February 18, 2015 RLC Technologies, Inc. 11023 Washington Hwy., Suite 100 Glen Allen, Virginia 23059 USA Tel. (804) 550-0400 Fax. (804) 550-3833 http://www.rlctechnologies.com Project List & Case Studies 2015 Project Name General Contractor Owner / Address Target Material Year On-site Thermal Remediation of Soils - Allied-Signal, East Rutherford, NJ Smith Technology New Jersey Allied-Signal Morristown, NJ PCB's, PAH's 1995 On-site Thermal Remediation of Chlorinated Solvents - Carteret, NJ ERM Enviroclean Ewing, NJ Confidential Carteret, NJ TCE/Chlorinated Hydrocarbons 1996 Remediation of Petroleum Contaminated Soil - Baytown Texas Tetra Process Services The Woodlands, TX Exxon Baytown, Texas Refinery Waste 1997 Remediation of Petroleum Contaminated Soil - Borger, Texas Tetra Process Services The Woodlands, TX Phillips 66 Borger, Texas Refinery Waste 1997 Remediation of Soil Contaminated with Drill Cuttings SR2 Ooltewah, TN PEMX Villahermosa, Mexico Diesel Fuel Crude Oil 1998 Remediation of Tanker bottom sludge - Singapore - Sold 3 Units Singaport Cleanseas Singapore Singaport CleanseasPte., Ltd. - Singapore High Chain Hydrocarbons 97,98 2000 Remediation of Petroleum Contaminated Soil - Andrews County, West Texas Tetra Process Services The Woodlands, TX TSD Facility Andrews County, West Texas TSD facility waste 2000 On-site Thermal Remediation Drill cuttings - Kristensund, Norway Tetra Process Services The Woodlands, TX TPS Norway Kristensund, Norway Drill Cuttings from the North Sea 2000 On-site Thermal Remediation Drill cuttings - Fujariah, United Arab Emirates Ecoref. Fujariah, United Arab Emirates Ecoref. Fujariah, United Arab Emirates Drill cuttings 2001 Remediation of Petroleum Contaminated Soil - St. Croix, Virgin Islands Tetra Process Services The Woodlands, TX Hess Refinery (Hovensa) St. Croix, Virgin Islands Refinery Waste 2001 On-site Thermal Remediation Drill cuttings - Abu Dhabi, UAE- 2 Units Gulf Environmental Abu Dhabi GENCO-Habshan Habshan, U.A.E. Drill cuttings 2002 2003 On-site Thermal Remediation Drill cuttings - Saudi Arabia. SEW Al-Khobar, Saudi Arabia SEW Al-Khobar, Saudi Arabia Drill cuttings Crude Oil 2003 On-site Hazardous Waste Recycling East Chicago IN Pollution Control Industries Pollution Control Industries East Chicago IN Industrial Solvents, Organic Wastes 2004 On-site Thermal Remediation Drill cuttings - Safat Kuwait Natioanl Cleaning Company (formerly Wataniya Environmental Services) Natioanl Cleaning Company. Safat Kuwait Drill cuttings, Crude Oil & Waste from '91 War 2005 On-site Thermal Remediation Puertollano Spain Tradebe Barcelona Spain Repsol Puertollano Spain Bio-Solids, Oliy Sludge, TPH Soil 2006

Upload: phamdung

Post on 31-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

February 18, 2015

RLC Technologies, Inc. 11023 Washington Hwy., Suite 100 Glen Allen, Virginia 23059 USA Tel. (804) 550-0400 Fax. (804) 550-3833 http://www.rlctechnologies.com

