Evaluation Report on Project PROVISION OF MISSING FACILITIES AT COLLEGE OF VETERINARY AND ANIMAL SCIENCES (CVAS), JHANG DIRECTORATE GENERAL MONITORING & EVALUATION PLANNING & DEVELOPMENT DEPARTMENT GOVERNMENT OF THE PUNJAB NOVEMBER, 2016 DGM&E, P&D Department, Civil Secretariat, Lahore – Punjab Tel: (042) 99214489, Fax: (042) 99214491

Upload: dr-khalid-shouq

Post on 14-Apr-2017

89 views

Category:

Education


0 download

TRANSCRIPT

Evaluation Report on Project

PROVISION OF MISSING FACILITIES AT COLLEGE OF VETERINARY AND

ANIMAL SCIENCES (CVAS), JHANG

DIRECTORATE GENERAL MONITORING & EVALUATION PLANNING & DEVELOPMENT DEPARTMENT

GOVERNMENT OF THE PUNJAB NOVEMBER, 2016

DGM&E, P&D Department, Civil Secretariat, Lahore – Punjab Tel: (042) 99214489, Fax: (042) 99214491

(This page is intentionally left blank)

i | P a g e

TABLE OF CONTENTS

1. INTRODUCTION: .............................................................................................................................. 1

1.1. OVERVIEW ............................................................................................................................... 1

1.2. PROJECT BRIEF: ....................................................................................................................... 3

1.3. PROJECT OBJECTIVES: ............................................................................................................. 4

1.4. THE EVALUATION REPORT: PURPOSE & STRUCTURE ............................................................. 5

2 METHODOLOGY: ............................................................................................................................. 6

2.1. TEAM FORMATION: ................................................................................................................ 7

2.2. DOCUMENTS REVIEW: ............................................................................................................ 7

2.3. IDENTIFICATION OF KEY INDICATORS: .................................................................................... 7

2.4. PROJECT SITE VISIT: ................................................................................................................. 8

A. INTERVIEWS WITH PROJECT OFFICIALS: ..................................................................................... 8

B. VISITS SNAPS / PICTORIAL SURVEY: ............................................................................................ 8

3 PROJECT FINANCIAL & PHYSICAL ASSESSMENT: ............................................................................. 9

3.1 PROJECTS COST ANALYSIS: ...................................................................................................... 9

3.2 ITEM WISE PLANNED & ACTUAL EXPENDITURE: ................................................................... 10

3.3 DGM&E PROJECT PHYSICAL ASSESSMENT ............................................................................ 14

4 OBSERVATIONS: ............................................................................................................................ 20

5 RECOMMENDATIONS: .................................................................................................................. 26

ii | P a g e

LIST OF TABLES:

TABLE 1: PROJECT BRIEF........................................................................................................................ 3

TABLE 2: PROJECT SITE VISIT ................................................................................................................. 8

TABLE 3: PROJECT OFFICIAL INTERVIEWED ........................................................................................... 8

TABLE 4: YEAR WISE FINANCIAL PHASING OF PROJECT ........................................................................ 9

TABLE 5: ITEM WISE PLANNED & ACTUAL EXPENDITURE ................................................................... 10

TABLE 6: DGM&E ASSESSMENT REGARDING ACHIEVEMENT OF PROJECT OBJECTIVES .................... 14

TABLE 7: PHYSICAL TARGET AND ACHIEVEMENTS .............................................................................. 16

TABLE 8: VARIATION IN SCOPE OF BUILDING STRUCTURES ............................................................... 23

TABLE 9: ITEMS PROCURED MORE THAN PLANNED UNITS ................................................................ 24

TABLE 10: COMPARISON BETWEEN EXPECTED & ACTUAL ANNUAL ENROLMENT .............................. 25

LIST OF FIGURES:

FIGURE 1: FLOW CHART DIAGRAM FOR EVALUATION ......................................................................... 6

FIGURE 2: RELEASES VS EXPENDITURE................................................................................................ 10

FIGURE 3: INTERNAL VIEW OF AUDITORIUM ...................................................................................... 20

FIGURE 4: INCOMPLETE WORK OF AUDITORIUM ............................................................................... 20

FIGURE 5: INCOMPLETE WORK OF WINDOWS ................................................................................... 20

FIGURE 6: EXTERNAL VIEW OF LIBRARY .............................................................................................. 20

FIGURE 7: INCOMPLETE ELECTRIFICATION WORK .............................................................................. 21

FIGURE 8: INCOMPLETE FRONT ELEVATION OF STC ........................................................................... 21

FIGURE 9 (A & B): STRUCTURAL CRACKS IN RCC SLAB ........................................................................ 21

FIGURE 10: LEAKAGE IN WALL ............................................................................................................ 22

FIGURE 11: PLASTER WAS NOT IN ALIGNMENT ................................................................................... 22

FIGURE 12 (A&B): SEEPAGE IN INTERNAL WALLS ............................................................................... 22

