Status as of September 30, 2016 Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Output 1 ILHZ /
CHTF
Orientation of ILHZ system, CHTF system
Note: (Unit: No. of Target ILHZs for Orientation)
Ifugao - 1
Kalinga - 1
Mt. Province - 1
TWG
(trained on
LHS
module)
Q1 – Q3 2014 In 3 (Ifugao, Kalinga,
Mt. Prov) provinces
87 pax, MHO, Mayor, SB on Health, COH,
PHO, DOH-Reps) No. of ILHZs
oriented:
3 by Dec. 2014
reproduction of Local
Health System Training
modules: 8,700
Board & Lodging (92
pax & Facilitator x
1,200 x 3 days)331,200
3 100% Conducted through one-on-one
meeting with the Governor.
Governor took the advocacy to all
concerned mayors.
Organize / Strengthen1 the Inter-Local Health Zone through Service Delivery
Network (plan, budget, implementation of activities, ILHZ TWG/Board)
Details of Target: Province Name of ILHZ Covered Municipalities
Abra (1) Ladala La Paz and Danglas
Ifugao (3)
AMADHS Aguinaldo, Alfonso Lista & Mayoyao
Terraces Banaue, Hingyon, Hunduan &
Lagawe
Kiastila Kiangan, Asipulo, Tinoc & Lamut
Kalinga (3)
Binulawan Pasil, Lubuagan & Tinglayan
Lin-awa Tabuk, Rizal & Tanudan
Pumiyan Balbalan & Pinukpuk
Mountain
(6)
Sabata Sabangan, Bauko & Tadian
Chico-River* Bontoc & Sadanga
Eagle Barlig & Natonin (upper)
Parana Paracelis & Natonin (lower)
Golinsan Besao
Ganduyan Sagada
TOTAL = 13
*Chico-River ILHZ is inter-provincial collaboration with Kalinga (Tinglayan)
Health
facility &
Systems
Development
Cluster
(HSDC) and
Prov. DOH
Q3-Q4 2013 [Project purpose
indicator]
No. of functioning
ILHZ:
2 by Dec 2013
ILHZ monitoring form:
(reproduced in the office)
2 100% Kalinga: 1 (Binulawan)
Ifugao: 1 (AMADHZ)
Q1-Q4 2014 _4 by Dec 2014 5 125% Kalinga: 2 (Binulawan & Lin-awa)
Ifugao: 1 (AMADHZ)
Mt. Province: 2 (Chico-River &
Sabata)
Q1-Q4 2015 8 by Dec 2015 8 100% Kalinga: 3 (Binulawan, Lin-awa &
Pumiyaan)
Ifugao: 2 (AMADHZ & Kiastila)
Mt. Province: 3 (Chico-River,
Sabata & Parana)
JICA-SSC provided technical and
financial (amounting to
PhP51,600.00) assistance to
Pumiyaan (Kalinga) & Parana
(Mountain).
Q1-Q42016 13 by Dec 2016 8 61% Kalinga: 3 (Binulawan, Lin-awa &
Pumiyaan)
Ifugao: 2 (AMADHZ & Kiastila)
Mt. Province: 3 (Chico-River,
Sabata & Parana)
Following ILHZs were given training
and currently finalizing the MOA:
Mt. Province: (2) Eagle (Barlig and
Natonin) and BESAG (Besao and
Sagada)
Abra: (5)
DaLa ILHZ – Danglas and La Paz
SaQLaPiBa ILHZ –San Quintin,
Langiden, Pidigan and Bangued
MaLiLa ILHZ – Malibcong, Licuan-
baay and Lacub
MaBoLuTu ILHZ – Manabo,
Boliney, Luba and Tubo
SaBuDaBu ILHZ – Sallapadan,
Bucloc, Daguioman and Bucay
San Isidro will join the VPP while
Tayum, Tineg and Lagayan to
DOLASAN
1 Using the project definition of functioning ILHZ [(1) ILHZ technical working group (TWG) and board meetings are regularly held; 2) ILHZ develops annual work and financial plan; and 3) ILHZ implements activities according to the plan].
Page 2 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Referral
Manual
Re-assessment and workshop on developing/ improving the content of Referral
Manual.
Target (1/ILHZ):
Abra – 1
Ifugao – 3
Kalinga – 3
Mountain – 6
Baguio City – 1
TOTAL = 14
HSDC and
Prov. DOH
Q2-Q3 2015 No. of Existing
Referral Manual re-
assessed:
14 by Dec 2015
Referral Manual template 14 100% In Ifugao, Kalinga and Mountain use
standardized Provincial Referral
Guideline while Abra utilize the
project-assisted developed referral
guideline from VPP ILHZ.
Q3 2015 No. of workshop
conducted:
3 by Dec 2015
Referral Manual
template
Workshop materials
Meals and lodging
3 100% Through technical and financial
support from JICA amounting to
Php206,400.00, the following
workshops were conducted:
ILHZ Dev.
Workshop
Finalization
Workshop
Pumiyaan Dec. 2015
Feb. 2016
Parana
Kiastila Feb. 2016 March 2016
Q1-Q4 2016 11 by Dec 2016 11 100% Workshops conducted:
Prov Workshop ILHZs
Mt.
Prov.
Aug. 16-
17, 2016
BESAG
Eagle
Kalinga Aug. 30- Binulawan
Aug. 31 Lin-awa
Abra Sept. 13-14
DaLa
SaQLaPiBa
MaLiLa
MaBoLuTu
SaBuDaBu
Chico-River and Sabata ILHZs in Mt.
