD'L MF EA. DIR., PLUS CLIMBING AND AUX LNS AS REQ, BY 2015 PER SCAG/TCA MOU 4/5/01. TCM. (INTERIM PHASES INCLUDED IN PROJECT. SEE MODEL LIST FOR FURTHER DETAIL)

$343,000

S ORA000152 74ORTEGA HWY (RANCHO VIEJO RD TO JUST EAST OF I-5/SR-74 INTERCHAGE) RDWAY WIDEN ADD RT TRN LNE TO CAPAC & REDUCE QUE ON WB SR-74 TO NB I-5 TRN. N/B FRM 2TO3 & S/B 2TO3 .

$2,550

S ORA120507 74 ORANGE COUNTY - ORTEGA HWY (SAN CLEMENTE) - WIDEN FRM 2 TO 4 LNS; CALLE ENTRADERO TO ANTONIO PKWY $54,071

Page 49: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 47

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S ORA000115 90IMPERIAL HWY SMART ST (LAC TO HARBOR) RESTRIPE 4 TO 6 LNS (LAC LINE TO IDAHO ST. ADD RAISED MEDIAN. MODFY MEDIANS AT 4 INTSECS. ADD BUS PADS, TURNOUTS.(COMBINES ORA028 AND ORA029)

$10,663

S ORA021201 90IMPERIAL HWY SMART ST (HARBOR TO SR57) RESTRIPE 4 - 6 LNS (HARBOR BLVD & BERRY ST MEDIAN MODIFICATNS AT PUENTE INTERSEC. BUS PADS, BUS TURNOUTS & SOUNDWALLS AT VAR LOCATIONS

$2,541

S ORA030601 91ADD 1 MF LANE E/B BTWN 91/55 CONNECTOR & E OF WEIR CNYN RD IC -- W/B BTWN E OF WEIR CYN RD IC & IMPERIAL HWY; MODIFY W/B ON RAMPS FROM LAKEVIEW AVE TO IMPRV MERGE - 0G3300

$118,658

S ORA040601 91ACQUIRE AND INSTALL VALUE PRICING PILOT SYSTEM ON THE 91 EXPRESS LANES TO TEST VIABILITY OF DYNAMIC PRICING OF TOLL LANES

$1,089

S ORA120336 91SR-91 EASTBOUND LANE ADDITION BETWEEN SR-241 & SR-71, & IMPROVE NB SR-71 CONNECTOR FROM SR-91 TO STD; ONE LANE AND SHOULDER WIDTH.

$96,481

S ORA050 241ETC(RTE 241/261/133) (RTE 91 TO I-5/JAMBOREE) EXISTING 2MF EA DIR, 2 ADD'L MF EA. DIR., PLUS CLIMBING AND AUX LNS AS REQ BY 2015 PER SCAG/TCA MOU 4/5/01. TCM. ADD INTERCHANGE AT WEIR CANYON AND JEFFREY. (INTERIM PHASES INCLUDED IN PROJ-ECT. SEE MODEL LIST FOR FURTHER DETAIL)

$548,000

S ORA051 241(FTC-N) (OSO PKWY TO ETC) (13MI) EXISTING 2MF IN EA DIR, 2 ADDITIONAL MF LANES, PLS CLIMBING AND AUX LANES AS REQ BY 2015 PER SCAG/TCA MOU 4/5/01. TCM. RAMP IMPROVEMENTS IN EAST ORANGE. (INTERIM PHASES INCLUDED IN PROJECT. SEE MODEL LIST FOR FURTHER DETAIL)

$118,000

S ORA052 241(FTC-S) TOLL RD (I-5 TO OSO PKWY) (15MI) 2 MF EA. DIR BY 2013; AND 1 ADDITIONAL MF EA. DIR. PLS CLIMBING AND AUX LANES AS REQ BY 2030 PER SCAG/TCA MOU 4/5/01. 2013 (2+2) AND 2030 (3+3) TCM.

$705,000

S ORA000111 405NEW OFF-RAMP ON I-405 AT SUSAN STREET @ S. COAST DRIVE (REPLACED W/ORA000186, ORA000110, ORA000182, ORA000191. (FROM 0 TO 1 LANE)

$2,402

S ORA020103 405 COSTA MESA (FAIRVIEW RD @ I-405 INTERCHANGE) ADD 3RD S/B LEFT-TURN LANE AND 3RD S/B I-405 ONRAMP LANE. $7,330

S ORA020110 405I-405 NORTHBOUND AUXILIARY LANE (MAGNOLIA TO BEACH BLVD) ADD ONE AUX. LANE N/B & S/B -- FROM 5 TO 6 LANES IN EACH DIRECTION.

$25,652

S ORA030605 405CONSTRUCT ONE ADDITIONAL ALL PURPOSE LANE IN EACH DIRECTION ON I-405 AND PROVIDE ADDITIONAL CAPITAL IMPROVEMENTS FROM SR 73 THROUGH THE LA COUNTY LINE #317

$635,234

S ORA045 405 BOLSA AVE (CHESTNUT TO GOLDENWEST) WIDEN BOLSA AVE BRIDGE FROM 4 TO 6 LANES $2,200

S ORA100507 405CONSTRUCT FOURTH NB THROUGH LANE ON BEACH BLVD AT THE I-405 INTERCHANGE AND REMOVE OFF-RAMP ON I-405 AT BEACH (NORTH-EAST CORNER OF BEACH/EDINGER)

$1,138

L ORA000109 0COSTA MESA - NB HARBOR BLVD (SB ON RAMP TO SUNFLOWER DR) CHANNELIZATIONS AND OPERATIONS IMP AT THE 1-405 INTER-CHANGE

$3,372

L ORA000110 0 KATELLA AVE SMART ST (HUMOR TO JEAN) WIDEN FRM 4 TO 6 LANES $11,607

Page 50: Project List - Southern California Association of Governments

48 P R O J E C T L I S T I N G R E P O R T

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L ORA000118 0SAND CYN RD @ SCRRA TRACKS (BURT RD TO LAGUNA CANYON/OAK CANYON) - RAILROAD GRADE SEPARATION. WIDENS FROM 4 TO 6 LANES.

$23,187

L ORA000125 0MOULTON PKWY (SANTA MARIA TO EL PACIFICO) WIDEN FRM 7 TO 9 LANES (N/B 3 TO 4 AND S/B 4 TO 5), WIDEN INTERSECTIONS, ADD SIDEWALK AND LANDSCAPING.

$7,685

L ORA000131 0CONSRUCT NEW OVERPASS ON RIDGE ROUTE DR AT I-5 FROM WEST SIDE OF I-5 TO EAST SIDE OF I-5 ON RIDGE ROUTE (FROM 0 TO 4 LANES).

$1,200

L ORA000135 0 GOLDEN LANTERN @ CAMINO DEL AVION INTERSECTION WIDENING. ADD DEDICATED SB LT LANE/ WB RT LANE/ AND NB RT LANE. $100

L ORA000136 0 CROWN VALLEY PKWY @ NIGUEL RD INTERSECTION WIDENING. ADD DEDICATED NB RT LANE - $50

L ORA000138 0CROWN VALLEY PKWY@GREENFIELD INTERSECTION WIDENING. ADD SB RT LANE, WIDEN SOUTHBOUND FRM 5 TO 6 LNES, FRM GREENFIELD TO 200 FT. NORTH. DESIGN ONLY

$150

L ORA000139 0CROWN VALLEY PKWY@LA PAZ INTERSECTION WIDENING. ADD 2ND NB LT LANE AT CROWN VALLEY PKWY N/B FRM 4 TO 5 LNES. FRM LA PAZ TO 200 FT. NORTH. DESIGN ONLY

$200

L ORA000140 0INTERSECTION WIDENING. CROWN VALLEY PKWY- WEST OF CABOT TO I-5 SB RAMPS. ADD WB THROUGH LANE/ LT AND RT LANES ON CROWN VALLEY PKWY/CABOT AND CORWN VALLEY PKWY/FORBES.

$3,500

L ORA000147 0BNSF RWY LINE (PLACENTIA TO IMPERIAL HY) ALONG CROWTHER/ORANGETHORP E. GRADE SEP CORRIDR IMPVS AT 11 ARTERIAL STS INCL P/E, PGM MGMT, PRJ RPT, EIR, RW & CONST & XING CLSURE/PED BRI

$83,228

L ORA000171 0 MEMORY LANE BRIDGE (PACIFIC AVE TO CITY DRIVE) WIDENING FROM 4 TO 6 LANES. $4,141

L ORA000173 0 LA PAZ RD (MURILANDS/I-5 TO CHRISANTA DR) WIDENING FROM 4 TO 6 LANES. $9,700

L ORA000177 0 RED HILL @ EDINGER AVE/RR TRACKS. GRADE SEPARATION $32,241

L ORA020115 0CABOT ROAD BRIDGE TO CAMINO CAPISTRANO -PROVIDE ALT ACCESS TO METROLINK STATION & RELIEF TO INTERCHANGE AT I-5 & AVERY

$2,678

L ORA020501 0HBRR LOCAL BRIDGE LUMP SUM FOR 2004/2005 - (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3).

$24,797

L ORA020503 0DANA POINT - SEA TERRACE PARK RECREATIONAL TRAILS IN SEA TERRACE PARK (PCH/NIGUEL RD) - EXISTING TRAIL IMPVS & NEW TRAIL CONSTRUCTION

$1,004

L ORA020506 0 CITY OF ORANGE - SANTA FE DEPOT SPECIFIC PLAN UPDATE $232

L ORA020507 0ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) - REDUCE ORANGE COUNTY CONGESTION (ROCC) PROGRAM (INCLUDES STUD-IES AND PLANNING)

$1,500

L ORA02925 0BNSF RAILWAY LINE (RAYMOND TO PLACENTIA) ALONG SS OF ORANGETHORPE. GRADE SEPARATION/ CORRIDOR IMPROVEMENTS AT 3 ARTERIAL STREETS.

$216,469

Page 51: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 49

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L ORA040602 0STATE COLLEGE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON STATE COLLEGE BLVD AT THE BNSF RR TRACKS (COM-MONWEALTH AVE TO KIMBERLEY AVE)

$76,683

L ORA040604 0EL TORO RD: IMPROVEMENTS OF EL TORO RD FROM 6 TO 8/9 LANES AND ASSOCIATED INTERSECTIONS (I-5 TO JUTEWOOD PL/CORNE-LIUS DR)

$27,959

L ORA040605 0 NEWPORT BEACH - JAMBOREE RD WIDENING (BETWEEN BAYVIEW WAY & MACARTHUR BLVD) FROM 6 TO 8 LANES $1,631

L ORA040606 0 YORBA LINDA - WEIR CANYON RD WIDENING ADD 1 NB LANE (FROM SR91 TO LA PALMA) $1,533

L ORA070501 0CITY OF IRVINE LONG RANGE TRANSPORTAITON PLAN OUTREACH INITIATIVE - EXTENSIVE OUTREACH TO CREATE A CONSENSUS VISION FOR A MULTI-MODAL TRAN SYSTEM

$60

L ORA080601 0PLANNING STUDY FOR THE TRANSIT ORIENTED DEVELOPMENT - LINKING TRANSIT PLANNING AND LAND USE IN NORTH ORANGE COUNTY (OCCOG ROCC)

$270

L ORA080602 0PLANNING STUDY TO EVALUATE THE LAND USE IN THE GATEWAY SPECIFIC PLAN (GSP) INCLUDING TRANSIT ORIENTED DEVELOPMENT AND MIXED USE DEVELOPMENT (OCCOG ROCC)

$203

L ORA080603 0THE CITY'S CONSULTANT WILL PREPARE A PROGRAM ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE SANTA FE SPECIFIC PLAN UPDATE (OCCOG ROCC)

$223

L ORA080604 0PLANNING FOR TRANSIT IN STANTON: CITYWIDE POLICIES AND SITE SPECIFIC DEVELOPMENT STANDARDS FOR TRANSIT-ORIENTED PROJECTS. (OCCOG ROCC)

$264

L ORA100501 0THORTON PARK RECREATION TRAIL REFURBISHMENT. INCLUDING REGRADING, REPLACE ASPHALT & CONCRETE, INSTALLATION OF EDGING.

$158

L ORA100506 0 SIGNAL UPGRADES ON AVENIDA DE LAS FLORES, MELINDA ROAD, AVENIDA DE LAS BANDERAS, AND ALMA ALDEA, IN RSM. $145

L ORA100508 0 DEVELOP AND IMPLEMENT AN ITS MASTER PLAN IN ANAHEIM $1,000

L ORA100509 0 DESIGN AND IMPLEMENT HARBOR BOULEVARD ITS IN GARDEN GROVE. $1,320

L ORA102905 0CONSTRUCT A BERM & WALL ALONG THE SOUTH SIDE OF ESPERANZA RD FROM IMPERIAL HWY TO WEIR CNYN RD/YORBA LINDA BLVD INCLUDING LANDSCAPING

$4,360

L ORA110601 0SANTIAGO CREEK BIKE TRAIL ENHANCMENT PROJECT. EXTEND TRAIL BY 600FT TO RUN UNDER BROADWAY AND I-5. REFURBISH EXISTING TRAIL FROM MAIN TO SANTIAGO PARK

$303

L ORA110602 0 WIDENING OF LAGUNA CANYON / I-405 OVERCROSSING FROM 2 LANES TO 4 LANES $12,031

L ORA110631 0DEVELOPMENT OF A COUNTYWIDE STANDARD PAVEMENT MANAGEMENT SYSTEM - EVALUATION AND SELECTION OF SINGLE STAN-DARD PAVEMENT MANAGEMENT SYSTEM SOFTWARE FOR COUNTYWIDE USE

$224

L ORA110632 0 1% TRANSIT ENHANCEMENTS - BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (MISSION VIEJO) $878

L ORA110634 0 1% TRANSIT ENHANCEMENTS - BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (OCTA) $4,407

L ORA120305 0 LA PALMA - LA PALMA AVE/DEL AMO BLVD OVER COYOTE CRK - REALIGN EXISTING RDWY TO STRAIGHT; DEMO & RECONSTRUCTION $800

Page 52: Project List - Southern California Association of Governments

50 P R O J E C T L I S T I N G R E P O R T

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L ORA120309 0 SAN JUAN CAPISTRANO - LA NOVIA BRIDGE WIDENING, SAN JUAN CREEK TO CALLE ARROYO, FROM 2 - 4 LANES $9,969

L ORA120310 0 WESTMINSTER - GOLDENWEST BRIDGE WIDENING OVER I-405, ADD 1 SB LN (5 TO 6 LNS) $1,450

L ORA120315 0IRVINE - SAND CANYON @ I-5 (ADD 3RD AND 4TH NB AND SB THRU LNS ON SND CYN; IMP EB APPROACH ADD 2 LFT TRN LNS, 1 THRU LN, & 1 RT TRN LN)

$7,364

L ORA120316 0LAGUNA NIGUEL - CROWN VALLEY PKWY WIDENING (WIDEN SB FROM FORBES TO I-5 ON RAMP; ADD DED RT TRN LN FOR SB I-5 ON RAMP & DED RT TRN LN FOR NB ON RAMP)

$10,109

L ORA120317 0 ORANGE - CITY OF ORANGE STATION - CONSTRUCT GRADE-SEPARATED PEDESTRIAN CROSSING $8,000

L ORA120319 0 BREA - VALENCIA/ROSE INTERSECTION IMPV - ADD LFT TRN LN AND THROUGH LANE IN EB & WB, WB RT TRN LN $2,093

L ORA120330 0SEAL BEACH - SEAL BEACH BLVD, OVERPASS BRIDGE LENGTHENING AND RAMPS REALIGNMENT (FROM BEVERLY MANNTER RD TO OLD RANCH PKWY)

$2,000

L ORA120351 0ITS INTERCONNECT 21 SIGNALS FROM THE WEST SIDE OF GARDEN GROVE TO THE CITY'S TMC WITH FIBER OPTICS -- PROJECT CLOSES 3.5 MILE GAP

$2,024

L ORA120360 0 ORANGE COUNTY - PLANNING PROGRAMMING AND MONITORING AB3090 -- PAYBACK PROJECT $3,500

L ORA120501 0 ANAHEIM - BROOKHURST STREET WIDENING (FROM 4 TO 6 LANES; S/O BALL TO N/O KATELLA) $13,025

L ORA120502 0 COSTA MESA NEWPORT BLVD WIDENING - 1 LN EA DIR (FROM 19TH TO HARBOR; FRM 6 TO 8 LNS) $2,559

L ORA120503 0 COSTA MESA - NEWPORT BLVD/17ST INTERSECTION IMPV - ON NEWPORT ADD 4TH NB THRU LN AND SB RT TRN LN $2,406

L ORA120504 0ORANGE COUNTY - LA PATA AVENUE WIDENING & GAP CLOSURE (WIDEN FROM 2 TO 4 LNS (ORTEGA HWY TO RD TERMINUS); GAP CLOSURE - ADD 4 LNS (EXISTING TERMINUS TO CALLE SALUDA)

$38,560

L ORA120505 0 ORANGE COUNTY - ALTON PARKWAY EXTENSION (IRVINE) (IRVINE BLVD TO CMMERCENTER DR; FRM 0 TO 6 LNS) $40,000

L ORA120508 0 IRVINE - MAC ARTHUR & RED HILL INT IMPV (ADD 3RD WB, EB, NB, SB THRU LNS & NB LFT TRN LN (FRM 4 TO 6 LNS) $28,336

L ORA120510 0 IRVINE - BARANCA & RED HILL INT IMPV (ADD 4TH WB, SB, EB, NB THRU LNS & EB/WB LFT TRN LNS & WB DEDICATED RT TRN LN) $15,475

L ORA120511 0 IRVINE - JAMBOREE RD @ I-5/MICHELLE (ADD 4TH SB AND NB THRU LANES) $10,100

L ORA120512 0 IRVINE - CULVER DR @ I-5/TRABUCO (ADD 5TH LANE ON I-5 SB OFFRAMP; 3RD NB THRU LN; 2ND WB RT TRN LN $2,885

L ORA120514 0 IRVINE - TRABUCO RD @ I-133 (ADD NEW ON-RAMPS AND OFF RAMPS AT TRABUCO & I-133) $71,875

L ORA120515 0 LA HABRA - LAMBERT RD WIDENING (FRM EUCLID TO CYPRESS ST; FRM 4 TO 6 LNS) $10,241

L ORA120518 0 SANTA ANTA - MACARUTHUR BLVD WIDENING (WIDEN NB ONRAMP (FROM EB MACARTHUR) TO SR-55 BY ADDING 1 LN) $1,841

L ORA120519 0 SANTA ANA - MACARTHUR BLVD WIDENING (WIDEN SB ONRAMP (FRM EB MACARTHUR) TO SR-55 BY ADDING 1LN) $1,499

Page 53: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 51

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L ORA120520 0 SANTA ANA - GRAND AVENUE WIDENING (FRM 1ST TO 4TH; FRM 2 TO 3 LNS ) $12,437

L ORA120521 0 SANTA ANA - FIRST STREET WIDENING (FRM SUSAN TO FAIRVIEW; FRM 4 TO 6 LNS) $5,751

L ORA120522 0 HUNTINGTON BEACH - ATLANTA AVE WIDENING (FRM FIRST TO DELEWARE; FRM 2 TO 4 LNS) $3,623

L ORA120523 0 PLACENTIA - RITCHFIELD AVE WIDENING (FRM ORANGETHORPE TO SCL; FRM 2 TO 4 LNS) $347

L ORA120524 0 PLACENTIA - ORANGETHORPE AVE WIDENING (FRM MELROSE AVE TO ECL; FRM 4 TO 6 LNS) $1,188

L ORA120525 0SAN JUAN CAPISTRANO - DEL OBISPO WIDENING (WIDEN FRM ALIPAZ TO CAMINO CAPISTRANO; TO ACCOMMODATE BIKE LANES AND SIDEWALK IN EACH DIRECTION)

$6,419

L ORA120526 0 FULLERTON - STATE COLLEGE BLVD WIDENING (ORANGETHORPE TO KIMBERLY; FRM 4 TO 6 LNS) $759

L ORA120527 0 ORANGE - MAIN ST (WIDEN FRM CULVER TO 260' N/O PALMYRA; FRM 4 TO 6 LNS) $4,043

L ORA120528 0 FULLERTON - GILBERT ST WIDENING (FRM CASTLEWOOD TO NCL; FRM 2 TO 4 LNS) $1,940

L ORA120534 0 ORANGE COUNTY - COUNTYWIDE GRADE SEPARATION PROGRAM (ENVIRONMENTAL & PREMLIMINARY ENGINGEERING ONLY) $251,803

L ORA120538 0 ORANGE COUNTY - HOV DROP RAMP STUDY $43,784

L ORA125 0BRISTOL ST (WARNER TO MEMORY LANE) WIDEN FROM 4 TO 6 LANES (IMPV AT BRISTOL/WARNER (ADD NB/EB/SB THRU LNS; WB RT TRN LN) AND BRISTOL/FIRST (ADD NB/SB THRU LNS; SB LFT/RT/TRN LNS

$257,005

L ORA151 0 BOLSA CHICA RD (DUNCANNON TO RTE 405) WIDEN FROM 4 TO 6 LANES. $350

L ORA48 0 JEFFERY RD (IRVINE CENTER DR TO WALNUT) RAILROAD GRADE SEPARATION. FROM 4 TO 6 LANES. $44,849

L ORA55013 0COUNTYWIDE: ROADWAY REHABILITATION OF MAJOR AND PRIMARY ARTERIALS NON-CAPACITY ADDING IMPROVEMENTS (PROJECTS CONSISTENT W/40 CFR PART 93.126,127,128,EXEMPT TABLES 2 & 3

$128,863

L ORA55024 0 VALLEY VIEW ST (LINCOLN TO ARTESIA) WIDEN FROM 6 LANES TO 8 LANES. $1,410

L ORA55031 0 HARBOR BLVD SMART STREET (SR-91 TO I-405) WIDENING FROM 4 TO 6 LANES AND INTERSECTION IMPROVEMENTS. $25,663

L ORA55244 0TUSTIN RANCH RD (WALNUT AVE TO EDINGER AVE) NEW 6 LANE MAJOR ARTERIAL WITH NEW GRADE SEPARATION AT EDINGER AVE. (1/2 MILE GAP)

$24,728

L ORA990451 0 MULTI-USE TRAIL IN SAN CLEMENTE CONSTRUCTED PARALLEL TO RAILROAD TRACKS. 2.6 MILES LONG. $7,205

L ORA990452 0TUSTIN BRANCH RAIL TRAIL ALONG THE SANTIAGO CREEK FROM TUSTIN ST. TO WALNUT AVE. AND CITY OWNED RW FROM WALNUT AVE. TO COLLINS AVE. FILLS 2 MILE GAP IN A REGIONAL TRAIL.

$2,391

L ORA990906 0LUMP SUM. TEA FUNDS FOR BICYCLE AND PEDESTRIAN FACILITY PROJECTS THROUGHOUT ORANGE COUNTY (PROJECTS ARE CONSIS-TENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$22,602

Page 54: Project List - Southern California Association of Governments

52 P R O J E C T L I S T I N G R E P O R T

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L ORA990907 0LUMP SUM. TEA FUNDS FOR LANDSCAPING AND OTHER SCENIC IMPROVEMENTS THROUGHOUT ORANGE COUNTY (PROJECTS CONSIS-TENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$18,832

T ORA000104 0TRANSITWAY IMPROVEMENTS AT IRVINE TRANSPORTATION CENTER; BUILD 900 SPACE PARKING STRUCTURE, INCLUDING ENVIRON-MENTAL, DESIGN AND CONSTRUCTION.

$27,075

T ORA020106 0 PREVENTATIVE MAINTENANCE (OCTA) $109,396

T ORA020113 0 FULLERTON TRAIN STATION - PARKING STRUCTURE, PHASE I AND II. TOTAL OF 500 SPACES (PPNO 2026) $41,969

T ORA020118 0PURCHASE REPLACEMENT PARATRANSIT VANS (353) - (79) IN FY06/07, (67) IN FY07/08, (96) IN FY09/10, (32) IN FY10-11 AND (79) IN FY 11/12

$44,831

T ORA021202 0 BUS OPERATING ASSISTANCE FTA9 - FOR PARATRANSIT - MISSION VIEJO - UZA $8,777

T ORA021203 0 PREVENTATIVE MAINTENANCE (MISSION VIEJO) $76,563

T ORA021204 0 '1%' TRANSIT ENHANCEMENTS BUS STOP ADA IMPROVEMENTS COUNTYWIDE (MISSION VIEJO) $115

T ORA030612 0PLACENTIA TRANSIT STATION - E OF SR-57 AND MELROSE ST AND N OF CROWTHER AVE. CONSTRUCT NEW METROLINK STATION AND RAIL SIDEING

$36,196

T ORA041501 0PURCHASE (52)STANDARD 30FT EXPANSION BUSES - ALTERNATIVE FUEL - (12) IN FY05-06, (5) IN FY06-07, (2) IN FY07-08, (5) IN FY08-09, (27) IN FY09-10, AND (1) IN FY10-11

$40,036

T ORA041502 0PURCHASE (45) PARATRANSIT EXPANSION MINIVANS - (4) IN FY07-08, (11) IN FY08-09, (12) IN FY09-10, AND (8) IN FY10-11 AND (10) IN FY11-12

$4,916

T ORA090302 0OCTA SHARE OF PURCHASE OF METROLINK CARS & LOCOS, UP TO 87 CARS/CABS ORDERED IN FY 06 & IN FUTURE YRS, UP TO 22 CARS/CABS, UP TO 11 LOCOS ORDERED BY FY06, & UP TO 4 LOCOS IN FUTURE

$147,524

T ORA110501 0BUS RAPID TRANIST - 28MI FIXED BRT FRM BREA MALL TO IRVINE TRANS CNTR. INCLUDES STRUCTURES, ROLLING STOCK, AND FEEDER SVC & IBC SHUTTLE- CNG SHUTTLES FROM JWA TO IBC.

$55,100

T ORA110608 0 EASTER SEALS SOUTHERN CALIFORNIA - PURCHASE (1) REPLACEMENT MODIFIED VAN FOR PARATRANSIT SERVICE (FY07 CYCLE) $51

T ORA110609 0 GOLDEN RAIN FOUNDATION LAGUNA WOODS PRUCHASE (1) REPLACEMENT LARGEST BUS FOR PARATRANSIT SERVICE (FY07 CYCLE) $51

T ORA110610 0 ST JUDE HOSPITAL - PURCHASE (2) REPLACEMENT MINI VANS FOR PARATRANSIT SERVICE (FY07 CYCLE) $87

T ORA110611 0 CITY OF LA HABRA SENIOR TRANSPORTATION PROGRAM - PURCHASE 2 REPLACEMENT PARATRANSIT VEHICLES $195

T ORA110612 0 CITY OF YORBA LINDA SENIOR MOBILITY PROGRAM $52

Page 55: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 53

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T ORA110613 0 SECURITY SURVEILLANCE AND MONITORING EQUIPMENT FOR TRANSIT $5,528

T ORA110614 0CAPITAL LEASE COSTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT ANAHEIM MAINTE-NANCE BASE

$9,121

T ORA110615 0CAPITAL LEASE COSTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT GARDEN GROVE MAIN-TENANCE BASE

$8,740

T ORA110616 0 BUS RAPID TRANSIT (BRT) - PURCHASE (3) 40' EXPANSION VEHICLES FOR SERVICE IN ORANGE COUNTY $1,009

T ORA110617 0ABRAZAR - PURCHASE (1) SMALL BUS, (2) MINVANS, (8) RADIOS, BASE STATION, COMPUTER EQUIPMENT TO EXPAND PARATRANSIT SERVICE (FY07 CYCLE)

$270

T ORA110618 0FTA SECTION 5317 NEW FREEDOMS VARIOUS PROJECTS AND TRANSPORTATION SERVIES BEOND THOSE REQUIRED BY ADA, INCLUDING VOUCHER PROGRAMS

$14,906

T ORA110619 0FTA SECTION 5316 JOBS ACCESS REVERSE COMMUTE (JARC) VARIOUS PROJECTS TO INCREASE TRANSPORTATION ACCESS TO JOBS FOR LOW INCOME INDIVIDUALS, INCLUDING VOUCHER PROGRAMS AND VANPOOLS

$19,804

T ORA110621 0 INTERMODAL PARK AND RIDE FACILITY AT DISCOVERY, CA $372

T ORA110624 0 SANTA ANA TRANSIT TERMINAL FACILITY IMPROVEMENTS TO INCREASE VENTILATION / SAFETY $1,007

T ORA110625 0VARIOUS PLANNING & TRANSPORTATION PROJECTS DETERMINED BY THE ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) TO REDUCE CONGESTION IN OC, INCLUDING SMARTH GROWTH AND INCREASED TRANSIT

$1,047

T ORA110633 0 RIDESHARE VANPOOL PROGRAM - CAPITAL LEASE COSTS $13,815

T ORA120311 0OCTA SHARE - EASTERN AREA ROLLING STOCK MAINT FACILITY IN COLTON BETWEEN MILL & OAK ST ON RR LINE (LAOC8369 & RIV030634)

$8,300

T ORA120318 0 ANAHEIM REGIONAL TRANS INTERMODAL CENTER (ARTIC) $1,106,500

T ORA120356 0 PURCHASE (64) STANDARD 30FT REPLACEMENT BUSES - ALTERNATIVE FUEL - (27) IN FY06/07, (25) IN FY08-09, AND (12) IN FY 11-12 $29,511

T ORA120357 0 BUS RAPID TRANSIT (BRT) GUIDEWAY PA&ED & PS&E PHASE - ORANGE COUNTY $5,363

T ORA120529 0 PURCHASE (14) REPLACEMENT MINIVANS - (10) IN FY09-10 AND (4) IN FY 11/12 $974

T ORA120531 0BUS RAPID TRANIST (HARBOR BOULEVARD BRT) - 19MILE FIXED RT BRT BETWEEN FULLERTON AND COSTA MESA; INCLUDES STRUC-TURES AND ROLLING STOCK

$33,300

T ORA120532 0BUS RAPID TRANIST (WESTMINSTER/17TH BRT) - 22MILE FIXED RT BRT BETWEEN SANTA ANA AND LONG BEACH; INCLUDES STRUC-TURES AND ROLLING STOCK

$36,600

Page 56: Project List - Southern California Association of Governments

54 P R O J E C T L I S T I N G R E P O R T

ORANGE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T ORA120533 0 ORANGE COUNTY METROLINK MAINTENANCE FACILITY FEASIBILITY STUDY - (STUDY ONLY) $4,559

T ORA120536 0TUSTIN RAIL STATION PARKING EXPANSION - CONSTRUCTION OF 191 NEW SPACES (281 EXISTING SPACES + 191 NEW SPACES = 472 TOTAL SPACES)

$10,000

T ORA120537 0 LAGUNA NIGUEL RAIL STATION PARKING EXPANSION - CONSTRUCTION OF 562 NEW SPACES (281 EXISTING + 562 NEW = 843 SPACES) $63,000

T ORA174 0 BUS OPERATING ASSISTANCE FTA9 - FOR PARATRANSIT (OCTA) $204,693

T ORA187 0 DEBT SERVICE FOR 1990 AND 1993 COPS FUNDING OF CAPITAL PROJECTS $2,600

T ORA1870 0PURCHASE (127) STANDARD 40FT REPLACEMENT BUSES - ALT FUEL (14) IN FY06-07, (28) IN FY07-08, (19) IN FY08-09, (2) IN FY09-10, (25) IN FY10-11, (39) IN FY11-12

$125,965

T ORA199 0 OPERATING ASSISTANCE $10,156

T ORA37111 0CAPITAL MAINTENANCE ON METROLINK SYSTEM. (REHAB OF TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES, FACILITIES, AND ROLLING STOCK)

$33,149

T ORA37115 0 OPERATING ASSISTANCE FOR COMMUTER RAIL $139,146

T ORA37122 0 VEHICLE MODIFICATIONS/MISC, REPLACE SUPP VEHICLES AND SUPPORT EQUIP, BUS AND FACILITY EQUIPMENT $8,047

T ORA55022 0 REPLACEMENT CLEAN AIR AND FESTIVAL TROLLIES $2,370

T ORA55134 0 FACILITY MODIFICATIONS FOR BUS TRANSIT $372

T ORA55241 0 PURCHASE (150) STANDARD 40 FT EXPAN ALT FUEL BUSSES - (17) IN FY06-07, (44) IN FY07-08, (56) IN FY08-09, AND (33) IN FY09/10 $45,788

T ORA55286 0 COMMUTER RAIL STATION (DALE STREET AND MALVERN) IN BUENA PARK. CONSTRUCT NEW RAIL STATION. 308 PARKING SPACES. $13,060

T ORA65002 0 RIDESHARE SERVICES RIDEGUIDE, DATABASE, CUSTOMER INFO, AND MARKETING (ORANGE COUNTY PORTION). $4,483

T ORA981102 0 '1%' TRANSIT ENHANCEMENTS BUS STOP ADA IMPROVEMENTS COUNTYWIDE (OCTA) $521

* S=State Highway, L=Local Highway, T=Transit

Page 57: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 55

RIVERSIDE COUNTY RTIP PROJECTS

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S 45580 10NEAR PALM SPRINGS ON I-10 AT GENE AUTRY TRAIL/PALM DRIVE IC FROM I-10 IC SOUTH TO SALVIA ROAD - WIDEN 2 TO 6 LANES, I-10 IC IMPROVS. MODIFY RAMPS FROM 1 TO 2 LANES

$38,603

S 45590 10ON I-10 IN CATHEDRAL CITY AT DATE PALM DR IC: MODIFY IC/WIDEN OC & ARTERIAL INCLUDING UPRR BRIDGE 2 TO 6 LNS FROM N. RAMPS SOUTH TO VISTA CHINO & RAMPS FROM 1 TO 2 LNS (EA: 45590K)

$31,149

S 45600 10ON I-10 NEAR RANCHO MIRAGE FROM 1.5 KM WEST TO 0.9 KM EAST OF RAMON RD IC - CONSTRUCT BOB HOPE DR EXTENSION (6 LANES) W/ A NEW DIAMOND IC & MODIFY RAMON RD IC & RAMPS (PPNO: 0007D)

$67,844

S 47520 10AT I-10/JEFFERSON ST IC NEAR INDIO, RECONSTRUCT/REALIGN EXISTING IC 2 TO 6 LANES & WIDEN JEFFERSON ST NON-CAPACITY OPERATIONAL IMPROVEMENTS (EA: 475200, PPNO: 0053A)

$73,404

S RIV010210 10ON I-10 AT & E/O APACHE TRAIL - CONSTRUCT NEW MORONGO PKWY IC (4 LNS, RAMPS - 2 LNS), CONSTRUCT AUX LANE, WIDEN APACHE TRAIL 3 TO 5 LNS, WIDEN SEMINOLE DR 2 TO 5 LNS (EA: OA650G)

$30,000

S RIV030901 10ON I-10 (5.5 KM E/O DILLON RD & 14.6 KM W/O CACTUS CITY SRRA) CONSTRUCT 6 LN MCNAUGHTON PKWY IC (3 LNS EACH DIR.), ENTRY RAMPS (1 LN) & EXIT RAMPS (2 LNS AT ARTERIAL) (EA: 45210K)

$35,415

S RIV031208 10AT I-10/MONTEREY AVE IC - RECONFIGURE IC: CONSTRUCT NEW WB ENTRY RAMP FROM VARNER RD AND REALIGN/RELOCATE WB EXIT RAMP (EA: 0F050)

$8,512

S RIV031209 10AT I-10/PORTOLA AVE: CONSTRUCT NEW 6 LN (3 EA DIR) PORTOLA AVE IC & RAMPS FROM DINAH SHORE TO VARNER INCLUDING BRIDGE OVER UPRR & REALIGN/WIDEN VARNER 2 TO 4 LNS (EA: 0F120K)

$71,858

S RIV060112 10AT I-10/SUNSET AVE UC - RAMP/GRADE MOD: LOWER SUNSET AVE & RAMPS GRADE, ADD NB RIGHT-TURN LN TO EB ON RAMP, RECON-STRUCT SIDEWALKS, RECONSTRUCT RAMP TERMINALS (EA: 33470K)

$10,942

S RIV060115 10AT I-10/OAK VALLEY PKWY IC: RECONSTRUCT/WIDEN IC FROM 2 TO 6 LNS & WIDEN RAMPS, ADD NEW EB/WB ENTRY LOOP RAMPS (2 LNS) , ADD EB/WB AUX LNS (EA: 0G280G)

$12,169

S RIV060116 10I-10/CHERRY VALLEY BLVD IC: RECONSTRUCT/WIDEN 2 TO 6 LNS, RAMPS (1- 2 & 1-3 LNS), ADD WB/EB AUX LNS, LEFT-TURN POCKET LNS & INTERSECTION IMPROVEMENTS. (EA: 0G170G)

$32,500

S RIV060117 10I-10/SINGLETON RD IC: RECON/WIDEN IC 2 TO 6 LNS & RAMPS-- ENTRY RAMPS: EB (1-2 LNS), ADD WB (2 LNS); EXIT RAMPS: WB (1-3 LNS), ADD EB EXIT (3 LNS), ADD LEFT-TURN LNS (EA: 0F980K)

$28,000

S RIV62032 10IN INDIO ON I-10 AT MADISON ST - CONSTRUCT NEW 4 LANE IC & RAMPS (2 LANES) AND WIDEN MADISON ST 2 TO 4 LANES FROM AVENUE 42 TO APPROX 600' BEYOND INDIO BLVD

$15,000

S RIV62036 10ON I-10 AT INDIAN AVE IC NEAR PALM SPRINGS - WIDEN OC 2 TO 6 LANES FROM 20TH AVE TO GARNET AVE AND RAMPS 1 TO 2 LANES (TEA21-#377 ) (EA: 45570, PPNO: 0007G)

$35,098

Page 58: Project List - Southern California Association of Governments

56 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S 991202 15FRENCH VALLEY PKWY (FVP) - PHASE 1: DESIGN & CONSTRUCT FVP (I-15 - JEFFERSON), SB EXIT RAMP (1 LN), SB AUX LANE (FVP - WINCHESTER RD) & WIDEN WINCHESTER SB EXIT RAMP (1 TO 2 LNS)

$18,142

S RIV010204 15AT I-15/CALIFORNIA OAKS RD/KALMIA ST IC - RECONFIGURE RAMPS (CONSTRUCT NB/SB LOOP ON RAMPS, RELOCATE SB OFF RAMP), WIDEN CAL OAKS 4 TO 6 LNS FROM UC TO CAL OAKS PLAZA (EA: 0A490)

$37,697

S RIV010206 15AT I-15/RAILROAD CYN RD IC: RECONSTRUCT/WIDEN UC 2 TO 4 LNS (SUMMERHILL DR TO CASINO RD), RECONFIGURE RAMPS, ADD AUX LNS & NEW NB ENTRY + SB EXIT RAMPS (EA: 0A440K)

$45,000

S RIV010207 15IN CORONA AT I-15/ONTARIO AVE IC - WIDEN SB ON & NB OFF RAMPS FROM 2 TO 3 LANES AND WIDEN ONTARIO AVE FROM 4 TO 6 LANES FROM COMPTON AVE TO STATE STREET

$3,429

S RIV010208 15NEAR CORONA AT I-15/CAJALCO RD IC - RECONSTRUCT/REALIGN & WIDEN CAJALCO RD FROM 2 TO 6 LANES FROM TEMESCAL CYN RD TO BEDFORD CYN RD & RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES.

$55,000

S RIV011233 15AT I-15/LIMONITE AVE IC - WIDEN IC 4 TO 6 LNS, RAMPS 1 TO 2 LNS, & WIDEN LIMONITE AVE FROM HAMNER TO WINEVILLE 4 TO 6 LNS (APPROX 1 MI) (EA: 0E150K)

$20,171

S RIV031215 15FRENCH VALLEY PKWY IC/ARTERIAL PHASES: CONSTRUCT 6 LN IC (JEFFERSON TO YNEZ) & RAMPS, NB/SB AUX LN, CD LNS (3 LNS NB & SB) & MODIFY WINCHESTER RD IC (I-215 PM: 8.2-9.5) (EA:43270)

$122,704

S RIV050531 15ON I-15 S/O TEMECULA - CONSTRUCT NEW EASTERN BYPASS/I-15 IC (4 LANES, 2 LANES IN EACH DIRECTION) & RAMPS (1 LANE) WITH EASTERLY 4 LANE ARTERIAL CONNECTION APPPROXIMATELY 2 MILES AT NEW EASTERN BYPASS ARTERIAL/IC BETWEEN PM 0.0 TO 2.0 ON I-15

$45,920

S RIV050532 15ON I-15 NEAR THE CITY OF NORCO - CONSTRUCT NEW SCHLEISMAN RD IC (6 LANES) AND RAMPS (1 LANE) (EA: 0E140K) (PA&ED/PRE-DESIGN)

$27,000

S RIV060105 15AT I-15/EL CERRITO RD IC - RECONSTRUCT/MODIFY RAMPS: WIDEN SB ENTRY AND NB EXIT RAMPS 1 TO 2 LANES, INSTALL NEW RAMP METER AND TRAFFIC SIGNALS

$2,002

S RIV060109 15I-15/SR74 (CENTRAL AVE) JCT IC: MODIFY/WIDEN 2 TO 6 LNS (COLLIER-CAMBERN) & 2 LEFT-TURN LNS, RAMPS 1 TO 2 LNS, ADD NB/SB EXIT LOOP RAMPS, NB/SB AUX LNS, & SIGNALS (EA: 0F310K)

$85,000

S RIV061163 15ON I-15 (R0.0 TO R41.8) & I-215 (R8.4 TO R38.5): INSTALL APPROX. 75 VEHICLE DETECTION STATIONS FOR IMPROVED INCIDENT RE-SPONSE, TRAFFIC DATA COLLECTION, & TRAVELER INFO (EA: 0J710G)

$2,300

S RIV62031 15I-15/SR79 SO. IC: REMOVE SB EXIT RAMP, ADD NEW SB EXIT LOOP RAMP, REALIGN SB EXIT RAMP (2 LNS) W/AUX LN. WIDEN SB ENTRY 1 TO 3, NB EXIT 1 TO 4, NB ENTRY 1 TO 3 & RECON SR79S.

$30,634

S RIV62034 15I-15/CLINTON KEITH RD IC: RECONSTRUCT/WIDEN OC 2 TO 6 LNS & RAMPS 1 & 2 LNS TO 3 & 4 LNS, ADD NB/SB AUX LNS PRIOR TO & AFTER EXIT/ENTRY RAMPS & LEFT-TURN LNS (EA: 0F580K)

$21,816

S 32300 60AT SR60/NASON ST IC - MODIFY/RECONSTRUCT IC & NASON ST FROM ELDER TO FIR: REALIGN EB, WB EXIT PLUS EB & WB ENTRY RAMPS, ADD EB & WB RAMP HOV LNS, & ADD AUX LANES (EA: 32300)

$18,544

Page 59: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 57

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S RIV041052 60SR60/NASON ST IC + MORENO BEACH DR IC: WIDEN NASON OC 2 TO 6 LNS; MODIFY MORENO BEACH DR IC - WIDEN 2 TO 6 LNS, REALIGN/WIDEN RAMPS, ADD WB ON RAMP, ADD EB/WB AUX LN (EA: 32301K)

$60,200

S RIV050535 60ON SR60 APPROXIMATELY 1 MILE W/O JCT SR60/I-10 - CONSTRUCT NEW POTRERO BLVD IC (4 LANES) & RAMPS (1 LANE) AND 4 LANE CONNECTING ROAD FROM SR60 TO SR79 (EA: 34140) (PA&ED/PRE-DESIGN)

$106,512

S RIV990701 60SR60/VALLEY WAY IC - RELOCATE OFF-RAMP (1 TO 2 LANES) AND ADD NEW EB ON-RAMP (2 LANES), SIGNALS & WIDEN VALLEY WAY/MISSION BLVD INTERSECTION.

$9,100

S RIV050517 74ON SR74 IN/NEAR HEMET FROM CALVERT AVE TO CALIFORNIA AVE: CURVE REALIGNMENT & PAVEMENT WIDENING (NON CAPACITY) INCLUDING INTERSECTION/LEFT TURN IMPROVEMENTS (EA 0C6900)

$11,161

S RIV990709 74 IN THE CITY OF PERRIS - INSTALL NEW SIGNAL AT 4TH ST (SR74) AND REDLANDS AVE $295

S 46460 79 IN WESTERN RIVERSIDE COUNTY ON STATE ROUTE 79 - WIDEN FROM 2 TO 4 LANES FROM THOMPSON RD TO DOMENIGONI PKWY $36,407

S RIV62024 79SR-79 BETWEEN 2.0 KILOMETERS SOUTH OF DOMENIGONI PKWY TO GILMAN SPRINGS ROAD - ONSTRUCT 4-LANE ARTERIAL ON NEW ALIGNMENT (KP LIMITS 25.580 T0 52.304) (EA: 49400) (PA&ED/PRE-DESIGN COMPLETION 2008)

$1,568,225

S RIV62029 79AT HWY 79 SO AND LA PAZ ST: ACQUIRE LAND, DESIGN AND CONSTRUCT PARK-AND-RIDE LOT - 250 SPACES (FY 05 HR4818 EAR-MARK)

$1,392

S RIV060101 86AT SR86S/AIRPORT BLVD (AVE 56): CONSTRUCT NEW IC (3 LANE OC: 1 LANE EACH DIR + 1 MEDIAN LANE) AND RAMPS (1 LANE) FROM APPROX DESERT CACTUS DR TO 57TH AVE (EA: 47860, PPNO: 0078L)

$49,601

S RIV061159 86AT SR86S/AVE 50: CONSTRUCT 4 LN IC & RAMPS (1 LN), 4 LN BRIDGE OVER COACHELLA STORM DRAIN, NB & SB SR86S AUX LANES, REALIGN AVE 50, TYLER ST (EA: 0C970) (PA&ED ONLY)

$25,390

S 45661 91NEAR CORONA ON RTE 91 FROM GREEN RIVER DR IC TO RTE 71/91 SEPARATION - RECONSTRUCT/REPLACE IC INCLUDING OC WIDEN-ING 3 TO 6 LANES AND WB RAMPS WIDENING (PPNO:0076B)

$24,511

S RIV0084 91SR91/VAN BUREN BLVD IC - RECONSTRUCT/WIDEN RAMPS 2 TO 3 LNS (INCLDS WB HOV LANE), WIDEN OC 4 TO 6 LNS (ANDREW TO RUDICILL) & ADD NEW EB ONRAMP (2 LNS) AT INDIANA AVE (EA: 20320)

$44,882

S RIV010212 91ON SR91 - ADAMS TO 60/215 IC: ADD HOV LNS, AUX LNS (MADISON-CENTRAL), BRIDGE WIDENING & REPLACEMENTS, EB/WB BRAIDED RAMPS, IC MOD/RECONSTRUCT + SOUND/RETAINING WALLS

$286,953

S RIV010225 91AT LINCOLN AVE/SR91 - WIDEN RAMPS (ADD 1 LANE TO EB ENTRY AND 2 LANES TO EB & WB EXIT) PLUS CHANNELIZATION/SIGNAL IMPROVEMENTS TO LINCOLN AVE FROM PARKRIDGE AVE TO ONTARIO AVE

$2,874

S RIV050102 91GREEN RIVER RD LANDSCAPE ENHANCEMENTS: NEAR CORONA FROM 1.0 KM E/O ORANGE/RIVERSIDE CNTY LINE TO 1.35 KM W/O SR 71/91 SEP - INSTALL LANDSCAPE ENHANCEMENTS (EA: 45662, PPNO: 0072G)

$1,200

Page 60: Project List - Southern California Association of Governments

58 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S RIV060106 91AT SR91/SERFAS CLUB DR IC: WIDEN UC ARTERIAL (BTWN WARDLOW & FRONTAGE) 5 TO 6 LNS (FOR 2ND LEFT-TURN LN), ADD SB RIGHT-TURN LN TO WB ENTRY RAMP, & WIDEN EB EXIT RAMP 2 TO 3 LNS

$3,198

S RIV060107 91AT SR91/MAIN ST IC: WIDEN WB ENTRY RAMP AT INTERSECTION 2 TO 3 LNS; WIDEN SB N. MAIN ST 4 TO 6 LNS (PARKRIDGE TO N. CITY LIMITS) PLUS CHANNELIZATION, MEDIAN, & SIDEWALKS

$657

S RIV060118 91ON SR91 THROUGH CORONA: RESTRIPE EASTBOUND INSIDE SHOULDER TO PROVIDE AN AUXILIARY LANE FROM JCT SR91/71 TO SER-FAS CLUB DR (EA: 0H770)

$1,500

S RIV070308 91AT SR91/71 JCT: REPLACE EB 91 TO NB 71 CONNECTOR W/ DIRECT FLY-OVER CONNECTOR, CONSTRUCT EB CD LNS (GREEN RIVER TO SERFAS CLUB ICS), CONSTRUCT WB AUX LN (SERFAS TO JCT 71) (0F162)

$139,049

S RIV031222 95IN BLYTHE ON U.S. 95/INTAKE BLVD (LOCAL ARTERIAL PORTION) - WIDEN FROM 2 TO 4 LANES FROM HOBSON WAY TO 14TH ST & INSTALL SIGNAL AT HOBSON WAY/INTAKE BLVD (EA: BLYTHE, PPNO: 0096E)

$1,978

S RIV031210 111IN CATHEDRAL CITY ON SR111/EAST PALM CYN DR - WIDEN E. PALM CYN DR FROM 4 TO 6 LNS (AT WEST CATHEDRAL CYN CHANNEL BRIDGE) & CONSTRUCT MISSING GAP SIDEWALKS NEAR EAST & WEST CL

$4,300

S RIV031211 111IN INDIO ON SR111 - WIDEN SR111 FROM 4 TO 6 LANES, INSTALL SIGNALS, CONSTRUCT/ LANDSCAPE MEDIAN, AND STORM DRAIN IMPROVEMENTS FROM MADISON ST TO JEFFERSON ST

$3,600

S RIV031214 111IN LA QUINTA ON SR111 FROM WASHINGTON ST TO WEST CL - CHANNELIZATION/SAFETY IMPROVEMENTS: INSTALL CURB & GUTTER, SIDEWALK, HANDICAP RAMPS, RAISED CURB MEDIAN, & ROCK MITIGATION

$1,980

S 0121D 215ON I-215/SR91/SR60, RIV I215 COR IMPROV PROJ - FROM 60/91/215 JCT TO 60/215 SPLIT - WIDEN 6 TO 8 LNS, INCLUDING MAINLINE/IC IMPROVS, ADD HOV, AUX, & SB TRUCK CLIMB LN (EA: 3348U1)

$463,286

S RIV010203 215AT I-215/CLINTON KEITH RD IC - CONSTRUCT PARTIAL CLOVERLEAF: WIDEN OC 2 TO 6 LNS, RECONSTRUCT RAMPS (WIDENING TO EXISTING NB/SB DIAMOND RAMPS) & CONSTRUCT NEW NB/SB LOOP ON RAMPS

$35,668

S RIV011232 215AT I-215/SCOTT ROAD IC NEAR MURRIETA - RECONSTRUCT/WIDEN IC FROM 2 TO 6 LANES AND RAMPS FROM 1 TO 2 LANES (EA: 0A020)

$72,600

S RIV030642 215AB3090 REIMBURSEMENT PROJECT: EA - 33489G, PPNO - 0121P (FOR GARVEE 0121D - EL CERRITO DRIVE TO JCT 60/91/215 IC - CONSTRUCT IC, ADD 2 HOV LANES & SB TRUCK CLIMBING LANE)

$31,324

S RIV031219 215CETAP - WINCHESTER TO TEMECULA CORRIDOR: DEVELOP TIER II ENVIRONMENTAL DOC (PAED ONLY) ALONG I-15: SR79 SO TO JCT I-15/I-215, I-215: JCT I-15 TO NEWPORT RD, & FRENCH VALLEY PKWY

$1,265,230

S RIV050501 215I-215 AT SR74/G ST IC: REPLACE 2 LN OC W/ 4 LN OC & WIDEN REDLANDS AVE (4TH TO SAN JACINTO), WIDEN/REALIGN RAMPS, MODIFY 4TH ST (G TO EASTERLY TERMINUS) & RECONSTRUCT INTERSECTIONS

$35,930

S RIV050533 215ON I-215 AT CACTUS AVE IC NEAR MORENO VALLEY - WIDEN UNDER CROSSING ARTERIAL 4 TO 6 LANES BETWEEN RAMPS & MODIFY RAMPS (EA: OE760G) (PA&ED/PRE-DESIGN)

$33,000

Page 61: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 59

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S RIV050534 215I-215/NEWPORT RD IC: RECON/WIDEN 4 TO 6 LNS (HAUN-ANTELOPE), ADD NB & SB 2 LN LOOP ON RAMPS, RECON NB+SB ON/OFF RAMPS, WIDEN SB ON 2 TO 3 LNS, ADD HOV LN TO NB & SB ON (EA: 0J440)

$45,000

S RIV050555 215ON I-215 (N/O EUCALYPTUS AVE TO S/O BOX SPRINGS RD) & SR60 (DAY ST TO SR60/I-215 JCT): RECONSTRUCT JCT TO PROVIDE 2 HOV DIRECT CONNECTOR LNS (SR60 PM: 12.21 TO 13.31) AND MINOR WIDENING TO BOX SPRINGS RD FROM 2 TO 4 LNS (APPROX 350 METERS) BTWN MORTON RD & BOX SPRINGS RD/FAIR ISLE IC (EA: 449311)

$37,250

S RIV060104 215IN MURRIETA ON I-215 AT LINNEL LANE: CONSTRUCT NEW 4 LANE (2 LANES EACH DIR) OC FROM MCELWAIN RD TO MEADOWLARK LN INCLUDING SIDEWALKS AND BIKELANES

$23,060

S RIV060111 215AT I-215/ETHANAC RD IC IN PERRIS: RECONSTRUCT/MODIFY IC FROM 2 TO 4 LANES, MODIFY/REALIGN RAMPS, ADD SIGNALS, PLUS SAFETY/CHANNELIZATION IMPROVEMENTS (PA&ED/PRE-DESIGN)

$5,000

S RIV060120 215I-215/VAN BUREN BLVD IC: RECON/WIDEN IC 3 TO 7 LNS (4 WB, 3 EB) & RAMPS 1 TO 2 & 1 TO 3 LNS), ADD NB LOOP ENTRY RAMP (2 LNS), ADD NB/SB AUX LNS & RT+LFT-TRN LNS (EA 0E520K)

$97,550

S RIV070305 215ON I-215 IN SW RIV CO FROM MURRIETA HOT SPRINGS RD TO SCOTT RD: CONSTRUCT A THIRD MIXED FLOW LANE IN EACH DIRECTION (WIDENS I-215 FROM 4 TO 6 MF LANES - 3 IN EACH DIRECTION) (EA: 0F161)

$78,756

S RIV070309 215ON I-215 IN SW RIV CO FROM SCOTT RD TO NUEVO RD IC: CONSTRUCT A THIRD MIXED FLOW LANE IN EACH DIRECTION (WIDENS I-215 FROM 4 TO 6 LANES - 3 IN EACH DIRECTION) (EA: 0F162) (PA&ED)

$236,469

S RIV62040 215ON I-215 AT LOS ALAMOS RD IC: RECONSTRUCT/WIDEN IC 2 TO 6 LNS (3 LNS EACH DIR) FROM HANCOCK AVE TO WHITEWOOD RD, WIDEN RAMPS (1 TO 2 & 1 TO 3 LNS), (EA: 432801)

$12,225

L 991203 0EXTEND OVERLAND DRIVE (4 LANES) FROM COMMERCE CENTER DRIVE TO AVENIDA ALVARADO/DIAZ ROAD INTERSECTION INCLUDING CONSTRUCTION OF 4 LANE BRIDGE OVER MURRIETA CREEK

$10,711

L 991206 0BUTTERFIELD STAGE RD EXTENSIONS: EXTEND MURRIETA HOT SPRINGS RD (4 LNS) BSR TO SERAPHINA RD, BSR (4 LNS) RANCHO CAL RD TO MHS RD, & NICHOLAS RD (4 LNS) BSR TO CALLE GIRASOL

$39,900

L RIV000103 0IN THE CITY OF PALM SPRINGS - CONSTRUCT BELARDO RD BRIDGE AND MISSING GAP, PARKING LOT AND AMENITIES FOR INDIAN INTERPRETIVE CENTER AT TAHQUITZ CANYON

$5,500

L RIV010205 0IN RIVERSIDE COUNTY NEAR MURRIETA RECONSTRUCT AND WIDEN SCOTT ROAD FROM 2 TO 6 LANES BETWEEN I-215 AND SR79 (WINCHESTER ROAD)

$26,100

L RIV010209 0IN THE CITY OF CORONA - CONSTRUCT FOOTHILL PARKWAY WESTERLY EXTENSION 4 LANE ROAD FROM LINCOLN AVE TO PASEO GRANDE (APPROX 2.5 MILES)

$49,311

L RIV010213 0AT GENE AUTRY TRAIL RAILROAD BRIDGE, SOUTHSIDE OF I-10 AT SALVIA RD TO SOUTHSIDE OF RAILROAD BRIDGE AT WHITEWATER WASH, WIDEN FROM 2 TO 6 LANES

$6,133

L RIV010221 0ON MILES AV FROM COACHELLA VALLEY STORMWATER CHNL TO CLINTON CONSTRUCT 4-LN BRIDGE OVER CHANNEL/WIDEN RD 2 TO 4 LNS AND ON CLINTON FROM MILES AV TO FRED WARING, WIDEN 3 TO 4 LNS

$16,157

Page 62: Project List - Southern California Association of Governments

60 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L RIV010227 0 CORONA ADVANCED TRAFFIC MANAGEMENT SYSTEM (ATMS) - AND REGIONAL ITS INTEGRATION PARTS 1 AND 2 $1,362

L RIV011201 0IN PALM DESERT/RANCHO MIRAGE - WIDEN MONTEREY AVE FROM 4 TO 6 LANES, INSTALL CURB/GUTTER & MEDIAN, AND UTLITY RELO-CATION FROM DINAH SHORE DR TO GERALD FORD DR (APPROX 1 MILE)

$1,000

L RIV011203 0IN PALM SPRINGS - WIDEN INDIAN CANYON DRIVE FROM 2 TO 4 LANES AT GRADE (NO BRIDGE) FROM THE UPRR BRIDGE TO TRAMVIEW ROAD (APPROX 2 MILES)

$4,961

L RIV011204 0IN COACHELLA ON DILLON RD - CONSTRUCT 4 LANE GRADE SEPARATION OVER UPRR TRACKS AND INDIO/GRAPEFRUIT BLVD (HWY 111) (PUC#: B613.0)

$16,107

L RIV011205 0IN MORENO VALLEY/PERRIS - WIDEN PERRIS BLVD 2 TO 4 LANES FROM RAMONA EXPRESSWAY TO PERRIS VALLEY STORM DRAIN - LATERAL 'A' (APPROX. 2 MILES)

$5,226

L RIV011208 0IN RIVERSIDE - WIDEN VAN BUREN BLVD FROM 4 TO 6 LANES FROM JACKSON STREET TO THE SANTA ANA RIVER AND ADD DEDICATED RIGHT-TURN LANES AT MAJOR INTERSECTIONS

$15,104

L RIV011209 0IN COACHELLA - WIDEN DILLON ROAD FROM 2 TO 4 LANES FROM HWY 86 TO I-10, CONSTRUCT MEDIAN CURB, AND INSTALL/INTER-CONNECT 2 SIGNALS (APPROX. .75 MILE)

$3,200

L RIV011210 0IN MORENO VALLEY/COUNTY - REALIGN RECHE VISTA DR (PERRIS BLVD TO 200' N/O CITY LIMITS - APPROX 2,000') & INSTALL SIGNAL (PERRIS/HEACOCK/RECHE VISTA DR)

$7,040

L RIV011212 0IN CATHEDRAL CITY ON RAMON RD - DATE PALM DR TO E. CITY LIMITS (1,500' E/O DA VALL) - WIDEN 4 TO 6 LNS & PAVEMENT REHAB, SIDEWALKS, SIGNAL INTERCONNECT, RETAINING WALLS, DRAIN IMP.

$1,847

L RIV011236 0IN RIV COUNTY & MURRIETA - EXTEND/CONSTRUCT CLINTON KEITH ROAD (6 LANES TOTAL - APPROX 3.4 MILES) WITH 2 BRIDGES FROM ANTELOPE ROAD TO WINCHESTER ROAD (SR79)

$62,400

L RIV011240 0IN CORONA ON MCKINLEY ST - CONSTRUCT 6 LANE (3 LANES EACH DIR) GRADE SEPARATION AT BNSF RAILROAD (PA&ED AND PRE-DESIGN ONLY)

$109,200

L RIV011241 0IN CORONA ON AUTO CENTER DRIVE - CONSTRUCT 4 LANE OVERCROSSING (GRADE SEPARATION) OVER BNSF RAILROAD (PA&ED AND PRE-DESIGN ONLY)

$29,720

L RIV031202 0IN THE CITY OF BANNING - CONSTRUCT 4 LANE (2 LANES EACH DIR.) RAMSEY STREET EXTENSION FROM HATHAWAY STREET TO FIELDS ROAD (APPROX 2.2 MILES) (DEMO ID#: 213, APPN CODE: 4260)

$10,562

L RIV031203 0MAGNOLIA AVE CORRIDOR (RIMPAU AVE TO E. 6TH ST): WIDEN SECTIONS 2 TO 6 & 4 TO 6 LNS, RECON/CHANNELIZATION, SAFETY & SIGNAL INSTALL/MODS (THIS PHASE: MAGNOLIA AT RIMPAU - 4 TO 6)

$1,835

L RIV031204 0IN MURRIETA - CONSTRUCT NEW 2 LANE GUAVA ST. BRIDGE (400') OVER MURRIETA CREEK FROM WASHINGTON AVE TO ADAMS AVE W/ SHOULDERS & ALL REQUIRED APPROACHES (BR#: 56C0162)

$6,418

L RIV031205 0 IN THE CITY OF PALM SPRINGS - WIDEN RAMON ROAD 4 TO 6 LANES FROM EL CIELO TO SUNRISE WAY (APPROX 1 MILE) $4,750

Page 63: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 61

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L RIV031206 0ON S. PALM CANYON DR OVER ARENAS CYN SOUTH DRAINAGE CHANNEL: REPLACE EXISTING 2 LANE LOW-WATER CROSSING W/ A NEW 4 LANE BRIDGE & DRAINAGE IMPROVEMENTS (HBRR#: 00L0027)

$4,827

L RIV031216 0IN SOUTHWEST RIVERSIDE COUNTY - CITY OF TEMECULA PAVEMENT REHAB/RECON PROJECTS LUMP SUM (NON CAPACITY ENHANCING) (CONSISTENT W/ 40 CFR PART 93.126,127,128 EXEMPT TABLES 2 & 3)

$3,370

L RIV031218 0CETAP - MID COUNTY PARKWAY CORRIDOR: CONSTRUCT A 4-8 LANE LIMITED ACCESS PARKWAY FROM CORONA (SLIGHTLY WEST OF I-15) TO SAN JACINTO (TO SR79) AND CONSTRUCT LOCAL INTERCHANGES IN THE CORRIDOR AT 15 LOCATIONS

$6,666,034

L RIV031221 0IN BLYTHE - REHABILITATE/RECONSTRUCT LOVEKIN BLVD FROM SOUTH OF I-10 RAMPS TO 14TH STREET INCLUDING CURB, GUTTER, AND SIDEWALK IMPROVEMENTS

$953

L RIV031223 0IN RIVERSIDE COUNTY LUMP SUM FOR REHABILITATION AND RECONSTRUCTION PROJECTS (NON CAPACITY ENHANCING PROJECTS) (CONSISTENT W/ 40 CFR PART 93.126, 127, 128, EXEMPT TABLE 2 &3)

$25,801

L RIV031226 0IN AND NEAR BLYTHE ON DE FRAIN BLVD - RECONSTRUCT/REHAB & CHANNELIZATION IMPROVEMENTS FROM HOBSON WAY TO 6TH AVE INCLUDING TURNING POCKETS & SHOULDER WIDENING

$910

L RIV041043 0WIDEN RECHE VISTA DR 2 TO 4 LNS (HEACOCK ST/PERRIS BLVD-RECHE CYN RD); WIDEN RECHE CYN RD 2 TO 4 LNS (RECHE VISTA-BARTON/HUNTS) PLUS REALIGN, SIGNALS, MEDIANS

$75,764

L RIV041044 0IN MORENO VALLEY: WIDEN PERRIS BLVD 4 TO 6 LNS (RAMONA EXPWY TO PVSD-LAT A) & 2 TO 6 LNS (PVSD-LAT A TO CACTUS AVE) INCLUDING CURB, GUTTER, SIDEWALKS, SIGNALS, & MEDIANS

$14,669

L RIV041045 0WIDEN PERRIS BLVD FROM 2 TO 6 LANES FROM IRONWOOD AVE TO MANZANITA AVE INCLUDING CURB, GUTTER, SIDEWALKS, SIGNAL MODS, STREET LIGHTS & MEDIANS IMPROVEMENTS

$10,600

L RIV041047 0 THROUGHOUT RIVERSIDE COUNTY - LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS $21,662

L RIV050101 0AB 3090 REIMBURSEMENT PROJECT: EA 08-RVCOT, PPNO 1109 (FOR PLANNING, PROGRAMMING, & MONITORING - RIV62047, EA 412374, PPNO 9803)

$175

L RIV050201 0HBRR LOCAL BRIDGE LUMP SUM PROGRAM FOR 2004/2005 (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EX-EMPT TABLES 2 & 3)

$67,114

L RIV050301 0CETAP - RIVERSIDE CNTY TO ORANGE CNTY CORRIDOR: FOR PA&ED & PRE-DESIGN WORK IN SUPPORT OF ENVIRONMENTAL DOCUMENT DEVELOPMENT (EARMARKS: FY05 HR4818 + SAFETEA LU #122+363)

$34,517

L RIV050304 0REHAB/RECON 100+ CITY BLOCKS OF STREETS (1ST, 2ND, 3RD, & 8TH STREETS PLUS CACTUS DR) INCLUDING CURB/GUTTERS, SPLASH APRONS, ADA RAMPS, SIDEWALKS, STORM DRAINS, ETC. (FY 04 APP)

$2,030

L RIV050502 0IN THE CITY OF RIVERSIDE - GRADE SEPARATION IMPROVEMENT PLANNING ACTIVITIES FOR FIVE RAILROAD GRADE SEPARATIONS (PA&ED/PRE-DESIGN) (HR4818 FY 05+SAFETEA LU EARMARKS)

$992

Page 64: Project List - Southern California Association of Governments

62 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L RIV050503 0CVAG PM-10 PROGRAM PHASE 5: IN ITHE CITY OF INDIO - PAVE EXISTING CITY OWNED DIRT PARKING LOT AT NORTHWEST CORNER OF DR. CARREON BLVD AND BRISTOL ST

$304

L RIV050504 0CVAG PM-10 PROGRAM PHASE 5: IN THE CITY OF INDIO - PAVE EXISTING CITY OWNED DIRT PARKING LOT AT SOUTHWEST CORNER OF MILES AVE AND KING ST

$175

L RIV050508 0CVAG PM-10 PROGRAM PHASE 5 WINDBREAKS: INSTALL NEW WIND FENCES IN CATHEDRAL CITY NEAR RAMON RD FROM NEUMA DR TO DA VALL DR & AT NW CORNER OF DATE PALM DR & VISTA CHINO

$112

L RIV050509 0CVAG PM-10 PROGRAM PHASE 5 WINDBREAKS: INSTALL NEW WIND FENCES IN CATHEDRAL CITY NEAR DATE PALM DR FROM I-10 TO VARNER RD & NEAR VARNER RD FROM DATE PALM DR TO WEST CITY LIMITS

$133

L RIV060102 0IN CALIMESA - WIDEN COUNTY LINE RD 1 TO 2 LNS (I-10 TO CALIMESA BLVD), ADD EB DEDICATED RIGHT-TURN LN, WIDEN SB CAL-IMESA BLVD 2 TO 3 LNS (APPROX 150' SOUTH FROM COUNTY LINE RD)

$2,414

L RIV060108 0IN CORONA ON N. MAIN ST: ADD NB DEDICATED RIGHT-TURN LANE (APPROX 300') FROM SR91 EXIT RAMP TO GRAND BLVD, SIGNAL MODS & CONSTRUCT RETAINING WALL AT PARK-N-RIDE LOT

$3,702

L RIV060110 0IN PALM SPRINGS: WIDEN S. PALM CANYON DR FROM 2 TO 4 LANES FROM MURRAY CANYON RD TO BOGERT TR (BRIDGE PORTION OVER ARENAS CYN CHANNEL IN RIV031206)

$1,000

L RIV060113 0CONSTRUCT NEW 4 LANE BRIDGE OVER MURRIETA CREEK (PART OF WESTERN BYPASS CORRIDOR) INCLUDING APPROACHES, CURB & GUTTER, SIDEWALKS, & STORM DRAIN FACILITIES

$8,092

L RIV060114 0IN SOUTHWEST TEMECULA: DESIGN AND CONSTRUCT 4 LANE WESTERN BYPASS CORRIDOR (PHASE 1) FROM SR79 SOUTH TO RANCHO CALIFORNIA RD

$13,358

L RIV060119 0RIVERSIDE COUNTY INDIAN RESERVATION ROADS (IRR) FY 04/05-06/07 IMPROVEMENT PROGRAM LUMP SUM - FEDERAL LANDS HIGH-WAY PROGRAM (23 USC 204)

$1,704

L RIV060121 0ON VAN BUREN BLVD NEAR MARCH AIR RESERVE BASE: WIDEN FROM 4 TO 6 LANES FROM APPROXIMATELY 0.5 MILES WEST OF I-215 TO BARTON ST

$6,700

L RIV060122 0IN MORENO VALLEY ON HEACOCK ST OVER PERRIS VALLEY STORM DRAIN (APPROX 2.7 MILES N/O RAMONA EXPWY): REPLACE EXIST-ING 2 LANE BRIDGE WITH A 4 LANE BRIDGE (BRIDGE #: 56C0233)

$3,392

L RIV060123 0ON CLAY ST APPROX 0.5 MILES E/O VAN BUREN BLVD AND N/O THE SANTA ANA RIVER: CONSTRUCT CLAY ST UNDERCROSSING UNDER THE UPRR (PA&ED/PRE-DESIGN ONLY)

$37,000

L RIV060124 0IN BANNING ON SUNSET AVE S/O I-10 IC: CONSTRUCT NEW 4 LANE UNDER CROSSING GRADE SEPARATION AT UPRR AND MINOR WID-ENING 2 TO 6 LANES S/O OF UPRR TO LINCOLN ST

$30,500

L RIV061101 0CALIMESA SCHOOL PEDESTRIAN WALKWAY SEGMENT 1: ON 3RD ST FROM COUNTY LINE RD TO AVE L (SIDEWALKS, HANDICAP RAMPS AT CORNERS, UNDERGROUNDING UTILITIES, BOX CULVERT WIDENING)

$1,135

L RIV061160 0ESSENTIAL ROAD IMPROVEMENTS - PHASE II: CITY SECTION 31 INCLUDING PAVEMENT REHAB, SIDEWALKS, CURB/GUTTERS, CROSS GUTTERS, ADA RAMPS & DRAINAGE IMPROVEMENTS (SAFETEA LU #270-2489)

$4,631

Page 65: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 63

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L RIV061161 0ESSENTIAL ROAD IMPROVEMENTS-PHASE III: CITY SECTION 31 INCLUDING PAVEMENT REHAB, SIDEWALKS, CURB/GUTTERS, CROSS GUTTERS, ADA RAMPS & DRAINAGE IMPROVE. (FY 06 APP., SEC 112 #CA763)

$1,490

L RIV061162 0AT DOWNTOWN RIVERSIDE METROLINK STATION FOR UCR (CE-CERT): IMPLEMENT UCR INTELLISHARE SYSTEM (INTELLIGENT SHARED-USE VEHICLE SYSTEM) AT 2 DESIGNATED PARKING SPACES

$100

L RIV52000 0IN RIVERSIDE CNTY LUMP SUM HWY OPERATION IMPROVEMENT PROJ. -INTERSECTION SIGNALIZATON @ INDIVIDUAL LOC (TEA21) (PROJECTS CONSISTENT W/ 40 CFR PART 93.126,127,128,EXEMPT TABLES 2&3

$219

L RIV52001 0IN RIVERSIDE CNTY LUMP SUM - REHABILITATION & RECONSTRUCTION PROJECTS (PROJECTS CONSISTENT W/ 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3.