Project List & Case Studies 2015

Project Name General Contractor

Owner / Address Target Material Year

On-site Thermal Remediation of Soils - Allied-Signal, East Rutherford, NJ

Smith Technology New Jersey

Allied-Signal Morristown, NJ

PCB's, PAH's 1995

On-site Thermal Remediation of Chlorinated Solvents - Carteret, NJ

ERM Enviroclean Ewing, NJ

Confidential Carteret, NJ

TCE/Chlorinated Hydrocarbons

1996

Remediation of Petroleum Contaminated Soil - Baytown Texas

Tetra Process Services The Woodlands, TX

Exxon Baytown, Texas

Refinery Waste 1997

Remediation of Petroleum Contaminated Soil - Borger, Texas

Tetra Process Services The Woodlands, TX

Phillips 66 Borger, Texas

Refinery Waste 1997

Remediation of Soil Contaminated with Drill Cuttings

SR2 Ooltewah, TN

PEMX Villahermosa, Mexico

Diesel Fuel Crude Oil

1998

Remediation of Tanker bottom sludge - Singapore - Sold 3 Units

Singaport Cleanseas Singapore

Singaport CleanseasPte., Ltd. - Singapore

High Chain Hydrocarbons

97,98 2000

Remediation of Petroleum Contaminated Soil - Andrews County, West Texas

Tetra Process Services The Woodlands, TX

TSD Facility Andrews County, West Texas

TSD facility waste 2000

On-site Thermal Remediation Drill cuttings - Kristensund, Norway

Tetra Process Services The Woodlands, TX

TPS Norway Kristensund, Norway

Drill Cuttings from the North Sea

2000

On-site Thermal Remediation Drill cuttings - Fujariah, United Arab Emirates

Ecoref. Fujariah, United Arab Emirates

Ecoref. Fujariah, United Arab Emirates

Drill cuttings 2001

Remediation of Petroleum Contaminated Soil - St. Croix, Virgin Islands

Tetra Process Services The Woodlands, TX

Hess Refinery (Hovensa) St. Croix, Virgin Islands

Refinery Waste 2001

On-site Thermal Remediation Drill cuttings - Abu Dhabi, UAE- 2 Units

Gulf Environmental Abu Dhabi

GENCO-Habshan Habshan, U.A.E.

Drill cuttings 2002 2003

On-site Thermal Remediation Drill cuttings - Saudi Arabia.

SEW Al-Khobar, Saudi Arabia

SEW Al-Khobar, Saudi Arabia

Drill cuttings Crude Oil

2003

On-site Hazardous Waste Recycling East Chicago IN

Pollution Control Industries

Pollution Control Industries East Chicago IN

Industrial Solvents, Organic Wastes

2004

On-site Thermal Remediation Drill cuttings - Safat Kuwait

Natioanl Cleaning Company (formerly Wataniya Environmental Services)

Natioanl Cleaning Company. Safat Kuwait

Drill cuttings, Crude Oil & Waste from '91 War

2005

On-site Thermal Remediation Puertollano Spain

Tradebe Barcelona Spain

Repsol Puertollano Spain

Bio-Solids, Oliy Sludge, TPH Soil

2006

2 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Project Name General Contractor

Owner / Address Target Material Year

Remediation of Petroleum Contaminated Soil - Bonny Facility Nigeria

Titan Projects Nig. Ltd Port Harcourt Nigeria

Shell Oil Nigeria

Refinery Waste 2006

On-Site Remediation Drill Cuttings San Paulo Brazil

ESBRA San Paulo Brazil

Petrobras Brazil

Drill Cuttings 2007

Central Environment Protection Facilty (BeAAT) - Ruwais UAE

SNC-Lavalin Montreal Canada

ADNOC Takreer UAE

Drill cuttings & Refinery Waste

2007

Remediation of Petroleum Contaminated Soil - Bilbao Spain

Lezama Trapagaran (Bizkaia) Spain

Repsol Bilbao Spain

Refinery Waste Biological Waste

2008

On-site Thermal Remediation Drill cuttings - Louisana

Phillips Services Corporation Houston TX

Shell Oil Norco, Louisiana

Refinery Waste 2009

ZOIL Hazardous Waste Recycling Facility - Madina-Accra , Ghana

Zoil Services Ltd Madina-Accra, Ghana

ZOOMLION Madina-Accra , Ghana

Oily Sludge, Contaminated Soils, Hazardous Materials

2011

TexCycle Hazardous Waste Recycling Facility - Kuala Lumpur, Malaysia

TexCycle TexCycle Kuala Lumpur, Malaysia

Oily Wastes, Hazardous Materials

2011

LUKOIL-Permnefteorgsyntez Thermal Desorption Facility

LUKOIL-Permnefteorgsyntez

LUKOIL Perm, Russia

Oily Sludge & Refinery Waste

2012

VAC-TECH Thermal Remediation Facility

VAC-TECH Engineering Pte. Ltd.