Prov. Were done during the regular
TWG meeting
Implementation of Referral Manual Prov. DOH Q4 2015 No. of ILHZs
implementing the
Referral Manual:
3 by Dec 2015
Referral Manual 3 100% The manual was finalized on March
2016 and reproduced 60 copies for
Pumiyaan and Parana while JICA-
SSC still awaiting for the final
version of Kiastila ((still awaiting for
ILHZ logo and will be finalized the
reproduction within July 2016) with
total budget of PhP9,095.00:
Pumiyaan: 40 copies;
Parana: 20 copies
Kiastila: 40 copies
Q1-Q4 2016 14 by Dec 2016 3 21% The manual for 11 ILHZs are still for
finalization and will be distributed
within November 2016
Local
mandate to
support FBD
and CHT
incentives.
Orientation to LCEs
Note: (Unit: No. of municipalities)
Abra - 21
Ifugao – 11
Kalinga – 8
Mt. Province – 10
Baguio City – 1
Total – 51 municipalities in non-project sites
HSDC &
Prov. DOH
Q3_ 2013 No. of DOH Reps
oriented on FBD,
CHT incentives and
PhilHealth:
_25_ by Dec 2013
Orientation materials
25 100% Conducted during the annual DOH
Rep meeting on April 2013
Prov. DOH _Q1-Q4_ 2014 No. of LCEs
oriented on FBD,
CHT incentives and
PhilHealth:
_51_ by Dec 2014
Meals
Orientation materials
(through LHB)
51 100% Done through the DOH Rep either
during their regular advocacy and
meeting with the Mayors at their
respective catchment areas and Local
Health Board
Monitoring of No. of LGUs with local mandate on facility-based delivery, support
for CHT (financial incentive)
Note: (Unit: No. of municipalities)
Abra – 21
Ifugao – 11
Kalinga – 8
Prov. DOH Q3_ 2013 No. of LGUs with
local mandate on
FBD, CHT
incentives:
4 by Dec 2013
Template of local
mandate
monitoring form
FBD:
0
CHT:
0
0%
0%
DOH-CAR facilitated the enactment
of local policy in the different
municipalities.
Page 3 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Mt. Province – 10
Baguio City – 1
Total – 51 municipalities / city
Q1-Q4 2014 5_ by Dec 2014 FBD:
8
CHT:
0
160%
0%
Kalinga: 1 (Pasil)
Ifugao: 5 (Lamut, Asipulo, Hunduan,
Tinoc, Lagawe)
Mt. Province: Sabangan, Tadian
Advocacy for additional incentives to
CHTs still on-going.
Q1-Q4 2015 30 by Dec 2015 FBD:
19
CHT:
0
63%
0%
Abra: 3 (San Quintin, Tubo & Luba)
Kalinga: 7 (Balbalan, Pasil,
Lubuagan, Tinglayan, Tabuk, Rizal
& Pinukpuk)
Ifugao: 5 (Lamut, Asipulo, Hunduan,
Tinoc, Lagawe)
Mt. Province: 4 (Bauko, Sabangan,
Sagada & Tadian)
Advocacy for additional incentives to
CHTs still on-going. In Ifugao, CHT
are supported through Provincial
Administrative Order.
Q1-Q4 2016 51 by Dec 2016 FBD:
19
CHT:
0
63%
0%
Template of the ordinance will be
distributed within October 2016 and
close follow-up will e done by the
PDOHO
Output 2 Localized
MNCHN
MOP
Roll out trainings (including re-assessment of BEmONC facility mapping thru Re-
defining service delivery network)
Notes: (Unit: Service Delivery Network)
Ifugao - 1
Kalinga - 1
Mt. Province - 1
Baguio City – 1
TOTAL = 4
Women and
Men’s
Health
Development
Cluster
(WMHDC)2
Prov. DOH
_Q3-Q4_2013 No. of personnel
trained:
___131____ by
Dec. 2013
Localized MNCHN
manual reproduction=
694,800
meals & accommodation
(P_1,774,800__)
136 104% 568,800.00 Trained as break-down: Abra – 34,
Baguio City – 24, Mt. Province – 32,
Kalinga – 35, and Provincial DOH –
11 (assigned in the non-project sites).
In Ifugao, conducted on May 2014
and funded by World Health
Organization (WHO).
_Q2 _2014 __20__ by Dec.
2014
24 120%
_Q3-Q4_2013 No. of trainings on
MNCHN-SDN
conducted:
__4_ by Dec. 2013
4 100% Conducted per province:
Ifugao – May 5-9, 2014
Kalinga –October 2013
Baguio City – June 13, 2014
Regular monitoring of MNCHN through field work and/or in Annual
implementation review meeting
Notes:
1. MNCHN SDN (Total Target developed March 2013)
Prov Name of
SDN
Covered
Mun./City
Birthing BHS/
Clinic
BEmONC CEmONC
Abra (5)
SDN 1
(VPP)
Villaviciosa
Pilar
Penarrubia
Tamac
Dalit
Callao
Namarabar
VillaviciosaRHU
PenarrubiaRHU
PilarRHU
VMCH
Candon IS
Sta.Maria IS
APH
SDN 2
(DOLASAN)
Dolores
Lagangilang
San Juan
Cayapa LagangilangRHU
DoloresRHU
San Juan RHU
DMCH
APH
SDN 3 Pidigan Pidigan RHU APH
WMHDC
Prov. DOH
__Q3-
Q4_2013
No. of functional
MNCHN-SDN in
the expansion sites:
__11____ by Dec.
2013
MNCHN Monitoring
Tool
Travelling Expenses
(Per diem and
transportation)
(Php100,000.00
annually)
11 100%
Q1-Q4_2014 __11____ by Dec.
