project gallon house program review 5
DESCRIPTION
Advisors Prof. Nuxoll, Dr. Crenshaw, Dr. Osterberg Industry Representative Walt Harrison Intel, etc. Project Gallon House Program Review 5. Team Evan McNichols Brian Myles Joe Oletti. Overview. Introduction Scorecard Additional Accomplishments Plans Issues/Concerns Conclusions. - PowerPoint PPT PresentationTRANSCRIPT
EE/CS 480/481
104/21/23 09:15 PM University of Portland School of Engineering
Project Gallon House Program Review 5
TeamEvan McNichols
Brian Myles
Joe Oletti
AdvisorsProf. Nuxoll, Dr. Crenshaw, Dr. Osterberg
Industry RepresentativeWalt Harrison
Intel, etc
EE/CS 480/481
2University of Portland School of Engineering
Overview
• Introduction
• Scorecard
• Additional Accomplishments
• Plans
• Issues/Concerns
• Conclusions
04/21/23 09:15 PM
EE/CS 480/481
3University of Portland School of Engineering
Introduction• 24 hour clock with bells and whistles
– Time, Day, Class, Greeting, Ten-minute count down till next class
04/21/23 09:15 PM
EE/CS 480/481
4University of Portland School of Engineering
Scorecard
04/21/23 09:15 PM
• CLPD Programmed/Debugged
• MOSIS inserted
• Clock is working
EE/CS 480/481
5University of Portland School of Engineering
Additional Accomplishments
04/21/23 09:15 PM
• Gallon House Road Trip
EE/CS 480/481
6University of Portland School of Engineering
Plans
04/21/23 09:15 PM
• Insert clock into display box
• Finish Final Report
• Rock the founders day presentation
(Like a Hurricane)
EE/CS 480/481
7University of Portland School of Engineering
Milestones
04/21/23 09:15 PM
Number Description Original08 Oct 09
Previous26 Feb 09
Present26 Mar 09
16 CPLD Testing Completed 31 Jan 31 Jan 25 Mar
17 Finalize PCB design 31 Jan 31 Jan 28 Feb
17 Receive MOSIS Chip 15 Mar 15 Mar 25 Mar
18Complete System Test with
MOSIS22 Mar 22 Mar 25 Mar
19 Case Build Completed 31 Mar 31 Mar 31 Mar
20 Final Report First Draft 10 Apr 10 Apr 10 Apr
21 Final Report Approved 24 Apr 24 Apr 24 Apr
EE/CS 480/481
8University of Portland School of Engineering
Concerns/Issues
• Ten-minute Countdown Issue
04/21/23 09:15 PM
EE/CS 480/481
9University of Portland School of Engineering
Conclusions
04/21/23 09:15 PM
• Introduction
• Scorecard
• Additional Accomplishments
• Plans
• Issues/Concerns
EE/CS 480/481
10
Questions
04/21/23 University of Portland School of Engineering