$14,100

L RIV62000 0IN PALM SPRINGS ON GENE AUTRY TRAIL - WIDEN 2 TO 6 LANES FROM VISTA CHINO TO VIA ESCUELA & 2 TO 4 LANES FROM VIA ESCUELA TO THE SOUTH SIDE OF UP RAILROAD BRIDGE

$4,374

L RIV62015 0IN NORTHWESTERN RIVERSIDE COUNTY AT RIVER ROAD BRIDGE OVER SANTA ANA RIVER (0.27 MILE N/O BLUFF ST) - REPLACE EXISTING 2 LANE BRIDGE WITH A 4 LANE BRIDGE (HBRR#: 56C0017)

$39,737

L RIV62047 0 RESERVE FOR SB45 PLANNING (UP TO 2%) (PPM - PLANNING PROGRAMMING AND MONITORING) (EA: 412374, PPNO: 9803) $3,634

L RIV990703 0 IN RIVERSIDE AT JURUPA AVE AND UP RR - CONSTRUCT UNDERPASS AND CLOSE DOWN MOUNTAIN VIEW AVE AT UPRR TRACKS $24,048

L RIV990727 0IN PALM SPRINGS: WIDEN INDIAN CANYON DR 2 TO 6 LANES (INCLUDING UPRR BRIDGE REPLACEMENT/WIDENING) FROM UPRR BRIDGE TO GARNET RD AT I-10 (HBRR#: 56C0025)

$5,453

L RIV991210 0ON PECHANGA PKWY FROM SR79 TO PECHANGA ROAD - WIDEN FROM 2 TO 6 LANES & INCLUDE CURB, GUTTER, SIDEWALK, SOUND WALL & STORM DRAIN FACILITY IMPROVEMENTS

$29,845

T RIV010502 0IN COACHELLA VALLEY, PROPERTY ACQUISITION OF APPROXIMATELY 2.27 ACRES FOR BUS PARKING/MAINTENANCE FACILITY EXPANSION AND ALTERNATE FUELS INFRASTRUCTURE EXPANSION

$411

T RIV010514 0SCRRA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC FY 03 PORTION TO SCRRA PROJ-ECT) (FY 02/03 5307) (UZA: RIV-SAN)

$995

T RIV011211 0IN CORONA AT N. MAIN ST/E. GRAND BLVD - CONSTRUCT NEW 1,000 SPACE PARKING STRUCTURE AT NEW CORONA N. MAIN ST. METROLINK STATION (EA: CORSTN, PPNO: 0079D)

$41,035

T RIV011242 0PURCHASE EXPANSION ROLLING STOCK (2 CAB CARS AND 3 LOCOMOTIVES) FOR METROLINK IEOC AND RIVERSIDE/FULLERTON/LA LINES (EA: RIVFUL, PPNO: 0079E)

$19,693

T RIV020902 0IN WEST RIV CO FOR EXCEED, A DIVISION OF VALLEY RESOURCE CENTER - PURCHASE 1 EXPANSION 20' MODIFIED VAN, 1 EXPANSION 22' MEDIUM BUS, AND 2 RADIOS - SECTION 5310 FY 02/03 CYCLE

$109

T RIV030633 0SCRRA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC FY 04 PORTION TO SCRRA PROJ-ECT) (FY 03/04 5307) (UZA: RIV-SAN)

$796

T RIV030902 0IN WESTERN RIVERSIDE COUNTY FOR EXCEED, A DIVISION OF VALLEY RESOURCE CENTER - PURCHASE 2 EXPANSION SMALL BUSES AND 1 EXPANSION MINIVAN (5310 FY 03/04 CYCLE)

$182

Page 66: Project List - Southern California Association of Governments

64 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T RIV030903 0IN WEST RIV COUNTY FOR EXCEED, A DIVISION OF VALLEY RESOURCE CENTER - PURCHASE 1 REPLACEMENT MEDIUM BUS, 2 REPLACE-MENT SMALL BUSES, AND 2 REPLACEMENT MINIVANS (5310 FY 03/04 CYCLE)

$282

T RIV030905 0IN THE COACHELLA VALLEY AREA FOR DESERT SAMARITANS FOR THE ELDERLY - PURCHASE 2 EXPANSION MODIFIED VANS (5310 FY 03/04 CYCLE)

$128

T RIV031207 0IN WESTERN RIVERSIDE COUNTY IN THE CITY OF CORONA - CONSTRUCT NEW CORONA TRANSIT CENTER AT 31 EAST GRAND BLVD (5309C FY 03+04+06 (E-2006-BUSP-080) EARMARKS)

$3,383

T RIV041004 0FOR RIV SPECIAL SERVICES- PURCHASE 6 REPLACEMENT ALT-FUEL MEDIUM SIZED (APPROX 12 PASS) DIAL-A-RIDE PARATRANSIT VEHICLES W/ LIFTS, TIEDOWNS, RADIOS & VIDEO CAMERAS (FY 05 5307)

$450

T RIV041005 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 05 5307) $100

T RIV041006 0FOR RIVERSIDE SPECIAL SERVICES - PURCHASE SCHEDULING/DISPATCHING SOFTWARE, COMPUTERS, AND OFFICE EQUIPMENT(FY 05 5307)

$150

T RIV041007 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 06 5307) $100

T RIV041027 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 06 5307, UZA: RIV-SAN) $4,127

T RIV041029 0IN THE CITY OF RIVERSIDE - CONSTRUCT NEW RIVERSIDE TRANSIT CENTER IN THE VICINTIY OF DOWNTOWN METROLINK STATION (5309C FY 03+04+06 (E-2006-BUSP-156) EARMARKS)

$7,076

T RIV041042 0 IN THE COACHELLA VALLEY AREA FOR SUNLINE - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 06 5307, UZA: INDCCPS) $1,000

T RIV041048 0IN COACHELLA VALLEY AREA FOR SUNLINE - PURCHASE 10 REPLACEMENT ALT-FUEL/CNG 40 FOOT (43 PASSENGER) BUSES W/ LIFTS, FAREBOXES, RADIOS, BICYCLE RACKS, & ACCESSORIES (FY 05 5307)

$2,481

T RIV050302 0IN THE COACHELLA VALLEY AREA FOR ANGEL VIEW CRIPPLED CHILDREN'S FOUNDATION, PURCHASE 1 EXPANSION MEDIUM BUS - SEC-TION 5310 FY 04/05 CYCLE

$76

T RIV050303 0IN WESTERN RIVERSIDE COUNTY FOR FRIENDS OF MORENO VALLEY SENIOR CENTER INC. - PURCHASE 1 REPLACEMENT MODIFIED VAN - SECTION 5310 FY 04/05 CYCLE

$65

T RIV050516 0 IN CORONA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 07 5307) (UZA: RIV-SAN) $183

T RIV050518 0PURCHASE 6 REPLACEMENT ALT-FUEL MEDIUM-SIZED (APPROX 12 PASS) DIAL-A-RIDE PARATRANSIT VEHICLES W/ LIFTS, TIEDOWNS, FARE BOXES, RADIOS, VIDEO CAMERAS , & ACCESSORIES (FY 06 5307)

$462

T RIV050519 0 FOR RIVERSIDE SPECIAL SERVICES - PURCHASE 1 LOW-FLOOR MINIVAN SUPPORT VEHICLE (FY 06 5307) $72

T RIV050520 0AT EXISTING RIVERSIDE SPECIAL SERVICES FACILITIES - FACILITY IMPROVEMENTS TO INCLUDE BUS WASH AND OPERATIONS FACILITIES REHABILITATION (FY 06 5307)

$50

Page 67: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 65

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T RIV050521 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 07 5307) (UZA: RIV-SAN) $100

T RIV050522 0PURCHASE 8 REPLACEMENT ALT-FUEL (CNG) (APPROX 12 PASS) DIAL-A-RIDE PARATRANSIT VEHICLES W/ LIFTS, TIEDOWNS, FAREBOX-ES, RADIOS, CAMERAS, & ACCESSORIES (FY 07 5307) (UZA: RIV-SAN)

$720

T RIV050523 0FOR RIV SS - PURCHASE REPLACEMENT OFFICE & MISC. EQUIPMENT (E.G. DESKS, CHAIRS, PHONES, RADIO EQUIP, FILE CABINETS, ETC.) FOR EXISTING ADMIN FACILITY (FY 07 5307) (UZA: RIV-SAN)

$50

T RIV050524 0FOR RIV SS - CONSTRUCT EXPANDED SERVICE BAY FOR VEHICLE MAINTENANCE AT EXISTING RIVERSIDE MAINT. FACILITY OPS AREA SUPPORTING EXISITNG VEHICLE FLEET (FY 07 5307) (UZA: RIV-SAN)

$1,000

T RIV050525 0 RCTC SHARE TO SCRRA ELECTRONIC PASSENGER INFORMATION SYSTEM (EPIS) (FY 06 SRTP) $161

T RIV050526 0 RCTC SHARE OF OCTA'S FY 06 REHAB AND RENOVATION (FY 06 5307) $1,384

T RIV050528 0RCTC LOCAL MATCHING SHARE TO SCRRA PROJECT TO PURCHASE 5 NEW TICKET VENDING MACHINES (1 TO DOWNTOWN RIVERSIDE STATION & 4 TO SANBAG STATIONS) (FY 06 SRTP)

$100

T RIV050530 0SCRAA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC'S FY 07 5307 PORTION TO SCRA PROJECT) (FY 07 5307) (UZA: RIV-SAN) (PARENT: LA963505)

$417

T RIV050536 0IN WESTERN RIVERSIDE COUNTY FOR RTA IN FY 05/06 - OPERATING ASSISTANCE: FIXED ROUTE AND DIAL-A-RIDE (FY 06 5307 - HEMET/SAN SAN JACINTO UZA)

$34,947

T RIV050537 0IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED COST OF CONTRACTING (PURCHASED TRANSPORTATION) (FY 06 5307, UZA'S: RIV-SAN + TEM/MURR)

$2,586

T RIV050538 0IN WESTERN RIVERSIDE COUNTY FOR RTA - DEBT FINANCING (FY 05/06 PORTION) FOR 57 TRANSIT COACHES, 25 REPLACEMENT, 32 EXPANSION (FY 06 5307, UZA: RIV-SAN)

$2,064

T RIV050539 0PURCHASE NEW COMPUTER SERVERS & SOFTWARE UPGRADES (E.G. OPERATOR TIMEKEEPING, ELECTRONIC DOC MGMNT, WIRELESS CAMERA DATA TRANSFER, MOBIL VIEW III, ETC.) (FY 06 5307)

$719

T RIV050540 0IN WESTERN RIVERSIDE COUNTY FOR RTA - BUS RAPID TRANSIT (BRT) AMENITIES (E.G.BUS SIGNAGE, ATIS KIOSKS, SHELTER MATERI-ALS, BRANDED SIGNAGE & AMENITIES, ETC.) (HR4818 FY 05 EARMARK)

$465

T RIV050541 0IN WESTERN RIVERSIDE COUNTY FOR RTA IN FY 06/07 - OPERATING ASSISTANCE: FIXED ROUTE & DIAL-A-RIDE (FY 07 5307 - HEMET/SAN JACINTO UZA)

$41,122

T RIV050542 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 07 5307, UZA: TEM/MURR) $2,543

T RIV050543 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED COST OF TIRE LEASE (FY 07 5307), (UZA: RIV-SAN) $226

T RIV050544 0IN WESTERN RIVERSIDE COUNTY FOR RTA - DEBT FINANCING (FY 06/07 PORTION) FOR 57 TRANSIT COACHES, 25 REPLACEMENT, 32 EXPANSION (FY 07 5307) (UZA: RIV-SAN)

$2,098

Page 68: Project List - Southern California Association of Governments

66 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T RIV050545 0 IN COACHELLA VALLEY FOR SUNLINE - FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2005/06 $16,930

T RIV050546 0IN COACHELLA VALLEY - PURCHASE 16 REPLACEMENT ALT-FUEL 40 FT (43 PASS) BUSES W/ LIFTS, BIKE RACKS, FAREBOXES, RADIOS & ACCESSORIES (FY 06 5307, UZA: INDCCPS) (HR4818 FY 05 EARMARK)

$6,506

T RIV050547 0PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES (E.G. BENCHES, TRASH CONTAINERS, KIOSK LEXANS, LEXAN SCHEDULES, ETC.) FOR VARIOUS BUS STOPS (FY 06 5307, UZA: INDCCPS) (TE)

$36

T RIV050548 0IN COACHELLA VALLEY FOR SUNLINE - PURCHASE 9 REPLACEMENT, ALT-FUEL, 12-15 PASSENGER, PARATRANSIT DIAL-A-RIDE VANS WITH ACCESSORIES (FY 06 5307, UZA: INDCCPS)

$508

T RIV050549 0 IN COACHELLA VALLEY AREA FOR SUNLINE - FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2006/07 $17,550

T RIV050550 0 IN THE COACHELLA VALLEY AREA FOR SUNLINE - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 07 5307) (UZA: INDCCPS) $1,541

T RIV050551 0IN COACHELLA VALLEY - PURCHASE 13 REPLACEMENT ALT-FUEL 40 FT (43 PASS) BUSES W/ LIFTS, BIKE RACKS, FARE BOXES, RADIOS & ACCESSORIES (FY 07 5307, UZA: INDCCPS)

$4,848

T RIV050552 0IN COACHELLA VALLEY FOR SUNLINE - PURCHASE 6 REPLACEMENT ALT-FUEL (12-15 PASS) PARATRANSIT DIAL-A-RIDE VANS W/ LIFTS, RADIOS, FAREBOXES, & ACCESSORIES (FY 07 5307, UZA: INDCCPS)

$758

T RIV050553 0IN TEMECULA - CONSTRUCT NEW TEMECULA TRANSIT CENTER IN THE VICINITY ALONG YNEZ RD ABOUT 0.5 MILES N/O WINCHESTER RD (SR79) (04, 05, 06 #315 (E-2006-BUSP-191) SAFETEA LU EARMARKS)

$2,026

T RIV050554 0BUS STOP AMENITIES: PURCHASE BENCHES, KIOSKS, SIGN POLES/EXTENSIONS, BUS SIGNS, TRASH RECEPTACLES, ETC. TO REHAB VARIOUS EXISTING STOPS/SHELTERS (FY 06 5307, UZA: RIV-SAN) (TE)

$110

T RIV050556 0BUS RAPID TRANSIT (BRT) ENHANCEMENTS: DEVELOP BRT ENHANCEMENT PLAN (E.G. PROMOTIONAL STRATEGIES, BRAND AWARENESS & RIDERSHIP SCENARIOS, ETC.) (FY 06 5307 UZA: TEM/MURR) (TE)

$400

T RIV051001 0IN THE COAHELLA VALLEY AREA FOR ANGELVIEW CRIPPLED CHILDREN'S FOUNDATION: PURCHASE 1 REPLACEMENT MEDIUM BUS (AP-PROX 12 PASS, GAS/DIESEL) W/ LIFT & TIEDOWNS (5310 FY 05/06 CYCLE)

$59

T RIV051002 0IN WESTERN RIVERSIDE COUNTY FOR PEPPERMINT RIDGE: PURCHASE 3 REPLACEMENT MODIFIED VANS (APPROX 8 PASS., GAS/DIESEL) AND MAINTENANCE EQUIPMENT (5310 FY 05/06 CYCLE)

$169

T RIV051003 0IN WEST. RIV. CO. FOR CARE-A-VAN TRANSIT, INC.: PURCHASE 1 REPLACEMENT MINIVAN (APPROX 5 PASS.) & 1 REPLACEMENT MODI-FIED VAN (APPROX 8 PASS.)(BOTH GAS/DIESEL) (5310 FY 05/06 CYCLE)

$94

T RIV051004 0IN COACHELLA VALLEY FOR DESERT HEALTHCARE FOUNDATION: PURCHASE 3 REPLACE. MINIVANS (APPROX 5 PASS) & 1 REPLACE. MODIFIED VAN (APPROX 8 PASS) (BOTH GAS/DIESEL) (5310 FY 05/06 CYCLE)

$181

Page 69: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 67

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T RIV051005 0IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE 10 EXPANSION MINIVANS (APPROX 5 PASSENGERS EACH, GAS/DIESEL) (5310 FY 05/06 CYCLE)

$410

T RIV051006 0IN WESTERN RIVERSIDE COUNTY FOR CARE CONNEXXUS INC.: PURCHASE 1 EXPANSION LARGE BUS (APPROX 16 PASSENGERS, GAS/DIESEL) W/ LIFT AND TIEDOWNS (5310 FY 05/06 CYCLE)

$63

T RIV051007 0NEAR MORENO VALLEY S/O ALESSANDRO BLVD BETWEEN SAN JAC BRANCH LINE & I-215: CONSTRUCT NEW MORENO VALLEY MULTI-MODAL TRANSIT CENTER AT 14211 MERIDIAN PKWY

$4,839

T RIV051201 0IN CORONA - IMPLEMENT NEW 60 SPACE PARK-AND-RIDE LOT (VIA ANNUAL LEASE AGREEMENT) AT FAITH BIBLE CHURCH AT 1114 W. ONTARIO AVE (TCM SUBSTITUTION FOR CORONA'S 3 EXPANSION BUSES)

$21

T RIV060201 0AT SUNLINE'S EXISTING HYDROGEN INFRASTRUCTURE/FACILITY IN THOUSAND PALMS: UPGRADE & MODERNINZE HYDROGEN FUEL REFORMER (FY 05 EARMARK: CLEAN FUELS MALL INFRASTRUCTURE EXPANSION)

$547

T RIV060202 0IN THE COACHELLA VALLEY AREA FOR THE FOUNDATION FOR THE RETARDED OF THE DESERT: PURCHASE 2 EXPANSION LARGER BUSES (APPROX 20 PASS, GAS/DIESEL) (FY 05/06 5310 CYCLE)

$176

T RIV060203 0IN THE COACHELLA VALLEY AREA FOR THE FOUNDATION FOR THE RETARDED OF THE DESERT: PURCHASE 1 REPLACEMENT LARGER BUS (APPROX 20 PASS, GAS/DIESEL) (FY 05/06 5310 CYCLE)

$87

T RIV061102 0 IN CORONA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 08 5307) $193

T RIV061103 0 IN CORONA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 09 5307) $183

T RIV061104 0PURCHASE 5 REPLACEMENT DIAL-A-RIDE 16-18 PASS., GAS/DIESEL BUSES W/ LIFTS, FARE BOXES, CAMERAS, DIGITIAL HEAD SIGNS, COMM EQUIP, ACCESSORIES & PAINT/GRAPHICS (FY 09 5307)

$380

T RIV061105 0FOR RIV SS - PURCHASE/INSTALL VEHICLE LOCATOR EQUIPMENT FOR PROVIDING A 25 VEHICLE FLEET MOBIL DATA & GPS INFO FOR INCREASED PASSENGER/DRIVER SECURITY (FY 07 5307) (UZA: RIV-SAN)

$260

T RIV061106 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 08 5307) $105

T RIV061107 0PURCHASE 5 REPLACEMENT ALT-FUEL (CNG) (APPROX 12 PASS) DIAL-A-RIDE PARATRANSIT VEHICLES W/ LIFTS, TIEDOWNS, FAREBOX-ES, RADIOS, CAMERAS, & ACCESSORIES (FY 08 5307)

$500

T RIV061108 0IN WESTERN RIV COUNTY FOR RTA - PURCHASE 23 REPLACEMENT TYPE 2 (GAS/DIESEL) (APPROX 12 PASSENGER) PARATRANSIT VEHICLES W/ LIFTS & ACCESSORIES (FY 07 5307) (UZA: RIV-SAN)

$1,334

T RIV061109 0IN WESTERN RIVERSIDE COUNTY FOR RTA - PURCHASE 2 REPLACEMENT SUPPORT TRUCKS AND LEASE 5 REPLACEMENT SUPPORT CARS (ALL GAS/DIESEL) (FY 07 5307) (UZA: RIV-SAN)

$131

T RIV061111 0BUS STOP AMENITIES: PURCHASE BENCHES, POLES/EXTENSIONS, SIGNS, TRASH RECEPTACLES, ETC. TO REHAB, INSTALL, & EXPAND EXISTING STOPS/SHELTERS (FY 07 5307) (UZA: RIV-SAN+TEM/MURR) (TE)

$139

T RIV061112 0CAPITAL MAINTENANCE SPARES: PURCHASE ROLLING STOCK CAPITAL PARTS (E.G ALTERNATOR, MANIFOLDS, PUMPS, CONTROLLER, TRANSMISSION, COMPRESSOR, ETC.) (FY 07 5307) (UZA: RIV-SAN)

$307

Page 70: Project List - Southern California Association of Governments

68 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T RIV061113 0PURCHASE REPLACE. SHOP EQUIP. (E.G. PARALLELOGRAM & SEFEC LIFTS, STAR BRAKE LATHE, PRESSURE WASHER, BUS WASH BRUSH, TIRE/VACUUM MACHINES, SWEEPERS, ETC.) (FY 07 5307)(UZA: RIV-SAN)

$159

T RIV061114 0IN WESTERN RIVERSIDE CO FOR RTA - PURCHASE MISCELLANEOUS ADMINISTRATIVE EQUIPMENT (E.G. ID CARD PRINTER, BOARD ROOM AUDIOVISUAL EQUIPMENT, ETC.) (FY 07 5307) (UZA: RIV-SAN)

$14

T RIV061115 0AT RTA EXISTING ADMINISTRATIVE FACILITIES - SUPPORT FACILITIES REPAIRS (E.G. HEMET ROOF REPAIR/SEAL, RIVERSIDE LIGHTING RETROFIT, ETC.) (FY 07 5307) (UZA: RIV-SAN)

$57

T RIV061116 0AT RTA EXISTING RIVERSIDE MAINT. FACILITY: MAINTENANCE SUPPORT UPGRADES (E.G. EXHAUST SYSTEM MODIFICATION, METHANE DETECTION SYSTEM UPGRADE, ETC.) (FY 07 5307) (UZA: RIV-SAN)

$65

T RIV061117 0AT EXISTING RTA RIVERSIDE & HEMET FACILITIES: YARD & SHOP FACILITY REPAIRS (E.G. CONCRETE REPLACEMENT, PARKING LOT REPAIRS, ASPHALT REPAIRS, ETC.) (FY 07 5307) (UZA: RIV-SAN)

$224

T RIV061118 0IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE 13 GFI ODYSSEY FAREBOXES (8 FOR LAIDLAW CONTRACTED & 5 FOR RTA) (FY 07 5307) (UZA: RIV-SAN)

$178

T RIV061119 0IN WESTERN RIVERSIDE COUNTY FOR RTA: LEASE COST OF AUTOMATIC PASSENGER COUNTER (APC) UNITS INSTALLED ON BUSES (FY 07 5307) (UZA: RIV-SAN)

$62

T RIV061120 0PURCHASE ADP HARD/SOFTWARE (E.G. NEW & REPLACE. SERVERS, TEL RECORDING/TRANS TRAK SYS FOR DAILY OPS, UPGRADE TIME KEEPING SYSTEM & GIS ANNUAL UPDATE) (FY 07 5307) (UZA: RIV- SAN)

$560

T RIV061121 0IN WESTERN RIVERSIDE COUNTY FOR RTA: INSTALL AUTOMATED TRAVELER INFORMATION SYSTEM (ATIS) ON VARIOUS FIXED ROUTE VEHICLES (APPROX 97) (SAFETEA LU EARMARK -#171, E-2006-BUSP-157)

$122

T RIV061122 0IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE ADP HARDWARE/COMPUTER EQUIPMENT (E.G. DESKTOP AND NOTEBOOK COM-PUTERS PLUS PRINTERS, ETC.) (FY 07 5307) (UZA: RIV-SAN)

$64

T RIV061123 0UPGRADE SELECTED RURAL AREA BUS STOPS (E.G. CONCRETE PAD CONSTRUCTION, W/ ONE WAITING BENCH, SIGN, TRASH RECEP-TACLE & INSTALL MODERN BUS SHELTERS OVER BENCH AREA)

$77

T RIV061124 0 IN WESTERN RIVERSIDE COUNTY FOR RTA IN FY 07/08 - OPERATING ASSISTANCE: FIXED ROUTE & DIAL-A-RIDE (FY 08 5307) $49,601

T RIV061125 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 08 5307) $4,671

T RIV061126 0FOR THE CITY OF CALEXICO THROUGH RTA (PASS THROUGH) - PURCHASE ONE REPLACEMENT FULL-SIZED BUS (40 FOOT, APPROX 40 PASSENGER, ALT-FUEL/CNG) (EARMARK # E-2004-BUSP-038)

$374

T RIV061127 0IN WESTERN RIVERSIDE COUNTY FOR RTA - PURCHASE 33 REPLACEMENT TYPE 2 (GAS/DIESEL) (APPROX 12 PASSENGER) PARATRANSIT VEHICLES W/ LIFTS & ACCESSORIES (FY 08 5307)

$2,778

T RIV061128 0IN WESTERN RIVERSIDE COUNTY FOR RTA - PURCHASE 4 REPLACEMENT BUSES (APPROX 40 FEET, 40-44 PASSENGER, ALT-FUEL/CNG) (FY 08 5307)

$146

T RIV061129 0IN WESTERN RIVERSIDE COUNTY FOR RTA - PURCHASE 2 REPLACEMENT SUPPORT CARS AND 2 REPLACEMENT SUPPORT STAKE BED TRUCKS (GAS/DIESEL) (FY 08 5307)

$340

Page 71: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 69

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T RIV061130 0IN WESTERN RIVERSIDE COUNTY FOR RTA - DEBT FINANCING (FY 07/08 PORTION) FOR 57 TRANSIT COACHES, 25 REPLACEMENT, 32 EXPANSION (FY 08 5307)

$2,034

T RIV061131 0BUS STOP AMENITIES: PURCHASE BENCHES, POLES/EXTENSIONS, SIGNS, TRASH RECEPTACLES, ETC. TO REHAB & EXPAND EXISTING STOPS/SHELTERS (FY 08 5307)

$119

T RIV061132 0CAPITAL MAINTENANCE SPARES: PURCHASE ROLLING STOCK CAPITAL PARTS (E.G. ALTERNATOR, MANIFOLDS, PUMPS, CONTROLLER, TRANSMISSION, COMPRESSOR, ETC.) (FY 08 5307)

$446

T RIV061133 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED COST OF TIRE LEASE (FY 08 5307) $227

T RIV061134 0PURCHASE ADP HARDWARE/SOFTWARE (E.G. NEW & REPLACE. SERVERS, SCHEDULING & RUNCUTTING SOFTWARE, UPGRADE TIME KEEPING SYSTEM, ORACLE 11I ENHANCEMENT, GIS UPDATE, ETC.) (FY 08 5307)

$10

T RIV061135 0IN WESTERN RIVERSIDE COUNTY FOR RTA: INSTALL AUTOMATED TRAVELER INFORMATION SYSTEM (ATIS) ON VARIOUS FIXED ROUTE VEHICLES (SAFETEA LU EARMARK #171)

$135

T RIV061136 0IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE ADP HARDWARE/COMPUTER EQUIPMENT (E.G. DESKTOP AND NOTEBOOK COM-PUTERS PLUS PRINTERS, ETC.) (FY 08 5307)

$58

T RIV061137 0IN WESTERN RIVERSIDE COUNTY FOR RTA - PURCHASE NEW SHOP EQUIPMENT (E.G. FLOOR AND PARKING LOT SWEEPERS) (FY 08 5307)

$13

T RIV061138 0AT EXISTING RTA RIVERSIDE & HEMET FACILITIES: SECURITY PROJECTS (E.G. CONSTRUCT GUARD HOUSES, INSTALL VIDEO SURVEIL-LANCE EQUIP, UPGRADE CARD ACCESS CONTROLS, ETC.) (FY 08 5307)

$151

T RIV061139 0AT EXISTING RTA ADMINISTRATION FACILITIES: PURCHASE REPLACEMENT ADMINISTRATIVE SUPPORT EQUIPMENT (E.G. REFRIGERATION UNITS) (FY 08 5307)

$2

T RIV061140 0 AT EXISTING RTA MAINTENANCE FACILITY: MAINTENANCE SHOP REPAIRS (E.G. FLOOR PAINTING, ETC.) (FY 08 5307) $65

T RIV061141 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE 4 GFI ODYSSEY FAREBOXES (FY 08 5307) $796

T RIV061142 0IN WESTERN RIVERSIDE COUNTY FOR RTA: LEASE COST OF AUTOMATIC PASSENGER COUNTER (APC) UNITS INSTALLED ON BUSES (FY 08 5307)

$290

T RIV061143 0 RCTC'S SHARE OF OCTA'S FY 07 REHAB AND RENOVATION (FY 07 5307) (UZA: RIV-SAN) $77

T RIV061144 0ROLLING STOCK MAINT. FACILITY IN SBD - FUNDING TO BUILD NEW COMMUTER TRAIN STORAGE & MAINTENANCE FACILITIES & CON-NECTING TRACKS IN INLAND EMPIRE (FY 07 5307 SHARE) (UZA: RIV-SAN)

$2,261

T RIV061145 0SCRRA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC'S FY 08 PORTION) TO SCRRA PROJECT) (FY 08 5307)

$509

T RIV061146 0IN WESTERN RIVERSIDE COUNTY FOR PEPPERMINT RIDGE: PURCHASE 2 BASE STATIONS, 13 MOBILE RADIOS, COMPUTER EQUIPMENT, AND SOFTWARE (FY 06/07 5310 CYCLE)

$34

Page 72: Project List - Southern California Association of Governments

70 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T RIV061147 0IN THE COACHELLA VALLEY AREA FOR ANGEL VIEW CRIPPLED CHILDREN'S FOUNDATION - PURCHASE 1 REPLACEMENT MEDIUM BUS (APPROX 12 PASSENGERS, GAS/DIESEL) (FY 06/07 5310 CYCLE)

$61

T RIV061148 0IN THE COACHELLA VALLEY AREA - PURCHASE 1 REPLACEMENT MEDIUM BUS (APPROX 12 PASSENGER, GAS/DIESEL), MOBILE RADIO, & COMPUTER EQUIPMENT (FY 06/07 5310 CYCLE)

$67

T RIV061149 0IN WESTERN RIVERSIDE COUNTY FOR PEPPERMINT RIDGE - PURCHASE 2 EXPANSION MODIFIED VANS (APPROX 8 PASS EACH, GAS/DIE-SEL) (FY 06/07 5310 CYCLE)

$108

T RIV061150 0IN COACHELLA VALLEY AREA FOR FOUNDATION FOR THE RETARDED OF THE DESERT - PURCHASE EXPANSION 1 LARGE BUS & 1 MODI-FIED VAN (APPROX 16 & 8 PASS., GAS/DIESEL) (FY 06/07 5310 CYCLE)

$119

T RIV061151 0IN THE COACHELLA VALLEY AREA - PURCHASE10 REPLACEMENT ALT-FUEL BUSES (RANGES 30'-40', APPROX 30-43 PASS., CNG) (FY 07 5307) (UZA: INCCPS) (SAFETEA LU EARMARK #45, E-2006-BUSP-148)

$4,096

T RIV061152 0PURCHASE TRANSIT ENHANCE. BUS STOP AMENITIES (E.G. BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 07 5307) UZA: INCCPS) (TE)

$411

T RIV061153 0PURCHASE REPLACEMENT MAINTENANCE TOOLS, EQUIPMENT, & PARTS (E.G. MULTI-METERS, TORQUE WRENCHES, IMPACT SOCKETS, SERVICE JACKS, AIR & HAND TOOLS, ETC.) (FY 07 5307) (UZA: INCCPS)

$205

T RIV061154 0 IN THE COACHELLA VALLEY FOR SUNLINE - FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2007/08 $18,287

T RIV061155 0 IN THE COACHELLA VALLEY AREA FOR SUNLINE - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 08 5307) $1,582

T RIV061157 0PURCHASE TRANSIT ENHANCE. BUST STOP AMENITIES (E.G. BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 08 5307) (TE)

$400

T RIV061158 0PURCHASE REPLACEMENT MAINTENANCE TOOLS, EQUIPMENT, & PARTS (E.G. MULTI-METERS, TORQUE WRENCHES, IMPACT SOCKETS, SERVICE JACKS, AIR & HAND TOOLS, ETC.) (FY 08 5307)

$216

T RIV32420 0IN COACHELLA VALLEY AREA PURCHASE 12 REPLACEMENT ALT FUEL PARATRANSIT VEHICLES DURING FY 2003/04 - 04/05 (6 IN 03/04 AND 6 IN 04/05)

$753

T RIV520109 0 RECONSTRUCT & UPGRADE SAN JACINTO BRANCH LINE FOR RAIL PASSENGER SERVICE (RIVERSIDE TO PERRIS) (PERRIS VALLEY LINE) $193,378

T RIV520111 0 REGIONAL RIDESHARE $10,123

* S=State Highway, L=Local Highway, T=Transit

Page 73: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 71

SAN BERNARDINO COUNTY RTIP PROJECTS

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S 200455 0 PLANNING, PROGRAMMING AND MONITORING AB3090 PAYBACK PROJECTS $632

S 150D 0IN COLTON FROM 0.2 MIL (0.3 KM) W/O RANCHO AVE TO 0.9 MI (1.5 KM) E/O LA CADENA DRIVE - CONSTRUCT RR TO RR GRADE SEPA-RATION

$147,974

S SBD59303 0 SET ASIDES/RESERVATIONS FOR FUTURE SB45 -PLANNING, PROGRAMMING, & MONITORING $4,056

S 1830 10I-10 AT CEDAR AVE. BETWEEN SLOVER AND VALLEY- RECONSTRUCT I/C-WIDEN FROM 4-6 LANES WITH LEFT AND RIGHT TURN LANES. ADD AUX LANE ON E/B ON AND OFF RAMPS

$48,889

S 34090 10 IN FONTANA AT ALDER AVENUE CONSTRUCT INTERCHANGE $26,674

S 38420 10ON I-10 FROM 0.1 KM W/O I-10/I-215 TO 0.2 KM W/O WABASH O/C & I-215 FROM 0.0-4.3 FROM RVSDE CO TO I-10/215 JCT. INSTALL FOC BACKBONE SYSTEM, MODIFY COMMUNIC HUB; WIDEN RAMPS

$16,855

S 43320 10IN YUCAIPA @ LIVE OAK CANYON ROAD INTERCHANGE RECONFIGURE INTERCHANGE AND WIDEN LIVE OAK CANYON ROAD FROM 2 TO 6 THRU LANES (I-10/LIVE OAK CANYON) (TCRP #59)

$18,634

S 44810 10I-10 TIPPECANOE INTERCHANGE I/C CONFIGURATION & ADD AUX LANES; HP#1366 (AUX LANE IS FOR EASTBOUND TRAFFIC FROM WATERMAN ON-RAMP TO TIPPECANOE OFF-RAMP.

$52,125

S 49750 10IN FONTANA, FROM 0.8KM E/OF ETIWANDA AVE OVC TO 1.5 KM W/O RIVERSIDE AVE. O/C-WIDEN EXIT RAMPS AND CONSTRUCT AUX. LANES

$32,693

S 200432 10 AT I-10 AND FORD ST. ON RAMP TO THE FREEWAY - SIGNAL AND INTERSECTIONS IMPROVEMENTS $700

S 200434 10 ON I-10 IN REDLANDS AND YUCAIPA FROM FORD ST. O/C TO LIVE OAK CANYON RD. CONSTRUCT 1 W/B MIXED-FLOW LANE $43,186

S 2002160 10I-10 AT GROVE INTERCHANGE AND GROVE AVE. CORRIDOR - RELOCATE I/10 & 4TH ST. I/C TO GROVE AVE. AND WIDEN GROVE AVE BETWEEN I-10 TO HOLT (WIDEN 4-6 LANES)

$97,335

S 2002163 10 AT I-10 AND SPERRY INTERCHANGE - CONSTRUCT AN ADDITIONAL LANE ON OFF RAMP $1,875

S 20020812 10I-10/CHERRY AVENUE INTERCHANGE - INTERCHANGE RECONSTRUCT -WIDEN I/C FROM SLOVER TO VALLEY FROM 4-6 LANES AND 1 AUX LN IN EA. DIR. WITH DOUBLE LEFT TURNS TO RAMPS

$71,663

S 0H930 10 FROM WATERMAN AVE UC TO ALABAMA ST OC - RESTRIPE ROADBED TO ADD A WESTBOUND AUXILIARY LANE (MINOR A) $400

S OH760 10FROM WATERMAN AVE UC TO ALABAMA ST OC - RECONSTRUCT MEDIAN BARRIER, PAVE MEDIAN, AND RESTRIPE ROADBED TO ADD EASTBOUND AUX LANE (EA OH760)0, CALTRANS MINOR 'A'.

$1,000

S SBD031269 10 IN FONTANA AT BEECH AVENUE CONSTRUCT 4 LANE INTERCHANGE ( 2 LANES IN EACH DIRECTION. $42,400

Page 74: Project List - Southern California Association of Governments

72 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S SBD31808 10I-10 AT RIVERISDE AVE - 2.1 KM W/O RIVERSIDE AVE TO 1.3 KM E/O RIVERSIDE AVE. MODIFY IC 4 TO 9 LNS (INCL TURN LNS) FROM SLOVER TO VALLEY & ADD AUX LANES & OPER IMPRV

$30,127

S SBD32225 10 AIRPORT GROUND ACCESS AT I-10/HAVEN LANDSCAPING & IRRIGATION $2,788

S SBD41147 10 AIRPORT GROUND ACCESS -I-10 AT ARCHIBALD AVE - INSTALL IRRIGATION SYSTEM AND LANDSCAPE PLANTING $2,867

S SBD41339 10 I-10 AT PEPPER AVE. REPLACE (I/C)-FROM 5-7 LANES WITH LEFT AND RIGHT TURN $8,250

S SBD45000 10IN FONTANA: I-10 AT CITRUS AVE IC RECONSTRUCT IC WITH 6 THRU LANES; & REPLACE BRIDGE OVERCROSSING(O/C WIDEN FROM 2-6 LNS) AND WIDEN CITRUS FROM SLOVER TO VALLEY 4-6 LNS.

$50,453

S SBD55022 10CYPRESS AVENUE FROM VALLEY BLVD. TO SLOVER AVENUE CONSTRUCT NEW FOUR LANE BRIDGE OVERCROSSING OVER I-10 WITH TRAFFIC SIGNALS & SAFETY LIGHTING

$25,993

S 33390 15AT MOJAVE DR OVERCROSSING (ROY ROGERS IC) WIDEN BRIDGE- NORTH SIDE (VILLAGE DR TO LA PAZ DR) FROM 2 TO 4 LANES, WIDEN RAMPS @ MOJAVE DR INTRSCTN: NB/SB ON 1 TO 2: NB/SB OFF 1TO 3

$13,281

S 34170 15 IN VICTORVILLE AT LA MESA ROAD/NISQUALLI ROAD CONSTRUCT I/C $77,120

S 35556 15IN VICTORVILLE FROM MOJAVE DR TO 1 MILE N/O EXISTING STODDARD WELLS RD OVERCROSSING - RECONSTRUCT D AND E ST IC, RELOCATE STODDARD WELLS RD IC, WIDEN MOJAVE RIVER BRIDGE & VICTORVILLE SEPARATION & OVERHEAD, UPGRADE 2.7 MILES OF MAINLINE TO ROADWAY STANDARDS, REALIGN EAST FRONTAGE RD, CONSTRUCT NEW WEST FRONTAGE RD

$138,976

S 35558 15IN SAN BERNARDINO CO. - ON I-15 FROM MOJAVE DR. IN VICTORIVILE TO STODDARD WELLS RD. IN BARSTOW-RETENTION WALL ENHANCMENTS AND LANDSCAPING

$2,446

S 47610 15NEAR BAKER FROM 5.9 KM NORTH OF AFTON RD OC TO 2.3 KM SO. OF BASIN RD.OC; ADD AC INSIDE (SOUTHBND TRUCK CLIMB LN & RECONSTRUCT INSIDE SHOULDER (P MI ARE R115.2/R119.0) (PPNO-176A)

$13,510

S 200048 15I-15 AT BASELINE INTERCHANGE - WIDEN RAMPS (INCLUDING BRIDGES), ADD AUX LANES, AND OPERATIONAL IMPROVEMENTS(ALSO -COST INCREASE) (EA497100)

$41,869

S 200078 15 PARK-N-RIDE LOT EXPANSION AND FACILITIES AT BEAR VALLEY RD & I-15 (70 EXISTING SPACES TO 300 SPACES) $705

S 200152 15ON I-15 FROM 200 FT. N. OF FOOTHILL BLVD. TO 2000 FT. SO. OF ARROW RTE.AND ON ARROW RT. FROM 1000 FT.W/TO 1000 FT. E/ OF I- 15-CONSTRUCT NEW I/C, AUX LANES, & OPERATN'L IMPROVMTS.

$59,700

S 200428 15IN RANCHO CUCAMONGA AT N/B I-15 AND FOOTHILL BLVD. ON RAMP- WIDEN EXISTING ONE LANE OFF RAMP TO 2 LANES AND ADD 400 METER DECELERATION LANE (EA OC0701) (MINOR A)

$2,207

S 200605 15 I-15/BASELINE RD. - WIDEN RAMPS AND INSTALL TRAFFIC METERING (SOUTHBOUND AND NORTHBOUND) $950

S 200606 15 I-15/FOOTHILL BLVD. - WIDEN SB DIRECT OFF-RAMP AND CONSTRUCT DECELERATION LANE (EA 0H790) $5,136

Page 75: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 73

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S 200613 15I-15 & MUSCATEL STREET & 1-15 OVERPASS-CONSTRUCT NEW OVERPASS AND NEW APPROACH TO ROADWAYS ON BOTH SIDES TO ADJOIN EXISTING ROADS

$22,500

S 0A6410 15 I/15 AT VALLEY WELLS REST AREA - DEVELOP WELCOME CENTER (PPNO -176D) $1,671

S 0H1300 15I-15/DUNCAN CANYON INTERCHANGE - CONVERT EXIST 2 LN OVERCROSSING TO DIAMOND IC, WIDEN TO 4 LANES PLUS DBL LEFT TURNS TO SB RAMP ACCEL/DECEL LANES & SINGLE LEFT TO NORTHBOUND RAMP

$18,000

S SBD031279 15 IN HESPERIA AT RANCHERO ROAD CONSTRUCT 6 LANE INTERCHANGE $57,605

S SBD41288 15 I-15 AND JOSHUA OFFRAMP - CONSTRUCT NORTHBOUND OFFRAMP AT JOSHUA - 2 LANE $1,000

S SBD41446 15 EUCALYPTUS AT I-15 CONSTRUCT INTERCHANGE 3 LANES IN EA DIR STANDARD I/C CONFIG. $25,000

S SBD55015 15IN BARSTOW I-15 AT OLD RTE. SR58 - CONSTRUCT NEW INTERCHANGE (T21-#926) BUILD OVERCROSSING AND UNDERCROSSING/BRIDGE AND PROVIDE CONNECTORS

$3,450

S SBD55026 15EUCALYPTUS STREET FROM I-15 TO PEACH AVENUE - RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES AND CONSTRUCT RAILROAD CROSSING

$8,546

S 200612 18 SR 18 FROM APPLE VALLEY RD. TO CORWIN RD. - WIDEN FROM 4-6 LANES (APPROX. 3 MI) $14,400

S 0A7910 18IN RUNNING SPRINGS FROM RTE. 18 FROM N/O NOB HILL DR. TO S/O R.S. SCHOOL RD. AND RTE 330 FROM S/O RTE. 18 TO RTE. 18-RURAL GATEWAY BEAUTIFICATION-AESTHETIC IMPROVEMTNS

$2,265

S 4351 58NEAR HINKLEY FROM 1.4 MILES WEST OF VALLEY VIEW RD. TO 0.7 MILES EAST OF LENWOOD ROAD -- REALIGN AND WIDEN TO 4 LANE EXPRESSWAY (2-4 LANES) (PHASE 2)

$154,478

S 34770 58 KERN CO LINE TO 7.5 MI EAST OF JCT RTE 395 - CONSTRUCT 4 LANE EXPRESS WAY ON NEW ALIGNMENT $158,397

S 200602 60SR 60 AND VINEYARD AVE. INTERCHANGE RECONSTRUCTION-LENGTHEN BRIDGE TO ACOMMODATE VINEYARD AVE WIDENING AND RAMP WIDENING 4-6 LANES

$44,250

S 200604 60 SR60 AT GROVE AVENUE INTERCHANGE RECONSTRUCTION AND GROVE AVE. +/-300 FT. N/S OF SR 60-WIDEN FROM 4-6 LANES $44,520

S 200435 62ON SH62 IN YUCCA VALLEY FROM APACHE TRAIL EAST TO APPROX 0.5 MILES TO PALM AVE. INSTALL NEW RAISED MEDIAN, CON-STRUCT CURB & GUTTER & NEW STREET LIGHTS

$2,741

S 20060201 62ON SR 62 FROM CHOLLA AVE TO TROJAN WAY - INSTALL RAISED MEDIAN ISLANDS, SIDEWALKS, AND CURB AND GUTTER (APPROX. 1 MILE)

$100

S 20060203 62SR 62 SAFETY & UTILITY IMPROVMNTS-TCRP 129 ON SR 62 FROM LA HONDA WY EAST APPROX. 0.2 MILES TO KICKAPOO TRAIL - IN-STALL RAISED LANDSCAPED MEDIANS, SIDEWALKS, UTIL U/GROUND/DRAINAGE

$320

S 20010133 66ON FOOTHILL BOULEVARD FROM GROVE TO VINEYARD- WIDEN FROM 4-6 LANES,MEDIAN ISLAND, TRAFFIC SIGNS,STORM DRAIN AND BIKE/PED BRIDGE(7,000 FT)

$15,023

Page 76: Project List - Southern California Association of Governments

74 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S 20020137 66 IN RANCHO CUCAMONGA - ON FOOTHILL BOULEVARD-FROM ARCHIBALD TO HAVEN AVE. WIDEN PORTIONS OF AREA 4-6 LANES $1,850

S 20020138 66 IN RANCHO CUCAMONGA ON FOOTHILL BLVD. FROM VINEYARD TO ARCHIBALD AVE. - WIDEN FROM 4 - 6 LANES $1,200

S SBD031247 66IN FONTANA FROM EAST AVENUE TO HEMLOCK AVE -WIDEN FROM 4 TO 6 LANES WIDEN TO STATE STANDARDS FOR 6 LANE (SCHEDULE DELAY ALSO)

$3,200

S SBD41205 66FOOTHILL BLVD. (66) I-15 TO ETIWANDA WIDEN NORTHSIDE FROM 2-3 LANES AND CONSTRUCT SIGNAL (SOUTHSIDE WIDENING COM-PLETE 2-3 LANES)

$1,500

S SBD41206 66 FOOTHILL BLVD. (66) ETIWANDA TO EAST STREET WIDEN FROM 4-6 LANES ,INSTALL SIGNAL AND ADD MEDIAN ISLAND $3,050

S 0F100 71ON RTE. 71 FROM SOQUEL CYN PARKWY TO RIVERSIDE CO. LINE AND RIV. CO FROM S.B. CO LINE TO SANTA ANA RIVER BRIDGE -PHASE 1- TREE PLANTING AND AESTHETICS

$1,505

S SBD41434 83EUCLID AVE. AT 8TH STREET INTERSECTION IMPROVEMENTS/MODIFI- CATIONS INCLUDING LEFT TURN POCKET AND PROTECTED LEFT PHASING

$500

S 34011 138NEAR WRIGHTWOOD FROM PHELAN RD TO I-15 WIDEN FROM 2 TO 4 LANES FROM BEEKLEY ROAD TO JCT 15; CONST 2 WILDLIFE CROSSINGS & 1 ADD'L LN EB FROM PHELAN RD TO BEEKLEY ROAD

$85,497

S 20432 210ON RTE 210 FROM ETIWANDA AVE.- 2.0 MI. NORTH TO 0.5 MI SOUTH OF RTE 210 - MITIGATION PLANTING 2,200 1-GAL. EUCALYPTUS TREES

$1,802

S 20620 210UPLAND TO SAN BERNARDINO FROM LA CO LINE TO RTE 215 - 8 LN FREEWAY INCLUDING 2 HOV LNS (6+2)-210 CORR. W/AUX LNS THRUOUT SEGS. 9-11(SEG.11 INCL CONNECTOR BETWEEN 210 & 215 (MORE)

$402,339

S 200626 210INLAND EMPIRE TRANSPORTATION MANAGEMENT CENTER AT EXISTING PARK N RIDE FACILITY - INSTALL TMC -IN THE SOUTHEAST QUADRANT OF I-15 AND SR 210 I/C ON VICTORIA AVE (I/T CITY OF FONTANA

$44,345

S 3770U 210IETMC/SO. REGIONAL LAB SITE WORK & PARK AND RIDE FACILITY - I/15/SR-210 I/C, NORTH SIDE OF VICTORIA AVE-CIVIL SITE WORK FOR IETMC (GRADING, DRAINAGE, UTILITIES, ETC.)

$9,382

S 713 215I-215 CORRIDOR NORTH - IN SAN BERNARDINO, ON I-215 FROM RTE 10 TO RTE 210 - ADD 2 HOV & 2 MIXED FLOW LNS (1 IN EA. DIR.) AND OPERATIONAL IMP INCLUDING AUX LANES AND BRAIDED RAMP

$677,012

S 200614 215I-215 BI-COUNTY IMPROVMT PROJECT - I-215 FROM - SR60/SR91/I-215 I/C IN RIVERSIDE TO ORANGE SHOW RD. IN SAN BERNAR-DINO- ADD 1 HOV & 1 MIXED FLOW LN IN EA.DIR.& ADD DECEL AND ACCEL LNS W/LOCAL RDS W/ ADDITIONAL IMPROVEMTNS AT COLUMBIA AVE, CENTER ST., IOWA AVE, WASHINGTON

$1,755,764

S SBD31850 215 IN GRAND TERRACE AT BARTON ROAD INTERCHANGE WIDEN OVERCROSSING FROM 2 TO 4 LANE $78,378

S SBD59204 215I-215 AT UNIVERSITY PARKWAY INTERCHANGE - CONSTRUCT SOUTHBOUND UNIVERSITY PARKWAY -INTERCHANGE RECONFIGURATION AND AUX. LANE

$14,100

Page 77: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 75

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S 20020144 220HI- DESERT CORR. -FROM 1.0 MI W/O SR 395 TO 1.0 S/O 18, CONST 4-6 LN FWY/EXPRY. NEW I/C @I/15 & AUX. LNS.ON I-15 N&S OF NEW IC.-- CNSTRCT IC@395 W/TURN POCKETS N&S ... ETC

$422,000

L 200006 0CITRUS AVENUE FROM JURUPA TO SLOVER - WIDEN FROM 2-4 LANES W/LEFT TURN LANES AT INTERSECTIONS (SLOVER, SANTA ANA AVE. & JURUPA-3 INTERSECTIONS)

$7,750

L 200009 0 BELLFLOWER ST FROM AIR BASE RD TO (AUBURN)SR-395 - RESURFACE EXISTING ROADWAY (1.75 MILES, NO NEW LANES) $438

L 200010 0 ASTER RD FROM VIOLET-AIR BASE TO BARTLETT-CRIPPEN - PAVE EXISTING 2 LANE DIRT ROAD (1.25 MILES, NON-CAPACITY) $325

L 200011 0 ADELANTO RD FROM CRIPPEN TO COLUSA 0 PAVE EXISTING 2 LANE DIRT ROAD (3 MILES, NON-CAPACITY) $750

L 200012 0 MAPLE AVENUE FROM MARIPOSA TD. TO MAIN STREET - ROAD REHAB. - RESURFACING 2 EXISTING LANES (NO NEW LANES) $2,310

L 200013 0 MAPLE AVENUE FROM MAIN ST. TO 650' SOUTH OF CROMDALE STREET - REHABILITATION - RESURFACE 2 LANE RD. (NO NEW LANES) $1,975

L 200018 0BOULDER AV ACROSS CITY CREEK S/O BASELINE - RECONSTRUCT EXISTING BRIDGE FROM 2 TO 4 LANES; ALSO WIDEN BOULDER AVE FROM 190' NORTH TO 1,430' SOUTH OF BRIDGE FROM 2-4 LANES

$20,325

L 200019 0BASELINE ACROSS CITY CREEK - FROM 600' W TO 600' EAST OF CITY CREEK RECONSTRUCT EXISTING BRIDGE TO INCREASE HYDRAU-LIC CAPACITY (NO ADDTL LANES - STILL 4) REPLACING LOW WATER XING

$22,522

L 200021 0 RAMONA AV AT STATE ST - RAILROAD CROSSING GRADE SEPARATION-FUNDED WITH TCRP (PART OF ALAMEDA CORRIDOR STUDY) $22,408

L 200022 0 6TH ST FROM HYSSOP DR TO 2500' EASTERLY - CONSTRUCT 2 LANES OF AN ULTIMATE 4 LANE ROAD $900

L 200023 0 CHERRY AV FROM SOUTH CITY LIMITS TO WILSON AV - WIDEN FROM 2 TO 4 LANES $470

L 200026 0HAVEN AV UNDERPASS AT METROLINK (SCRRA) RAILROAD - JERSEY TO ACACIA -GRADE SEPARATION, 6 LANES, MEDIAN ISLAND, ADJA-CENT STREET RE-ROUTING

$16,460

L 200031 0 MILLIKEN AV FROM BANYAN ST TO WILSON AV - CONSTRUCT NEW 4 LANE STREET (PART OF PROJECT NOW UNDER CONSTRUCTION) $1,100

L 200032 0 WILSON AV FROM AMETHYST ST TO HAVEN AV - WIDEN PORTIONS FROM 2 TO 4 LANES $700

L 200033 0 WILSON AV FROM HAVEN AV TO CANISTEL AV - WIDEN FROM 2 TO 4 LANES $500

L 200034 0 WILSON AV FROM ETIWANDA AV TO WARDMAN BULLOCK RD - CONSTRUCT NEW 4 LANE DIVIDED STREET $2,900

L 200035 0WABASH AV FROM 5TH ST TO I-10 - CONSTRUCT NEW 2 LANE STREET TO I-10 TO MATCH ON AND OFF RAMPS-CONSTRUCT MISSING LINK (2 LANE IN EACH DIRECTION)-1 MILE

$950

Page 78: Project List - Southern California Association of Governments

76 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L 200049 0MOJAVE RIVER BRIDGE CROSSING FROM TERMINUS OF YUCCA LOMA RD TO TERMINUS OF GREEN TREE BLVD - PRE. ENVIRONMENTAL REVIEW FOR CONSTRUCTION OF NEW 4 LANE BRIDGE

$28,500

L 200050 0 AMETHYST RD FROM SYCAMORE RD TO EUCALYPTUS RD - CONSTRUCT NEW 4 LANE ROAD $1,200

L 200051 0VISIONS 20/20 BRIDGE CROSSINGS ON 9TH, 2ND, 5TH, AND 'E' STREETS. VARIOUS LOCATIONS - BOX CULVERTS-TO ACCOMMODATE UNDERGROUND WATER SYSTEM. JOINT PROJECT W/IVDA & S.B.VALLEY WATER

$4,000

L 200064 0WASHINGTON ST FROM RECHE CANYON TO HUNTS LANE - ELIMINATE BOTTLENECK, ADD 2 LANES TO 4 LANE ROAD USING EXISTING STREET WIDTH AT INTERSECTIONS, TRAFFIC SIGNAL IMPROVEMENTS

$570

L 200074 0LUMP SUM - TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS FOR SAN BERNARDINO COUNTY-BIKE/PED PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126,127,128, EXEMPT TABLE 2 & 3).

$4,071

L 200111 0 VICTOR VALLEY COLLEGE TRANSFER POINT FACILITY - LOCATED 18422 BEAR VALLEY RD. IN VICTORVILLE $837

L 200150 0ADELANTO ROAD FROM AUBURN TO CHAPARRAL, AUBURN AVENUE FROM ADELANTO RD. TO JONATHAN AND JONATHAN FROM AUBURN TO LA HABRA- PAVE DIRT ROADS

$266

L 200151 0 EL MIRAGE RD. FROM RICHARDSON RD. (CITY LIMITS) TO SR 395 - PAVE EXISTING 2 LANE DIRT ROAD AND RESURFACE $5,295

L 200157 0AT MAIN STREET AND IOWA AVENUE AND APPROX. 300' NORTH AND 300' EAST OF EACH SIDE OF STREET-INTERSECTION IMPROVE-MENTS, CURB & GUTTER, REMOVE BILLBOARD AND TRAFFIC SIGNAL

$369

L 200201 0IN ADELANTO, EL MIRAGE RD. FROM SR. 395 TO 1 MILE EAST TO ADELANTO RD. AND ON ADELANTO RD. FROM EL MIRAGE RD. TO 1 MILE SOUTH-AUBURN AVE. PAVE EXISTING 2 LANE RD.

$560

L 200202 0IN CHINO - ON CHINO AVENUE FROM MONTE VISTA TO SIXTH STREET-WIDEN EXISTING 2 LANES TO 4 LANES AND INSTALL SIGNAL AT INTERSECTION OF CHINO AVE. AND MONTE VISTA

$584

L 200207 0 IN CHINO - ON PINE AVE EXTENSION FROM EL PRADO TO SR-71 - WIDEN BRIDGE FROM 2-4 LANES $25,000

L 200209 0 IN HESPERIA - PAVE ESCONDIDO ROAD FROM RANCHERO TO CEDAR (2.0 MILES). PAVE 4 LANES OF ROADWAY 2 IN EACH DIRECTION. $5,900

L 200210 0IN HESPERIA - ON BEAR VALLEY RD. FROM I-15 TO MOJAVE RIVER (CITY LIMITS) APPROX. 5.5 MILES - WIDEN SOUTHSIDE FROM 2-3 LANES

$4,225

L 200211 0 IN HESPERIA ON I STREET FROM MAIN ST. TO BEAR VALLEY RD. APPROX. 4.4 MILES - WIDEN FROM 2-4 LANES $7,700

L 200212 0ON GREENSPOT RD. BRIDGE OVER SANTA ANA RIVER (.045)-CONSTRUCT NEW 4 LN BRIDGE AT SANTA ANA RVR- REALIGN & WIDEN 2-4 LNS ON GREENSPOT RD FROM ST PAULA-E, CITY LIMITS W/CHANNEL IMPR

$959

L 200213 0ON 3RD ST. FROM PALM AVE. TO 5TH ST. WIDEN 3RD ST. OF E/O PALM AVE. FROM 2 TO 4 LANES AND EXTEND 3RD ST. EASTERLY TO CONNECT 5TH ST.

$280

Page 79: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 77

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L 200401 0FAIRFIELD RANCH EXT.-EXTEND FAIRFIELD RANCH RD. FROM 950 FT. S/O INTERSECTION OF FFRANCH RD TO 5000 FT. PARALLEL TO SR71 TO PINE INTERSECTION-CONSTRUCT NEW 2 LANE RD. W/BIKE LANES

$6,443

L 200403 0EVANS STREET FROM REDLANDS BLVD TO N/O UPRR TRACKS W/EAST-WEST CONNECTOR AT EVANS TO ANDERSON-4 LANES WITH LEFT TURN LANE IN CENTER AT INTERSECTIONS (FED DEMO # 1001)

$9,153

L 200404 0HOLT BLVD CORRIDOR WIDENING FROM BENSON AVE. TO VINEYARD AVE. WIDEN ROAD FROM 4-6 LANES INCLUDING TRAFFIC SIGNAL MODIFICATIONS AND RESTRIPING

$42,320

L 200405 0S. MILLIKEN AVE. GRADE SEPARATION - ON MILLIKEN FROM UPR TO NORTH OF MISSION BLVD. RR GRADE SEP-CONSTRUCT O/C/U/C AT RR-REALIGNMENT OF STS TO MEET O/CROSSING & INTERSTN IMPROVMTS

$16,001

L 200407 0FLAMINGO HEIGHTS LANDERS ROAD IMPROVEMTS-SH 247 PIPES WASH NORTH TO JOHNSON VALLEY-WIDEN TO ACCOMMODATE PASS-ING LANES WITH TURN POCKETS

$8,500

L 200408 0 CUMBERLAND DRIVE EXTENSION - SH 18 NORTH TO CUMBERLAND DRIVE -PAVE NEW ROAD - 1 LANE IN EACH DIRECTION $2,200

L 200409 0CHERRY AVE. AT SCRRA RR CROSSING - WIDEN BRIDGE FROM 2-4 LANES ON CHERRY OVER RR CROSSING (FROM MERRILL TO WHITTRAM)

$8,829

L 200410 0 CHERRY AVE. WIDENING FROM WHITTRAM TO FOOTHILL BLVD. -WIDEN 2-4 LANES $2,791

L 200414 0ON DUNCAN ROAD FROM OASIS EAST TO BALDY MESA PAVE DIRT ROADS 1 LANE IN EACH DIRECTION INCLUDING STOP SIGNS AT RR CROSSING

$1,480

L 200417 0EUCALYPTUS ST. FROM US395 TO AMETHYST- NEW 4 LANE RD FROM 395-MESA LINDA;WIDEN 2-4 LANES FROM MESA LINDA TO CLOVERLY AND CONSTRUCT NEW 4 LANE RD. FROM CLOVERLY TO AMETHYST

$2,800

L 200418 0 AIR EXPRESSWAY FROM NATION TRAILS HIGHWAY TO VILLAGE DRIVE - WIDEN FROM 2-4 LANES $2,600

L 200419 0 ALABAMA STREET WIDENING - WIDEN FROM 2-4 LANES FROM NORTH CITY LIMITS TO 3,000 FT. NORTH PALMETTO $7,200

L 200420 0 ORANGE STREET WIDENING - FROM NORTH CITY LIMITS TO RIVERVIEW DRIVE - WIDEN STREET FROM 2-4 LANES $6,200

L 200421 0DOWNTOWN REDLAND CORE AREA PARKING GARAGE-NEW PARKING STRUCTURE BETWEEN EUREKA AND 3RD STREET SOURTH OF STUART AND N/OR RR-APPOX. 200 SPACES (NOT A PNR)

$6,000

L 200429 0 AT SR30 AND 5TH ST. - RAMP MODIFICATION - WIDENING RAMPS FROM 1-2 LANES AND ADD TURN LANES ON 5TH ST. $3,000

L 200430 0ON 3RD& 5TH STS. FROM PALM AVETO TIPPECANOE AVE.- WIDEN FROM 2-4 LNS & IMPROVEMT TO SHOULDER ON VICTORIA, DEL ROSA, STERLING AVES FROM 3RD TO 6TH STS. (NO ADDTL LANES ON VICTORIA)

$27,308

L 200431 0INLAND PACIFIC ELECTRIC TRAIL - ON OLD SP ABANDONED RR BETWEEN I-15 TO JUNIPER AVE.-CONSTRUCT CLASS 1 BIKE LANE (AP-PROX. 7 MILES LONG)

$2,804

Page 80: Project List - Southern California Association of Governments

78 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L 200603 0 RIVERSIDE AVE. SOUTH OF I-10 BETWEEN I-10 AND SLOVER AVE - RAILROAD BRIDGE MODIFICATION FROM 4-8 LANES $11,132

L 200607 0LENA ROAD EXENSION PROJECT - EXTENSION OF LENA RD. FROM MILL ST. TO ORANGE SHOW RD.-NEW 4 LANE ROAD (CO-OP PROJECT WITH IVDA)SAFETEA-LU -#1701

$6,300

L 200608 0CENTRAL AVENUE WIDENING PROJECT BETWEEN WATERMAN AND MT.VIEW AVE.(2 MI) -WIDEN FROM 2-4 LANES BETWEEN TIPPECANOE AND MT.VIEW, ADDING CURBS, SIDEWALKS AND LIGHTING

$5,600

L 200609 0MT.VIEW WIDENING/EXTENSION PROJECT- FROM RIVERVIEW TO CENTRAL AVE-NEW 4 LANE RD.-WIDEN 2 BRIDGES (SANTA ANA & MIS-SION CRK) FROM 2-4 LNS;WIDEN S/B FROM 1-2 LNS- COULSTON TO SB AVE

$9,034

L 200610 0 TIPPECANOE WIDENING PROJECT - BETWEEN MILL AND HARDT ST. (1.4 MI)-WIDEN FROM 4-6 LANES INCLUD.MEDIAN LANDSCAPE $2,978

L 200611 0 HELENDALE ROAD-VICTORVILLE CITY LIMITS NORTH TO SHADOW MT. ROAD - STUDY $750

L 200618 0 PINE AVE. ENHANCEMENT - FROM EL PRADO TO EUCLID AVE. - WIDEN 2-4 LANES $3,650

L 200619 0GLEN HELEN PARKWAY-FROM 4 LANE TRANSITION WEST OF CAJON WASH-CMRS #382400-REALIGN AND WIDEN TO FOUR LN RD EAST TO CAJON BOULEVARD. DEMOLISH AND REPLACE THE EXISTING GLEN HELEN PARKWAY BRIDGE OVER CAJON CREEK WITH A NEW BRIDGE STRUCTURE; CONSTRUCT A GRADE

$20,700

L 200622 0LENWOOD GRADE SEPARATION - NORTH OF WEST MAIN ST. APPROX. 400 FT. N/O TO 600 FT. S/O BNSF AND SANTA FE RR RIGHT-OF-WAY-4 TRAVEL LANE GRADE SEPARATION

$23,814

L 200630 0 ARROW ROUTE WIDENING FROM LOS ANGELES COUNTY LINE TO BENSON AVENUE - WIDEN FROM 2 TO 4 LANES 1 IN EA DIR. (1.1MILE) $4,500

L 2002164 0ON VALLEY BLVD. IN COLTON TO NORTH TO 10TH STREET CONNECTING TO ABANDONED RR CORRIDOR ON WEST SIDE OF COLTON AVE.-CONSTRUCT CLASS I BIKEWAY, LANDSCAPING AND LIGHTING

$565

L 2002170 0 PEPPER AVE: FOOTHILL BLVD TO HIGHLAND AVE. -- WIDEN EXISTING 2 LANES TO 6 LANES (3 EACH DIR) $15,000

L 20010112 0LUMP SUM-IN VARIOUS LOCATIONS WITHIN SAN BERNARDINO COUNTY - 5 GRADE SEPARATION PROJECTS - TCRP FUNDING ( PROJ-ECTS CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$8,000

L 20010135 0MONTE VISTA AVENUE @ UNION PACIFIC RAILROAD CROSSING - GRADE SEPARATION PART OF ALAMEDA CORRIDOR GRADE SEPARATION PROJECTS FUNDED WITH TCRP #55.1

$27,088

L 20010137 0 HUNTS LANE @ UNION PACIFIC RAILROAD CROSSING - GRADE SEPARATION -PART OF ALAMEDA CORRIDOR STUDY (TCRP #55.3) $26,600

L 20010138 0STATE STREET/UNIVERSITY AVENUE AT SAN BERNARDINO LINE - GRADE SEPARATION-(PART OF ALAMEDA CORRIDOR STUDY - TCRP #55.3

$28,944

L 20010139 0 IN ONTARIO: ON MILLIKEN AT UNION PACIFIC RAILROAD - GRADE SEPARATION - PART OF ALAMEDA CORRIDOR STUDY - TCRP #55.2 $72,783

Page 81: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 79

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L 20020134 0 IN RANCHO CUCAMONGA - ON ARROW RTE. FROM ETIWANDA AVENUE TO EAST STREET - WIDEN FROM 2-4 LANES (3,200 FEET) $1,100

L 20020201 0PACIFIC ELECTRIC INLAND EMPIRE TRAIL - PHASE 1 - HAVEN AVENUE TO 1200' EAST OF ETIWANDA AVE(3.4 MILES) CONSTRUCT CLASS 1 BIKE TRAIL&ROW ACQ.ETIWANDA DEPOT

$6,523

L 20020202 0REDLANDS PARK ONCE PROGRAM - ON CITRUS BETWEEN 6TH AND 7TH STS. CITRUS AVE. PARKING GARAGE - APPROX. 200 SPACES- FOR DOWNTOWN REDLANDS

$2,800

L 20020301 0 IN YUCAIPA - ON OAK GLEN ROAD INTERCONNECT FROM CALIMESA TO BRYANT ST $150

L 20040209 0NATL TRAILS HIWAY FROM BRYMAN RD S/O MORNING GLORY ST. TO BRYMAN TO N O MARIGOLD- WIDEN EXISTG 2 LN RD FOR PASSING LNS - 1 IN EA DIRECT., INCL TRANSITIONS Y (CO W/#200106)

$2,150

L 20040210 0SUMMIT VALLEY ROAD - FROM SH138 TO HESPERIA CITY LIMITS-PSE ONLY - FOR REALIGNMENT OF SUMMIT VALLEY RD, 2 LANES IN EACH DIRECTION

$2,325

L 20040804 0I-40/AZ95 CONNECTOR- J ST. FROM I-40 OFFRAMPS TO W. BROADWY;NEEDLES HGWY FROM W. BROADWY TO N.K ST; N.K ST FROM NEEDLES TO AZ 95-WIDEN 2-4 LNS-INTERSCTN& CORRIDOR IMPRVT.

$3,550

L 20040826 0 GLEN HELEN PARKWAY - GRADE SEPARATION - STUDY TO DEVELOP A PLAN $25,650

L 20040828 0 RIDESHARE PROGRAM FOR MOJAVE DESERT AIR DISTRICT $2,050

L 20040830 0 STIP TEA RESERVES FOR BIKE/PED.;LANDSCAPE TYPE PROJECT $14,688

L 20041201 0ON BEAR VALLEY ROAD AND FISH HATCHERY ROAD - SIGNAL - WILL BE TYING INTO OTHER SIGNALS ON BEAR VALLEY (PART OF VICTOR VALLEY COLLEGE PARK AND RIDE PROJECT) 200111

$203

L SBD031118 0 EDISON AVENUE RAMONA TO CENTRAL WIDEN FROM 4 LANES TO 6 LANES & REHABILITATION (SPOT WIDENING) $2,000

L SBD031152 0 RIVERSIDE DRIVE AT SAN ANTONIO FLOOD CONTROL CHANNEL WIDEN BRIDGE FROM 4 LANES TO 6 LANES $1,120

L SBD031154 0 RECHE CANYON ROAD WASHINGTON STREET TO CITY LIMITS WIDEN FROM 2 LANES TO 4 LANES $1,801

L SBD031157 0 MILL STREET BORDWELL TO RANCHO WIDEN ROADWAY AND BRIDGE FROM 2 LANES TO 4 LANES $4,721

L SBD031190 0 CHERRY AVENUE BASELINE AVENUE TO HIGHLAND AVENUE WIDENING STREET FROM 2 LANES TO 6 LANES $4,180

L SBD031207 0 SIERRA AVENUE AT SANTA FE RAILROAD CONSTRUCT 6 LANE UNDERCROSSING $17,134

L SBD031213 0 CITRUS AVENUE AT SANTA FE RAILROAD: CONSTRUCT UNDERCROSSING FOR EXISTING 4 LANES $17,134

L SBD031217 0 BEECH AVENUE STATE ROUTE 30 TO FOOTHILL BOULEVARD WIDEN FROM 2 LANES TO 4 LANES $3,919

Page 82: Project List - Southern California Association of Governments

80 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L SBD031218 0 ALDER AVENUE BASELINE TO FOOTHILL BOULEVARD WIDEN 2 LANES TO 4 LANES W/TURN LANES $1,500

L SBD031220 0 SANTA ANA AVENUE MULBERRY TO LIVE OAK AVENUE WIDEN FROM 2 TO 4 LANES-INCLUDES RR CROSSING $2,771

L SBD031221 0 PHILADELPHIA STREET MULBERRY TO ETIWANDA AVENUE CONSTRUCT 4 LANE ROAD (1.0 MILE) $2,776

L SBD031225 0 LOCUST AVENUE RIVERSIDE COUNTY LINE TO JURUPA AVENUE WIDEN FROM 2 LANES TO 4 LANES $2,500

L SBD031227 0 JURUPA AVENUE ETIWANDA TO SIERRA AVENUE CONSTRUCT 6 LANE ROAD $24,500

L SBD031228 0 ETIWANDA AVENUE RIVERSIDE COUNTY LINE TO INTERSTATE 10 WIDEN FROM 4 TO 6 LANES, LEFT TURN LANES & SIGNALS (2) $2,534

L SBD031230 0 CHERRY AVENUE JURUPA AVENUE TO SLOVER AVENUE WIDEN FROM 2 TO 6 LANES (1.0 MILE) $3,786

L SBD031232 0 BANANA AVENUE JURUPA AVENUE TO SLOVER AVENUE WIDEN 2 LANES TO 4 LANES $1,517

L SBD031233 0 ARROW BOULEVARD ALDER TO MAPLE AVENUE WIDEN 2 LANES TO 4 LANES $1,880

L SBD031235 0 ARROW HIGHWAY CHERRY TO CITRUS AVENUE WIDEN 2 LANES TO 4 LANES $1,550

L SBD031238 0 ALDER AVENUE VALLEY TO SAN BERNARDINO AVENUE WIDEN 2 LANES TO 4 LANES $1,460

L SBD031239 0 BEECH AVENUE VALLEY TO ARROW BOULEVARD WIDEN FROM 2 LANES TO 4 LANES $12,050

L SBD031240 0 BEECH AVENUE ARROW BOULEVARD TO FOOTHILL BLVD WIDEN FROM 2 TO 4 LANES $1,597

L SBD031241 0 BASELINE AVENUE FROM CITRUS TO MAPLE AVENUE ADD UP TO 5' SHOULDER & WIDEN FROM 2 TO 6 LANES (SCHEDULE DELAY ALSO) $7,550

L SBD031244 0 CHERRY AVENUE MERRILL AVENUE TO FOOTHILL BOULEVARD CONSTRUCT RAILROAD GRADE SEPARATION & WIDEN 4-6 LANES $10,557

L SBD031246 0 FOOTHILL BOULEVARD CITRUS AVENUE TO MAPLE AVENUE WIDEN TO STATE STANDARDS FROM 4 TO 6 LANES $12,000

L SBD031248 0 FONTANA AVENUE VALLEY BOULEVARD TO MERRILL AVENUE WIDEN FROM 2-4 LANES $6,500

L SBD031252 0 MERRILL AVENUE CITRUS AVENUE TO ALDER AVENUE WIDEN FROM 2 LANES TO 4 LANES $2,388

L SBD031254 0 MERRILL AVENUE ALDER TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES $2,100

L SBD031258 0 RANDALL AVENUE CATAWABA AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES $458

L SBD031259 0 RANDALL AVENUE ALDER AVENUE TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES $1,700

L SBD031260 0 SANTA ANA AVENUE SIERRA TO TAMARIND AVENUE WIDEN FROM 2 TO 4 LANES & INSTALL TRAFFIC SIGNALS (2) $1,800

L SBD031261 0SAN BERNARDINO AVE FROM FONTANA AVETO ALDER AVENUE SPOT WIDENING 4 - 6 LANES (TO ACCOMMODATE TRANSITIONS ON SIDE STREETS,

$3,969

L SBD031264 0 SAN BERNARDINO AVENUE ALDER TO LOCUST AVENUE WIDEN FROM 2 TO 4 LANES $1,200

L SBD031265 0 SIERRA AVENUE FROM BASELINE TO WALNUT- WIDEN FROM 4 TO 6 LANES (PROJECT SPLIT WITH #20020112) $7,800

L SBD031266 0 SIERRA AVENUE FOOTHILL BOULEVARD TO BASELINE AVENUE- WIDEN FROM 4 TO 6 LANES $8,040

Page 83: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 81

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L SBD031270 0 SUMMIT AVENUE BEECH AVENUE TO SIERRA AVENUE WIDEN FROM 2 TO 4 LANES $8,000

L SBD031271 0 FOOTHILL BOULEVARD AT EAST AVE TO HEMLOCK WIDEN 2-3 LANES ON SOUTH SIDE $8,750

L SBD031276 0RANCHERO ROAD 7TH AVENUE TO DANBURY REALIGN ROAD AND WIDEN FROM 2-4 LANES AND CONSTRUCT RAILROAD UNDERCROSS-ING

$27,755

L SBD031284 0 "I" AVENUE FROM RANCHERO RD TO MAIN ST. WIDEN FROM 2 LANES TO 4 LANES $6,870

L SBD031290 0 MOUNTAIN VIEW AVENUE VAN LEUVAN TO PROSPECT WIDEN TWO EXISTING BRIDGES FROM 3 LANES TO 4 LANES $5,980

L SBD031294 0 REDLANDS BOULEVARD AT CALIFORNIA STREET WIDEN INTERSECTION AND INSTALL TRAFFIC SIGNALS AND DRAINAGE $6,096

L SBD031295 0 BARTON ROAD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES SPOT WIDENINGS $690

L SBD031296 0 REDLANDS BOULEVARD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES $6,850

L SBD031315 0MISSION BOULEVARD GROVE TO HAVEN WIDEN FORM 4 LANES TO 6 LANES ,LANDSCAPED MEDIAN AND STORM DRAIN(3.3 MI) (T21-#60) SEG.1 ARCHIBALD TO HAVEN AND SEG.2- GROVE TO ARCHIBALD

$18,770

L SBD031323 0 ARCHIBALD AVENUE HILLSIDE ROAD TO SOUTH OF BANYON ROAD - WIDEN FROM 2 LANES TO 4 LANES $1,070

L SBD031333 0 CARNELIAN STREET HILLSIDE ROAD TO ALMOND STREET WIDEN FROM 2 LANES TO 4 LANES & REHABILITATION $410

L SBD031335 0 FOOTHILL BOULEVARD AT ARCHIBALD AVENUE INTERSECTION IMPROVEMENTS (ADD RIGHT TURN LANE) $640

L SBD031360 0RIVERSIDE AVENUE SANTA ANA TO AGUA MANSA CONTINUOUS LEFT TURN LANE;WIDEN WEST SIDE(FOR LEFT TURN LANE AND ADDING CURB AND GUTTER

$2,200

L SBD031361 0 AYALA DRIVE BASELINE ROAD TO HIGHLAND AVENUE WIDEN FROM 2 LANES TO 4 LANES $3,036

L SBD031395 0 7TH AVENUE BEAR VALLEY ROAD TO NISQUALLI ROAD WIDEN FROM 2 LANES TO 4 LANES $660

L SBD031398 0 COTTONWOOD AVENUE MARIPOSA ROAD TO BEAR VALLEY WIDEN FROM 2 LANES TO 4 LANES $350

L SBD031412 0NISQUALLI RD FROM BALSAM RD TO HESPERIA RD - WIDEN FROM 2 LANES TO 4 LANES, DRAINAGE IMPROVEMENTS, AND VERTICAL REALIGNMENT

$3,750

L SBD031417 0 LA MESA ROAD AT STATE ROUTE 395 INSTALL TRAFFIC SIGNALS $625

L SBD031418 0 AMETHYST ROAD PALMDALE ROAD TO HOPLAND STREET WIDEN EXISTING ROAD FROM 2 LANES TO 4 LANES $4,000

L SBD031419 0EL EVADO ROAD, PALMDALE RD TO AIR BASE ROAD PALMDALE TO HOPLAND (12/98) HOPLAND TO AIR BASE (12/96), WIDEN FROM 2 TO 4 WITH LEFT TURN LANES

$4,000

L SBD031421 0 3RD AVENUE BEAR VALLEY TO NISQUALLI ROAD WIDEN FROM 2 LANES TO 4 LANES, EXTEND ROAD WITH 4 LANES $750

L SBD031422 0 3RD AVENUE NISQUALLI ROAD TO GREEN TREE BOULEVARD WIDEN FROM 2 LANES TO 4 LANES $750

Page 84: Project List - Southern California Association of Governments

82 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L SBD031426 0NEEDLES HIGHWAY FROM 'N' STREET TO NEVADA STATE LINE-REALIGN, REHABILITATE, WIDEN SHOULDERS, TURN LANES, PASSING LANES, AND ACCELERATION LANES (1 LANE IN EACH DIR.) RELOCATE UTIL.