2014
11 100%
Q1-Q4_2015 11_ by Dec. 2015 27 245% Abra: 5
Kalinga: 8 (Increased from 3 to 8
due to developed SDNs in Balbalan
and Pinukpuk last February 2016
with 3 and 2 respectively)
Ifugao: 3
Mt. Province: 10 (Increased from 4
to 10 due to developed SDNs in
Natonin and Paracelis last February
2016 with both 3).
2 Family Health Cluster was divided into Women and Men’s Health development Cluster and Adolescent and Child’s Health Development cluster in mid 2014.
Page 4 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS (Pilaquin) Langiden
San Quintin
Bangued
SanQuintin RHU
SDN 4
(Bucay)
Sallapadan
Bucloc
Daguioman
Bucay
Bucay RHU
Sallapadan RHU
Daguioman RHU
APH
SDN 5 Malibcong
Boliney
Tubo
Tineg
Lagayan
Tayum
La Paz
Malibcong RHU
Tubo RHU
Tayum RHU
LPDH
APH
Apayao
(3)
Lower
Apayao
Flora
Sta.Marcela
Putol
Luna
Marcela
Consuelo
Mataguisi
Cacalagan
Caatacan
Swan
Capannikian
Dagupan
Marag
Flora RHU
Sta.MarcelaRHU
LunaRHU
Flora DH
Sta.Marcela DH
AJDH
FNLH
CVMC
MMMC
SPH
PGH
RPGMC
Conner-
Kabugao
Conner
Kabugao
SanJuan*
Guina-ang
Malama
Buluan
Madatag
Lenneng
CDH
APH
CVMC
SPH
PGH
RPGH
Calanasan Calanasan Sta.Felomina
Eva
AZLIC
Cadaclan
Tanglagan
ADH
Namuac
MMMC
Benguet
(4)
Mt.Trail Atok
Mankayan
Buguias
Bakun
Pasdong
Naguey
Sinacbat
Cayapa
Poblacion(Bakun)
Amlimay
Amgalueyguey
Bagao
Catlubong
Natubleng
Am-am
Balili
Bedbed
Taneg
Cabiten
Bulalacao
Colalo
Guinaoang
Palasan/Suyoc
Paco
Sapid
Tabio
ADH
AEH
Atok RHU
Mankayan RHU
Bakun RHU
BeGH
PCDH
BGHMC
Lutheran H
3K Kibungan
Kapangan
Cayapes
Taba-ao
Gaswiling
Gadang
Sagubo
Belengbelis
Labueg
Balakbak
Datakan
Cuba
Badeo
Mocgao
Lubo Proper
Culliang
Polis
Nangayangan
Masala
Sagpat
Palina
Batangan
Tacadang
KMCH
Kibungan RHU
Kapangan RHU
BeGH
PCDH
BGHMC
BKD Bokod
Kabayan
Bila
Bobok
Ballay
Bashoy
Batan
Bokod RHU
DMMH
Kabayan RHU
BeGH
PCDH
BGHMC
Baguio City: 1
Q1-Q4_2016 _11_ by Dec. 2016 72 654% Abra: 50
Increased from 5 to 50 due to the
following:
Langiden – 1
San quintin – 4
Malibcong – 3
Tubo – 5
San Isidro – 2
Lacub – 1
Bucay – 5
Danglas – 3
La Paz – 3
Bangued – 3
Lagayan – 2
Bucloc – 3
Manabo – 3
Licuan-baay – 2
Luba – 3
Pidigan – 1
Sallapadan – 1
Tineg - 3
Kalinga: 8 (Increased from 3 to 8
due to developed SDNs in Balbalan
and Pinukpuk last February 2016
with 3 and 2 respectively)
Ifugao: 3
Mt. Province: 10 (Increased from 4
to 10 due to developed SDNs in
Natonin and Paracelis last February
2016 with both 3).
Baguio City: 1
SDNs of Kalinga and Mt. Province
still for finalization.
_Q3-Q4 2013 No. of functional
Local MNCHN
Team:
__4_ by Dec. 2013
3 75% In Ifugao, composition was finalized
on May 2014.
_Q1-Q4_2014 __4__by Dec.
2014
4 100%
_ Q1-Q4_2015 __4__by Dec. 2015 4 100%
_ Q1-Q4_2016 _4_by Dec. 2016 4 100% Monitoring on-going
Page 5 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS Lusod
Tawangan
BLIISTT La Trinidad
Itogon
Tuba
Tublay
Sablan
Bagong
Balluay
Banengbeng
Kamog
IMH
Ucab BHS
Tublay RHU
Sablan RHU
BeGH
PCDH
BGHMC
Ifugao
(3)
SDN 1 Lagawe
Kiangan
Banaue
Boliwong
Duit
Ducligan
Lagawe RHU
Kiangan RHU
Banaue RHU
GNCH
IGH
SDN 2 Lamut Lamut RHU IGH
PLT
VH
SDN 3 Aguinaldo
Al. Lista
Chalalo APH
AguinaldoRHU
A.Lista RHU
PDH
De Vera’s
Hospital
Kalinga
(3)
Binulawan Pasil
Lubuagan
Tinglayan
Abundant Grace*
KDH
Tinglayan RHU
Pasil RHU
KPH
BGH
Lin-awa Tabuk
Rizal
Tanudan
Taloctoc*
Abundant Grace*
JMDDH
Tanudan RHU
TMH
Tabuk I RHU
TabukIIRHU
KPH
CVMC
Pumiyan Balbalan
Pinukpuk
PDH
WKDH
Pinuk. 1 RHU
Pinuk II RHU
KPH
Mt. (4)
Mainit Bontoc
Besao
Mainiti Besao DH BGH
Madongo Sagada
Sabangan
Sadanga
Barlig
Natonin
Madongo STH
Sabangan RHU
Sadanga RHU
Barlig DH
NCH
BGH
Masla Tadian Masla LHMRH
Banao Bauko
Sabangan
Paracelis
Banao Bauko RHU
Sabangan RHU
Paracelis DH
LHMRH
KPH
VH
Baguio
City (1)
Baguio SDN City-wide AtokTrail
Our Lady of
Lourdes*
BGHMC
SLU
PCDH
NotreDame
TOTAL A (Ifugao, Mountain & Kalinga) 11
TOTAL B (Abra, Apayao & Benguet) 12
Note: (i) * - private clinic; (ii) the project will assist on monitoring the Total B while DOH
CAR for Total A; (iii) Criteria of functionality: implemented the referral manual, conduct of regular meeting and birthing facilities are operating 24/7 (regardless if on-call or on-
manned). (iv) monitoring tool will be used to determine the functionality.