FIGURE 13 (A&B): POOR CONDITION OF EXTERNAL PAINT ................................................................ 23

FIGURE 14: YEAR WISE NO. OF CASES EXAMINED .............................................................................. 25

ACRONYMS

DGM&E DIRECTORATE GENERAL MONITORING & EVALUATION

PC-I PLANNING COMMISSION FORM-I

PC-IV PLANNING COMMISSION FORM - IV

ECM EVALUATION COMMITTEE MEETING

LAD LIVESTOCK ASSISTANT DIPLOMA

1 | P a g e

1. INTRODUCTION:

1.1. OVERVIEW

Livestock plays an important role in national economy. It contributes to more than 55.4

percent of the agriculture value added and 11.9 per cent to the Gross Domestic Product

(GDP). Livestock development has linkages with other sectors such as rural development,

industries, poverty alleviation and environment. It can be used as an effective tool for

poverty alleviation in the rural areas. For a large population of rural households in rain-fed

agriculture production system, livestock provide security against crop failure. It is an income

generating activity especially for women. For the poor in the villages, it is a form of financial

security cashing it at the time of need.

The productivity of livestock in terms of meat and milk is low. However, there is considerable

potential to increase the productivity of livestock. Some of the best breeds of cattle, buffalo,

goat and sheep are available in the country, whose full production potential has not been

realized. Meeting the challenge of modernizing the livestock sub-sector requires a change of

attitude and an active policy for its development, reflected in appropriate allocations and

institutional facilities.

Keeping in view the importance of livestock and poultry sectors in the national economy,

Government of Punjab took initiative and decided to establish four Faculties / Colleges at

BZU, Multan, Islamia University Bahawalpur, Arid Agri. University, Rawalpindi and a

constituent college at Jhang. As a result, College of Veterinary and Animal Sciences, Jhang

was established under the supervision of UVAS, Lahore. However, certain infrastructural

facilities which were indispensable for proper functioning of the College had not been

provided due to the inadequacy of funds.

To provide those missing infrastructural facilities at CVAS, Jhang, a project titled “Provision

of Missing Facilities at CVAS, Jhang” was initiated. The approved cost of the project was Rs.

185.550 million with a gestation period of 36 months. However, actual expenditure

remained Rs. 183.606 million (up to 30th June, 2016) against released amount of Rs. 185.550

million i.e. 98.95 % of the total released funds. The main activities of the project were to

construct veterinary clinic / hospital, artificial insemination lab, training/research poultry &

dairy units, experimental animal shed, boundary walls with steel gate, post mortem teaching

block, library, auditorium, student teacher centre, boys hostel for 100 students, residences,

2 | P a g e

procurement of vehicles, furniture, plant & machinery, purchase of cows & buffaloes and

recruitment of Project Staff.

The department has submitted the PC-IV (Project Completion Report) and the gestation

period of the project has been completed since 30th June 2016, but the civil work of

auditorium, library and student teacher centre was still going on. Flooring, ceiling,

electrification work, washrooms and paint of auditorium was yet to complete. Scope

variation was also observed in most of the building structures. In some buildings, the

department increased the covered area while in others they decreased on his own, without

any revision in scope. Some defects were observed in civil work which are highlighted in the

observation section. However, overall quality of civil works was found satisfactory.

While in procurement two deviations were observed. i) Number of units of some items

were procured more than approved units, ii) some items were procured at more than double

cost from the approved cost. Two (02 ) vehicles were procured under this project, one was

Hino Bus (32+1) seater and other was Toyota Corolla 1300 CC, but only one vehicle (Hino

Bus) was found at site. The second vehicle (Toyota Corolla) was neither found at site nor

under the use of project staff.

The targets should be pursued to achieve as set at planning stage. After the completion of

the project, it was expected that College of Veterinary and Animal Sciences Jhang, will

produce 100 DVM graduates, 20 M. Phil. Scholars, 200 Livestock Assistant Diploma holders,

50 Dairy Farm Supervisors and 150 students in other short courses annually but in actual

these enrolment targets were not achieved ( observation section may refer).

Ali Amjad Dogar (Research Analyst)

3 | P a g e

1.2. PROJECT BRIEF:

TABLE 1: PROJECT BRIEF.

Project Title Provision of Missing Facilities at CVAS, Jhang

Location 12-KM, Chiniot Road, Jhang (Tehsil and Distt. Jhang).

Sponsoring Ministry/ Agency Government of the Punjab, Livestock & Dairy

Development Department.

Execution Agency University of Veterinary & Animal Sciences, Lahore

Operation & Maintenance College of Veterinary & Animal Sciences, Jhang.