$87,788

L SBD031505 0VARIOUS LOCATIONS - LUMP SUMS LTF, ARTICLE 3 BICYCLE/PEDESTRIAN PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128, EXEMPT TABLES 2 & 3)

$7,900

L SBD031523 0 AVENUE "F" AT INTERSTATE 10, SOUTH SIDE RAMPS INSTALL TRAFFIC SIGNAL $514

L SBD31718 0 ORANGE STREET AT SANTA ANA RIVER RECONSTRUCT ALL-WEATHER CROSSING OF RIVER, WIDEN FROM 2 TO 4 LANES $5,180

L SBD31785 0 EUCALYPTUS AVENUE PEYTON DRIVE TO GALLOPING HILLS RD. CONSTRUCT 2 LANE ROAD $6,020

L SBD31876 0 CALIFORNIA STREET BARTON ROAD TO REDLANDS BOULEVARD WIDEN FROM 2 TO 6 LANES $630

L SBD31886 0 CUNNINGHAM STREET FROM NINTH STREET TO BASELINE - WIDEN FROM 2 TO 4 LANES $350

L SBD31903 0FOOTHILL BOULEVARD (STATE ROUTE 66) AT FOURTH MODIFY SIGNALS, CHANNELIZE TRAFFIC SIGNAL, INTERSECTION IMPROVEMENTS/REALIGN INTERSECTION

$1,137

L SBD31905 0 MT. VERNON AVENUE BRIDGE AT BNSF REPLACE GRADE SEPARATION, $51,519

L SBD41207 0 GROVE AVE, 8TH TO SAN BERNARDINO RD WIDEN FROM 2-4 LANES, UPGRADE SIGNALS AND DRAINAGE. $2,200

L SBD41208 0 GROVE AVE, SAN BERNARDINO RD TO FOOTHILL BLVD. WIDEN FROM 2-4 LANES AND UPGRADE SIGNALS (700 FT.) $760

L SBD41213 0 APPLE VALLEY ROAD EXTENSION FROM NORTHERN TERMINUS OF APPLE VALLEY RD. TO FALCHION RD. CONSTRUCT 4 LANE NEW ROAD $1,200

L SBD41239 0WOODVIEW AVE/PIPELINE TO PEYTON DR. WOODVIEW AVE. FROM 30FT.-52FT WIDEN FROM 2 TO 4 LANES & MARKED BIKE LANES IN EACH DIR, INCLUDES CURB, GUTTER & SIDEWALK IMPROVEMENTS

$2,150

L SBD41241 0PEYTON DRIVE/WOODVIEW ROAD TO SOQUEL CANYON PARKWAY CONSTRUCT NEW 2 LANE_ROAD INCLUDED ARE BICYCLE LANES MARKED IN EACH DIRECTION

$4,575

L SBD41242 0PEYTON DRIVEFROM GRAND AVE TO EUCALYPTUS;WIDEN PEYTON FROM 2 TO 6 LNS W/ MARKED BIKE LNS IN EA.DIRECT;AND FROM EUCALYPTUS TO 142 WIDEN 2-4 LANES W/MARKED BIKE LNS IN EA DIRECT

$15,840

L SBD41289 0RANCHO LAS FLORES PARKWAY -NO LANES CURRENTLY EXIST. DEVELOPER TO CONST RUCT HIGHWY 138 TO RANCHERO RD. 2 LANES IN EACH DIRECTION.

$10,000

L SBD41316 0MT. VIEW AVE. RAILWAY GRADE CROSSING, 1500 FT. NORTH OF I-10 WIDEN RAILWAY GRADE CROSSING FROM 1 LANE NORTH & SOUTH TO 2 LANES NORTH & SOUTH & UPGRADE GATES

$150

L SBD41317 0MT. VIEW AVE. BRIDGE AT MISSION CREEK CHANNEL WIDEN ROADWAY & SHOULDER WORK AND EXISTING BRIDGE AT MT. VIEW -1 LN. NO. & SO. TO 2 LNS N/S & LFT_TURNS

$720

L SBD41427 0 AMBOY ROAD - LEAR AVE TO ADOBE RD. (5.5 MILES) CONSTRUCT NEW 2 LANE ROAD (ONE LANE IN EACH DIRECTION) $550

L SBD41428 0 TWO MILE ROAD - SUNRISE AVE. TO LEAR AVE. (2.5 MILES) WIDEN ROAD FROM 2-4 LANES $400

Page 85: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 83

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L SBD41438 0 CORNER: NWC OF 'A' ST. AND 3RD AVE. 52 STALL PARKING LOT FOR METROLINK $345

L SBD55011 0YUCCA LOMA RD. FROM APPLE VALLEY RD. TO NAVAJO RD. WIDEN EXISTING 2 LANE RD. TO 4 LANE RD. (2 LANES IN EACH DIRECTION) (3 MILES)

$2,150

L SBD55012 0 YUCCA LOMA RD. AT SR 18 CONNECTION NEW CONNECTION - CONNECTING YUCCA LOMA RD. AND SR 18 - NEW INTER- SECTION $2,772

L SBD55025 0MAIN STREET FROM ESCONDIDO TO 11TH AVE - WIDEN AND RECONSTRUCT FROM 4 - 6 LANES, INCLUDING WIDENING OF BRIDGE OVER CALIFORNIA AQUEDUCT (2.75 MILES)

$14,500

L SBD55028 0 RANCHERO RD. FROM DANBURY TO ARROWHEAD LAKE RD. - WIDEN FROM 2 TO 4 LANES (9.50 MILES) $11,000

L SBD55030 0 RANCHERO RD. FROM I-15 TO 7TH ST. - WIDEN FROM 2 TO 4 LANES (5.50 MILES) $11,000

L SBD55031 0 ALABAMA STREET FROM 3RD STREET TO SOUTH CITY LIMITS - WIDEN FROM 2 TO 4 LANES (0.25 MILES) $1,270

L SBD55033 0 BOULDER AVE. FROM 5TH ST. TO SOUTH CITY LIMITS - WIDEN FROM 2-4 LANES (0.60 MILES) $330

L SBD55034 0MISSION BLVD. FROM LA COUNTY LINE TO BENSON AVE (2.2 MILES) RECONSTRUCT RDWAY, LANDSCAPE MEDIAN ISLANDS, STORM DRAINS, UPGRADED SIGNALS (NO ADDTL LANES) (T21-#60)

$14,130

L SBD58044 0 CITRUS AVENUE AUBURN CT. TO WABASH AVENUE WIDEN FROM 2 TO 4 LANES $525

L SBD59004 0 FRANCIS ST. FROM BON VIEW AVE TO GROVE WIDENING 2 TO 4 LANES (STORM DRAIN FROM BON VIEW TO PARCO) $12,631

L SBD59006 0GROVE AVENUE FROM STATE ST. TO 350' NORTH OF HOLT BLVD. WIDENING FROM 4 TO 6 LANES WIDENING RAILROAD BRIDGE ALSO (1,450'),LANDSCAPE RESTORATION, LEFT TURN LANES AT HOLT

$9,440

L SBD59012 0 C HURCH ST. FROM CLARK STREET TO COLTON AVENUE WIDEN FROM 2-4 LANES (0.6 MILES) $1,665

L SBD59016 0CALIFORNIA STREET FROM LUGONIA TO SAN BERNARDINO AVENUE. WIDEN FROM 2 LANES TO 6 LANES ( 3 IN EACH DIRECTION) WITH MEDIAN ISLAND (1/2 MILE)

$850

L SBD59019 040TH ST. FROM ACRE LANE TO ELECTRIC AVENUE; ACQUIRE ROW AND WIDEN ROAD FROM 2 TO 4 LANES (1,200 FT.)

$3,395

L SBD59021 0STATE STREET FROM 16TH STREET TO FOOTHILL BLVD.; EXTEND AND CONSTRUCT (2) LANES OF ROADWAY (1.5 MILES) TO CONNECT STATE STREET TO RANCHO AVENUE (NEW ROAD)4 PHASES TOTAL IN PROJECT

$7,889

L SBD59023 0CAMPUS PKWY-PEPPER/LINDEN DRIVE EXTENSION FROM KENDALL TO I-215 FWY - CONSTRUCT (4) LANE ROADWAY - BETWEEN KEND-ALL DRIVE AND I-215, PARTIAL DIAMOND INTERCHANGE FOR N/B (2,000 FT)

$22,000

L SBD59027 0FT IRWIN RD: I-15 TO FT IRWIN BOUNDARY-REHAB EXISTING RDWY(22.46 MILES), WIDEN SHOULDERS,RELOCATE UTILITIES,ADD LEFT/RIGHT TURN LANES,CONSTRUCT 5 PASSING LANES, 1 ACCELERATION LANE

$23,097

L SBD88086 0 EUCLID AVENUE FROM D ST TO FOOTHILL BOULEVARD - STORM DRAIN EXTENSION $1,414

Page 86: Project List - Southern California Association of Governments

84 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L SBD88140 0 NATIONAL TRAILS ROAD BETWEEN INTERSTATE 15 & AIRBASE RD. WIDEN FROM 2 LANES TO 4 LANES $2,600

L SBD94118 0 ARDEN AVENUE PACIFIC SOUTH TO SAND CREEK CONSTRUCT 2 LANE ROAD & BRIDGE OVER SAND CREEK $800

L SBD94173 0 STATE ROUTE 62 LEE DRIVE TO LUPINE DRIVE WIDEN FROM 4 TO 5 LANES FOR CONTINUOUS LEFT TURN LANE $300

L SBD94174 0 STATE ROUTE 62 MESQUITE SPRINGS RD/DESERT KNOLL WIDEN FROM 4 TO 5 LANES FOR CONINUOUS LEFT TURN LANE $323

L SBD94175 0 RTE 62 FROM DESERT KNOLL TO MOJAVE TO MOJAVE ROAD WIDEN TO CREATE LT. TURN POCKETS $137

L SBD94177 0 STATE ROUTE 62 AT LARREA AVENUE & HATCH ROAD RECONFIGURE AND SIGNALIZATION (NO SYNCHRONIZATION) $196

L SBD97123 0RIVERSIDE AVENUE AT SIERRA AVENUE -ROADWAY REALIGNMENT (APPROX. 800')NO ADDITION LANES- TRAFFIC SIGNALS, LIGHTS, AND STREET IMPROVEMENTS

$2,300

L SBD97147 0 GREEN TREE BLVD AT AT&SF RAILROAD CONSTRUCT 4-LANE BR & CONNECT TO HESPERIA & RIDGECREST RD $14,583

L SBDLS08 0 HBRR LOCAL BRIDGE LUMP SUM FOR 2006 - (PROJETS ARE CONSISTENT WITH 40 CFR PART 93.126.127.128, EXEMPT TABLES 2 & 3) $47,731

T 200084 0 TRANSIT - ADMINISTRATION EQUIPMENT $2

T 200086 0BUS SYSTEM - PASSENGER FACILITIES. PURCHASE BUS STOP SIGNS AND SHELTERS PROVIDING ADA ACCESSIBILITY;04-15 BS;05-15; 06-15;07-15

$319

T 200088 0 TRANSIT SERVICE EQUIPMENT - PURCHASE MAINTENANCE EQUIPMENT FOR EAST AND WEST VALLEY FACILITIES. $1,203

T 200416 0SCLA RAIL SERVICE FROM AIR EXPRESSWAY APPROX. 5 MILES N0 TO COLUSA RD. BETWEEN PHANTOM EAST & MOJAVE RIVER-PUT IN NEW RAIL LINE FROM BNSF TO SCLA.(FOR FREIGHT)

$38,000

T 200423 0 PARATRANSIT VEHICLES - REPLACEMENT - GAS/DIESEL; 04-3;05-2;06-4;08-3,09-3 $1,198

T 200424 0 PURCHASE REPLACEMENT DIESEL BUSES - 06-1;07-4 $1,416

T 200425 0 VEHICLE REPLACEMENT - PARATRANSIT VEHICLES - 2 -18 PASSENGER ACCESSIBLE SMALL BUSES $147

T 200426 0 PARATRANSIT VEHICLES - REPLACING 7 PASSENGER GAS BUS 06-1;08-2;09-1 $190

T 200427 0 CAPITAL COST OF CONTRACTING FOR OPERATIONS $7,488

T 200441 0 FACILITIES: EASTERN AREA MAINTENANCE: THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA & RCTC $17,714

T 200450 0 RIALTO METROLINK STATION - INCREASE PARKING SPACES FROM 225-775 $3,000

Page 87: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 85

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T 200625 0 E STREET TRANSIT CORRIDOR- FROM SAN BERNARDINO TO LOMA LINDA $252,871

T 981104 0 TRANSIT - SECURITY $890

T 981111 0 TRANSIT - ENHANCEMENTS: 1% TRANSIT ENHANCEMENTS TO INCREASE ACCESSIBILITY TO BUS STOPS $619

T 981114 0 TRANSIT - SECURITY CAPITALIZATION OF SECURITY COSTS $734

T 981118 0 BUS SYSTEM - PASSENGER FACILITIES: DESIGN AND BUILDING OF ONTARIO TRANSCENTER $690

T 981122 0 CAPITALIZATION OF PREVENTIVE MAINT $25,599

T 990602 0 METROLINK CAPITAL MAINTENANCE (INCLUDES OCTA PAYBACK IS 100% IN 5309) FOR 2005/06,2006/07, 2007/08 $16,120

T 2002172 0 MID VALLEY FACILITY - NEW MAINTENANCE & ADMINISTRATION FACILITY LOCATED IN RANCHO CUCAMONGA (ETIWANDA & ARROW) $21,941

T 20010120 0 TRANSIT SERVICE EQUIPMENT - PURCHASE OF VARIOUS MAINTENANCE EQUIPMENT (ON-GOING PROJECT) $31

T 20010127 0TRANSIT OPERATING EQUIPMENT - PURCHASE MOBILE DISPLAY EQUIPMENT, RADIOS, FAREBOX PARTS & TOOLS, DISPATCH PHONE MONITOR

$223

T 20020140 0 PARATRANSIT - VEHICLES 17 PASSENGER REPLACEMENT - ALT. FUEL; 05-01 - REPLACEMENT YEAR 2005-FY 2001 VEHICLE $663

T 20020801 0METROLINK ROLLING STOCK - SANBAG'S SHARE OF PURCHASE OF METROLINK CARS & LOCOM UP TO 47 CARS/CABS AND IN FUTURE YEARS UP TO 22 CARS/CABS & UP TO 8 LOCOM (CO-OP LA0C8231, RIV010214)

$22,584

T 20020802 0METROLINK ADD'L PARKING STRUCTURE - CONSTRUCT 5 LEVEL PARKING STRUCTURE TO SERVE EXISTING METROLINK STATION AT SANTA FE DEPOT LOCATION

$11,064

T 20020804 0MAJOR INVESTMENT STUDY FOR BUS RAPID TRANSIT CORRIDOR ALONG IN SAN BERNARDINO - FROM SAN BERNARDINO TO LOMA LINDA

$2,125

T 20020806 0 TRANSIT - FACILITIES - IMPROVEMENT/UPKEEP OF EXISTING FACILITIES $2,203

T 20020810 0 REPLACEMENT-PARATRANSIT - 9 PASSENGER VEHICLES - GAS - 04-1;05-1;06-1;08-1;09-1 $205

T 20040211 0 REPLACEMENT PARATRANSIT VEHICLES REPLACING PARATRANSIT VEHICLES ON OMNITRANS ACCESS FLEET06-10;07-25;08-50 $5,153

T 20040701 0 PARATRANSIT - VEHICLES 22 PASSENGER REPLACEMENT - GAS 06-1;08-2;09-1 $533

T 20040808 0 ITS SOFTWARE AND HARDWARE $900

T 20040811 0 PARATRANSIT VEHICLE REPLACEMENT - 16 PASSENGER - GAS-07-6;08-4 $709

T 20040812 0 VEHICLE REPLACEMENT - 28 PASSENGER DEVIATED FIXED ROUTE; 07-2 $376

T 20040813 0 REPLACEMENT - ALT. FUEL 33 PASSENGER DEVIATED FIXED ROUTE VEHICLES; 06-1; 08-1 $609

T 20040815 0 ADMINISTRATION EQUIPMENT - COMPUTER HARDWARE AND OFFICE FURNISHINGS $30

T 20040817 0 VEHICLE OVERHAULS - TO REBUILD ENGINES, TRANSMISSIONS, ETC. ON AGING FLEET $90

Page 88: Project List - Southern California Association of Governments

86 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T 20040825 0 UPLAND METROLINK STATION - ADDITIONAL PARKING $5,500

T 20040829 0 FUELING FACILITIES - TO SERVE OMNITRANS SERVICE AREA - REHABILITATION AND MAINTENANCE OF ALTERNATIVE FUELING FACILITIES $383

T 20041303 0 BUS SYSTEM REPLACEMENT 35' ALT FUEL $1,290

T R589TA 0 INTERSTATE - LOS ANGELES/CHICAGO AT EL GARCES STATION MULTIMODAL - STATION - FACILITY $8,090

T SBD31037 0 BUS SYSTEM - OPERATING ASSISTANCE $11,291

T SBD31055 0 TRANSIT ADMINISTRATION EQUIPMENT PURCHASE COMPUTER HARDWARE & SOFTWARE FOR MIS $5,427

T SBD31073 0 FACILITIES IMPROVEMENTS - EQUIPMENT AND FURNISHINGS - EAST/WEST VALLEY FACILITY PURCHASE OFFICE EQUIPMENT $3,106

T SBD31084 0 BUS SYSTEM-SERVICE VEHICLES, PURCHASE SEVERAL EXPANSION SERVICE VEHICLES $2,168

T SBD31581 0 BUS SYSTEM - OPERATING ASSISTANCE $29,231

T SBD31612 0 BUS SYSTEM - OPERATING ASSISTANCE $1,139

T SBD41055 0 BUS SYSTEM - OPERATING ASSISTANCE $9,595

T SBD41064 0BUS SYSTEM - BUS SHELTERS ON VARIOUS ROUTES-REPLACING MISSING AND/OR DAMAGED BUS STOPS, PURCHASE AND REPAIR SHELTERS, BENCHES, ETC.

$83

T SBD41073 0CAPITAL - PURCHASE OF LAND AND ARCHITECTURAL SERVICES & CONSTRUCT FOR ADMINISTRATIVE, MAINTENANCE, & OPERATIONS FACILITY (PH I & II)

$15,436

T SBD41109 0 METROLINK OPERATING ASSISTANCE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK) $38,999

T SBD41114 0 PARATRANSIT - VEHICLE REPLACEMENT ALT. FUEL, 04-3, 07-5, 09-6 $1,509

T SBD41117 0 BUS SYSTEM - PURCHASE SERVICE VEHICLES 04-2; 06-2;07-3 $258

T SBD44003 0 PARATRANSIT VEHICLE REPLACEMENT $65

T SBD44006 0 TRANSIT ADMINISTRATION EQUIPMENT OFFICE EQUIPMENT $128

T SBD90105 0 BUS SYSTEM-BUSES BUS REPLACEMENTS ALT. FUEL, 01-25, 02-16;06-22;08-11 $16,149

* S=State Highway, L=Local Highway, T=Transit

Page 89: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 87

VENTURA COUNTY RTIP PROJECTS

VENTURA COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S VEN001004 0SOUNDWALL PROGRAM ON STATE HWYS THROUGHOUT VENTURA COUNTY - LUMP SUM (PROJECTS ARE CONSISTENT WIH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$8,812

S VEN040401 0 IN OXNARD AT RICE AVE. RAILROAD GRADE SEPARATION $12,327

S VEN54187 0 2% FOR PLANNING, PROGRAMMING, & MONITORING $1,640

S VEN031225 23 IN FILLMORE ROUTE 23 AT RIVER STREET INSTALL TRAFFIC SIGNAL $200

S VEN051213 23IN MOORPARK RTE 23 MOORPARK AVE FROM THIRD ST TO HIGH ST WIDEN FROM 2 LANES TO 1 LANE NB AND 2 LANES SB. REALIGN FIRST ST/POINDEXTER INTERSECTION AND UPGRADE RAIL CROSSING

$1,895

S 343 101 IN OXNARD AT RICE AVE (SANTA CLARA) RECONSTRUCT INTERCHANGE (T21-#664) (SAFETEA-LU #1565) $93,541

S VEN010202 101RECONFIGURE N/B CALIFORNIA ST OFFRAMP (RECONFIGURE RAMP TO TERMINATE AT OAKS ST INSTEAD OF THE CURRENT CALIFORNIA ST LOCATION)

$23,970

S VEN011205 101IN THOUSAND OAKS - IMPRVTS FROM 101/23 IC TO MOORPARK ROAD: EXTEND AUX LANES L.A. CNTY LINE / HAMPSHIRE, NEW NB LANE HAMPSHIRE/23; MEDIAN IMPR; SOUNDWALL

$66,660

S VEN031226 101IN CAMARILLO ROUTE 101 AT PLEASANT VALLEY ROAD IMPROVE INTERSECTION WITH SOUTHBOUND RAMPS - WIDEN ONRAMP EN-TRANCE FROM 1 TO 2 LANES AND ADD TURN LANES

$1,053

S VEN050404 101 AT CENTRAL AVENUE - LANDSCAPING ENHANCEMENTS $600

S VEN051006 101 IN OXNARD AT DEL NORTE BOULEVARD - IMPROVE INTERCHANGE $55,476

S VEN051210 101 IN CAMARILLO RECONFIGURE CENTRAL AVENUE / ROUTE 101 INTERCHANGE $37,861

S VEN051212 101SAFETEA-LU HIGH PRIORITY PROJECT REPAYMENT OF FUNDS ADVANCED BY CITY OF OXNARD FOR RICE/101 INTERCHANGE RECONFIGU-RATION

$1,141

S VEN053402 101 IN OXNARD LANDSCAPING/IRRIGATION ENHANCEMENTS SOUTH SIDE OF ROUTE 101 AT DEL NORTE $704

S VEN056406 101ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS INCLUDING WENDY DRIV BRIDGE WIDENING ACROSS ROUTE 101; NB AND SB RAMP IMPROVEMENTS; INTERSECTION IMPROVEMENTS; SIGNAL MOD

$12,647

S VEN070201 101NEAR LA CONCHITA FROM MOBIL PIER RD TO SANTA BARBARA COUNTY LINE ADD HOV LANES IN EACH DIRECTION PLUS ITS FEATURES AND CLOSE 3 MEDIAN OPENINGS; ADD PEDESTRIAN UC IN LA CONCHITA

$76,600

S VEN54020 101IN CAMARILLO CONSTRUCT AIRPORT NORTH (SPRINGVILLE) INTERCHANGE (CONNECTING FUTURE EXTENSIONS OF VERDULERA ST & PONDEROSA DR) INTERSECTING US 101

$40,000

S 12020 118IN MOORPARK LOS ANGELES AVE AT SHASTA AVE AND MAUREEN LN INSTALL SIGNALS AT SHASTA AVE AND WIDEN FROM 4 TO 6 LANES BETWEEN MAUREEN AND LETA YANCY

$504

S 1238J 118IN SIMI VALLEY WIDEN RT 118 FROM TAPO CYN TO LA COUNTY LINE (WIDEN FROM 6 TO 8 LNS & FROM 8 TO 10 LNS) & CONSTRUCT SOUNDWALLS & ITS ITEMS (ITS ITEMS RT 23 / LA CNTY LINE)

$98,143

Page 90: Project List - Southern California Association of Governments

88 P R O J E C T L I S T I N G R E P O R T

VENTURA COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

S 6566 118 NEAR SIMI VALLEY AT ALAMOS CYN RD ADD RAMPS $2,992

S VEN010201 118IN SIMI VALLEY AT ROCKY PEAK RD CONSTRUCT W/B ONE LANE ONRAMP & E/B ONE LANE OFFRAMP TO PROVIDE FULL DIAMOND INTER-CHANGE

$8,301

S VEN011208 118ADD ONE MIXED FLOW LANE IN EACH DIRECTION FROM TAPO CANYON ROAD TO NEW LOS ANGELES AVENUE (FROM 6 TO 8). WIDEN THE SR23/118 CONNECTORS FROM 2 TO 3 LANES.

$433,108

S VEN041004 118 IN VENTURA COUNTY WILDLIFE CORRIDOR ENHANCEMENTS ROUTE 118 $726

S VEN051003 118 IN SIMI VALLEY LANDSCAPE ENHANCEMENTS FROM WESTERN CITY LIMIT TO EASTERN CITY LIMIT $1,400

S VEN34089 118IN MOORPARK L.A. AVE FROM ROUTE 23 (MOORPARK AVE) TO E/O SPRING CONSTRUCT SIDEWALKS, REALIGN ROADWAY AND WIDEN FROM 4 TO 6 LANES

$1,158

S VEN031224 126 IN FILLMORE AT CENTRAL AVENUE IMPROVE INTERSECTION INCLUDING LANE RESTRIPING, REVISED CURBS AND DRAINS $678

S VEN990340 126 IN VENTURA ENHANCED LANDSCAPING RT 126 INTERCHANGES AT VICTORIA, KIMBALL, & WELLS (RT 118) $925

S VEN990316 150 ROUTE 150 @ SAN ANTONIO CREEK BRIDGE WIDEN TO ACCOMMODATE PEDESTRIAN/EQUESTRIAN/BICYCLE $516

S VENLS08 999 LUMP SUM AT VARIOUS LOCATIONS IN VENTURA COUNTY - MANDATE PROJECTS (EA 4S140 AND 4S150) $72

L VEN010203 0 OJAI VALLEY BIKE TRAIL EXTENSION/FULTON ST EXTENSION $611

L VEN011202 0 HUENEME RD FROM OXNARD CITY LIMITS TO RICE RD - WIDEN FROM 2 TO 4 LANES $6,953

L VEN011209 0 CONSTRUCT BIKEWAY ADJACENT TO RT 101 (SOUTH SIDE) FROM RANCHO RD TO WILLOW LN (TEA21 #221) $1,014

L VEN020402 0VIDEO MONITORING CAMERAS AND OTHER ITS IMPROVEMENTS IN VENTURA COUNTY INCLUDING SMARTCARD & PARATRANSIT DIS-PATCH SYSTEM UPGRADE

$4,106

L VEN031209 0 CONSTRUCT BIKE LANES CITYWIDE AS SPECIFIED IN BICYCLE FACILITIES MASTER PLAN DATED 5/05 $290

L VEN031212 0 EXPAND TRAFFIC SIGNAL COORDINATION SYSTEM $450

L VEN031215 0 GREEN ALLEY AND ADJACENT PARKING LOT PEDESTRIAN IMPROVEMENTS $401

L VEN031216 0INSTALL NEW SIGNALS AT INTERSECTION OF PALM AVENUE AND ROUTE 126 EB OFF-RAMP, AND TENTH STREET AND ROUTE 126 EB OFF-RAMP

$558

L VEN031220 0 SANTA CLARA AVENUE CLASS II BIKE LANES FROM FRIEDRICH TO CENTRAL (1.6 MILES) $950

L VEN031227 0WIDEN CENTRAL AVENUE FROM 2 TO 4 LANES (PLUS BIKE LANES) FROM ROUTE 101 NB RAMPS TO CITY LIMIT (0.4 MILES) PLUS SIG-NALS @ RTE 101 RAMPS.

$1,100

L VEN031228 0 VICTORIA AVENUE/OLIVAS PARK DRIVE INTERSECTION - ADD TURN LANES $158

L VEN031229 0 ROUTE 126 BIKE PATH - PHASE II BIKE PATH (CLASS I) CROSSING THE HARMON BARRANCA $1,082

Page 91: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 89

VENTURA COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L VEN040501 0NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS - CON PHASE (PE & ROW IN 07-VEN54122) - INCL FINANCE COST

$52,966

L VEN040502 0 SANTA ROSA ROAD FROM UPLAND ROAD TO WOODCREEK ROAD WIDEN FROM TWO TO FOUR LANES AND ADD BIKE LANES $1,541

L VEN041001 0SANTA ROSA ROAD / HILL CANYON ROAD - INTERSECTION IMPROVEMENTS INCLUDING ACCELERATION/DECELERATION LANES ON SANTA ROSA ROAD

$395

L VEN050402 0 ADOLFO ROAD EASTBOUND AT SANTA ROSA ROAD - ADD DUAL LEFT AND RIGHT TURN LANES $500

L VEN050403 0CALLEGUAS BIKE PATH - CONSTRUCT CLASS I BIKE PATH FOR 0.7 MILES FROM ADOLFO ROAD TO THE ROUTE 101 FREEWAY, WITH CON-NECTION TO NEW TRAIL AT VILLAGE AT THE PARK (PHASE II)

$1,500

L VEN051002 0 OLSON ROAD WIDENING FROM FOUR TO SIX LANES FROM PRESIDENTIAL DRIVE TO SIMI VALLEY CITY LIMIT, 2700 FEET $2,156

L VEN051004 0 RECONSTRUCT AND DEEP LIFT ASPHALT ON VARIOUS ROADS IN VENTURA COUNTY WITHIN CONGRESSIONAL DISTRICT 24 $6,000

L VEN051201 0 WEST LOS ANGELES AVENUE FROM WEST CITY LIMIT TO EASY STREET CLASS II BIKE LANES $1,621

L VEN051206 0 CRUZERO STREET FROM LOMA DR TO EL CENTRO ST, CONSTRUCT SIDEWALK, CURB, AND GUTTER $144

L VEN051211 0 LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES $4,417

L VEN051401 0 ROUTE 126 AND SANTA PAULA BRANCH RAILROAD AT POLE CREEK - CLASS I BIKE PATH UNDERCROSSING 0.2 MILES IN LENGTH $1,330

L VEN053401 0 INSTALL INTERCONNECT CABLE TO CONNECT SIGNALIZED INTERSECTIONS AT VARIOUS LOCATIONS THROUGHOUT THE CITY $500

L VEN053403 0EAST VENTURA BOULEVARD FROM NYLAND AVENUE TO ALMOND DRIVE - LANDSCAPE ENHANCEMENT, PEDESTRIAN AND BICYCLE FACILI-TIES

$500

L VEN054401 0HISTORIC PRESERVATION OF THE MILL BUILDING, AND SANTA PAULA DEPOT, HISTORIC TRANSPORTATION STRUCTURES IN SANTA CLARA RIVER VALLEY

$2,566

L VEN054605 0 CONEJO CREEK PARK BIKE PATH - CLASS I BIKE PATH FOR 0.5 MILES IN CONEJO CREEK PARK FROM ROUTE 23 TO JANSS ROAD $300

L VEN055402 0 SIGNAL SYNCRONIZATION AT VARIOUS LOCATIONS CITYWIDE $1,135

L VEN055407 0 ERRINGER ROAD NB AT COCHRAN - ADD RIGHT-TURN LANE $588

L VEN055503 0 ERRINGER ROAD FROM ROYAL TO FITZGERALD - REALIGN ROAD, AND ADD BIKE LANES AND LANDSCAPED PARKWAY $1,600

L VEN056403 0 LYNN ROAD FROM ROUTE 101 TO AVENIDA DE LAS FLORES SIGNAL SYNCHRONIZATION IMPROVEMENT (PHASE III) $460

L VEN056404 0BORCHARD ROAD FROM LOS VIENTOS TO MARIANO - LANDSCAPED MEDIAN WITH SAFETY RAILINGS, WILDLIFE CROSSING FEATURES, AND RUN-OFF CONTAINMENT DRAINAGE SYSTEM

$903

L VEN056407 0 HILLCREST DRIVE FROM TELLER ROAD TO CONEJO BLVD - CLASS II BIKE LANES $284

Page 92: Project List - Southern California Association of Governments

90 P R O J E C T L I S T I N G R E P O R T

VENTURA COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L VEN058401 0CENTRAL AVENUE AT ROSE AVENUE INTERSECTION IMPROVEMENTS INCLUDING ADDITIONAL TURN LANES AND DRAINAGE IMPROVE-MENTS

$565

L VEN058402 0 KANAN ROAD AT DOUBLETREE ROAD LEFT TURN LANE EXTENSIONS $113

L VEN070101 0PHASE 2 - SANTA PAULA BRANCH ROW - PIRU CREEK TO RTE 126, CONSTRUCT CLASS I BIKE PATH AND PEDESTRIAN PATH WITH GRAD-ING ON ENTIRE ROW (SPLIT FROM VEN990310)

$2,266

L VEN34094 0 IN OXNARD HUENEME RD SAVIERS TO INDUSTRIAL WIDEN AND CONSTRUCT FROM 2 TO 4 LANES $1,848

L VEN34095 0 IN OXNARD COLONIA RD/CAMINO DEL SOL RT 1 TO ENTRADA DR CONSTRUCT 4 LANES $10,269

L VEN34303 0 IN THOUSAND OAKS BORCHARD/MICHAEL WIDEN TO ADD TURN LANES & IMPROVE INTERSECTION $294

L VEN34304 0 IN THOUSAND OAKS OLD CONEJO RD FROM REINO TO WENDY WIDEN FROM 2 TO 4 LANES $615

L VEN34305 0 IN THOUSAND OAKS HILLCREST FROM RANCHO CONEJO TO CAMINO DOS RIOS WIDEN FROM 2 TO 4 LANES $779

L VEN54019 0 IN CAMARILLO ADOLFO RD EXTENSION EXTEND ROAD EASTERLY TO CAMARILLO SPRINGS RD/US 101 (TWO-LANE UNDIVIDED ROAD) $11,358

L VEN54032 0LUM SUM - REHABILITATION & RECONSTRUCTION PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$11,979

L VEN54051 0 IN SIMI VALLEY ARROYO SIMI BIKE TRAIL FROM END OF EXISTING TRAIL TO CORRIGANVILLE PARK. CONSTRUCT BIKE PATH AND LANES $460

L VEN54164 0 BICYCLE & PEDESTRIAN TRAIL EXTENSION: FOX CYN BARRANCA FROM RT 150 TO OJAI VALLEY TRAIL $182

L VEN54168 0FACILITY INCL BIKEWAY/WALKWAY FROM SANTA PAULA CREEK TO PECK RD FENCING, LANDSCAPING, BRIDGE & DRAINAGE, PUBLIC AC-CESS POINTS/ SAFETY ITEMS

$4,094

L VEN93017 0 REGIONAL RIDESHARE PROGRAM $2,215

L VEN990305 0CONSTRUCT PONDEROSA EXTENSION FROM EARL JOSEPH TO VENTURA BL & VENTURA BLVD EXTENSION FROM PONDEROSA TO EAST OF CENTRAL AVE INCLUDING BIKE LANES

$8,614

L VEN990306 0 CAWELTI ROAD LAS POSAS ROAD / LEWIS ROAD ADD BIKE LANES $154

L VEN990310 0PIRU/RANCHO CAMULOS CONSTRUCT CLASS I BIKE PATH AND ADJACENT PEDESTRIAN PATH, FENCING RE-LAY TRACK, INSTALL PLAT-FORM AT RANCHO CAMULOS

$6,772

L VEN990317 0 OXNARD BLVD 5TH/VINEYARD & ON 5TH ST (RT 34) OXNARD BLVD/ROSE AVE CONSTRUCT NEW BICYCLE & PEDESTRIAN FACILITIES $4,589

L VEN990319 0 CALIFORNIA ST BRIDGE OVER RT 101 PEDESTRIAN ENHANCEMENTS $1,284

L VEN990336 0RANCHO CAMULOS ROADSIDE REST STOP CONSTRUCT REST STOP, INCLUDING REHAB OF ADOBE BLDG, RE-ESTABLISH ENTRANCE TO SITE, BUILD PARKING, RESTROOMS

$1,430

L VEN990341 0 SURFERS' POINT BIKE PATH RESTORATION RESTORE 2 KM BIKEWAY SEGMENT DESTROYED BY STORMS ENVIRONMENTAL $4,582

Page 93: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 91

VENTURA COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

L VEN991207 0 FIGUEROA ST UNDERPASS AT RT 101 - BICYCLE & PEDESTRIAN ENHANCEMENTS, AESTHETIC IMPROVEMENTS $513

L VEN991218 0 PLEASANT VALLEY RD - WIDEN FROM 2 TO 4 LANES & BIKE LANES FOR 1.7 MILES FROM CALLEGUAS CR TO RT 101 $6,205

L VENLS07 0HBRR LOCAL BRIDGE LUMP SUM FOR 2004/2005 - (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128,EXEMPT TABLES 2 & 3)

$10,592

T 057402 0 NINETEEN (19) REPLACEMENT CNG PARATRANSIT VEHICLES $1,869

T VEN010406 0 SMART CARD DATA MANAGEMENT $1,062

T VEN010409 0 EAST COUNTY ADA PARATRANSIT SERVICE OPERATIONS $793

T VEN011214 0 DBE GOAL EVALUATION/SETTING CONSULTING SERVICE $106

T VEN011218 0 MOBILE DATA TERMINALS $75

T VEN011219 0 BUS WASHER REPLACEMENT $484

T VEN011220 0 MAINTENANCE FACILITY EXPANSION $1,264

T VEN011221 0 PAINT 4 CNG BUSES $35

T VEN011222 0 FOUR (4) REPLACEMENT COMPUTERS $10

T VEN011223 0 THREE (3) REPLACEMENT UTILITY VANS $105

T VEN011226 0 METROLINK RAIL REPLACEMENT MOORPARK TO SIMI VALLEY $4,216

T VEN020901 0 FUEL TANK REMEDIATION - MTBE PROJECT $192

T VEN020902 0 FINANCIAL MANAGEMENT SYSTEM $73

T VEN020903 0 REPLACE TRANSIT RADIO SYSTEM $278

T VEN030604 0 PREVENTIVE MAINTENANCE - ADA PARATRANSIT $1,869

T VEN030608 0 CAPITAL MAINTENANCE FOR MOORPARK TRANSIT - BUSES AND TRANSIT CENTER (MOORPARK METROLINK STATION) $793

T VEN030609 0 METROLINK STATION SECURITY WALL (TRANSIT ENHANCEMENT) $79

T VEN030611 0 PREVENTIVE MAINTENANCE- THOUSAND OAKS TRANSIT FIXED-ROUTE BUSES AND FACILITIES INCLUDING TRANSIT CENTER $1,260

T VEN030612 0 ADA SERVICE - CAPITAL LEASE COST $816

T VEN030614 0THOUSAND OAKS TRANSPORTATION CENTER OPERATIONS BUILDING & CUSTOMER WAITING ROOM INCLUDING LANDSCAPING, OUTDOOR SEATING, AND SECURITY LIGHTING

$1,982

T VEN030909 0 TWO GILLIG BUSES CONVERT FROM DIESEL TO CNG AND REHAB $524

T VEN031202 0 SIMI VALLEY TRANSIT EXPANSION TO SERVE NEW MALL - DEMONSTRATION PROJECT $1,268

T VEN031203 0 ONE (1) CNG PARATRANSIT VAN FOR EXPANSION $100

T VEN031218 0 REALIGN MOORPARK RAIL STATION SOUTH PARKING LOT ENTRANCE $150

Page 94: Project List - Southern California Association of Governments

92 P R O J E C T L I S T I N G R E P O R T

VENTURA COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T VEN031223 0 REFURBISH OXNARD TRANSPORTATION CENTER EAST FOURTH STREET PARKING LOT $1,103

T VEN031232 0 REPLACE OFFICE EQUIPMENT $63

T VEN031233 0 REPLACE BUS VACUUM SYSTEM $200

T VEN031236 0 TRANSIT OPERATOR AUDIO VISUAL TRAINING AIDS/MATERIALS $10

T VEN031237 0 MIGRATION FROM MIDAS TO TRAPEZE SOFTWARE FOR PARATRANSIT SERVICE SCHEDULING $50

T VEN031239 0 RUN CUTTING/SCHEDULING SOFTWARE ACQUISITION $53

T VEN031241 0 SAFETY AND SECURITY PLANNING AND TRAINING $10

T VEN031242 0 REPLACE GARAGE HOISTS $30

T VEN031244 0 TRANSIT MARKETING $30

T VEN031245 0 ONE (1) REPLACEMENT COLOR LASER JET PRINTER $4

T VEN031246 0 GFI FAREBOX REPLACEMENT $190

T VEN031247 0 FOUR (4) REPLACEMENT COMPUTERS $10

T VEN031249 0 REPLACE BUS STOP SIGNS $20

T VEN031253 0 TWO FLOOR JACKS $3

T VEN040405 0 NEXT BUS UPGRADE FOR REAL-TIME BUS STOP SIGNAGE (TRANSIT ENHANCEMENTS) $244

T VEN041002 0 ONE MECHANIC TOOL SET $15

T VEN050401 0 OPERATING ASSISTANCE -- CAMARILLO AREA TRANSIT $3,900

T VEN050405 0 SECURITY CAMERAS AT MOORPARK METROLINK STATION $400

T VEN050701 0 REPLACE BUS MAINTENANCE EQUIPMENT $75

T VEN051001 0PURCHASE TWO MODIFIED VANS FOR ARC VENTURA COUNTY (C/O PROJECT FROM 05/06)

$223

T VEN051005 0ELDERLY & DISABLED ACCESS SERVICE PROJECTS IN VENTURA COUNTY ABOVE AND BEYOND ADA REQUIREMENTS 5307 = NEW FREE-DOMS INITIATIVE FUNDS

$2,119

T VEN051203 0 TITLE VI SURVEYS $70

T VEN051204 0 REFURBISH BUSES $318

T VEN051205 0 TRANSIT ITS SYSTEM UPGRADE STP=FY 2006/07 SURFACE TRANS PROJECT APPROPRIATION EARMARK $700

T VEN051207 0 REPLACE TWELVE (12) COMPUTERS $30

T VEN051208 0 ONE (1) REPLACEMENT COPIER $10

T VEN051209 0UPGRADE TRACK ON VCTC SANTA PAULA BRANCH LINE FOR 4.4 MILES FROM MONTALVO JUNCTION IN VENTURA TO CAMPANULA CREEK IN SATICOY

$810,772

Page 95: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 93

VENTURA COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T VEN054601 0 4 REPLACEMENT CNG BUSES AND 16 REPLACEMENT FLEET SUPPORT AND VANPOOL VEHICLES $1,684

T VEN055401 0 EXPAND TRANSIT MAINTENANCE FACILITY TO ACCOMMODATE SYSTEM EXPANSION $2,171

T VEN055404 0 THREE REPLACEMENT PARATRANSIT VANS WITH FAREBOXES AND 2-WAY RADIOS $330

T VEN055405 0 INSTALL METHANE INFUSION EQUIPMENT TO IMPROVE RELIABILITY OF CNG SUPPLY $230

T VEN055406 0 FIVE REPLACEMENT PARATRANSIT VANS $523

T VEN055408 0 AUTOMATIC VEHICLE LOCATION AND DATA TERMINALS $216

T VEN055409 0 THREE REPLACEMENT PARATRANSIT VANS $302

T VEN055410 0 ONE EXPANSION PARATRANSIT VAN $121

T VEN055412 0 THREE (3) REPLACEMENT PARATRANSIT VANS $515

T VEN055413 0 ONE EXPANSION PARATRANSIT VAN $128

T VEN056409 0 BUS STOP ENHANCEMENTS FOR THOUSAND OAKS TRANSIT $50

T VEN056410 0 TRANSIT MARKETING FOR THOUSAND OAKS TRANSIT $194

T VEN057403 0 DOWNTOWN VENTURA / VENTURA HARBOR DEMONSTRATION SERVICE (3-YEAR DEMONSTRATION) $551

T VEN057404 0 REPLACE SERVICE VEHICLES $255

T VEN057413 0 CNG FUEL REPLACEMENT TANKS $1,050

T VEN057414 0 MIS EQUIPMENT REPLACE/UPGRADE $84

T VEN059401 0 VENTURA COUNTY SMARTCARD SYSTEM MAINTENANCE & REHABILITATION $631

T VEN060202 0 BUS TRANSIT RADIO SYSTEM $469

T VEN061000 0 CAMARILLO RAIL STATION MAINTENANCE $437

T VEN061001 0 PURCHASE ONE MINIVAN FOR REPLACEMENT FOR ARC VENTURA COUNTY $54

T VEN061002 0 PURCHASE TWO MODIFIED VANS FOR REPLACEMENT FOR CAMARILLO HEALTH CARE DISTRICT $125

T VEN061005 0 PURCHASE ONE EXPANSION DEMAND-RESPONSE BUS $84

T VEN061006 0 BUS BENCH REPLACEMENT $10

T VEN061007 0 MILLS ROAD AT MAPLE ADJACENT TO PACIFIC VIEW MALL - BUS TURNOUTS WITH BUS SHELTERS, AND OTHER BUS STOP AMENITIES $359

T VEN061008 0 REPLACE MAINTENANCE MIS EQUIPMENT $500

T VEN061010 0UPGRADE OF COUNTYWIDE BUS ITS EQUIPMENT INCLUDING SMARTCARD AND NEXTBUS SYTEMS AND RENEWAL OF NEXTBUS OPERAT-ING CONTRACT

$374

T VEN061011 0 RAIL CONSTRUCTION PROJECT MANAGEMENT $199

T VEN061013 0 REPLACE HEADSIGNS ON FIVE CNG BUSES $37

T VEN061014 0 REPLACE DRIVER SEATS IN EIGHT CNG ADA/DAR VANS $15

Page 96: Project List - Southern California Association of Governments

94 P R O J E C T L I S T I N G R E P O R T

VENTURA COUNTY RTIP PROJECTS

SYS-TEM*

RTP ID ROUTE DESCRIPTIONPROJECT COST

($1,000'S)

T VEN061017 0 REPLACE TWO (2) LASER JET PRINTERS $6

T VEN06104 0 PURCHASE ONE REPLACEMENT FIXED-ROUTE BUS $152

T VEN061215 0 ONE (1) EXPANSION SUPERVISOR VEHICLE (NON-REVENUE) $30

T VEN070203 0CAMARILLO METROLINK STATION IMPROVEMENTS INCLUDING PLATFORM AND PEDESTRIAN CIRCULATION, PASSENGER STATION BUILD-ING/RESTROOMS, PLUS RELATED CONSTRUCTION OF NEW SIDING BETWEEN CAMARILLO AND OXNARD

$4,400

T VEN34206 0 OPERATING ASSISTANCE - FIXED ROUTE $22,813

T VEN34253 0 OPERATING ASSISTANCE - FIXED ROUTE & PARATRANSIT $3,148

T VEN34348 0 TRANSIT PROGRAMMING & PLANNING $763

T VEN54036 0 IN VENTURA COUNTY VENTURA INTERCITY SERVICE TRANSIT AUTHORITY (VISTA) CAPITAL LEASE $24,087

T VEN54054 0 PASSENGER AWARENESS ACTIVITY $563

T VEN54056 0 PLANNING/IMPLEMENTATION OF COORDINATED PARATRANSIT $678

T VEN54057 0 MARKETING ACTIVITIES IMPLEMENTATION (PLANNING: PROGRAM SUPPORT & ADM) $970

T VEN54069 0 DIAL-A-ROUTE TRANSIT INFORMATION $763

T VEN54070 0 TRANSIT MARKETING $1,412

T VEN54095 0 ADA PARATRANSIT SERVICE $7,022

T VEN54115 0 VISTA BUS SYSTEM PLANNING $537

T VEN54149 0 TWO-WAY RADIO SYSTEM REPLACEMENT $125

T VEN64003 0 PREVENTIVE MAINTENANCE - FIXED ROUTE $12,942

T VEN981107 0 ADA SERVICE - PARATRANSIT CAPITAL $6,882

T VEN981118 0 PREVENTIVE MAINTENANCE $6,035

T VEN990602 0 TRANSIT PLANNING & PROGRAMMING $1,173

T VEN990609 0SYSTEMWIDE REHABILITATION AND RENOVATION INCLUDING TRACK, SIGNALS, PLATFORMS, POWER SYSTEMS, FACILITIES, ROLLING STOCK, EQUIPMENT, SIGNAGE

$27,540

T VEN990903 0 OXNARD TRANSPORTATION CENTER PARKING EXPANSION / IMPROVEMENTS STP = STIP-IRR FUNDS $4,317

T VEN991203 0 INSTALLATION OF ABOVE GROUND HOIST SYSTEM $175

* S=State Highway, L=Local Highway, T=Transit

Page 97: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 95

Financially Constrained RTP Projects

The following projects are included in the financially constrained RTP and represent regional commitments above and beyond what is already programmed in

the 2006 RTIP. Projects are sorted by category, and project costs are presented in nominal dollars.

The “Project Completion By” column indicates the first year for which a project may have been analyzed as part of the RTP modeling and regional emissions

analysis. For more specific individual project information as part of the RTP modeling and regional emissions analysis, refer to the Master Modeled Project List

available at www.scag.ca.gov/rtp2008/.

IMPERIAL COUNTY RTP PROJECTS

IMPERIAL COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

ARTERIAL 6A07008 0 JASPER RD. SR-111 SR-7WIDEN FROM 2 TO 6 LANES (3 EACH DIR) LIMITED AC-CESS EXPRESSWAY

2023 $819,601

ARTERIAL 6M0400E 115 SR-115 I-8EVAN HEWES HWY

CONSTRUCT 4-LANE LIMITED ACCESS EXPRESSWAY 2018 $157,600

IC/RAMPS 6M04018 8 I-8 DOGWOOD RDON I-8 AT DOGWOOD RD, CONSTRUCT FULL INTER-CHANGE - WIDEN DOGWOOD FROM 2 TO 4 LANES (2 EACH DIR) OVER I-8

2018 $41,006

MIXED FLOW

6M01003 111 SR-111 SR-98 I-8UPGRADE TO FREEWAY (3 LANES EACH DIR) INCL. INTERCHANGES AT MCCABE, JASPER, HEBER, AND OVER-CROSSING AT CHICK RD

2030 $824,962

O&M 6OM0701 0OPERATIONS & MAINTE-NANCE

COUNTYWIDESTATE HIGHWAY, ARTERIAL, AND TRANSIT PRESERVA-TION/MAINTENANCE AND OPERATIONS

ONGOING $184,677

TDM 6TDL04 0 TDM/NON-MOTORIZED COUNTYWIDE TDM (NON-MOTORIZED, TELECOMMUTE, ETC.) ONGOING $52,712

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Page 98: Project List - Southern California Association of Governments

96 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTP PROJECTS

LOS ANGELES COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

ARTERIAL 1AL04 0 ARTERIAL IMPROVEMENTS COUNTYWIDEREGIONAL SURFACE TRANSPORTATION IMPROVEMENTS, INCLUDING GOODS MOVEMENT GRADE CROSSINGS

ONGOING $2,891,358

HOV 1H0707 5 I-5 ROUTE 19 I-710RTE 5 HOV LNS FROM RTE 19 TO RTE 710 - ADD ONE LANE IN EACH DIRECTION

2035 $396,909

HOV 1H0102 5 I-5 SR-170 I-5/SR-170 HOV CONNECTOR 2030 $215,342

HOV 1H0103 5/405 I-5/I-405 SOUTH NORTHI-5/I-405 CARPOOL LANE PARTIAL CONNECTOR (SOUTH TO NORTH)

2030 $503,008

HOV 1H0101 14 SR-14 AVE. P-8 AVE. LADD 1 HOV LANE EACH DIRECTION ON THE SR-14 FROM AVE. P-8 TO AVE. L

2030 $151,943

IC/RAMPS 1M0430 47 SR-47 AT NAVY WAY CONSTRUCTION OF INTERCHANGE AT SR-47 / NAVY WAY 2014 $58,925

IC/RAMPS 1M0132 103PIER B ST/TERMINAL ISLAND FWY

INTERCHANGE IMPROVEMENT - NEW NB ON-RAMP TO SR-103

2010 $2,392

IC/RAMPS 1M0104 57/60 SR-57/SR-60 SR-57/SR-60 INTERCHANGE IMPROVEMENT 2030 $735,341

ITS 1ITS04 0 ITS COUNTYWIDE SIGNAL SYNCHRONIZATION & BUS SPEED IMPROVEMENT ONGOING $1,728,758

NON-MO-TORIZED

1NL04 0 NON-MOTORIZED COUNTYWIDEBIKEWAY AND PEDESTRIAN IMPROVEMENTS, TRANS-PORTATION ENHANCEMENTS

ONGOING $1,192,114

O&M 1OM0702 0OPERATIONS & MAINTE-NANCE

COUNTYWIDESTATE HIGHWAY, ARTERIAL, AND TRANSIT PRESERVA-TION/MAINTENANCE AND OPERATIONS

ONGOING $5,462,621

OPERA-TIONAL

1O0703 0 FREEWAY SERVICE PATROL COUNTYWIDE FREEWAY SERVICE PATROL ONGOING $955,620

OTHER 1O0701 0EXPANSION OF PIER B ST INTERMODAL RAILYARD (FOR PIER B ST REALIGNMENT PHASE OF PROJECT SEE LA0C8094)

2015 $370,787

OTHER 1O0702 0RETROFIT SOUNDWALL PROGRAM

COUNTYWIDE RETROFIT SOUNDWALL PROGRAM ONGOING $1,150,640

OTHER 1O0704 0 SAFE CALL BOXES COUNTYWIDE SAFE CALL BOXES 2030 $341,238

Page 99: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 97

LOS ANGELES COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

OTHER 1O0711 0CAPITAL PROJECT CONTIN-GENCY

COUNTYWIDE HIGHWAY PROJECT CONTINGENCY ONGOING $1,944,223

OTHER 1O0706 0PORTS OF LOS ANGELES/LONG BEACH

PORTS RAIL SYSTEM 2018

$257,900 (As-sumes cost

covered by Ports of LA/LB)

OTHER 1O0707 0PORTS OF LOS ANGELES/LONG BEACH

NEW CERRITOS CHANNEL RAIL BRIDGE TBD$91,000 (Assumes

cost covered by Ports of LA/LB)

OTHER 1O0708 0PORTS OF LOS ANGELES/LONG BEACH

TRIPLE TRACK S/O THENARD 2020$16,500 (Assumes

cost covered by Ports of LA/LB)

OTHER 1O0709 0PORTS OF LOS ANGELES/LONG BEACH

REEVES GRADE SEPARATION 2014$61,000 (Assumes

cost covered by Ports of LA/LB)

OTHER 1O0710 0PORTS OF LOS ANGELES/LONG BEACH

OTHER IN-PORT MAINLINE TBD

$204,700 (As-sumes cost

covered by Ports of LA/LB)

TDM 1TDL04 0 TDM COUNTYWIDE TRANSPORTATION DEMAND MANAGEMENT ONGOING $490,541

TDM 1RL04 0 RIDESHARE COUNTYWIDE RIDESHARE SERVICES ONGOING $461,992

TRANSIT - BRT

1TR0705 0 CANOGA TRANSITWAY WARNER CENTER CHATSWORTHSAN FERNANDO VALLEY NORTH/SOUTH BRT PHASE I (EXTENSION OF METRO ORANGE LINE ALONG CANOGA RAIL ROW, BRT OR LRT, TECHNOLOGY TBD)

2018 $212,123

TRANSIT - BRT

1TR0706 0 SFV N/S BRTSAN FERNANDO VALLEY NORTH/SOUTH BRT PHASE II (METRO RAPID SERVICE IMPROVEMENTS ON MAJOR NORTH/SOUTH ARTERIALS IN SFV)

2026 $157,464

TRANSIT - BUS

1TL104 0 BUS CAPITAL COUNTYWIDE COUNTYWIDE BUS SYSTEM IMPROVEMENT ONGOING $15,071,170

Page 100: Project List - Southern California Association of Governments

98 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TRANSIT - COM-MUTER

RAIL

1CR04 0METROLINK COMMUTER RAIL

COUNTYWIDE SERVICE EXPANSION ONGOING $1,321,163

TRANSIT - HEAVY

RAILUT101 0

METRO PURPLE (FORMER RED) LINE WESTSIDE EXTENSION

WILSHIRE/WEST-ERN STATION

LA CIENAGAWESTSIDE EXTENSION - PURPLE LINE FROM WILSHIRE/WESTERN TO LA CIENEGA

2020 $1,448,263

TRANSIT - HEAVY

RAIL1TR0404 0 REGIONAL CONNECTOR

LA UNION STA-TION

7TH ST/METRO CENTER

LIGHT RAIL IN TUNNEL ALLOWING THROUGH MOVE-MENTS OF TRAINS (BLUE, GOLD, EXPO LINES)

2035 $4,246,141

TRANSIT - LIGHT RAIL

1TR0704 0METRO RAIL GOLD LINE EXTENSION

AZUSA-CITRUS MONTCLAIRMETRO RAIL GOLD LINE EXTENSION-SEGMENT 2 AZUSA-CITRUS TO MONTCLAIR STATION LRT EXTENSION.

2020 $1,250,761

TRANSIT - LIGHT RAIL

1TR0101 0METRO RAIL GREEN LINE EXTENSION

MARIPOSA & NASH

CENTURY & SEPULVEDA-LAX TERMINAL

PEOPLE MOVER OR LIGHT RAIL 2030 $401,497

TRANSIT - OTHER

1TL204 0TRANSIT CAPITAL PROJECT FUNDING

COUNTYWIDE TRANSIT CAPITAL PROJECT FUNDING ONGOING $708,517

TRANSIT - OTHER

1TL0703 0METRO RAIL TRANSIT CAPITAL

COUNTYWIDE RAIL CAPITAL PROJECTS ONGOING $6,145,709

TRANSIT O&M

1OM0701 0METRO RAIL GOLD LINE EXTENSION O&M

METRO RAIL GOLD LINE EXTENSION O&M - SEGMENT 2 AZUSA-CITRUS TO MONTCLAIR STATION LRT EXTEN-SION.

ONGOING $330,024

TRANSIT O&M

1OM0702 0METRO PURPLE (FORMER RED) LINE WESTSIDE EXTENSION O&M

WESTSIDE EXTENSION - PURPLE LINE O&M FROM WILSHIRE/WESTERN TO LA CIENEGA

ONGOING $640,321

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Page 101: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 99

ORANGE COUNTY RTP PROJECTS

ORANGE COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

ARTERIAL 2A0703 0M1 ROADWAY PROJ-ECTS

COUNTYWIDE COMPLETION OF MEASURE M ROADWAY PROJECTS ONGOING $37,118

ARTERIAL 2A0704 0REGIONAL CAPACITY PROGRAM

COUNTYWIDE COMPLETE MPAH, IMPROVE ARTERIAL CAPACITY ONGOING $1,124,497

ARTERIAL 2A0705 0SIGNAL SYNCHRONI-ZATION PROGRAM

COUNTYWIDESYNCHRONIZE SIGNALS ACROSS JURISDICTIONS AND SMART STREETS

ONGOING $823,265

ARTERIAL 2A0706 0 IRVINE CENTER DRIVE AT I-405 WIDEN OVERCROSSING 2025 $11,176

AUXILIARY 2M01108 5 I-5 SB LA PAZ ROAD OSO PARKWAY EXTEND AUXILIARY LANE THROUGH INTERCHANGE 2030 $5,322

AUXILIARY 2M01110 5 I-5 SB ALICIA PARKWAY LA PAZ ROAD EXTEND AUXILIARY LANE THROUGH INTERCHANGE 2030 $19,510

AUXILIARY 2M0704 55 SR-55 NB DYER EDINGER ADD AUXILIARY LANE 2030 $146,633

AUXILIARY 2M01125 91 SR-91 WB NB SR-55WB SR-91 AT TUSTIN

ADD 1 AUX LANE WESTBOUND 2014 $115,394

AUXILIARY 2M04130 405 I-405 SB SR-133IRVINE CENTER DRIVE

ADD 2ND AUXILIARY LANE 2020 $10,892

AUXILIARY 2M04131 405 I-405 NB JEFFREY CULVER ADD AUXILIARY LANE 2020 $13,927

GRADE SEPA-RATION

2GL04 0 GRADE SEPARATION LOSSAN/BNSFCONSTRUCT GRADE SEPARATIONS AT SELECT LOCATIONS ALONG THE LOSSAN AND BNSF CORRIDORS

ONGOING $718,976

HOV 2H01143 5 I-5 COAST HIGHWAY PICO ADD 1 HOV LANE EACH DIRECTION 2018 $202,680

HOV 2H0702 5 I-5BARRANCA PARKWAY

BARRANCA PARKWAY HOV INTERCHANGE IMPROVEMENT - ADD SB HOV ON-RAMP AND NB HOV OFF-RAMP

2021 $24,966

HOV 2H0703 5 I-5 SR-55 SR-57 ADD 1 HOV LANE EACH DIRECTION 2035 $600,929

HOV 2H0705 57 SR-57 CERRITOS HOV DROP RAMP 2035 $277,056

HOV 2H0706 73 SR-73 I-405 HOV CONNECTOR 2035 $664,935

HOV 2H0707 73 SR-73 I-405 MACARTHUR ADD 1 HOV LANE EACH DIRECTION 2035 $236,421

HOV 2H01148 405 I-405 AT VON KARMAN HOV DROP RAMP 2020 $139,275

HOV 2H0701 405 I-405 BEAR HOV DROP RAMP 2020 $133,918

IC/RAMPS 2M01107 5 I-5 SR-55RECONFIGURE INTERCHANGE TO REDUCE WEAVING - INTERIM PROJECT

2035 $811,254

Page 102: Project List - Southern California Association of Governments

100 P R O J E C T L I S T I N G R E P O R T

ORANGE COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 2M01111 5 I-5 AVERY PARKWAYAVERY PARKWAY RAMP RELOCATION, RECONFIGURATION, UPGRADES

2023 $141,535

IC/RAMPS 2M01109 5 I-5 LA PAZ ROADRE-CONSTRUCT INTERCHANGE TO INCREASE STORAGE CAPACITY OF RAMPS

2023 $115,284

IC/RAMPS 2M04109A 5 I-5 STONEHILL DR ADD SOUTHBOUND I-5 OFF-RAMP AT STONEHILL 2020 $117,848

IC/RAMPS 2M0709 5 I-5 ALICIA PARKWAY ALICIA PKWY INTERCHANGE IMPROVEMENT 2021 $118,405

IC/RAMPS 2M0714 5 I-5 AVENIDA PICO AVENIDA PICO INTERCHANGE RECONFIGURATION 2017 $62,818

IC/RAMPS 2M0717 5 I-5EL TORO ROAD (LOS ALISOS)

ADD RAMPS AT LOS ALISOS OR AVE. DE LA CARLOTA 2023 $123,912

IC/RAMPS 2M0718 5 I-5 MARGUERITE PARKWAY

ADD NEW INTERCHANGE AT MARGUERITE PARKWAY (SADDLEBACK CC CONNECTION)

2020 $186,057

IC/RAMPS 2M0738 5 I-5 EL TORO JAMBOREENORTH IRVINE TRANSPORTATION MITIGATION (NITM) RAMP IMPROVEMENTS (ALTON, BAKE, CULVER, EL TORO, JAMBOREE, JEFFREY, AND SAND CANYON)

2025 $82,806

IC/RAMPS 2M01129 55 I-405 SB/SR-55 NBSOUTH BRISTOL BRAID

DELETE LEFT TURN ACCESS FROM NB BRISTOL TO SB I-405. PROVIDE RIGHT TURN ON-RAMP FROM NB BRIS-TOL TO SB I-405 VIA A NEW BRAID THAT ALSO PROVIDES DIRECT ACCESS TO NB SR-55.

2035 $192,092

IC/RAMPS 2M0724 57 SR-57 LAMBERT ST LAMBERT INTERCHANGE IMPROVEMENT 2035 $26,967

IC/RAMPS 2M0726 73 SR-73 GLENWOOD DRIVE COMPLETE GLENWOOD INTERCHANGE TO/FROM SOUTH 2035 $92,352

IC/RAMPS 2M01127 91 SR-91LAKEVIEW INTER-CHANGE

CONSTRUCT BARRIER-SEPARATED ON-RAMP (2 LANES) FROM SB LAKEVIEW TO WB SR-91

2035 $200,178

IC/RAMPS 2M0727 91 SR-91 SR-55 IMPROVE INTERCHANGE 2020 $446,394

IC/RAMPS 2M0719 605 I-605KATELLA ON-RAMP

IMPROVE INTERCHANGE 2035 $85,463

MIXED FLOW 2M0731 5 I-5 SR-133 SR-55 ADD 1 MF LANE EACH DIRECTION 2030 $647,980

MIXED FLOW 2M0732 5 I-5 SR-57 SR-91 ADD 1 LANE EACH DIRECTION 2030 $1,093,331

MIXED FLOW 2M0730 5 I-5 SR-73 EL TORO RD ADD 1 MF LANE EACH DIRECTION 2035 $1,470,333

MIXED FLOW 2M0733 55 SR-55 I-405 SR-22ADD 1 MIXED FLOW LANE EACH DIRECTION & FIX CHOKE-POINTS FROM I-405 TO SR-22

2030 $596,185

MIXED FLOW 2M0735A 57 SR-57 NB ORANGEWOOD KATELLA ADD 1 MF LANE NB 2018 $13,439

Page 103: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 101

ORANGE COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

MIXED FLOW 2M0735B 57 SR-57 NB LINCOLNORANGETHO-RPE

ADD 1 MF LANE NB AND INTERCHANGE IMPROVEMENTS AT SR-91

2020 $39,318

MIXED FLOW 2M01126 91 SR-91 WB SR-57 I-5ON SR-91 WB FROM SR-57 TO I-5, TIE EXISTING AUX LANES TOGETHER TO FORM A NEW 4TH MF LANE

2018 $193,863

MIXED FLOW 2M0736 91 SR-91 EB SR-57 SR-55 ADD 1 MF LANE 2023 $25,295

MIXED FLOW 2M0737 91 SR-91 SR-241 I-15

IN ORANGE COUNTY, ADD A WB MF LANE FROM 241 OFF RAMP TO GYPSUM CANYON AND AUX LANES EACH DIREC-TION BETWEEN 241 AND COUNTY LINE. SEE RIVERSIDE COUNTY FOR ADDITIONAL IMPROVEMENTS.

2018 $219,678

MIXED FLOW 2M0728 405 I-405 I-5 SR-55 ADD 1 MF LANE EACH DIRECTION 2035 $1,009,468

NON-MOTOR-IZED

2L224 0 OTHER TEA COUNTYWIDE TRANSPORTATION ENHANCEMENT ACTIVITIES ONGOING $330,855

NON-MOTOR-IZED

2L220 0 NON-MOTORIZED COUNTYWIDE BUILD THE COMMUTER BIKEWAYS STRATEGIC PLAN ONGOING $124,092

O&M 2OM0701 0OPERATIONS & MAIN-TENANCE

COUNTYWIDESTATE HIGHWAY, ARTERIAL, AND TRANSIT PRESERVATION/MAINTENANCE AND OPERATIONS

ONGOING $885,154

OPERATIONAL 2L149 0 MOTORIST SERVICES COUNTYWIDE FREEWAY SERVICE PATROL AND CALLBOX PROGRAM ONGOING $492,036

OTHER 2SL04 0 CORRIDOR STUDIESONGOING CORRIDOR STUDIES AND OTHER STUDIES INCLUDED IN FY 07-08 WORK PROGRAM

ONGOING $3,881

OTHER 2L150 0 SOUNDWALLS COUNTYWIDE RETROFIT SOUNDWALL PROGRAM ONGOING $79,045

OTHER 2S1 0 CAL NEVADA HS RAIL ANAHEIMONTARIO AIRPORT

STUDY FEASIBILITY OF ADDING HIGH SPEED RAIL BE-TWEEN ANAHEIM AND ONTARIO AIRPORT

2020 $1,645

TOLL 2T04128 91 SR-91 FAIRMONT DRIVE

CONSTRUCT NEW PARTIAL OVERCROSSING AT FAIRMONT BLVD TO PROVIDE NORTHERLY ACCESS FOR YORBA LINDA TO/FROM SR-91 EXPRESS LANES; DROP RAMPS ON EAST SIDE OF OVERCROSSING, TO EB AND FROM WB EXPRESS LANES

2018 $91,107

TOLL 2T01135 91 SR-91 SR-241HOV/HOT CONNECTOR NB 241 TO EB 91, WB 91 TO SB 241

2020 $404,398

Page 104: Project List - Southern California Association of Governments

102 P R O J E C T L I S T I N G R E P O R T

ORANGE COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TRANSIT - BRT

2TR01209C, 2TR04209D, 2TR04209E, 2TR04209F

0 BUS RAPID TRANSIT COUNTYWIDEADD MIXED FLOW BUS RAPID TRANSIT WITH SIGNAL PRIORITY ON THE FOLLOWING LINES: KATELLA, EDINGER, BEACH, AND LA PALMA

2018(cost included in Fixed Route Bus

category)

TRANSIT - BRT

2TR0711 0IRVINE GUIDEWAY DEMONSTRATION PROJECT

5 MILE TRANSIT SYSTEM IN THE GREAT PARK/SPECTRUM AREA. LINKS IRVINE STATION WITH SPECTRUM AND OTHERS

2012 $325,539

TRANSIT - BUS

2L207 0 EXPRESS BUS

COUNTYWIDE (INTER-COUNTY AND INTRA-COUNTY)

RIVERSIDE TO FULLERTON (11), RIVERSIDE TO ANAHEIM (11), RIVERSIDE/CORONA TO IRVINE (11), SAN CLEMENTE TO LAGUNA HILLS (10), SAN CLEMENTE TO SOUTH COAST METRO (12), LONG BEACH TO SOUTH COAST METRO (12), RANCHO SANTA MARGARITA TO IRVINE (12), LONG BEACH TO ORANGE (12), AND OTHERS

2030(cost included in Fixed Route Bus

category)

TRANSIT - BUS

2L208 0 RAIL FEEDER BUS COUNTYWIDERAIL FEEDER - ADD SERVICE TO SUPPORT METROLINK EXPANSION

ONGOING(cost included in Fixed Route Bus

category)

TRANSIT - BUS

2TR0702 0COMMUNITY-BASED SHUTTLES

COUNTYWIDE DEPLOY COMMUNITY-BASED SHUTTLES ONGOING $175,667

TRANSIT - BUS

2TR0703 0ELDERLY & HANDI-CAPPED ASSISTANCE

COUNTYWIDEEXPAND TRANSPORTATION CHOICES FOR SENIORS AND THE DISABLED

ONGOING $274,299

TRANSIT - BUS

2TR0708 0EXTENSIONS TO METROLINK

COUNTYWIDEPROGRAM TO DEVELOP CITY-INITIATED PROJECTS TO IMPROVE ACCESS TO METROLINK STATIONS (GO LOCAL)

ONGOING $1,901,102

TRANSIT - BUS & BRT

2L206 0 FIXED ROUTE BUS COUNTYWIDECOUNTYWIDE FIXED ROUTE, EXPRESS, RAPID BUS, PARATRANSIT. EXPAND LOCAL SERVICE TO ACHIEVE UP TO 10-MINUTE HEADWAYS IN THE CORE OF THE COUNTY.