2. Local MNCHN Team
Ifugao - 1
Kalinga - 1
Mt. Province - 1
Baguio City – 1
TOTAL – 4 teams
Project TCL Orientation on the project TCL
Target (as proposed by the DMO Vs and approved during RUPMC Meeting on May 28,
2015):
Abra Prov. Ifugao Prov. Kalinga Prov. Mt. Prov
Bangued
Boliney
Bucay
Bucloc
Daguioman
Danglas La Paz
Lacub Lagayan
Langiden
Licuan-baay Luba
Malibcong
Manabo Pidigan
Kiangan
Hungduan
Hingyon
Aguinaldo
Asipulo
Lamut Lagawe
Alfonso Lista
Balbalan
Lubuagan
Pasil
Pinukpuk
Rizal
Tabuk City Tanudan
Tinglayan
Bauko
Natonin
Paracelis
Tadian
Sabangan
Prov. DOH Q3-Q4_2015 No. of
municipalities
oriented on the
Project TCL:
_42_ by Dec. 2015
Project TCL Tool
Meals and
accommodation
43 102% Details:
Abra – 21 of 21
Kalinga – 8 of 8
Mt Province – 5 of 10
Ifugao – 9 of 11* (including Banaue)
In 2016, DOH will spearhead the
implementation of Residence-based
TCL in all municipalities in the
region except Baguio City. FIC will
be included as one of the indicators
for collection and analysis starting
2016.
Page 6 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Sallapadan
San Isidro San Quintin
Tayum
Tineg Tubo
21 of 21
municipalities
8 of 11
municipalities
8 of 8
municipalities
5 of 10
municipalities
Remaining municipalities not included in the target
Banaue
Mayoyao
Tinoc
Barlig
Besao
Bontoc Sadanga
Sagada
Implementation of the Project TCL Prov. DOH
MHO
Q4_2015 No. of
municipalities
implementing the
Project TCL:
_42_ by Dec. 2015
43 102% Data encoding and analysis done by
JICA-SSC.
In mid-2016, JICA SSC and DOH
CAR will spearheaded the transfer of
technology in all provinces.
Q1-Q4_2016 __42_ by Dec. 2016 50 119% Implemented in all municipalities in
the region including Tabuk City
MNDR Roll-out trainings
WMHDC
Prov. DOH
_Q3-Q4_2013 No. of personnel
trained:
___131____ by
Dec. 2013
MNDR Manual
reproduction=
89,477.20
Meals and
accommodation
Note: Ride-on activity
with MNCHN MOP
Roll-out (3days)
136 104% Integrated during the conduct of
Localized MNCHN MOP training:
Abra – 34, Baguio City – 24, Mt.
Province – 32, Kalinga – 35, Ifugao –
24 and Provincial DOH – 11.
For Ifugao, it was only conducted in
2014 funded by WHO.
In 2014, 30 personnel from the
private hospitals in Baguio City were
trained.
However, all midwives, especially at
the BHS level, were not included
and still need for training.
_Q2 _2014 _20__ by Dec. 2014 54 270% On June 13, 2014, 30 personnel from
the private hospitals in Baguio City
were oriented.
Regular monitoring of MNDR implementation.
WMHDC
Prov. DOH
_Q3-Q4_2013 No. of MNDR
Team organized:
(RRT)___1__Dec.
2013
(C/PRT) ___7__
Dec. 2013
(ILHZ) _2____Dec.
2013:
(Teams supported
by an office order)
RRT= WMHDC; PRT
exist already so maybe
Re-organized/
Revitalized/
Strengthened (with
updated legal
document)
Part of the above
travelling expenses
1
7
5
100%
100%
250%
Baguio City conducted the MNDR
for community-based death only.
Hospital-based death was clinically
reviewed by the concerned hospital.
At zonal level: Apayao – 4 and Mt.
Province – 1.
After establishment of the Inter-LGU
Collaboration-Service Delivery
Network, it is expected that the
number of zonal team will increase.
Prov. DOH
Q3-Q4 __2013 [Project purpose
Indicator]
No. of Provinces
and the Baguio
City implementing
MNDR:
__6_ by Dec.
2013
Conduct of at least once a
year but may conduct for
every M/N deaths
7 117% In 2013, total of 12 reviews were
conducted (Abra - 1, Apayao, 3,
Benguet - 2, Ifugao - 1, Kalinga-1,
Mt. Province - 3 and Baguio City of
1) and total of 4 in 2014 (Benguet-1,
Kalinga-1, Apayao-1 and Abra-1).