VAC-TECH Engineering Pte. Ltd. Singapore

Oily Sludge, Drill Cuttings

2012

TERVITA Thermal Remediation Facility

Tervita Corporation – Waste Processing

Calgary, Canada Oily Centrifuge & Shaker Discharge, BTEX

2012

APEX Thermal Remediation Facility APEX Marine and Securities Services Limited

Nigeria Oily Sludge, Drill Cuttings

2013

Tradebe SDS-2 Tradebe North America

Tradebe North America 4343 Kennedy Ave Easy Chicago, IN 46312

RCRA wastes, Industrial Solvents, Organic Wastes

2014

Veolia P66 Veolia North America

Veolia North America 4760 World Houston Pkwy Houston, TX 77032

Oily Sludge & Refinery Waste

2014

KOC-1 National Cleaning Company

Natioanl Cleaning Company / Kuwait Oil Company

Oil Based Drilling Muds and Contaminated Waste

2014

3 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Recent ATDU Projects ADCO Drilling Operations Habshan, United Arab Emirates

Material: Drill Cuttings Composition: Solids Content: ±70% Oil Content: ±25% Water Content: ±5% Start Date: October 2002 Completion: 2005 Quantity Treated: 30,000 tons Processing Rate: 3.5 to 4.5 ton/hour Project Description: RLC Technologies was contracted to manufacture equipment to be used for the ADCO drilling operations in Habshan, UAE. The equipment was used to process drill cuttings. The above mentioned Waste was be treated to reduce the Total Petroleum Hydrocarbon (TPH), as per EPA procedures SW846/8015B and 1664, to below an environmentally acceptable limit of 0.5% Weight/Weight and to satisfactorily dispose of or recycle all recovered solids, liquids and other material used in the performance of the Services in compliance with all applicable environmental laws, regulations and also ADNOC / ADCO guidelines.

Drill Cuttings prior to treatment in ATDU

4 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Wataniya Environmental Services Safat, Kuwait

Material: Drill Cuttings Soil & Sand Contaminated with Crude Oil Composition: Solids Content: ±70% Oil Content: ±25% Water Content: ±5% Start Date: July 2005 Quantity Treated: +75,000 tons Processing Rate: 3.5 ton/hour

Project Description: RLC Technologies was contracted to manufacture equipment for WES to process drill cuttings, crude oil and waste from the ’91 war. The RLCT plant has been in continual use and remains in use today, processing these waste streams. RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer. Cleanup criteria was 1% (~10,000 mg/L)

Crude Oil Sludge Pond Remediated by ATDU

5 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Pollution Control Industries East Chicago, U.S.A.

Material: Hazardous Materials Industrial Wastes Composition: Solids Content: ±30% Oil Content: ±30% Water Content: ±30% Start Date: February 2004 Quantity Treated: +50,000 tons Processing Rate: 1.5 to 2.5 ton/hour Project Description: RLC Technologies was contracted by Pollution Control Industries to supply an ATDU system for a hazardous material recycling facility located in East Chicago. The facility treats and recycles paint waste, resins, polymers, solvent soaked rags, oily wastes, and discarded commercial products. The RLCT plant has been in continual use and remains in use today, processing these waste streams. RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer. Cleanup criteria was 1% (10,000 ppm)

6 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

BeAAT Central Environmental Waste Facility Ruwais, United Arab Emirates

Material: Refinery Waste Contaminated Soils & Sludge Centrifuge Cake Composition: Solids Content: ±60% Oil Content: ±20% Water Content: ±20% Start Date: September 2008 Quantity Treated: +40,000 tons Processing Rate: 2.5 to 3.5 ton/hour

Project Description: RLC Technologies was contracted by PSC to supply an ATDU system for a hazardous material recycling facility located in Norco, Louisiana. The facility processes refinery waste from the Shell and Valero refineries, as well as outside sources. The RLCT plant has been in continual use and remains in use today, processing these waste streams. RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer. Cleanup criteria was 1% (10,000 ppm)

7 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Lezama Demolition Services Bilbao, Spain