PC-I Cost Rs. 185.550 million

Actual Cost Rs. 183.606 million (up to 30.06.2016)

Implementation Period Date of Commencement Date of Completion

As per PC-I 01-08-2013 30-06-2016

Actual 01-08-2013 30-06-2016 (As per PC-IV)

But in actual it’s still going on

Planned Gestation Period 36 Months

Actual Gestation Period 36 Months ( still going on)

Beneficiaries General Public

4 | P a g e

1.3. PROJECT OBJECTIVES:

The Objectives of the project were:

Construction of missing / essentially required components such as college library,

auditorium, student teacher center, boys hostel for 100 students, teachers & staff

residences.

Provision of missing / needed equipment for labs and allied facilities for five

departments.

To strengthen the clinical facilities by providing experimental animal sheds,

veterinary clinic / hospital and an artificial insemination lab for hands on training to

students.

Construction of training / research dairy animals, poultry units and post mortem

teaching block along with boundary wall around 25 acres of land.

To produce 100 graduates Doctor of Veterinary Medicines (DVM) annually and more

than 20 M. Phil. in different disciplines.

To train more than 200 skilled para-professionals annually by offering diploma

programs of livestock assistant and short training courses.

To provide professional and skilled manpower for development of livestock, poultry

& allied sectors, which will help to enhance the production potential of the local

livestock / poultry in the region.

Following were the activities to establish the project;

Construction of Veterinary Clinic / Hospital

Construction of Artificial Insemination Lab.

Construction of Training/Research Poultry Unit

Construction of Training/Research Dairy Unit

Construction of Experimental Animal Shed

Construction of Boundary Walls with Steel Gate

Construction of Post Mortem Teaching Block

Construction of Library, Auditorium ,Student Teacher Centre

Construction of Boys Hostel # 1 for 100 Students

Construction of Residences

Procurement of Vehicles

5 | P a g e

Procurement of Furniture , Plant & Machinery

Purchase of Cows & Buffaloes

Recruitment of Project Staff

1.4. THE EVALUATION REPORT: PURPOSE & STRUCTURE

This evaluation report is divided into 5 different parts. The first part starts with introduction

giving details about the project domain and structure of the project evaluation report. The

second part of this report focuses on evaluation methodology, followed by documents

review, selection of performance indicators, project site visit plan etc. The third part of

report consists of project physical and financial analysis. The fourth part consists of

observations regarding the project activities, targets made by the evaluation team of

DGM&E, P&D Department. The fifth and the most critical part reflect recommendations for

the effective usage of the project outcomes and resources.

6 | P a g e

2 METHODOLOGY:

Following criteria is used to carry out evaluation of the project as elaborated in flow chart

given in Figure below;

PROJECT DOCUMENTS

REVIEW

IDENTIFYING PROJECT

KEY INDICATORS

PHYSICAL ACTIVITIES AND

DATA COLLECTION

DATA ANALYSIS AND

INTERPRETATION

REPORT

SUBMISSION

TEAM FORMATION

PC-IV REVIEW

PHYSICAL

ACHIEVEMENTS

FINANCIAL

ACHIEVEMENTS

PC-I REVIEW

DURATION

PERIODIC FINANCIAL

PROGRESS REPORTS

PERIODIC PHYSICAL

PROGRESS REPORTS

PROCUREMENT

RECORDS

PROJECT COST

ANALYSIS

INTERVIEWS

SITE VISITS

SITE SNAPS

DGM&E ASSESSMENT

COST

OBJECTIVES

OBSERVATIONS/

RECOMMENDATION

OTHERS

FIGURE 1: FLOW CHART DIAGRAM FOR EVALUATION

7 | P a g e

2.1. TEAM FORMATION:

In-house meeting held in Directorate General Monitoring & Evaluation and the competent

authority has assigned this project for the evaluation to following members for having his

expertise in project’s domain such as data collection methods, data analysis and

interpretation.

Mr. Ali Amjad Dogar, Research Analyst.

Engr. Fahad Ahmad, Project Manager.

2.2. DOCUMENTS REVIEW:

Following project documents, evaluation tools and techniques were consulted.

Planning Commission Form-I (PC-I) of the Project

Planning Commission Form-IV (PC-IV) of the Project

DGM&E approved Evaluation Guidelines

Punjab.gov.pk/ Punjab Portal

2.3. IDENTIFICATION OF KEY INDICATORS:

Project performance parameters were defined in the following terms;

Project cost

Project time duration

Quality of procured items

Project achievements against its approved objectives & targets

Quality of civil/misc. work,

These parameters are helpful to map objectives and targets planned in PC-I with its actual

execution and implementation in order to assess whether the achievements have been

actually made under the project or otherwise.

8 | P a g e

2.4. PROJECT SITE VISIT:

The project site visit was conducted by the Evaluation Team of the Directorate General,

Monitoring & Evaluation, Planning & Development Department for data collection and

evaluation purposes. Detail has been given in table below.

TABLE 2: PROJECT SITE VISIT

LOCATION /DISTRICT DATE OF VISIT TEAM MEMBER

Jhang 28-09-2016

& 29-09-2016

Mr. Ali Amjad Dogar

(Research Analyst)

a. INTERVIEWS WITH PROJECT OFFICIALS:

A session of interview with the following project officials was conducted during the process

of evaluation and on site visit of the CVAS, Jhang.