For the deaths in Baguio General
Hospital, this was covered by the
Regional Review Team. Q1-Q4_2014 __7__by Dec.
2014
7 100%
Q1-Q4_2015 __7___by Dec.
2015
7 100%
Q1-Q4 _2016 __7__by Dec. 2016 7 100% As of September 2016, the following
Page 7 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
provinces conducted the MNDR:
Abra: 1
Benguet: 1
Ifugao: 1
Kalinga: 1
Apayao: 1
Mt. prov.: 1
Q1._2014 No. of Regional
MNDR Conducted
by DOH CAR:
___1___by Dec.
2014
Presentation Material
of Cases- Summary
Status of
municipal/Provincial
Intervention Plans
Board and lodging of
participants ; training
materials
4 400% 190,000.00 Conducted in January 28-30, 2014
(funded by JICA amounting to
PhP48,000 held at DOH CAR
Regional Training Center) and April
24-25, 2014 (funded by DOH-CAR),
July 30-31, 2014 and Nov. 5-6, 2014
In January 2014 review, the Regional
Review Team have agreed to conduct
regularly (at quarterly basis) the
review, thus, there will be 4 reviews
to be done by each year.
As agreed on Nov. 2014 MNDR, the
regional review will be done semi-
annually including the annual PIR
__ Q1 __2015 __1__by Dec. 2015 2 200% Conducted on the following dates:
1st: February 10-12, 2015
2nd: September 16-17, 2015
__ Q1 __2016 __1__by Dec. 2016 2 200% Regional MNDR Conducted:
March 3-4, 2016.
June 29-30, 2016.
Next MNDR scheduled on November
2016
Family
Health Diary
Revision of the FHD WMHDC
Adolescent
and Child’s
Health
Development
Cluster
(ACHDC)
__Q3__2013 FHD is updated
using the most
recent protocol and
guideline
Result of consultative-
write shop -2012/ As
per program updates
Copies of MNCHN-
related updates from
DOH
1 100% 117,200.00 Updated at the most latest guideline
and protocol
Reproduction and distribution
WMHDC
and
ACHDC
__Q3. _2013 No. of copies
reproduced and
distributed by DOH
CAR:
13,800 by Dec.
2013
Blueprint of revised
FHD
Reproduction cost
14,500 105% 649,980.00
__ Q4___2014 _15,000_____ by
Dec. 2014
15,000 100% 300,000.00 Considering the quantity is only for
augmentation, advocacy is currently
done for the LGU to reproduce.
__ Q4.__2015 10,000 by Dec.
2015
12,000 120% 10,000 copies on Family Health
Diary distributed to all provinces and
Mountain Province was given with
2,000 copies of Mother and Child
Book
__ Q4_2016 30,000 by Dec.
2016
On process for reproduction
Orientation on FHD to health worker, CHT and pregnant women.
WMHDC
and
ACHDC
Q3 2013 No of DOH Reps
trained as trainer on
the updated FHD:
__25__by Sept.
2013
FHD
Training design
Meals
Ride on activity to FBD
Ordinance and
BEmONC Certification)
25 100% Conducted to all DOH Reps assigned
in the 6 provinces and Baguio City
during the MNDRS Training funded
by WHO
Provincial Q3-Q4_2013 No. of health FHD 479 100% Conducted through DOH Rep during
Page 8 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
DOH personnel trained on
the updated FHD:
___479___ by
Dec. 2013
Training design
Meals
their catchment meetings to all
MHOs, PHNs and RHMs
WMHDC
and
ACHDC
Provincial
DOH
RHUs
__Q4___2013 No. of CHT
member and
pregnant women
trained on the
updated FHD:
___4,798___ by
Dec. 2013
CHT re-orientation on FHD
updated version
4798 100% 549,650.00 Facilitated by Rural Health
Midwives.
In 2014, the Family Health Diary was
included during the Adolescent
Health training
_Q1-Q2_2014 _4,798_by Dec.
2014 Meals
materials
4,798 100%
Q1-Q4_2015 3,000_by Dec. 2015 8,798 293% Conducted to 4,798 CHTs during
their Family Health Diary re-training
and 4,000 pregnant women
(estimated) during UHC Caravan at
the locality.
BEmONC
Capable
Health
Facilities
monitoring
BEmONC monitoring and supportive supervisory tool and guideline development
WMHDC
and
ACHDC
Provincial
DOH
BGHMC
BEmONC
Trainers
JICA-SSC
PHO
__Feb_2014
No. of monitoring
and supervisory tool
developed:
__1_by Dec. 2014
Pregnancy, Childbirth,
postpartum and
Newborn Care
(PCPNC) Manual
Sample monitoring and
supervisory tool from
DOH-EV
Reproduction cost by
DOH-CAR
Workshop cost
1 100% Facilitated by BEmONC Trainers
from BGHMC, the development
workshop and pretested was done on
July 7-11, 2014.
However, the tool was revisited and
finalized on June 9-11, 2015 as a
result of recommendations during the
roll-out training and made consistent
to the 2014 Harmonized BEmONC
training manual for midwives.
_Q2_2014
No. of reproduced
copies of
monitoring and
supervisory tool:
_69_by Dec. 2014
Prototype supervisory and
monitoring tool
130
copies
188% Abra – 20 copies; Baguio City - 10;
Ifugao – 40 copies; Kalinga - 30
copies; Mt. Province - 30 copies.