ONGOING $2,100,102

TRANSIT - COMMUTER

RAIL2TR0704 0

METROLINK COM-MUTER RAIL

COUNTYWIDEHIGH-FREQUENCY SERVICE TO LA & RIVERSIDE AND COR-RIDOR IMPROVEMENTS

ONGOING $1,070,891

TRANSIT - INTERMODAL

2TR0705 0METROLINK REGIONAL GATEWAY PROGRAM

COUNTYWIDEDEVELOP INTERMODAL CENTER(S) LINKED WITH HIGH-SPEED RAIL

ONGOING $600,601

Page 105: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 103

ORANGE COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TRANSIT - INTERMODAL

2TR0712 0IRVINE STATION IMPROVEMENTS

ENHANCE STATION TO ACCOMMODATE METROLINK, AMTRAK, FIXED-ROUTE BUS SERVICE, AND THE IRVINE GUIDEWAY

2015 $266,815

TRANSIT - OTHER

2TR0709 0 SAFE TRANSIT STOPS COUNTYWIDE IMPROVE SAFETY AND AMENITIES AT TRANSIT STOPS ONGOING $64,579

TRUCK CLIMBING

2TK01116 57 SR-57 NB LAMBERTTONNER CAN-YON ROAD

TRUCK CLIMBING LANE 2030 $239,274

TRUCK LANE 2M0708 405 I-405 NBLAKE FOREST DRIVE

IRVINE CENTER DRIVE

ADD 2ND NB TRUCK LANE 2018 $3,862

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Page 106: Project List - Southern California Association of Governments

104 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTP PROJECTS

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

ARTERIAL 3AL104 0ARTERIAL IMPROVE-MENTS

COACHELLA VALLEYEASTERN COUNTY WIDEN/RECONSTRUCT/REHABILI-TATE REGIONAL ARTERIALS

ONGOING $1,236,164

ARTERIAL 3AL204 0ARTERIAL IMPROVE-MENTS

COUNTYWIDE WIDEN/CONSTRUCT REGIONAL ARTERIALS ONGOING $1,348,543

ARTERIAL 3AL304 0ARTERIAL IMPROVE-MENTS

WESTERN COUNTYWESTERN COUNTY WIDEN/REHABILITATE ARTERIAL IMPROVEMENTS

ONGOING $1,236,164

ARTERIAL 3A04SH12A 79 SR-79DOMENIGONI PKWY (R15.6)

GILMAN SPRINGS RD. (M32.6)

REALIGNMENT/WIDENING 4 TO 6 LANES 2035 $2,879,761

ARTERIAL 3A04SH12 79 SR-79 HUNTER RDDOMENIGONI PKWY

WIDEN FROM 4 TO 6 LANES 2020 $213,804

AUXILIARY 3M04SH05 10 I-10CALIMESA @ COUNTY LINE RD (R4.0)

500 METERS E/O SANDLWOOD DR I/C (R4.3)

REPLACE BRIDGE, RAMPS, CONSTRUCT AUXILIARY LANES, AND REALIGN CALIMESA RD (EA 0A710K)

2020 $212,193

AUXILIARY 3M0701 15 I-15 SR79 SOUTH (3.44)SR79 NORTH (6.62)

ADD 1 AUXILIARY LANE IN BOTH DIRECTIONS 2012 $5,853

AUXILIARY 3M0702 15 I-15 SR-60 (51.5)SAN BERNARDINO COUNTY LINE (52.8)

ALSO SBD-15-0.0/2.39 ROUTE 60 TO I-10 ADD & EX-TEND AUX LANES (EA:0C350) (ALSO SEE 3M01MA06)

2030 $35,608

AUXILIARY 3M04SH11 60 SR-600.4 MI E/O I-15/SR-60 IC

0.2 MI E/O MAIN ST

ADD AUXILIARY LANES BOTH DIRECTIONS 2009 $11,356

GRADE SEPARA-

TION3GL04 0 GRADE SEPARATION COUNTYWIDE GRADE SEPARATION IMPROVEMENTS ONGOING $1,228,890

HOV 3M0703 15 I-15 I-215/I-15 JCT SR74 BUILD 2 HOV LANES (1 LANE IN EACH DIRECTION) 2020 $537,763

HOV 3H07A 215 I-215 NUEVO RD BOX SPRINGS RD ADD 1 HOV LANE IN EACH DIRECTION 2020 $168,048

IC/RAMPS 3M0722 0NEW INTERCHANGE LANDAU AND I-10

VISTA CHINO VARNER ROAD

CONSTRUCT NEW 6-LANE MIXED FLOW, PARTIAL CLOVERLEAF IC WITH AUXILIARY LANES AND 4 TWO LANE RAMPS PLUS 6 LANE GRADE SEPARATION BRIDGE OVER UPRR BETWEEN PALM DR IC AND DATE PALM DRIVE IC

2035 $238,060

Page 107: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 105

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 3A04WT003 10 I-10 (PM 8.81 TO 9.81)AT HIGHLAND SPRINGS AVE

BTWN 5TH ST AND SOUTH RAMPS

RECONSTRUCT/WIDEN IC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2030 $23,652

IC/RAMPS 3A04WT007 10 I-10 (PM 11.1 TO 11.6) AT SUNSET AVE BTWN RAMPSRECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2014 $496

IC/RAMPS 3M01CV01 10 I-10 AT AVE 50 I-10 CONSTRUCT NEW 4 LANE IC AND RAMPS 2020 $54,571

IC/RAMPS 3M04WT001 10 I-10 (PM 7.07 TO 8.07)AT SR-79/ BEAU-MONT AVE

BTWN 6TH ST & 1ST ST

RECONSTRUCT/WIDEN IC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2020 $29,167

IC/RAMPS 3M04WT002 10 I-10 (PM12.35 TO 13.35) AT 8TH STBTWN RAMSEY ST & LINCOLN ST

RECONSTRUCT/WIDEN IC UC 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2030 $6,860

IC/RAMPS 3M04WT003 10 I-10 (PM 0.0 TO 2.8)AT CALIMESA BLVD/SANDALWOOD DR

BTWN 7TH ST & SANDALWOOD DR

RECONSTRUCT IC AND RECONSTRUCT/WIDEN RAMPS 2014 $39,657

IC/RAMPS 3M04WT004 10 I-10 (PM 7.71 TO 8.71)AT PENNSYLVANIA AVE

BTWN 6TH ST & 3RD ST

RECONSTRUCT IC AND RECONSTRUCT/WIDEN RAMPS 2020 $29,167

IC/RAMPS 3M0704 10 I-10 (PM 18.9 TO 19.9)

IN CABAZON (R18.9) (FROM AP-PROX SEMINOLE DR N/O I-10)

AT MAIN STREET IC (19.9) (TO AP-PROX BONITA AVE S/O I-10)

IMPROVE INTERCHANGE - WIDEN 3 TO 6 LANES & CONSTRUCT RR GRADE SEPARATION CROSSING (EA:0G600)

2014 $32,632

IC/RAMPS 3M0705 10I-10 (PM SBD 38.66 TO RIV 0.52)

AT COUNTY LINE RDBTWN 7TH ST & I-10 EAST RAMPS

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2014 $19,829

IC/RAMPS 3M0715 10 I-10 (PM 58.39 TO 59.39) AT DILLON RD BTWN VISTA DEL NORTE AND VISTA DEL SUR

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2020 $15,161

IC/RAMPS 3M0720 10 I-10AT FUTURE DA VALL DR AT I-10 SOUTH OF VARNER ROAD

DA VALL ROAD SOUTH OF UPRR

CONSTRUCT NEW 6-LANE MIXED FLOW, PARTIAL CLOVERLEAF IC WITH AUXILIARY LANES AND 4 TWO LANE RAMPS PLUS 6 LANE GRADE SEPARATION BRIDGE OVER UPRR BETWEEN RAMON ROAD IC AND DATE PALM DRIVE IC

2030 $132,986

IC/RAMPS 3M04MA05 10 I-10/SR-60 JCT/SPLITSR60/I-10 JCT/SPLIT

CONSTRUCT NEW INTERCHANGE 2030 $590,624

IC/RAMPS 3A04A16 15 I-15AT SECOND ST (CHANEY AVE)

BTWN COLLIER AVE AND CAMINO DEL NORTE

CONSTRUCT NEW 4 LANE ARTERIAL CONNECTING OVERCROSS OVER I-15

2035 $74,014

Page 108: Project List - Southern California Association of Governments

106 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 3A04A17 15 I-15 AT RIVERSIDE DRBTWN COLLIER AVE AND DEXTER AVE

CONSTRUCT NEW 4 LANE OC OVER I-15 2023 $43,311

IC/RAMPS 3A04A26 15 I-15AT BELLEGRAVE AVE

BTWN HAMNER AVE & WINEVILLE RD

ADD SIGNALS AND RAMPS. 0.1 MI. 2030 $13,678

IC/RAMPS 3M04WT005 15 I-15 (PM 45.1 TO 46.1) AT 6TH STBTWN HAMNER AVE & SIERRA AVE

RECONSTRUCT INTERCHANGE/RAMPS/CHANNELIZA-TION IMPROVEMENTS

2018 $22,065

IC/RAMPS 3M04WT007 15 I-15 (PM 42.37 TO 43.37)AT HIDDEN VALLEY PKWY

BTWN HAMNER AVE & BEYOND NB EXIT RAMP

RECONSTRUCT INTERCHANGE/RAMPS/CHANNELIZA-TION IMPROVEMENTS

2018 $4,414

IC/RAMPS 3M0721 15 I-15 (PM 4.48 TO 5.48)AT I-15/RANCHO CALIFORNIA

BTWN YNEZ RD AND JEFFERSON AVE

RECONFIGURE 4 TO 6 LANE IC AND RAMPS AT I-15. TYPE OF LANES FOR ARTERIAL WIDENING WILL BE THROUGH LANES.

2030 $48,885

IC/RAMPS 3M0726 15 I-15 AT FRANKLINBTWN MAIN ST AND RR

CONSTRUCT NEW 4 LANE IC AND RAMPS 2018 $41,276

IC/RAMPS 3M0727 15 I-15 (PM 15.8 TO 16.8)AT BUNDY CANYON RD

BTWN ORANGE ST & CHERRY ST

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT RAMPS

2030 $31,814

IC/RAMPS 3M0728 15 I-15 (PM 32.60 TO 33.60)AT TEMESCAL CANYON

NEAR INDIAN TRUCK TRAIL AND GLENN IVY JUST BEYOND AND BTWN RAMPS

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT RAMPS

2030 $33,501

IC/RAMPS 3M0729 15 I-15 (28.36 TO 29.36)AT HORSETHIEF CANYON RD

JUST BEYOND AND BTWN RAMPS

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT RAMPS

2030 $6,701

IC/RAMPS 3M0730 15 I-15AT MURRIETA HOT SPRINGS RD

ENTRANCE AND EXIT RAMP LIMITS

IMPROVE IC RAMPS INCLUDING RECONSTRUCTION OF NORTHBOUND OFF-RAMP TO PROVIDE A LOOP, COMPLETING THE PARTIAL CLOVER LEAF

2014 $6,134

IC/RAMPS 3M0732 15 I-15 AT LEMON ST UCBTWN ALMOND ST AND GRAPE ST

WIDEN UC FROM 2 TO 4 LANES 2023 $10,191

Page 109: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 107

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 3M0733 15 I-15 (PM 43.13 TO 44.13) AT 2ND STBTWN HAMNER AVE & VALLEY VIEW AVE

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND WIDEN RAMPS

2018 $4,668

IC/RAMPS 3M0734 15 I-15 AT MALAGA RD

BTWN CASINO DR LAKEVIEW TERRACE AND GRAPE ST

CONSTRUCT NEW 4 LANE OC OVER I-15 2030 $49,087

IC/RAMPS 3M0735 15 I-15 (PM 17.01 TO 18.01) AT OLIVE STBTWN ORCHARD ST AND GRAPE ST

CONSTRUCT NEW 4 LANE IC AND RAMPS 2018 $56,483

IC/RAMPS 3M0736 15 I-15 (PM 23.35 TO 24.35) AT NICHOLS RD BTWN RAMPSRECONSTRUCT/WIDEN IC FROM 2 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2030 $68,606

IC/RAMPS 3M0737 15 I-15 AT LAKE STBTWN WALKER CYN RD TEMES-CAL CYN RD

RECONSTRUCT/WIDEN IC FROM 2 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2023 $28,692

IC/RAMPS 3A04A29 60 SR-60 (PM 9.06 TO 10.06) AT RUBIDOUX BLVDBTWN 30TH & 34TH STS

RECONSTRUCT/WIDEN IC, RAMPS AND CHANNELIZA-TION IMPROVEMENTS

2018 $26,960

IC/RAMPS 3A04A30 60SR-60 (PM SBD 9.46 TO 10.46)

AT MILLIKEN AVEBTWN HARREL AVE & IBERIA

RECONSTRUCT/WIDEN IC, RAMPS, AND CHANNELIZA-TION IMPROVEMENTS

2018 $4,735

IC/RAMPS 3M01WT019 60 CANYON ROADRECONSTRUCT/WIDEN IC, RAMPS AND CHANNELIZA-TION IMPROVEMENTS

2030 $6,701

IC/RAMPS 3M01WT020 60 SR-60 (PM 2.53 TO 3.53) AT MISSION BLVDBTWN GRAN-ITE HILL DR & SEVAINE WAY

RECONSTRUCT INTERCHANGE/RAMPS 2030 $11,780

IC/RAMPS 3M04WT017 60SR-60 (PM 14.84 TO 15.84)

AT HEACOCK STBTWN HEMLOCK AVE & SUN-NYMEAD BLVD

WIDEN/RECONSTRUCT IC, RAMPS, AND CHANNEL-IZATION IMPROVEMENTS. NO ADDITIONAL LANES PLANNED

2018 $4,735

IC/RAMPS 3M04WT018 60SR-60 (PM 11.23 TO 12.23)

AT MAIN STBTWN RUSSELL ST & STODDARD AVE

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS, CHANNELIZATION IMPROVEMENTS

2020 $5,834

IC/RAMPS 3M0712 60SR-60 (PM 19.87 TO 20.87)

AT REDLANDS BLVDBTWN HEMLOCK AVE & FIR AVE

WIDEN ARTERIAL FROM 2 TO 4 THROUGH LANES. RECONSTRUCT TO TYPE L-9/EB OFF - 3 LANES, EB ON - 2 LANES, WB OFF - 2 LANES, WB ON - 2 LANES

2018 $51,843

Page 110: Project List - Southern California Association of Governments

108 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 3M0713 60SR-60 (PM 15.85 TO 16.85)

AT PERRIS BLVDBTWN SUN-NYMEAD BLVD & IRONWOOD

RECONSTRUCT/WIDEN ARTERIAL FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS (NO ADDITIONAL LANES PLANNED)

2018 $30,847

IC/RAMPS 3M0714 60SR-60 (PM 21.60 TO 22.60)

AT GILMAN SPRINGS ROAD

BTWN N/B & S/B ON/OFF RAMPS

WIDEN ARTERIAL FROM 2 THROUGH LANES TO 6 THROUGH LANES. RECONSTRUCT/WIDEN TO EB OFF - 2 LANES, EB ON - 1 LANE, WB OFF - 1 LANE, WB ON - 2 LANES/WIDEN RAMPS

2018 $28,860

IC/RAMPS 3M0718 79SANDERSON AVE (SR-79) (PM 29.83 TO 30.83)

AT RAMONA EX-PRESSWAY (SR-79)

BTWN N.RAMONA BLVD AND RA-MONA EXP.

CONSTRUCT NEW 6 LANE I/C AND RAMPS 2030 $66,999

IC/RAMPS 3M0723 79 SR-79 (HEMET BYPASS)AT SR-74 (FLORIDA AVE)

WEST OF HEMET (BETWEEN WAR-REN AVE AND 1/2 MILE WEST OF SR79/SR74 INTERSECTION)

CONSTRUCT NEW 6 LANE I/C AND RAMPS 2020 $52,982

IC/RAMPS 0E620K 86 SR86S (PM 10.6 TO 11.4)AT SR195 (AVE 66) NEAR MECCA

BTWN PIERCE ST AND LINCOLN ST

CONSTRUCT NEW 4 LANE IC AND RAMPS 2014 $62,572

IC/RAMPS 3M01CV03 86SR-86 (PM 17.81 TO 18.81)

AT AVE 54BTWN SR-111 & FILLMORE

CONSTRUCT 4 LANE BRIDGE/INTERCHANGE AND RAMPS ACROSS SR-86

2030 $107,829

IC/RAMPS 3M0706 86 SR-86S (PM 12.9 TO 13.3)NEAR COACHELLA, SR-86S

AT AVE. 62CONSTRUCT A 4 LANE SPREAD DIAMOND IC W/ 4 RAMPS 2 LANE ENTRANCE RAMPS AND 1 LANE EXIT RAMPS (EA 0J530)

2014 $19,485

IC/RAMPS 3M0716 86SR86S (PM 21.02 TO 22.02)

AT DILLON RD

BTWN WEST OF COACHELLA STORM WATER CHANNEL AND AVENUE 47

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2020 $36,293

IC/RAMPS 3M0717 86 SR86S (PM 18.1 TO 20.1) AT AVENUE 52

BTWN COACHEL-LA STORM WATER CHANNEL AND POLK ST

CONSTRUCT IC AND WIDEN FROM 2 TO 6 LANES AND CONSTRUCT RAMPS

2023 $60,143

IC/RAMPS 3M01WT021 91SR-91 (PM 19.50 TO 20.50)

AT 14TH STBTWN OLIVE-WOOD AVE & COMMERCE ST

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2018 $22,529

Page 111: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 109

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 3M01WT022 91SR-91 (PM 15.50 TO 15.70)

AT ADAMS STBTWN DIANA AVE & INDIANA AVE

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2020 $32,694

IC/RAMPS 3M01WT023 91SR-91 (PM 16.15 TO 17.15)

AT MADISON STBTWN GARDEN ST & INDIANA AVE

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2020 $32,694

IC/RAMPS 3M01WT024 91 SR-91(PM 10.6 TO 11.6) AT MAGNOLIA AVEBTWN MERCED DR & FILLMORE ST

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2020 $32,694

IC/RAMPS 3M01WT026 91 SR-91(PM 12.9 TO 13.1) AT TYLER STBTWN DIANA AVE & INDIANA AVE

RECONSTRUCT/WIDEN IC FROM AND RECONSTRUCT/WIDEN RAMPS

2020 $58,332

IC/RAMPS 3M01WT027 91SR-91 (PM 20.02 TO 20.53)

AT UNIVERSITY AVE/9TH ST

BTWN LEMON ST & VINE ST

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2020 $5,834

IC/RAMPS 3M0709 91SR-91 (PM 17.32 TO 18.32)

AT ARLINGTON AVE

BTWN MT DIABLO TO S/O EAST-BOUND ENTRY RAMPS

RECONSTRUCT/WIDEN IC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2018 $28,851

IC/RAMPS 3M0710 91 SR-91(18.36 TO 19.36) AT CENTRAL AVEBTWN NEVA PL AND BNSF RR

RECONSTRUCT/WIDEN IC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2018 $4,505

IC/RAMPS 3M04MA11 91 SR91/I-15SR91/I-15 JUNC-TION

SR91/I-15 JUNC-TION

BUILD CONNECTOR IMPROVEMENTS AND COLLECTOR DISTRIBUTION SYSTEM AT I-15

2020 $880,785

IC/RAMPS 3A04A27 215I-215 (PM 15.95 TO 16.95)

AT GARBANI RDBTWN HAUN RD & ANTELOPE RD

" CONSTRUCT NEW 4 LANE (2 LNS EAC DIR) AND RAMPS"

2030 $67,425

IC/RAMPS 3A04WT059 215I-215 (PM 31.83 TO 32.83)

AT OLEANDER AVEBTWN HARVILL AVE AND WEST-ERN WAY

RECONSTRUCT AND WIDEN OC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2018 $25,672

IC/RAMPS 3M0731 215 I-215 (PM 24.7 TO 26.1) AT ELLIS AVE

BTWN PERRIS VALLEY STORM DRAIN W/O I-215 TO DUNLAP DR E/O I-215

CONSTRUCT NEW 2 LANE IC AND RAMPS (1 LANE) 2030 $118,566

IC/RAMPS 3M04WT009 215I-215 (PM 23.04 TO 24.04)

AT SR-74 (MAT-THEWS RD)

BTWN CASE RD & TRUMBLE RD

RECONSTRUCT INTERCHANGE/RAMPS 2030 $43,659

IC/RAMPS 3M04WT011 215I-215 (PM 44.51 TO 45.51)

AT CENTER STBTWN STEPHENS AVE & IOWA AVE

RECONSTRUCT INTERCHANGE/RAMPS 2030 $49,896

Page 112: Project List - Southern California Association of Governments

110 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 3M04WT012 215I-215 (PM 43.40 TO 44.40)

AT COLUMBIA AVEBTWN PRIMER ST & BRANDYWINE AVE

RECONSTRUCT INTERCHANGE/RAMPS 2020 $32,073

IC/RAMPS 3M04WT014 215I-215 (PM 27.38 TO 28.38)

AT NUEVO RDBTWN A ST & E. FRONTAGE RD

RECONSTRUCT INTERCHANGE, ADD CHANNELIZATION LANES ON RAMPS, MODIFY TRAFFIC SIGNALS

2018 $23,152

IC/RAMPS 3M04WT016 215I-215/SR-60 (PM 40.99 TO 41.99)

AT UNIVERSITY AVEBTWN IOWA AVE & CANYON CREST DR

RECONSTRUCT INTERCHANGE/RAMPS 2020 $10,256

IC/RAMPS 3M0708 215 I-215 (PM 30.9) AT RAMONA EXPWY BTWN RAMPS

RECONSTRUCT/WIDEN FROM 4 TO 8 LANES, WIDEN SB AND NB EXIT RAMPS AT I-214/RAMONA EXPWY IC AND OC, CONSTRUCT DUAL LEFT-TURN LANES AT THE EXIT RAMPS TEMINI

2018 $41,907

IC/RAMPS 3M0719 215I-215 (PM 20.34 TO 21.34)

AT MCCALL BLVDBTWN BRADLEY RD & ENCANTO DR

RECONSTRUCT/WIDEN IC FROM 4 TO 6 LANES AND RECONSTRUCT RAMPS

2030 $33,501

IC/RAMPS 3M0724 215I-215 (PM 35.92 TO 36.92)

AT ALESSANDRO BLVD

BTWN BNSF & OLD 215 FRONT-AGE ROAD

WIDEN/RECONSTRUCT IC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2018 $4,745

IC/RAMPS 3M0725 215 I-215AT MID-COUNTY PARKWAY

BTWN RAMPS CONSTRUCT NEW 6 LANE IC AND RAMPS 2020 $110,899

ITS 3ITS07 0 ITS COUNTYWIDE ITS LUMP SUM ONGOING $271,608

ITS 3ITS0701 0INTELLIGENT TRANS-PORTATION SYSTEM (ITS) EQUIPMENT

COACHELLA VALLEY

PURCHASE AND INSTALL VARIOUS ITS EQUIPMENT SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES FOR BUS STOP IMPROVEMENT PROJECT.

2009 $1,054

MIXED FLOW

3C01MA02 0CETAP - MORENO VALLEY TO SAN BERNARDINO COUNTY

MORENO VALLEYSAN BERNARDINO COUNTY

CONSTRUCT NEW NORTH-SOUTH WESTERN COUNTY TRANSPORTATION CORRIDOR

2030 $5,488,952

MIXED FLOW

3M01SH06 10 I-10MONTEREY AVE (44.5)

DILLON RD (58.9) ADD 1 MF LANE EACH DIRECTION (EA 0A030K) 2030 $221,297

MIXED FLOW

3M07A 15 I-15 BUNDY CANYON I-15/I-215 ICI-15 ADD 1 MF LANE EACH DIR, BUNDY CANYON TO I-15/I-215 INTERCHANGE (FROM 3 TO 4 MF EACH DIR)

2014 $135,601

Page 113: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 111

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

MIXED FLOW

3M01MA09 71 SR-71 SR-91SAN BERNARDINO COUNTY LINE

WIDEN TO 3 MF LANES EACH DIRECTION 2035 $534,808

MIXED FLOW

3M04MA10 91 SR-91 PIERCE STREET ORANGE COUNTY LINE

ADD 1 MF LANES EACH DIRECTION 2018 $503,258

MIXED FLOW

3M0738 215 I-215MURRIETA HOT SPRINGS ROAD

I-15/215 INTER-CHANGE

CONSTRUCT A THIRD MIXED FLOW LANE IN EACH DIRECTION

2014 $17,226

NON-MO-TORIZED

3NL04 0 NON-MOTORIZED COUNTYWIDEVARIOUS PEDESTRIAN AND BIKEWAY NON-MOTOR-IZED IMPROVEMENT PROJECTS

ONGOING $70,386

O&M 3OM0701 0OPERATIONS & MAINTE-NANCE

COUNTYWIDESTATE HIGHWAY, ARTERIAL, AND TRANSIT PRESERVA-TION/MAINTENANCE AND OPERATIONS

ONGOING $753,606

OTHER 3EL04 0ECONOMIC DEVELOP-MENT

WESTERN COUNTYINFRASTRUCTURE & FACILITY IMPROVEMENTS INCENTIVES

ONGOING $192,513

TDM 3RL04 0 RIDESHARE COUNTYWIDERCTC COMMUTER ASSISTANCE PROGRAM: RIDE-SHARE AND OTHER INCENTIVE PROGRAMS, TDM (TELECOMMUTE, PARK AND RIDE, ETC.)

ONGOING $188,020

TOLL 3HL0402 15 I-15 SR74SAN BERNARDINO COUNTY LINE

BUILD HOV/HOT LANES: 2 HOV3+/HOT EACH DIR FROM SR-74 TO SAN BERNARDINO COUNTY LINE

2020 $873,433

TOLL 3HL0401 91 SR-91ORANGE COUNTY LINE

I-15BUILD/EXTEND 4 HOT LANES (2 IN EACH DIRECTION) BUILD HOT EB SR91 TO SB I-15 AND NB I-15 TO WB SR91 CONNECTOR LANES

2020 $751,118

TRANSIT - BRT

3TR04A, 3TR04B

0 BUS RAPID TRANSIT

MAGNOLIA COR-RIDOR PHASE 1 (CITY OF RIVER-SIDE)

MORENO VAL-LEY CORRIDOR PHASE 2 (CITY OF MORENO VALLEY)

BUS RAPID TRANSIT (BRT): 65 INTERSECTIONS RET-ROFITTED FOR SIGNAL PRIORITY FOR TRANSIT AND AUTOMATED TRAVEL INFORMATION AT 15 BUS STOPS

2018 $3,149

TRANSIT - BRT

3TR04C 0 BUS RAPID TRANSIT COACHELLA VALLEY

IMPLEMENT BUS RAPID SERVICE/BRT ON HIGHWAY 111 BASED ON RECOMMENDATIONS IN THE COM-PREHENSIVE OPERATIONAL ANALYSIS CONDUCTED IN 2005/06. PROJECT WILL ENTAIL COMPLETING FEASIBILITY STUDY AND WORKING WITH THE LOCAL JURISDICTION ON VARIOUS ACTIVITIES PRIOR TO IMPLEMENTING PROJECT.

2018 $19,523

Page 114: Project List - Southern California Association of Governments

112 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TRANSIT - BUS

3TL104 0ELDERLY & DISABLED ASSISTANCE

COACHELLA VALLEYIMPROVE PARATRANSIT SERVICES FOR THE ELDERLY & PERSONS WITH DISABILITIES

ONGOING $29,149

TRANSIT - BUS

3TL1507 0ENHANCED COMMUTER LINK - EAST CORRIDOR

WESTERN RIVER-SIDE COUNTY

SAN DIEGO, ORANGE, AND LOS ANGELES COUN-TIES

PROPOSED COMMUTER LINK SERVICE AT THE EASTERN SIDE OF I-215 CORRIDOR TO SAN DIEGO AND NEIGHBORING COUNTIES OF ORANGE AND LOS ANGELES THROUGH METROLINK SERVICE CONNEC-TIONS.

2010 $19,237

TRANSIT - BUS

3TL1607 0ENHANCED COMMUTER LINK - WEST CORRIDOR

WESTERN RIVER-SIDE COUNTY

SAN DIEGO, ORANGE, AND LOS ANGELES COUN-TIES

PROPOSED COMMUTER LINK SERVICE AT THE WESTERN SIDE OF I-15 CORRIDOR TO SAN DIEGO AND NEIGHBORING COUNTIES OF ORANGE AND LOS ANGELES THROUGH METROLINK CONNECTIONS. A PROPOSED EXPANSION AN IMPROVEMENT OF THE EXISTING COMMUTER SERVICE FROM MURRIETA/TE-MECULA INCLUDING THE CITIES OF PERRIS, MORENO VALLEY, NORCO, AND CORONA

2010 $8,783

TRANSIT - BUS

3TL504 0 BUS PURCHASES COACHELLA VALLEYPURCHASE 15 ADDITIONAL EXPANSION BUSES, ROUTES TBD. THEY WILL INCLUDE 60FT, 45FT, 40FT, 32FT, AND 30FT BUSES.

2010 $6,522

TRANSIT - BUS

3TL507 0 BUS PURCHASES COACHELLA VALLEY

PURCHASE ADDITIONAL REPLACEMENT BUSES FOR FIXED ROUTE AND PARATRANSIT SERVICES. THE ADDITIONAL VEHICLES WILL CONSIST OF 60FT, 45FT, 40FT, 32 FT, AND 30FT BUSES.

ONGOING $13,174

TRANSIT - BUS

3TL907 0EXPRESS/COMMUTER BUS SERVICE

COACHELLA VALLEY RIVERSIDEIMPLEMENT EXPRESS BUS SERVICE TO CONNECT COMMUTERS TO METROLINK SERVICE IN RIVERSIDE, AS WELL AS EXPRESS BUS SERVICE ALONG I-10.

2018 $4,668

TRANSIT - COMMUT-

ER RAIL3CR104 0

METROLINK COMMUTER RAIL

COUNTYWIDEMETROLINK IMPROVEMENTS (TRACK, ROLLING STOCK)

ONGOING $360,527

TRANSIT - COMMUT-

ER RAIL3CR204 0

METROLINK COMMUTER RAIL

IEOC & 91 LINES METROLINK RAIL STATION IMPROVEMENTS ONGOING $47,467

Page 115: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 113

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TRANSIT - COMMUT-

ER RAIL3CR0701 0

RIVERSIDE LINE, 91 LINE, & IEOC LINE

THROUGHOUT RIVERSIDE, ORANGE COUNTY, & LOS ANGELES COUNTY

METROLINK COMMUTER RAIL EXISTING LINES SER-VICES EXPANSION - RIVERSIDE, 91, AND IEOC LINES

2035 $1,742,025

TRANSIT - COMMUT-

ER RAIL3CR0702 0 PERRIS VALLEY LINE CITY OF PERRIS

CITY OF SAN JACINTO

METROLINK PERRIS VALLEY LINE COMMUTER RAIL EXTENSION FROM PERRIS TO SAN JACINTO (~16.5 MILES), STATIONS AT WINCHESTER RD (SR-79 @ ASBURY ST), HEMET AIRPORT (SANDERSON AVE @ STETSON RD), SAN JACINTO (STATE ST @ 7TH ST)

2030 $276,465

TRANSIT - COMMUT-

ER RAIL3CR0703 0 PERRIS VALLEY LINE CITY OF PERRIS

CITY OF TE-MECULA

METROLINK PERRIS VALLEY LINE COMMUTER RAIL EXTENSION FROM PERRIS TO TEMECULA (~16.5 MILES), STATIONS AT NEWPORT RD (@ I-215), CLINTON KEITH RD (@ I-215), AND WINCHESTER RD (SR-79 @ I-215)

2030 $708,017

TRANSIT - INTER-MODAL

3TC04TR1 0 TRANSIT CENTERBANNING/ BEAU-MONT/ CALIMESA AREA

TRANSIT CENTER 2020 $7,862

TRANSIT - INTER-MODAL

3TC04TR10 0 TRANSIT CENTER LAKE ELSINORE TRANSIT CENTER 2020 $7,862

TRANSIT - INTER-MODAL

3TC04TR3 0 TRANSIT CENTER COACHELLA VALLEYCONSTRUCT 4 TRANSIT CENTERS IN THE COACHELLA VALLEY, LOCATIONS TBD

2012 $21,002

TRANSIT - INTER-MODAL

3TC04TR6 0 TRANSIT CENTERMENIFEE (SOUTH-WESTERN RIVER-SIDE COUNTY)

TRANSIT CENTER 2020 $7,862

TRANSIT - INTER-MODAL

3TC04TR8 0 TRANSIT CENTER

NORTHWEST RIVERSIDE COUNTY ZONE - EAST VALE/ NORCO

TRANSIT CENTER 2020 $7,862

TRANSIT - INTER-MODAL

3TC0701 0 TRANSIT CENTER BRIDGE CORONABRIDGE TO CONNECT THE TRANSIT CENTER TO THE METROLINK LOADING AREA

2017 $1,968

Page 116: Project List - Southern California Association of Governments

114 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TRANSIT - INTER-MODAL

3TC0702 0TRANSIT CENTER EN-HANCEMENTS

RIVERSIDE, CORONA, TEMECULA, HEMET, MORENO VALLEY, BANNING/BEUMONT, NORCO, MENIFEE, LAKE ELSINORE

TRANSIT CENTER ENHANCEMENT - LANDSCAPING, STREET SCRAPING, BUS SHELTERS

2020 $19,297

TRANSIT - INTER-MODAL

3TC0703 0 PARK & RIDE LOTS COACHELLA VALLEYACQUIRE PROPERTY AND CONSTRUCT 3 PARK AND RIDE LOTS

2012 $29,267

TRANSIT - INTER-MODAL

3TL0407 0TRANSFER LOCATION IMPROVEMENT

COACHELLA VALLEY

FACILITY IMPROVEMENT TO ACCOMMODATE ADDITIONAL SERVICE ROUTES BASED ON RECOM-MENDATION FROM COMPREHENSIVE OPERATIONAL ANALYSIS

2012 $8,780

TRANSIT - INTER-MODAL

3TL1707 0METROLINK COMMUTER RAIL

IEOC & 91 LINESMETROLINK CONSTRUCT NEW STATION AT 3360 VAN BUREN BLVD IN RIVERSIDE (PARKING 550 SPACES)

2035 $38,052

TRANSIT - OTHER

3TC04TR11 0FACILITY ACQUISITION/ CONSTRUCTION

THOUSAND PALMS

PROPERTY ACQUIRED IN FY 2002 TO CONSTRUCT NEW ADMINISTRATIVE/MAINTENANCE FACILITY. SUNLINE PLANS TO CONDUCT AN ENVIRONMENTAL ASSESSMENT PRIOR TO OBTAINING PERMITS FOR CONSTRUCTION OF FACILITY.

2010 $13,044

TRANSIT - OTHER

3TL1307 0 SUPPORT VEHICLES COACHELLA VALLEYPURCHASE VEHICLES THAT WILL BE USED AS RELIEF VEHICLES FOR SUNLINE DRIVERS AT THE BEGINNING OR ENDING OF THEIR SHIFTS IN MID-ROUTE.

2009 $158

TRANSIT - OTHER

3TL1007 0PREVENTIVE MAINTE-NANCE

COACHELLA VALLEYPURCHASE VEHICLE PARTS AND PAY FOR LABOR COST ASSOCIATED WITH ONGOING MAINTENANCE OF REVENUE VEHICLES

2010 $1,665

TRANSIT - OTHER

3TL1107 0PREVENTIVE MAINTE-NANCE

COACHELLA VALLEYPURCHASE VEHICLE PARTS AND PAY FOR LABOR COST ASSOCIATED WITH ONGOING MAINTENANCE OF REVENUE VEHICLES

2009 $1,054

TRANSIT - OTHER

3TL607 0 PURCHASE AMENITIES COACHELLA VALLEY PURCHASE MORE AMENITIES FOR INSTALLATION AT BUS STOPS THROUGHOUT THE SERVICE AREA BASED ON RECOMMENDATIONS FROM THE COA.

2010 $5,953

TRANSIT - OTHER

3TL707 0GFI FAREBOXES, SMART-CARDS, & SECURITY SYSTEMS

COACHELLA VALLEY INSTALL SECURITY SYSTEMS IN SUNLINE BUSES AND ACQUIRE NEW FAREBOXES WITH SMARTCARD TECHNOLOGY AND CAPABILITIES.

2012 $5,140

Page 117: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 115

RIVERSIDE COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TRANSIT O&M

3TL1207 0MISCELLANEOUS MAINTE-NANCE EQUIPMENT

COACHELLA VALLEYPURCHASE VARIOUS MAINTENANCE EQUIPMENT FOR THE MAINTENANCE DEPARTMENT.

2009 $211

TRANSIT O&M

3TL307 0TRANSIT CENTER MAIN-TENANCE

N/A N/A MAINTENANCE OF NINE TRANSIT CENTERS 2027 $35,184

TRANSIT O&M

3TL807 0 ATIS MAINTENANCE N/A N/A SYSTEM MAINTENANCE ONGOING $7,037

TRUCK CLIMBING

3TK04MA12 10 I-10SAN BERNARDINO COUNTY LINE (R0.0)

I-10/SR60 JCT ADD EASTBOUND TRUCK CLIMBING LANE 2020 $65,275

TRUCK CLIMBING

3TK04MA13 60 SR-60

BADLANDS AREA EAST OF MORENO VALLEY (NEAR GIL-MAN SPRINGS RD)

BADLANDS AREA - WEST OF SR-60-/I-10 JCT

ADD EASTBOUND TRUCK CLIMBING LANE 2018 $71,025

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

RIVERSIDE COUNTY ARTERIAL PROJECTS

In the process of developing the 2008 RTP, the Riverside County Transportation Commission provided to SCAG a list of arterial improvement projects planned

for implementation in Riverside County within the timeframe of the RTP. The projects in this list are included in the 2008 RTP subject to available funding as

identified in the Riverside County RTP Projects list.

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04A23 "A" STREET NUEVO RD 4TH ST WIDEN FROM 2 TO 4 LANES 2012 $3,692

3A04WT092 11TH ST/CASE RD PERRIS BLVD GOETZ RD WIDEN FROM 2 TO 4 LANES 2007 $602

3A04A05 14TH AVE RIVER VALLEY RD 7TH ST WIDEN EXISTING BRIDGE AT D-CANAL FROM 2 TO 4 LANES 2012 $2,136

3A04WT086 1ST ST PARKRIDGE AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2012 $1,989

3A04WT087 2ND ST RIVER RD HAMNER AVE WIDEN FROM 2 TO 4 LANES 2018 $6,503

3A04A08 7TH ST HOBSONWAY RICE ST WIDEN FROM 2 TO 4 LANES 2008 $770

Page 118: Project List - Southern California Association of Governments

116 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07261 A ST SAN JACINTO ST 4TH ST WIDEN FROM 2 TO 4 LANES 2030 $3,594

3A07062 ADAMS STBEFORE AND AFTER BRIDGE AT WHITEWATER CHANNEL

CONSTRUCT NEW 4 LANE BRIDGE 2012 $8,686

3A01WT049 ALESSANDRO BLVD I-215 PERRIS BLVD WIDEN FROM 4 TO 6 LANES 2012 $14,275

3A01WT050 ALESSANDRO BLVD PERRIS BLVD NASON ST WIDEN FROM 2 TO 6 LANES 2012 $17,385

3A01WT051 ALESSANDRO BLVD NASON ST GILLMAN SPRINGS WIDEN FROM 2 TO 4 LANES 2018 $21,041

3A01WT123 ALESSANDRO BLVD TRAUTWEIN RD I-215 WIDEN FROM 4 TO 6 LANES 2030 $12,133

3A04A20 ARABY DR ANZA TR STAGECOACH RDCONSTRUCT NEW BRIDGE CROSSING OVER PALM CANYON WASH

2030 $52,089

3A01WT124 ARCHIBALD AVESAN BERNARDINO COUNTY LINE

RIVER RD WIDEN FROM 2 TO 4 LANES 2030 $46,226

3A01WT112 ARLINGTON AVE MAGNOLIA AVE ALESSANDRO BLVD WIDEN FROM 4 TO 6 LANES 2018 $17,996

3A04WT125 ARMSTRONG RD SAN BERNARDINO COUNTY LINE

VALLEY WAY WIDEN FROM 2 TO 4 LANES 2030 $12,160

3A07047 AT GRAHAM ST SUNNYMEAD BLD HEMLOCK AVE CONSTRUCT 4 LANE OC OVER SR60 2030 $18,839

3A04A13AUTO CENTER DR (CA-SINO DR)

FRANKLIN STDIAMOND DR (RAILROAD CYN RD)

WIDEN BRIDGE OVER SAN JACINTO RIVER FROM 2 TO 4 LANES 2018 $5,417

3A07057 AVE 48 JACKSON ST VAN BUREN ST (CENTER LINE)

WIDEN FROM 2 TO 6 LANES 2012 $9,232

3A07092 AVE 48GRADE SEPARATION AT HWY 111/SPRR

WIDEN FROM 4 TO 6 LANES 2023 $9,950

3A07108 AVE 48 VAN BUREN ST W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2012 $4,581

3A07167 AVE 48INTERSECTION OF AVE 48 AND HWY 86

WIDEN FROM 4 TO 6 LANES 2014 $139

3A07172 AVE 48 VAN BUREN ST TO W W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2018 $4,551

Page 119: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 117

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A01CV002 AVE 50 BRIDGE. AT ALL AMER.CANAL

CONSTRUCT 4-LANE BRIDGE 2009 $3,798

3A01CV004 AVE 50 SR-86S TO I-10 I-10 WIDEN FROM 2 TO 4 LANES 2012 $29,068

3A01CV005 AVE 50 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 4 LANES 2014 $9,312

3A04CV113 AVE 50 HWY 111 TO SR-86S SR-86S WIDEN FROM 2 TO 4 LANES 2014 $102,837

3A07039 AVE 50 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 4 LANES 2014 $13,052

3A07070 AVE 50 JEFFERSON STREET MADISON STREET WIDEN FROM 2 TO 4 LANES 2012 $8,168

3A01CV010 AVE 52 JEFFERSON STREET MADISON STREET INCL. BRIDGE @ CV CANAL

WIDEN FROM 2 TO 4 LANES 2009 $7,905

3A01CV014 AVE 52 CALHOUN ST FREDRICK ST WIDEN FROM 2 TO 6 LANES 2012 $9,485

3A01CV015A AVE 52 FREDRICK ST HARRISON ST WIDEN FROM 2 TO 6 LANES 2014 $2,991

3A01CV015B AVE 52 HARRISON ST HWY 111 WIDEN FROM 2 TO 6 LANES 2018 $1,979

3A01CV015C AVE 52 HWY 111 SR-86S WIDEN FROM 2 TO 6 LANES 2030 $196,478

3A07094 AVE 52GRADE SEPARATION AT HWY 111/SPRR

WIDEN FROM 2 TO 6 LANES 2018 $7,745

3A07098 AVE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2014 $5,707

3A07164 AVE 52INTERSECTION OF AVE 52 AND HWY 111

WIDEN FROM 2 TO 6 LANES 2018 $210

3A07165 AVE 52INTERSECTION OF AVE 52 AND SR-86

WIDEN FROM 2 TO 6 LANES 2018 $185

3A07173 AVE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2030 $7,170

3A07174 AVE 52 CALHOUN ST FREDRICK ST WIDEN FROM 2 TO 6 LANES 2030 $12,035

3A01CV016 AVE 54 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 4 LANES 2018 $12,101

3A01CV017 AVE 54 HARRISON ST TYLER ST WIDEN FROM 2 TO 4 LANES 2018 $12,988

3A01CV018 AVE 54 TYLER ST HWY 111 WIDEN FROM 2 TO 4 LANES 2018 $5,809

3A07011 AVE 54 HWY 111 FILLMORE CONSTRUCT 4-LANE BRIDGE 2018 $55,757

3A01CV023 AVE 56 / AIRPORT BLVD0.25 MI. W OF VAN BUREN ST

HARRISON ST WIDEN FROM 2 TO 4 LANES 2023 $21,601

Page 120: Project List - Southern California Association of Governments

118 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04CV027 AVE 56 / AIRPORT BLVD SPRRE SIDE OF BR. AT COACHELLA VLLY STORM CHNL

WIDEN FROM 2 TO 4 LANES 2023 $3,063

3A07175 AVE 56 / AIRPORT BLVD MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2023 $10,889

3A07176 AVE 56 / AIRPORT BLVD JACKSON ST 0.25 MILES W OF VAN BUREN ST

WIDEN FROM 2 TO 6 LANES 2023 $6,472

3A07177 AVE 56 / AIRPORT BLVD HARRISON ST TYLER ST WIDEN FROM 2 TO 6 LANES 2020 $7,783

3A07178 AVE 56 / AIRPORT BLVD TYLER ST POLK ST WIDEN FROM 2 TO 6 LANES 2018 $6,832

3A07179 AVE 56 / AIRPORT BLVD POLK ST HWY 111 WIDEN FROM 2 TO 6 LANES 2014 $2,446

3A07180 AVE 56 / AIRPORT BLVDGRADE SEPARATION OVER HWY 111 AND SPRR

BTWN PALM ST AND EAST SIDE OF COACHELLA STORM CHNL

WIDEN FROM 2 TO 6 LANES INCLUDING GRADE SEPARATION OVER UPRR

2023 $8,084

3A07181 AVE 56 / AIRPORT BLVD0.25 MI. W OF VAN BUREN ST

HARRISON ST WIDEN FROM 2 TO 6 LANES 2023 $18,161

3A07182 AVE 56 / AIRPORT BLVDSPRR TO E SIDE OF BR. AT COACHELLA VLLY STORM CHNL

WIDEN FROM 2 TO 6 LANES 2030 $4,075

3A07183 AVE 56 / AIRPORT BLVD AVE 56 SR-86S ICBTWN DESERT CACTUS DR AND 57TH AVE

WIDEN FROM 0 TO 6 LANES (3 LANE (1 EA DIR + MEDIAN LN) IC IN RTIP IN RIV060101)

2030 $63,478

3A07078 AVE 58 VAN BUREN ST HARRISON ST (SR-86) WIDEN FROM 2 TO 4 LANES 2023 $11,677

3A07102 AVE 58 JEFFERSON ST MADISON ST WIDEN FROM 2 TO 4 LANES 2010 $4,869

3A07106 AVE 58 MADISON ST MONROE ST WIDEN FROM 2 TO 4 LANES 2010 $4,572

3A07184 AVE 58 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2023 $12,611

3A07185 AVE 58 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 4 LANES 2020 $11,517

3A07186 AVE 62 AVE 62 SR-86S ICBTWN W/O SR111 TO BUCHANAN ST

WIDEN FROM 0 TO 6 LANES 2023 $47,983

3A07187 AVE 62 MONROE ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2030 $20,086

Page 121: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 119

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07188 AVE 62 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 6 LANES 2030 $22,830

3A07189 AVE 62 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 6 LANES 2030 $21,510

3A07190 AVE 62 HARRISON ST TYLER ST WIDEN FROM 2 TO 6 LANES 2030 $16,940

3A07191 AVE 62 TYLER ST POLK ST WIDEN FROM 2 TO 6 LANES 2030 $19,296

3A07192 AVE 62 POLK ST FILLMORE ST WIDEN FROM 2 TO 6 LANES 2030 $14,076

3A07193 AVE 62 FILLMORE ST PIERCE ST WIDEN FROM 2 TO 6 LANES 2023 $12,019

3A07194 AVE 62 PIERCE ST SR86S WIDEN FROM 2 TO 6 LANES 2020 $7,889

3A07195 AVE 66 AVE 66 SR-86S ICBTWN W/O BUCHANAN ST AND E/O SR86S

WIDEN FROM 0 TO 6 LANES 2030 $56,358

3A07196 AVE 66AVE 66 BR./LOW WATER XING

BTWN W/O COACHELLA VALLEY STORM WATER CHNL AND PERCE ST

WIDEN FROM 2 TO 6 LANES 2030 $4,533

3A07017 AVENUE 44 LOW WATER XING DILLON RD WIDEN FROM 4 TO 4 LANES 2009 $21,472

3A07029 AVENUE 44 MONROE ST LOW WATER XING WIDEN FROM 2 TO 4 LANES 2009 $13,581

3A07137 AVENUE 44AVE. 44 BR. / LOW WATER XING

WIDEN FROM 2 TO 4 LANES 2009 $2,553

3A07025 AVENUE 48 JEFFERSON ST ALL AMERICAN CANAL WIDEN FROM 4 TO 6 LANES 2012 $19,260

3A07043 AVENUE 48 HJORTH ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2012 $12,492

3A07076 AVENUE 48 JACKSON STVAN BUREN ST (CENTER LINE)

WIDEN FROM 2 TO 6 LANES 2012 $8,198

3A07117 AVENUE 48 VAN BUREN ST W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2009 $3,860

3A07166 AVENUE 48INTERSECTION OF AVE 48 AND HWY 86

INTERSECTION IMPROVEMENTS 2009 $128

3A01CV003 AVENUE 50 JEFFERSON STMADISON ST (EXCL BR. AT ALLAMERICAN CANAL)

WIDEN FROM 2 TO 4 LANES 2012 $9,874

3A07052 AVENUE 50 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2012 $10,809

3A07056 AVENUE 50 MADISON ST MONROE ST WIDEN FROM 2 TO 4 LANES 2012 $10,087

3A07065 AVENUE 50 JACKSON STVAN BUREN ST (CENTER LINE)

WIDEN FROM 2 TO 4 LANES 2012 $9,323

Page 122: Project List - Southern California Association of Governments

120 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A01CV011 AVENUE 52 MADISON ST MONROE ST WIDEN FROM 2 TO 4 LANES 2014 $10,067

3A01CV012 AVENUE 52 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2014 $10,294

3A07115 AVENUE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2014 $4,664

3A04A10 BARNARD ST DATE ST INTAKE BLVD CONSTRUCT/EXTEND 2 LANE ARTERIAL 2018 $2,740

3A04WT126 BAXTER RD I-15 CENTRAL ST WIDEN FROM 2 TO 4 LANES 2030 $35,555

3A01WT127 BELLGRAVE AVECANTU-GALLEANO RANCH RD

VAN BUREN BLVD WIDEN FROM 2 TO 4 LANES 2030 $9,410

3A01WT128 BENTON RD SR-79 EASTERN BYPASS WIDEN FROM 2 TO 4 LANES 2030 $14,169

3A07082 BOB HOPE DR GERALD FORD DINAH SHORE DR WIDEN FROM 4 TO 6 LANES 2014 $7,225

3A07109 BOB HOPE DR DINAH SHORE RAMON RD WIDEN FROM 4 TO 6 LANES 2012 $4,506

3A07138 BOB HOPE DR FRANK SINATRA DR GERALD FORD DR WIDEN FROM 4 TO 6 LANES 2012 $2,619

3A07197 BOB HOPE DR DINAH SHORE RAMON RD WIDEN FROM 2 TO 6 LANES 2014 $10,769

3A07198 BOB HOPE DR RAMON RD I-10 WIDEN FROM 0 TO 6 LANES 2012 $1,922

3A04WT129 BRIGGS RD SR-74 (PINACATE RD) SIMPSON RD CONSTRUCT 4 LANE ARTERIAL 2030 $29,475

3A04WT130 BRIGGS RD SIMPSON RD NEWPORT RD CONSTRUCT 4 LANE ARTERIAL 2030 $34,446

3A04WT131 BRIGGS RD NEWPORT RD SCOTT RD WIDEN FROM 2 TO 4 LANES 2030 $17,943

3A04WT132 BRIGGS RD SCOTT RD SR-79 (WINCHESTER RD) CONSTRUCT 4 LANE ARTERIAL 2030 $37,982

3A01WT133 BUNDY CANYON RD I-15 MURRIETA RD"WIDEN FROM 2 TO 4 LANES "

2010 $14,315

3A01WT134 BUNDY CANYON RD MISSION TRAIL I-15 WIDEN FROM 2 TO 4 LANES 2030 $7,209

3A01WT135 BUTTERFIELD STAGE RD RANCHO CALIFORNIA RD SR-79 (CONSTANCE) WIDEN FROM 2 TO 4 LANES 2020 $32,750

3A01WT136BUTTERFIELD STAGE RD+ POURROY RD

MURRIETA HOT SPRINGS RD

SR-79 (WINCHESTER) CONSTRUCT 4 LANE ARTERIAL 2018 $50,453

3A07012BUTTERFIELD STAGE ROAD (BSR)

RANCHO CALIFORNIA ROAD

MURRIETA HOT SPRINGS ROAD(MHSR)

CONSTRUCT 0 TO 4 LANE ARTERIAL (APPROX. 2.913 MILES OF ROADWAY)

2012 $37,223

3A07015BUTTERFIELD STAGE ROAD (BSR)

RANCHO CALIFORNIA ROAD

SR-79 SOUTH (CON-STANCE)

WIDEN FROM 2 TO 4 LANES 2012 $24,421

Page 123: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 121

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07144 CACTUS AVE - SI GRAHAM ST HEACOCK ST WIDEN FROM 4 TO 6 LANES STREET IMPROVEMENT 2007 $1,111

3A04WT137 CAJALCO RD TEMSECAL CANYON RD HARLEY JOHN RD WIDEN FROM 2 TO 4 LANES 2030 $79,865

3A04WT138 CAJALCO RD HARLEY JOHN RD I-215 WIDEN FROM 2 TO 6 LANES 2030 $71,630

3A04WT139 CANTARINI RD RECHE CANYON RD PIGEON PASS RD CONSTRUCT 2 LANE ARTERIAL 2030 $14,529

3A04WT140CANTU-GALLEANO RANCH RD (AKA GALENA ST)

WINEVILLE RD BELLGRAVE AVE CONSTRUCT 4 LANE ARTERIAL 2020 $18,812

3A07107 CANYON CREST DR COUNTRY CLUB CENTURY WIDEN 2 TO 4 LANES 2010 $4,477

3A07262 CASE RD GOETZ RD I-215 WIDEN FROM 2 TO 4 LANES 2030 $7,189

3A07033 CATHEDRAL CYN DRBR. AT WHITEWATER CHNL

CONSTRUCT 4 LANE BRIDGE 2018 $15,014

3A07099 CATHEDRAL CYN DR TERRACE RD E PALM CYN WIDEN FROM 2 TO 4 LANES 2018 $6,774

3A07287 CAWSTON AVE ESPLANADE AVE RAMONA EXPWAY CONSTRUCT 4 LANES 2030 $30,808

3A04WT141 CENTER ST MT VERNON AVE RECHE CANYON RD CONSTRUCT 4 LANE ARTERIAL 2030 $40,151

3A01WT114 CENTRAL AVE MAGNOLIA AVE SR91 WIDEN FROM 4 TO 6 LANES BTWN SR-91 AND MAGNOLIA 2018 $3,641

3A04WT142 CENTRAL ST BAXTER RD PALOMAR ST WIDEN FROM 2 TO 4 LANES 2030 $5,555

3A04WT143 CENTRAL ST GRAND AVE PALOMAR ST WIDEN FROM 2 TO 4 LANES 2030 $3,841

3A07199 CHASE SCHOOL RD I-10 RAMON RD WIDEN FROM 0 TO 4 LANES 2020 $3,340

3A04WT144 CHERRY VALLEY BLVD DESERT LAWN DR NOBLE ST"WIDEN FROM 2 TO 4 LANES "

2030 $19,054

3A04WT145 CHERRY VALLEY BLVD NOBLE ST HIGHLAND SPRINGS AVE CONSTRUCT 4 LANE ARTERIAL 2030 $20,860

3A01WT071 CLINTON KEITH RD I-15 COPPERCRAFT WIDEN FROM 2 TO 6 LANES 2014 $5,902

3A01WT072 CLINTON KEITH RD COPPERCRAFT TOULON DR WIDEN FROM 4 TO 6 LANES 2020 $2,840

3A01WT073 CLINTON KEITH RD I-215 MEADOWLARK LN WIDEN FROM 4 TO 6 LANES 2020 $3,524

3A01WT083 CLINTON KEITH RD TOULON DR I-215 WIDEN FROM 2 TO 6 LANES 2009 $37,416

Page 124: Project List - Southern California Association of Governments

122 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04WT146 CLINTON KEITH RD MEADOWLARK LN SR-79 CONSTRUCT 6 LANE ARTERIAL 2020 $72,902

3A04WT147 CLOVERDALE RD ARCHIBALD AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2030 $10,593

3A07256 COOK ST FRED WARING HWY 111 WIDEN FROM 4 TO 5 LANES 2012 $525

3A07299 COOK STBR. AT WHITEWATER CHNL

WIDEN FROM 4 TO 6 LANES 2023 $18,197

3A07300 COOK ST FRANK SINATRA DR GERALD FORD DR WIDEN FROM 4 TO 6 LANES 2008 $9,024

3A07301 COOK ST COUNTRY CLUB WHITEWATER BRG. WIDEN FROM 4 TO 6 LANES 2008 $9,024

3A07311 COOK ST WHITEWATER BR. FRED WARING DR WIDEN FROM 4 TO 6 LANES 2008 $2,393

3A07136 COOK STREET FRANK SINATRA COUNTRY CLUB DR. WIDEN FROM 4 TO 6 LANES 2008 $2,566

3A04WT088 CORYDON AVE RIVER RD NORCO DR WIDEN FROM 2 TO 4 LANES 2030 $16,619

3A07288 COTTONWOOD AVE WARREN RD STATE ST WIDEN FROM 2 TO 4 LANES 2030 $18,228

3A07147 COUNTRY CLUB DR BOB HOPE DR MONTEREY AVE INTERSECTION IMPROVEMENTS 2010 $1,200

3A07200 COUNTRY CLUB DR MONTEREY AVE PORTOLA AVE WIDEN FROM 4 TO 6 LANES 2030 $16,897

3A01CV030 COUNTRY CLUB DRIVE EL DORADO DRIVE OASIS CLUB DRIVE WIDEN FROM 4 TO 6 LANES 2030 $7,008

3A01CV031 COUNTRY CLUB DRIVE OASIS CLUB DRIVE WASHINGTON STREET WIDEN FROM 4 TO 6 LANES 2030 $9,269

3A01CV032 COUNTRY CLUB DRIVE MONTEREY AVENUE PORTOLA AVE WIDEN FROM 4 TO 6 LANES 2030 $7,535

3A01CV033 COUNTRY CLUB DRIVE PORTOLA AVENUE COOK STREET WIDEN FROM 4 TO 6 LANES 2030 $6,815

3A07123 COUNTRY CLUB DRIVE COOK STREET ELDORADO DR WIDEN FROM 4 TO 6 LANES 2023 $6,528

3A07009CROSSLEY RD / GOLF CLUB DR

AVE 34 LOS SANTOS (INCL. BR. AT PALM CYN CHNL)

WIDEN FROM 4 TO 4 LANES 2030 $113,203

3A07095CROSSLEY RD / GOLF CLUB DR

MESQUITE AVE AVE 34 WIDEN FROM 2 TO 4 LANES 2030 $10,537

3A07112CROSSLEY RD / GOLF CLUB DR

RAMON RD MESQUITE AVE WIDEN FROM 2 TO 4 LANES 2018 $6,159

3A07134CROSSLEY RD / GOLF CLUB DR

LOS SANTOS E PALM CYN WIDEN FROM 4 TO 4 LANES 2030 $5,778

Page 125: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 123

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07263 D ST SAN JACINTO ST 4TH ST WIDEN FROM 2 TO 4 LANES 2030 $1,797

3A07042 DA VALL RD I-10 VARNER RD CONSTRUCT NEW 6-LANE ROAD 2030 $24,450

3A07055 DA VALL RD DINAH SHORE RAMON RD WIDEN FROM 2 TO 6 LANES 2018 $13,416

3A07120 DA VALL RD AVE 30 I-10 CONSTRUCT NEW 6-LANE ROAD 2030 $7,118

3A07125 DA VALL RD RAMON RD MCCALLUM WAY WIDEN FROM 2 TO 6 LANES 2020 $5,578

3A07127 DA VALL RD MCCALLUM WAY AVE 30 WIDEN FROM 2 TO 6 LANES 2023 $5,987

3A07201 DA VALL RD MCCALLUM WAY AVE 30 WIDEN FROM 2 TO 4 LANES 2030 $6,044

3A07202 DA VALL RD AVE 30 I-10 CONSTRUCT NEW 4-LANE ROAD 2030 $11,309

3A07203 DA VALL RD I-10 VARNER RD CONSTRUCT NEW 4-LANE ROAD 2030 $137,570

3A01CV034 DATE PALM DR VISTA CHINO I-10 WIDEN FROM 4 TO 6 LANES 2009 $38,143

3A07027 DATE PALM DR

WHITEWATER RIVER BRIDGE LOCATED .4 MI NORTH OF EAST PALM CANYON DR.: WIDEN - 2 LANES ON EAST SIDE AND APPROX. 500 FEET OF THE NORTH AND SOUTH BOUND APPROACHES TO THE BRIDGE

WHITEWATER RIVER BRIDGE .2 MI SOUTH OF GERALD FORD DR.: WIDEN - 2 LANES ON EAST SIDE AND APPROX.500 FEET OF THE NORTH AND SOUTH BOUND APPROACHES TO THE BRIDGE

WIDEN FROM 4 TO 6 LANES 2020 $20,232

3A07028 DATE PALM DR I-10 VARNER (INCL. REALIGN & BRIDGE AT LONG CYN.)

WIDEN FROM 2 TO 6 LANES 2030 $27,473

3A07032 DATE PALM DR DINAH SHORE DR RAMON RD WIDEN FROM 4 TO 6 LANES 2020 $18,950

3A07048 DATE PALM DR GERALD FORD DR DINAH SHORE DR WIDEN FROM 4 TO 6 LANES 2020 $15,903

3A07060 DATE PALM DR PALM CYN GERALD FORD DR WIDEN FROM 4 TO 6 LANES 2018 $11,909

3A07129 DIAZ ROAD DENDY PARKWAY NORTH CITY LIMITS CONSTRUCT 4 LANE ARTERIAL 2009 $3,034

3A07091 DILLON RDGRADE SEPARATION AT HWY 111 / SPRR

WIDEN FROM 2 TO 4 LANES 2008 $5,163

3A07026 DILLON RD SR-62 INDIAN AVE WIDEN FROM 2 TO 2 LANES 2030 $33,194

3A07051 DILLON RD AVE 44 I-10 WIDEN FROM 2 TO 4 LANES 2014 $11,546

Page 126: Project List - Southern California Association of Governments

124 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07096 DILLON RD I-10 WHITEWATER BR. WIDEN FROM 2 TO 4 LANES 2010 $5,053

3A07204 DILLON RD INTERSECTION OF DIL-LON RD & INDIAN AVE

WIDEN FROM 2 TO 6 LANES 2018 $212

3A07205 DILLON RD INDIAN AVE PALM DR WIDEN FROM 2 TO 4 LANES 2018 $18,541

3A07206 DILLON RD INTERSECTION OF DIL-LON RD & PALM DR

WIDEN FROM 4 TO 6 LANES 2018 $152

3A07207 DILLON RD PALM DR MOUNTAIN VIEW WIDEN FROM 2 TO 4 LANES 2018 $9,866

3A07208 DILLON RD MOUNTAIN VIEW BENNETT RD RECONSTRUCT/RESURFACE EXISTING 2 LANES 2018 $2,237

3A07209 DILLON RD BENNETT RD THOUSAND PALMS CYN RD

RECONSTRUCT/RESURFACE EXISTING 2 LANES 2020 $53,380

3A07210 DILLON RD THOUSAND PALMS CYN RD

SUNNY ROCK RD RECONSTRUCT/RESURFACE EXISTING 2 LANES 2022 $48,000

3A07211 DILLON RD SUNNY ROCK RD AVE 44 RECONSTRUCT/RESURFACE EXISTING 2 LANES 2024 $62,568

3A07212 DILLON RD BR. AT WHITEWATER CHNL

WIDEN FROM 2 TO 4 LANES 2030 $22,123

3A07213 DILLON RD WHITEWATER BR. HWY 111 WIDEN FROM 2 TO 4 LANES 2030 $10,102

3A07214 DILLON RD SR-62 TO INDIAN AVE RECONSTRUCT/RESURFACE EXISTING 2 LANES 2018 $19,270

3A04WT034 DOMENIGONI PKWY WARREN RD SANDERSON AVE WIDEN FROM 4 TO 6 LANES 2014 $7,258

3A04WT148 DOMENIGONI PKWY SR-79 (WINCHESTER RD) WARREN RD WIDEN FROM 4 TO 6 LANES 2030 $29,965

3A07061 DUNE PALMS RDBR. AT WHITEWATER CHNL

CONSTRUCT 4-LANE BRIDGE 2012 $9,167

3A07264 DUNLAP ORANGE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2030 $10,783

3A07034 E PALM CYN DR FARRELL DR GENE AUTRY TRAIL WIDEN FROM 4 TO 4 LANES 2020 $19,476

3A07066 E PALM CYN DR PALM CYN DR SUNRISE WAY WIDEN FROM 4 TO 4 LANES 2018 $10,946

3A07157 E PALM CYN DR SUNRISE WAY FARRELL DR WIDEN FROM 4 TO 4 LANES 2020 $959

3A07215 E PALM CYN DRPALM SPRINGS/CATHE-DRAL CITY LIMITS

CATHEDRAL CYN DR RECONSTRUCT/RESURFACE EXISTING 4 LANES 2023 $15,742

Page 127: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 125

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04WT149 EL CERRITO RD I-15 ONTARIO AVE WIDEN FROM 2 TO 4 LANES 2030 $3,496

3A04WT093 ELLIS AVE SR-74 I-215CONSTRUCT 2 LANE ARTERIAL AND 2 LANE GRADE SEPARA-TION OVER BNSF RR (KEEP GRADE SEPARATION IN ARTERIAL SECTION)

2010 $12,324

3A04WT150 ELLIS AVE POST RD SR-74 WIDEN FROM 2 TO 4 LANES 2030 $15,528

3A04WT208 ESPLANADE AVE WARREN RD STATE ST WIDEN FROM 2 TO 4 LANES 2009 $11,122

3A01WT151 ETHANAC RD SR-74 KEYSTONE DR CONSTRUCT 4 LANE ARTERIAL 2030 $12,678

3A01WT152 ETHANAC RD SHERMAN RD MATTHEWS RDWIDEN FROM 2 TO 4 LANES INCL. GRADE SEPARATION OVER BNSF RR (GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE)

2030 $64,738

3A04WT052 EUCALYPTUS AVE I-215 TOWNGATE BLV WIDEN FROM 4 TO 6 LANES 2014 $4,863

3A07162 EUCALYPTUS AVE TOWNGATE BLV ELSWORTH ST STREET IMPROVEMENT / WIDENING 2014 $232

3A01WT100 EVANS RD NUEVO RD I-215 CONSTRUCT 4 LANE ARTERIAL 2010 $19,415

3A04WT099 EVANS RD PLACENTIA AVE NUEVO RD CONSTRUCT 4 LANE ARTERIAL 2010 $10,091

3A01CV040A FRANK SINATRA DR ELDORADO DR TAMARISK ROW DR WIDEN FROM 4 TO 6 LANES 2023 $2,897

3A01CV040B FRANK SINATRA DR COOK ST ELDORADO DR WIDEN FROM 4 TO 6 LANES 2023 $1,995

3A07024 FRANK SINATRA DRWHITEWATER RVR BR. (WITHIN FS1)

CONSTRUCT 4 LANE BRIDGE 2014 $19,604

3A07149 FRANK SINATRA DR BOB HOPE DR VISTA DEL SOL RD INTERSECTION IMPROVEMENTS 2010 $878

3A07151 FRANK SINATRA DRINTERSECTION OF FRANK SINATRA & BOB HOPE

INTERSECTION IMPROVEMENTS 2010 $817

3A07152 FRANK SINATRA DR VISTA DEL SOL RD MONTEREY AVE INTERSECTION IMPROVEMENTS 2010 $808

3A07216 FRANK SINATRA DR MONTEREY AVE PORTOLA AVE RECONSTRUCT/RESURFACE EXISTING 4 LANES 2016 $11,556

Page 128: Project List - Southern California Association of Governments

126 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07304 FRANK SINATRA DR MONTEREY AVE PORTOLA AVE WIDEN FROM 4 TO 6 LANES 2023 $15,274

3A07306 FRANK SINATRA DR PORTOLA AVE COOK ST WIDEN FROM 4 TO 6 LANES 2023 $11,212

3A04A14 FRANKLIN ST AVENUE 6 CANYON ESTATES DR WIDEN STREET AND BRIDGE OVER I-15 FROM 2 TO 4 LANES 2018 $1,999

3A07063 FRED WARING DR WASHINGTON ST DUNE PALMS RD WIDEN FROM 4 TO 6 LANES 2009 $8,234

3A07111 FRED WARING DR DUNE PALMS RD JEFFERSON ST WIDEN FROM 3 TO 6 LANES 2009 $3,979

3A07217 FRED WARING DR WASHINGTON ST DUNE PALMS RD WIDEN FROM 4 TO 6 LANES 2014 $10,141

3A07218 FRED WARING DR DUNE PALMS RD JEFFERSON ST WIDEN FROM 3 TO 6 LANES 2008 $3,875

3A07059 FRENCH VALLEY (DATE) SR-79 (WINCHESTER) MARGARITA RD WIDEN 2 TO 4 LANES 2020 $13,533

3A01WT221FRENCH VALLEY (WEST-ERN BYPASS)

MARGARITA RD MURRIETA CREEK CONSTRUCT 0 TO 6 LANE ARTERIAL 2012 $22,141

3A01WT222AFRENCH VALLEY (WEST-ERN BYPASS)

MURRIETA CREEK RANCHO CALIFORNIA RD CONSTRUCT 0 TO 4 LANE ARTERIAL 2014 $34,080

3A01WT222BFRENCH VALLEY (WEST-ERN BYPASS)

RANCHO CALIFORNIA ROAD

I-15 (FRONT) CONSTRUCT 0 TO 4 LANE ARTERIAL 2012 $30,174

3A04A31 GARBANI RD I-215 MENIFEE RD RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES 2030 $5,779

3A04A32 GARBANI RD BRADLEY RD I-215 CONSTRUCT 4-LANE ARTERIAL 2030 $6,567

3A07004 GENE AUTRY TRAILWHITEWATER RVR BR. XING

WIDEN FROM 2 TO 4 LANES 2023 $211,873

3A07312 GERALD FORD DR COOK ST FRANK SINATRA DR WIDEN FROM 3 TO 4 LANES 2018 $2,042

3A01CV046 GERALD FORD DRIVE PORTOLA AVENUE COOK STREET WIDEN FROM 2 TO 6 LANES 2008 $10,101

3A07121 GERALD FORD DRIVE MONTEREY AVENUE PORTOLA AVE WIDEN FROM 4 TO 5 LANES (3 EB, 2 WB) 2008 $3,336

3A01WT053 GILMAN SPRINGS RD SR-60 ALESSANDRO BLVD WIDEN FROM 2 TO 4 LANES 2018 $7,730

3A01WT153 GILMAN SPRINGS RD ALESSANDRO BLVD BRIDGE ST WIDEN FROM 2 TO 4 LANES 2030 $39,547

Page 129: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 127

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A01WT154 GILMAN SPRINGS RD BRIDGE ST SANDERSON AVE WIDEN FROM 2 TO 4 LANES 2030 $17,356

3A01WT101 GOETZ RD CASE RD ETHANAC RD WIDEN FROM 2 TO 4 LANES 2010 $10,311

3A04WT102 GOETZ RD LESSER LN ETHANAC RD WIDEN FROM 2 TO 4 LANES 2010 $5,225

3A04WT155 GOETZ RD NEWPORT RD JUANITA DR WIDEN FROM 2 TO 4 LANES 2030 $6,029

3A04WT156 GOETZ RD JUANITA DR LESSER LN WIDEN FROM 2 TO 4 LANES 2030 $14,899

3A07110 GOETZ RD RAILROAD CANYON RD NEWPORT WIDEN FROM 2 TO 4 LANES 2012 $4,539

3A07021 GOLF CTR PKWY GOLF CTR PKWY I-10 ICWIDEN FROM 4 TO 6 LANES AND WIDEN/RECONSTRUCT RAMPS

2012 $22,624

3A04WT042 GRAND AVE TOFT DR SR-74 WIDEN FROM 2 TO 4 LANES 2023 $5,482

3A04WT157 GRAND AVE ORTEGA HWY (SR-74) CENTRAL ST WIDEN FROM 2 TO 4 LANES 2030 $52,612

3A07040 GRAPEFRUIT BLVD AVE 48/DILLON RD AVE 50 WIDEN FROM 4 TO 6 LANES 2018 $16,480

3A07069 GRAPEFRUIT BLVD AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2018 $11,290

3A07071 GRAPEFRUIT BLVD AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2012 $8,142

3A07088 GRAPEFRUIT BLVD AVE 54 AVE 56 WIDEN FROM 2 TO 4 LANES 2030 $11,209

3A07130 GREEN RIVER ROAD DOMINGUEZ RANCH RD PALISADES DRIVE WIDEN FROM 4 TO 6 LANES 2008 $2,938

3A01CV047A HACIENDA AVE CHOLLA DR PALM DR WIDEN FROM 2 TO 6 LANES 2008 $5,321

3A01CV047B HACIENDA AVE LITTLE MORONGO RD CHOLLA DR(MISSINGLINK) CONSTRUCT NEW 6-LANE ROAD 2010 $5,603

3A01CV048 HACIENDA AVE PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 6 LANES 2010 $9,862

3A01CV049 HACIENDA AVE MOUNTAIN VIEW RD DILLON RD(LONGCYNRD) WIDEN FROM 2 TO 4 LANES 2012 $18,213

3A04WT089 HAMNER COTA STREET HAMNER AVE WIDEN FROM 4 TO 6 LANES 2018 $1,818

3A01WT158 HAMNER AVE MISSION BLVD BELLEGRAVE AVE WIDEN FROM 2 TO 6 LANES 2030 $17,949

3A01WT159 HAMNER AVE BELLEGRAVE AVE SANTA ANA RIVER WIDEN FROM 2 TO 6 LANES 2030 $60,026

3A04WT160 HARLEY JOHN RD WASHINGTON ST CAJALCO RD WIDEN FROM 2 TO 4 LANES 2030 $7,494

3A07074 HARRISON ST AVE 54 AVE 56 WIDEN FROM 2 TO 4 LANES 2018 $9,568

3A07080 HARRISON ST AVE 52 AVE 54 RECONSTRUCT/RESURFACE EXISTING 4 LANES 2024 $12,751

3A07081 HARRISON ST GRAPEFRUIT BLVD AVE 52 RECONSTRUCT/RESURFACE EXISTING 4 LANES 2019 $9,849

Page 130: Project List - Southern California Association of Governments

128 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04WT054 HEACOCK ST CACTUS AVE SAN MICHELE RD WIDEN FROM 2 TO 4 LANES 2012 $11,794

3A07160 HEACOCK ST-SI EUCALYPTUS FIR STREET IMPROVEMENT / WIDENING 2020 $475

3A07168 HEACOCK ST-SI DRACAEA EUCALYPTUS STREET IMPROVEMENT / WIDENING 2020 $181

3A07169 HEACOCK ST-SI IRONWOOD AVE MANZANITA AVE STREET IMPROVEMENT / WIDENING 2020 $98

3A07289 HEWITT ST MAIN ST SOUTH CITY LIMIT WIDEN FROM 2 TO 4 LANES 2030 $5,135

3A07031 HIGHWAY 111 MADISON ST MONROE ST WIDEN FROM 4 TO 6 LANES 2014 $14,275

3A07049 HIGHWAY 111 MONROE ST JACKSON ST WIDEN FROM 4 TO 6 LANES 2014 $11,983

3A07053 HIGHWAY 111 JEFFERSON ST MADISON ST WIDEN FROM 4 TO 6 LANES 2009 $9,138

3A07087 HIGHWAY 111 JACKSON ST INDIO BLVD WIDEN FROM 4 TO 6 LANES 2018 $7,639

3A07257 HIGHWAY 111 COOK ST ELDORADO DR WIDEN FROM 4 TO 6 LANES 2012 $8,592

3A07258 HIGHWAY 111 ELDORADO DR MILES AVE WIDEN FROM 4 TO 6 LANES 2014 $10,949

3A07259 HIGHWAY 111 MILES AVE WASHINGTON AVE WIDEN FROM 4 TO 6 LANES 2014 $12,406

3A04WT090 HILLSIDE AVE 1ST ST HIDDEN VALLEY PKWY CONSTRUCT 2 LANE ARTERIAL 2030 $4,277

3A04A03 HOBSONWAY ARROWHEAD BLVD CARLTON AVE WIDEN FROM 2 TO 4 LANES 2018 $4,771

3A04A06 HOBSONWAY OLIVE LAKE BLVD INTAKE BLVD WIDEN EXISTING BRIDGE AT C-CANAL FROM 2 TO 4 LANES 2023 $4,651

3A04WT161 HORSETHIEF CANYON RD TEMESCAL CANYON RD I-15 WIDEN FROM 2 TO 4 LANES 2030 $7,322

3A04WT074 HUNTER RD LOS ALAMOS RD VIA MIRA MOSA CONSTRUCT 2 LANE ARTERIAL 2020 $8,453

3A07316 HWY 111 WEST CITY LIMITS COOK STREET WIDEN FROM 4 TO 6 LANES 2012 $1,401

3A01CV053 INDIAN AVE PIERSON BLVD MISSION LAKES BLVD WIDEN FROM 2 TO 6 LANES 2012 $7,070

3A07023 INDIAN AVE MISSION LAKES BLVD SR-62 WIDEN FROM 2 TO 6 LANES 2014 $19,838

3A07265 INDIAN AVE NORTH CITY LIMIT ORANGE WIDEN FROM 2 TO 4 LANES 2030 $14,634

3A07002 INDIAN AVE OLD PALM SPRINGS CITY LIMIT

RR XING (INCL. BR. AT WHITEWATER RVR)

WIDEN FROM 2 TO 6 LANES 2030 $475,274

3A07054 INDIAN AVE 19TH AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2030 $19,414

3A07139 INDIAN AVE 20TH AVE 19TH AVE WIDEN FROM 2 TO 4 LANES 2030 $5,373

3A07163 INDIAN AVE INTERSECTION OF INDIAN AVE & 20TH AVE

WIDEN FROM 2 TO 4 LANES 2030 $408

Page 131: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 129

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07219 INDIAN AVE DILLON RD 14TH AVE WIDEN FROM 2 TO 6 LANES 2018 $11,952

3A07220 INDIAN AVE 14TH AVE PIERSON BLVD WIDEN FROM 2 TO 6 LANES 2018 $8,667

3A07221 INDIAN AVE INTERSECTION OF INDIAN AVE & 20TH AVE

WIDEN FROM 2 TO 6 LANES 2012 $172

3A07222 INDIAN AVE 20TH AVE 19TH AVE WIDEN FROM 2 TO 4 LANES 2012 $2,246

3A07223 INDIAN AVE 19TH AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2014 $8,878

3A07038 INDIAN CYN DR RACQUET CLUB RD OLD PALM SPRINGS CITY LIMITS

WIDEN FROM 4 TO 4 LANES 2030 $24,932

3A07084 INDIAN CYN DR RAMON RD TAHQUITZ CYN WAY WIDEN FROM 4 TO 4 LANES 2030 $12,363

3A07133 INDIAN CYN DR TAHQUITZ CYN WAY ALEJO RD WIDEN FROM 4 TO 4 LANES 2018 $4,262

3A07142 INDIAN CYN DR TACHEVAH DR VISTA CHINO WIDEN FROM 4 TO 4 LANES 2020 $3,053

3A07143 INDIAN CYN DR ALEJO RD TACHEVAH DR WIDEN FROM 4 TO 4 LANES 2020 $2,229

3A07153 INDIAN CYN DR VISTA CHINO RACQUET CLUB RD WIDEN FROM 4 TO 4 LANES 2023 $1,495

3A04WT055 INDIAN ST SAN MICHELE RD OLEANDER AVE WIDEN FROM 2 TO 4 LANES 2012 $3,125

3A07045 INDIAN ST HEMLOCK ST SUNNYMEAD BLD WIDEN OC FROM 2 TO 4 LANES 2030 $25,032

3A04WT162 INDIAN TRUCK TRAIL TEMESCAL CANYON RD I-15 WIDEN FROM 2 TO 4 LANES 2030 $7,078

3A01CV106 INDIO BLVD JACKSON ST HWY 111 WIDEN FROM 4 TO 4 LANES 2018 $678

3A01CV107 INDIO BLVD MADISON ST MONROE ST WIDEN FROM 4 TO 4 LANES 2018 $2,028

3A01CV108 INDIO BLVD MONROE ST JACKSON ST WIDEN FROM 4 TO 4 LANES 2018 $1,983

3A01CV109 INDIO BLVD JEFFERSON ST / I-10 MADISON ST WIDEN FROM 4 TO 4 LANES 2018 $1,205

3A07041 INDIO BLVD HWY 111 AVE 48 (WAS HWY111A) WIDEN FROM 4 TO 4 LANES 2018 $14,897

3A04WT115 IOWA AVE CENTER ST 3RD ST WIDEN FROM 4 TO 6 LANES 2020 $14,778

3A04WT056 IRONWOOD AVE MORTON RD REDLANDS BLVD WIDEN FROM 2 TO 4 LANES 2018 $39,734

3A01CV054 JACKSON ST AVE 48 AVE 50 WIDEN FROM 2 TO 4 LANES 2012 $8,900

3A01CV110A JACKSON ST AVE 44 AVE 46 WIDEN FROM 4 TO 6 LANES 2010 $10,776

3A01CV110B JACKSON ST I-10 IC AVE 44 WIDEN FROM 4 TO 6 LANES 2010 $5,191

3A01CV111 JACKSON ST AVE 46 AVE 48 WIDEN FROM 3 TO 6 LANES 2012 $10,071

3A01CV123 JACKSON ST AVE 40 I-10 IC WIDEN FROM 2 TO 6 LANES 2010 $10,879

Page 132: Project List - Southern California Association of Governments

130 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07020 JACKSON ST JACKSON ST I-10 IC I-10 ICWIDEN FROM 2 TO 6 LANES AND WIDEN/RECONSTRUCT RAMPS

2012 $63,623

3A07086 JACKSON ST AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2012 $6,315

3A07224 JACKSON ST AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2023 $8,537

3A01WT075 JEFFERSON AVE PALOMAR ST NUTMEG ST CONSTRUCT 4 LANE ARTERIAL 2020 $9,014

3A01WT076 JEFFERSON AVE NUTMEG STMURRIETA HOT SPRINGS RD

WIDEN FROM 2 TO 4 LANES 2020 $16,497

3A01CV116 JEFFERSON ST AVE 40 AVE 38 WIDEN FROM 2 TO 2 LANES 2010 $52,567

3A07019 JEFFERSON ST I-10 IC AND BR. OVER RR WIDEN FROM 2 TO 6 LANES 2010 $20,277

3A07171 JEFFERSON ST I-10 AVE 40 WIDEN FROM 2 TO 2 LANES 2010 TBD

3A07290 KIRBY ST ESPLANADE AVE COTTONWOOD AVE WIDEN FROM 2 TO 4 LANES 2030 $5,135

3A04WT043 LAKE ST I-15 LINCOLN ST WIDEN FROM 2 TO 6 LANES 2018 $33,208

3A07018 LANDAU VISTA CHINO VARNER RD CONSTRUCT NEW 6-LANE ROAD 2030 $47,334

3A01WT057 LASSELLE ST EUCALYPTUS JOHN F KENNEDY WIDEN FROM 2 TO 4 LANES 2012 $8,386

3A04A18 LEMON ST MISSION TR GRAPE ST WIDEN FROM 2 TO 4 LANES 2018 $3,639

3A01WT163 LIMONITE AVE ETIWANDA AVE VAN BUREN BLVD WIDEN FROM 2 TO 4 LANES 2012 $9,038

3A01WT164 LIMONITE AVE VAN BUREN BLVD CLAY ST WIDEN FROM 4 TO 6 LANES 2030 $4,666

3A07016 LIMONITE AVE HAMNER AVE ETIWANDA AVE WIDEN FROM 2 TO 4 LANES 2020 $30,503

3A01CV103 LITTLE MORONGO RD TWO BUNCH PALMS TR DILLON RD WIDEN FROM 2 TO 6 LANES 2018 $14,526

3A01CV104 LITTLE MORONGO RD MISSION LAKES BLVD PIERSON BLVD WIDEN FROM 2 TO 4 LANES 2014 $5,565

3A01CV105 LITTLE MORONGO RD PIERSON BLVD TWO BUNCH PALMS TR WIDEN FROM 2 TO 4 LANES 2012 $5,718

3A04WT077 LOS ALAMOS RD JEFFERSON AVE I-215 WIDEN FROM 2 TO 4 LANES 2020 $16,049

3A07010 LOS ALAMOS RD I-15 I-215 WIDEN FROM 2 TO 4 LANES 2020 $67,488

3A01CV058 MADISON ST AVE 54 AVE 52 CONSTRUCT NEW 4 LANE ROAD 2009 $7,935

3A01CV059A MADISON ST AVE 52 AVE 50 WIDEN FROM 3 TO 6 LANES 2012 $6,654

3A01CV059B MADISON ST AVE 52 AVE 50 WIDEN FROM 3 TO 4 LANES 2009 $4,832

3A01CV060 MADISON ST AVE 50 AVE 49 (MISSING LINK) CONSTRUCT NEW 4 - LANE ROAD 2012 $11,620

Page 133: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 131

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A01CV061 MADISON ST 0.25 MI. N. OF AVE 49HWY 111 (INCL. MISSING LINK 1/4 MI. N OF AVE 49

CONSTRUCT NEW 4 - LANE ROAD 2012 $7,146

3A01CV062 MADISON ST HWY 111 MILES AVE WIDEN FROM 2 TO 4 LANES 2014 $13,640

3A01CV063 MADISON ST MILES AVEFRED WARING DR (MISS-ING LINK)

CONSTRUCT NEW 4 - LANE ROAD 2014 $6,104

3A01CV064 MADISON ST FRED WARING DR INDIO BLVD WIDEN FROM 2 TO 4 LANES 2018 $6,824

3A01CV065 MADISON STFUTURE MADISON ST I-10 IC

CONSTRUCT 6 - LANE INTERCHANGE 2020 $85,474

3A07058 MADISON ST AVE 56 AVE 54 WIDEN FROM 3 TO 6 LANES 2008 $8,060

3A07093 MADISON ST AVE 60 AVE 58 WIDEN FROM 4 TO 6 LANES 2009 $5,142

3A07103 MADISON ST AVE 58 AVE 56 (AIRPORT BLVD) WIDEN FROM 4 TO 6 LANES 2009 $4,652

3A07225 MADISON ST MILES AVE FRED WARING DR CONSTRUCT NEW 4-LANE ROAD 2020 $6,712

3A04T027 MAGNOLIA AVE ONTARIO AVE RIMPAU AVEINTERSECTION UPGRADES ON MAGNOLIA AVE. BETWEEN ON-TARIO AVE. AND RIMPAU AVE. TO ACCOMMODATE RESTRIPING FROM 4 TO 6 LANES.