TABLE 3: PROJECT OFFICIAL INTERVIEWED

SR

NO. NAME DESIGNATION CONTACT NO.

1. Muhammad Younus Rana Principal/Project Director 0333-4483593

2. Haneef ur Rahman Khan Assistant / Computer

Operator 0332-6258898

3. Nadeem Tariq Sub Engineer 0315-6503291

b. VISITS SNAPS / PICTORIAL SURVEY:

Project pictorials are placed at Annexure-A.

9 | P a g e

3 PROJECT FINANCIAL & PHYSICAL ASSESSMENT:

DGM&E assessment vis-à-vis financial & physical activities of the project are given

as following.

3.1 PROJECTS COST ANALYSIS:

Detailed analysis of the project cost along with overall expenditure has been carried out to

gauge the financial performance of the project after its completion. The rationale of above-

said actual expenditures has also been figured out by calculating its percentages to line-up

the evaluation process.

Total planned cost:

TOTAL COST: Rs. 185.550 million

Total actual expenditure:

TOTAL EXPENDITURE: Rs. 183.606 million (up to 30-06- 2016)

TABLE 4: YEAR WISE FINANCIAL PHASING OF PROJECT

Year PC-I Phasing ADP Allocation Releases Expenditure

% Age Utilization

on Releases

2013-14 30.778 30.778 30.778 28.844 93.71

2014-15 91.646 91.646 91.646 91.639 99.99

2015-16 63.126 63.126 63.126 63.123 99.99

Total 185.55 185.55 185.55 183.606 98.95

10 | P a g e

3.2 ITEM WISE PLANNED & ACTUAL EXPENDITURE:

TABLE 5: ITEM WISE PLANNED & ACTUAL EXPENDITURE

Sr. No.

Items As per PC-I PC-I

Estimates Actual

Expenditure

CIVIL WORK

1 Department of Clinical Studies

Construction of Veterinary Clinic / Hospital /Artificial Insemination Lab.

6260000 10471139

2 Construction of Poultry/Dairy/Animal Shed/Boundary Walls

Construction of Training / Research Poultry Unit, Training / Research Dairy Unit, Animal Shed & Boundary Walls

24210000 24734867

3 Construction of Post Mortem Teaching Block

Post Mortem Block 9260000 11285941

4 Construction of Library/STC/Auditorium

Library Auditorium & Student Teacher Centre 48030000 49606874

5 Construction of Boys Hostel

Construction of Boys Hostel # 1 for 100 Students 33770000 31725755

6 Construction of Residences

BPS-20 (1 Nos.) 38170000 30295424

BPS 18-19 (2 Nos.)

0

20

40

60

80

100

2013-14 2014-15 2015-16

Am

ou

nt

in m

illio

n

RELEASES VS EXPENDITURE

Releases Expenditure

FIGURE 2: RELEASES VS EXPENDITURE

11 | P a g e

BPS 11-14 (2 Nos.)

BPS 1-10 (4 Nos.)