_ Q3 _2015 _69_by Dec. 2015 Reproduction of the tool (c/o
DOH CAR)
78 113% Ifugao – 40
Kalinga – 13
Mountain – 23
Baguio City - 2
_ Q1 _2016 _69__by Dec. 2016 Reproduction of the tool (c/o
DOH CAR)
Ongoing reproduction
Roll-out training on BEmONC monitoring and supportive supervisory tool and
guideline
WMHDC
Provincial
DOH
_ Q4 _2014 No. of Provincial
BEmONC MSS
Team trained:
_3__by Dec. 2014
BEmONC MSS
Manual
Training materials
Board and lodging
3 100% Roll-out training was conducted on
the following dates:
Ifugao – Oct. 28-30, 2014
Kalinga – Oct. 28-30, 2014
Mt. Province – Nov. 4-6, 2014
While DOH CAR handled the cost of
board and lodging, JICA SSC
covered the reproduction of 64
copies (amounting to Php9,600.00) of
the BEmONC MSS Manual:
Ifugao – 40 copies
Kalinga – 30 copies
Mt. Province – 30 copies
Monitoring for the implementation of BEmONC Monitoring and Supportive
Supervisory (BEmONC MSS) System in all provinces and cities
No. of Target BEmONC Capable Birthing Facilities
Province Hosp RHUs BHS TOTAL
Abra 3 10 0 13
Ifugao 7 11 7 25
Kalinga 5 7 0 12
Mt. Prov 6 3 9 18
WMHDC
and
ACHDC
Provincial
DOH
PHO
_ Q3_2014
No. of Provincial
BEmONC MSS
Team organized:
_3__by Dec. 2014
BEmONC MSS Manual 3 100% Province of Ifugao was supported
with a signed Provincial
Administrative Order (E.O. 17 s.
2014).
Advocacy will be done for the
Provinces of Kalinga and Mountain.
Q3-Q4 2014
No. of BEmONC
Capable birthing
facilities monitored
BEmONC Monitoring
and supervisory Tool
Traveling expenses
0 0 Consistent to the requirement of July
2014 approved BEmONC
Certification SOP, the monitoring
Page 9 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Baguio 1 0 1
Total 22 31 16 69
and supervised by
Local BEmONC
MSS Team :
_69_by Dec. 2014
and supervisory system will be fully
implemented in 2015.
Q3-Q4 2015 __69__by Dec.
2015
34 49% As of May 18, 2016, below are the
total facilities assessed by the
Provincial BEmONC Monitoring and
Supportive Supervisory Team:
Abra; 11 of 13 (84%)
Baguio City: 1 of 1 (100%)
Ifugao: 8 of 25 (32%)
Kalinga: 12 of 12 (100%)
Mountain: 2 of 18 (11%)
Ifugao and Mountain will train
additional members of the BEmONC
MSS Team to ensure that all target
birthing facilities will be assessed.
Remaining target is scheduled in
2016 while the assessed facilities will
receive the annual monitoring on
Sept. 2016 onwards.
Because of the cancellation of
BEmONC Certification as per DOH
AO#2015-0003, the system will still
be implemented as agreed among the
PHOs during the June 9-11, 2015
workshop to ensure the quality of
BEmONC services.
Sustainability at the regional level
will still be discussed with the
Licensing Division. According to
OIC-Regional Director Dr. Amelita
Pangilinan on June 15, 2015, the
result of the BEmONC MSS will be
use as part of the process on issuing
the License to Operate.
Q3-Q4 2016 _69__by Dec.
2016
For 2016, facility visit will be done
within October 2016 to December
2016. Follow-up to PHOs will be
done for the schedule
MNCHN
IEC for CHT
Reproduction and distribution
(Flip chart)
WMHDC
and
ACHDC
_Q1_2014 No. of MNCHN-
IEC materials for
CHT reproduced
and distributed:
5,000 by Dec. 2014
Blue print of IEC
material
Reproduction cost for
Flip chart only (P
1,600,000.00)
Distribution cost
5,000 100% 250,000.00
Orientation
Provincial
DOH
Q4 by Dec.
2013
No. of DOH Reps
oriented on
MNCHN IEC as
provincial trainer:
_25__ by Dec. 2013
Materials to be use c/o
JICA-assisted
developed
Ride on to end-quarter
meeting of DOH Reps
25 100% Orientation was dove tailed with the
MNDRS trainings conducted by
WHO
Provincial
DOH
_Q2__2014 No. of CHT
oriented on the
MNCHN-IEC
materials:
4,798_by Dec.