2035 TBD

3A04A25 MAIN ST OLD TOWN FRONT ST PUJOL ST CONSTRUCT 2 LANE BRIDGE ACROSS MURRIETA CREEK 2009 $8,265

3A04WT029 MAIN ST SR-91 NORTH GRAND BLVD WIDEN FROM 4 TO 6 LANES 2010 $4,803

3A04WT030 MAIN ST SOUTH GRAND BLVD ONTARIO AVE WIDEN FROM 2 TO 4 LANES 2018 $4,046

3A04A15 MALAGA RD MISSION TRCASINO DR/LAKEVIEW TERRACE

WIDEN FROM 2 TO 4 LANES 2023 $5,083

3A07266 MAPES AVE GOETZ RD WEST CITY LIMIT CONSTRUCT 4 LANES 2030 $17,972

3A04WT165 MARKET ST RUBIDOUX BLVD SANTA ANA RIVERWIDEN FROM 2 TO 4 LANES INCL. BRIDGE OVER SANTA ANA RIVER

2030 $19,541

3A07268 MARKHAM ST WADE REDLANDS AVE WIDEN FROM 2 TO 4 LANES 2030 $7,702

3A01WT166 MCCALL BLVD I-215 ASPEL RD WIDEN FROM 4 TO 6 LANES 2030 $7,228

3A01WT167 MCCALL BLVD ASPEL RD MENIFEE RD WIDEN FROM 2 TO 4 LANES 2030 $5,799

3A04WT168 MCCALL BLVD MENIFEE RD SR-79 (WINCHESTER)CONSTRUCT 2 LANE ARTERIAL INCL. GRADE SEPARATION OVER BNSF RR (GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE)

2030 $57,195

Page 134: Project List - Southern California Association of Governments

132 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04WT169 MCCALL BLVD SR-79 (WINCHESTER RD) WARREN RDCONSTRUCT 2 LANE ARTERIAL INCL. GRADE SEPARATION OVER BNSF RR (GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE)

2030 $46,105

3A07267 MCPHERSON RD ETHANAC RD MAPES AVE CONSTRUCT 4 LANES 2030 $7,959

3A01WT170 MENIFEE RD RAMONA EXPWY SR-74 (PINACATE RD) WIDEN FROM 2 TO 4 LANES 2030 $38,774

3A01WT171 MENIFEE RD SR-74 (PINACATE RD) SIMPSON RDWIDEN FROM 2 TO 4 LANES INCL. GRADE SEPARATION OVER RR (GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE)

2030 $76,750

3A01WT172 MENIFEE RD SIMPSON RD ALDERGATE DR CONSTRUCT 4 LANE ARTERIAL 2030 $12,035

3A04WT078 MENIFEE RD KELLER RD CLINTON KEITH RD CONSTRUCT 4 LANE ARTERIAL 2020 $20,774

3A04WT079 MENIFEE RD HOLLAND RD GARBANI RD CONSTRUCT 4 LANE ARTERIAL 2020 $11,730

3A04WT080 MENIFEE RD GARBANI RD SCOTT RD WIDEN FROM 2 TO 4 LANES 2020 $5,105

3A07044 MID COUNTY PKWY ARANTINE HILLS/EAGLE I-15 CONSTRUCT NEW 4 LANE ARTERIAL SEGMENT 2012 $11,516

3A07003 MID-COUNTY I-15 I-215CONSTRUCT 4 LANE ARTERIAL (I-15 TO HARLEY JOHN). CON-STRUCT 2 LANE ARTERIAL (HARLEY JOHN TO I-215).

2030 $305,460

3A07013 MID-COUNTY RIDER ST WARREN RD CONSTRUCT 2 LANE ARTERIAL 2030 $60,560

3A01WT110A MID-COUNTY PARKWAY I-215 RIDER ST WIDEN FROM 2 TO 6 LANES 2018 $26,170

3A01CV121A MILES AVE MONROE ST INDIO BLVD WIDEN FROM 2 TO 4 LANES 2010 $7,954

3A01CV121B MILES AVE CLINTON ST MONROE ST WIDEN FROM 4 TO 4 LANES 2010 $3,582

3A07077 MILES AVE JEFFERSON ST WHITEWATER RVR WIDEN FROM 4 TO 4 LANES 2010 $6,817

3A01CV067 MISSION LAKES BLVD INDIAN AVE LITTLE MORONGO RD WIDEN FROM 2 TO 6 LANES 2009 $7,312

3A01CV068 MISSION LAKES BLVD LITTLE MORONGO RD PALM DR WIDEN FROM 2 TO 6 LANES 2010 $8,769

3A07001 MISSION LAKES BLVD PALM DREASTERN TERMINUS AT VERBENA DR

WIDEN FROM 2 TO 6 LANES 2035 $10,808

3A07226 MISSION LAKES BLVD INDIAN AVE LITTLE MORONGO RD WIDEN FROM 2 TO 6 LANES 2023 $16,366

3A07227 MISSION LAKES BLVD LITTLE MORONGO RD PALM DR WIDEN FROM 2 TO 6 LANES 2023 $15,511

Page 135: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 133

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A01WT044 MISSION TR RAILROAD CANYON RD BUNDY CANYON RD WIDEN FROM 4 TO 6 LANES 2009 $7,634

3A07022 MONROE ST MONROE ST I-10 IC WIDEN FROM 2 TO 6 LANES AND WIDEN/RECONSTRUCT RAMPS 2012 $63,623

3A07030 MONROE ST AVE 40 I-10 IC WIDEN FROM 2 TO 6 LANES 2012 $13,398

3A01CV069 MONTEREY AVE COUNTRY CLUB DR FRANK SINATRA DR WIDEN FROM 4 TO 6 LANES 2009 $5,175

3A07067 MONTEREY AVE GERALD FORD DR DINAH SHORE DR WIDEN FROM 4 TO 6 LANES 2010 $8,032

3A07085 MONTEREY AVE FRANK SINATRA DR GERALD FORD DR WIDEN FROM 4 TO 6 LANES 2012 $6,144

3A07090 MONTEREY AVE COUNTRY CLUB DR FRANK SINATRA DR WIDEN FROM 4 TO 6 LANES 2012 $5,784

3A07116 MONTEREY AVE CLANCY LANE COUNTRY CLUB DR WIDEN FROM 4 TO 6 LANES 2012 $4,093

3A07128 MONTEREY AVE FRED WARING DR CLANCY LANE WIDEN FROM 4 TO 6 LANES 2012 $3,382

3A07228 MONTEREY AVE I-10 RAMON RD WIDEN FROM 2 TO 6 LANES 2018 $5,091

3A07229 MONTEREY AVE COUNTRY CLUB DR FRANK SINATRA DR WIDEN FROM 4 TO 6 LANES 2018 $7,505

3A07303 MONTEREY AVE GERALD FORD DR DINAH SHORE DR WIDEN FROM 4 TO 6 LANES 2009 $8,022

3A07307 MONTEREY AVE FRANK SINATRA DR GERALD FORD DR WIDEN FROM 4 TO 6 LANES 2009 $5,346

3A07308 MONTEREY AVE CLANCY LANE COUNTRY CLUB DR WIDEN FROM 4 TO 6 LANES 2012 $4,304

3A07310 MONTEREY AVE HIGHWAY 111 FRED WARING DR WIDEN FROM 4 TO 6 LANES 2012 $2,848

3A07313 MONTEREY AVE FRED WARING DR CLANCY LANE WIDEN FROM 4 TO 6 LANES 2012 $1,399

3A07105 MORENO BEACH DR RECHE CANYON RD SR-60 WIDEN FROM 2 TO 4 LANES 2020 $6,266

3A07155 MORENO BEACH DR CACTUS AVE AUTOMALL DR. WIDEN 2 TO 6 LANES / STREET IMPROVEMENT 2014 $669

3A07269 MORGAN ST NEVADA INDIAN AVE WIDEN FROM 2 TO 4 LANES 2030 $668

3A07270 MORGAN ST INDIAN AVE BRADLEY RD CONSTRUCT 4 LANES 2030 $14,120

3A07271 MOUNTAIN AVE MCPHERSON A ST WIDEN FROM 2 TO 4 LANES 2030 $2,567

3A01CV071 MOUNTAIN VIEW HACIENDA AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2018 $12,095

3A01CV073 MOUNTAIN VIEW 20TH AVE VARNER RD WIDEN FROM 2 TO 6 LANES 2030 $21,472

3A07230 MOUNTAIN VIEW DILLON RD 20TH AVE WIDEN FROM 2 TO 4 LANES 2030 $19,333

3A07231 MOUNTAIN VIEW 20TH AVE VARNER RD WIDEN FROM 2 TO 6 LANES 2030 $18,180

3A07232 MOUNTAIN VIEW HACIENDA AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2023 $20,791

Page 136: Project List - Southern California Association of Governments

134 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A01WT173MURRIETA HOT SPRINGS RD

POURROY RD SR-79 (EASTERN BYPASS) CONSTRUCT 4 LANE ARTERIAL 2030 $25,045

3A01WT174MURRIETA HOT SPRINGS RD

MARGARITA RD SR-79 (WINCHESTER) WIDEN FROM 4 TO 6 LANES 2020 $8,719

3A04WT081MURRIETA HOT SPRINGS RD

I-215 MARGARITA RD WIDEN FROM 4 TO 6 LANES 2020 $9,527

3A07072MURRIETA HOT SPRINGS RD

MARGARITA RD SR-79 (WINCHESTER) WIDEN FROM 4 TO 6 LANES 2020 $11,644

3A04WT175 MURRIETA RD ETHANAC RD MCCALL BLVD WIDEN FROM 2 TO 4 LANES 2030 $11,742

3A07272 MURRIETA RD CASE RD ETHANAC RD WIDEN FROM 2 TO 4 LANES 2030 $4,365

3A04A04 N. LOVEKIN BLVD 10TH AVE 8TH AVE WIDEN EXISTING BRIDGE AT C-CANAL FROM 2 TO 4 LANES 2018 $3,355

3A04A09 N. LOVEKIN BLVD HOBSONWAY 10TH AVE WIDEN FROM 2 TO 4 LANES 2020 $7,010

3A04WT070 NASON ST IRONWOOD AVE ALESSANDRO BLVD WIDEN FROM 2 TO 4 LANES 2010 $5,997

3A07101 NASON ST IRIS AVE DELPHINIUM AV CONSTRUCT 4 LANES 2018 $5,717

3A07119 NASON ST CACTUS AVE ALESSANDRO BLVD WIDEN 4 TO 6 LANES / STREET IMPROVEMENT 2010 $3,707

3A07135 NASON ST DELPHINIUM AVE CACTUS AVE CONSTRUCT 6 LANES 2010 $2,707

3A07154 NASON ST ELDER AVE IRONWOOD AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $1,077

3A01WT176 NEWPORT RD GOETZ RD MURRIETA RD CONSTRUCT 6 LANE ARTERIAL 2030 $32,182

3A04WT177 NEWPORT RD MURRIETA RD I-215 WIDEN FROM 4 TO 6 LANES 2030 $45,500

3A04WT178 NEWPORT RD I-215 MENIFEE RD WIDEN FROM 4 TO 6 LANES 2030 $6,118

3A04A11 NICHOLS RD COLLIER AVE DEXTER AVE WIDEN FROM 2 TO 6 LANES 2023 $17,961

3A04WT091 NORCO DR CORYDON AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2012 $5,316

3A04WT179 NUEVO RD DUNLAP DR MENIFEE RD WIDEN FROM 2 TO 4 LANES 2030 $17,063

3A04WT082 NUTMEG ST JEFFERSON AVE CLINTON KEITH RD WIDEN FROM 2 TO 4 LANES 2020 $10,237

3A04WT060 OLEANDER AVE WESTERN WAY INDIAN AVE WIDEN FROM 2 TO 4 LANES 2010 $5,641

3A04A12 OLIVE ST MISSION TR ORCHARD ST WIDEN FROM 2 TO 4 LANES 2014 $7,347

3A07273 ORANGE AVE INDIAN AVE DUNLAP DR WIDEN FROM 2 TO 4 LANES 2030 $8,729

3A07035OVERLAND DRIVE EXTENSION

JEFFERSON AVE DIAZ ROAD CONSTRUCT 4 LANE ROAD EXTENSION & BRIDGE CROSSING 2012 $11,908

Page 137: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 135

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04WT117 OVERLOOK PKWY CHATEAU RIDGE LN SANDTRACK RD CONSTRUCT NEW 4 LANE ARTERIAL 2010 $20,963

3A07291 PALM AVE ESPLANADE AVE SEVENTH ST CONSTRUCT 4 LANES 2030 $4,878

3A07292 PALM AVE SEVENTH ST RAMONA BLVD WIDEN FROM 2 TO 4 LANES 2030 $7,959

3A07104 PALM CYN DR RAMON RD MESQUITE AVE WIDEN FROM 4 TO 4 LANES 2030 $9,640

3A07114 PALM CYN DR TAHQUITZ CYN RD RAMON RD WIDEN FROM 3 TO 3 LANES 2030 $8,516

3A07118 PALM CYN DR ALEJO RD TAHQUITZ CYN RD WIDEN FROM 3 TO 3 LANES 2030 $8,126

3A07124 PALM CYN DR MESQUITE AVE E PALM CYN DR WIDEN FROM 4 TO 4 LANES 2030 $7,229

3A07150 PALM CYN DR TACHEVAH DR ALEJO RD WIDEN FROM 4 TO 4 LANES 2030 $1,844

3A07286 PALM CYN DR VISTA CHINO TACHEVAH DR WIDEN FROM 4 TO 4 LANES 2030 TBD

3A01WT180 PALOMAR ST MISSION TRAIL CLINTON KEITH RD WIDEN FROM 2 TO 4 LANES 2030 $17,073

3A01WT181 PALOMAR ST CLINTON KEITH RD JEFFERSON AVE WIDEN FROM 2 TO 4 LANES 2030 $4,063

3A01WT061 PERRIS BLVD CACTUS AVE OLEANDER AVE WIDEN FROM 2 TO 6 LANES 2010 $15,368

3A01WT062 PERRIS BLVD RECHE VISTA DR IRONWOOD AVE WIDEN FROM 2 TO 6 LANES 2010 $9,826

3A01WT105 PERRIS BLVD RAMONA EXPWY NUEVO RD WIDEN FROM 4 TO 6 LANES 2012 $11,148

3A01WT106 PERRIS BLVD NUEVO RD 11TH ST WIDEN FROM 2 TO 4 LANES 2018 $11,395

3A07140 PERRIS BLVD IRONWOOD AVE SUNNYMEAD BLD WIDEN FROM 4 TO 6 LANES 2020 $2,957

3A07170 PERRIS BLVD DRACAEA FIR WIDEN FROM 4 TO 6 LANES / STREET IMPROVEMENT 2020 $62

3A04A33 PHILADELPHIA AVE WINEVILLE RD ETIWANDA AVE WIDEN FROM 1 EB EXISTING TO 2 LANES 2030 $2,614

3A04A34 PHILADELPHIA AVE MILLIKEN AVE I-15 WIDEN FROM 1 EB EXISTING TO 2 LANES 2030 $2,408

3A01CV075 PIERSON BLVD SR-62 INDIAN AVE WIDEN FROM 2 TO 6 LANES 2010 $14,616

3A01CV076 PIERSON BLVD INDIAN AVE LITTLE MORONGO RD WIDEN FROM 2 TO 6 LANES 2010 $5,994

3A01CV077 PIERSON BLVD PALM DREASTERNTERMINUS OF DESERT VIEW AVE

RECONSTRUCT/RESURFACE EXISTING 4 LANES 2010 $11,233

3A07233 PIERSON BLVD SR-62 INDIAN AVE WIDEN FROM 2 TO 6 LANES 2020 $23,160

3A07234 PIERSON BLVD INDIAN AVE LITTLE MORONGO RD WIDEN FROM 2 TO 6 LANES 2020 $9,698

3A04WT064 PIGEON PASS RD CANTARINI IRONWOOD AVE WIDEN FROM 2 TO 4 LANES 2009 $13,218

3A01WT107 PLACENTIA AVE INDIAN AVE EVANS RD WIDEN FROM 2 TO 4 LANES 2012 $9,905

Page 138: Project List - Southern California Association of Governments

136 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07297 PORTOLA AVEFUTURE PORTOLA AVE I-10 IC

CONSTRUCT AN INTERCHANGE 2014 $39,787

3A07298 PORTOLA AVE MAGNESIA FALLS DR COUNTRY CLUB DR WIDEN FROM 4 TO 6 LANES 2018 $15,629

3A07302 PORTOLA AVEBR. AT WHITEWATER CHNL

CONSTRUCT A BRIDGE AT WWR 2007 $8,355

3A07305 PORTOLA AVE COUNTRY CLUB DR FRANK SINATRA DR WIDEN FROM 4 TO 6 LANES 2018 $10,587

3A07309 PORTOLA AVE GERALD FORD DR I-10 WIDEN FROM 4 TO 6 LANES 2014 $3,559

3A07314 PORTOLA AVE HWY 111 MAGNESIA FALLS DR WIDEN FROM 4 TO 6 LANES 2018 $1,544

3A07122 PORTOLA AVENUE FRANK SINATRA DRIVE GERALD FORD DRIVE WIDEN FROM 4 TO 6 LANES 2023 $6,528

3A04WT025 RAILROAD CANYON RDCOTTONWOOD CANYON RD

GOETZ RD WIDEN FROM 4 TO 6 LANES 2012 $12,314

3A04WT032 RAILROAD ST SHERMAN AVE MAIN ST (AT GRAND) WIDEN FROM 2 TO 4 LANES 2010 $5,649

3A01CV078 RAMON RD GENE AUTRY TRAIL W BANK OF THE WHITE-WATER RVR

WIDEN FROM 4 TO 6 LANES 2018 $7,946

3A01CV081 RAMON RD PALM CANYON DR SUNRISE WAY WIDEN FROM 4 TO 6 LANES 2012 $5,958

3A07005 RAMON RD INDIAN CYN SUNRISE WAY (INCL. BARISTO STORM CHNL XING)

WIDEN FROM 4 TO 6 LANES 2020 $169,326

3A07046 RAMON RD EL CIELO RD GENE AUTRY TRAIL WIDEN FROM 6 TO 6 LANES 2023 $19,374

3A07068 RAMON RD GENE AUTRY TRAIL W BANK OF THE WHITE-WATER RV

WIDEN FROM 4 TO 6 LANES 2023 $15,389

3A07083 RAMON RD SUNRISE WAY FARRELL DR WIDEN FROM 4 TO 6 LANES 2020 $10,293

3A07089 RAMON RD

BR. AT WHITEWATER RVR - WIDEN NORTH AND SOUTH SIDES AND APPROACHES

BR. AT WHITEWATER RVR - WIDEN NORTH AND SOUTH SIDES AND AP-PROACHES

WIDEN FROM 4 TO 6 LANES 2018 $7,266

3A07100 RAMON RD BR. AT WHITEWATER RVR WIDEN FROM 4 TO 6 LANES 2030 $10,083

3A07113 RAMON RD FARRELL DR EL CIELO RD WIDEN FROM 4 TO 6 LANES 2023 $7,169

3A07141 RAMON RD DATE PALM DR DA VALL DR WIDEN FROM 4 TO 6 LANES 2008 $1,864

Page 139: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 137

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07145 RAMON RD PALM CYN DR INDIAN CYN DR WIDEN FROM 4 TO 6 LANES 2018 $1,798

3A07235 RAMON RDINTERSECTION OF RA-MON RD & VARNER RD

WIDEN FROM 4 TO 6 LANES 2014 $244

3A07236 RAMON RD I-10 MONTEREY AVE RECONSTRUCT/RESURFACE EXISTING 4 LANES 2017 $6,457

3A07237 RAMON RDINTERSECTION OF RAMON RD & MONTEREY AVE

RECONSTRUCT/RESURFACE EXISTING 4 LANES 2009 $117

3A07238 RAMON RD MONTEREY AVE THOUSAND PALMS CYN RD

WIDEN FROM 2 TO 4 LANES 2020 $37,082

3A07293 RAMONA BLVD SEVENTH ST SAN JACINTO AVE WIDEN FROM 2 TO 4 LANES 2030 $18,742

3A01WT108 RAMONA EXPWY I-215 EAST RAMPS PERRIS BLVD WIDEN FROM 4 TO 6 LANES 2018 $7,609

3A01WT109 RAMONA EXPWY PERRIS BLVD EVANS RD WIDEN FROM 4 TO 6 LANES 2018 $8,063

3A01WT110B RAMONA EXPWY EVANS RD RIDER ST WIDEN FROM 2 TO 6 LANES 2018 $10,500

3A01WT182 RAMONA EXPWY RIDER ST PICO AVE WIDEN FROM 4 TO 6 LANES 2030 $5,973

3A01WT183 RAMONA EXPWY PICO AVE BRIDGE ST WIDEN FROM 2 TO 6 LANES 2030 $85,402

3A01WT206 RAMONA EXPWY BRIDGE ST WARREN RDWIDEN FROM 2 TO 6 LANES (NOTE: RTIP#RIV011230 WIDENS PORTIONS TO 4 LANES)

2030 $19,595

3A01WT210 RAMONA EXPWY SANDERSON AVE STATE ST WIDEN FROM 2 TO 6 LANES 2009 $19,342

3A01WT217 RANCHO CALIFORNIA RD JEFFERSON AVE MARGARITA RD WIDEN FROM 4 TO 6 LANES 2030 $28,599

3A04WT065 RECHE CANYON RD RECHE VISTA DR MORENO BEACH DR CONSTRUCT 4 LANE ARTERIAL 2018 $21,490

3A04WT184 RECHE CANYON RDSAN BERNARDINO CO LINE

RECHE VISTA DR WIDEN FROM 2 TO 4 LANES 2020 $24,913

3A01WT066 RECHE VISTA DR RECHE CANYON RD HEACOCK ST WIDEN FROM 2 TO 4 LANES 2012 $7,343

3A07274 REDLANDS AVE OLEANDER AVE PLACENTIA AVE CONSTRUCT 4 LANES 2030 $14,120

3A07275 REDLANDS AVE PLACENTIA AVE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2030 $5,391

3A01WT067 REDLANDS BLVD LOCUST AVE ALESSANDRO BLVD WIDEN FROM 2 TO 4 LANES 2014 $9,408

3A07148 REDLANDS BLVD IRONWOOD AVE KALMIA AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $1,526

3A07156 REDLANDS BLVD CACTUS AVE SR-60 WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2012 $651

Page 140: Project List - Southern California Association of Governments

138 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07159 REDLANDS BLVD KALMIA AVE LOCUST AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $642

3A07161 REDLANDS BLVD SPRUCE AVE IRONWOOD AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $359

3A07276 RIDER ST NEVADA RAMONA EXPWY WIDEN FROM 2 TO 4 LANES 2030 $11,553

3A04A35 RIVERSIDE DR HAMNER AVE ETIWANDA AVE WIDEN FROM 2 TO 4 LANES 2030 $6,303

3A04A36RIVERSIDE DR AT DAY CREEK

WINEVILLE RD ETIWANDA AVE WIDEN BRIDGE FROM 2 TO 4 LANES 2030 $999

3A04A07 RIVIERA DR 18TH AVE 20TH AVECONSTRUCT 2 LANE OVERCROSSING AT THE LOWER OUTFALL DRAIN

2014 $2,013

3A04A21 SALVIA RD INDIAN CANYON DR GENE AUTRY TR CONSTRUCT 4 LANE ARTERIAL CONNECTOR 2030 $27,781

3A07277 SAN JACINTO AVE WEST CITY LIMIT NAVAJO WIDEN FROM 2 TO 6 LANES 2030 $1,797

3A07278 SAN JACINTO AVE NAVAJO A ST CONSTRUCT 4 LANES 2030 $7,445

3A07279 SAN JACINTO AVE A ST REDLANDS AVE WIDEN FROM 2 TO 4 LANES 2030 $4,108

3A07280 SAN JACINTO AVE REDLANDS AVE DUNLAP DR WIDEN FROM 2 TO 6 LANES 2030 $8,216

3A04WT068 SAN MICHELE RD HEACOCK ST INDIAN AVE WIDEN FROM 2 TO 4 LANES 2010 $1,753

3A01WT035 SANDERSON AVE DOMENIGONI PKWY STETSON AVE WIDEN FROM 2 TO 4 LANES 2008 $5,372

3A01WT036 SANDERSON AVEBNSF RR CROSSING (NEAR STETSON AVE)

ACACIA AVE WIDEN FROM 2 TO 4 LANES 2008 $2,269

3A01WT185 SANDERSON AVE (SR-79)GILLMAN SPRINGS RD (AT SR-79)

RAMONA EXPWY WIDEN FROM 4 TO 6 LANES 2030 $45,542

3A04WT186 SCHLEISMAN RDSAN BERNARDINO COUNTY LINE

HARRISON AVE WIDEN FROM 2 TO 4 LANES 2030 $27,948

3A04WT187 SCHLEISMAN RD HARRISON AVE CLEVELAND AVE CONSTRUCT 4 LANE ARTERIAL 2030 $22,952

3A04WT188 SCHLEISMAN RD CLEVELAND AVE 68TH ST WIDEN FROM 2 TO 4 LANES 2030 $12,073

3A04WT189 SCHLEISMAN RD 68TH ST I-15 CONSTRUCT 6 LANE ARTERIAL 2018 $89,427

3A07014 SCHLEISMAN RD I-15 ARLINGTON AVE CONSTRUCT 4 LANE ARTERIAL 2030 $51,035

3A01WT207 SCOTT RD MURRIETA RD I-215 WIDEN FROM 2 TO 4 LANES 2010 $6,596

3A07294 SEVENTH ST WARREN RD CAWSTON AVE CONSTRUCT 4 LANES 2030 $10,526

3A07295 SEVENTH ST CAWSTON AVE RAMONA EXPWAY WIDEN FROM 2 TO 4 LANES 2030 $23,620

3A07296 SOBOBA RD CHABELA DR CITY LIMIT WIDEN FROM 2 TO 4 LANES 2030 $4,365

3A04WT037 SR-74 WINCHESTER RD (SR-79) WARREN RD WIDEN FROM 4 TO 6 LANES 2009 $10,306

Page 141: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 139

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04WT191 SR-74 I-15 ETHANAC RD WIDEN FROM 4 TO 6 LANES 2020 $31,310

3A07260 SR-74 NAVAJO I-215 WIDEN FROM 2 TO 4 LANES 2030 TBD

3A04WT190 SR-74 (ETHANAC) MATTHEWS RD SR-79 (WINCHESTER)WIDEN FROM 2 TO 4 LANES (MATTHEWS TO BRIGGS). WID-DEN FROM 4 TO 6 LANES(BRIGGS TO SR-79).

2020 $25,331

3A01WT045 SR-74 (GRAND AVE) RIVERSIDE DR (SR-74) ORTEGA HWY (SR-74) WIDEN FROM 2 TO 6 LANES 2023 $10,855

3A04WT046 SR-74 (RIVERSIDE DR) LAKESHORE DR GRAND AVE WIDEN FROM 2 TO 6 LANES 2018 $18,915

3A04WT047SR-74 (RIVERSIDE DR/COLLIER AVE)

I-15 LAKESHORE DR WIDEN FROM 2 TO 6 LANES 2010 $17,518

3A01WT213 SR-79 NORTH RAMONA BLVD 7TH ST WIDEN FROM 2 TO 4 LANES 2018 $1,375

3A01WT196SR-79 (EASTERN BYPASS)

SR79 (WINCHESTER RD NEAR SCOTT RD)

I-15 CONSTRUCT 4 LANE ARTERIAL 2020 $253,713

3A01WT192SR-79 (GILMAN SPRINGS)

SANDERSON AVE STATE ST WIDEN FROM 2 TO 4 LANES 2030 $16,277

3A07008 SR79 (WINCHESTER RD) DOMENIGONI PKWY HUNTER RDWIDEN FROM 2 TO 6 LANES (DOMENIGONI TO LA ALBA). WIDEN FROM 4 TO 6 LANES (LA ALBA TO HUNTER).

2030 $164,012

3A01WT219 SR-79 (WINCHESTER RD)MURRIETA HOT SPRINGS RD

JEFFERSON AVERECONSTRUCT ROAD - EXISTING 6 LANES TO REMAIN 6 LANES (3 EACH DIRECTION)

2012 $17,843

3A01WT218SR-79 SOUTH (CON-STANCE)

I-15 PECHANGA RD WIDEN FROM 6 TO 8 LANES 2010 $2,286

3A01WT038 STATE ST DOMENIGONI PKWY STETSON AVE WIDEN FROM 2 TO 4 LANES 2008 $7,002

3A01WT039 STATE ST JOHNSTON AVE FLORIDA AVE (SR-74) WIDEN FROM 2 TO 4 LANES 2008 $1,520

3A01WT214 STATE ST GILLMAN SPRINGS RD QUANDT RANCH RD WIDEN FROM 2 TO 4 LANES 2018 $8,872

3A01WT040 STETSON AVE WARREN RD CAWSTON AVE RELOCATE AND CONSTRUCT 4 LANE ARTERIAL 2010 $4,726

3A04A22 SUNRISE WAYSUNRISE WAY (NORTH OF SAN RAFAEL DR)

INDIAN CANYON DR CONSTRUCT/EXTEND 4 LANE ARTERIAL CONNECTOR 2009 $3,162

3A07126 SUNRISE WAY INDIAN CANYON DRNORTH PALM CANYON DRIVE (SR 111)

CONSTRUCT/EXTEND 4 LANE ARTERIAL CONNECTOR 2030 $8,681

3A04WT197 TEMESCAL CANYON RD ONTARIO AVE INDIAN TRUCK TRAIL WIDEN FROM 2 TO 4 LANES 2030 $44,947

Page 142: Project List - Southern California Association of Governments

140 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04WT198 TEMESCAL CANYON RD INDIAN TRUCK TRAIL LAKE ST WIDEN FROM 2 TO 4 LANES 2030 $31,654

3A07239 THOUSAND PALMS RD RAMON RD DILLON RD RECONSTRUCT/RESURFACE EXISTING 2 LANES 2010 $20,148

3A07281 TRUMBLE RD MAPES AVE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2030 $3,081

3A01CV085 TWO BUNCH PALMS TR LITTLE MORONGO RD PALM DR WIDEN FROM 2 TO 6 LANES 2012 $9,061

3A01CV086 TWO BUNCH PALMS TR PALM DR MIRACLE HILL RD WIDEN FROM 2 TO 6 LANES 2012 $6,647

3A07240 TWO BUNCH PALMS TR INDIAN AVE LITTLE MORONGO RD WIDEN FROM 0 TO 6 LANES 2030 $24,293

3A04WT118 TYLER ST WELLS AVE ARLINGTON AVE WIDEN FROM 2 TO 4 LANES 2020 $9,755

3A04WT224 VALLEY WAY ARMSTRONG RD MISSION BLVD WIDEN FROM 2 TO 4 LANES 2018 $24,467

3A01WT199 VAN BUREN BLVDMOCKINGBIRD CANYON RD

WOOD RD WIDEN FROM 4 TO 6 LANES 2018 $17,242

3A01WT201 VAN BUREN BLVD SR-60 SANTA ANA RIVERWIDEN FROM 4 TO 6 LANES (NOTE: OVERLAPS RTIP#RIV011208)

2030 $43,011

3A07007 VAN BUREN BLVD ORANGE TERRACE PKWY I-215 WIDEN FROM 4 TO 6 LANES 2030 $148,721

3A07315 VAN BUREN BLVD JACKSON ST GARFIELD WIDEN FROM 4 TO 6 LANES 2014 $26,579

3A07097 VAN BUREN ST INDIO BLVD AVE 48 WIDEN FROM 3 TO 6 LANES 2014 $6,361

3A01CV087 VAN BUREN ST AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2023 $982

3A01CV088 VAN BUREN ST AVE 54 AVE 56/AIRPORT BLVD WIDEN FROM 2 TO 4 LANES 2023 $987

3A07036 VAN BUREN ST AVE 48 AVE 50 WIDEN FROM 2 TO 6 LANES 2014 $13,187

3A07037 VAN BUREN ST AVE 50 AVE 52 WIDEN FROM 2 TO 6 LANES 2014 $13,152

3A07241 VAN BUREN ST AVE 50 AVE 52 WIDEN FROM 2 TO 6 LANES 2020 $11,801

3A07242 VAN BUREN ST AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2020 $820

3A07243 VAN BUREN ST AVE 54 AVE 56/AIRPORT WIDEN FROM 2 TO 4 LANES 2020 $803

3A07244 VAN BUREN ST INDIO BLVD AVE 48 WIDEN FROM 3 TO 6 LANES 2018 $6,469

3A01CV089 VARNER RD PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 4 LANES 2018 $17,733

3A01CV090 VARNER RD MOUNTAIN VIEW RD DATE PALM DR WIDEN FROM 2 TO 4 LANES 2018 $26,609

3A01CV091 VARNER RD DATE PALM DR RAMON RD WIDEN FROM 2 TO 4 LANES 2030 $77,096

Page 143: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 141

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A07158 VARNER RD WASHINGTON ST ADAMS ST WIDEN FROM 3 TO 4 LANES 2009 $468

3A07245 VARNER RDINTERSECTION OF VAR-NER RD & RAMON RD

RECONSTRUCT/RESURFACE EXISTING 4 LANES 2013 $173

3A07246 VARNER RD RAMON RD MONTEREY AVE RECONSTRUCT/RESURFACE EXISTING 2 LANES 2010 $4,579

3A07247 VARNER RD MONTEREY AVE CHASE SCHOOL RD RECONSTRUCT/RESURFACE EXISTING 2 LANES 2012 $1,446

3A07248 VARNER RD CHASE SCHOOL RD WASHINGTON ST RECONSTRUCT/RESURFACE EXISTING 2 LANES 2013 $4,113

3A07249 VARNER RD PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 4 LANES 2030 $19,098

3A07250 VARNER RD MOUNTAIN VIEW RD DATE PALM DR WIDEN FROM 2 TO 4 LANES 2030 $36,165

3A07251 VARNER RD DATE PALM DR RAMON RD WIDEN FROM 2 TO 4 LANES 2030 $73,115

3A07252 VARNER RD WASHINGTON ST ADAMS ST WIDEN FROM 3 TO 4 LANES 2023 $1,761

3A07050 VARNER RD / AVE 42 MADISON ST MONROE ST WIDEN FROM 2 TO 6 LANES 2009 $9,746

3A07064 VARNER RD / AVE 42 MONROE ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2009 $8,083

3A07075 VARNER RD / AVE 42 JACKSON ST GOLF CTR PKWY WIDEN FROM 2 TO 6 LANES 2009 $6,905

3A07079 VARNER RD / AVE 42 JEFFERSON ST MADISON ST WIDEN FROM 2 TO 6 LANES 2009 $6,285

3A01CF096 VISTA CHINOE BANK OF WHITEWATER BR.

LANDAU BLVD WIDEN FROM 4 TO 6 LANES 2018 $14,574

3A01CV095 VISTA CHINOW. BANK OF WHITEWATER RIVER

E. BANK OF WHITEWATER RIVER

CONSTRUCT NEW BRIDGE CROSSING OVER WHITEWATER RIVER WASH

2030 $177,101

3A01CV097 VISTA CHINO DATE PALM DA VALL DR CONSTRUCT NEW 4-LANE ROAD 2030 $36,209

3A01CV098 VISTA CHINO PALM CANYON DR SUNRISE WAY WIDEN FROM 4 TO 6 LANES 2030 $12,067

3A07006 VISTA CHINOWHITEWATER RVR BR. XING

WIDEN FROM 4 TO 6 LANES 2030 $169,435

3A07131 VISTA CHINO GENE AUTRY TRAIL WHITEWATER RVR WIDEN FROM 4 TO 6 LANES 2023 $5,822

3A01WT041 WARREN RD ESPLANADE AVE DOMENIGONI PKWY WIDEN FROM 2 TO 4 LANES 2030 $37,514

3A01WT215 WARREN RD RAMONA EXPWY ESPLANADE AVE WIDEN FROM 2 TO 4 LANES 2012 $15,373

3A04WT120 WASHINGTON ST VICTORIA AVE HERMOSA DR WIDEN FROM 2 TO 4 LANES 2018 $10,312

Page 144: Project List - Southern California Association of Governments

142 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

3A04WT202 WASHINGTON ST HERMOSA DR HARLEY JOHN RD WIDEN FROM 2 TO 4 LANES 2030 $24,019

3A07132 WASHINGTON ST AVE 50 HWY 111 RECONSTRUCT/RESURFACE EXISTING 6 LANES 2010 $2,937

3A07146 WASHINGTON ST AVE 52 AVE 50 RECONSTRUCT/RESURFACE EXISTING 6 LANES 2010 $1,177

3A07253 WASHINGTON ST I-10 AVE 38 WIDEN FROM 4 TO 6 LANES 2018 $9,843

3A07254 WASHINGTON ST AVE 38 FRANCES WAY RECONSTRUCT/RESURFACE EXISTING 4 LANES 2017 $4,895

3A07255 WASHINGTON ST FRANCES WAY RAMON RD RECONSTRUCT/RESURFACE EXISTING 2 LANES 2017 $1,822

3A07282 WATSON A ST MCPHERSON RD CONSTRUCT 4 LANES 2030 $3,594

3A07283 WEBSTER AVE OLEANDER AVE MARKHAM CONSTRUCT 6 LANES 2030 $4,621

3A07284 WEBSTER AVE MARKHAM RAMONA EXPWY WIDEN FROM 2 TO 6 LANES 2030 $2,824

3A07285 WEBSTER AVE RAMONA EXPWY RIDER ST WIDEN FROM 2 TO 4 LANES 2030 $3,081

3A04WT121 WOOD RD JOHN F KENNEDY DR VAN BUREN WIDEN FROM 2 TO 4 LANES 2012 $5,470

3A04WT203 WOOD RD KRAMERIA AVE CAJALCO RD WIDEN FROM 2 TO 4 LANES 2030 $17,449

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

RIVERSIDE COUNTY GRADE SEPARATION PROJECTS

In the process of developing the 2008 RTP, the Riverside County Transportation Commission provided to SCAG a list of grade separation improvement projects

planned for implementation in Riverside County within the timeframe of the RTP. The projects in this list are included in the 2008 RTP subject to available

funding as identified in the Riverside County RTP Projects list.

RIVERSIDE COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY

PROJECT COST ($1,000'S)

3G01G36 22ND ST I-10 LINCOLN ST GRADE SEPARATION - 2 LANES OVER UPRR TRACKS 2018 $31,774

3G01G01 3RD STREET SR-91 KANSAS AVEGRADE SEPARATION - 4 LANES UNDER BNSF AND UPRR TRACKS

2016 $40,435

3G01G287TH ST/ MISSION INN AVE

SR-91 PARK AVE GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2035 $76,446

Page 145: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 143

RIVERSIDE COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY

PROJECT COST ($1,000'S)

3G01G23 ADAMS ST INDIANA AVE LINCOLN ST GRADE SEPARATION - 4 LANES OVER BNSF RR 2035 $79,770

3G04G44 AIRPORT RD POLK ST ORANGE STGRADE SEPARATION - 2 LANES OVER UPRR TRACKS AND SR111

2031 $62,179

3G0706 APACHE TR I-10SOUTH OF UPRR ON APACHE TR

GRADE SEPARATION - 2 LANES AT UPRR 2031 $62,179

3G01G13 AVENUE 52 SHADY LN INDUSTRIAL WAYGRADE SEPARATION - 4 LANES OVER UPRR TRACKS AND SR111

2016 $35,719

3G01CV102 AVENUE 54GRADE SEPARATION AT SR-111/SPRR

GRADE SEPARATION 2031 $62,179

3G0711 AVENUE 58 SR111 EAST OF CACTUS DR GRADE SEPARATION - 2 LANES AT UPRR 2031 $62,179

3G0703 AVENUE 62 WEST OF SR111 WEST OF SR86S GRADE SEPARATION - 2 LANES AT UPRR TRACKS AND SR111 2031 $62,179

3G0705 AVENUE 66WEST OF SR111/LIN-COLN ST

EAST OF HAMMOND RD GRADE SEPARATION - 2 LANES AT UPRR 2031 $62,179

3G01G40 BELLGRAVE AVE BAIN ST RUTILE ST GRADE SEPARATION - 2 LANES OVER UPRR TRACKS 2018 $32,465

3G01G30 BROADWAY MAIN ST BONITA AVE GRADE SEPARATION - 2 LANES OVER UPRR TRACKS 2018 $32,465

3G01G20 BROCKTON AVE CENTRAL AVE JURUPA AVE GRADE SEPARATION - 4 LANES UNDER UPRR TRACKS 2018 $40,737

3G01G32 BUCHANAN ST MAGNOLIA AVE ELMVIEW DR GRADE SEPARATION - 2 LANES OVER BNSF RR TRACKS 2030 $64,184

3G01G26 CALIFORNIA AVE 3RD ST I-10 GRADE SEPARATION - 2 LANES OVER UPRR TRACKS 2018 $32,465

3G01G18 CENTER ST IOWA AVE GARFIELD AVE GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2019 $50,414

3G01G05 CHICAGO AVE THORTON ST COLUMBIA AVE GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2035 $161,867

3G01G11 COLUMBIA AVE CHICAGO AVE PALMYRITA AVE GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2016 $26,786

3G01G39 COTA ST RAILROAD ST MCGRATH DR GRADE SEPARATION - 2 LANES OVER BNSF RR TRACKS 2019 $36,368

3G01G12 CRIDGE ST SR-91 PARK AVE GRADE SEPARATION - 2 LANES OVER BNSF RR TRACKS 2035 $86,417

3G0713 GIBSON ST INDIANA AVE AGUILAR ST GRADE SEPARATION - 2 LANES AT BNSF RR 2031 $62,179

3G01G19 HARGRAVE ST I-10 LINCOLN ST GRADE SEPARATION - 2 LANES OVER UPRR 2019 $36,659

3G01G37 HARRISON ST INDIANA AVE WALNUT GROVE AVE GRADE SEPARATION - 2 LANES OVER BNSF RR TRACKS 2030 $59,049

3G01G02 IOWA AVE SPRING ST PALMYRITA AVE GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2017 $23,948

3G01G35 JACKSON ST INDIANA AVE LINCOLN AVE GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2030 $64,184

Page 146: Project List - Southern California Association of Governments

144 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY

PROJECT COST ($1,000'S)

3G0702 JANE ST INDIANA AVE MARGUERITA AVE GRADE SEPARATION - 2 LANES OVER BNSF AND UP RR TRACKS 2018 $32,465

3G01G38 JEFFERSON ST INDIANA AVE LINCOLN AVE GRADE SEPARATION - 2 LANES OVER BNSF RR TRACKS 2030 $60,333

3G01G33 JOY ST SR-91 HARRISON ST GRADE SEPARATION - 2 LANES OVER BNSF RR TRACKS 2019 $36,368

3G01G24 MADISON ST INDIANA AVE LINCOLN ST GRADE SEPARATION - 4 LANES UNDER BNSF RR TRACKS 2030 $48,780

3G01G04 MAGNOLIA AVE LINCOLN ST BUCHANAN ST GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2018 $36,886

3G01G08 MAGNOLIA AVE CENTRAL AVE JURUPA AVE GRADE SEPARATION - 5 LANES UNDER UPRR TRACKS 2017 $36,534

3G01G45 MAIN ST I-215 MICHIGAN AVE GRADE SEPARATION - 2 LANES OVER BNSF AND UP RR TRACKS 2018 $32,465

3G01G10 MARY ST SR-91 MARGUERITA AVE GRADE SEPARATION - 4 LANES UNDER BNSF RR TRACKS 2017 $40,223

3G0708 MOUNTAIN VIEW AVE HILLSIDE AVE RAYANN CT GRADE SEPARATION - 2 LANES AT UPRR 2031 $62,179

3G01G34 PALM AVE CENTRAL AVE JURUPA AVE GRADE SEPARATION - 4 LANES OVER UPRR TRACKS 2030 $64,184

3G0704 PANORAMA RD SR91 MONTEREY RD GRADE SEPARATION - 2 LANES AT BNSF RR 2031 $62,179

3G01G42 PENNSYLVANIA AVE I-10 3RD ST GRADE SEPARATION - 2 LANES OVER UPRR TRACKS 2018 $32,465

3G01G31 PIERCE ST MAGNOLIA AVE INDIANA AVE GRADE SEPARATION - 3 LANES OVER BNSF RR TRACKS 2030 $64,184

3G0710 RADIO RD NORTH OF SAMPSON AVE SOUTH OF QUARRY ST GRADE SEPARATION - 2 LANES AT BNSF RR 2031 $62,179

3G01G29 RAILROAD ST SMITH AVE SHERMAN AVE GRADE SEPARATION - 4 LANES OVER BNSF RR 2019 $36,368

3G01G09 RIVERSIDE AVE CENTRAL AVE JURUPA AVE GRADE SEPARATION - 3 LANES UNDER UPRR TRACKS 2017 $39,927

3G0707 RUTILE STGALENA ST S/O VAN BUREN BLVD/UPRR

GALENA ST N/O UPRR GRADE SEPARATION - 2 LANES AT UPRR 2031 $62,179

3G01G43 SAN GORGONIO AVE I-10 LINCOLN ST GRADE SEPARATION - 2 LANES OVER UPRR TRACKS 2018 $32,465

3G01G25SAN TIMOTEO CANYON RD

ENTRANZ BLVD HAGEN RD GRADE SEPARATION - 2 LANES OVER UPRR TRACKS 2019 $34,186

3G0712 SHERIDAN ST BLAINE ST RAILROAD ST GRADE SEPARATION - 2 LANES AT BNSF RR 2031 $62,179

3G01G27 SMITH AVE WALL CIRCLE RAILROAD ST GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2019 $45,678

3G01G07 SPRUCE ST SR-91 I-215 GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2035 $89,741

3G01G06 STREETER AVE GRAND AVE CENTRAL AVE GRADE SEPARATION - 4 LANES UNDER UPRR TRACKS 2018 $49,989

3G0709 TIPTON RD NORTH OF UPRR SOUTH OF UPRR GRADE SEPARATION - 2 LANES AT UPRR 2031 $62,179

Page 147: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 145

RIVERSIDE COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY

PROJECT COST ($1,000'S)

3G01G22 TYLER ST SR-91 COMANCHE AVE GRADE SEPARATION - 4 LANES OVER BNSF RR TRACKS 2030 $69,319

3G0701 VIELE AVE B STREET LUIS ESTRADA RD GRADE SEPARATION - 2 LANES AT UPRR 2031 $62,179

3G01G17 WASHINGTON ST INDIANA AVE MARGUERITA AVE GRADE SEPARATION - 2 LANES OVER BNSF RR TRACKS 2019 $36,513

RIVERSIDE COUNTY ITS PROJECTS

In the process of developing the 2008 RTP, the Riverside County Transportation Commission provided to SCAG a list of ITS improvement projects planned

for implementation in Riverside County within the timeframe of the RTP. The projects in this list are included in the 2008 RTP subject to available funding as

identified in the Riverside County RTP Projects list.

RIVERSIDE COUNTY ITS PROJECTS

RTP ID SPONSOR PROJECT PROJECT BENEFITSBUDGET

($1,000,000'S)

3ITS0710 CALTRANS DISTRICT 7 INTERCAD INTEROPERABLE COMPUTER AIDED DISPATCH OF SERVICES $2.53

3ITS0701 CALTRANS DISTRICT 8 RAMP METERING IMPROVED TRAFFIC FLOW AND SAFETY. $247.19

3ITS0702 CALTRANS DISTRICT 8 FREEWAY OPS. COMMUNICATIONS INFRASTRUCTURE COMMUNICATIONS LINKS FOR FREEWAY OPS. $120.21

3ITS0703 CALTRANS DISTRICT 8 CLOSED CIRCUIT TV INCIDENT DETECTION AND TRAFFIC MONITORING. $65.51

3ITS0704 CALTRANS DISTRICT 8 ULTIMATE TMC IMPROVED TRAFFIC FLOW AND SAFETY. $46.87

3ITS0705 CALTRANS DISTRICT 8 CHANGEABLE MESSAGE SIGNS TRAVELER INFORMATION ON TRAFFIC AND SAFETY CONDITIONS. $27.68

3ITS0707 CALTRANS DISTRICT 8 ADVANCED WEATHER WARNING WEATHER MONITORING AND DETECTION. $6.26

3ITS0709 CALTRANS DISTRICT 8 HIGHWAY ADVISROY RADIO EXPANSION TRAVELER INFORMATION ON TRAFFIC AND SAFETY CONDITIONS. $2.89

3ITS0711 CALTRANS DISTRICT 8 ENVIRONMENTAL SENSING UNITS ENVIRONMENTAL HAZARDS DETECTION. $2.27

3ITS0714 CALTRANS DISTRICT 8 SYSTEMS SUPPORT DEVELOPMENT SYSTEMS SUPPORT ELEMENTS TO TMC/FWY OPS. $0.92

3ITS0717 CALTRANS DISTRICT 8 FREEWAY SERVICE PATROL ACCIDENT AND INCIDENT REMOVAL AND REDUCTION. $0.44

3ITS0706 INLAND EMPIRE ITS ITS RR GRADE CROSSING VARIABLE SPEED WARNING IMPROVED GRADE CROSSING SAFETY REDUCED DELAY. $9.90

3ITS0708 INLAND EMPIRE ITS ITS RR GRADE CROSSING IMPROVEMENTS IMPROVED GRADE CROSSING SAFETY REDUCED DELAY. $4.91

Page 148: Project List - Southern California Association of Governments

146 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY ITS PROJECTS

RTP ID SPONSOR PROJECT PROJECT BENEFITSBUDGET

($1,000,000'S)

3ITS0712 INLAND EMPIRE ITS ELECTRONIC CLEARANCE/PRE PASS PROGRAM REDUCED DELAY TRUCKS/INCREASED COMPLIANCE WITH TRUCK SAFETY $2.15

3ITS0715 INLAND EMPIRE ITS TRUCK STOP KIOSKS REDUCED DELAY TRUCKS/INCREASED COMPLIANCE WITH TRUCK SAFETY $0.59

3ITS0718 INLAND EMPIRE ITS OVERSIZE/WEIGHT PERMITTING REDUCED DELAY TRUCKS/INCREASED COMPLIANCE WITH TRUCK SAFETY $0.32

3ITS0720 INLAND EMPIRE ITS WESTERN RIVERSIDE TMC IMPROVED ARTERIAL TRAFFIC FLOW AND SAFETY. TBD

3ITS0721 INLAND EMPIRE ITS COACHELLA VALLEY TMC IMPROVED ARTERIAL TRAFFIC FLOW AND SAFETY. TBD

3ITS0726 INLAND EMPIRE ITS WESTERN RIVERSIDE TMC IMPROVED ARTERIAL TRAFFIC FLOW AND SAFETY. TBD

3ITS0713 OMNITRANS TRANSIT TRAVELER INFORMATION IMPROVED TRANSIT INFORMATION. $2.02

3ITS0722 OMNITRANS TRANSIT OPS. MANAGEMENT IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. TBD

3ITS0723 OMNITRANS OPS. MANAGEMENT PARATRANSIT IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. TBD

3ITS0724 OMNITRANS AUTOMATED FARE MANAGEMENT AND DATA IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. TBD

3ITS0725 RTA/SUNLINEFULLY INTEGRATED TRANSIT OPS, MANAGEMENT AND TRAVELER INFORMATION SYSTEM

IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. TBD

3ITS0716 SUNLINE TRANSIT ITS MOBILITY ENHANCEMENT IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. $0.48

3ITS0719 TBD REGIONAL MOBILITY MANAGER IMPROVED TRANSIT/RIDESHARE INFORMATION. $0.06

Page 149: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 147

SAN BERNARDINO COUNTY RTP PROJECTS

SAN BERNARDINO COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

ARTERIAL 4AL04 0ARTERIAL IMPROVE-MENTS

COUNTYWIDE COUNTYWIDE ARTERIAL IMPROVEMENTS ONGOING $4,366,180

ARTERIAL 4A01900 18 SR-18LOS ANGELES COUNTY LINE

US 395WIDEN FROM 1 TO 2 LANES EACH DIR (PM 116-100.9)

2020 $95,487

ARTERIAL 4A04902 18 SR-180.8 MI WEST OF ORCHARD DR (PM 79.9)

2.1 MI WEST OF ORCHARD DR (PM 81.2)

CONSTRUCT PASSING LANES (PM 79.9/81.2) AND TURN LANES (PM 73.76/84.33)

2018 $23,648

ARTERIAL 4A01382 38SR-38 (ORANGE/LUGO-NIA)

REDLANDS CITY LIMIT (W)

REDLANDS CITY LIMIT (E)

WIDEN FROM 1 TO 2 LANES EACH DIR (PM 5.5-8.0) 2020 $13,020

ARTERIAL 4M07016 38 MENTONE BLVD (SR-38) WABASH AVE E/GARNET STWIDEN MENTONE BLVD (SR-38) FROM WABASH AVE TO E/GARNET ST FROM 2 TO 4 LANES (PM 3.0-5.5)

2020 $12,768

ARTERIAL 4A01383 62SR-62 (TWENTY-NINE PALMS HWY)

FAIRWAY DR SR-247WIDEN FROM 2 TO 3 LANES EACH DIR (PM 8.75-12.5)

2020 $70,894

ARTERIAL 4M07020 62 SR-62KICKAPOO TRAIL (9.0)

CHURCH ST. (11.9)WIDEN FROM 4-LANES TO 6-LANES AND REALIGN (EA:0G930)

2018 $91,288

ARTERIAL 4A01384 83 SR-83 (EUCLID) MERRIL AV KIMBALL AV WIDEN FROM 2 TO 4 LANES EACH DIR (3.9-2.8) 2020 $3,138

ARTERIAL 4M07035 138 SR-138 SR-18 PHELAN RDPHASE II: WIDEN 2 TO 4 LANES FROM SR-18 TO PHELAN RD (PHASE I PHELAN RD TO I-15 IN RTIP#34011)

2018 $116,607

ARTERIAL 4A01385 142SR-142 (CHINO HILLS PKWY)

CARBON CANYON RD

PIPELINE DR WIDEN FROM 2 TO 3 LANES EACH DIR (PM 2.0-5.5) 2020 $13,510

ARTERIAL 4A01386 247SR-247 (OLD WOMAN SPRINGS RD)

NORTH OF SR-62 GRIFFITH RDWIDEN FROM 1 TO 2 LANES EACH DIR (EA:34430) (PM

2020 $13,510

AUXILIARY 4M07013 10 I-10 HAVEN FORD ST ADD 1 AUX LANE EACH DIRECTION 2020 $445,805

AUXILIARY 4M07021 10 I-10 FORD ST.RIVERSIDE COUNTY LINE

ADD 1 AUX LANE EACH DIRECTION (PM33.0-0.0) 2030 $102,731

AUXILIARY 4M07008 60 SR-60RAMONA AVE IC (R1.5)

SB I-15 CONNEC-TOR (R10.0)

WIDEN AUX LANES IN EACH DIRECTION, WIDEN CONNECTOR FROM SB-15 TO WB-60 AND EB-60 TO NB/SB-15, WIDEN RAMPS FROM ONE TO TWO LANES (EA:OE330)

2018 $116,159

Page 150: Project List - Southern California Association of Governments

148 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

AUXILIARY 4M04009 395 US-395

NB FROM 0.84MI S/O DESERT FLOWER RD TO 2.84MI N/O PURPLE SAGE ST, AND FROM 4MI N/O SHADOW MOUNTAIN AVE TO 6.07MI N/O SHADOW MOUN-TAIN AVE

SB FROM 2.72MI N/O PURPLE SAGE ST TO 0.95MI S/O DESERT FLOWER RD, AND FROM 5.95MI N/O SHAD-OW MOUNTAIN AVE TO 3.88MI N/O SHADOW MOUN-TAIN AVE

ADD PASSING LANES IN BOTH DIRECTIONS AND ADJUST VERTICAL AND HORIZONTAL ALIGNMENTS (EA: 0E840)

2018 $76,516

GRADE SEPA-RATION

4GL04 0 GRADE SEPARATION COUNTYWIDE GRADE SEPARATION IMPROVEMENTS ONGOING $1,210,328

HOV 4H01001 10 I-10 HAVEN FORD STADD 1 HOV LANE EACH DIRECTION, WIDEN UC'S, RECONSTRUCT RAMPS (PM7.4-34.0)

2020 $1,080,234

HOV 4H01003 10 I-10 FORD ST.RIVERSIDE COUNTY LINE

ADD 1 HOV LANE EACH DIRECTION (PM 33.0-0.0) 2030 $253,974

HOV 4H01009 10 I-10/I-215SOUTH TO EAST/EAST TO SOUTH

HOV CONNECTOR 2030 $36,323

HOV 4H01010 10 I-10/I-15SOUTH TO WEST/WEST TO SOUTH

HOV CONNECTOR 2030 $34,199

HOV 4H01011 10 I-10/I-15NORTH TO WEST/WEST TO NORTH

HOV CONNECTOR 2030 $35,051

HOV 4H01004 15 I-15RIVERSIDE COUNTY LINE

I-215 ADD 1 HOV LANE EACH DIRECTION (PM 0.0- 16.0) 2020 $859,904

HOV 4H01005 15 I-15 I-215 US-395 ADD 1 HOV LANE EACH DIRECTION (PM 16.0-33.2) 2020 $495,645

HOV 4H01006 15 I-15 US-395SR-18/MOJAVE RIVER

ADD 1 HOV LANE EACH DIRECTION (PM 31.0-40.6) 2020 $731,380

HOV 4H01008 215 I-215 SR-210 I-15 ADD 1 HOV LANE EACH DIRECTION (PM 9.5-18.0) 2030 $404,251

IC/RAMPS 4M01025 10 I-10 ALABAMA ST INTERCHANGE (PM 28.0-29.5) 2020 $37,985

IC/RAMPS 4M01027 10 I-10 CALIFORNIA ST INTERCHANGE (PM 27.5-28.5) 2035 $134,869

IC/RAMPS 4M01030 10 I-10 MOUNTAIN VIEW AV INTERCHANGE (PM 26.5-27.5) 2020 $61,732

Page 151: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 149

SAN BERNARDINO COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 4M01031 10 I-10 MT VERNON AV INTERCHANGE (23.0-24.0) 2020 $54,845

IC/RAMPS 4M01032 10 I-10 WABASH AV INTERCHANGE (PM 23.6-34.2) 2030 $51,546

IC/RAMPS 4M04023 10 I-100.1 KM E/O I-15 (PM 9.9)

0.4 KM E/O I-215 (PM R24.5)

INSTALL RMS, CCTV ESU; WIDEN ENTRANCE RAMPS FROM 1 TO 2 LANES AT: EB & WB AT CHERRY AVE, CITRUS AVE, CEDAR AVE, RIVERSIDE AVE AND MT VERNON AVE; WB AT RANCHO AVE; EB AT 9TH ST (EA:38430)

2012 $25,201

IC/RAMPS 4M04033 10 I-10WILDWOOD CAN-YON

INTERCHANGE PM 37.5-38.5) 2020 $45,351

IC/RAMPS 4M07001 10 I-10 EUCLID AVIN ONTARIO ON I-10 AT EUCLID AVENUE - WIDEN EASTBOUND/WESTBOUND RAMPS (PM 3.0-4.0)

2030 $13,914

IC/RAMPS 4M07002 10 I-10 MONTE VISTA AT I-10 FREEWAYIN MONTCLAIR ON I-10 AT MONTE VISTA - INTER-CHANGE IMPROVEMENTS (PM.25-1.1)

2020 $45,754

IC/RAMPS 4M07003 10 I-10 UNIVERSITY AVE.IN REDLANDS ON I-10 AT UNIVERSITY AVE - INTER-CHANGE IMPROVEMENTS (PM31.4-32.0)

2035 $21,231

IC/RAMPS 4M01037 15 I-15 CAJON JN/SR-138 INTERCHANGE (PM 16.0-21.7) 2020 $56,585

IC/RAMPS 4M07034 15 I-15 AT FOOTHILL BLVD

WIDEN-NB-ON-RAMP TO 2 LANES FROM RAMP EN-TRANCE TO THE METERING POINT AND TRANSITION TO 1 LANE AT THE GORE POINT & INSTALL RAMP METERING. (EA 0H791)

2018 $1,401

IC/RAMPS 4M01040 15 I-15 OAK HILL RD REPLACE OVERCROSSING (R28.4-29.8) 2020 $3,369

IC/RAMPS 4M01041 15 I-15 SIERRA AV INTERCHANGE (PM 12.5-13.5) 2020 $24,172

IC/RAMPS 4M07004 15 I-15 BEAR VALLEY RD INTERCHANGE MODIFICATION (PM 36.5-38.5) 2020 $54,424

IC/RAMPS 4M07010 15 I-15HIGH DESERT COR-RIDOR

IN VICTORVILLE/APPLE VALLEY ON I-15 AT EAST/WEST HIGH DESERT CORRIDOR - CONSTRUCT INTERCHANGE (PM 15.1-35.9)

2018 $129,257

IC/RAMPS 4M07014 15 I-15 MOJAVE ST. NEW INTERCHANGE (PM 41.0-43.0) 2020 $111,559

IC/RAMPS 4PL07015 15 I-15SIERRA AVE UC (12.8)

1/93 MILES S/O GLEN HELEN PKWY U/C

SIGNALIZE SB AND NB I-15 RAMP INTERSECTIONS (EA:0G290) (4M045054) (12.8-13.2)

2010 $1,665

IC/RAMPS 4M01047 30 SR-30 (SR-210) DEL ROSA AV INTERCHANGE (PMR 25.0-26.0) 2030 $97,232

IC/RAMPS 4M01048 30 SR-30 (SR-210) HIGHLAND AV INTERCHANGE (PM T21.0-22.0) 2030 $59,857

Page 152: Project List - Southern California Association of Governments

150 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

IC/RAMPS 4M01049 30 SR-30 (SR-210) WATERMAN AV INTERCHANGE (PM R23.5-24.5) 2030 $149,641

IC/RAMPS 4M07006 30 SR-30 (SR-210) 5TH STREETIN HIGHLAND ON SR-30 (SR-210) AT 5TH STREET - INTERCHANGE IMPROVEMENTS (

2015 $7,887

IC/RAMPS 4M07007 30 SR-30 (SR-210) BASE LINEIN HIGHLAND ON SR-30 (SR-210) AT BASE LINE - INTERCHANGE IMPROVEMENTS

2020 $10,135

IC/RAMPS 4M04050 60 SR-60SR-60 AT CENTRAL AVE (3.8)

ADD AUX LANES AND WIDEN RAMPS, CONST EN-TRANCE LOOP RAMP (EA:0C870) PM R2.1-3.0)

2014 $16,595

IC/RAMPS 4M07017 60 SR-60 ARCHIBALDIN ONTARIO ON SR-60 AT ARCHIBALD AVENUE - WIDEN OFF RAMPS FROM 2 TO 3 LANES (PM R7.6-7.8)

2030 $10,457

IC/RAMPS 4M07018 60 SR-60 EUCLIDIN ONTARIO ON SR-60 AT EUCLID AVENUE - WIDEN OFF RAMPS FROM 2 TO 3 LANES (PM R4.6-5.0)

2030 $11,595

IC/RAMPS 4PL07019 60 SR-60SR-60 AT MOUN-TAIN AVE (5.8)

WIDEN RAMPS, CONST AUX LANES (EA:0C880) 2014 $8,139

IC/RAMPS 4M01043 215 I-215 BARTON ROAD RECONSTRUCT BARTON RD INTERCHANGE 2018 $80,509

IC/RAMPS 4M01044 215 I-215 PALM AV INTERCHANGE (PM13.5-14.5) 2020 $16,575

IC/RAMPS 4M01045 215 I-215 PEPPER-LINDEN AV INTERCHANGE 2030 $138,903

IC/RAMPS 4M07005 215 I-215BARTON ROAD IC (0.8)

TO (1.8) RECONSTRUCT INTERCHANGE 2015 $61,099

ITS 4ITS04 0 ITS COUNTYWIDE INTELLIGENT TRANSPORTATION SYSTEMS ONGOING $592,423

MIXED FLOW 4M01003 215 I-215 SR-30 I-15 ADD 1 MF LANE EACH DIRECTION (10.0-18.0) 2030 $236,757

MIXED FLOW & AUXILIARY

& TRUCK CLIMBING

4M07011 15 I-15I-215 (DEVORE INTERCHANGE) (PM 14.0 - R16.0)

ON I-15 WIDEN FROM 3 TO 4 MF EACH DIR FROM 14.0 TO R14.3.; ADD 2 TRUCK BYPASS LANES EA DIR ALONG I-15 WITHIN PROJECT LIMITS. ADD AUX-ILIARY LANES EACH DIR THROUGH PROJECT LIMITS; PROVIDE LOCAL ROAD IMPROVEMENTS

2030 $461,748

MIXED FLOW & HOV

4M01005 210 SR-210 I-215 I-10ADD 1 MF LANE AND 1 HOV LANE EACH DIRECTION AND WIDEN UC'S (PM 22.0-33.2)

2020 $253,547

O&M 4OM0701 0OPERATIONS & MAINTE-NANCE

COUNTYWIDESTATE HIGHWAY, ARTERIAL, AND TRANSIT PRESER-VATION/MAINTENANCE AND OPERATIONS

ONGOING $2,439,040

Page 153: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 151

SAN BERNARDINO COUNTY RTP PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

OTHER 4PD04 0PROJECT DEVELOPMENT & TRAFFIC MITIGATION

COUNTYWIDE PROJECT DEVELOPMENT & TRAFFIC MITIGATION ONGOING $503,349

OTHER 4FR04 0SOUTHERN CALIFORNIA LOGISTICS AIRPORT RAIL PROJECT

TRACK AND INTERMODAL YARD IMPROVEMENTS (PHASES 1 THROUGH 4)

2030 $995,421

OTHER 4PL07029 15 I-15

18MILES N/O BAKER AT AFTON RD OC #54-0364 (111.6)

BISON RD OC #54-0383 AND RASOR RD OC #54-0391 (124.2)

SEISMIC RETROFIT THREE BRIDGES (EA:0G480) 2013 $2,901

OTHER 4PL07030 15 I-15

35 MILES N/O BAKER AT BAILEY RD OC #54-0613 (171.5)

AND YATES WELL RD OC #54-0542 (181.4

SEISMIC RETROFIT TWO BRIDGES (EA:0G370) 2013 $2,923

OTHER 4PL07026 18 SR-18

ALSO SBD-189-0.0/0.37: NR RIM FOREST FROM JCT RTE 18/189

0.5 KM EASTRECONSTRUCT SLOPES, STACK WALL WIDEN LAND & SHOULDER ON RTE 189 AND EXTEND RETAINING WALL ON RTE 18 (EA:1A900)

2012 $9,271

OTHER 4PL07027 395 US-39515.02 KM N/O SHADOW MTN RD (36.2)

1.0 KM S/O KRAMER JCT (45.3)

CORRECT CURVE (EA: 0C130) (PM 36.2-45.3) 2013 $24,268

TDM 4RL04 0 RIDESHARE COUNTYWIDE RIDESHARE ONGOING $4,063

TRANSIT - BUS

4TL204 0ELDERLY & HANDI-CAPPED ASSISTANCE

COUNTYWIDE ELDERLY & HANDICAPPED ASSISTANCE ONGOING $500,612

TRANSIT - BUS

4TL104 0 LOCAL TRANSIT SERVICE COUNTYWIDE COUNTYWIDE LOCAL TRANSIT SERVICE 2030 $1,269,402

TRANSIT - COMMUTER

RAIL4CR04 0

METROLINK COMMUTER RAIL

COUNTYWIDESERVICE EXPANSION; SB LINE 72 DAILY TRAINS, RIVERSIDE LINE 46 DAILY TRAINS, IEOC LINE 28 DAILY TRAINS

2030 $419,178

TRANSIT - COMMUTER

RAIL4TR0101 0

SAN BERNARDINO-RED-LANDS EXTENSION

4TH ST/MT. VERNON GROVE/CENTRALEXTEND RAIL SERVICE TO REDLANDS (10 MILES); RAIL TECHNOLOGY TBD; 15-MIN. FREQ. DAILY

2014 $199,605

TRUCK CLIMBING

4T01003 15 I-15 DEVORE SUMMIT TRUCK CLIMBING LANE (PM 15.9-27.0) 2010 $22,170

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Page 154: Project List - Southern California Association of Governments

152 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

In the process of developing the 2008 RTP, the San Bernardino Associated Governments provided to SCAG a list of arterial improvement projects planned for

implementation in San Bernardino County within the timeframe of the RTP. The projects in this list are included in the 2008 RTP subject to available funding

as identified in the San Bernardino County County RTP Projects list.