Material: Refinery Waste Bio-Solids Contaminated Soils & Sludge Composition: Solids Content: <30% Oil Content: >30% Water Content: >40% Start Date: September 2008 Quantity Treated: +30,000 tons Processing Rate: 1.5 to 2.5 ton/hour

Project Description: RLC Technologies was contracted by Lezama to construct a 54” diameter ATDU system for the processing of oily refinery waste and bio-solids in Bilbao, Spain. The unit is installed in a Repsol oil refinery. Twin centrifuge operations preceded the ATDU system. Due to the high liquid loading in the feed material, special provisions were made to allow for the direct pumping of oily sludge into the ATDU feed screw conveyor. The ATDU has processed feed materials with liquid loading up to 90% by weight. Discharged solids have a high caloric value and are therefore sold as an auxiliary fuel which can be blended for firing in cement kilns or industrial furnaces. Non-Condensable process gases are returned to the ATDU furnace for oxidation. RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer. Cleanup criteria was 1% (10,000 ppm)

8 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Phillips Services Corporation Louisiana, U.S.A.

Material: Refinery Waste Contaminated Soils & Sludge Composition: Solids Content: ±60% Oil Content: ±20% Water Content: ±20% Start Date: September 2008 Quantity Treated: +40,000 tons Processing Rate: 2.5 to 3.5 ton/hour

Project Description: RLC Technologies was contracted by PSC to supply an ATDU system for a hazardous material recycling facility located in Norco, Louisiana. The facility processes refinery waste from the Shell and Valero refineries, as well as outside sources. The RLCT plant has been in continual use and remains in use today, processing these waste streams. Through the use of our ATDU system, PSC is able to ‘de-list’ hazardous waste materials, thereby substantially lowering their disposal costs for processed solids. RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer. Cleanup criteria was 1% (10,000 ppm)

9 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Zoil Ghana

Material: Refinery Waste Contaminated Soils & Sludge Composition: Solids Content: ±60% Oil Content: ±20% Water Content: ±20% Start Date: November 2010 Processing Rate: 3 to 6 ton/hour Project Description: RLC Technologies was contracted by ZOIL Services Limited to deliver a 72” diameter ATDU facility for operation in Ghana. The unit was to treat crude oil tanker bottoms and marine waste, drill cuttings, fixed tank bottoms and oily sludge, general refinery waste, filter cakes, PAHs, PCBs as well as soils contaminated with engine and hydraulic oil, kitchen and galley grease. Pesticides, TCE, PCE and other chlorinated organic compounds can be treated in the ATDU without the formation of dioxins and furans due to the non-oxidizing environment inside the ATDU. The unit was provided with a stack disc centrifuge skid as well as thermal oxidizer for the treatment of non-condensable process gases.

10 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Tex-Cycle Kuala Lumpur, Malaysia

Material: Industrial Wastes Oily Rags Paints and Resins Contaminated Soils & Sludge Composition: Solids Content: ±60% Oil Content: ±20% Water Content: ±20% Start Date: January 2013 Processing Rate: 2 to 4 ton/hour Project Description: RLC Technologies was contracted by Tex Cycle Technology for the construction of a 54” diameter ATDU system to be installed in Kuala Lumpur, Malaysia. The unit will expand their already existing capabilities in the hazardous waste disposal industry. The unit is installed indoors and was provided with a SSI industrial shredder to reduce steel drums to part sizes acceptable for the processing inside the ATDU. Cleanup criteria was 1% (10,000 ppm)

Industrial waste feed-stock for ATDU processing

11 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Lukoil Perm, Russia

Material: Refinery Waste Composition: Solids Content: ±70% Oil Content: ±10% Water Content: ±20% Start Date: 2013 Processing Rate: 2 ton/hour Project Description: RLC Technologies was contracted by Argus Limited to construct a 54” diameter ATDU system to be installed in the Lukoil owned oil refinery in Perm, Russia. The unit is designed to process oily refinery waste at a rate of 2 metric tons per hour. A pre-mixer was provided to homogenize the various feed materials entering the system. Solids exiting the ATDU system travel to an adjoining briquetting facility for stabilization of heavy metals prior to disposal. Due to the extreme climate of the region (winter temperatures as much as -40oC) the unit is installed inside a building. Local regulations required that the ATDU system be built fully explosion proof (Ex d or NEC Class 1 Division 1) and feature a continuous emissions monitor system (CEM). The unit was built to all required Russian regulatory codes for GOST-R certification. Cleanup criteria was 0.5% (5,000 ppm)