Sub Total in Millions 159.7 158.12

TRANSPORT

1. Bus for Students Hino 32+1 seater 5500000 5400000

2. Toyota Corolla 1300 CC 1800000 1800000

Sub Total (Rupees) 7300000 7200000

Sub Total (In Millions) 7.3 7.2

PLANT & MACHINERY

1. Mitosis and Meiosis Stages Slides 20000 2528

2. Binocular microscope 250000 131040

3. Milk adulteration kit 6000 Nil

4. Automatic Milking machine 150000 185000

5. Mastitis kit/Teat Dipper 5000 5650

6. Electric iron disbudded 3000 13500

7. Electric branding iron and freezed brands 5000 97500

8. Automatic drenchers 2000 7000

9. Balling gun/Hot Brand 2000 15300

10. Milk buckets and cans 60000 11800

11. Milk homogenizer 100000 Nil

12. Milk/butter churners and cream separator 60000 189000

13. Cheese press 80000 Nil

14. Cheese vat 20000 Nil

15. Butter churner 56000 Nil

16. Sample Grinder 250000 Nil

17. Soxlet Glassware assembly 60000 149760

18. Ph meter digital 35000 53100

19. Computer P-IV 160000 226700

20. Spectrophotometer 150000 157950

21. Accessories of Raw fiber extractor FIWE 15000 169650

22. Paraffin dispenser 250000 98300

12 | P a g e

23. Disposable blades, Stainless steel 250000 74732

24. Tissue floating water bath 90000 38770

25. Slide rakes for staining 2000 1590

26. Thermo cycler (96 well) 450000 579150

27. Gel Documentation system 450000 965250

28. Electrophoresis (Horizontal) apparatus 100000 67880

29. Electrophoresis (Vertical) apparatus 90000 Nil

30. Micro Centrifuge (13000rpm)for eppendorf 200000 595538

31. Ice Machine for making crushed ice 200000 173160

32. Freezer (-20 oC)18 Cuft (Vertical) 80000 79800

33. Split Air Conditioner unit (1.5 ton) 140000 203280

34. Micropipette set adjustable 100000 40452

35. Laminar Air flow cabinet 300000 Nil

36. Petroff Hauser counting chamber 40000 128000

37. Fluorescent microscope 400000 Nil

38. ELISA reader (complete set) and software 300000 588000

39. Trinocular Research Microscope 150000 321750

40. Desiccators (8”) 4000 37760

41. Rabbit Anesthesia mask Model 40000 75600

42. Blood Pressure Measurement Device 225000 788000

43. Antibiotic sensitivity discs Company 65000 16082

44. Antibiotic zone reader P-A6 80000 21865

45. Analgesiometer EM-28 150000 12377

46. Electroconvusiometer EM-31 120000 15887

47. Act photometer (Activity cage) EM-27 65000 17883

48. Rota rod EM-35 50000 23693

49. Ultrasound Machine (HONDA) 1000000 970000

50. A.I Kits 54000 44400

51. Digital Camera 50000 43700

52. Generator (10-15 KVA) 350000 240623

13 | P a g e

53. Cow Dumy 350000 Nil

Sub Total 7684000 7679000

Sub Total (In Millions) 7.684 7.679

FURNITURE & FIXTURE

1. Steel Cots 300000 238300

2. Study Chair 300000 185000

3. Sofa Set for Parents Waiting Room 60000 59600

4. Study Table 300000 237500

5. Office Table 16000 13000

6. Office Chair with Arms 300000 199508

7. Wooden Chair (Library/S.T.C) without arms 600000 470000

8. File cabinet (04 shelves) 22x24 80000 103000

9. Steel Almirah (3x6x1.5 ft) 22x24 200000 97000

10. Fixed Chairs for Auditorium 1500000 2386800

11. Wooden Table (Library) 8x4 ft 96000 117000

12. Computer Table 2x3 ft 20000 6000

13. Revolving chair for computer Table Plastic 10000 6000

14. Stools wooden 100000 85000

15. Wooden Almirah for chemicals 40000 165000

16. Chair for TV room 90000 82600

17. Office chair for warden 24000 23600

18. Steel Almirah (6x3x22’ gauge 22-24) 220000 99900

19. Book Shelf (wooden) 1.5x2.5x2.5 ft 50000 14040

20. Wooden Table for Labs 300000 0

21. Television LCD 36 Inch to 40 Inch 70000 85000

Sub Total 4676000 4673848

Sub Total (In Millions) 4.676 4.673

LIVESTOCK

01. Cows & Buffaloes 300000 300000

Sub Total (In Million) 0.300 0.300

14 | P a g e

3.3 DGM&E PROJECT PHYSICAL ASSESSMENT

Based on the documents review, analysis of data and site visit, the DGM&E assessment has

been carried out regarding the achievement of objectives and physical targets of the project

given at ensuing tables.

TABLE 6: DGM&E ASSESSMENT REGARDING ACHIEVEMENT OF PROJECT OBJECTIVES

AS CONTAINED IN PC-1 ACTUAL ACHIEVEMENT

Construction of missing / essentially

required components such as college

library, auditorium, student teacher centre,

boys hostel for 100 students, teachers &

staff residences.

Partially Achieved

College library, auditorium and student

teacher centre was yet to complete and

civil work of these components was still

going on.

Provision of missing / needed equipment

for labs and allied facilities for five

departments.

Achieved

Missing facilities /needed equipment’s for

labs and allied facilities for five

departments have been provided.

To strengthen the clinical facilities by

providing experimental animal sheds,

veterinary clinic / hospital and an artificial

insemination lab for hands on training to

students.

Achieved

To strengthen the clinical facilities

experimental animal sheds, veterinary

clinic/hospital and an artificial

insemination lab has been established at

CVAS, Jhang, where free of cost treatment

was being provided. Developed facility

has enabled the post-graduate, under-

graduate and Livestock Assistant Diploma

(LAD) students to conduct practical’s and

hands on training activities.

Construction of training / research dairy

animals, poultry units and post mortem

Achieved

Training / research dairy animals, poultry

unit and post mortem teaching block

15 | P a g e

teaching block along with boundary wall

around 25 acres of land.

along with boundary wall around 25 acres

of land have been completed.

To produce 100 graduates (DVM) annually

and more than 20 M. Phil. in different

disciplines

Partially Achieved

100 graduates are being enrolled in DVM

annually but the enrolment of M.Phil. was

less than set target, only 10 students get

enrolled in 2016.

To train more than 200 skilled para-

professionals annually by offering diploma

programs of livestock assistant and short

training courses.

Partially Achieved

The college is offering diploma of livestock

assistant to only 50 students annually and

no any other short training courses were

started yet.