2014
MNCHN-IEC material
Incorporated at FHD
Orientation
(Ride-on to CHT
Training on DOH-CO
updated guideline and
protocol)
4798 100% Mt. province was not included since
they are using the Mother and Child
Book
CHT support Monitoring of CHT activeness
Provincial
DOH Reps /
_Q1-Q4_2013 No. of functional
CHT members:
CHT monitoring tool
4,798 100% Provision of incentives include BP
apparatus for each team of 1,063
Page 10 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
PHOs 4,798_by Dec. 2013 teams (5,800 members) amounting to
P1,807,000.00 and honoraria of
P10,049,105.00 for the 7,798
members
_ Q1-Q4
_2014
4,798_by Dec. 2014 4,798 100% Monitoring done through the DOH’s
deployed nurses
_ Q1-Q4_2015 4,798_by Dec. 2015 4,798 100% Monitoring done through the DOH’s
deployed nurses
_ Q1-Q4_2016 4,798_by Dec. 2016 4,798 100% Ongoing monitoring
(ILHZ)
MNCHN
Referral
guideline
Reproduction and distribution of the developed ILHZ/SDN Referral Guideline:
Target recipients: Province Name of ILHZ
(no. of Health Facilities)
RHUs Hospital
Abra Ladala (4) La Paz
Danglas
LaPaz DH
APH
Ifugao (3)
AMADHS (6) Aguinaldo
Alfonso Lista
Mayoyao
Mayoyao DH
Aguinaldo PH
Potia DH
Terraces (6) Banaue
Hingyon
Hunduan
Lagawe
Hungduan DH
IGH
Kiastila (6) Kiangan
Asipulo
Tinoc
Lamut
Panopdopan DH
Tinoc DH
Kalinga
(3)
Binulawan (4) Pasil
Lubuagan
Tinglayan
KDH
Lin-awa (5) Tabuk
Rizal
Tanudan
KPH
JMDDH
Pumiyan (4) Balbalan
Pinukpuk
Pinukpuk DH
WKDH
Mountain
(6)
Sabata (4) Sabangan
Bauko
Tadian
LHMH
Chico-River (4) Bontoc
Sadanga
Tinglayan(Kalinga)
BGH
Eagle (4) Barlig
Natonin (upper)
Barlig DH
Natonin DH
Parana (4) Paracelis
Natonin (lower)
Paracelis DH
Natonin DH
Golinsan (2) Besao Besao DH
Ganduyan (2) Sagada St. Theodore H.
TOTAL: 55 health facilities
HSDC,
Prov. DOH
and PHO
_Q2_2014 No. of MNCHN
Referral Guideline
reproduced and
distributed:
__42_by Dec.
2014
Development workshop
result
Reproduction cost
0 0% Re-scheduled on 2015 due to
unavailability of most MHOs.
However, DOH CAR re-targeted the
following for 2015:
Ifugao – Kiastila ILHZ
Kalinga – Pumiyan ILHZ
Mt. province – Paraya ILHZ
Q3-Q4 _2015 _14_by Dec. 2015 0 0% The referral guideline was developed
and finalized on March 2016.
Reproduction and distribution will be
done within June 2016 for the
facilities from:
Ifugao – Kiastila ILHZ
Kalinga – Pumiyan ILHZ
Mt. province – Parana ILHZ
Q1-Q4 _2016 _41_by Dec. 2016 107 261% Reproduced and distributed last July
2016:
Parana: 20 copies
Pumiyaan: 40 copies
Kiastila: 47 copies
Finalization and reproduction for all
other ILHZs will be done in
November 2016.
Orientation on the developed/revised Referral Manual
Note: 2 persons per health facility
HSDC,
Prov. DOH
and PHO
_Q3_2014 No. of Personnel
trained on ILHZ-
MNCHN Referral
Guideline:
_84__by Dec. 2014
ILHZ MNCHN Referral
Guideline
Meals and
accommodation
0 0 Re-scheduled on 2015 due to
unavailability of most MHOs.
Consistent to above, the personnel for
training in 2015 will be coming from
the facilities in the following ILHZs:
Ifugao – Kiastila ILHZ
Kalinga – Pumiyan ILHZ
Mt. province – Parana ILHZ
_ Q3-Q4
_2015
_28__by Dec. 2015 0 0% The referral guideline was developed
and finalized on March 2016.
Reproduction, distribution and
orientation of the personnel from the
following ILHZs will be done within
June 2016.
_ Q1-Q4
_2016
_82__by Dec. 2016 335 409% Training conducted:
Parana (Mt. Prov): 100 pax last July
21-22, 2016)
Pumiyaan (Kalinga): 75 pax last
August 30, 2016
Binulawan (Kalinga): 65 pax last
August 31, 2016
Lin-awa (Kalinga): 95 pax last Sept.
1, 2016
Kiastila (Ifugao) still for schedule
Page 11 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Barangay
MNCHN
Health
Emergency
Plan (BHEP)
Orientation to MHO / PHO
Ifugao – 11 MHOs & 2 PHOs
Kalinga – 10 MHOs & 2 PHOs
Mt. Prov – 10 MHOs & 2 PHOs
Baguio – 3 CHOs
Abra – 21 MHOs
Total: 61 MHOs and CHOs, PHOs
MDRRMC /
HEMS /
Prov. DOH /
PHO
_Q2_2014 No. of PHOs and
MHOs oriented on
MNCHN BHEP:
_13_by Dec. 2014
BRRMC Plan
MNCHN BHEP Guide
13 100% Only given to Baguio City (3) and
Mt. Province (10). All other target
pax were scheduled on 2015.
_Q2_2014 _48_by Dec. 2015 48 100% Done during the Provincial MNCHN
Implementation Review and
monitored during the regular conduct
of Regional MNDR
Monitoring of development/implementation status
Total Barangays:
Abra – 216 brgys
Ifugao – 179 brgys
Kalinga – 153 brgys
Mt. Province – 144 brgys
TOTAL = 692 brgys
DOH Reps /
PHOs
_Q3_2014 No. of barangays
with MNCHN
BHEP at BDRRMC
and implemented:
_144__by Dec.
2014
0 0
_ Q3-Q4 .2015 144_by Dec. 2015 692 100% All barangays have set-up their
emergency transport support. In most
cases, they forged partnership with
the public transport group where
gasoline will be handled by the
barangay or family of the patient. In
areas that is only accessible by foot, a
barangay health emergency response
team were created and served to carry
the patient from the community to the
nearest available health facility.