Custom H.M.I. Control Screen

12 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Vac-Tech Singapore

Material: Marine Waste Contaminated Soils & Sludge Composition: Solids Content: >50% Oil Content: <40% Water Content: <30% Start Date: January 2013 Processing Rate: 2 ton/hour Project Description: RLC Technologies was contracted by Vac-Tech Engineering to deliver a 54” ATDU system to Singapore for the processing of drill cuttings and oily sludge. The LPG fired ATDU features a double pass single stack design and is equipped with a continuous emissions monitor system (CEM). Cleanup criteria was 1% (10,000 ppm)

13 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Tervita Calgary, Canada

Material: Drill Cuttings & Mud BTEX Contaminated Soil Composition: Solids Content: ±50% Oil Content: ±5% Water Content: ±45% Start Date: April 2013 Processing Rate: 3 to 6 ton/ hour Project Description: RLC Technologies was contracted by TERVITA Corporation to construct a 76” ATDU system for the processing of drilling cuttings and mud in Calgary, Canada. The natural gas fired ATDU is to be installed outdoors in an environment where winter temperatures drop to as low as -40oC. For that reason the system is being fully winterized with insulation and heat tracing. An auxiliary dry cooler system has been employed to allow cooling of the process water in winter months when evaporative cooling is not possible.

14 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

APEX Thermal Remediation Facility Nigeria

Material: Contaminated Soils & Oily Waste Composition: Solids Content: 70% Oil Content: 20% Water Content: 10% Contract Date: January 2013 Processing Rate: 10 ton/ hour Project Description: RLC Technologies was contracted by APEXa Marine to construct a 84” ATDU system for the processing of contaminated soils and drilling waste in Nigeria. The unit is designed for operation outdoors in the humid Nigerian environment. The system includes a traveling gantry crane traversing a material receiving and storage pit which feeds the ATDU system. Contract also included two forklift trucks with rotary forks.

15 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Tradebe SDS-2 East Chicago, Indiana

Material: RCRA wastes including hydrocarbon contaminated debris Composition: Solids Content: ±40% Oil Content: ±20% Water Content: ±30% Metals: ±10% Start Date: Q1 2015 Processing Rate: 4 to 5 ton/ hour Project Description: RLC Technologies was contracted by TERVITA Corporation to construct a 84” diameter by 56’ length ATDU system for the processing of RCRA listed wastes as well as various hydrocarbon contaminated debris and industrial wastes. Materials are shredded to 2” parts prior to feeding into the ATDU. Once inside the ATDU organics are vaporized and plastics are pyrolyized into vapors which are condensed in the provided vapor recovery unit. SDS-2 is the second ATDU installation at the site.

16 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

Veolia P66 Borger, Texas

Material: RCRA wastes including hydrocarbon contaminated debris Composition: Solids Content: ±40% Oil Content: ±20% Water Content: ±30% Metals: ±10% Start Date: December 2014 Processing Rate: 8 ton/ hour Project Description: RLC Technologies was contracted by Veolia North America to construct a 96” diameter by 48’ length ATDU system for the processing of tank bottoms, oily sludge and refinery waste. The 96” ATDU is the largest built by RLC to date. The plant is fired with natural gas and features an RLC built Thermal Oxidizer Unit for the handling of non-condensable vapors.

17 | P a g e F e b r u a r y 1 8 , 2 0 1 5

www.RLCTechnologies.com

KOC-1 Kuwait

Material: RCRA wastes including hydrocarbon contaminated debris Composition: Solids Content: ±40% Oil Content: ±20% Water Content: ±30% Start Date: Q1 2015 Processing Rate: 5-8 ton/ hour Project Description: RLC Technologies was contracted by National Cleaning Company to construct an 84” diameter by 56’ length ATDU system for the processing of OBM contaminated drilling waste for the Kuwait Oil Company. The unit is the second ATDU provided to this customer in Kuwait and will service the Kuwait Oil Company. The plant is fired with No.2 oil and features an RLC built Thermal Oxidizer Unit for the handling of non-condensable vapors.