To provide professional and skilled

manpower for development of livestock,

poultry & allied sectors, which will help to

enhance the production potential of the

local livestock / poultry in the region.

Achieved

The college is producing 100 graduates

DVM and 50 livestock assistant diploma

holders annually. College has also

produced more than 14 M.Phil. in

different disciplines, of course these

professionals will be helpful for

development of livestock , poultry & allied

sectors.

16 | P a g e

PHYSICAL TARGET AND ACHIEVEMENTS:

TABLE 7: PHYSICAL TARGET AND ACHIEVEMENTS

Sr. No.

Items (as per PC-I) Unit Quantity Actual

Achievement

CIVIL WORKS

1. Department of Veterinary Clinical Studies

a. Construction of Veterinary Clinic / Hospital

Sft 3345 4554

b. Construction of Artificial Insemination Lab.

2. Construction of Training/Research Poultry Unit

Sft 13420 11922

3. Construction of Training/Research Dairy Unit

4. Construction of Experimental Animal Shed

5. Construction of Boundary Walls with Steel Gate

6. Construction of Post Mortem Teaching Block Sft 5264 4490

7. Construction of Library, Auditorium ,Student Teacher Centre

Sft 18915 20921

8 Construction of Boys Hostel # 1 for 100

Students Sft 19342 19252

9 Construction of Residences:

a. BPS-20 (1 Nos.) Sft 4025 4052

b. BPS 18-19 (2 Nos.) Sft 6300 4842

c. BPS 11-14 (2 Nos.) Sft 2720 2720

d. BPS 1-10 (4 Nos.) Sft 3960 3960

Sub Total 17005 15574

TRANSPORT

1 Bus for students Hino 32+1 seater No. 1 1

2 Toyota Corolla 1300 CC No. 1 1

PLANT & MACHINERY

1. Mitosis and Meiosis Stages Slides No. 2 2

17 | P a g e

2. Binocular microscope No. 5 5

3. Milk adulteration kit No. 1 -

4. Automatic Milking machine No. 1 1

5. Mastitis kit/Teat dipper No. 1 6

6. Electric iron disbudder No. 3 3

7. Electric branding iron and freezed brands No. 5 5

8. Automatic drenchers No. 2 2

9. Balling gun No. 2 12

10. Milk buckets and cans No. 2 1

11. Milk homogenizer No. 1 0

12. Milk/butter churners and cream separator No. 1 1

13. Cheese press No. 1 0

14. Cheese vat No. 1 0

15. Butter churner No. 1 0

16. Sample Grinder No. 1 0

17. Soxlet Glassware assembly No. 2 2

18. Ph meter digital No. 1 1

19. Computer P-IV No. 2 3

20. Spectrophotometer No. 1 1

21. Accessories of Raw fiber extractor FIWE No. 1 1

22. Paraffin dispenser No. 1 1

23. Disposable blades, Stainless steel No. 5 4

24. Tissue floating water bath No. 1 1

25. Slide rakes for staining (Steel rods 2-3x12”) No. 2 1

26. Thermo cycler (96 well) No. 1 1

27. Gel Documentation system No. 1 1

28. Electrophoresis (Horizontal) apparatus No. 1 1

29. Electrophoresis (Vertical) apparatus No. 1 0

30. Micro Centrifuge (13000rpm) for eppendorf tubes

No. 1 1

31. Ice Machine for making crushed ice No. 1 1

18 | P a g e

32. Freezer (-20 oC)18 Cuft (Vertical) No. 1 1

33. Split Air Conditioner unit (1.5 ton) No. 2 3

34. Micropipette set adjustable (0.2-2 µl),(1-10 µl), (10-100 µl)

No. 1 1

35. Laminar Air flow (Biological safety) cabinet No. 1 0

36. Petroff Hauser counting chamber No. 2 1

37. Fluorescent microscope No. 1 0

38. ELISA reader (complete set) and software No. 1 1

39. Trinocular Research Bright field Microscope No. 1 1

40. Desiccators (8”) No. 2 1

41. Rabbit Anesthesia mask Model No. 2 2

42. Blood Pressure Measurement Device for dogs pet MAP graphic System

No. 1 1

43. Antibiotic sensitivity discs Company No. 1 1

44. Antibiotic zone reader P-A6 No. 1 1

45. Analgesiometer EM-28 No. 1 1

46. Electro convusiometer EM-31 No. 1 1

47. Act photometer (Activity cage) EM-27 No. 1 1

48. Rota rod EM-35 No. 1 1

49. Ultrasound Machine (HONDA) No. 1 1

50. A.I Kits No. 3 3

51. Digital Camera No. 1 1

52. Generator (10-15 KVA) No. 1 1

53 Cow Dummy No 1 0

Sub Total 76 79

FURNITURE & FIXTURE

1. Steel Cots No. 100 100

2. Office Chair No. 100 100

3. Study Chair No. 100 100

4. Sofa Set for Parents Waiting Room No. 2 2

19 | P a g e

5. Study Table No. 50 50

6. Office Table No. 2 2

7. Wooden Chair (Library/S.T.C) without arms No. 200 200

8. File cabinet (04 shelves) 22x24 No. 10 10

9. Steel Almirah (3x6x1.5 ft) 22x24 No. 20 10

10. Fixed Chairs for Auditorium No. 300 400

11. Wooden Table (Library) 8x4 ft No. 12 12