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A04415 14TH ST YUCAIPA BL OAK GLEN RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $6,329

4A07155 19TH ST EAST CITY LIMITS CAMPUS WIDEN 19TH ST FROM EAST CITY LIMITS TO CAMPUS FROM 2 TO 4 LANES 2007 $2,560

4A07064 3RD ST VICTORIA AVE PALM AVE WIDEN 3RD ST FROM VICTORIA AVE TO PALM AVE 2009 $5,406

4A07137 3RD ST TIPPECANOE AVE 200' E/O SHIRLEY LNWIDEN 3RD ST FROM TIPPECANOE AVE TO 200' E/O SHIRLEY AVE FROM 2 TO 6 LANES

2009 $3,026

4A07203 3RD ST PALM AV 5TH ST WIDEN 3RD ST FROM PALM AVE. TO 5TH ST. FROM 2 TO 4 LANES 2012 $1,759

4A01185 4TH ST VINEYARD AV CUCAMONGA CREEK WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $943

4A07302 4TH ST PALMETTO SAN ANTONIO WIDEN 4TH ST FROM PALMETTO TO SAN ANTONIO FROM 2 TO 4 LANES 2018 $691

4A07311 4TH ST CAMPUS AV GROVE AV WIDEN 4TH ST FROM CAMPUS AV TO GROVE AV FROM 2 TO 4 LANES 2018 $610

4A01262B 5TH AV CRAFTON AV WABASH AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $3,990

4A01366 5TH ST OAK GLEN RD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $7,684

4A01387 5TH ST VICTORIA AV PALM AV WIDEN FROM 2 TO 4 LANES 2008 $6,638

4A01388 5TH ST TIPPECANOE SHIRLEY WIDEN FROM 2 TO 4 LANES 2008 $4,634

4A07119 5TH ST STERLING VICTORIA WIDEN 5TH ST FROM STERLING TO VICTORIA FROM 2 TO 4 LANES 2012 $3,655

4A07292 5TH ST WARM CREEK PEDLEY WIDEN 5TH ST FROM WARM CREEK TO PEDLEY FROM 2 TO 4 LANES 2030 $1,111

4A01147 7TH AVE RANCHERO RD BEAR VALLEY RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $14,384

4A07062 9TH ST DEL ROSA DR VICTORIA AV WIDEN 9TH ST FROM DEL ROSA DR TO VICTORIA AV FROM 2 TO 4 LANES 2030 $11,676

4A07353 9TH ST TIPPECANOE AVE FAIRFAX LN WIDEN 9TH ST FROM TIPPECANOE AVE TO FAIRFAX LN FROM 2 LANES TO 4 LANES. 2030 $562

4A07334 ACACIA CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF ACACIA AND RIALTO 2035 $1,380

4A04406 ADELANTO RD AUBURN AVE COLUSA RD NEW ROAD, 2 LANES EACH DIR 2018 $12,931

Page 155: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 153

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07226 AGUA MANSA RD RANCHO AV WIDEN AGUA MANSA RD FROM 0080M W, RANCHO AVE E0073 FROM 2 TO 4 LANES 2020 $2,054

4A01188 AIRPORT DR ROCHESTER AV WINEVILLE WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $3,084

4A01237 ALABAMA 3RD ST SAN BERNARDINO AVWIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: RTIP#SBD31719 WIDENS BRIDGE AT SANTA ANA RIVER)

2020 $12,345

4A07017 ALABAMA LUGONIA AV BARTON RD WIDEN ALABAMA FROM LUGONIA AVE TO BARTON RD FROM 4 TO 6 LANES 2018 $17,004

4A07042 ALABAMA N CITY LIMITS PALMETTO WIDEN ALABAMA FROM N CITY LIMITS TO PALMETTO FROM 2 TO 4 LANES 2020 $13,295

4A07073 ALABAMA ST LUGONIA PALMETTO WIDEN ALABAMA ST FROM LUGONIA AVE TO PALMETTO AVE FROM 4 TO 6 LANES 2020 $7,661

4A07175 ALABAMA ST 3RD ST CITY LIMITS WIDEN ALABAMA ST FROM 3RD ST TO CITY LIMITS FROM 2 TO 4 LANES 2030 $5,556

4A07251 ALDER AV VALLEY SAN BERNARDINO WIDEN ALDER AVE FROM VALLEY BLVD TO SAN BERNARDINO AV FROM 2 LANES TO 4 2020 $1,388

4A07349 ALDER AV TAYLOR ST VALLEY BLVD WIDEN ALDER AVE FROM TAYLOR ST TO VALLEY BLVD FROM 2 LANES TO 4 2020 $500

4A07126 ALDER AVE JURUPA N/ SLOVER WIDEN ALDER AVE FROM JURUPA TO N/O SLOVER AVE FROM 2 TO 4 LANES 2020 $4,996

4A07262 ALDER AVE SLOVER N 0023M WIDEN ALDER AVE FROM SLOVER AVE TO .23M NORTH FROM 2 TO 4 LANES 2020 $1,277

4A07322 ALDER AVE JURUPA AVE N .12M WIDEN ALDER AVE FROM JURUPA AVE TO .12M NORTH FROM 2 TO 4 LANES 2020 $666

4A07149 AMARGOSA RD RANCHO RD VILLAGE DRWIDEN AMARGOSA RD FROM RANCHO RD TO VILLAGE DR FROM 0 TO 4 LANES (INCLUDES WASH CROSSING)

2010 $2,957

4A07276 AMARGOSA RD CLOVIS RD RANCHO RD WIDEN AMARGOSA RD FROM CLOVIS RD TO RANCHO ROAD FROM 2 TO 4 LANES 2020 $1,270

4A07281 AMARGOSA RDJUST S/O AIR BASE RD

AT POWER LINE EASEMENT

WIDEN AMARGOSA RD FROM JUST S/O AIR BASE RD TO POWER LINE EASEMENT FROM 1 TO 4 LANES

2020 $1,206

4A07318 AMARGOSA RD2050' S/O AIR BASE RD

AT POWER LINE EASEMENT

WIDEN AMARGOSA RD FROM 2050' S/O AIR BASE DR TO POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $769

4A07319 AMARGOSA RD1780' N/O VILLAGE DRIVE

AT POWER LINE EASEMENT

WIDEN AMARGOSA RD FROM 1780' N/O VILLAGE DR TO CENTER OF LADWP POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $769

200415 AMBOY RD IRONAGE RDNATIONAL TRAILS HWY

RECONSTRUCT ROAD, 1 LANE EACH DIR 2008 $873

4A07210 AMETHYST PALMDALE RD SENECA RD WIDEN AMETHYST RD FROM PALMDALE RD TO SENECA RD FROM 2 TO 4 LANES 2020 $2,387

Page 156: Project List - Southern California Association of Governments

154 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07223 AMETHYST RD RANCHO RD HOPLAND WIDEN AMETHYST RD FROM RANCHO RD TO HOPLAND FROM 0 TO 4 LANES 2010 $1,404

4A07296 AMETHYST RDJUST N/O HOP-LAND

POWER LINE EASE-MENT

WIDEN AMETHYST RD FROM JUST N/O HOPLAND TO POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $1,046

4A01008 APPLE VALLEY RD SR-18 YUCCA LOMA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $42,217

4A01191 ARCHIBALD AV JURUPA AV MISSION BL WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $1,631

4A04189 ARCHIBALD AV EDISON AV SCL WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $7,006

4A04190 ARCHIBALD AV RIVERSIDE DR EDISON AV WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $6,518

4A07277 ARCHIBALD AV CONSTRUCT A BRIDGE ON ARCHIBALD AVE OVER UPPER DEER CREEK 2018 $909

4A07278 ARCHIBALD AV CONSTRUCT A BRIDGE ON ARCHIBALD AVE OVER UPPER DEER CREEK SPILLWAY 2018 $909

4A07326 ARCHIBALD AV CONSTRUCT A BRIDGE ON ARCHIBALD AVE OVER LOWER DEER CREEK 2018 $497

4A07180 ARDEN TERMINI LANKERSHIM EXTEND ARDEN AV TO CONNECT TO LANKERSHIM AVE FROM 0-4 LANES 2030 $5,356

4A07076 ARROW COUNTY LINE CENTRAL WIDEN ARROW FROM COUNTY LINE TO CENTRAL FROM 2 TO 4 LANES 2009 $4,864

4A07066 ARROW BLVD ALDER AVE MAPLE AVE WIDEN FROM 2 TO 4 LANES 2018 $8,180

4A01294 ARROW HWY SAN ANTONIO AV EAST CITY LIMIT WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $14,677

4A07024 ARROW ROUTE HICKORY AV TOKAY AVE WIDEN ARROW ROUTE FROM HICKORY AV TO TOKAY AV FROM 2 TO 4 LANES 2020 $18,152

4A07179 ARROW ROUTE CLAIRMONT CENTRAL AVE WIDEN ARROW ROUTE FROM CLAIRMONT AVE TO CENTRAL AVE FROM 2 TO 4 LANES 2020 $3,109

4A07219 ARROW ROUTE CENTRAL AVE BENSON AVE WIDEN ARROW ROUTE FROM CENTRAL AVE TO BENSON AVE FROM 2 TO 4 LANES 2020 $2,165

4A04405 ASTER RD RANCHO RD AIR EXPRESSWAY NEW ROAD, 1 LANE EACH DIR 2010 $2,053

4A07221 ASTER RD PALMDALE RD OLVINE RD WIDEN ASTER RD FROM PALMDALE RD TO OLVINE RD FROM 0 TO 4 LANES 2020 $2,369

4A07348 ASTER RD OLVINE RD DEL ROSA RD WIDEN ASTER RD FROM OLVINE RD TO DEL ROSA RD FROM 0 TO 4 LANES 2020 $592

4A07170 ASTER ROAD MOJAVE DR CACTUS ROAD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $3,331

4A04400AUBURN/AD-ELANTO

CHAMBERLAIN WAY (CRIPPEN RD)

JONATHAN ST WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $3,162

Page 157: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 155

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07248 AVE E 16TH ST WILSON CK WIDEN AVE E FROM 16TH ST TO WILSON CK ST FROM 2 LANES TO 4 LANES 2018 $1,284

4A04416 AVENUE E 8TH ST BRYANT ST WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $17,723

4A01255 AYALA DR HIGHLAND AV RIVERSIDE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $3,876

4A01310 BALDY MESA RD PALMDALE RD LA MESA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,767

4A07285 BALDY MESA RD LA MESA RD OLIVINE RD WIDEN BALDY MESA RD FROM LA MESA RD TO OLIVINE RD FROM 0 TO 4 LANES 2020 $1,176

4A07145 BANANA AVE JURUPA N/SLOVER WIDEN BANANA AVE FROM JURUPA AVE TO N/SLOVER AVE FROM 2 TO 4 LANES 2020 $4,496

4A01066 BARTON RD S. CITY LIMITS WATERMAN AVWIDEN FROM 2 TO 3 LANES EACH DIR (NOTE: OVERLAPS RTIP#200064 AND SBD78022, RECHE CYN TO WATERMAN)

2010 $1,187

4A01139 BARTON RD HONEY HILLS N.E. CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $2,743

4A01141 BARTON RD I-215 WEST CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $3,344

4A07245 BARTON RDLOMA LINDA CITY LIMITS

CALIFORNIA STWIDEN BARTON RD FROM LOMA LINDA CITY LIMITS TO CALIFORNIA ST FROM 4 TO 6 LANES

2020 $1,554

4A07016 BASE LINE BOULDER AVE CHURCH STWIDEN BASE LINE FROM BOULDER AVE TO CHURCH ST (INCLUDING BRIDGE AT CITY CR.)

2012 $14,981

4A07038 BASE LINE CHURCH AVE BOULDER AVEWIDEN BASE LINE FROM CHURCH AVE TO BOULDER AVE FROM 4 LANES TO 6 LANES (INCLUDING SR 30 BRIDGE WIDENING).

2018 $10,487

4A07046 BASE LINE W.CITY LIMIT PALM AVE WIDEN BASE LINE FROM W.CITY LIMIT TO PALM AVE 2030 $14,735

4A07121 BASELINE WEST CITY LIMITS AYALA/CEDARWIDEN AND RECONSTRUCT BASELINE FROM WEST CITY LIMITS TO AYALA DR FROM 2 TO 4 LANES

2035 $13,528

4A07335 BASELINE CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF BASELINE AND TAMARIND 2035 $1,380

4A07083 BASELINE AV MANGO MAPLE BASELINE AVE FROM MANGO AVE TO MAPLE AVE WIDEN FROM 2 TO 6 LANES 2012 $4,797

4A07212 BASELINE AV SIERRA MANGO BASELINE AVE FROM SIERRA AVE TO MANGO AVE WIDEN FROM 2 TO 6 LANES 2012 $1,599

4A07074BEAR VALLEY CUTOFF

JOSHUA RD SR-18 WIDEN BEAR VALLEY CUOFF FROM JOSHUA RD TO SR-18 FROM 2 TO 6 LANES 2020 $7,594

4A01011 BEAR VALLEY RD APPLE VALLEY RD NAVAJO RD WIDEN FROM 2 TO 3 LANES EACH DIR 2023 $14,231

4A07080 BEAR VALLEY RD NAVAJO JOSHUA RD WIDEN BEAR VALLEY RD FROM NAVAJO RD TO JOSHUA RD FROM 2 TO 4 LANES 2018 $7,010

Page 158: Project List - Southern California Association of Governments

156 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07156 BEAR VALLEY RD US HWY 395ASTER RD (MONTE VISTA RD)

WIDEN BEAR VALLEY FROM US HWY 395 TO ASTER RD FROM 2 LANES TO 6 LANES. 2020 $4,710

4A07355 BEAR VALLEY RD1920' E/O TOPAZ RD

AT POWER LINE EASEMENT

WIDEN BEAR VALLEY RD FROM 1920' E/O TOPAZ RD TO POWER LINE EASEMENT 2020 $427

4A07391 BEAR VALLEY RD1270' W/O TOPAZ RD

AT POWER LINE EASEMENT

WIDEN BEAR VALLEY RD FROM 1270' W/O TOPAZ RD TO POWER LINE EASEMENT FROM 2 TO 4 LANES

2020 $48

4A07104 BEECH RANDALL AV ARROW ROUTE WIDEN BEECH AVE FROM RANDALL AVE TO ARROW ROUTE FROM 2 TO 4 LANES 2020 $5,718

4A07157 BEECH VALLEY RANDALL WIDEN BEECH AVE FROM VALLEY TO RANDALL AVE FROM 2 TO 4 LANES 2020 $4,163

4A07185 BEECH ARROW ROUTE SH-66 WIDEN BEECH AVE FROM ARROW ROUTE TO SH-66 FROM 2 TO 4 LANES 2020 $2,831

4A04407 BELLFLOWER ST MOJAVE DR BARTLETT RD WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $9,052

4A07096 BELLFLOWER ST BEAR VALLEY RD GOODWIN DRWIDEN BELLFLOWER RD FROM BEAR VALLEY RD TO .5 MI. S/O GOODWIN DR FROM 0 LANES TO 4 LANES.

2020 $7,064

4A04192 BELLGRAVE AVE MERRILL AVEMILLIKEN AVE (HAM-NER AVE)

WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $11,569

4A07294 BENSON AVE HOWARD N/STATE WIDEN BENSON AVE FROM HOWARD ST TO STATE ST FROM 2 TO 4 LANES 2020 $944

4A07298 BENSON AVE PHILLIPS BLVD N/ HOWARD WIDEN BENSON AVE FROM PHILLIPS BLVD TO HOWARD ST FROM 2 TO 4 LANES 2020 $888

4A01025 BIG BEAR BL WEST CITY LIMITS EAST CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $20,680

4A07186 BIG BEAR BL VILLAGE DR. EAST CITY LIMITS CONSTRUCTION OF NEW SIDEWALKS AND REPAIR OF EXISTING SIDEWALKS 2010 $1,875

4A07195 BIG BEAR BL WEST CITY LIMITS EAST CITY LIMITS INTERSECTION SIGNALIZATION AND SYNCHRONIZATION 2013 $2,022

4A07241 BLOOMINGTON AVE CEDAR LARCH WIDEN BLOOMINGTON AVE FROM CEDAR TO LARCH FROM 2 TO 4 LANES 2020 $1,665

4A07009 BOULDER AVE BASE LINE 5TH ST WIDEN BOULDER AVE FROM 2 LANES TO 4 LANES (INCLUDING BRIDGE). 2010 $18,407

4A07168 BOULDER AVE 5TH ST S. CITY LIMITSWIDEN BOULDER AVE FROM 5TH ST TO S. CITY LIMITS FROM 2 TO 4 LANES (INCLUD-ING BRIDGE)

2018 $2,775

4A04417 BRYANT STNORTH CITY LIMITS

COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $17,426

Page 159: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 157

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07304 BRYANT ST JUNIPER AVE SR-38 WIDEN BRYANT ST FROM JUNIPER AVE TO SR-38 FROM 2 TO 4 LANES 2020 $833

4A07192 C STREET0007M W, JACK-SON

E/0007M,TEJON AVEWIDEN C STREET FROM 0007M W, JACKSON E/0007M E, TEJON AVE FROM 2 TO 4 LANES

2020 $2,665

4A01256 CACTUS AV VIRGINIA BASELINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $465

4A07336 CACTUS AV CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF CACTUS AND RANDALL 2007 $325

4A07337 CACTUS AV CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF CACTUS AND WALNUT 2007 $325

4A07143 CALABASH AVE WHITTRAM AVE N/FOOTHILL BLVDWIDEN CALABASH AVE FROM WHITTRAM AVE TO N/FOOTHILL BLVD FROM 2 TO 4 LANES

2020 $4,552

4A01367 CALIFORNIA ST YUCAIPA BLVD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,047

4A04238 CALIFORNIA ST LUGONIA AV SAN BERNARDINO AV WIDEN FROM 1 TO 3 LANES EACH DIR 2010 $985

4A07184 CALIFORNIA ST REDLANDS BL I-10 WIDEN CALIFORNIA ST FROM REDLANDS BL TO I-10 FROM 5 TO 6 LANES 2010 $1,914

4A07190 CALIFORNIA ST SAN BERNARDINO PALMETTOWIDEN CALIFORNIA ST FROM SAN BERNARDINO AVE TO PALMETTO AVE FROM 2 TO 6 LANES

2020 $2,776

4A07291 CALIFORNIA ST ALMOND AVESAN BERNARDINO AVE

WIDEN CALIFORNIA ST FROM ALMOND AVE TO SAN BERNARDINO AVE FROM 3 TO 6 LANES

2020 $999

4A01368 CALIMESA BL OAK GLEN RD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $2,296

4A04193 CAMPUS AV RIVERSIDE DR MERRILL AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,889

4A04295 CAMPUS AV 16TH ST 18TH ST WIDEN FROM 1 TO 2 LANES EACH DIR 2007 $1,850

4A07139 CAMPUS AV FRANCIS HOLT WIDEN CAMPUS FROM FRANCIS TO HOLT FROM 2 TO 4 LANES 2018 $3,764

4A07181 CAMPUS PKWY KENDALL I-215CAMPUS PKWY (PEPPER-LINDEN) EXTENSION FROM KENDALL TO I-215. CONSTRUCT 4 LANES AND A PARTIAL DIAMOND INTERCHANGE

2020 $2,573

4A04084 CASA GRANDE AVELYTLE CREEK KNOX

SIERRA AV NEW ROAD, 2 LANES EACH DIR 2010 $5,205

4A04085 CASA GRANDE AVE SIERRA AV MANGO AV NEW ROAD, 2 LANES EACH DIR 2010 $1,010

4A01086CASMALIA AVE (CARTER AVE)

SIERRA AV MANGO AV NEW WIDEN ROAD, 2 LANES EACH DIR 2010 $1,554

Page 160: Project List - Southern California Association of Governments

158 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A01026 CENTRAL AV FRANCIS AV RIVERSIDE DR WIDEN FROM 3 TO 4 LANES EACH DIR 2020 $4,562

4A01027 CENTRAL AV CHINO AVE EL PRADOWIDEN FROM 2 TO 3 LANES EACH DIR (NOTE: OVERLAPS RTIP#SBD41236 SBD31933 FROM SR-71 TO EL PRADO)

2020 $3,064

4A01267 CENTRAL AVMONTCLAIR CITY LIMIT

CHINO CITY LIMIT WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $2,314

4A01296 CENTRAL AV FOOTHILL BL BENSON AV NEW ROAD, 2 LANES EACH DIR 2020 $20,939

4A01297 CENTRAL AVSOUTH CITY LIMITS

ARROW ROUTE WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $6,967

4A01266 CENTRAL AVE PHILLIPS BLVD STATE ST WIDEN CENTRAL AVE FROM PHILLIPS BLVD TO STATE ST FROM 4 TO 6 LANES 2020 $3,442

4A07015 CENTRAL RD BEAR VALLEY WAALEW WIDEN CENTRAL RD FROM BEAR VALLEY RD TO WAALEW RD FROM 2 TO 4 LANES 2020 $24,863

4A07091 CENTRAL RD ROUNDUP WY N/ POPPY WIDEN CENTRAL RD FROM ROUNDUP WY TO N/ POPPY RD FROM 2 TO 4 LANES 2020 $6,661

4A07048 CERES AVE MERRIL CATAWBA WIDEN CERES AVE FROM MERRILL AVE TO CATAWBA AVE FROM 2 TO 4 LANES 2020 $10,103

4A07040 CHERRY VALLEY FOOTHILL WIDEN CHERRY AV FROM VALLEY TO FOOTHILL BLVD FROM 4 TO 6 LANES 2020 $12,823

4A01089 CHERRY AV JURUPA AV SLOVER AV WIDEN FROM 1 TO 3 LANES EACH DIR 2010 $4,713

4A04087 CHERRY AV HIGHLAND I-15 WIDEN FROM 1 TO 3 LANES EACH DIR 2012 $3,101

4A04091 CHERRY AV VALLEY BL SAN BERNARDINO AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $3,734

4A04194 CHINO AV EUCLID AV MILLIKEN BL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $14,829

4A01028 CHINO AVE CENTRAL AVE MOUNTAIN AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $3,909

4A01029 CHINO AVE CENTRAL AVE600' EAST OF MONTE VISTA

WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $3,618

4A01030 CHINO AVE FERN AV EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $4,487

4A01031 CHINO AVE SR-71 EAST END AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2035 $4,199

4A07205 CHINO AVE MOUNTAIN FERN WIDEN CHINO FROM MOUNTAIN TO FERN FROM 2 TO 4 LANES 2018 $1,952

4A01062 CHINO HILLS PKWY RAMONA600 FT. EAST OF RAMONA

WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $1,532

Page 161: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 159

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A01239 CHURCH ST COLTON AV REDLANDS BLWIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: RTIP#SBD59012 WIDENS FROM COL-TON TO CLARK)

2012 $4,858

4A01093 CITRUS AV I-15 SUMMIT AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $7,468

4A01094 CITRUS AVSAN BERNARDINO AV

VALLEY BL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,867

4A01096 CITRUS AV SLOVER AV JURUPA AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $5,601

4A04095 CITRUS AVSAN BERNARDINO AV

FOOTHILL BLVD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,427

4A04240 CITRUS AV DEARBORN ST WABASH AVWIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: RTIP#SBD58044 WIDENS FROM AU-BURN CT TO WABASH)

2012 $1,171

4A07331 CIVIC DR MOJAVE DR ROY RODGERS DR WIDEN CIVIC DR FROM MOJAVE DR. TO ROY ROGERS DR. FROM 0 TO 4 LANES 2020 $617

4A07081 COLSTON TIPPECANOE MT. VIEW WIDEN COLSTON AV FROM TIPPECANOE TO MT. VIEW FROM 2 TO 4 LANES 2030 $12,223

4A07108 COLTON AVE WABASH AV CRAFTON AV WIDEN COLTON AV FROM WABASH AV TO CRAFTON AV FROM 2 TO 4 LANES 2020 $5,607

4A07027 COMMERCE WAY PICO MAIN ST. WIDEN COMMERCE WY FROM PICO AVE TO MAIN ST FROM 2 TO 4 LANES 2012 $11,917

4A07085 COMMERCE WAY900 FT. NORTH OF DE BERRY

PICO WIDEN COMMERCE WY FROM 900' N/O DEBERRY RD TO PICO AV FROM 2 TO 4 LANES 2010 $4,661

4A07150 CONE CAMP GREENSPOT SOUTH CITY LIMITCONSTRUCT NEW STREET CONE CAMP FROM GREENSPOT RD TO SOUTH CITY LIM-ITS FROM 0 TO 2 LANES (INCLUDING ENVIRONMENTAL)

2030 $7,624

4A07093 CONNECTOR 3RD 5TH BUILD A CONNECTOR ROAD BETWEEN 3RD ST AND 5TH ST FROM 0 TO 4 LANES 2020 $7,514

4A01013 CORWIN RD SR-18 DALE EVANS PKWY WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $17,720

4A01370 COUNTY LINE RD I-10 BRYANT ST WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $2,348

4A07114 COYOTE CNYN SADDLEBACK I-15 COYOTE CANYON RD FROM SADDLEBACK RD TO I-15 WIDEN FROM 0 TO 4 LANES 2018 $4,481

4A07028CRAFTON HILLS PARKWAY

WABASH AVEOVERCREST/TEN-NESSEE

PAVE DIRT ROAD, 1 LANE EACH DIR 2020 $16,653

Page 162: Project List - Southern California Association of Governments

160 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07238CRAFTON HILLS PKWY

WABASH AVE E/CRAFTON PUDWIDEN CRAFTON HILLS PKWY FROM WABASH AVE TO E/CRAFTON PUD FROM 0 TO 2 LANES

2035 $4,331

4A07328 CUNNINGHAM ST 9TH ST BASE LLINE WIDEN CUNNINGHAM 2018 $475

4A01241 CYPRESS AV I-10 CITRUS AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $641

4A04098 CYPRESS AVSOUTH HIGHLAND AV

SIERRA LAKES PARKWAY

NEW OVERCROSSING AT 210, 2 LANES EACH DIR 2020 $14,987

4A07007 DALE EVANS PKWY THUNDERBIRD RD I-15WIDEN DALE EVANS PKWY FROM THUNDERBIRD RD TO I-15 FROM 2 LANES TO 4 LANES.

2020 $33,150

4A07130DALEY CANYON AT SH 18

IN SAN BERNAR-DINO COUNTY

INTERSECTION IMPROVEMENTS 2020 $4,934

4A07063 DEEP CREEK RD BEAR VALLEY RD SITTING BULL RDWIDEN DEEP CREEK RD FROM BEAR VALLEY RD TO SITTING BULL RD FROM 0 TO 4 LANES

2023 $10,725

4A07069 DEEP CREEK RDTUSSING RANCH RD

BEAR VALLEY RDWIDEN DEEP CREEK RD FROM TUSSING RACH RD TO BEAR VALLEY RD FROM 2 TO 4 LANES

2018 $7,647

4A07010 DEL ORO RD APPLE VALLEY RD CENTRAL RDWIDEN DEL ORO RD FROM APPLEY VALLEY RD TO CENTRAL RD FROM 0 LANES TO 2 LANES

2018 $26,764

4A07232 DEL ROSA 6TH ST 9TH ST WIDEN DEL ROSA AVE FROM 6TH ST TO 9TH ST FROM 2 TO 4 LANES 2012 $1,380

4A07380 DEL ROSA AVE DEL ROSA DRSAN BERNARDINO CITY LIMITS

WIDEN DEL ROSA AVE FROM DEL ROSA DR TO SAN BERNARDINO CITY LIMITS FROM 2 TO 4 LANES

2020 $222

4A07214 DEL ROSA DR 3RD ST N.CITY LIMIT WIDEN DEL ROSA DR FROM 3RD ST TO N.CITY LIMIT FROM 2 LANES TO 4 LANES. 2018 $1,832

4A07256 DEL ROSA DRIVE BASE LINE RD PACIFIC ST WIDEN DEL ROSA DR FROM BASE LINE RD TO PACIFIC ST FROM 2 TO 4 LANES 2020 $1,388

4A07125 DEVORE RD I-215 OFF RAMP KENWOOD DR WIDEN DEVORE RD FROM I-215 TO KENWOOD DR FROM 2 TO 4 LANES 2020 $4,940

4A07270 DEVORE RD CAJON BLVDN/O I-215 OFF RAMPS

WIDEN DEVORE RD FROM CAJON BLVD TO N/O I-215 OFF RAMPS FROM 2 TO 4 LANES

2020 $1,166

4A07300 DEVORE RD KENWOOD DR FOOTHILL DR WIDEN DEVORE RD FROM KENWOOD DR TO FOOTHILL DR FROM 2 TO 4 LANES 2020 $888

4A07088 DOS PALMAS PACOIMA RD BOREGO RD WIDEN DOS PALMAS RD FROM PACOIMA RD TO BOREGO RD FROM 2 TO 4 LANES 2020 $6,883

Page 163: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 161

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07220 DOS PALMAS SAN MATEO RD PACOIMA WIDEN DOS PALMAS RD FROM SAN MATEO RD TO PACOIMA RD FROM 2 TO 4 LANES 2020 $2,165

4A01099DUNCAN CANYON RD

CITRUS AV SIERRA AV NEW ROAD, 2 LANES EACH DIR 2018 $5,601

4A07297DUNCAN CANYON RD

.33 M W/O I-15 E/O I-15 WIDEN DUNCAN CANYON RD FROM .33 M W/O I-15 TO E/O I-15 2020 $888

4A07037 E ST MAIN ST I ST WIDEN E ST FROM MAIN ST TO I ST FROM 2 TO 4 LANES 2018 $11,881

4A07133 EAST END AVE CHINO AVE WALNUT AVE WIDEN EAST END AVE FROM CHINO AVE TO WALNUT AVE FROM 2 TO 4 LANES 2020 $4,774

4A07146 EAST END AVE PHILADELPHIA AV PHILLIPS BLVD WIDEN EAST END AV FROM PHILADELPHIA AV TO PHILLIPS BLVD FROM 2 TO 4 LANES 2020 $4,441

4A07333 EAST END AVE PHILLIPS BLVD GRAND AV WIDEN EAST END AV FROM PHILLIPS BLVD TO GRAND AV FROM 2 TO 4 LANES 2035 $1,380

4A01032 EDISON AV CENTRAL AV EUCLID AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $5,068

4A01033 EDISON AV PIPELINE RAMONA AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $3,163

4A04196 EDISON AV MILL CREEK MILLIKEN BL WIDEN FROM 1 TO 4 LANES EACH DIR 2018 $6,844

4A04197 EDISON AV EUCLID AV WALKER AV WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $11,470

4A04198 EDISON AV VINEYARD AV MILL CREEK WIDEN FROM 1 TO 4 LANES EACH DIR 2018 $3,096

4A04199 EDISON AV WALKER AV VINEYARD AV WIDEN FROM 1 TO 4 LANES EACH DIR 2018 $20,205

4A07174 EIGHT ST CONSTRUCT A BRIDGE ON EIGHT ST OVER CUCAMONGA CREEK 2018 $2,627

4A07099 EL EVADO LA BRISA RD ANACAPA RD WIDEN EL EVADO RD FROM LAS BRISA RD TO ANACAPA RD FROM 2 TO 4 LANES 2020 $5,995

4A07307 EL EVADO RD1260' N/O HOOK BL

AT POWER LINE EASEMENT

WIDEN EL EVADO RD FROM 1260' N/O HOOK BL TO POWER LINE EASEMENT 2020 $929

4A07330 EL EVADO RD510' S/O RANCHO RD

AT POWER LINE EASEMENT

WIDEN EL EVADO RD FROM 510' S/O RANCHO RD TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES

2020 $627

4A01004 EL MIRAGE RD RICHARDSON RD US-395 WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $10,632

4A01270 EL MIRAGE RD KOALA RD LA COUNTY LINEWIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: #4A01004 IN ADELANTO WIDENS FROM RICHARDSON TO US-395 TO 4 LANES EACH DIR IN 2015)

2020 $39,544

4A04408 EL MIRAGE RD US-395 ADELANTO RD NEW ROAD, 2 LANES EACH DIR 2010 $3,995

4A01063 EL PRADO RD CENTRAL AV PINE AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,871

Page 164: Project List - Southern California Association of Governments

162 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07087 EL RIVINO RD CEDAR AV AGUA MANSA RD WIDEN EL RIVINO RD FROM CEDAR AV TO AGUA MANSA RD FROM 2 TO 4 LANES 2020 $6,883

4A07094 ELECTRIC AVE MT. VIEW NORTHPARK BLVD WIDEN ELECTRIC AVE FROM MT VIEW AVE TO NORTHPARK BLVD FROM 2 TO 4 LANES 2030 $11,112

4A07209 EMERALD RD PALMDALE RD SENECA RD WIDEN EMERALD RD FROM PALMDALE RD TO SENECA RD FROM 2 TO 4 LANES 2020 $2,442

4A01149 ESCONDIDO AV MAIN ST SULTANA ST WIDEN FROM 1 TO 3 LANES EACH DIR 2012 $1,846

4A04200 EUCALYPTUS AV EUCLID AV WALKER AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $692

4A07358 EUCALYPTUS AV CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF EUCALYPTUS AND MOUNTAIN 2009 $203

4A01151 EUCALYPTUS ST I-15 PEACH AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $30,110

4A07249 EUCALYPTUS ST AMARGOSA RD AMETHYST RD WIDEN EUCALYPTUS ST FROM AMARGOSA RD TO AMETHYST RD FROM 0 TO 6 LANES 2020 $1,648

4A07286 EUCALYPTUS ST MESA VIEW DR BELLFLOWER RDWIDEN EUCALYPTUS ST FROM MESA VIEW DR. TO BELLFLOWER RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY)

2020 $1,176

4A07287 EUCALYPTUS ST US-395 MESA VIEW DR. WIDEN EUCALYPTUS ST FROM US 395 TO MESA VIEW DR. FROM 0 TO 4 LANES 2020 $1,176

4A04035 EUCLID AV KIMBALL PINE WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $3,722

4A04036 EUCLID AV PINE SR71 WIDEN FROM 1 TO 4 LANES EACH DIR 2035 $48,831

4A04201 EUCLID AV RIVERSIDE DR MERRILL AV WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $7,985

4A07118 EUCLID AVE 24TH MOUNTAIN AV WIDEN EUCLID AVE FROM 24TH ST TO MOUNTAIN AVE FROM 2 TO 4 LANES 2020 $5,329

4A07012 EVANS ST. PHASE I REDLANDS BLVD. UPRR NEW ROAD, 2 LANES EACH DIR 2012 $17,819

4A07002 EVANS ST. PHASE II UPRR BARTON RD. NEW ROAD, 2 LANES EACH DIR 2014 $40,719

4A07057FAIRFIELD RANCH ROAD

SKATE PARK PINE AVENUEEXTEND THE THE EXISTING FAIRFIELD RANCH ROAD TO PINE AVENUE, 2 LANES WITH BIKE LANES

2014 $6,950

4A04067 FAIRWAY DR SPERRY DR CITY LIMITS WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $2,071

4A07006 FALCHION RD I-15 DALE EVANS PKWY WIDEN FALCHION RD FROM I-15 TO DALE EVANS PKWY FROM 0 TO 4 LANES 2009 $21,079

4A07161 FALCHION RD DALE EVANS NAVAJO WIDEN FALCHION RD FROM DALE EVANS PKWY TO NAVAJO RD FROM 0 TO 6 LANES 2018 $3,823

4A07361 FERN CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF FERN AND RIVERSIDE 2008 $183

4A01262A FIFTH AVE WABASH AVE CRAFTON AVE WIDEN FIFTH AV FROM WABASH AV TO CRAFTON AV FROM 2 TO 4 LANES 2020 $5,329

Page 165: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 163

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07230 FIFTH ST PEDLEY RD TIPPECANOE AV WIDEN FIFTH ST FROM PEDLEY RD TO TIPPECANOE AVE FROM 2 TO 4 LANES 2020 $1,943

4A07234 FIFTH ST WATERMAN AVE PEDLEY RD WIDEN FIFTH ST FROM WATERMAN AVE TO PEDLEY RD FROM 2 TO 4 LANES 2020 $1,887

4A07162 FLORIDA ST GREENSPOT RD GARNET ST WIDEN FLORIDA ST FROM GREENSPOT RD TO GARNET ST FROM 2 TO 4 LANES 2020 $3,941

4A04101 FONTANA AVVALLEY BL POPLAR

MERRILL WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,834

4A07014 FONTANA AVE VALLEY POPLAR WIDEN FONTANA AVE FROM VALLEY BLVD TO POPLAR AVE FROM 2 TO 4 LANES 2020 $24,425

4A07098 FOOTHILL COUNTY LINE CENTRAL WIDEN FOOTHILL FROM COUNTY LINE TO CENTRAL FROM 2 TO 6 LANES 2030 $9,500

4A01298 FOOTHILL BL BENSON AV EAST CITY LIMIT WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $32,935

4A04102 FOOTHILL BL HEMLOCK ALMERIA WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $10,082

4A01243 FORD ST 5TH AVE I-10 WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,833

4A01271 FORT IRWIN RD I-15 FT IRWIN BOUNDARY WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $15,960

4A01272 FRANCIS EAST END TELEPHONE WIDEN FRANCIS FROM EAST END TO TELEPHONE FROM 2 TO 4 LANES 2020 $9,048

4A01037 FRANCIS AV WEST CITY LIMIT BENSON AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,495

4A01273 FRANCIS AV LA COUNTY LINE CHINO CITY LIMIT WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $7,703

4A01203 FRANCIS ST BENSON AV MOUNTAIN AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $192

4A07208 FRANCIS ST CONSTRUCT A BRIDGE ON FRANCIS ST OVER CUCAMONGA CREEK 2018 $1,986

4A07227 FRANCIS ST CONSTRUCT A BRIDGE ON FRANCIS ST OVER WEST CUCAMONGA CREEK 2018 $1,623

4A01104FRONTAGE RD (I-15)

DUNCAN CANYON RD

RIVERSIDE AV NEW ROAD, 2 LANES EACH DIR 2018 $6,535

4A07176 G ST MILL ST RIALTO AV WIDEN "G" ST FROM MILL ST TO RIALTO AVE FROM 2 TO 4 LANES 2020 $3,315

4A07169 GARNET ST NEWPORT FLORIDA ST WIDEN GARNET ST FROM NEWPORT AV TO FLORIDA ST FROM 2 TO 4 LANES 2020 $3,331

4A07314 GARNET ST SR 38 NEWPORT AVE WIDEN GARNET ST FROM SR 38 TO NEWPORT AVE FROM 2 TO 4 LANES 2020 $722

4A07320 GARNET ST MENTONE AV SR 38 WIDEN GARNET ST FROM MENTONE AV TO SR 38 FROM 2 TO 4 LANES 2020 $666

Page 166: Project List - Southern California Association of Governments

164 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07352 GARNET ST.08 S/O MENTONE AVE

MENTONE AVEWIDEN GARNET ST FROM .08 M S/O MENTONE AV TO MENTONE AV FROM 2 TO 4 LANES

2020 $444

4A07018 GLEN HELEN PKWY LYTLE CREEK RD NELY/CAJONWIDEN GLEN HELEN PKWY FROM LYTLE CREEK TO NELY/CAJON BLVD FROM 2 TO 4 LANES

2020 $20,484

4A07036 GLEN HELEN PKWY LYTLE CREEK RD I-15 WIDEN GLEN HELEN PKWY FROM LYTLE CREED RD TO I-15 FROM 2 TO 4 LANES 2020 $13,878

4A07127 GLEN HELEN RD GLEN HELEN PKWY NW/END WIDEN GLEN HELEN RD FROM GLEN HELEN PKWY TO NW/END FROM 2 TO 4 LANES 2020 $4,996

4A07144 GRAND AVE EAST END RD RAMONA AVE WIDEN GRAND AVE FROM EAST END RD TO RAMONA AVE FROM 2 TO 4 LANES 2020 $4,552

4A07246 GRAND AVE GREENWOOD WY MONTE VISTA WIDEN GRAND AVE FROM GREENWOOD WY TO MONTE VISTA 2020 $1,554

4A07011 GREEN TREE BVD HESPERIA RD RIDGECREST RD AT ATS&F RAILROAD CONSTRUCT 4-LANE BRIDGE; WIDEN GREEN TREE 0 TO 4 LANES 2020 $29,200

4A01173 GREENSPOT RD GOLD BUCKLE SANTA ANA RIVER WIDEN FROM 2 TO 4 LANES (NOTE: RTIP#200212 WIDENS BRIDGE PORTION) 2018 $23,841

4A07019 GREENSPOT RD SANTA ANA RIVER BRYANTCONSTRUCT NEW STREET, GREENSPOT RD TO CONNECT TO BRYANT FROM 0 TO 2 LANES WITHIN CITY LIMIT (INCLUDING BRIDGE)

2020 $21,223

4A07044 GREENSPOT RD ORANGE ST SR 30WIDEN 5TH STREET FROM BOULDER AVENUE TO SR-30 FROM 2 TO 6 LANES (IN-CLUDING SR-30 UNDERCROSSING)

2012 $7,987

4A07213 GREENSPOT RD SANTA ANA RIVER CITY LIMIT WIDEN GREENSPOT RD FROM SANTA ANA RIVER TO CITY LIMIT 2020 $2,383

4A07236 GREENSPOT RD ORANGE ST CHURCH ST WIDEN 5TH ST FROM ORANGE ST TO CHURCH ST 2010 $1,223

4A07295 GREENSPOT RD.19 M N/O FLORIDA ST

FLORIDA STWIDEN GREENSPOT RD FROM .19 M N/O FLORIDA ST TO FLORIDA ST FROM 2 TO 4 LANES

2020 $944

4A04206 GROVE AV RIVERSIDE DR MERRILL AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $812

4A04207 GROVE AV AIRPORT DR HOLT BLVD WIDEN EXISTING GRADE SEPARATION FROM 2 TO 3 LANES EACH DIR 2018 $13,326

4A07263 H ST KENDALL DR 40TH ST WIDEN "H" ST FROM KENDALL DR TO 40TH ST FROM 2 TO 4 LANES 2030 $2,222

4A04208 HAVEN AV RIVERSIDE DR BELLEGRAVE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,462

4A04038 HELLMAN AVE KIMBALL CHINO CORONA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $5,735

4A07129 HESPERIA MESQUITE LIME WIDEN HESPERIA RD FROM MESQUITE TO LIME FROM 0 TO 4 LANES 2030 $6,706

Page 167: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 165

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07206 HESPERIA LIME MAIN WIDEN HESPERIA RD FROM LIME TO MAIN FROM 2 TO 4 LANES 2018 $3,879

4A01152 HESPERIA RD BEAR VALLEY YUCCA ST WIDEN FROM 1 TO 2 LANES EACH DIR 2014 $9,889

4A01244 HIGHLAND AV REDLANDS BL FORD ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $3,679

4A07261 HIGHLAND AV CAJON ST REDLANDS BL WIDEN HIGHLAND FROM CAJON TO REDLANDS BL FROM 3 TO 4 LANES 2035 $3,397

4A07136 HIGHLAND AVE CHURCH ST BOULDER AVE WIDEN HIGHLAND AVE FROM CHURCH ST TO BOULDER AVE FROM 2 TO 4 LANES 2018 $3,837

4A07258 HIGHLAND AVE OLIVE ST800' W/O VICTORIA AVE

WIDEN HIGHLAND AVE FROM OLIVE ST TO 800' W/O VICTORIA AVE 2020 $1,456

4A07280 HIGHLAND AVE BOULDER AVE200' W/O DENAIR AVE

WIDEN HIGHLAND AVE FROM BOULDER AVE TO 200' W/O DENAIR AVE 2020 $1,156

4A01210 HOLT BL BENSON AV VINEYARD AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $30,114

4A07035 HOLT BLVD CONSTRUCT A BRIDGE ON HOLD BLVD OVER WEST CUCAMONGA CREEK 2018 $11,528

4A07327 HOLT BLVD CONSTRUCT A BRIDGE ON HOLT BLVD OVER CUCAMONGA CREEK 2018 $497

4A01325 HOOK BL US-395 AMETHYST RD WIDEN HOOK FROM US 395 TO 0.4 MILES WEST OF AMETHYST 0 TO 4 LANES 2020 $1,859

4A07383 HOOK BLVD1680' W/O EMER-ALD RD

AT POWER LINE EASEMENT

WIDEN HOOK BLVD FROM 1680' W/O EMERALD RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $155

4A07389 HOOK BLVD 1820' E/O US-395AT POWER LINE EASEMENT

WIDEN HOOK BLVD FROM 1820' E/O US-395 TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $102

4A07309 HOPLAND ST US-395 COBALT RDWIDEN HOPLAND ST FROM US-395 TO COBALT RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY)

2020 $889

4A07387 HOPLAND STJUST W/O AM-ETHYST RD

AT POWER LINE EASEMENT

WIDEN HOPLAND ST FROM JUST W/O AMETHYST RD TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES

2020 $112

4A01212 INLAND EMPIRE BL VINEYARD AV ARCHIBALD AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $8,095

4A07067 INSTITUTION ROADIN SAN BERNAR-DINO COUNTY

ELEVATE ROADWAY 2020 $8,224

4A01107 JURUPA AV ETIWANDA AV LIVE OAK SIERRA WIDEN FROM 1 TO 3 LANES EACH DIR 2012 $19,190

4A04108 JURUPA AVSIERRA AV TAMA-RIND

ALDER AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,242

4A07165 JURUPA AV LOCUST AVE CEDAR AVE WIDEN JURUPA AVE FROM LOCUST AVE TO CEDAR AVE FROM 2 TO 4 LANES 2020 $3,664

Page 168: Project List - Southern California Association of Governments

166 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07111 JURUPA AVE CEDAR AVE LILAC AVE WIDEN JURUPA AVE FROM CEDAR AVE TO LILAC AVE FROM 2 TO 4 LANES 2020 $5,551

4A07250 JURUPA AVE TAMARIND ALDER WIDEN JURUPA AVE FROM TAMARIND AVE TO ALDER AVE FROM 2 TO 6 LANES 2020 $1,443

4A07299 JURUPA AVE LILAC AVE WILLOW AVE WIDEN JURUPA AVE FROM LILAC AVE TO WILLOW AVE FROM 2 TO 4 LANES 2020 $888

4A01213 JURUPA ST TURNER AV ARCHIBALD AV WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $4,364

4A01068 K AND L STREETS 3RD ST 5TH ST WIDEN TO 1 LANE EACH DIR 2010 $355

4A07060 KENDALL DR PALM AVE CAJON BLVD WIDEN KENDALL DR FROM PALM AVE TO CAJON BLVD FROM 2 TO 4 LANES 2020 $8,826

4A07086 KENDALL DR CAMBRIDGE PINE WIDEN KENDALL DR FROM CAMBRIDGE AVE TO PINE AVE FROM 2 TO 4 LANES 2030 $12,154

4A01377 KICKAPOO TRAIL SR-62 YUCCA TRAIL NEW ROAD, 1 LANE EACH DIR 2010 $239

4A07052 KIMBALL EUCLID HELLMAN WIDEN KIMBALL FROM EUCLID TO HELLMAN FROM 2 TO 4 LANES 2018 $7,318

4A07366 KIMBALL CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF KIMBALL AND CAMPUS 2015 $213

4A07367 KIMBALL CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF KIMBALL AND EARNHART 2015 $213

4A07368 KIMBALL CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF KIMBALL AND MAIN 2015 $213

4A07369 KIMBALL CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF KIMBALL AND MILLCREEK 2015 $213

4A07370 KIMBALLCONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF KIMBALL AND WALKER/FLIGHT

2015 $213

4A04017 KIOWA RD YUCCA LOMA RD BEAR VALLEY RD WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $5,907

4A07070 KIOWA RD OCOTILLO RD BEAR VALLEY RD WIDEN KIOWA RD FROM OCOTILLO RD TO BEAR VALLEY RD FROM 2 TO 4 LANES 2023 $9,900

4A04409 KOALA RD PALMDALE RD HOLLY RD NEW ROAD, 2 LANES EACH DIR 2030 $12,470

4A04410 KOALA RD HOLLY RD EL MIRAGE RD WIDEN FROM 2 TO 4 LANES EACH DIR 2030 $17,292

4A04411 KOALA RD EL MIRAGE RD DESOTO RD NEW ROAD, 1 LANE EACH DIR 2030 $4,455

4A01069 LA CADENA DR RANCHO AV SOUTH CITY LIMITS WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $4,662

4A07092 LA MESA RD BALDY MESA CANTINAWIDEN LA MESA RD FROM BALDY MESA TO CANTINA DR FROM 0 LANES TO 4 LANES.

2020 $7,371

Page 169: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 167

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07224 LA MESA RD CAUGHLIN RD WHITE RD WIDEN LA MESA RD FROM CAUGHLIN RD TO WHITE RD FRM 0 TO 4 LANES 2020 $2,354

4A07288 LA MESA RD WHITE RD BALDY MESA RDWIDEN LA MESA RD FROM WHITE RD TO BALDY MESA RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY)

2020 $1,176

4A07382 LA MESA RD2010' E/O TOPAZ RD

AT POWER LINE EASEMENT

WIDEN LA MESA RD FROM 2010' E/O TOPAZ RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $183

4A07231 LANKERSHIM AV 5TH ST 1200' N/O 9TH ST WIDEN LANKERSHIM AV FROM 5TH ST TO 1200' N/O 9TH ST 2020 $2,036

4A01293LEAR AV/SUNFAIR RD

POLELINE RD MCAS NEW ROAD, 2 LANES EACH DIR 2012 $22,765

4A01155 LEMON ST MAUNA LOA MOHAVE RIVER WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $14,469

4A07338 LILAC CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF LILAC AND RIALTO 2035 $1,380

4A07134 LITTLE LEAGUE DR PALM AVE I-215 FRONTAGE RDWIDEN LITTLE LEAGUE DR FROM PALM AVE TO I-215 FRONTAGE RD FROM 2 TO 4 LANES

2030 $8,334

4A07177 LITTLE LEAGUE DRI-215 FRONTAGE RD

BELMONT AVEWIDEN LITTLE LEAGUE DR FROM I-215 FRONTAGE RD TO BELMONT AVE (INCLUDING CULVERT) FROM 2 TO 4 LANES

2030 $5,556

4A07308LITTLE MOUNTAIN DR

DEVIL CREEK CHANNEL

48TH STWIDEN LITTLE MIOUNTAIN RD FROM DEVIL CREEK CHANNEL TO 48TH ST FROM 2 TO 4 LANES

2030 $1,389

4A07187 LIVE OAK AVE ARROW ROUTE FOOTHILL WIDEN LIVE OAK AVE FROM ARROW ROUTE TO FOOTHILL FROM 2 TO 4 LANES 2020 $2,776

4A01245 LIVE OAK CYN RDSAN TIMOTEO CYN RD

EAST CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $17,451

4A01371 LIVE OAK CYN RD WEST CITY LIMIT I-10 WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,636

4A04110 LIVE OAK RD VALLEY BL MERRILL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $7,405

4A07183 LOCUST AVE JURUPA AV SANTA ANA AV WIDEN LOCUST AVE FROM JURUPA AVE TO SANTA ANA AVE FROM 2 TO 4 LANES 2020 $2,887

4A07188 LOCUST AVESAN BERNARDINO AVE

RANDALL AVEWIDEN LOCUST AVE FROM SAN BERNARDINO AVE TO RANDALL AVE FROM 2 TO 4 LANES

2020 $2,776

4A07189 LOCUST AVE VALLEY BLVDSAN BERNARDINO AVE

WIDEN LOCUST AVE FROM VALLEY BLVD TO SAN BERNARDINO AVE FROM 2 TO 4 LANES

2020 $2,776

4A07193 LOCUST AVE SANTA ANA AV SLOVER AVE WIDEN LOCUST AVE FROM SANTA ANA AVE TO SLOVER AVE FROM 2 TO 4 LANES 2020 $2,665

Page 170: Project List - Southern California Association of Governments

168 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07315 LOCUST AVE SEVENTH ST ELEVENTH ST WIDEN LOCUST AVE FROM SEVENTH ST TO ELEVENTH ST FROM 2 TO 4 LANES 2020 $722

4A01246 LUGONIA AV TENESSEE ST ORANGE ST WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $6,983

4A07229 LUGONIA AVE CALIFORNIA ALABAMA WIDEN LUGONIA AVE FROM CALIFORNIA ST TO ALABAMA ST FROM 2 TO 4 LANES 2020 $1,943

4A07255 LUGONIA AVE ALABAMA ST TENNESEE ST WIDEN LUGONIA AVE FROM ALABAMA ST TO TENNESEE ST FROM 2 TO 4 LANES 2020 $1,388

4A07045 LYTLE CREEK SUMMIT AVE SIERRA AVE LYTLE CREEK FROM SUMMIT AVE TO SIERRA AVE WIDEN FROM 0 TO 4 LANES 2018 $9,336

4A01156 MAIN ST 7TH AV I AV WIDEN FROM 2 TO 3 LANES EACH DIR 2035 $17,851

4A01157 MAIN ST I-15 US HWY 395 WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $5,710

4A01158 MAIN ST I-15 ESCONDIDO AV WIDEN FROM 2 TO 3 LANES EACH DIR 2012 $1,107

4A07102 MAIN ST I ST ROCK SPRINGS RD WIDEN MAIN ST FROM I ST TO ROCK SPRINGS RD FROM 4 TO 6 LANES 2025 $7,890

4A07217 MAIN ST 11TH ST 7TH ST WIDEN MAIN ST FROM 11TH ST TO 7TH ST FROM 4 TO 6 LANES 2035 $5,058

4A07356 MAIN ST.(W.B.) S.F.R.R. S.P.R.R. WIDEN MAIN ST (W.B.) FROM SFRR TO SPRR FROM 2 TO 4 LANES 2008 $231

4A07339 MAPLE CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF MAPLE AND RIALTO 2035 $1,380

4A01159 MAPLE AV EUCALYPTUS AV MAIN ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $11,802

4A07090 MARIPOSA EUCALYPTUS BEAR VALLEY RD WIDEN MARIPOSA FROM EUCALYPTUS TO BEAR VALLEY RD FROM 2 TO 4 LANES 2030 $9,109

4A07332 MARIPOSA RD PALMDALE RD YATES RD WIDEN MARIPOSA RD FROM 0.2 MI. S/O PALMDALE RD TO YATES RD. 2020 $614

4A01161 MAUNA LOA 7TH AV LEMON ST NEW ROAD, 2 LANES EACH DIR 2035 $26,225

4A01162 MAUNA LOA MAPLE AV 7TH AV WIDEN FROM 1 TO 2 LANES EACH DIR 2035 $18,114

4A07340 MERILL CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF MERRIL AND WILLOW 2007 $325

4A07120 MERRILL WEST CITY LIMITS RIVERSIDE WIDEN MERRILL AVE FROM WEST CITY LIMITS TO RIVERSIDE FROM 2 TO 4 LANES 2035 $13,588

4A07385 MERRILL CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF MERRILL AND BON VIEW 2015 $107

4A07386 MERRILL CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF MERRILL AND WALKER 2015 $107

4A01040 MERRILL AV EUCLID AV EAST CITY LIMIT WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,001

Page 171: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 169

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A04114 MERRILL AV CATAWBA FONTANA AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,417

4A04214 MERRILL AV GROVE AVEMILLIKEN BL (HAM-NER)

WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $521

4A07055 MERRILL AVE CHERRY CATAWBA WIDEN MERRILL AVE FROM CHERRY AV TO CATAWBA FROM 2 TO 4 LANES 2020 $9,492

4A01163 MESQUITE ST TOPAZ AV MAPLE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,075

4A07268 MICHIGAN ST COMMERCE WY DEBERRY STWIDEN MICHIGAN ST FROM COMMERCE WY TO DEBERRY ST FROM 2 LANES TO 4 LANES.

2010 $823

4A07310 MICHIGAN ST BARTON RD COMMERCE WY WIDEN MICHIGAN ST FROM BARTON RD TO COMMERCE WY FROM 2 TO 4 LANES 2008 $488

4A07131 MIDWAY AVENUEIN SAN BERNAR-DINO COUNTY

PAVE DIRT ROAD 1 LANE IN EACH DIRECTION 2020 $4,934

4A07243 MILL PEPPER AV MERIDIAN WIDEN MILL FROM PEPPER TO MERIDIAN FROM 2 TO 4 LANES 2030 $2,778

4A04195 MILL CREEK RIVERSIDE DR BELLEGRAVE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $3,423

4A04216 MILLIKEN AV RIVERSIDE DR EDISON AV WIDEN FROM 1 TO 4 LANES EACH DIR 2018 $3,911

4A04215MILLIKEN AV (HAMNER)

EDISON AV SCL WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $1,630

4A01276 MISSION BLVD LA COUNTY LINE PIPE LINE WIDEN MISSION BLVD FROM LA COUNTY LINE TO PIPE LINE FROM 2 TO 6 LANES 2020 $1,721

4A07182 MISSION BLVD CENTRAL BENSON WIDEN MISSION BLVD FROM CENTRAL TO BENSON FROM 4 TO 6 LANES 2020 $2,942

4A07215 MISSION BLVD CONSTRUCT A BRIDGE ON MISSION BLVD OVER WEST CUCAMONGA CREEK 2018 $1,820

4A07233 MISSION BLVD RAMONA FREMONT WIDEN MISSION BLVD FROM RAMONA TO FREMONT FROM 4 TO 6 LANES 2020 $1,887

4A07317 MISSION BLVD CONSTRUCT A BRIDGE ON MISSION BLVD OVER CUCAMONGA CREEK 2018 $580

4A07008MISSION BOULE-VARD

LA COUNTY LINE BENSON AV ROADWAY REHABILITATION/SIGNAL MODIFICATIONS 2010 $18,941

4A07312 MOJAVE DR1000' E/O EL EVADO RD

AT POWER LINE EASEMENT

WIDEN MOJAVE DR FROM 1000' E/O EL EVADO RD TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES

2020 $835

4A07377 MOJAVE DRJUST W/O COBALT RD

AT POWER LINE EASEMENT

WIDEN MOJAVE DR FROM JUST W/O COBALT RD TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES

2020 $262

Page 172: Project List - Southern California Association of Governments

170 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07388 MOJAVE DR 1190' E/O US-395AT POWER LINE EASEMENT

WIDEN MOJAVE DR FROM 1190' E/ US-395 TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES

2020 $107

4A01165 MOJAVE ST I-15 MAPLE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $3,435

4A07207MONTE VISTA AT PHILLIPS

IN SAN BERNAR-DINO COUNTY

INTERSECTION IMPROVEMENTS 2020 $2,467

4A01183 MONTE VISTA AVSAN BERNARDINO ST

ARROW HWY WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $8,047

4A07202 MONTE VISTA AVE PHILLIPS BLVD STATE ST WIDEN MONTE VISTA AVE FROM PHILLIPS BLVD TO STATE ST FROM 2 TO 4 LANES 2020 $3,997

4A01041 MOUNTAIN AV PHILADELPHIA ST RIVERSIDE DR WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $3,564

4A07172 MOUNTAIN AV CHINO EDISON WIDEN MOUNTAIN FROM CHINO TO EDISON FROM 2 TO 4 LANES 2018 $2,667

4A07329 MOUNTAIN AV BICKMORE EL PRADO WIDEN MOUNTAIN AVENUE FROM BICKMORE TO EL PRADO 2020 $599

4A07047 MOUNTAIN AVE EUCLID LA COUNTY LINE WIDEN MOUNTAIN AVE FROM EUCLID AVE TO LA COUNTY LINE FROM 2 TO 4 LANES 2020 $10,603

4A07105 MOUNTAIN AVE 23RD EUCLID WIDEN MOUNTAIN AVE FROM 23RD ST TO EUCLID AVE FROM 2 TO 4 LANES 2020 $5,718

4A01146 MT VERNON AV CANAL ST NORTH CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2014 $789

4A04071 MT VERNON AV LA CADENA DR I-10 WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $4,396

4A07289 MT VERNON AV BARTON RD 700' N/O MINONA STWIDEN MT VERNON AV FROM BARTON RD 700' N/O MINONA ST FROM 2 LANES TO 4 LANES.

2010 $685

4A07264 MT VIEW THOMPSON PL ELECTRIC AV WIDEN MT VIEW AVE FROM THOMPSON PL TO ELECTRIC AVE FROM 2 TO 4 LANES 2030 $2,222

4A07211 MT VIEW AV I-10 SAN BERNARDINO AVWIDEN MT VIEW AV FROM I-10 TO SAN BERNARDINO AV FROM 2 TO 4 LANES (WEST SIDE ONLY)

2020 $2,486

4A04115 MULBERRY VALLEY BL SAN BERNARDINO AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,776

4A04401 MULBERRY JURUPA AV SLOVER AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,083

4A04413 MULBERRY SLOVER AV VALLEY BL CONSTRUCT GRADE SEPARATION 2020 $36,258

4A07271 MULBERRY AVE JURUPA SANTA ANA MULBERRY AVE FROM JURUPA AVE TO SANTA ANA AVE WIDEN FROM 2 TO 4 LANES 2010 $777

Page 173: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 171

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07020NATIONAL TRAILS HIGHWAY

IN SAN BERNAR-DINO COUNTY

SAFETY UPGRADE 2020 $19,737

4A01339NATIONAL TRAILS HWY

MOJAVE RIVER I-15WIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: OVERLAPS RTIP#SBD88140 FROM AIR EXPWY TO I-15)

2010 $1,244

4A07025NATIONAL TRAILS HWY

MOJAVE RIVERWIDEN NATIONAL TRAILS HIGHWAY BRIDGE OVER MOJAVE RIVER (REPLACE EXISTING BRIDGE)

2020 $20,313

4A07239NATIONAL TRAILS HWY

MOJAVE RIVER1.6 MI. N/O MOJAVE RIVER

WIDEN NATIONAL TRAILS HIGHWAY FROM MOJAVE RIVER TO 1.6 MI. N/O MOJAVE RIVER - 2 TO 4 LANES

2020 $1,892

4A07071 NAVAJO RD SR-18 THUNDERBIRD RD WIDEN NAVAJO RD FROM SR-18 TO THUNDERBIRD RD FROM 2 TO 4 LANES 2018 $7,647

4A07112 NEVADA ST LUGONIA AVE PALMETTO WIDEN NEVADA ST FROM LUGONIA AVE TO PALMETTO FROM 2 TO 4 LANES 2020 $5,551

200411 NIELSON RD BEEKLEY MALPASO PAVE DIRT ROAD, 1 LANE EACH DIR 2007 $491

4A07041 OAK GLEN RD COLORADO ST CASA BLANCA AVEWIDEN OAK GLEN RD FROM COLORADO ST TO CASA BLANCA AVE FROM 2 TO 4 LANES

2030 $17,319

4A07197 OLIVE STREET0007M W, JACK-SON

E/0003M W RANCHO AVE

WIDEN OLIVE STREET FROM 0007M W, JACKSON E/0003M W, RANCHO AVE FROM 2 TO 4 LANES

2020 $2,554

4A01378 ONAGA TRAIL KICKAPOO CAMINO DEL CIELO NEW ROAD, 1 LANE EACH DIR 2010 $377

4A04218ONTARIO AVE/HELLMAN

RIVERSIDE DR BELLEGRAVE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,236

4A01247 ORANGE ST N. CITY LIMITS PIONEER AVWIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: RTIP#SBD31718 WIDENS BRIDGE AT SANTA ANA RIVER)

2020 $6,677

4A01248 ORANGE ST SAN BERNARDINO AV

LUGONIA AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,575

4A07054 ORANGE ST COLTON AV LUGONIA AV WIDEN FROM 1 TO 2 LANES EACH DIR - CALTRANS (STATE ROUTE 38) 2020 $10,100

4A01343 OTTAWA ST MARIPOSA RD OTTAWA PL WIDEN OTTAWA ST FROM MARIPOSA RD TO OTTAWA PL FROM 0 TO 4 LANES 2010 $997

4A07360 OTTAWA ST HESPERIA RD INDUSTRIAL BLVD WIDEN OTTAWA ST FROM HESPERIA RD TO INDUSTRIAL BLVD FROM 0 TO 4 LANES 2020 $343

4A07275 PACIFIC ST COLE ST PALM AVE WIDEN FROM 2 TO 4 LANES 2030 $1,539

Page 174: Project List - Southern California Association of Governments

172 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07290 PACIFIC ST PALM AVE CHURCH AVE WIDEN PACIFIC AVE 2030 $1,374

4A07364 PACIFIC ST ORANGE ST WEST OF COLE WIDEN FROM 2 TO 4 LANES 2030 $371

4A01340 PALM AV SOUTH CITY LIMIT BASELINE WIDEN FROM 2 TO 4 LANES 2018 $5,376

4A01389 PALM AV BASELINE PACIFIC AV WIDEN FROM PALM AVE 2020 $2,970

4A07247 PALM AV CAJON BLVD I-215 WIDEN PALM AV FROM CAJON BLVD TO I-215 FROM 2 TO 4 LANES 2020 $1,575

4A07323 PALM AV PACIFIC AVE ATLANTIC AVE WIDEN PALM AVE FROM PACIFIC ST TO ATLANTIC AVE FROM 2 LANES TO 4 LANES. 2020 $666

4A07023 PALMDALE RD US 395 I-15 WIDEN PALMDALE RD FROM US 395 TO I-15 FROM 4 TO 6 LANES. 8.5 LANE MILES 2030 $36,174

4A07154 PALMETTO AVE CALIFORNIA ST ALABAMA ST WIDEN PALMETTO AVE FROM CALIFORNIA ST TO ALABAMA ST FROM 2 TO 4 LANES 2020 $4,219

4A07068 PEPPER ETIWANDA AV SR-210 WIDEN PEPPER AVE FROM FOOTHILL BLVD TO SR-210 FROM 3 TO 6 LANES 2035 $21,197

4A07265 PEPPER RIALTO FOOTHILL WIDEN PEPPER AVE FROM RIALTO AVE TO FOOTHILL BLVD FROM 2 TO 4 LANES 2035 $3,185

4A07200 PEPPER AVE SLOVER VALLEY WIDEN PEPPER AV FROM SLOVER TO VALLEY FROM 2 TO 4 LANES 2020 $2,498

4A07198PERRIS HILL PARK TE

21ST ST PACIFIC ST WIDEN PERRIS HILL PARK RD FROM 21ST ST TO PACIFIC ST FROM 2 TO 4 LANES 2030 $4,445

4A01277 PHELAN RD BALDY MESA RDHESPERIA W. CITY LIMIT

WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $6,773

4A01278 PHELAN RD SHEEP CREEK RD BALDY MESA RD WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $46,124

4A07191 PHILADELPHIA EAST END AV NORTON AVE WIDEN PHILADELPHIA AV FROM EAST END AV TO NORTON AVE FROM 2 TO 4 LANES 2020 $2,720

4A07269 PHILADELPHIA RAMONA MONTE VISTA WIDEN PHILADELPHIA AV FROM RAMONA TO MONTE VISTA FROM 2 TO 4 LANES 2020 $1,166

4A07293 PHILADELPHIA LOS ANGELES CRL EAST END AVWIDEN PHILADELPHIA AV FROM LOS ANGELES CRL TO EAST END AV FROM 2 TO 4 LANES

2020 $944

4A01042 PHILADELPHIA ST CENTRAL AV BENSON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $1,198

4A01043 PHILADELPHIA ST LA COUNTY LINE CENTRAL AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $3,914

4A07138 PHILADELPHIA ST VINEYARD AV CUCAMONGA CREEK WIDEN FROM 1 TO 2 LANES EACH DIR, INCL. BRIDGE OVER CUCAMONGA CREEK 2018 $3,822

4A07266 PHILADELPHIA ST CAMPUS AV GROVE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $995

Page 175: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 173

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07107 PHILLIPS BLVD YORBA AV BENSON AV WIDEN PHILLIPS BLVD FROM YORBA AV TO BENSON AV FROM 2 TO 4 LANES 2020 $5,662

4A07124 PHILLIPS BLVD ROSWELL AVE YORBA AVE WIDEN PHILLIPS BLVD FROM ROSWELL AVE TO YORBA AVE FROM 2 TO 4 LANES 2020 $4,996

4A07252 PHILLIPS BLVD EAST END AVE ROSWELL AVE WIDEN PHILLIPS BLVD FROM EAST END AVE TO ROSWELL AVE FROM 2 TO 4 LANES 2020 $1,388

4A07390 PHILLIPS BLVD LA COUNTY LINE EAST END AVE WIDEN PHILLIPS BLVD FROM LA COUNTY LINE TO EAST END AVE FROM 2 TO 4 LANES 2020 $56

4A07371 PINE CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF PINE AND LOOP ROAD WEST 2015 $198

4A07372 PINE CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF PINE AND LOOP ROAD EAST 2015 $213

4A07373 PINE CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF PINE AND CHINO-CORONA RD 2015 $198

4A07374 PINE CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF PINE AND BON VIEW 2015 $213

4A07375 PINE CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF PINE AND SULTANA 2015 $213

4A04044 PINE AV SR71 EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $40,147

4A04045 PINE AV EUCLID AV HELLMAN WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $8,223

4A07244 PINE AV KENDALL DR BELMONT AV WIDEN PINE AVE FROM KENDALL DR TO BELMONT AVE FROM 2 TO 4 LANES 2030 $2,778

4A07116 PINE AVE SR-71 CHINO CREEK WIDEN PINE AVE FROM SR-71 TO CHINO CREEK (NORTH SIDE ONLY) 2010 $3,607

4C01001PINE AVE (FOUR CORNERS)

NEW ARTERIAL CORRIDOR LINKING PINE AVE, SCHLEISMAN AVE, ARLINGTON AVE (RIV. CO.)

2030 $237,676

4A07059 PIPE LINE AVE PHILADELPHIA MISSION BLVD WIDEN PIPE LINE AV FROM PHILADELPHIA AV TO MISSION BLVD FROM 2 TO 4 LANES 2020 $8,882

4A07216 PIPE LINE AVE CHINO AV RIVERSIDE DR WIDEN PIPE LINE AV FROM CHINO AVE TO RIVERSIDE DR FROM 2 TO 4 LANES 2020 $2,220

4A07279 PIPE LINE AVE RIVERSIDE WALNUT WIDEN PIPE LINE AV FROM RIVERSIDE AV TO WALNUT AV FROM 2 TO 4 LANES 2020 $1,110

4A07303 PIPE LINE AVE WALNUT .25 M NORTH WIDEN PIPE LINE AV FROM WALNUT AV TO .25 M NORTH FROM 2 TO 4 LANES 2020 $833

4A07151 RAMONA PHILADELPHIA PHILLIPS BLVD WIDEN RAMONA AV FROM PHILADELPHIA TO PHILLIPS BLVD FROM 2 TO 4 LANES 2020 $4,330

4A07032 RANCHERIAS RD RINCON CORWIN RD WIDEN RANCHERIAS RD FROM RINCON RD TO CORWIN RD FROM 2 TO 4 LANES 2023 $19,490

Page 176: Project List - Southern California Association of Governments

174 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07065 RANCHERO ST.94M E/O MARI-POSA

ESCONDIDO AVEWIDEN RANCHERO RD FROM .94M E/O MARIPOSA RD TO ESCONDIDO AVE FROM 2 TO 4 LANES

2020 $8,327

4A07110 RANCHERO ST ESCONDIDO AVEHESPERIA CITY LIMITS

WIDEN RANCHERO RD FROM ESCONDIDO AVE TO HESPERIA CITY LIMITS FROM 2 TO 4 LANES

2020 $5,551

4A07122 RANCHERO ST MARIPOSA RD EAST .94M WIDEN RANCHERO RD FROM .94M E/O MARIPOSA RD FROM 2 TO 4 LANES 2018 $4,031

4A07148 RANCHOCOLTON CITY LIMITS

5TH ST WIDEN RANCHO FROM COLTON CITY LIMITS TO 5TH ST FROM 2 TO 4 LANES 2030 $7,779

4A01362 RANCHO RDNATIONAL TRAILS HWY

STODDARD WELLS RD

WIDEN RANCHO RD FROM NATIONAL TRAILS HWY TO STODDARD WELLS RD FROM 0 TO 4 LANES.

2010 $1,342

4A04412 RANCHO RD KOALA RD CAUGHLIN RD NEW ROAD, 2 LANES EACH DIR PLUS TURNING LANE 2020 $13,392

4A07160 RANCHO RD AMARGOSANATIONAL TRAILS HWY

WIDEN RANCHO FROM AMARGOSA TO NATIONAL TRAILS HWY FROM 0 TO 4 LANES (INCLUDES WAS CROSSING)

2020 $4,474

4A07257 RANCHO RDJUST W/O EL EVADO RD

AT POWER LINE EASEMENT

WIDEN RANCHO RD FROM JUST W/O EL EVADO TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $1,569

4A07282 RANCHO RD AMETHYST EL EVADO RD WIDEN RANCHO RD FROM AMETHYST RD TO EL EVADO RD FROM 0 TO 4 LANES 2020 $1,183

4A07301 RANCHO RD PACOIMAAT POWER LINE EASEMENT

WIDEN RANCHO RD FROM PACOIMA TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $995

4A07325 RANCHO RD COBALT RD AMETHYST RD WIDEN RANCHO RD FROM COBALT RD TO AMETHYST RD FROM 0 TO 4 LANES 2020 $698

4A07351 RANCHO RD2025' E/O GASLINE RD

AT POWER LINE EASEMENT

WIDEN RANCHO RD FROM 2025' E/O GASLINE RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $523

4A07376 RANCHO RDJUST W/O VILLAGE DR

AT POWER LINE EASEMENT

WIDEN RANCHO RD FROM JUST W/O VILLAGE DR TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES

2020 $287

4A07225 RANDALL AV ALDER MAPLE RANDALL AV FROM ALDER TO MAPLE WIDEN FROM 2 TO 4 LANES 2018 $1,766

4A07061 RANDALL AVE CHERRY AV POPLAR AVE WIDEN RANDALL AVE FROM CHERRY AV TO POPLAR AV FROM 2 TO 4 LANES 2020 $8,715

4A07222 RANDALL AVE ALDER CEDAR WIDEN RANDALL AVE FROM ALDER AVE TO CEDAR AVE FROM 2 TO 4 LANES 2020 $2,083

4A04077 RECHE CANYON RD BARTON RD CITY LIMITS WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $2,118

4A07204 RECHE CNYN RD1.2 M S/O BARTON RD

.78M NORTHWIDEN RECHE CNYN RD FROM 1.2M S/O BARTON RD TO .78M NORTH FROM 2 TO 4 LANES EACH DIR

2020 $3,997

Page 177: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 175

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07313 RECHE CNYN RD.067M NW/O RIV COUNTY LINE

COLTON CITY LIMITSWIDEN RECHE CNYN RD FROM .067M N/W RIV COUNTY LINE TO COLTON CITY LIMITS FROM 2 TO 4 LANES EACH DIR

2020 $722

4A01249 REDLANDS BL WEST CITY LIMITS COLTON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $15,113

4A07135 RIALTO LENA RD TIPPECANOE WIDEN RIALTO AV FROM LENA RD TO TIPPECANOE AV FROM 2 TO 4 LANES 2030 $8,334

4A07163 RIALTO WEST CITY LIMITS LINDEN AV WIDEN RIALTO AVE FROM WEST CITY LIMITS TO CACTUS AVE FROM 2 TO 4 LANES 2035 $9,821

4A07178 RIALTO SIERRA WY WATERMAN WIDEN RIALTO AV FROM SIERRA WY TO WATERMAN FROM 2 TO 4 LANES 2030 $5,556

4A07199 RIALTO RIVERSIDE EAST CITY LIMITS WIDEN RIALTO AVE FROM RIVERSIDE AVE TO EAST CITY LIMITS FROM 2 TO 4 LANES 2035 $6,454

4A07128 RIDGE CREST RD PAH-UTE RD CHINQUAPIN DR WIDEN RIDGE CREST RD FROM PAH-UTE RD TO CHINQUAPIN RD FROM 2 TO 4 LANES 2020 $4,940

4A07237 RIVERSIDE LOCUST CEDAR WIDEN RIVERSIDE AVE FROM LOCUST AVE TO CEDAR AVE FROM 3 TO 4 LANES 2035 $4,501

4A07341 RIVERSIDE CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF RIVERSIDE AND ALDER 2007 $325

4A01079 RIVERSIDE AVRIVERSIDE COUNTY LINE

NORTH CITY LIMIT WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $3,624

4A01257 RIVERSIDE AV CACTUS AV CASMALIA ST WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,708

4A01258 RIVERSIDE AV SOUTH CITY LIMIT SLOVER AV WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $7,672

4A01259 RIVERSIDE AV VALLEY BL N/O SLOVER AV WIDEN FROM 2 TO 4 LANES EACH DIR (NOTE: OVERLAPS RTIP#SBD31808) 2010 $1,998

4A07342 RIVERSIDE AV CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF RIVERSIDE AND LINDEN 2035 $1,380

4A07343 RIVERSIDE AV CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF RIVERSIDE AND LOCUST 2035 $1,380

4A01046 RIVERSIDE DR BENSON AV MAGNOLIA AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $1,474

4A01047 RIVERSIDE DR FERN AV EUCLID AV WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $1,342

4A01048 RIVERSIDE DR MOUNTAIN AV MAGNOLIA AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $805

4A01049 RIVERSIDE DR PIPELINE FERN AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $8,248

4A01050 RIVERSIDE DR WEST CITY LIMITS BENSON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $3,741

4A04219 RIVERSIDE DR EUCLID AV MILLIKEN BL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $13,362

Page 178: Project List - Southern California Association of Governments

176 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07267 RIVERSIDE DR CONSTRUCT A BRIDGE RIVERSIDE DR OVER CUCAMONGA CREEK 2030 $1,316

4A07242RIVERSIDE/MERRIL/BLOOMINGTON

INTERSECTION IMPROVEMENTS AT RIVERSIDE AVE/MERRIL AVE/BLOOMINGTON AVE 2035 $4,246

4A07173 RIVERSIDE/VALLEY INTERSECTION IMPROVEMENTS AT RIVERSIDE AVE AND VALLEY BLVD 2035 $8,492

4A01168 ROCK SPRINGS RDARROWHEAD LAKE RD

E CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $3,384

4A07082 ROCK SPRINGS RD MOJAVE RIVER CL KIOWA RDWIDEN ROCK SPRINGS RD FROM MOJAVE RIVER CRL TO KIOWA RD FROM 2 TO 4 LANES

2020 $6,914

4A07123 ROCK SPRINGS RD GLENDALE AVE MOJAVE RIVER CLWIDEN ROCK SPRINGS RD FROM GLENDALE AVE TO MOJAVE RIVER CRL FROM 2 TO 4 LANES

2020 $5,196

4A07058 ROUNDUP WY KIOWA CENTRAL WIDEN ROUNDUP WY FROM KIOWA RD TO CENTRAL FROM 2 TO 4 LANES 2020 $8,882

4A07316 SAN ANTONIO AVE 23RD 24TH WIDEN SAN ANTONIO AVE FROM 23RD TO 24TH FROM 2 TO 4 LANES 2020 $722

4A07357SAN ANTONIO CRESCENT E

24THSAN ANTONIO CRES-CENT WEST

WIDEN SAN ANTONION CRESCENT EAST FROM 24TH ST TO SAN ANTONIO CRESCENT WEST

2020 $333

4A07101 SAN BERNARDINO WEST CITY LIMITS EAST CITY LIMITSWIDEN SAN BERNARDINO FROM WEST CITY LIMITS TO EAST CITY LIMITS FROM 2 TO 4 LANES

2035 $15,218

4A01080SAN BERNARDINO AV

PEPPER AV MERIDIAN AV WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $577

4A01250SAN BERNARDINO AV

CHURCH ST WABASH AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,677

4A01252SAN BERNARDINO AV

ROUTE 30 ORANGE ST WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $4,370

4A01281SAN BERNARDINO AV

ALABAMA ST CALIFORNIA ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $10,753

4A07240SAN BERNARDINO AV

WABASH AVE OPAL AVE WIDEN SAN BERNARDINO AV FROM WABASH AV TO OPAL AV FROM 2 TO 4 LANES 2020 $1,665

4A07033SAN BERNARDINO AVE

ALDER AVE LAUREL AVE WIDEN SAN BERNARDINO AVE FROM ALDER AVE TO LAUREL AVE FROM 2 TO 4 LANES 2020 $14,821

Page 179: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 177

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07072SAN BERNARDINO AVE

CHERRY AVEFONTANA CITY LIMITS AVENUE

WIDEN SAN BERNARDINO AVE FROM CHERRY AVE TO FONTANA CITY LIMITS FROM 2 TO 4 LANES

2020 $7,661

4A07079SAN BERNARDINO AVE

LAUREL AVE RIALTO CITY LIMITSWIDEN SAN BERNARDINO AVE FROM LAUREL AVE TO RIALTO CITY LIMITS FROM 2 TO 4 LANES

2020 $7,272

4A07109SAN BERNARDINO AVE

ETIWANDA AVE CHERRY AVEWIDEN SAN BERNARDINO AVE FROM ETIWANDA AVE TO CHERRY AVE FROM 5 TO 6 LANES

2020 $5,551

4A07147SAN BERNARDINO AVE

ALABAMA ST REDLANDS CRLWIDEN SAN BERNARDINO AVE FROM ALABAMA ST TO REDLANDS CRL FROM 2 TO 6 LANES

2020 $4,441

4A01184SAN BERNARDINO ST

LA COUNTY LINE BENSON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $9,723

4A07084 SAN SEVAINE BASELINE SUMMIT SAN SEVAINE RD FROM BASELINE AVE TO SUMMIT AVE WIDEN FROM 2 TO 4 LANES 2018 $5,601

4A01254SAN TIMOTEO CYN RD

RR CROSSING LIVE OAK CYN RD WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $15,412

4A07132 SANTA ANA AVE CEDAR AVE CACTUS AVE WIDEN SANTA ANA AVE FROM CEDAR AVE TO CACTUS AVE FROM 2 TO 4 LANES 2020 $4,885

4A07153 SANTA ANA AVE TAMARIND LOCUST WIDEN SANTA ANA AVE FROM TAMARIND TO LOCUST AVE FROM 2 TO 4 LANES 2020 $4,219

4A07158 SANTA ANA AVE MULBERRY AVE REDWOOD AVE WIDEN SANTA ANA AV FROM MULLBERRY AVE TO REDWOOD AVE FROM 2 TO 4 LANES 2020 $4,163

4A07159 SANTA ANA AVE LOCUST CEDAR WIDEN SANTA ANA AVE FROM LOCUST AVE TO CEDAR AVE FROM 2 TO 4 LANES 2020 $4,163

4A01379 SANTA FE TRAIL APACHE ACOMA NEW ROAD, 1 LANE EACH DIR 2010 $377

4A01051 SCHAEFER AV BENSON AV EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $3,490

4A04220 SCHAEFER AV EUCLID AV EDISON AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $30,961

4A01354 SENECA RD US-395 AMETHYST RD NEW ROAD, 2 LANES EACH DIR 2020 $1,775

4A07113 SENECA RD EMERALD RD AMETHYST RD WIDEN SENECA RD FROM EMERALD RD TO AMETHYST RD FROM 2 TO 4 LANES 2020 $5,551

4A07350 SENECA RD2340' W/O EL EVADO RD

AT POWER LINE EASEMENT

WIDEN SENECA RD FROM 2340' W/O EL EVADO RD TO AT POWER LINE EASEMENT FROM 3 TO 4 LANES

2020 $533

Page 180: Project List - Southern California Association of Governments

178 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07362 SENECA RD0.4 M E/O HESPE-RIA RD

ROAD B WIDEN SENECA RD FROM .4 M E/O HESPERIA RD TO ROAD B FROM 0 TO 4 LANES 2020 $320

4A07365 SENECA RD 2360' E/O US-395AT POWER LINE EASEMENT

WIDEN SENECA RD FROM 2360' E/O US-395 TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $307

4A07378 SENECA RD HESPERIA RD.2 M E/O HESPERIA RD

WIDEN SENECA RD FROM HESPERIA RD TO 0.2 M E/O HESPERIA RD FROM 0 TO 4 LANES

2020 $262

4A07384 SENECA RD650' W/O EMER-ALD RD

AT POWER LINE EASEMENT

WIDEN SENECA RD FROM 650' W/O EMERALD RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $155

4A04420 SH 247 ABERDEEN LINN WIDEN WITHIN ROW TO ACCOMMODATE PASSING LANES 2008 $9,752

4A01283 SHEEP CREEK RD PHELAN RD SR-138 WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $3,530

4A01284A SIERRA AV I-15 LYTLE CREEK RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,117

4A04122 SIERRA AVSAN BERNARDINO AV

FOOTHILL BLVD WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $32,066

4A04123 SIERRA AV SLOVER AV VALLEY BL WIDEN FROM 3 TO 4 LANES EACH DIR 2018 $1,494

4A04125 SIERRA AV SUMMIT AV I-15 WIDEN FROM 1 TO 3 LANES EACH DIR 2014 $8,846

4A04126 SIERRA AV VALLEY BL SAN BERNARDINO AV WIDEN FROM 2 TO 3 LANES EACH DIR 2014 $4,423

4A01284B SIERRA AVE I-15 LYTLE CREEK WIDEN SIERRA AVE FROM I-15 TO LYTLE CREED RD FROM 3 TO 4 LANES 2020 $611

4A04127SIERRA LAKES PARKWAY

BEECH CITRUS WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $9,162

4A07034SIERRA LAKES PKWY

CHERRY ALMERIASIERRA LAKES PKWY FROM CHERRY AVE TO ALMERIA AVE WIDEN FROM 2 TO 4 LANES

2018 $12,555

4A07026 SITTING BULL RD APPLE VALLEY RD NAVAJO RDWIDEN SITTING BULL RD FROM APPLE VALLEY RD TO NAVAJO RD FROM 2 TO 4 LANES

2023 $22,274

4A07260 SIXTH ST CONSTRUCT A BRIDGE ON SIXTH ST OVER CUCAMONGA CREEK 2030 $1,426

4A01132 SLOVER AV ETIWANDA AV MULBERRY AV WIDEN FROM 1 TO 2 LANES EACH DIR 2014 $1,946

4A01260 SLOVER AV CACTUS AV RIVERSIDE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,507

4A01285 SLOVER AV ALDER AV CACTUS AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $8,221

4A07259 SLOVER AV TAMARIND E. CITY LIMITS SLOVER AV FROM TAMARIND AV TO E. CITY LIMITS WIDEN FROM 4 TO 6 LANES 2018 $1,177

Page 181: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 179

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07075 SMOKETREE RD TOPAZ RD AMARGOSA RDWIDEN SMOKETREE RD FROM TOPAZ RD TO AMARGOSA RD FROM 0 TO 4 LANES (INCLUDES WASH CROSSING)

2020 $8,430

4A07056 SO. HIGHLAND AV CHERRY CITRUS SO. HIGHLAND AVE FROM CHERRY AVE TO CITRUS AVE WIDEN FROM 2 TO 4 LANES 2018 $7,468

4A07103 SO. HIGHLAND AV BASELINE CHERRYSO. HIGHLAND FROM BASELINE RD TO CHERRY AV WIDEN FROM 0 LANES TO 4 LANES.

2020 $6,043

4A07166 SO. HIGHLAND AV SIERRA PALMETTO SO. HIGHLAND AVE FROM SIERRA AVE TO PALMETTO AVE WIDEN FROM 2 TO 4 LANES 2018 $2,943

4A07043SPRING VALLEY PKWY

HUERTA RD DRIFTWOOD DRWIDEN SPRING VALLEY PKWY FROM HUERTA RD TO DRIFTWOOD DR FROM 2 TO 4 LANES

2020 $12,212

4A07001 SR 62 YUCCA TRAIL ACOMA TRAIL NEW ROAD, 3 LANES EACH DIR 2012 $84,293

4A07100 SR 62 SAGE AIRWAY MEDIANS WITHIN SR 62 RIGHT OF WAY 2007 TBD

4A07115 SR 62 LA HONDA WAY DUMOSA AVENUE SIDEWALKS, MEDIANS, UTILITY UNDERGROUNDING 2008 $3,406

4A07306 SR 62 CURB, GUTTER, AND SIDEWALK WITHIN R-O-W 2007 $500

4A07031 STATE ST FOOTHILL I-215 WIDEN STATE ST FROM FOOTHILL TO I-210 FROM 2 TO 4 LANES 2020 $16,575

4A07049 STATE ST HIGHLAND AVE SR-30 WIDEN STATE ST FROM HIGHLAND AVE TO SR-30 FROM 2 TO 4 LANES 2018 $7,718

4A07050 STATE STREETIN SAN BERNAR-DINO COUNTY

WIDEN TO ULTIMATE 2020 $9,869

4A07078 STERLING AVE S.CITY LIMIT PACIFIC AVE WIDEN STERLING AVE FROM S.CITY LIMIT TO PACIFIC AVE FROM 2 TO 4 LANES 2020 $7,700

4A07359 STODDARD WELLS DANTE ST I-15WIDEN STODDARD WELLS FROM DANTE ST TO OSBORNE RD, 0.56 MI. S/O I-15, FROM 2 TO 4 LANES

2020 $348

4A07171STODDARD WELLS RD

LOS PADRES I-15 WIDEN STODDARD WELLS RD FROM LOS PADRES RD TO I-15 FROM 2 TO 4 LANES 2020 $3,331

4A07167 SUMMIT AV CHERRY AV SAN SEVAINE SUMMIT AV FROM CHERRY AV TO SAN SEVAINE WIDEN FROM 2 LANES TO 4 LANES. 2018 $2,801

4A04414SUMMIT VALLEY RD

SR-138 HESPERIA CITY LIMIT PAVE DIRT ROAD, 1 LANE EACH DIR 2008 $1,540

4A07053SUMMIT VALLEY RD

1.88M N/O SH-138 N/O SH-138 2.18M WIDEN SUMMIT VALLEY RD FROM 1.88M N, SR-138 N 2.18M (HSP CL) 2018 $7,478

4A07095SUMMIT VALLEY RD

4.31M N/O SH-138 N/O SH-138 1.20M WIDEN SUMMIT VALLEY RD FROM 4.31M N, SR-138 (HSP CL) N 1.20M (HSP CL) 2020 $6,561

Page 182: Project List - Southern California Association of Governments

180 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07097SUMMIT VALLEY RD

MARIPOSAE/O MARIPOSA RD .94M

WIDEN SUMMIT VALLEY RD FROM SR-138 NO188M (E,PVMT) FROM 2 TO 4 LANES 2035 $15,965

4A07117SUMMIT VALLEY RD

4.31M N/O SH-138 N/O SH-138 1.20M WIDEN SUMMIT VALLEY RD FROM 4.31M N, SR-138 (HSP CL) N 1.20M (HSP CL) 2018 $4,116

4A07013 SUNBURST AVENUEIN SAN BERNAR-DINO COUNTY

WIDEN EXISTING TRAFFIC LANES: ADJUST VERTICAL PROFILE SAFETY 2020 $24,672

4A01380SUNNYSLOPE DRIVE

MOHAWK PIONEERTOWN RD NEW ROAD, 1 LANE EACH DIR 2010 $239

4A01381SUNNYSLOPE DRIVE

PIONEERTOWN RD CAMINO DEL CIELO NEW ROAD, 1 LANE EACH DIR 2010 $602

4A07344 SYCAMORE CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF SYCAMORE AND RANDALL 2035 $1,380

4A07345 SYCAMORE CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF SYCAMORE AND MERRILL 2035 $1,380

4A01018 THUNDERBIRD RD RANCHERIAS RD CENTRAL RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $11,470

4A07152 TIPPECANOE MILL ST HARRIMAN WIDEN TIPPECANOE FROM MILL ST TO HARRIMAN FROM 4 TO 6 LANES 2012 $2,995

4A07005 TIPPECANOE AVESAN BERNARDINO AVE

SANTA ANA RIVER WIDEN BRIDGE FROM 4 TO 6 LANES 2020 $37,294

4A07142 TIPPECANOE AVE 3RD ST 9TH ST WIDEN TIPPECANOE AVE FROM 3RD ST TO 9TH ST FROM 2 TO 4 LANES 2020 $4,787

4C01002TONNER CANYON (FOUR CORNERS)

GRAND SR-57NEW ARTERIAL CORRIDOR CONNECTING CHINO HILLS WITH SR-57 (LA/OR CO.) WITH 2 LANES EACH DIR, ACCESS TO SR-57 AT BREA CYN RD OR TONNER CYN RD, CON-NECTION TO GRAND AVE AND EUCALYPTUS AVE, NO CONNECTION TO VALENCIA AVE

2030 $602,016

4A01361 TOPAZ RD SENECA RD PALMDALE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,445

4A07164 TOPAZ RD HOPLAND LUNA RD WIDEN TOPAZ RD FROM HOPLAND ST TO LUNA ROAD FROM 0 TO 4 LANES 2020 $4,144

4A07283 TOPAZ RD EUCALYPTUS SMOKETREE RD WIDEN TOPAZ RD FROM EUCALYPTUS RD TO SMOKETREE RD FROM 0 TO 4 LANES 2020 $1,183

4A07379 TOPAZ RD360' N/O SENECA RD

AT POWER LINE EASEMENT

WIDEN TOPAZ RD FROM 360' N/O SENECA RD TO AT POWERLINE EASEMENT FROM 0 TO 4 LANES

2020 $256

4A07228 UNIVERSITY PKWY HALLMARK PKWYBNSF GRADE SEPA-RATION

WIDEN UNIVERSITY PKWY FROM HALLMARK PKWY TO BNSF GRADE SEPARATION FROM 2 TO 4 LANES

2012 $1,371

Page 183: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 181

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07004 US 395 AQUEDUCT HOLLY ST.WIDEN US 395 FROM AQUEDUCT TO HOLLY ST. FROM 2 TO 6 LANES OR 4 TO 6 LANES, VARIOUS SEGMENTS. 22.25 LANE MILES

2020 $46,282

4A07141 US 395 AQUEDUCT WIDEN US 395 AT AQUEDUCT FROM 4 TO 6 LANES 2020 $5,205

4A07392 US-395 CALLEJA RD DESERT FLOWER RD WIDEN US-395 FROM CALLEJA TO DESERT FLOWER RD FROM 2 TO 4 LANES 2018 $3,302

4A07039 VALLEY CHERRY ALDER VALLEY BLVD FROM CHERRY TO ALDER WIDEN FROM 2 TO 4 LANES 2018 $10,456

4A07346 VALLEY CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF VALLEY AND LILAC 2035 $1,380

4A07347 VALLEY CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF VALLEY AND CACTUS 2035 $1,380

4A01082 VALLEY BLVD SYCAMORE AV MT. VERNON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $7,659

4A01261 VALLEY BLVD SPRUCE AV SYCAMORE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,807

4A07140 VALLEY BLVD JUNIPER TAMARIND VALLEY BLVD FROM JUNIPER AVE TO TAMARIND AVE WIDEN FROM 4 TO 6 LANES 2018 $3,734

4A07201 VALLEY BLVD ETIWANDA AVE COMMERCE DR WIDEN VALLEY BLVD FROM ETIWANDA AVE TO COMMERCE DR FROM 5 TO 6 LANES 2020 $2,498

4A07218 VALLEY BLVD COMMERCE DR ALMOND AV WIDEN VALLEY BLVD FROM COMMERCE DR TO ALMOND AVE FROM 5 TO 6 LANES 2020 $2,165

4A07272 VALLEY BLVD ALMOND CHERRY VALLEY BLVD FROM ALMOND AVE TO CHERRY AVE WIDEN FROM 4 TO 6 LANES 2018 $934

4A07273 VALLEY BLVD HEMLOCK BEECH VALLEY BLVD FROM HEMLOCK AVE TO BEECH AVE WIDEN FROM 4 TO 6 LANES 2018 $934

4A07274 VALLEY BLVD POPLAR CATAWBA VALLEY BLVD FROM POPLAR AVE TO CATAWBA AVE WIDEN FROM 4 TO 6 LANES 2018 $934

4A07284 VALLEY BLVD CHERRY AVE HEMLOCK WIDEN VALLEY BLVD FROM CHERRY AVE TO HEMLOCK AVE FROM 5 TO 6 LANES 2020 $1,041

4A01341 VICTORIA AV 3RD ST 6TH ST WIDEN VICTORIA AVE 2008 $610

4A01222 VINEYARD AV 4TH ST I-10 WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $1,263

4A04223 VINEYARD AV RIVERSIDE DR EDISON AV WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $5,704

4A07196 W. VAN LEUVEN ST. EVANS ST. ORANGE GROVE ST. NEW ROAD, 1 LANES EACH DIR 2012 $1,828

4A07029 WAALEW RD CORWIN RD CENTRAL WIDEN WAALEW RD FROM CORWIN RD TO CENTRAL RD FROM 2 TO 4 LANES 2018 $15,931

4A07235 WABASH AV.30 M S/O SEV-ENTH ST

.13 M N/O SEVENTH ST

WIDEN WABASH AV FROM .30 M S/O SEVENTH ST TO .13M N/O SEVENTH ST FROM 2 TO 4 LANES

2020 $1,832

4A07253 WABASH AV COLTON AV SR 38 WIDEN WABASH AV FROM COLTON AV TO SR 38 FROM 2 TO 4 LANES 2020 $1,388

Page 184: Project List - Southern California Association of Governments

182 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07254 WABASH AV SR 38SAN BERNARDINO AVE

WIDEN WABASH AV FROM SR 38 TO SAN BERNARDINO AVE FROM 2 TO 4 LANES 2020 $1,388

4A07321 WABASH AV 6TH AV 5TH AV WIDEN WABASH AV FROM 6TH AV TO 5TH AV FROM 2 TO 4 LANES 2020 $666

4A07381 WABASH AVREDLANDS CITY LIMITS

I-10 WIDEN WABASH AV FROM REDLANDS CITY LIMITS TO I-10 FROM 2 TO 4 LANES 2020 $167

4A04224 WALKER AV RIVERSIDE DR SCL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,236

4A07077 WALNUT I-15 SAN SERVAINE WALNUT AVE FROM I-15 TO SAN SERVAINE FROM 2 TO 4 LANES 2018 $6,277

4A04137 WALNUT AV ALMERIA SIERRA WIDEN FROM 1 TO 2 LANES EACH DIR 2014 $7,431

4A07354 WALNUT AV.12 M W/O NOR-TON AVE

.03 M E/O NORTON AV

WIDEN WALNUT AV FROM .12 M W/O NORTON TO .03 M E/O NORTON FROM 2 TO 4 LANES

2020 $389

4A07363 WALNUT AV.10 M W/ O RO-SWELL AVE

ROSWELL AVWIDEN WALNUT AV FROM .10 M W/O ROSWELL AV TO ROSWELL AV FROM 2 TO 4 LANES

2020 $278

4A07106 WASHINGTON ST WASHINGTON ST EXTENSION TO LA CADENA DR 2020 $6,581

4A07194 WASHINGTON ST BARTON RD I-215 WIDEN WASHINGTON FROM BARTON RD TO I-215 FROM 4 TO 6 LANES 2018 $2,372

4A01292 WATERMAN AV 5TH ST BASELINE AV WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $20,002

4A07003 WATERMAN AV/I-10 HOSPITALITY LANE REDLANDS BLVD REPLACE I-10 BRIDGE TO WIDEN WATERMAN AVE FROM 4 TO 6 LANES 2030 $86,814

4A01376AWILDWOOD CAN-YON RD

CALIMESA BL COLORADO ST WIDEN FROM 1 TO 2 LANES EACH DIR 2010 $1,507

4A01376BWILDWOOD CAN-YON RD

COLORADO ST CANYON DR WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $8,262

4A07022WILDWOOD CYN RD

OUTER I-10CALIMESA BLVD NEW RD

WIDEN WILDWOOD CYN RD FROMOUTER I-10 ST TO CALIMESA BLVD FROM 2 LANES TO 4 LANES.

2018 $15,877

4A07324 WILLOW CONSTRUCT TRAFFIC SIGNAL AT THE INTERSECTION OF WILLOW AND BLOOMINGTON 2007 $385

4A07051WILSON RANCH ROAD

GOSS ROAD PALMDALE PAVE DIRT ROAD, 1 LANE EACH DIR 2020 $9,869

4A07021 WINTERS ROADIN SAN BERNAR-DINO COUNTY

PAVE ALTERNATIVE ROUTE TO TNP MARINE BASE 2020 $19,737

Page 185: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 183

SAN BERNARDINO COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

4A07089 YATES RD CHINQUAPIN DR FORTUNA WIDEN YATES RD FROM CHINQUAPIN DR TO FORTUNA RD FROM 2 TO 4 LANES 2020 $6,828

4A04418 YUCAIPA BL I-10 BRYANT ST WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $27,007

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

SAN BERNARDINO COUNTY GRADE SEPARATION PROJECTS

In the process of developing the 2008 RTP, the San Bernardino Associated Governments provided to SCAG a list of grade separation improvement projects

planned for implementation in San Bernardino County within the timeframe of the RTP. The projects in this list are included in the 2008 RTP subject to avail-

able funding as identified in the San Bernardino County RTP Projects list.

SAN BERNARDINO COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY

PROJECT COST ($1,000'S)

4G0148 ACACIA AV IN RIALTO (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $224

4G0140 ALDER AV IN FONTANA (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SPOT WIDENING (HIGH OPTION) 2020 $2,293

4G0166 ALESSANDRO RD IN REDLANDS (YUMA) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $56,122

4G0116 ARCHIBALD AV IN ONTARIO (LOS ANGELES) ROADWAY WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $41,942

4G0164 BEAUMONT AV IN LOMA LINDA (YUMA) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $25,887

4G0134 BEECH AVIN SAN BERNARDINO COUNTY

(SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), ROADWAY WIDENING (HIGH OPTION) 2020 $3,334

4G0119 BENSON AVE IN UPLAND (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SPOT WIDENING (HIGH OPTION) TBD $1,983

4G0113 BON VIEW AV IN ONTARIO (LOS ANGELES) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $33,475

4G0143 CACTUS AV IN RIALTO (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $1,545

4G0104/ 4G0112

CAMPUS AV IN ONTARIO"(ALHAMBRA)/ (LOS ANGELES)"

SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $41,844

Page 186: Project List - Southern California Association of Governments

184 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY

PROJECT COST ($1,000'S)

4G0124 CAMPUS AV IN UPLAND (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $357

4G0142 CEDAR AV IN RIALTO (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION) TBD $24,484

4G0118 CENTRAL AV IN MONTCLAIR (SAN GABRIEL ) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) TBD $27,488

4G07421 CENTRAL AVIN MONTCLAIR ON THE ALHAMBRA AND LOS ANGELES LINES

HOLT BOULEVARD TO MISSION BOU-LEVARD

WIDEN CENTRAL AV GRADE SEPARATION IN MONTCLAIR ON THE ALHAMBRA AND LOS ANGELES LINES

2025 $12,070

4G0135 CITRUS AV IN FONTANA (SAN GABRIEL ) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $38,675

4G0156 E ST IN COLTON (SAN BERNADINO) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) 2015 $348

4G0149 EUCALYPTUS AVIN RIALTO/SAN BER-NARDINO CITY

(SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) 2030 $428

4G0429 EUCALYPTUS ST IN HESPERIA (BNSF) GRADE SEPARATION 2025 $44,705

4G0122 EUCLID AV IN UPLAND (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $1,821

4G0161 GLEN HELEN PKWYIN SAN BERNARDINO COUNTY

(CAJON) ROADWAY WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $29,928

4G0157 H ST IN COLTON (SAN BERNADINO) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) 2015 $348

4G0169 HINKLEYIN SAN BERNARDINO COUNTY

(CAJON) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $24,563

4G0168 INDIAN TRAILIN SAN BERNARDINO COUNTY

(CAJON) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) 2020 $243

4G0173 JOHNSON RDIN SAN BERNARDINO COUNTY

(CUT-OFF) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) 2020 $243

4G0136 JUNIPER AV IN FONTANA (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SPOT WIDENING (HIGH OPTION) 2020 $1,887

4G0154 LAUREL ST IN COLTON (SAN BERNADINO) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2015 $24,506

4G0144 LILAC AV IN RIALTO (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $224

4G0141 LOCUST AVIN SAN BERNARDINO COUNTY

(SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SPOT WIDENING (HIGH OPTION) 2020 $1,704

Page 187: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 185

SAN BERNARDINO COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY

PROJECT COST ($1,000'S)

4G04027 MAIN ST IN GRAND TERRACE (SAN BERNARDINO)GRADE SEPARATION AT MAIN ST IN GRAND TERRACE ON THE SAN BERNAR-DINO LINE

2014 $24,696

4G0138 MANGO AV IN FONTANA (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) 2020 $1,412

4G0106 MILLIKEN AV IN ONTARIO (ALHAMBRA) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2010 $44,376

4G0117 MILLIKEN AV IN ONTARIO (LOS ANGELES) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $37,150

4G0102 MONTE VISTA AV IN MONTCLAIR (ALHAMBRA) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2010 $31,278

4G0108 MONTE VISTA AV IN MONTCLAIR (LOS ANGELES) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2010 $31,278

4G07422 MOUNT VERNON.2 MILES WEST OF RANCHO AVE.

.9 MILES EAST OF LA CADENA DR

CONSTRUCT RAILROAD GRADE SEPARATION FROM SOUTH OF I-10 IN CITY OF COLTON

2020 $6,368

4G0120 MOUNTAIN AV IN UPLAND (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $1,821

4G0155 OLIVE ST IN COLTON (SAN BERNADINO) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2010 $19,463

4G07420 ORO GRANDEIN SAN BERNARDINO COUNTY

REPLACE GRADE SEPARATION 2020 $49,343

4G0160 PALM AVIN SAN BERNARDINO CITY

(CAJON) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $37,294

4G0139 PALMETTO AV IN FONTANA (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) 2015 $315

4G0150 PEPPER AVIN SAN BERNARDINO CITY

(SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SPOT WIDENING (HIGH OPTION) 2030 $3,585

4G0172 PHELANIN SAN BERNARDINO COUNTY

(CUT-OFF) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $24,563

4G0107 RAMONA AV IN MONTCLAIR (LOS ANGELES) ROADWAY WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2008 $16,291

4G0152 RANCHO AVIN SAN BERNARDINO CITY

(SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) 2020 $407

4G0151 RIALTO AVIN SAN BERNARDINO CITY

(SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), ROADWAY WIDENING (HIGH OPTION) 2030 $6,118

4G0153 RIALTO AVIN SAN BERNARDINO CITY

(SAN BERNADINO) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2030 $59,381

Page 188: Project List - Southern California Association of Governments

186 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY

PROJECT COST ($1,000'S)

4G0146 RIVERSIDE AV IN RIALTO (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $1,103

4G07423 RIVERSIDE AVE IN RIALTO ATSFGRADE SEPARATION OF ATSF AT RIVERSIDE AVE AND ATSF METROLINK TRACKS

TBD $37,789

4G0103/ 4G0109

SAN ANTONIO AV IN ONTARIO(ALHAMBRA) (LOS ANGELES)

SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $41,844

4G0121 SAN ANTONIO AV IN UPLAND (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $662

4G0165 SAN TIMOTEO RD IN REDLANDS (YUMA) SPOT WIDENING (LOW OPTION), SPOT WIDENING (HIGH OPTION) TBD $1,965

4G0123 SECOND AV IN UPLAND (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $1,276

4G0137 SIERRA AV IN FONTANA (SAN GABRIEL ) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $27,756

4G0111 SULTANA AV IN ONTARIO (LOS ANGELES) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $33,475

4G0147 SYCAMORE AV IN RIALTO (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $224

4G07424 US-395 0.9 MI S/O SR-58 0.1 MI N/O SR-58 RR GRADE SEPARATION 2015 $56,731

4G0158 VALLEY BL IN COLTON (SAN BERNADINO) ROADWAY WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $41,682

4G0110 VINE AV IN ONTARIO (LOS ANGELES) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $33,475

4G0105 VINEYARD AV IN ONTARIO (ALHAMBRA) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2025 $35,551

4G0167 VISTAIN SAN BERNARDINO COUNTY

(CAJON) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) 2020 $24,563

4G0145 WILLOW AV IN RIALTO (SAN GABRIEL ) SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION) TBD $224

SAN BERNARDINO COUNTY ITS PROJECTS

In the process of developing the 2008 RTP, the San Bernardino Associated Governments provided to SCAG a list of ITS improvement projects planned for

implementation in San Bernardino County within the timeframe of the RTP. The projects in this list are included in the 2008 RTP subject to available funding

as identified in the San Bernardino County RTP Projects list.

Page 189: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 187

SAN BERNARDINO COUNTY ITS PROJECTS

RTP ID SPONSOR PROJECT PROJECT BENEFITSBUDGET

($1,000,000'S)

4ITS07012 CALTRANS DISTRICT 7 INTERCAD INTEROPERABLE COMPUTER AIDED DISPATCH OF SERVICES $2.20

4ITS07001 CALTRANS DISTRICT 8 RAMP METERING IMPROVED TRAFFIC FLOW AND SAFETY. $214.95

4ITS07002 CALTRANS DISTRICT 8FREEWAY OPS. COMMUNICATIONS INFRASTRUC-TURE

COMMUNICATIONS LINKS FOR FREEWAY OPS. $104.53

4ITS07003 CALTRANS DISTRICT 8 CLOSED CIRCUIT TV INCIDENT DETECTION AND TRAFFIC MONITORING. $56.96

4ITS07004 CALTRANS DISTRICT 8 ULTIMATE TMC IMPROVED TRAFFIC FLOW AND SAFETY. $40.76

4ITS07005 CALTRANS DISTRICT 8 CHANGEABLE MESSAGE SIGNS TRAVELER INFORMATION ON TRAFFIC AND SAFETY CONDITIONS. $24.07

4ITS07008 CALTRANS DISTRICT 8 ADVANCED WEATHER WARNING WEATHER MONITORING AND DETECTION. $5.44

4ITS07011 CALTRANS DISTRICT 8 HIGHWAY ADVISROY RADIO EXPANSION TRAVELER INFORMATION ON TRAFFIC AND SAFETY CONDITIONS. $2.52

4ITS07015 CALTRANS DISTRICT 8 ENVIRONMENTAL SENSING UNITS ENVIRONMENTAL HAZARDS DETECTION. $1.98

4ITS07016 CALTRANS DISTRICT 8 SYSTEMS SUPPORT DEVELOPMENT SYSTEMS SUPPORT ELEMENTS TO TMC/FWY OPS. $0.80

4ITS07006 FONTANA/ ONTARIO FONTANA/ONTARIO AREA TMC IMPROVED ARTERIAL TRAFFIC FLOW AND SAFETY. $12.38

4ITS07007 INLAND EMPIRE ITSITS RR GRADE CROSSING VARIABLE SPEED WARN-ING

IMPROVED GRADE CROSSING SAFETY REDUCED DELAY. $9.90

4ITS07009 INLAND EMPIRE ITS ITS RR GRADE CROSSING IMPROVEMENTS IMPROVED GRADE CROSSING SAFETY REDUCED DELAY. $4.91

4ITS07013 INLAND EMPIRE ITS ELECTRONIC CLEARANCE/PRE PASS PROGRAM REDUCED DELAY TRUCKS/INCREASED COMPLIANCE WITH TRUCK SAFETY $2.15

4ITS07017 INLAND EMPIRE ITS TRUCK STOP KIOSKS REDUCED DELAY TRUCKS/INCREASED COMPLIANCE WITH TRUCK SAFETY $0.59

4ITS07019 INLAND EMPIRE ITS OVERSIZE/WEIGHT PERMITTING REDUCED DELAY TRUCKS/INCREASED COMPLIANCE WITH TRUCK SAFETY $0.32

4ITS07020 INLAND EMPIRE ITS SAN BERNARDINO WEST VALLEY TMC IMPROVED ARTERIAL TRAFFIC FLOW AND SAFETY. TBD

4ITS07021 INLAND EMPIRE ITS SAN BERNARDINO EAST VALLEY TMC IMPROVED ARTERIAL TRAFFIC FLOW AND SAFETY. TBD

4ITS07022 INLAND EMPIRE ITS HIGH DESERT TMC IMPROVED ARTERIAL TRAFFIC FLOW AND SAFETY. TBD

4ITS07014 OMNITRANS TRANSIT TRAVELER INFORMATION IMPROVED TRANSIT INFORMATION. $2.02

4ITS07023 OMNITRANS TRANSIT OPS. MANAGEMENT IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. TBD

4ITS07024 OMNITRANS OPS. MANAGEMENT PARATRANSIT IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. TBD

4ITS07025 OMNITRANS AUTOMATED FARE MANAGEMENT AND DATA IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. TBD

4ITS07010 SANBAG FREEWAY SERVICE PATROL ACCIDENT AND INCIDENT REMOVAL AND REDUCTION THEREBY IMPROVING TRAF-FIC FLOW AND SAFETY.

$3.84

4ITS07018 SUNLINE TRANSIT ITS MOBILITY ENHANCEMENT IMPROVED TRANSIT RELIABILITY AND MODE SHIFT. $0.48

Page 190: Project List - Southern California Association of Governments

188 P R O J E C T L I S T I N G R E P O R T

VENTURA COUNTY RTP PROJECTS

VENTURA COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

ARTERIAL 5AL07 0 ARTERIAL IMPROVEMENTS COUNTYWIDE ARTERIAL IMPROVEMENTS LUMP SUM ONGOING $879,303

GRADE SEPARATION

5GL04 0 GRADE SEPARATION COUNTYWIDE GRADE SEPARATION IMPROVEMENTS ONGOING $208,023

IC/RAMPS 5A0701 33 SR-33AT STANLEY AVENUE

NEW TWO-LANE FREEWAY BRIDGE FOR SB TRAFFIC 2012 $10,536

IC/RAMPS 5M0104 101 SR-101 AT LA CONCHITAEXTEND ACCELERATION AND DECELERATION LANES; AND CLOSE THREE MEDIAN CROSSINGS NEAR LA CONCHITA.

2014 $16,373

ITS 5ITS04 0 ITS COUNTYWIDE MISC. ITS PROJECT IMPLEMENTATION ONGOING $166,488

NON-MO-TORIZED

5O0703 0MISC. TRANSPORTATION ENHANCEMENTS

COUNTYWIDE TRANSPORTATION ENHANCEMENT ONGOING $31,216

NON-MO-TORIZED

5N011 0 ALONG SP BRANCH RAIL LINE MONTALVOLOS ANGELES COUNTY LINE

SANTA PAULA BRANCH RECREATIONAL TRAIL 2020 $76,948

O&M 5OM0702 0 OPERATIONS & MAINTENANCE COUNTYWIDESTATE HIGHWAY, ARTERIAL, AND TRANSIT PRESERVA-TION/MAINTENANCE AND OPERATIONS

ONGOING $275,154

OTHER 5O0701 0 PLANTING/ LANDSCAPING COUNTYWIDE MISC. PLANTING AND LANDSCAPING ONGOING $62,433

OTHER 5O0702 0RETROFIT SOUNDWALL PROGRAM

COUNTYWIDE RETROFIT SOUNDWALL PROGRAM ONGOING $31,216

OTHER 5OM0701 118 SR-118JCN 23 & 34 IN MOORPARK

CONSTRUCT NEW WEIGH STATION 2014 $27,016

TDM 5TDL04 0 TDM COUNTYWIDE MISC. TDM (NON-MOTORIZED, TELECOMMUTE, ETC.) ONGOING $62,433

TRANSIT - BUS

5TL04 0 TRANSIT SERVICE EXPANSION COUNTYWIDE COUNTYWIDE TRANSIT SERVICE EXPANSION 2035 $67,752

TRANSIT - BUS

5TL0703 0BUS EXPANSIONS (INCLUDES PARATRANSIT)

COUNTYWIDE BUS EXPANSIONS (INCLUDES PARATRANSIT) ONGOING $93,649

TRANSIT - COMMUTER

RAIL5CR104 0 METROLINK COMMUTER RAIL

IN VENTURA COUNTY

METROLINK COMMUTER RAIL SERVICE EXPANSION 2035 $67,752

TRANSIT - INTER-MODAL

5TC0701 0MULTIMODAL TRANSPORTA-TION CENTER

IN DOWNTOWN VENTURA

SERVICE CENTER, PARKING, LAYOVER, AND RETAIL SPACE FOR RAIL, BUS, AND BICYCLE COMMUTERS.

2014 $64,904

Page 191: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 189

VENTURA COUNTY RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TRANSIT - OTHER

5TL0702 0PLANNING & ADMINISTRA-TION

TRANSIT PLANNING & ADMINISTRATION ONGOING $104,055

TRANSIT - OTHER

5TL0706 0 FACILITY IMPROVEMENTS COUNTYWIDE NEW TRANSIT FACILITIES & IMPROVEMENTS ONGOING $62,433

TRANSIT - OTHER

5TL0707 0MISC. ITEMS AND AMENITIES, ENHANCEMENTS

COUNTYWIDE MISC. TRANSIT ITEMS ONGOING $31,216

TRANSIT - OTHER

5TR0701 0 BUS TRANSIT MULTI-AGENCY TRANSPORTATION FACILITY 2012 $3,998

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

VENTURA COUNTY ARTERIAL PROJECTS

In the process of developing the 2008 RTP, the Ventura County Transportation Commission provided to SCAG a list of arterial improvement projects planned

for implementation in Ventura County within the timeframe of the RTP. The projects in this list are included in the 2008 RTP subject to available funding as

identified in the Ventura County RTP Projects list.

VENTURA COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

5A0744 ARROYO DRIVEE/B SR-118 OFF-RAMP AT COLLINS DRIVE

CITY EASTERLY LIMITS WIDEN ARROW DRIVE FROM 2 TO 4 LANES 2018 $7,006

5A0725CENTRAL AVENUE WID-ENING IMPROVEMENT

SANTA CLARA AVE.CAMARILLO CITY LIMITS

WIDEN FROM TWO LANES TO FOUR LANES 2020 $13,640

5G0405 GONZALES RD SR-1 (OXNARD BLVD) UPRR TRACKSCONSTRUCT 6 LANE GRADE SEPARATION AT SR-1 (OXNARD BLVD) AND UPRR TRACKS WITH LEFT TURN POCKETS

2014 $24,655

5A0707GRIMES CANYON ROAD AND HITCH BLVD RE-ALIGNMENT

AT SR118ADD 2ND WESTBOUND THROUGH LANE AND 2ND EASTBOUND THROUGH LANE

2020 $6,127

5A0708 HARBOR BLVD AT GOZALES ROADADD 2ND SOUTHBOUND THROUGH LANE AND 2ND NORTHBOUND THROUGH LANE

2022 $2,355

Page 192: Project List - Southern California Association of Governments

190 P R O J E C T L I S T I N G R E P O R T

VENTURA COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

5A0720HARBOR BOULEVARD WIDENING IMPROVE-MENT

OXNARD CITY LIMITS VENTURA CITY LIMITSWIDEN FROM TWO LANES TO FOUR LANES, INCLUDING REPLACE-MENT OR WIDENING OF EXISTING BRIDGE

2030 $52,117

5A0715 HERMOSA RD AT SR 150 INTERSECTION IMPROVEMENTS 2015 $442

5A0730 LOS ANGELES AVENUE

SEGMENT 1: 200' E/O ORCHID AVENUE SEGMENT 2: 200' E/O OF SEQUOIA AVENUE

"SEGMENT 1: 100' W/O SYCAMORE DRIVE SEMENT 2: 100' W/O OF DARRAH AVENUE"

WIDEN SOUTH SIDE OF LOS ANGELES AVENUE BY ADDING A LANE (FROM 4 TO 5 LANES)

2010 $3,130

5A0735 LOS ANGELES AVENUEAPPROXIMATELY 1250' E/O SYCAMORE DRIVE

APPROXIMATELY 1000' E/O SYCAMORE DRIVE

WIDEN TAPO CHANNEL BRIDGE AT LOS ANGELES AVENUE (15' ON THE NORTH SIDE & 20' ON THE SOUTH SIDE). THIS INCLUDES ADDITION OF ONE LANE IN EACH DIRECTION (FROM 4 TO 6 LANES), RELOCATION OF THE EXISITING UTILITIES & MODIFICATIONS TO UPSTREAM & DOWN STREAM OF THE CHANNEL.

2010 $1,252

5AL04MISC. ARTERIAL IMPROVEMENTS (NON-CAPACITY)

COUNTYWIDE MISC. ARTERIAL IMPROVEMENTS (NON-CAPACITY) 2035 $254,071

5A0742 NORTHHILLS PARKWAYW/B SR-118 OFF-RAMP AT PRINCETON

CITY WESTERLY LIMITS AT SR-118

CONSTRUCT 4-LANE FREEWAY CONNECTION ON NEW ALIGNMENT 2023 $21,180

5A0723 OLIVAS PARK DRIVE PERKIN AVE AUTO CENTER DRIVE CONSTRUCT 4-LANE EXTENSION 2009 $10,539

5A0746 PEARL ST FOX ST BALD ST GAP CLOSURE EXTENSION 2014 $2,120

5A0709 PLEASANT VALLEY ROAD AT E. 5TH STREETADD 2ND SOUTHBOUND THROUGH LANE AND 2ND NORTHBOUND THROUGH LANE

2017 $1,567

5A0721PLEASANT VALLEY ROAD WIDENING IMPROVE-MENT

DODGE RD LAS POSAS ROAD WIDEN FROM TWO TO FOUR LANES 2030 $39,392

5A0743 PRINCETON AVENUESR-118 OFFRAMP AT PRINCETON AVE

SPRING ROAD WIDEN, REALIGN AND RECONSTRUCT FROM 2 TO FOUR LANES 2018 $11,210

5A0710 RICE AVENUE AT WOOLEY ROADADD 3RD NORTHBOUND THROUGH LANE AND 3RD SOUTHBOUND THROUGH LANE

2015 $1,267

Page 193: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 191

VENTURA COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

5A0711 RICE AVENUEAT CHANNEL ISLANDS BLVD

ADD 3RD NORTHBOUND THROUGH LANE AND 3RD SOUTHBOUND THROUGH LANE AND SOUTHBOUND RIGHT-TURN LANE

2015 $1,267

5A0402 ROSE AVE AT GONZALEZ RD CONSTRUCT 4 LANE FLYOVER WITH LEFT TURN POCKETS 2018 $31,862

5G0404 ROSE AVE AT SR-34 (E. FIFTH ST) CONSTRUCT 4 LANE GRADE SEPARATION WITH LEFT TURN POCKETS 2014 $24,655

5A0719SANTA CLARA AVENUE WIDENING IMPROVE-MENT

N/O OXNARD CITY LIMITS SR 118 WIDEN FROM TWO TO FOUR LANES 2018 $30,071

5A0716SOMIS RD/SR118/DON-LON D INTERSECTION IMPROVEMENTS

WIDEN INTERSECTION, ADD TURN LANES, RALIGN DONLON ROAD (COUNTY PORTION ONLY)

2020 $6,127

5A0705 SR 33 SR 33 SR 150 AT "Y" ROUNDABOUT 2020 $1,622

5A0706 SR 33 SR 33 CUYAMA RD ROUNDABOUT 2014 $644

5A0703 SR-118 AT COLLINS DRIVEINTERCHANGE AND SIGNAL IMPROVEMENT. WIDEN W/B OFF-RAMP TO ADD A FREE RIGHT- TURN LANE AND SIGNAL MODIFICATION.

2011 $2,001

5G0403 SR-232 (VINEYARD AVE) OXNARD BLVD SAINT MARY'S DRIVE CONSTRUCT 6 LANE GRADE SEPARATION OVER UPRR TRACKS 2014 $24,655

5A0704 SR33/SR150 VARIOUS LOCATIONSVARIOUS MINOR SPOT IMPROVEMENTS TO REDUCE CONGESTION ON SR 33 AND 150 IN OJAI VALLEY AND NEAR OJAI

2025 $3,287

5A0734 STEARNS STREET COCHRAN STREET LEEDS STREETWIDENING OF STEARNS STREET TO ADD A LANE IN EACH DIRECTION (FROM 2 TO 4 LANES)

2010 $1,707

5A0728 TAPO CANYON RD WALNUT STREET LOST CANYON RD.WIDEN TAPO CANYON ROAD TO ADD AN ADDITIONAL LANE IN EACH DIRECTION (FROM 2 TO 4 LANES) AND A DIVIDED CENTER MEDIAN.

2012 $5,393

5A0738 TAPO STREET WALNUT STREET PRESIDIO DR.WIDENING OF TAPO STREET TO ADD A LANE IN EACH DIRECTION (FROM 2 TO 4 LANES)

2010 $740

5A0736 TBDBETWEEN FLANAGAN DRIVE

AND EVENING SKY DR.PROVIDES THE MISSING LINK (A 60' ROAD WITH TWO LANES) BE-TWEEN TWO STREETS (FLANAGAN DR. & EVENING SKY DR.). FROM 0 TO 2 LANES)

2010 $911

5A0713 TOPA TOPA ST FOX ST MONTGOMERY ST GAP CLOSURE EXTENSION 2015 $1,149

5A0401 VICTORIA AVE AT GONZALES RD CONSTRUCT 4 LANE FLYOVER WITH LEFT TURN POCKETS 2018 $31,862

Page 194: Project List - Southern California Association of Governments

192 P R O J E C T L I S T I N G R E P O R T

VENTURA COUNTY ARTERIAL PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

5A0712 VICTORIA AVENUE AT GONZALES ROAD

CONVERT SOUTHBOUND RIGHT-TURN LANE TO SHARED 3RD SOUTHBOUND THROUGH LANE/SOUTHBOUND RIGHT TURN LANE, ADD 2ND SOUTHBOUND LEFT-TURN LANE AND NORTHBOUND RIGHT-TURN LANE AND CONVERT DUAL WESTBOUND THROUGH LANE TO WESTBOUND RIGHT-TURN LANE AND SHARED WESTBOUND THROUGH LANE/2ND WESTBOUND RIGHT-TURN LANE

2020 $1,633

5A0714 VICTORIA AVENUE AT OLIVAS PARK DRIVE ADD ADDITIONAL EB-WB THROUGH LANES AND NB LEFT TURN LANES 2009 $474

5A0722VICTORIA AVENUE WIDENING IMPROVE-MENT - A

GONZALES ROAD VENTURA CITY LIMITS WIDEN FROM FOUR LANES TO SIX LANES 2030 $29,729

5A0726VICTORIA AVENUE WIDENING IMPROVE-MENT - B

GONZALES ROAD OXNARD CITY LIMITS WIDEN FROM FOUR LANES TO SIX LANES 2030 $18,983

5A0732WENDY DRIVE WIDENING IMPROVEMENTS

BORCHARD ROADTHOUSAND OAKS CITY LIMITS

RE-STRIPE FROM TWO TO FOUR LANES; INLCUDES REPLACEMENT OR WIDENING OF EXISTING BRIDGE

2018 $2,134

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Page 195: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 193

VENTURA COUNTY GRADE SEPARATION PROJECTS

In the process of developing the 2008 RTP, the Ventura County Transportation Commission provided to SCAG a list of grade separation improvement projects

planned for implementation in Ventura County within the timeframe of the RTP. The projects in this list are included in the 2008 RTP subject to available

funding as identified in the Ventura County RTP Projects list.

VENTURA COUNTY GRADE SEPARATION PROJECTS

RTP ID ROUTE NAME FROM TO DESCRIPTIONPROJECT

COMPLETION BY:

PROJ-ECT COST ($1,000'S)

5G0701LOS ANGELES AVENUE

LA AVENUE GRADE SEPARATION. GRADE-SEPARATE LA AVENUE (MP 437.0) IN SIMI VALLEY. REALIGN 0.30-MILE-LONG CURVE SOUTH OF LOS ANGELES AVENUE, CONSTRUCT LOS ANGE-LES AVENUE OVERPASS, CONSTRUCT 0.48 MILE OF NEW TRACK TO FRA CLASS 5 STANDARDS.

2019 $156,288

5G0102 SR118NEAR GRIMES CANYON

CROSOOVER ON SR118 NEAR GRIMES CANYON 2011 $58,431

Page 196: Project List - Southern California Association of Governments

194 P R O J E C T L I S T I N G R E P O R T

REGIONAL RTP PROJECTS

REGIONAL RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

HSRT - FREIGHT

HSRT0702 0HSRT (TECHNOLOGY TBD)

PORTS OF LOS ANGELES/LONG BEACH

HOBART YARDHIGH-SPEED REGIONAL TRANSPORT (HSRT): SPUR FROM PORTS OF LOS ANGELES/LONG BEACH TO HOBART YARD FOR FREIGHT MOVEMENT

2020 $17,899,546

HSRT - PAS-SENGER

HSRT0701 0 HIGH-SPEED RAIL ANAHEIM UNION STATIONHIGH-SPEED REGIONAL TRANSPORT (HSRT): (CALIFORNIA HIGH-SPEED RAIL AUTHORITY) - ANAHEIM TO UNION STATION

2020

$4,009,021 (Plan assumes cost

covered by state HSRT Bond Act)

HSRT - PAS-SENGER

HSRT0703 0HSRT (TECHNOLOGY TBD)

LAX/WEST LA ONTARIO AIRPORTHIGH-SPEED REGIONAL TRANSPORT (HSRT): IOS (LAX-WEST LA-UNION STATION-WEST COVINA-ONTARIO AIRPORT)

2020 $18,941,077

HSRT - PAS-SENGER

HSRT0704 0HSRT (TECHNOLOGY TBD)

ONTARIO AIRPORTSAN BERNARDINO AIRPORT

HIGH-SPEED REGIONAL TRANSPORT (HSRT): IOS EXTEN-SION FROM ONTARIO AIRPORT TO SAN BERNARDINO AIRPORT

2020 $3,453,152

HSRT - PAS-SENGER

HSRT0705 0HSRT (TECHNOLOGY TBD)

ANAHEIM ONTARIO AIRPORTHIGH-SPEED REGIONAL TRANSPORT (HSRT): (CALIFOR-NIA-NEVADA SUPERSPEED TRAIN COMMISSION) - ANA-HEIM TO ONTARIO AIRPORT

2020 $6,705,772

TOLL 1C0404 TBDHIGH DESERT COR-RIDOR

I-5 US-395HIGH DESERT CORRIDOR, CONSTRUCT NEW 4-6 LANE FACILITY: E-W I-14 TO US-395 (CONNECTING AT SB CO #20020144), E-W I-5 TO SR-14, N-S SR-14 TO SR-138.

2030 $6,958,029

DEBT SER-VICE

1C0404-DS TBDHIGH DESERT COR-RIDOR

I-5 US-395 DEBT SERVICE - HIGH DESERT CORRIDOR ONGOING $2,838,404

TOLL 1M0101 710SR-710 (GAP CLO-SURE)

VALLEY BOULEVARDCALIFORNIA BL & PASADENA AVE

CONSTRUCT 4 TOLL LANES IN EACH DIRECTION IN TUN-NEL TO COMPLETE THE 710 FREEWAY

2020 $4,616,060

DEBT SER-VICE

1M0101-DS 710SR-710 (GAP CLO-SURE)

VALLEY BOULEVARDCALIFORNIA BL & PASADENA AVE

DEBT SERVICE - 710 TUNNEL ONGOING $1,726,734

Page 197: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 195

REGIONAL RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

TOLL 3C01MA03 0CETAP - RIVER-SIDE COUNTY TO ORANGE COUNTY

WESTERN RIVER-SIDE COUNTY

ORANGE COUNTY

CETAP - RIVERSIDE COUNTY TO ORANGE COUNTY: - CONSTRUCT NEW INTERCOUNTY TRANSPORTATION CORRIDOR A - 2 TOLL EACH DIR ON NEW FACILITY PARALLEL TO SR-91, FROM SR-241 TO I-15, WITH IC AT SR-241, SR-71, I-15; - PRELIMINARY ENGINEERING AND ENVIRONMENTAL IMPACT REPORT/STATEMENT ONLY ON CORRIDOR B - 2 TOLL EACH DIR ON NEW FACILITY FROM I-15/MID-COUN-TY PKWY TO SR-241/SR-133

2035 $11,938,050

DEBT SER-VICE

3C01MA03-DS

0CETAP - RIVER-SIDE COUNTY TO ORANGE COUNTY

WESTERN RIVER-SIDE COUNTY

ORANGE COUNTY DEBT SERVICE - CETAP RIV TO OC CORRIDOR A ONGOING $1,978,321

MIXED FLOW AND TRUCK TOLL LANES

1C0401 710 I-710OCEAN BLVD IN LONG BEACH

INTERMODAL RAILROAD YARDS IN COMMERCE/VERNON

I-710 CORRIDOR USER-FEE BACKED CAPACITY EN-HANCEMENT - WIDEN TO 5 MIXED FLOW + 2 DEDICATED LANES FOR CLEAN TECHNOLOGY TRUCKS (EACH DIREC-TION) AND INTERCHANGE IMPROVEMENTS, FROM OCEAN BLVD IN LONG BEACH TO THE INTERMODAL RAILROAD YARDS IN COMMERCE/VERNON

2020 $8,239,161

DEBT SER-VICE

1C0401-DS 710 I-710OCEAN BLVD IN LONG BEACH

INTERMODAL RAILROAD YARDS IN COMMERCE/VERNON

DEBT SERVICE - I-710 CORRIDOR ONGOING $5,939,925

RAILROAD CAPACITY

RRC0701 0REGIONAL RAIL CA-PACITY PROGRAM

REGIONWIDE RAIL INVESTMENT PACKAGE - RAIL CAPACITY 2015 $3,149,301

GRADE SEPARATION

RRC0702 0REGIONAL RAIL CA-PACITY PROGRAM

REGIONWIDE RAIL INVESTMENT PACKAGE - GRADE SEPARATIONS 2015 $5,995,841

OTHER RRC0703 0REGIONAL RAIL CA-PACITY PROGRAM

REGIONWIDE RAIL INVESTMENT PACKAGE - TIER 4 ENGINES 2021 $3,771,002

DEBT SER-VICE

RRC07-DS 0REGIONAL RAIL CA-PACITY PROGRAM

REGIONWIDEDEBT SERVICE - RAIL INVESTMENT PACKAGE - RAIL CAPACITY, GRADE SEPARATIONS, TIER 4 ENGINES

ONGOING $10,100,413

Page 198: Project List - Southern California Association of Governments

196 P R O J E C T L I S T I N G R E P O R T

REGIONAL RTP PROJECTS

CAT-EGORY

RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

PROJECT COMPLE-TION BY*

PROJECT COST ($1,000'S)

O&M REG0701 0HIGHWAY OPERA-TIONS & MAINTE-NANCE

REGIONWIDE

STATE HIGHWAY PRESERVATION/MAINTENANCE AND OPERATIONS PROJECTS (INCLUDES SHOPP, HIGHWAY BRIDGE PROGRAM, EMERGENCY RELIEF, PUBLIC LAND HIGHWAYS, HAZARD ELIMINATION AND SAFETY, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, AND SECTION 130 STP RAILROAD PROGRAM PROJECTS)

ONGOING

SEE FINANCIAL PLAN HIGHWAY

OPERATIONS AND MAINTENACE

COST

O&M REG0702 0TRANSIT OPERA-TIONS & MAINTE-NANCE

REGIONWIDETRANSIT PRESERVATION/MAINTENANCE, REHABILITA-TION/REPLACEMENT AND OPERATIONS PROJECTS

ONGOING

SEE FINANCIAL PLAN TRANSIT

OPERATIONS AND MAINTENACE

COST

O&M REG0703 0ARTERIAL OPERA-TIONS & MAINTE-NANCE

REGIONWIDEARTERIAL PRESERVATION/MAINTENANCE AND OPERA-TIONS PROJECTS

ONGOING

SEE FINANCIAL PLAN LOCAL

STREETS AND ROADS OPERA-

TIONS AND MAIN-TENACE COST

OTHER REG0704 0 OTHER PROGRAMS REGIONWIDERECREATIONAL TRAILS, SCENIC BYWAYS, TRANS-PORTATION COMMUNITY AND SYSTEM PRESERVATION PROGRAM PROJECTS

ONGOINGSEE FINANCIAL

PLAN OTHER COST

OTHER 1O0705 0 TBD INTERMODAL FACILITIES (LOCATION TBD) TBDPRIVATELYFINANCED

* For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Page 199: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 197

IMPERIAL COUNTY STRATEGIC PLAN PROJECTS

IMPERIAL COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

LEAD AGENCY

ARTERIAL U6A07001 0PORT OF ENTRY (POE)/CESAR CHAVEZ

POE/CESAR CHAVEZ IMPROVEMENTS, BRIDGE, TRAFFIC SIGNALS, GRADE SEPARATION, STREET IMPROVEMENTS

CITY OF CALEXICO

ARTERIAL U6A07002 0 IMPERIAL AVE. MCCABE RD. I-8 IMPROVE TO 6 PA TBD

ARTERIAL U6A07003 0 FORRESTER RD. SR-98 SR-78/86 IMPROVE/CONSTRUCT NORTH SOUTH CORRIDOR TBD

ARTERIAL U6A07004 0 DOGWOOD RD. SR-98 MEAD RD. IMPROVE TO 4PA TBD

ARTERIAL U6A07005 0 MCCABE RD. AUSTIN RD. SR-111 IMPROVE TO 6PA TBD

ARTERIAL U6A07007 0 KEYSTONE FORRESTER RD. SR-115 NEW EAST-WEST 6PA CORRIDOR TBD

ARTERIAL U6A07010 0 IMPERIAL AVE. I-8 ATEN IMPROVE TO 6PA TBD

ARTERIAL U6A07011 08TH STREET (EL CENTRO)

WIDEN TO 4 LANES TBD

ARTERIAL U6A07009 0 AUSTIN RD. MCCABE RD. SR-86 IMPROVE TO 6PA TBD

ARTERIAL U6A01006 78 SR-78 SR-115RIVERSIDE COUNTY LINE

IMPROVE CAPACITY TBD

ARTERIAL 6M01004 111 SR-111 SHANK RD. SR-115 IMPROVE TO CONVENTIONAL HIGHWAY TBD

GRADE SEPA-RATION

U6G07001 0VARIOUS GRADE SEPA-RATIONS

VARIOUS (10 CROSSINGS) WARD, HWY. 78, MALAN, MEAD, KEY-STONE, ATEN ROAD, WEST MAIN STREET (EVAN HEWES HWY), DOGWOOD, EAST MAIN ST., W. COLE

TBD

IC/RAMPS U6M07001 7 SR-7 NEW INTERCHANGE SR-7 TO ACCESS NEW AIRPORT TBD

IC/RAMPS U6M07003 8 I-88TH STREET OVER-PASS (EL CENTRO)

WIDEN OVERPASS TO 4 LANES. TBD

IC/RAMPS U6M07005 86 AUSTIN RD. MCCABE RD. SR-86 CONSTRUCT INTERCHANGE TBD

IC/RAMPS U6M01007 111 SR-111 SR-78 I-8WIDEN TO 6 LANES & CONSTRUCTION NEW INTERCHANGES SR-78, KEYSTONE, WORTHINGTON, & ATEN

COUNTY OF IMPERIAL

Strategic Plan Projects

The following is an illustrative list of additional investments that the region would pursue if additional funding were to become available, and after further consen-

sus building is undertaken to solidify commitment around specific project scopes and strategies. These projects are not part of the financially constrained RTP.

Page 200: Project List - Southern California Association of Governments

198 P R O J E C T L I S T I N G R E P O R T

IMPERIAL COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION

LEAD AGENCY

IC/RAMPS U6M07004 186 SR-186/I-8IMPROVE INTERCHANGE - ON SR-186 ADD 1 LANE EACH DIR BE-TWEEN RAMPS, AND WIDEN RAMPS

TBD

MIXED FLOW U6A01010 0WESTMORELAND BYPASS

EAST OF WESTMO-RELAND

WEST OF WEST-MORELAND (AT SR-78/86)

CONSTRUCT 4E EXTENSIONCOUNTY OF IMPERIAL

MIXED FLOW U6A01019 0 BOWKER ROADINTERNATIONAL BORDER/ANZA ROAD

NORTH OF I-8 IMPROVE INTERCHANGE TO 6E TBD

MIXED FLOW U6M01010 8 I-8

NEW NORTH-SOUTH FACILITY ALONG FORRESTER RD CORRIDOR

SR-111 IMPROVE TO 6FCOUNTY OF IMPERIAL

MIXED FLOW U6M07002 111 SR-111 WILKINSON RD.RIVERSIDE COUNTY LINE

IMPROVE TO CONVENTIONAL HIGHWAY TBD

MIXED FLOW U6M01009 115 SR-115 EVAN HEWES HWY SR-78 CONSTRUCT 4E EXTENSIONCOUNTY OF IMPERIAL

MIXED FLOW U6M01008 115 SR-115 SR-78 SR-111 WIDEN TO 4-LANE EXPRESSWAYCOUNTY OF IMPERIAL

MIXED FLOW UIMP0021 115 SR-115/78 BRAWLEY BYPASS SR-78 CONSTRUCT CONVENTIONAL 4-LANE HIGHWAYCOUNTY OF IMPERIAL

Page 201: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 199

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0702 0 111TH ST111TH STREET FROM AVIATION BLVD TO LA CIENEGA BLVD. WIDEN AND RESTRIPE TO ACCOMMODATE TWO THROUGH LANES IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0703 0 ALAMEDA ST

ALAMEDA ST WIDENING AND RECONSTRUCTION BTWN US-101 AND 26TH ST REBUILD STREET AND REPAVE TO HEAVY DUTY VE-HICLE STANDARDS; INSTALL CHANNELIZATION AND WIDEN CURB RETURNS TO FACILITATE TRUCK MOVEMENTS BTWN US-101 AND 26TH ST

CITY OF LOS ANGELES

ARTERIAL U1A0704 0 ALAMEDA STALAMEDA ST. WIDENING - 7TH ST. TO 101 FWY.. RECONSTRUCT ALAMEDA BLVD. WITHIN THE PROJECT LIMITS.

CITY OF LOS ANGELES

ARTERIAL U1A0705 0 ALVARADO STWIDEN ALVARADO ST (SR-2) UNDER US-101 TO CREATE A SB LEFT TURN LANE ONTO EB US-101 ON-RAMP

CITY OF LOS ANGELES

ARTERIAL U1A0706 0 ANAHEIM STANAHEIM ST. WIDENING FROM FARRAGUT AVE. TO DOMINGUEZ CHANNEL. WIDEN TO MAJOR HWY. STDS. 4 TO 6 LANES

CITY OF LOS ANGELES

ARTERIAL U1A0707 0 ANAHEIM ST

ANAHEIM ST./ GAFFEY ST./PALOS VERDES DR. INTERSECTION IMPROVEMENT (ROUNDABOUT FOR 5 POINTS). CREATE A ROUND-ABOUT FOR A FIVE LEGGED INTERSECTION IN THE WILMINGTON AREA.

CITY OF LOS ANGELES

ARTERIAL U1A0708 0 AVIATION BLVDAVIATION BLVD FROM ARBOR VITAE ST TO IMPERIAL HWY. WIDEN AND RESTRIPE TO ACCOMMODATE THREE THROUGH LANES IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0709 0 BALBOA BLVDBALBOA BLVD. WIDENING AT DEVONSHIRE ST.. WIDEN EAST SIDE OF BALBOA FOR APPROXIMATELY 500 FEET AND RESTRIPE THE INTERSECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0710 0 BARHAM BLVDWIDEN BARHAM BLVD BETWEEN CAHUENGA AND BURBANK CITY LIMIT TO INCREASE CAPACITY

CITY OF LOS ANGELES

ARTERIAL U1A0711 0 BARHAM BLVDBARHAM BLVD AT CAHUENGA BLVD. WEST. INCREASE INTERSEC-TION CAPACITY.

CITY OF LOS ANGELES

ARTERIAL U1A0712 0 BARHAM BLVDWIDEN BARHAM BLVD BRIDGE AT HOLLYWOOD FWY TO INCREASE TRAFFIC CAPACITY THAT MATCHES A STREET WIDENING PROJECT PROGRAMMED IN 2001 CFP

CITY OF LOS ANGELES

Page 202: Project List - Southern California Association of Governments

200 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0713 0 BARHAM BLVD

BARHAM BLVD BRIDGE/US 101 FWY BRIDGE REPLACEMENT. REPLACE THE EXISTING BRIDGE TO INCREASE TRAFFIC CAPACITY, AND WIDEN/RESTRIPE SB US-101 OFF-RAMP AT BARHAM BLVD TO PROVIDE SB DOUBLE LEFT TURNS.

CITY OF LOS ANGELES

ARTERIAL U1A0714 0 BEAUDRY AVWIDEN BEAUDRY AVENUE TO PERMIT NORTHBOUND LEFT TURN LANE AND TO MAINTAIN TWO FULL-TIME NORTHBOUND LANES ON BEAUDRY AVE BETWEEN TEMPLE AND SUNSET

CITY OF LOS ANGELES

ARTERIAL U1A0715 0 BEVERLY BLVDBEVERLY BLVD. WIDENING - JUANITA TO NEW HAMPSHIRE. WIDEN BEVERLY BLVD ROADWAY FROM 56' TO 70'.

CITY OF LOS ANGELES

ARTERIAL U1A0716 0 BEVERLY GLEN BLVDBEVERLY GLEN BLVD AND MULHOLLAND DR . WIDEN SOUTH LEG OF BEVERLY GLEN BLVD TO CREATE A RIGHT TURN ONLY LANE.

CITY OF LOS ANGELES

ARTERIAL U1A0717 0 BRANFORD STBRANFORD ST. WIDENING IN PACOIMA. STREET WIDENING AND SIDEWALK, INCREASE PED SAFETY.

CITY OF LOS ANGELES

ARTERIAL U1A0718 0 BROADWAY

BRAZIL ST./BROADWAY & SAN FERNANDO RD. CROSSINGS. IM-PROVE TRAFFIC FLOW AT BRAZIL ST. CROSSING THROUGH WIDEN-ING, ADDITIONAL TRAFFIC LANES, AND UPGRADING BOTH SIGNAL AND RAILROAD TRAFFIC CONTROL DEVICES.

CITY OF LOS ANGELES

ARTERIAL U1A0719 0 BUNDY DRBUNDY DR. WIDENING - WILSHIRE BLVD. TO SANTA MONICA BLVD.. WIDEN BUNDY DR. TO PROVIDE AN ADDITIONAL LANE IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0720 0 BURBANK BLVDBURBANK BLVD BETWEEN BALBOA BLVD AND SEPULVEDA BLVD. ELEVATE BURBANK BLVD IN THE FLOOD CONTROL BASIN TO AVOID CLOSURES DURING RAINY SEASON

CITY OF LOS ANGELES

ARTERIAL U1A0721 0 BURBANK BLVDBURBANK BLVD. WIDENING - CLYBOURNE AVE. TO VINELAND AVE.. WIDENING ON BOTH SIDES OF STREET

CITY OF LOS ANGELES

ARTERIAL U1A0722 0 BURBANK BLVDBURBANK BLVD. WIDENING - CLEON TO LANKERSHIM BLVD. WIDEN BOTH SIDES AND IMPROVE INTERSECTIONS

CITY OF LOS ANGELES

ARTERIAL U1A0723 0 CAHUENGA BLVD

WIDEN CAHUENGA BLVD WEST BTWN HIGHLAND AVE AND BARHAM BLVD; WIDEN/CANTILEVER OVER THE FWY TO PROVIDE TWO LANES IN EACH DIRECTION WITH PEDESTRIAN SIDEWALK AND BICYCLE LANE, AND LEFT TURN LANES AT MULHOLLAND AND OAKCREST

CITY OF LOS ANGELES

ARTERIAL U1A0724 0 CAHUENGA BLVDCAHUENGA BLVD. EAST. ADD A NB LANE FROM ODIN ST TO BARHAM BLVD.

CITY OF LOS ANGELES

ARTERIAL U1A0725 0 CANOGA AVEWIDEN CANOGA AVE UNDER THE FREEWAY OVERPASS TO FULL STANDARD

CITY OF LOS ANGELES

Page 203: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 201

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0726 0 CANOGA AVECANOGA AVE AT ROSCOE . CANOGA AVE AT ROSCOE - WIDEN TO ADD A NB RIGHT-TURN LANE, EB THROUGH LANE, AND WB SEC-OND LEFT-TURN LANE.

CITY OF LOS ANGELES

ARTERIAL U1A0727 0 CENTINELA AVECENTINELA AVE BETWEEN SHORT AVE AND JEFFERSON BLVD . WIDEN TO SECONDARY HIGHWAY STANDARDS.

CITY OF LOS ANGELES

ARTERIAL U1A0728 0 CHATSWORTH STCHATSWORTH STREET - DE SOTO AVE TO TOPANGA CYN BLVD. WIDEN TO INCREASE CAPACITY.

CITY OF LOS ANGELES

ARTERIAL U1A0729 0 COLDWATER CYN AVCOLDWATER CANYON AVE BETWEEN VENTURA BLVD & MAGNOLIA BLVD . REMOVE JUT-OUTS TO ADD ONE THROUGH LANE IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0730 0 COLDWATER CYN AVCOLDWATER CYN AVE AT 101 FWY - WIDEN TO PROVIDE DUAL LEFT-TURNS TO TWO ON-RAMPS

CITY OF LOS ANGELES

ARTERIAL U1A0731 0 COLDWATER CYN AVCOLDWATER CYN AVE AT MULHOLLAND DR. (WEST INTERSECTION) . WIDEN COLDWATER AND MULHOLLAND TO IMPROVE CAPACITY.