12. Computer Table 2x3 ft No. 2 2

13. Revolving chair for computer Table Plastic No. 2 2

14. Stools wooden No. 100 100

15. Wooden Almirah for chemicals(4.0x8.0 ft) No. 10 10

16. Chair for TV room (armless Sheesham wood) No. 30 28

17. Office chair for warden (Sheesham wood cane knitting)

No. 8 8

18. Steel Almirah (6x3x22’ gauge 22-24) No. 20 10

19. Book Shelf (wooden) 1.5x2.5x2.5 ft No. 10 10

20. Television lcd 36” No. 1 1

21. Wooden Table No. 15 0

TOTAL 1094 1157

20 | P a g e

4 OBSERVATIONS:

1. The approved cost of the project was Rs. 185.550 million with gestation period of 36

months. However, actual expenditure remained Rs. 183.606 million (up to 30th June,

2016) against released amount of Rs. 185.550 million i.e. 98.95 % of the total released

funds.

Civil Work:

2. The department submitted the PC-IV (Project Completion Report) on completion of

gestation period of the project i.e., 30th June 2016, but the civil work of project was still

going on at the time of evaluation. Flooring, ceiling, electrification work, washrooms

and paint of Auditorium was yet to complete as shown in Fig 3 & 4 below.

FIGURE 3: INTERNAL VIEW OF AUDITORIUM

FIGURE 4: INCOMPLETE WORK OF AUDITORIUM

3. Library was also not functional, work of installation of windows and glasses was still

going on as shown in the Fig 5 & 6 below.

FIGURE 5: INCOMPLETE WORK OF WINDOWS

FIGURE 6: EXTERNAL VIEW OF LIBRARY

21 | P a g e

4. Electrification work and front elevation of Student Teacher Centre was also incomplete

as indicated in Fig 7 & 8 below.

FIGURE 7: INCOMPLETE ELECTRIFICATION WORK

FIGURE 8: INCOMPLETE FRONT ELEVATION OF STC

5. Structural cracks in RCC Slab were observed in the building of Experimental Animal

Sheds as shown in Fig 9 (A&B) below.

FIGURE 9 (A & B): STRUCTURAL CRACKS IN RCC SLAB

6. At some locations, leakage was observed in walls as shown in Fig 10 below. Such kind

of hidden leakage can be very dangerous for brick masonry structures.

22 | P a g e

FIGURE 10: LEAKAGE IN WALL

7. Quality of plasterwork was not up to the mark at some places , even alignments were

not found straight as shown in Fig 11 below.

FIGURE 11:PLASTER WAS NOT IN ALIGNMENT

8. Seepage was also observed on internal walls of the buildings as shown in following

pictures.

FIGURE 12 (A&B): SEEPAGE IN INTERNAL WALLS

23 | P a g e

9. External paint of Research Poultry & Dairy Units was found in poor condition and was

giving ugly look as shown in pictures below.

FIGURE 13 (A&B): POOR CONDITION OF EXTERNAL PAINT

10. Scope along with cost variations were observed in some of the building structures (for

cost variation bold and underlined planned & actual expenditure of items in Table 5 may

refer). In some buildings, the department increased the covered area while in others

they decreased on his own, without any revision in scope. The scope variation is shown

in Table 8 below.

TABLE 8: VARIATION IN SCOPE OF BUILDING STRUCTURES

Sr. No.

Items (As per PC-I)

Unit Quantity Actual

Achievement Variation in

Scope

1. Department of Veterinary Clinical Studies

a. Construction of Veterinary Clinic / Hospital

Sft 3345 4554 1209 Sft

( Area covered more than Scope) b.

Construction of Artificial Insemination Lab.

2. Construction of Training/Research Poultry Unit

Sft 13420 11922 1498 Sft

( Area covered less than scope)

3. Construction of Training/Research Dairy Unit

4. Construction of Experimental Animal Shed

5. Construction of Boundary Walls with Steel Gate

24 | P a g e

6. Construction of Post Mortem Teaching Block

Sft 5264 4490 774 Sft

(Area covered less than scope)

7. Construction of Library, Auditorium ,Student Teacher Centre

Sft 18915 20921 2006 Sft

(Area covered more than Scope)

8 Construction of Boys Hostel # 1 for 100Students

Sft 19342 19252 90 Sft

(Area covered less than scope)

9 Construction of Residences:

a. BPS-20 (1 Nos.) Sft 4025 4052 -

b. BPS 18-19 (2 Nos.) Sft 6300 4842 1458 Sft

( Area covered less than scope)

c. BPS 11-14 (2 Nos.) Sft 2720 2720 -

d. BPS 1-10 (4 Nos.) Sft 3960 3960 -

11. After detailed inspection of all construction works, it was observed that overall quality

of civil works was satisfactory.