CITY OF LOS ANGELES

ARTERIAL U1A0732 0 COLFAX AVEREPLACE COLFAX AVE BRIDGE OVER LA RIVER WITH SIGNATURE SPAN AND WIDEN TO VENTURA BLVD

CITY OF LOS ANGELES

ARTERIAL U1A0733 0 COLLEGE STCOLLEGE ST. BRIDGE OVER 110 FWY. REPLACE WITH WIDER BRIDGE TO IMPROVE CAPACITY. RAISE THE SUPERSTRUCTURE TO RESOLVE UNDERCLEARANCE DEFICIENCY.

CITY OF LOS ANGELES

ARTERIAL U1A0734 0 CRENSHAW BLVD

CRENSHAW BLVD & I-10 WB ON-RAMP. WIDEN SB CRENSHAW BLVD TO PROVIDE A SB RIGHT TURN ONLY LANE AND REDESIGN THE WB OFF-RAMP TO REDUCE CONGESTION AND IMPROVE INTERSECTION OPERATION.

CITY OF LOS ANGELES

ARTERIAL U1A0735 0 DE SOTO AVEDE SOTO AVE/US-101 RAMPS . DE SOTO AVE/US-101 RAMPS – WIDEN DE SOTO AVE UNDER FWY BRIDGE TO PROVIDE MORE CAPACITY.

CITY OF LOS ANGELES

ARTERIAL U1A0736 0 DE SOTO AVEDE SOTO AVE. WIDENING - RONALD REGAN FWY. TO DEVONSHIRE ST.. WIDEN DE SOTO TO PROVIDE CURBS, GUTTERS, SIDEWALKS, AND PROVIDE AN ADDITIONAL LANE IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0737 0 ENTERPRISE STWIDEN ENTERPRISE ST AT MATEO ST (NEAR WB I-10 OFF-RAMP) TO IMPROVE TRUCK MOVEMENT AT CURB RETURNS.

CITY OF LOS ANGELES

ARTERIAL U1A0738 0 EXPOSITION BLVDEXPOSITION PARK TRAFFIC CIRCULATION IMPROVEMENTS. STREET WIDENING AND INSTALLATION OF RIGHT TURN ONLY LANES ALONG MAJOR ARTERIAL CORRIDORS SURROUND EXPOSITION PARK.

CITY OF LOS ANGELES

Page 204: Project List - Southern California Association of Governments

202 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0739 0 EXPOSITION BLVDEXPOSITION BLVD/BALLONA CRK. WIDEN EXISTING BRIDGE TO REMOVE BOTTLENECKS AND DEFICIENCIES.

CITY OF LOS ANGELES

ARTERIAL U1A0740 0 FIGUEROA STFIGUEROA ST - CYPRESS AVE TO 5 FWY. WIDEN TO ADD SOUTH-BOUND CAPACITY.

CITY OF LOS ANGELES

ARTERIAL U1A0741 0 FIGUEROA STFIGUEROA ST BETWEEN 146TH ST AND REDONDO BEACH BLVD. WIDEN FIGUEROA ST TO MAJOR HIGHWAY STANDARD FROM 62' TO 80' TO PROVIDE THREE LANES IN EACH DIRECTION

CITY OF LOS ANGELES

ARTERIAL U1A0742 0 FLETCHER DRFLETCHER DRIVE AT GLENDALE BLVD. WIDEN TO INCREASE CAPACITY.

CITY OF LOS ANGELES

ARTERIAL U1A0743 0 FLETCHER STFLETCHER ST BRIDGE/LA RIVER. WIDEN TO INCREASE CAPACITY AND IMPROVE ACCESS TO I-5 FWY. ALSO ADD BIKE LANES AND SIDEWALKS.

CITY OF LOS ANGELES

ARTERIAL U1A0744 0 FOOTHILL BLVDWIDEN FOOTHILL BLVD BTWN SIERRA HWY AND BALBOA BLVD TO INCREASE CAPACITY

CITY OF LOS ANGELES

ARTERIAL U1A0745 0 FOOTHILL BLVD

FOOTHILL BLVD. AND SIERRA HWY. INTERSECTION IMPROVE-MENTS. WIDEN FOOTHILL BLVD. AT SIERRA HWY. BY 40 FT. FOR AN EXCLUSIVE LEFT-TURN LANES, THROUGH LANES AND DUAL FREE RIGHT-TURN LANES AND INTEGRATE TRAFFIC SIGNAL WITH THE ATCS.

CITY OF LOS ANGELES

ARTERIAL U1A0746 0 FOREST LAWN DR

FOREST LAWN DR. BRIDGE OVER LA RIVER. CONSTRUCT AN ACCESS BRIDGE (INCL. EQUESTRIAN TRAIL) OVER LA RIVER AT LAEC. RE-ALIGN SR 134 ON/OFF RAMPS AT FOREST LAWN DR. TO ENHANCE TRAFFIC FLOW IN AND AROUND THE NEW BRIDGE.

CITY OF LOS ANGELES

ARTERIAL U1A0747 0 FOUNTAIN AVWIDEN FOUNTAIN AVE BETWEEN SUNSET BLVD AND WESTERN AVE TO INCREASE CAPACITY

CITY OF LOS ANGELES

ARTERIAL U1A0748 0 FRANKLIN AVEFRANKLIN AVE/CAHUENGA BLVD. WIDEN TO ADD A SECOND WB RIGHT-TURN ONLY LANE AND ADD A RIGHT-TURN SIGNAL.

CITY OF LOS ANGELES

ARTERIAL U1A0749 0 GLENOAKS BLVDGLENOAKS BLVD AT SUNLAND BLVD. WIDEN EAST SIDE OF GLENO-AKS BLVD TO IMPROVE CAPACITY.

CITY OF LOS ANGELES

Page 205: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 203

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0750 0 GRAND AVE

WIDEN GRAND AVE BRIDGE BETWEEN CESAR CHAVEZ AND TEMPLE ST OVER US-101 TO IMPROVE ACCESS TO US-101 AND I-110 ON-RAMPS AND ALLOW DUAL LEFT-TURN LANE TO 101 & 110 ON-RAMPS, AND ADD THRU LANE AND RIGHT-TURN LANE. WIDEN SIDEWALK FOR FUTURE SCHOOL AND GRAND PLAZA ACCESS AND STUDY REPALCEMENT ALTERNATIVE.

CITY OF LOS ANGELES

ARTERIAL U1A0751 0 HASKELL AVEHASKELL AVE. WIDENING - CHASE ST. TO ROSCOE BLVD.. WIDEN BOTH SIDES OF HASKELL TO PROVIDE CURBS, GUTTERS, SIDE-WALKS, AND AN ADDITIONAL TRAFFIC LANES.

CITY OF LOS ANGELES

ARTERIAL U1A0752 0 HAYVENHURST AVHAYVENHURST AVE BETWEEN MAGNOLIA BLVD AND VENTURA BLVD. WIDEN OR REALIGN THE JUTOUTS ON THE WEST SIDE TO CITY STANDARDS

CITY OF LOS ANGELES

ARTERIAL U1A0753 0 HIGHLAND AVEHIGHLAND AVE. AND FRANKLIN AVE. STREET IMPROVEMENTS - PHASE II. WIDEN THE W/S OF HIGHLAND N/O FRANKLIN AVE.

CITY OF LOS ANGELES

ARTERIAL U1A0754 0 HOLLYWOOD BLVDHOLLYWOOD BLVD. WIDEN EB HOLLYWOOD BLVD BETWEEN VAN NESS AVE AND US-101 TO PROVIDE EB LEFT-TURN LANE TO VAN NESS AVE.

CITY OF LOS ANGELES

ARTERIAL U1A0755 0 HUBBARD STHUBBARD ST/ FOOTHILL BLVD. WIDEN TO IMPROVE CAPACITY & SIGNAL OPERATION.

CITY OF LOS ANGELES

ARTERIAL U1A0756 0HYPERION AVE / GLEN-DALE BLVD

WIDEN HYPERION AVE/GLENDALE BLVD BRIDGE OVER I-5 FWY TO INCLUDE BIKE LANES, SHOULDERS, AND SIDEWALKS

CITY OF LOS ANGELES

ARTERIAL U1A0757 0 IMPERIAL HWYIMPERIAL HWY BETWEEN SEPULVEDA BLVD AND PERSHING DR. WIDEN TO PROVIDE CONTINUOUS THREE THROUGH LANES IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0758 0 LA CIENEGA BLVDLA CIENEGA BLVD FROM ARBOR VITAE ST TO 111 ST. WIDEN AND RESTRIPE TO ACCOMMODATE THREE THROUGH LANES IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0701 0 LA CIENEGA BLVD. I-405 I-10 LA CIENEGA BLVD CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

ARTERIAL U1A0759 0 LA TIJERA BLVDLA TIJERA BLVD BETWEEN AIRPORT BLVD AND LA CIENEGA BLVD. WIDEN AND RESTRIPE TO PROVIDE CONTINUOUS THREE THROUGH LANES IN EACH DIRECTION.

CITY OF LOS ANGELES

Page 206: Project List - Southern California Association of Governments

204 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0760 0 LAUREL CANYON BLVDLAUREL CANYON BL/LA CIENEGA BL BETWEEN US-101 AND I-10 – BUILD A TUNNEL TO CONNECT US-101 AND I-10 (APPROX. 10 MILES)

CITY OF LOS ANGELES

ARTERIAL U1A0761 0 LAUREL CYNLAUREL CYN. BLVD. WIDENING SOUTH OF MULHOLLAND DR.. WIDEN WEST SIDE OF LAUREL CANYON SOUTH OF MULHOLLAND TO PROVIDE AN ADDITIONAL SOUTHBOUND LANE.

CITY OF LOS ANGELES

ARTERIAL U1A0762 0LINCOLN BLVD (SR-1)

WIDEN LINCOLN BLVD BRIDGE OVER THE BALLONA CREEK, INCLUDING RECONSTRUCTION OF THE CULVER BLVD BRIDGE OVER LINCOLN BLVD

CITY OF LOS ANGELES

ARTERIAL U1A0763 0 LOS ANGELES ST

LOS ANGELES ST BRIDGE OVER US-101: REPLACE WITH LONGER BRIDGE FOR INCREASED LATERAL UNDERCLEARANCE; COVER NB ON-RAMP WITH A PORTAL FRAME FOR INCREASED OPEN SPACE FOR PROPOSED PARK

CITY OF LOS ANGELES

ARTERIAL U1A0764 0 MAGNOLIA BLVDEXTEND MAGNOLIA BLVD FROM HAYVENHURST AVE TO LIBBIT AVE. EXTEND MAGNOLIA BLVD FROM HASKELL AVE TO SEPULVEDA BLVD

CITY OF LOS ANGELES

ARTERIAL U1A0765 0 MAGNOLIA BLVDWIDEN MAGNOLIA BLVD FROM COLFAX AVE TO LAUREL CYN BLVD TO INCREASE CAPACITY

CITY OF LOS ANGELES

ARTERIAL U1A0766 0 MAGNOLIA BLVDMAGNOLIA BLVD. WIDENING - CAHUENGA BLVD. TO VINELAND AVE.. ST. WIDENING, SIDEWALK, CURB, AND GUTTER.

CITY OF LOS ANGELES

ARTERIAL U1A0767 0 MAIN & DALYCAPACITY ENHANCEMENT AT DALY ST AND MAIN ST INCREASE CURB RETURNS AT NW AND SW CORNERS OF DALY AND MAIN TO FACILITATE TRUCK MOVEMENTS

CITY OF LOS ANGELES

ARTERIAL U1A0768 0 MELROSE AVMELROSE AVE BETWEEN VERMONT AVE AND WESTERN AVE. REMOVE ON-STREET PARKING; WIDEN TO HAVE 1 LEFT-TURN LANE AND 2 THROUGH LANES EACH WAY WITH 10-FOOT SIDEWALKS

CITY OF LOS ANGELES

ARTERIAL U1A0769 0 MELROSE AVWIDEN SOUTH SIDE OF MELROSE AVE BTWN WESTERN AVE AND US-101 BY 10 FT TO INCREASE CAPACITY

CITY OF LOS ANGELES

ARTERIAL U1A0770 0 MISSION RDMISSION RD. WIDENING - GRIFFIN AVE. TO MARENGO ST.. WIDEN MISSION ROAD FROM 60' TO 80' ROADWAY.

CITY OF LOS ANGELES

ARTERIAL U1A0771 0 MONTEREY RDMONTEREY ROAD NORTH OF HUNTINGTON DR. WIDEN AND RE-ALIGN INTERSECTION, POSSIBLY CLOSE ACCESS TO BROWNE AVE.

CITY OF LOS ANGELES

Page 207: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 205

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0772 0 MOORPARK AVEMOORPARK AVE. WIDENING - WOODMAN AVE. TO MURIETTA AVE.. ST. WIDENING, STREET LIGHTS, CURB & GUTTER

CITY OF LOS ANGELES

ARTERIAL U1A0773 0 MULHOLLAND DRWIDEN MULHOLLAND DR FROM SAN FELICIANO DR TO FLAMINGO ST TO REDUCE CONGESTION

CITY OF LOS ANGELES

ARTERIAL U1A0774 0 NAVY WAYNAVY WAY AT SEASIDE AVE (SR-47). BUILD A NEW FLYOVER CON-NECTOR FROM NB NAVY WAY TO WB SEASIDE AVE

CITY OF LOS ANGELES

ARTERIAL U1A0775 0 NORTH SPRING STNORTH SPRING ST. WIDENING - ROUNDOUT ST. TO BAKER ST.. WIDEN N SPRING ST. BETWEEN ROUNDOUT ST. AND BAKER FROM 44' TO AN 80 ' ROADWAY WITH WITH LANDSCAPED MEDIANS.

CITY OF LOS ANGELES

ARTERIAL U1A0776 0 OLYMPIC BLVDOLYMPIC BLVD AT ALAMEDA ST WIDEN TO IMPROVE TRUCK MOVE-MENT (RIGHT-OF-WAY REQUIRED)

CITY OF LOS ANGELES

ARTERIAL U1A0777 0 OSBORNE STWIDEN OSBORNE ST BTWN FOOTHILL BLVD AND SAN FERNANDO RD FOR PEDESTRIAN SAFETY AND IMPROVED TRAFFIC CAPACITY

CITY OF LOS ANGELES

ARTERIAL U1A0778 0 OXNARD STEXTEND OXNARD ST. FROM SEPULVEDA BLVD TO WOODLEY AVE AND BUILD A HALF INTERCHANGE TO NORTHBOUND I-405

CITY OF LOS ANGELES

ARTERIAL U1A0779 0 PENROSE STPENROSE ST – TUJUNGA ST TO GLENOAKS BLVD -. WIDEN TO SEC-ONDARY HWY STANDARDS TO PROVIDE 2 THROUGH LANES PLUS LEFT- TURN CHANNELIZATION IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0780 0 POLK STPOLK ST . POLK ST - WIDEN BETWEEN BORDEN AV & ELDRIDGE AV (NEAR I-210) TO PROVIDE LEFT TURN POCKETS.

CITY OF LOS ANGELES

ARTERIAL U1A0781 0 RIVERSIDE DRRIVERSIDE DR FROM VAN NUYS BLVD TO SEPULVEDA BLVD - EX-TEND RIVERSIDE DR FROM VAN NUYS BLVD TO SEPULVEDA BLVD

CITY OF LOS ANGELES

ARTERIAL U1A0782 0 RIVERSIDE DRWIDEN RIVERSIDE DR AT SOUTHBOUND SR-170 OFF-RAMP TO PROVIDE DOUBLE RIGHT TURNS ONTO SB TUJUNGA AVE (FREEWAY COLUMNS ARE IN THE WAY)

CITY OF LOS ANGELES

ARTERIAL U1A0783 0 RIVERSIDE DR

RIVERSIDE DR. OVERCROSSING AT SR-134. WIDEN THE BRIDGE TO ACCOMMODATE A MEDIAN LEFT TURN LANE ONTO WESTBOUND SR134, NEW SHOULDER/BIKE ROUTE ON EACH SIDE, AND WIDER SIDEWALKS. CONSTRUCT THE NEW TRAFFIC SIGNALS TO IMPROVE TRAFFIC PROGRESSION.

CITY OF LOS ANGELES

Page 208: Project List - Southern California Association of Governments

206 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0784 0 ROSCOE BLVDROSCOE BL. WIDENING- HASKELL AVE. TO I-405 FWY. SB ON-RAMP. WIDEN 160 FEET OF ROSCOE ON THE SOUTH SIDE TO CREATE AN EASTBOUND RIGHT TURN ONLY LANE TO THE I-405 FWY.

CITY OF LOS ANGELES

ARTERIAL U1A0785 0ROXFORD & SEP-ULVEDA

CAPACITY ENHANCEMENTS AND RAMP IMPROVEMENTS AT ROXFORD ST/SEPULVEDA BL/I-5 WIDEN AND SIGNALIZE ROXFORD STREET/SEPULVEDA BLVD AT I-5 TO FACILITATE TRUCK MOVE-MENTS

CITY OF LOS ANGELES

ARTERIAL U1A0786 0 ROXFORD STROXFORD ST. WIDENING AT SEPULVEDA BLVD.. WIDEN CURB RADIUS FOR TRUCKS. SIDEWALK, CURB AND GUTTER IMPROVE-MENTS.

CITY OF LOS ANGELES

ARTERIAL U1A0787 0 ROXFORD ST

ROXFORD ST. & 210 FWY. RAMPS IMPROVEMENTS. IMPROVE I-210 FREEWAY ACCESS AT ROXFORD BY PROVIDING ADDITIONAL SOUTHBOUND RIGHT TURN AND LEFT TURN LANES; AND AN AD-DITIONAL WESTBOUND LEFT TURN LANE FROM THE OFF-RAMP.

CITY OF LOS ANGELES

ARTERIAL U1A0788 0SAN FERNANDO / MISSION

SAN FERNANDO MISSION WIDENING - SEPULVEDA BLVD. TO I-5. WIDEN TO 70FT, INCREASE FROM 2 TO 4 LANES, 0.61 MI

CITY OF LOS ANGELES

ARTERIAL U1A0789 0 SAN FERNANDO RDSAN FERNANDO ROAD SIERRA HWY TO SEPULVEDA BLVD/ROX-FORD ST. WIDEN AND INSTALL REVERSIBLE LANE.

CITY OF LOS ANGELES

ARTERIAL U1A0790 0 SAN FERNANDO RDWIDEN SAN FERNANDO RD FROM SR-2 TO I-5 TO MAJOR OR SECONDARY HIGHWAY STANDARD; CONSTRUCT STREETSCAPE, LIGHTING, AND PARKING

CITY OF LOS ANGELES

ARTERIAL U1A0791 0 SAN FERNANDO RDWIDEN SAN FERNANDO RD FROM TYBURN ST TO SR-2 TO MAJOR HIGHWAY STANDARD

CITY OF LOS ANGELES

ARTERIAL U1A0792 0SAN FERNANDO RD WEST

CAPACITY ENHANCEMENTS AT SAN FERNANDO RD WEST/BRAZIL ST AND SAN FERNANDO RD WEST/DORAN ST WIDEN AND IMPROVE NORTH AND SOUTH SIDES OF BRAZIL ST AND DORAN ST TO CRE-ATE ADDITIONAL LANES, CURB AND GUTTER IN EACH DIRECTION; INCREASE CURB RETURNS TO FACILITATE TRUCK MOVEMENTS

TBD

ARTERIAL U1A0793 0 SANTA FE AVSANTA FE AVENUE - 8TH STREET TO OLYMPIC BLVD. WIDEN TO INCREASE CAPACITY AND ACCESS TO I-10 RAMPS

CITY OF LOS ANGELES

Page 209: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 207

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0794 0 SANTA FE AVESANTA FE AVE/PORTER ST INTERSECTION. WIDEN INTERSECTION TO IMPROVE TRUCK MOVEMENT AT CURB RETURNS.

CITY OF LOS ANGELES

ARTERIAL U1A0795 0 SATICOY STBUILD A TUNNEL ON SATICOY ST UNDERNEATH THE VAN NUYS AIRPORT BETWEEN WOODLEY ST AND HAYVENHURST AVE

CITY OF LOS ANGELES

ARTERIAL U1A0796 0 SEPULVEDA BLVDWIDEN SEPULVEDA BOULEVARD BTWN OLYMPIC BLVD AND PICO BLVD TO MAJOR HIGHWAY STANDARD

CITY OF LOS ANGELES

ARTERIAL U1A0797 0 SEPULVEDA BLVD EXTEND SEPULVEDA BLVD FROM RINALDI ST TO ROXFORD STCITY OF LOS

ANGELES

ARTERIAL U1A0798 0 SEPULVEDA BLVDWIDEN/RESTRIPE SEPULVEDA BLVD FROM RINALDI ST TO MULHOL-LAND TUNNEL TO PROVIDE PEAK HOUR REVERSIBLE LANES

CITY OF LOS ANGELES

ARTERIAL U1A0799 0 SEPULVEDA BLVDSEPULVEDA BLVD BETWEEN PICO BLVD TO NATIONAL BLVD. WIDEN TO MAJOR HWY STANDARD AND INCREASE NUMBER OF THROUGH LANES FROM TWO TO THREE LANES. (RIGHT-OF-WAY REQUIRED)

CITY OF LOS ANGELES

ARTERIAL U1A0800 0 SEPULVEDA BLVD

SEPULVEDA BLVD BETWEEN NATIONAL BLVD TO VENICE BLVD. WIDEN TO MAJOR HWY STANDARD AND INCREASE NUMBER OF THROUGH LANES FROM TWO TO THREE LANES. (RIGHT-OF-WAY REQUIRED)

CITY OF LOS ANGELES

ARTERIAL U1A0801 0 SEPULVEDA BLVDSEPULVEDA BLVD TUNNEL AT MULHOLLAND BRIDGE. WIDEN EXISTING TUNNEL TO PROVIDE ADDITIONAL BIKE AND TRAFFIC LANES.

CITY OF LOS ANGELES

ARTERIAL U1A0802 0 SHERMAN WAY SHERMAN WAY CAPACITY IMPROVEMENTSCITY OF LOS

ANGELES

ARTERIAL U1A0803 0 SHOUP AVE

SHOUP AVE WIDENING AT VETURA BLVD. WIDEN WEST SIDE OF SHOUP AVE FROM VENTURA BLVD TO ABOUT 170 FT S/O VENTURA BLVD AND RESTRIPE NB SHOUP AVE FOR ONE LT, ONE THROUGH, AND ONE RT/THROUGH AT THE INTERSECTION. (RIGHT-OF-WAY REQUIRED)

CITY OF LOS ANGELES

ARTERIAL U1A0804 0SIERRA HWY / OLD ROAD

SIERRA HWY/OLD ROAD . SIERRA HWY/OLD ROAD – WIDEN INTER-SECTION AND CONNECT WITH BALBOA BLVD ATSAC TO REDUCE CONGESTION.

CITY OF LOS ANGELES

Page 210: Project List - Southern California Association of Governments

208 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0805 0 SIXTH STSIXTH ST. VIADUCT OVER LA RIVER AND US-101 FWY.. RECON-STRUCT BRIDGE DUE TO MATERIAL DEFECTS

CITY OF LOS ANGELES

ARTERIAL U1A0806 0 SPRING STSPRING ST FROM ALISO ST TO TEMPLE ST. WIDEN SPRING STREET TO PROVIDE AN ADDITIONAL SB LANE TO IMPROVE BUS OPERA-TIONS AND REDUCE CONGESTION.

CITY OF LOS ANGELES

ARTERIAL U1A0807 0 STATE STSTATE ST BETWEEN MARENGO ST AND CITY VIEW AVE. WIDEN THE LONG BRIDGE OVER I-10 FREEWAY TO ACCOMMODATE TWO LANES IN EACH DIRECTION WITH LEFT TURN CHANNELIZATION

CITY OF LOS ANGELES

ARTERIAL U1A0808 0 STOCKER ST WIDEN STOCKER STREET AT VICTORIA AVE TO INCREASE CAPACITYCITY OF LOS

ANGELES

ARTERIAL U1A0809 0 SUNSET BLVDWIDEN SUNSET BLVD BTWN LAS PALMAS AND MANSFIELD FROM 70' TO 78'

CITY OF LOS ANGELES

ARTERIAL U1A0810 0 SUNSET BLVDSUNSET BLVD - VIRGIL AVE TO VERMONT AVE. WIDEN TO INCREASE CAPACITY.

CITY OF LOS ANGELES

ARTERIAL U1A0811 0 SUNSET BLVDSUNSET BLVD. - BARRINGTON AVE. TO GUNSTON DR.. WIDEN BOTH SIDES OF SUNSET, INSTALL NEW SIDEWALKS, CURBS, GUTTERS, TRAFFIC SIGNALS, AND LANDSCAPING.

CITY OF LOS ANGELES

ARTERIAL U1A0812 0 SUNSET BLVDWIDEN SUNSET BLVD AT LA BREA AVE TO PROVIDE DUAL LEFT TURN LANES

CITY OF LOS ANGELES

ARTERIAL U1A0813 0 TEMPLE STTEMPLE ST BETWEEN SR-110 FWY AND GRAND AVE. WIDEN TO INCREASE CAPACITY BY PROVIDING ADDITIONAL THROUGH LANES.

CITY OF LOS ANGELES

ARTERIAL U1A0814 0TOPANGA CANYON BLVD

WIDEN TO PROVIDE SIX THROUGH LANES ALL DAY BETWEEN 101 FWY AND 118 FWY

CITY OF LOS ANGELES

ARTERIAL U1A0815 0 TUJUNGA AVEWIDEN TUJUNGA AVE BRIDGE (HBRR PROJECT – DESIGN COM-PLETE, CONSTRUCTION POSTPONED TO FY 2007-08)

CITY OF LOS ANGELES

ARTERIAL U1A0816 0 VALLEY BLVD

VALLEY BLVD. CORRIDOR IMPROVEMENTS. IMPROVE CAPACITY AT RAILROAD CROSSINGS THROUGH WIDENING, ADDITIONAL LANES, CURB IMPROVEMENTS, AND UPGRADES IN SIGNAL AND RAILROAD EQUIPMENT.

CITY OF LOS ANGELES

Page 211: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 209

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

ARTERIAL U1A0817 0 VAN NESS STSUNSET BLVD AT SB 101 OFF-RAMP. WIDEN VAN NESS ST FROM THE OFF-RAMP TO SUNSET BLVD TO ADD A RIGHT-TURN-ONLY LANE

CITY OF LOS ANGELES

ARTERIAL U1A0818 0 VAN NUYS BLVDIMPROVE CAPACITY ALONG SOUTHBOUND VAN NUYS BLVD SB BETWEEN BURBANK BLVD AND US-101

CITY OF LOS ANGELES

ARTERIAL U1A0819 0 VENTURA BLVDVENTURA BLVD . WIDEN BETWEEN SHOUP AV AND US-101 FREEWAY SB RAMPS TO PROVIDE DOUBLE LT LANES AND TWO THROUGH LANES.

CITY OF LOS ANGELES

ARTERIAL U1A0820 0 VERMONT AVEVERMONT AVE FROM WASHINGTON BLVD TO I-10 WB OFF-RAMP. WIDEN 10’ ON EAST-SIDE OF VERMONT AVE TO PROVIDE LT LANE.

CITY OF LOS ANGELES

ARTERIAL U1A0821 0 VICTORY BLVDWIDEN VICTORY BLVD BTWN WHITE OAK AVE AND SEPULVEDA BLVD TO ADD CAPACITY

CITY OF LOS ANGELES

ARTERIAL U1A0822 0 VICTORY BLVDWIDEN VICTORY BLVD FROM TOPANGA CANYON BLVD TO DESOTO AVE TO MAJOR HIGHWAY CLASS I STANDARD

CITY OF LOS ANGELES

ARTERIAL U1A0823 0 WESTERN AVE

WESTERN AVE. WIDENING - FLORENCE AVE. TO 80TH ST. AND AT MANCHESTER BLVD.. WIDEN WESTERN AVE. TO PROVIDE FOR RIGHT AND LEFT TURN LANES AT VARIOUS INTERSECTIONS WITHIN THE PROJECT LIMITS.

CITY OF LOS ANGELES

ARTERIAL U1A0824 0 WILMINGTON AVEWILMINGTON AVE BETWEEN 115TH ST AND IMPERIAL HWY. WIDEN AND RECONSTRUCT ROADWAY FROM 40' TO 60' TO PROVIDE TWO THROUGH LANES IN EACH DIRECTION.

CITY OF LOS ANGELES

ARTERIAL U1A0825 0 WILSHIRE BLVDWILSHIRE BLVD. WIDENING - BARRINGTON AVE TO 405 FWY. WIDEN WILSHIRE BLVD. TO 86 FEET ROADWAY WIDTH TO PROVIDE AD-DITIONAL LANE IN EACH DIRECTION FOR BUSES.

CITY OF LOS ANGELES

ARTERIAL U1A0826 0 WOODMAN AVEWOODMAN AVE/US-101. WIDEN STREET UNDER THE 101 FREEWAY BRIDGE TO PROVIDE DUAL LEFT-TURN LANES FOR BOTH DIREC-TIONS.

CITY OF LOS ANGELES

Page 212: Project List - Southern California Association of Governments

210 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

GRADE SEPA-RATION

U1G0701 0 BROAD AVE

BROAD AVE FROM HARRY BRIDGES BLVD TO WATER ST. BUILD GRADE-SEPARATED ACCESS TO WATERFRONT AREA FROM RAIL LINES, EXTEND BROAD AVE TO WATER STREET, AND INSTALL BIKE LANES AND SIDEWALKS ON BOTH SIDES OF BROAD AVE

CITY OF LOS ANGELES

GRADE SEPA-RATION

U1G0702 0 EL MONTE BUSWAYPROVIDE GRADE SEPARATION AT ALAMEDA ST FOR DIRECT AC-CESS OF TRANSIT BUSES FROM DOWNTOWN LA TO EL MONTE BUSWAY

CITY OF LOS ANGELES

GRADE SEPA-RATION

U1G0703 0 LA CIENEGA BLVD

CONSTRUCT GRADE SEPARATIONS ON LA CIENEGA BLVD AT JEF-FERSON BLVD, RODEO BLVD, LA TIJERA BLVD, AND MANCHESTER BLVD TO IMPROVE TRAVEL TIME ALONG LA CIENEGA BETWEEN I-10 AND LAX AREA.

CITY OF LOS ANGELES

GRADE SEPA-RATION

U1G0704 0 LINCOLN BLVD (SR-1)LINCOLN BLVD/WASHINGTON BLVD. BUILD A GRADE SEPARATION TO REDUCE CONGESTION.

CITY OF LOS ANGELES

GRADE SEPA-RATION

U1G0705 0 N. MAIN STN. MAIN ST GRADE SEPARATION WITH LA RIVER/METROLINK/UNION PACIFIC RAILROAD

CITY OF LOS ANGELES

GRADE SEPA-RATION

U1G0706 0 SATICOY STSATICOY ST. BETWEEN VAN NUYS BLVD AND WOODMAN AVE - CONSTRUCT GRADE SEPARATION BETWEEN STREET AND RR TRACKS FOR IMPROVED SAFETY.

CITY OF LOS ANGELES

GRADE SEPA-RATION

U1G0707 0 SEPULVEDA BLVDCONSTRUCT GRADE SEPARATION (UNDERPASS) AT THE SEPULVEDA BLVD AND WILSHIRE BLVD INTERSECTION

CITY OF LOS ANGELES

GRADE SEPA-RATION

U1G0708 0 SUNLAND BLVDCONSTRUCT GRADE SEPARATION ON SUNLAND BLVD NEAR SAN FERNANDO RD

CITY OF LOS ANGELES

GRADE SEPA-RATION

U1G0709 0ALAMEDA CORRIDOR NORTH

ALAMEDA CORRIDOR NORTH - BETWEEN SR-2 AND SR-134. GRADE SEPARATION (TRENCH) FOR COMMUTER AND FREIGHT RAIL LINES

TBD

HOV U1H0705 2 SR-2CONSTRUCT 4 LANE TUNNEL FOR HOV BETWEEN SR-2 TERMINUS AND I-10 FWY

CITY OF LOS ANGELES

HOV U1H0705 5 I-5 ADD HOV LANE IN BOTH DIRECTIONS BETWEEN SR-134 AND I-110 CITY OF LOS

ANGELES

HOV U1H0702 10 I-10 I-405 SR-110 HOV LANES ON I-10 BETWEEN I-405 AND SR-110CITY OF LOS

ANGELES

Page 213: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 211

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

HOV U1H0705 60 SR-60 ADD HOV LANE FROM RT 101 TO I-605 (BOTH DIRECTIONS) TBD

HOV U1H0701 101 US-101 SR-170 I-405 HOV LANES ON US-101 BETWEEN SR-170 AND I-405CITY OF LOS

ANGELES

HOV U1H0704 101 US-101 LANKERSHIM BLVD. SR-110 HOV LANES ON US-101 BETWEEN LANKERSHIM BLVD. AND SR-110CITY OF LOS

ANGELES

HOV U1H0705 101 US-101CONSTRUCT HOV LANE CONNECTOR FROM 101 FWY TO EAST-WEST BUSWAY

CITY OF LOS ANGELES

HOV U1H0705 101 US-101ADD HOV LANES IN BOTH DIRECTIONS BETWEEN TOPANGA CAN-YON BLVD AND CITY BOUNDARY

CITY OF LOS ANGELES

HOV U1H0703 110 SR-110 ADAMS BLVD. I-10 HOV LANES ON SR-110 BETWEEN ADAMS BLVD. AND I-10CITY OF LOS

ANGELES

IC/RAMPS U1M0711 2 SR-2 / I-5FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: SR-2/I-5 INTERCHANGE - ACCESS TO DOWNTOWN L.A.

CITY OF LOS ANGELES

IC/RAMPS U1M0737 2 SR-2 SAN FERNANDO RD. FREEWAY RAMP IMPROVEMENT: SR-2/SAN FERNANDO RD.CITY OF LOS

ANGELES

IC/RAMPS U1M0720 5ALAMEDA STREET BYPASS

FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: ALAMEDA STREET BYPASS FOR ACCESS FROM I-5 TO DOWNTOWN L.A.

CITY OF LOS ANGELES

IC/RAMPS U1M0723 5 I-5 HOLLYWOOD WAY FREEWAY RAMP IMPROVEMENT: I-5 AT HOLLYWOOD WAYCITY OF LOS

ANGELES

IC/RAMPS U1M0742 5 I-5 IMPROVE I-5 AND I-10 INTERCHANGECITY OF LOS

ANGELES

IC/RAMPS U1M0743 5 I-5I-5 RAMPS AT ROXFORD ST/SEPULVEDA BLVD - WIDEN AND SIG-NALIZE INTERSECTION TO IMPROVE ACCESS TO SB I-5 RAMPS.

CITY OF LOS ANGELES

IC/RAMPS U1M0744 5 I-5SB I-5 OFF-RAMP AT CALZONA ST IN BOYLE HEIGHTS CONSTRUCT A DECELERATION LANE AND A BARRIER BETWEEN THE OFF-RAMP AND THE ON-RAMP.

CITY OF LOS ANGELES

Page 214: Project List - Southern California Association of Governments

212 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

IC/RAMPS U1M0745 5 I-5 IMPROVE I-5 AND RT 134 INTERCHANGECITY OF LOS

ANGELES

IC/RAMPS U1M0746 10 I-10MODIFY EB OFF-RAMPS AT WESTERN AVE, ARLINGTON AVE, CREN-SHAW BLVD

CITY OF LOS ANGELES

IC/RAMPS U1M0747 10 I-10 LINCOLN BLVD RAMPS IMPROVEMENTCITY OF LOS

ANGELES

IC/RAMPS U1M0748 10 I-10 CENTINELA AV RAMPS IMPROVEMENTCITY OF LOS

ANGELES

IC/RAMPS U1M0749 10 I-10EB I-10 ON-RAMP AT OLYMPIC BLVD MAKE THE RAMP ACCESSIBLE FROM BOTH DIRECTIONS ON OLYMPIC BLVD, REALIGN THE RAMP AND INSTALL TRAFFIC SIGNAL. (RIGHT-OF-WAY REQUIRED)

CITY OF LOS ANGELES

IC/RAMPS U1M0750 10 I-10WB I-10 OFF-RAMP AT MATEO ST IMPROVE CURB RETURNS TO IMPROVE TRUCK MOVEMENT. (RIGHT-OF-WAY REQUIRED)

CITY OF LOS ANGELES

IC/RAMPS U1M0751 10 I-10 MAJOR RAMP RECONFIGURATION AT ROBERTSON AND VENICE TBD

IC/RAMPS U1M0780 10 I-10I-10/ROBERTSON NATIONAL AREA CIRCULATION IMPROVEMENT PROJECT

TBD

IC/RAMPS 1M0711 60 I-605/SR-60 RECONSTRUCT I-605/SR-60 INTERCHANGE TBD

IC/RAMPS 1M0712 60 I-605/I-10 RECONSTRUCT I-605/I-10 INTERCHANGE TBD

IC/RAMPS 1M0710 91 SR-91/I-605 RECONSTRUCT SR-91/I-605 INTERCHANGE TBD

IC/RAMPS U1M0724 101 US-101 VERMONT AV. FREEWAY RAMP IMPROVEMENT: US-101/VERMONT AV. CITY OF LOS

ANGELES

Page 215: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 213

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

IC/RAMPS U1M0725 101 US-101 CAHUENGA BLVD. FREEWAY RAMP IMPROVEMENT: US-101/CAHUENGA BLVD. CITY OF LOS

ANGELES

IC/RAMPS U1M0726 101 US-101 HIGHLAND AV. FREEWAY RAMP IMPROVEMENT: US-101/HIGHLAND AV. CITY OF LOS

ANGELES

IC/RAMPS U1M0727 101 US-101 VENTURA BLVD. FREEWAY RAMP IMPROVEMENT: US-101/VENTURA BLVD.CITY OF LOS

ANGELES

IC/RAMPS U1M0728 101 US-101COLD WATER CAN-YON BLVD.

FREEWAY RAMP IMPROVEMENT: US-101/COLD WATER CANYON BLVD.

CITY OF LOS ANGELES

IC/RAMPS U1M0729 101 US-101 VAN NUYS BLVD. FREEWAY RAMP IMPROVEMENT: US-101/VAN NUYS BLVD.CITY OF LOS

ANGELES

IC/RAMPS U1M0730 101 US-101 HAYVENHURST AV. FREEWAY RAMP IMPROVEMENT: US-101/HAYVENHURST AV.CITY OF LOS

ANGELES

IC/RAMPS U1M0731 101 US-101 CANOGA AV. FREEWAY RAMP IMPROVEMENT: US-101/CANOGA AV.CITY OF LOS

ANGELES

IC/RAMPS U1M0732 101 US-101TOPANGA CANYON BLVD.

FREEWAY RAMP IMPROVEMENT: US-101/TOPANGA CANYON BLVD.CITY OF LOS

ANGELES

IC/RAMPS U1M0733 101 US-101 FALLBROOK AVE. FREEWAY RAMP IMPROVEMENT: US-101/FALLBROOK AVE.CITY OF LOS

ANGELES

IC/RAMPS U1M0752 101 US-101IMPROVE US-101 AND I-110 INTERCHANGE. NB I-110 CONNECTOR TO NB I-101: EXTEND 2 LANES TO GLENDALE BLVD OFF-RAMP (ELIMINATE MERGING OF 2 LANES INTO 1 LANE)

CITY OF LOS ANGELES

IC/RAMPS U1M0753 101 US-101US-101/VAN NUYS BLVD RECONFIGURE WB ON/ OFF-RAMPS AS HOOK RAMPS CONNECTING ONTO RIVERSIDE DR & ELIMINATE EXISTING WB OFF-RAMP.

CITY OF LOS ANGELES

IC/RAMPS U1M0754 101 US-101CANOGA AVE/US-101 WB OFF-RAMP - WIDEN WB OFF-RAMP TO PROVIDE A RT ONLY LANE TO CANOGA AVE.

CITY OF LOS ANGELES

IC/RAMPS U1M0755 101 US-101WIDEN EDGEWARE BRIDGE ON SB US-101 BETWEEN GLENDALE BLVD ON-RAMP AND US-101/I-110 INTERCHANGE TO PROVIDE AUXILIARY LANES

CITY OF LOS ANGELES

Page 216: Project List - Southern California Association of Governments

214 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

IC/RAMPS U1M0756 101 US-101CONSTRUCT DIRECT NB ON AND OFF-RAMPS TO THE HOLLYWOOD BOWL PARKING LOTS

CITY OF LOS ANGELES

IC/RAMPS U1M0757 101 US-101BUILD NEW SB US-101 ON- AND OFF-RAMPS AT CAMPO DE CAHUENGA WAY (VENTURA BLVD EXIT FROM NORTHBOUND DIREC-TION)

CITY OF LOS ANGELES

IC/RAMPS U1M0758 101 US-101US-101/LAUREL CANYON BLVD WIDEN WB ON-RAMP TO THREE LANES TO PROVIDE A CARPOOL BY-PASS LANE.

CITY OF LOS ANGELES

IC/RAMPS U1M0759 101 US-101SB US-101 ON-RAMP AT UNIVERSAL CENTER DR BUILD A NEW DIRECT ON-RAMP FROM UNIVERSAL CENTER DR.

CITY OF LOS ANGELES

IC/RAMPS U1M0760 101 US-101NB US-101 ON-RAMP AT HOLLYWOOD BLVD LENGTHEN AND WIDEN THE RAMP TO TWO LANES.

CITY OF LOS ANGELES

IC/RAMPS U1M0761 101 US-101WIDEN SB US-101 OFF-RAMP AT WESTERN AVE VIA LEXINGTON AVE TO PROVIDE ADDITIONAL LEFT-TURN LANE.

CITY OF LOS ANGELES

IC/RAMPS U1M0762 101 US-101

NB US-101 OFF-RAMP AND SB US-101 ON-RAMP AT SANTA MON-ICA. WIDEN NB US-101 OFF-RAMP TO PROVIDE TWO EXIT LANES, AND ADD A DEDICATED RIGHT TURN ONLY LANE AT INTERSECTION: AND WIDEN EB SANTA MONICA BLVD AT SB US-101 ON-RAMP TO ADD A RIGHT TURN ONLY LANE ONTO THE ON-RAMP.

CITY OF LOS ANGELES

IC/RAMPS U1M0763 101 US-101

NB US-101 OFF-RAMP AT MELROSE AVE WIDEN OFF-RAMP TO PROVIDE TWO EXIT LANES, AND ADD A DEDICATED RIGHT TURN ONLY LANE AT INTERSECTION TO PROVIDE THREE LANES (LEFT TURN, OPTIONAL AND RIGHT TURN).

CITY OF LOS ANGELES

IC/RAMPS U1M0764 101 US-101

SB US-101 RAMPS AT NORMANDIE AVE/MELROSE AVE EXTEND THE OFF-RAMP TO CONNECT DIRECTLY TO NORMANDIE AVE; BUILD A SERVICE ROAD FROM THE OFF-RAMP TO MELROSE AVE AND CONNECT DIRECTLY TO THE SB ON-RAMP AT MELROSE. (RIGHT-OF-WAY REQUIRED)

CITY OF LOS ANGELES

IC/RAMPS U1M0736 110 I-110 3RD ST. FREEWAY RAMP IMPROVEMENT: I-110/3RD ST.CITY OF LOS

ANGELES

IC/RAMPS U1M0765 110 I-110BETWEEN US-101 AND I-10 - RECONFIGURE FREEWAY RAMPS TO PROVIDE ADDITIONAL NB LANE AND SB LANE IN THE DOWNTOWN AREA

CITY OF LOS ANGELES

Page 217: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 215

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

IC/RAMPS U1M0766 110 I-110

I-110/SR-47/HARBOR BLVD INTERCHANGE IMPROVEMENTS LENGTHEN DECELERATION AND SIGHT DISTANCES ON THE I-110 AND SR-47 CONNECTORS, SEPARATE TRUCK TRAFFIC FROM AUTO TRAFFIC TO ELIMINATE TRAFFIC CONFLICTS.

CITY OF LOS ANGELES

IC/RAMPS U1M0717 170 SR-170 NB / I-5FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: SR-170 NORTHBOUND AT I-5 - S. F. VALLEY

CITY OF LOS ANGELES

IC/RAMPS U1M0767 210 I-210 ADDITIONAL LANE ON THE CONNECTOR FROM NB I-210 TO NB I-5CITY OF LOS

ANGELES

IC/RAMPS U1M0718 405 I-405 NB / I-5FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: I-405 NORTHBOUND AT I-5 - S.F. VALLEY

CITY OF LOS ANGELES

IC/RAMPS U1M0734 405 I-405 SKIRBALL DR. FREEWAY RAMP IMPROVEMENT: I-405/SKIRBALL DR.CITY OF LOS

ANGELES

IC/RAMPS U1M0735 405 I-405 SUNSET BLVD. FREEWAY RAMP IMPROVEMENT: I-405/SUNSET BLVD.CITY OF LOS

ANGELES

IC/RAMPS U1M0768 405 I-405NB I-405/NB I-5 INTERCHANGE EXTEND 4TH LANE NB ON 405 FWY ALL THE WAY TO I-210 FREEWAY.

CITY OF LOS ANGELES

IC/RAMPS U1M0769 405 I-405 I-405/NORDHOFF ST WIDEN RAMPS TO REDUCE CONGESTION. CITY OF LOS

ANGELES

IC/RAMPS U1M0770 405 I-405I-405/ROSCOE BLVD WIDEN SOUTH SIDE OF ROSCOE BLVD TO ADD A EB THROUGH LANE AND WIDEN THE SB ON-RAMP TO ADD A CAR-POOL BYPASS LANE.

CITY OF LOS ANGELES

IC/RAMPS U1M0771 405 I-405I-405/SHERMAN WAY WIDEN SB ON AND OFF-RAMP TO ADD A LANE.

CITY OF LOS ANGELES

IC/RAMPS U1M0772 405 I-405NB I-405 AT SEPULVEDA/VENTURA BLVD BUILD A NEW NB OFF-RAMP AND ON-RAMP AT MORRISON ST TO RELIEVE CONGESTION AT SEPULVEDA/VENTURA INTERSECTION.

CITY OF LOS ANGELES

IC/RAMPS U1M0773 405 I-405NB I-405 OFF-RAMP AT IMPERIAL HWY WIDEN OFF-RAMP FROM TWO LANES TO THREE LANES.

CITY OF LOS ANGELES

Page 218: Project List - Southern California Association of Governments

216 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

IC/RAMPS U1M0713 10/5/60 I-10/I-5/SR-60FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: I-10/I-5/SR-60 INTERCHANGE - EAST L.A.

CITY OF LOS ANGELES

IC/RAMPS U1M0774 10/101 I-10/US-101WIDEN CESAR CHAVEZ AVE OVERCROSSING OVER I-10 AND RELO-CATE NB 101 FWY RAMPS AT CESAR CHAVEZ AVE

CITY OF LOS ANGELES

IC/RAMPS U1M0721 10/110 I-10/SR-110FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: I-10/SR-110 INTERCHANGE

CITY OF LOS ANGELES

IC/RAMPS U1M0714 10/405 I-10/I-405FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: I-10/I-405 INTERCHANGE - WEST L.A.

CITY OF LOS ANGELES

IC/RAMPS U1M0719 101/110 US-101/SR-110FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: US-101/SR-110 INTERCHANGE - DOWNTOWN L.A.

CITY OF LOS ANGELES

IC/RAMPS U1M0715101/134/

170US-101/SR-134/SR-170

FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: US-101/SR-134/SR-170 INTERCHANGE - S. F. VALLEY

CITY OF LOS ANGELES

IC/RAMPS U1M0716 101/405 US-101/I-405FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: US-101/I-405 INTERCHANGE - S. F. VALLEY

CITY OF LOS ANGELES

IC/RAMPS U1M0722 5/110 I-5/SR-110FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: I-5/SR-110 INTERCHANGE

CITY OF LOS ANGELES

IC/RAMPS U1M0712 5/14/ 210 I-5/SR-14/I-210FREEWAY TO FREEWAY INTERCHANGE IMPROVEMENTS: I-5/SR-14-/I-210 INTERCHANGE - S.F. VALLEY

CITY OF LOS ANGELES

ITS U1ITS0701 0 CITYWIDEVEHICLE INFRASTRUCTURE INTEGRATION - TO INTEGRATE VEHICLE NAVIGATION SYSTEM WITH INTELLIGENT TRANSPORTATION SYS-TEM (ITS)

CITY OF LOS ANGELES

ITS U1ITS0702 0

NORTH SAN FER-NANDO VALLEY, SOUTH CENTRAL LOS ANGELES

COMPLETE CITYWIDE ATSAC SYSTEMCITY OF LOS

ANGELES

MIXED FLOW U1M0739 0 SR-14 SR-232TUNNEL CONNECTION BETWEEN SR-14 (PALMDALE) AND SR-2 (GLENDALE)

CITY OF LOS ANGELES

MIXED FLOW U1M0740 0 LAUREL CANYON BLVD US-101 I-10TUNNEL (CROSS MOUNTAIN) CONNECTION BETWEEN US-101 AND I-10 ALONG LAUREL CANYON BLVD.

CITY OF LOS ANGELES

Page 219: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 217

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

MIXED FLOW U1M0706 2 SR-2 I-5 SR-134 FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

MIXED FLOW U1M0775 2 SR-2SR-2 FROM I-5 TO SR-110 – BUILD A TUNNEL UNDER GLENDALE BLVD CONNECTING FROM I-5 THROUGH US-101 TO SR-110

CITY OF LOS ANGELES

MIXED FLOW U1M0703 5 I-5 SR-14 I-405 FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

MIXED FLOW U1M0704 5 I-5 SR-134 SR-110 FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

MIXED FLOW U1M0776 5 I-5SB FROM MARIETTA ST TO LORENA ST. CONSTRUCT SB AUXILIARY LANE ON I-5 FROM MARIETTA ST TO LORENA ST

CITY OF LOS ANGELES

MIXED FLOW U1M0777 5 I-5GLENDALE BLVD AT SR-2. IMPLEMENT SR-2 TERMINUS IMPROVE-MENTS AT GLENDALE BLVD AND SR-2

CITY OF LOS ANGELES

MIXED FLOW U1M0778 5 I-5SB I-5 BETWEEN SR-14 FREEWAY AND I-210 FREEWAY WIDEN THE TRUCK ROUTE TO ADD A THIRD TRUCK LANE AND EXTEND THE TRUCK ROUTE TO I-405.

CITY OF LOS ANGELES

MIXED FLOW U1M0779 5 I-5SB FROM DITMAN AVE TO CALZONA ST. CONSTRUCT SB AUXILIARY LANE ON I-5 FROM DITMAN AVE TO CALZONA ST

TBD

MIXED FLOW U1M0701 10 I-10 SR-110 I-405 FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

MIXED FLOW U1M0702 101 US-101VALLEY CIRCLE BLVD.

EAST L.A. INTER-CHANGE

FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

MIXED FLOW U1M0741 101 US-101 ALVARADO ST. I-10/SR-110 I/CUS-101 BYPASS TUNNEL AT ALVARADO ST. TO I-10/SR-110 NTER-CHANGE

CITY OF LOS ANGELES

MIXED FLOW U1M0710 110 I-110 I-10 US-101 FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

MIXED FLOW U1M0709 210 I-210 HUBBARD OSBORNE FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

Page 220: Project List - Southern California Association of Governments

218 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

MIXED FLOW U1M0705 405 I-405 US-118 I-105 FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

MIXED FLOW U1M0738 405 I-405 US-101 I-105 TUNNEL UNDER I-405 BETWEEN US-101 AND I-105CITY OF LOS

ANGELES

MIXED FLOW U1M0708 710 I-710 SR-47 I-210 FREEWAY CORRIDOR IMPROVEMENTSCITY OF LOS

ANGELES

MIXED FLOW U1M070710 /101/

110I-10 / US-101 / SR-110

DOWNTOWN L.A. FREEWAY CORRIDOR IMPORVEMENTS (I-10, US-101 & SR-110)

CITY OF LOS ANGELES

NON-MOTOR-IZED

U1O0701 0 US-101DECKING OVER 101 FWY BETWEEN BRONSON AVE AND VERMONT AVE FOR PEDESTRIAN LINKAGE AND OPEN SPACE

CITY OF LOS ANGELES

OPERATIONAL U1O0702 10 I-10 CORRIDOR-WIDE EXPANSION OF FREEWAY SERVICE PATROLCITY OF LOS

ANGELES

TDM U1O0703 0 CITYWIDERESTRIPE VARIOUS ARTERIALS FOR TURN POCKETS AND AD-DITIONAL LANES. ARTERIAL RECONFIGURATION TO FACILITATE DIRECTIONAL FLOW SUCH AS REVERSIBLE LANES.

CITY OF LOS ANGELES

TDM U1O0704 0 CITYWIDECREATE A TRANSPORTATION MANAGEMENT ASSOCIATION TO CHAMPION TDM PROGRAMS

CITY OF LOS ANGELES

TDM U1O0705 0 CITYWIDE ADD/EXPAND PARK-AND-RIDE FACILITIESCITY OF LOS

ANGELES

TDM U1O0706 0 CITYWIDEENHANCE/EXPAND/COORDINATE PEDESTRIAN, BICYCLE, AND TRANSIT INFORMATION AND AMENITIES

CITY OF LOS ANGELES

TRANSIT - BRT

U1TR0701 0ORANGE LINE EXTEN-SION

EXTEND THE NEW VALLEY ORANGE LINE BUSWAY TO BURBANKCITY OF LOS

ANGELES

TRANSIT - BRT

U1TR0702 0 RAPID BUS ADD MORE RAPID BUS CORRIDORSCITY OF LOS

ANGELES

TRANSIT - BUS

U1TR0706 0 DASH EXPANSION 10 NEW DASH ROUTES CITYWIDECITY OF LOS

ANGELES

Page 221: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 219

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

TRANSIT - BUS

U1TR0707 0 N/S BUSWAY ADD PLANNED NORTH-SOUTH BUSWAY PROJECTCITY OF LOS

ANGELES

TRANSIT - BUS

U1TR0708 0 TRANSIT SERVICEVARIOUS LOCATIONS TO BE DETERMINED. INCREASE TRANSIT SER-VICES THROUGHOUT THE I-5 CORRIDOR

CITY OF LOS ANGELES

TRANSIT - BUS

U1TR0709 0 US -101

ADD LOCAL COMMUNITY TRANSIT SERVICE CONNECTIONS TO RED LINE STATIONS BTWN US-101/SR-134/SR-170 INTERCHANGE AND DOWNTOWN LA: HOLLYWOOD/WESTERN (2 ROUTES), VERMONT/SANTA MONICA/LACC (3 ROUTES), VERMONT/BEVERLY (6 ROUTES), WESTLAKE/MACARTHUR PARK (3 ROUTES)

CITY OF LOS ANGELES

TRANSIT - BUS

U1TR0710 0 TRANSIT SERVICESR-1 TO I-5 PARALLEL TO I-10. IMPROVED TRANSIT SERVICES BY INCREASING FREQUENCY, SIGNAL PRIORITY, DEDICATED TRANSIT LANES AND HIGH-CAPACITY BUSES

TBD

TRANSIT - COMMUTER

RAILU1TR0704 0

SANTA PAULA BRANCH LINE

US-101LOS ANGELES COUNTY LINE

BRING TRACK TO CLASS 4 STANDARDS AND RECONSTRUCT TRACK BETWEEN PIRU AND LOS ANGELES COUNTY LINE"

TBD

TRANSIT - COMMUTER

RAILU1TR0711 0 METROLINK SERVICE

VARIOUS LOCATIONS TO BE DETERMINED. EXPAND METROLINK SERVICE AND CAPACITY ON EXISTING TRAINS

TBD

TRANSIT - COMMUTER

RAILU1TR0712 0 METROLINK

INCREASE METROLINK SERVICES B/W MOORPARK AND UNION STATION

CITY OF LOS ANGELES

TRANSIT - HEAVY RAIL

U1TR0703 0METRO PURPLE LINE WESTSIDE EXTENSION

LA CIENEGA BLVD. SANTA MONICAMETRO PURPLE LINE EXTENSION - CENTURY CITY (LA CIENEGA TO CENTURY & CENTURY CITY TO SANTA MONICA SEGMENTS)

METRO

TRANSIT - INTERMODAL

U1TR0719 0REGIONAL TRANSIT CENTER

AT CRENSHAW BLVD. AND DEL AMO BLVD.

CITY OF TORRANCE REGIONAL TRANSIT CENTER (RTC) TORRANCE

TRANSIT - LIGHT RAIL

U1TR0713 0 FLORENCE AVE / BNSFBUILD RAIL TO CONNECT HARBOR AND CRENSHAW CORRIDORS TO LAX UTILIZING EXISTING BNSF RAIL LINE

CITY OF LOS ANGELES

TRANSIT - LIGHT RAIL

U1TR0714 0 GREEN LINE EXTEND GREEN LINE FROM LAX TO CITY OF SANTA MONICACITY OF LOS

ANGELES

TRANSIT - LIGHT RAIL

U1TR0715 0 TRANSIT SERVICE BUILD RAIL CONNECTION FROM LAX TO SYLMAR ALONG 405 FWYCITY OF LOS

ANGELES

Page 222: Project List - Southern California Association of Governments

220 P R O J E C T L I S T I N G R E P O R T

LOS ANGELES COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

TRANSIT - LIGHT RAIL

U1TR0716 0 RED LINE EXTEND RED LINE FROM N. HOLLYWOOD TO SYLMARCITY OF LOS

ANGELES

TRANSIT - LIGHT RAIL

U1TR0717 0 EAST LA CORRIDOREASTSIDE GOLD LINE -EXTEND FROM ATLANTIC TO NORWALK/WHITTIER

TBD

TRANSIT - LIGHT RAIL

U1TR0718 0 VERMONT CORRIDORMETRO GREEN LINE - I-105 TO HOLLYWOOD BLVD ALONG VER-MONT AVE

TBD

Page 223: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 221

ORANGE COUNTY STRATEGIC PLAN PROJECTS

ORANGE COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

TRANSIT - LIGHT RAIL

U2TR0701 0ARTIC-PLATINUM TRIANGLE-ANAHEIM RESORT CONNECTOR

ARTICANAHEIM RESORT DISTRICT

ELEVATED FIXED-GUIDEWAY SYSTEM CONNECTING THE ANAHEIM REGIONAL TRANSPORTATION INTERMODAL CENTER (ARTIC), THE PLATINUM TRIANGLE, AND THE ANAHEIM RESORT

CITY OF ANAHEIM

Page 224: Project List - Southern California Association of Governments

222 P R O J E C T L I S T I N G R E P O R T

RIVERSIDE COUNTY STRATEGIC PLAN PROJECTS

RIVERSIDE COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

MIXED FLOW U3M0701 91 SR-91 BUCHANAN STREET REPLACE BOTH BRIDGES. TBD

MIXED FLOW U3M0702 215 I-215EL CERRITO DRIVE BRIDGE

REPLACE WB BRIDGE. TBD

MIXED FLOW U3M0703 215 I-215 BOX SPRING REPLACE WB BRIDGE. TBD

MIXED FLOW U3M0704 215 I-215 SB I-215 EB SR-60 REPLACE SB BRIDGE. TBD

O&M U3O0701 0 BLYTHE LINE RICE RIPLEYTRACK REHABILITATION FOR BLYTHE LINE OF THE ARIZONA CALI-FORNIA RAILROAD

TBD

TRUCK CLIMB-ING

U3TK0701 10 EASTBOUND I-10CHIRIACO SUMMIT AND BLYTHE AREAS

EASTBOUND TRUCK CLIMBING LANES TBD

Page 225: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 223

SAN BERNARDINO COUNTY STRATEGIC PLAN PROJECTS

SAN BERNARDINO COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

AUXILIARY U4MF07032 83 SR-83 PINE AVE (1.88)KIMBALL AVE (2.92)

WIDEN & IMPROVE 3 INTERSECTIONS (EA:0G470) CALTRANS

IC/RAMPS U4MF07027 15 I-15AT OLD HIGHWAY 58 IC (76.0)

FUTURE SANTA FE DR (77.5)

RECONSTRUCT INTERCHANGE (EA:47160) CALTRANS

IC/RAMPS U4MF07028 215 I-215BARTON ROAD IC (0.8)

TO (1.8) RECONSTRUCT INTERCHANGE (EA:0J070) CALTRANS

MIXED FLOW U4MF07005 15 I-15BEAR VALLEY CUTOFF

INTERCHANGE CALTRANS

MIXED FLOW U4MF07026 15 I-15 JCT RTE 40 (74.9)0.3 MI SOUTH OF SOAP MINE RD (75.7)

WIDEN TO 6 LANES (EA:35080) CALTRANS

MIXED FLOW U4MF07001 18 SR-18 AND SR-330

VARIOUS LOCA-TIONS, SR-18 (PM31.9 TO 42.35), SR-330 (PM30.63 TO 44.11)

SR-18 INTERSECTION IMPROVEMENT AT SR-330, REALIGNMENT (E/O GREEN VALLEY LAKE RD), OFF-STREET PARKING; SR-330 ADD RIGHT TURN INTO RUNNING SPRINGS; SR-18 ADD 1 LANE (DIR?) PM39-40.86, PM41.75-42.35; SR-330 ADD 1 LANE (DIR?) PM30.63-31.48, 32.03-32.76, 33.38-36.07, 36.5-37.75, 37.61-40.76

CALTRANS

MIXED FLOW U4MF07020 38 SR-38GREEN CANYON RD (45.7)

S. JCT RTE 18 (49.5)

ADD TWO LANES (EA:33990) CALTRANS

MIXED FLOW U4MF07021 38 SR-38 RTE 10 (0.0) BRYANT ST (8.5) ADD TWO LANES (EA:34710) CALTRANS

MIXED FLOW U4MF07006 60 SR-60 PIPELINE AVE REPLACE ONE BRIDGE. CALTRANS

MIXED FLOW U4MF07007 60 SR-60 MONTE VISTA AVE REPLACE EB BRIDGE. CALTRANS

MIXED FLOW U4MF07031 83 SR-83BETWEEN JCT 71 (0.0)

JCT. SR-60 (7.2) STUDY FOR NEW CORRIDOR CALTRANS

Page 226: Project List - Southern California Association of Governments

224 P R O J E C T L I S T I N G R E P O R T

SAN BERNARDINO COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

MIXED FLOW U4MF07008 215 I-215GRAND TERRACE R/R UNDER PASS

REPLACE BOTH BRIDGES. CALTRANS

MIXED FLOW U4MF07009 215 I-215 5TH STREET REPLACE NB BRIDGE. CALTRANS

MIXED FLOW U4MF07010 215 I-215 NEWPORT AVE REPLACE BOTH BRIDGES. CALTRANS

MIXED FLOW U4MF07011 215 I-215WASHINGTON/ MT. VERNON

REPLACE BOTH BRIDGES. CALTRANS

MIXED FLOW U4MF07012 215 I-215HIGH GROVE R/R UNDERPASS

REPLACE BOTH BRIDGES. CALTRANS

MIXED FLOW U4MF07003 395 US-3950.6 MI N/O DESERT FLOWER RD

0.5 MI S/O FARM-INGTON RD

6-LANE HIGHWAY CALTRANS

MIXED FLOW U4MF07004 395 US-3950.5 MI S/O FARM-INGTON RD

KERN CO LINE 6-LANE HIGHWAY CALTRANS

OTHER U407013 0 AERIAL TRAMWAYSAN BERNARDINO/HIGHLAND AREA

BIG BEAR LAKE AREA

AERIAL TRAMWAY TBD

OTHER U407024 0 999

LUMP SUM AT VARI-OUS LOCATIONS IN SAN BERNARDINO COUNTY

SOUNDWALL PR0JECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)

CALTRANS

TRANSIT - BRT

U4TR07035 0BRT: FOOTHILL BLVD EAST

FONTANA SAN BERNARDINOTHIS WILL INCLUDE MAJOR INVESTMENT STUDY, ENVIRONMEN-TAL, PRELIMINARY ENGINEERING, FINAL DESIGN AND CON-STRUCTION

OMNITRANS

TRANSIT - BRT

U4TR07036 0BRT: FOOTHILL BLVD WEST

FONTANA MONTCLAIR THIS WILL INCLUDE MAJOR INVESTMENT STUDY, ENVIRONMEN-TAL, PRELIMINARY ENGINEERING, FINAL DESIGN AND CON-STRUCTION

OMNITRANS

TRANSIT - BRT

U4TR07037 0BRT: MOUNTAIN/EU-CLID AVENUES

UPLAND CHINOTHIS WILL INCLUDE MAJOR INVESTMENT STUDY, ENVIRONMEN-TAL, PRELIMINARY ENGINEERING, FINAL DESIGN AND CON-STRUCTION

OMNITRANS

TRANSIT - BRT

U4TR07038 0BRT: SAN BERNAR-DINO AVENUE

ONTARIO MILLS FONTANATHIS WILL INCLUDE MAJOR INVESTMENT STUDY, ENVIRONMEN-TAL, PRELIMINARY ENGINEERING, FINAL DESIGN AND CON-STRUCTION

OMNITRANS

Page 227: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 225

SAN BERNARDINO COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP IDROUTE

#ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

TRANSIT - BRT

U4TR07039 0BRT: HOLT AVENUE/4TH STREET

POMONA FONTANATHIS WILL INCLUDE MAJOR INVESTMENT STUDY, ENVIRONMEN-TAL, PRELIMINARY ENGINEERING, FINAL DESIGN AND CON-STRUCTION

OMNITRANS

TRANSIT - BRT

U4TR07040 0GRAND/EDISON AVENUES

HOV INTERCHANGE @ SR 60/91

CHINOTHIS WILL INCLUDE MAJOR INVESTMENT STUDY, ENVIRONMEN-TAL, PRELIMINARY ENGINEERING, FINAL DESIGN AND CON-STRUCTION

OMNITRANS

TRANSIT - COMMUTER

RAILU4TR07014 0

METROLINK COM-MUTER RAIL

ADDITIONAL METROLINK EXPANSION TBD

TRUCK CLIMBING

U4TK07016 15 I-15 E. MAIN ST.CALICO GHOST TOWN RD

SOUTHBOUND TRUCK CLIMBING LANE CALTRANS

TRUCK CLIMBING

U4TK07017 15 I-15 BAKER CIMA RD SOUTHBOUND TRUCK DESCENDING LANE CALTRANS

TRUCK CLIMBING

U4TK07018 15 I-15NEVADA STATE LINE ALTERNATE

CAJON SUMMIT COMMERCIAL VEHICLE ENFORCEMENT FACILITY CALTRANS

TRUCK CLIMBING

U4TK07022 15 I-15.2 MI N/O BIRD DITCH WASH BR

0.05 MI N/O AFTON CNY RD. OC

EXTEND SB TRUCK CLIMBING LANE (EA:0E720) CALTRANS

TRUCK CLIMBING

U4TK07023 15 I-15WHEATON SPRINGS-BAILY ROAD

YATES WELL RD NORTHBOUND TRUCK DESCENDING LANE CALTRANS

TRUCK CLIMBING

U4TK07019 40 I-40 IN NEEDLES TRUCK WEIGH STATION CALTRANS

Page 228: Project List - Southern California Association of Governments

226 P R O J E C T L I S T I N G R E P O R T

VENTURA COUNTY STRATEGIC PLAN PROJECTS

VENTURA COUNTY STRATEGIC PLAN PROJECTS

CATEGORY RTP ID ROUTE # ROUTE NAME FROM TO DESCRIPTION LEAD AGENCY

GRADE SEPA-RATION

U5M07012 0 ROSE AVEAT SR-34 (E. FIFTH ST)

CONSTRUCT 4 LANE GRADE SEPARATION WITH LEFT TURN POCKETS

TBD

GRADE SEPA-RATION

U5M07013 0 SR-118 GRADE SEPARATION IN VENTURA COUNTY TBD

IC/RAMPS U5M0705 126 SR-126WITHIN CITY OF VENTURA

CONSTRUCT NEW SOUTHBOUND TO US-101 CONNECTORSAN BUENAVEN-

TURA

MIXED FLOW U5M0704 23 SR-23 SR-23/SR-118 WALNUT CANYON NEW ALIGNMENT MOORPARK

MIXED FLOW U5M0706 23 SR-23 SR-118 SR-126 FREEWAY: MIXED FLOW CALTRANS

MIXED FLOW U5M0711 33SR-33 (CASITAS BYPASS)

FOSTER PARK CREEK RD EXPRESSWAY CALTRANS

MIXED FLOW U5M0707 34 SR-34 SR-1 SR-118WIDEN CONVENTIONAL HIGHWAY FROM 1 TO 2 LANES EACH DIRECTION (CALTRANS DISTRICT 7 DRAFT TRANSPORTATION CONCEPT REPORT FOR SR-34, OCTOBER 2003)

CALTRANS

MIXED FLOW U5M0701 101 US-101LOS ANGELES COUNTY LINE

SR-33ADD 1 LANE EACH DIRECTION, INTERCHANGE AND RAMP IMPROVEMENTS, ITS

CALTRANS

MIXED FLOW U5M0702 101 US-101 SR-33 MUSSEL SHOAL ADD 1 LANE EACH DIRECTION (REMAINS CONVENTIONAL HIGHWAY)

CALTRANS

MIXED FLOW U5M0708 118 SR-118 SR-23 SR-232 FREEWAY: MIXED FLOW CALTRANS

MIXED FLOW U5M0709 118 SR-118 SR-232 SR-126 FREEWAY: MIXED FLOW CALTRANS

MIXED FLOW U5M0703 126 SR-126WITHIN CITY LIMITS OF FILLMORE

ADD 1 LANE EACH DIRECTION CALTRANS

MIXED FLOW U5M0710 232 SR-232 SR-118 US-101 FREEWAY: MIXED FLOW CALTRANS

Page 229: Project List - Southern California Association of Governments

P R O J E C T L I S T I N G R E P O R T 227

REGIONAL STRATEGIC PLAN PROJECTS

REGIONAL STRATEGIC PLAN PROJECTS

Category Rtp Id Route # Route Name From to Description Lead Agency

HSRT - PAS-SENGER

UHSRT0701 0 HSRT LAX ORANGE COUNTYHIGH SPEED REGIONAL TRANSPORT (HSRT): LONG TERM SYSTEM SEGMENT: LAX TO ORANGE COUNTY

TBD

HSRT - PAS-SENGER

UHSRT0702 0 HSRT LAX PALMDALEHIGH SPEED REGIONAL TRANSPORT (HSRT): LONG TERM SYSTEM SEGMENTS: LAX TO PALMDALE

TBD

HSRT - PAS-SENGER

UHSRT0703 0 HSRT PALMDALE VICTORVILLEHIGH SPEED REGIONAL TRANSPORT (HSRT): LONG TERM SYSTEM SEGMENTS: PALMDALE TO VICTORVILLE

TBD

HSRT - PAS-SENGER

UHSRT0704 0 HSRT SAN BERNARDINOCOACHELLA VAL-LEY

HIGH SPEED REGIONAL TRANSPORT (HSRT): LONG TERM SYS-TEM SEGMENTS: SAN BERNARDINO TO COACHELLA VALLEY (INCLUDING PALM SPRINGS AIRPORT)

TBD

HSRT - PAS-SENGER

UHSRT0705 0 HSRT COACHELLA VALLEY IMPERIALHIGH SPEED REGIONAL TRANSPORT (HSRT): LONG TERM SYSTEM SEGMENTS: COACHELLA VALLEY (INCLUDING PALM SPRINGS AIRPORT) TO IMPERIAL

TBD

HSRT - PAS-SENGER

UHSRT0706 0 HSRT SAN BERNARDINO SAN DIEGOHIGH SPEED REGIONAL TRANSPORT (HSRT): LONG TERM SYS-TEM SEGMENTS: SAN BERNARDINO TO SAN DIEGO

TBD

HSRT - PAS-SENGER

UHSRT0707 0 HSRT ONTARIO AIRPORTNEVADA STATE LINE

HIGH SPEED REGIONAL TRANSPORT (HSRT): CALIFORNIA-NEVADA MAGLEV (CALIFORNIA-NEVADA SUPERSPEED TRAIN COMMISSION) - ONTARIO AIRPORT TO NV STATE LINE

TBD

HSRT - PAS-SENGER

UHSRT0708 0 HIGH SPEED RAIL REGIONWIDE

HIGH SPEED REGIONAL TRANSPORT (HSRT): CALIFORNIA HIGH-SPEED RAIL AUTHORITY (SERVING THE SCAG REGION NOT INCLUDING ANAHEIM TO UNION STATION SEGMENT IN CONSTRAINED PLAN)

TBD

HSRT - PAS-SENGER

UHSRT0709 0ORANGELINE HIGH-SPEED TRANSIT

ORANGE COUNTY PALMDALEORANGELINE SEGMENT ON PACIFIC ELECTRIC ROW (ORANGE COUNTY - UNION STATION - SANTA CLARITA - PALMDALE)

TBD

TOLL U3T0701 0CETAP - RIVERSIDE COUNTY TO ORANGE COUNTY

WESTERN RIVER-SIDE COUNTY

ORANGE COUNTY

CETAP - RIVERSIDE COUNTY TO ORANGE COUNTY - CON-STRUCT NEW INTERCOUNTY TRANSPORTATION CORRIDOR B - 2 TOLL EACH DIR ON NEW FACILITY FROM I-15/MID-COUNTY PKWY TO SR-241/SR-133

TBD

TOLL 1T0401 101 US-101 SR-23 SR-134/SR-170FROM SR-23 IN VENTURA TO TO SR-134/SR-170 IN LA ADD 2 HOT LANES IN EACH DIRECTION

TBD

Page 230: Project List - Southern California Association of Governments

228 P R O J E C T L I S T I N G R E P O R T

REGIONAL STRATEGIC PLAN PROJECTS

Category Rtp Id Route # Route Name From to Description Lead Agency

TRANSIT - COMMUTER

RAILMTRLNK0701 0

METROLINK STRATE-GIC PLAN

METROLINK STRATEGIC PLAN - INVESTMENTS IN ADDITIONAL TRACK CAPACITY, SIGNALING, STATION CAPACITY, CARS, LO-COMOTIVES, SUPPORT FACILITIES, AND NEW SERVICE LEVELS TO MAXIMIZE RIDERSHIP POTENTIAL

TBD

TRANSIT - LIGHT RAIL

U1TR0705 0METRO RAIL GOLD LINE EXTENSION

MONTCLAIR ONTARIO AIRPORTMETRO RAIL GOLD LINE EXTENSION-SEGMENT 3 MONTCLAIR STATION TO ONTARIO AIRPORT LRT EXTENSION.

TBD

TRANSIT - OTHER

LOSSAN0701 0LOSSAN STRATEGIC PLAN

LOSSAN STRATEGIC PLAN: SYSTEMIC CAPACITY AND SERVICE IMPROVEMENTS ON THE LOSSAN RAIL INTERCITY RAIL COR-RIDOR

TBD

TRUCK TOLL LANES

UTK0701 15 I-15

EAST-WEST COR-RIDOR CONNECT-ING THE PORTS OF LA/LB TO AND THROUGH THE INLAND EMPIRE

BARSTOW DEDICATED LANES FOR CLEAN TECHNOLOGY TRUCKS TBD

TRUCK TOLL LANES

UTK0702 TBD

EAST-WEST CORRIDOR CONNECTING THE PORTS OF LA/LB TO AND THROUGH THE INLAND EMPIRE

I-710 I-15 DEDICATED LANES FOR CLEAN TECHNOLOGY TRUCKS TBD