GENERAL OBSERVATIONS:

12. Two deviations were observed in procurement, i) number of unit of some items were

procured more than the approved units, ii) some items were procured at more than

double cost from the approved one (Bold and underlined planned & actual expenditure

of items in Table 5 may refer). The Table 9 below is showing items that were procured

more than approved units.

TABLE 9: ITEMS PROCURED MORE THAN APPROVED UNITS

Sr. No.

Name of Item Quantity as per PC-I Actual Achievement

1 Computer P-IV 2 3

2 Split Air Conditioner unit (1.5 ton) 2 3

3 Fixed Chairs for Auditorium 300 400

4 Balling gun 2 12

5 Mastitis kit/Teat dipper 1 6

13. Two (02) vehicles were procured under this project, one was Hino Bus (32+1) seater and

other was Toyota Corolla 1300 CC, but only one vehicle (Hino Bus) was found on site

and used for the purpose. The second vehicle (Toyota Corolla) was neither found at site

nor under the use of project staff (copy of registration book is attached at Annex D).

25 | P a g e

14. After the completion of project, it was expected that College of Veterinary and Animal

Sciences Jhang, will produce 100 graduates DVM, 20 M. Phil., 200 Livestock Assistant

Diploma holders, 50 Dairy Farm Supervisors and 150 students in other short courses

annually but actually these enrolment targets were not achieved. The Table 10 below is

indicating the comparison between the expected annual enrolment after completion of

project and actual annual enrolment in different disciplines.

TABLE 10: COMPARISON BETWEEN EXPECTED & ACTUAL ANNUAL ENROLMENT

Name of Courses Expected Annual Enrolment After

Completion of Project

Actual Annual Enrolment After Completion of

Project (2016)

Doctor of Veterinary Medicine (DVM) 100 100

M.Phil 20 10

Livestock Assistant Diploma 200 50

Dairy Farm Supervisor 50 0

Short Courses 150 0

15. The clinic/hospital is providing 24 hours free of cost services to the farmers. The data

provided by the department regarding number of cases examined in outdoor at CVAS,

Hospital is satisfactory. It indicates that farmers, livestock stakeholders and public of

periphery areas are being facilitated from the clinic. It is also very helpful for post-

graduate, under-graduate and LAD students to conduct practical and hands on training

activities. The Fig 14 below, is showing year wise number of cases examined at CVAS,

Hospital, Jhang.

FIGURE 14: YEAR WISE NO. OF CASES EXAMINED

1682

2167

4139

0 500 1000 1500 2000 2500 3000 3500 4000 4500

2013 To 2014

2014 To 2015

2015 To 2016

2013 To 2014 2014 To 2015 2015 To 2016

Cases 1682 2167 4139

Year Wise No. of Cases Examined

26 | P a g e

5 RECOMMENDATIONS:

1. Reference observations # 2, 3 & 4, the department should complete the civil work on

urgent basis and justify the reasons why civil work was still incomplete, as project has

completed its gestation period.

2. Reference observations related to issues in civil work, the department should rectify

all the defects mentioned in observation section as early as possible.

3. Reference observation # 10, the department should justify how they can change the

scope of work without any revision.

4. Reference observation # 12, the department should justify the procurement of more

units of items than planned units.

5. Reference observation # 13, the vehicle (Toyota Corolla 1300 CC) that was purchased

for project staff should be handed over to project staff on urgent basis.

6. Reference observation # 14, the targets should be achieved once they set at planning

stage. The department should justify why the college still not offer the Dairy Farm

Supervisor Diploma & other short courses and start these courses as soon as possible.

ANNEXURE A : Pictorial Evidence:

PHYSICAL INSPECTION AT SITE DISCUSSION WITH PROJECT OFFICIALS

POULTRY RESEARCH UNIT VEHICLE (HINO BUS)

EQUIPMENT FURNITURE

ANNEXURE B: Project Staff for SNE:

NAME OF POST BS NO. OF POSTS RECOMMENDED

POSTS

Assistant/Computer Operator

14 01

To be discussed and finalize in

ECM Junior Clerk 7 01

TOTAL 02

ANNEXURE C: Recurring Cost after Completion of Project:

SR.NO COMPONENTS PC-I ESTIMATES PC-IV ESTIMATES

1 A01- Employee Related Expenses - 0.480

2 A03- Operating Expenses 2.500 2.071

3 A13- Total Repair & Maintenance 0.300 0.550

Total: 2.800 3.101

ANNEXURE D: Copy of Registration Book of Vehicles:

© Directorate General of Monitoring and Evaluation, Planning and Development

Department, Govt. of Punjab (November, 2016)