_ Q1-Q4 2016 _692_by Dec. 2016 692 100% Continuing validation and monitoring
Output 3 Re-
assessment
of BEmONC
facility
mapping
Re-assessment of BEmONC facility mapping at MNCHN MOP roll out training
(when SDN discussed)
Finalized SDN is an output during the MNDR. MNCHN MOP rollout training
WMHDC
/ DOH Reps
/ PHO
_Q3-Q4._2013 No. of
Rationalization Plan
of health care
delivery system
based on health
needs done:
_4_by Dec. 2013
Rationalization Plan of
health care delivery
system
SDN structure
4 100% No. per province reviewed: Ifugao –
1, Kalinga – 1, Mt. Province – 1,
Baguio City – 1
BEmONC
training
Conduct of BEmONC trainings for team (RHU and hospitals)
WMHDC
BGHMC
BEmONC
Training
Team
_Q2-Q4 2014
No. of team
(doctors, nurses and
midwives) trained
on BEmONC:
__8___by Dec.
2014
BEmONC Training
Enrolment Cost
Per Diems and
transportation (c/o LGU)
8 100% 562,169.30 Teams trained (7 teams) non JICA
sites on Jan. 21-31, 2014: Abra -6,
Baguio-1 & Mt. Province - 1
_Q3-Q4 _2015 __9___by Dec.
2015 BEmONC Training
Enrolment Cost
Per Diems and
transportation (c/o LGU)
15 167% Conducted on March 3-13, 2015 (6
teams or 19 participants) and Nov.
10-20, 2015 (9 teams or 27
participants)
Q2-Q4 2016 __8___by Dec.
2016 BEmONC Training
Enrolment Cost
Per Diems and
transportation (c/o LGU)
8 100% August 9-19, 2016
Conduct of harmonized BEmONC trainings for midwives in RHU and BHSs and
Hospital Nurses
WMHDC
BGHMC
BEmONC
Training
Team
_ Q4 2013 No. of midwives
trained on
Harmonized
BEmONC:
_30_by Dec. 2013
BEmONC Training
Enrolment Cost
Per Diems and
transportation
0 0 No trainings conducted on
Harmonized BEmONC for RHMs in
2013 due to no available slot at
BGHMC
_ Q2-Q4
_2014
_32___by Dec.
2014 BEmONC Training
Enrolment Cost
(P512,000.00)
Per Diems and
transportation
32 100% 485,840.00 Conducted training at BGHMC on
April 2014 and June 2014
Q3-Q4 _2015 _48__by Dec. 2015 BEmONC Training
Enrolment Cost
Per Diems and
transportation
54 112% Conducted on:
Sept. 2-8, 2015 – 15 pax
Oct. 6-12, 2015 – 19 pax
Dec. 8-14, 2015 – 20 pax
Page 12 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Q2-Q4 2016 _16__by Dec. 2016 80 500% In 2016, the following training was
conducted:
Feb. 9-15, 2016 - 19 pax
April 12-22, 2016 – 22 pax
May 17-23, 2016 – 22 pax
Oct. 4-10, 2016 – 17 pax
.
Conduct of Didactic BEmONC training for PHO and Provincial DOH WMHDC,
BGHMC
BEmONC
Training
Team
_Q3-Q4 _2015 No of PHO and
Prov. DOH
personnel trained:
_25_by Dec. 2015
BEmONC Training
Enrolment Cost
Per Diems and
transportation (c/o LGU)
0 0% Re-scheduled in 2016
Equipment /
Facility
Needs assessment for equipment and facility PHOs / DOH
Reps
_Q4_2013 No. of Re-
assessment Result
for structural
requirements for
BEmONC Facility:
__1__by Dec. 2013
MNCHN MOP
1 100% Updating will be done annually.
[ALL provinces] Facility improvement (construction/renovation) and Equipment
Provision for Birthing facility-hospital, RHU and BHS
HSDC,
Prov. DOH
and PHO
Q1-Q4, 2013 No. of BEmONC-
Hospitals provided
infrastructure
support through
HFEP:
16 by Dec. 2013
Construction/renovation cost
P25,800,000
14 88% 155,707,000.00 Abra – 1 Apayao – 4
Benguet – 6 Kalinga – 3
Q1-Q4 2014 15 by Dec. 2014 P 36,249,700 12 80% 56,250,000 Abra – 4 Ifugao – 5
Kalinga – 2 Mt. Province – 1
Q1-Q4 2015 _ 7_ by Dec.
2015
P67,426,700.00 0 0% No fund downloaded from DOH
Central Office in 2015. Target was
carried over to 2016. DOH approved
budget and processed for
implementation include: Province Facility Budget
Abra (4) Bucay DH 5.8M
Abra PH 10M
Dolores CH 1M
La Paz DH 1M
Apayao(5) AJDH 2.3M
SMDH 1.5M
Apayao DH 2M
Conner DH 25.5M
FNLGH 28.7M
Benguet
(5)
DMMH 2.5M
Atok DH 2.5M
KMCH 3.5M
Abatan DH 0.4M
Itogon MH 1M
Ifugao (6) Aguinaldo DH
3M
Potia DH 2.5M
Hungduan
DH
3.9M
Mayoyao
DH
3M
Tinoc DH 1.9M
Panopdopan DH
3M
Kalinga
(3)
JMDDH 2.5M
Kalinga DH 2.5M
WKDH 3.3M
Mountain
(4)
Barlig DH 2.5M
Besao DH 2.5M
Page 13 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Paracelis
DH
2.5M
LHRH 45.8M
Baguio
(1)
BGHMC 50M
TOTAL 27 216.6M
Q1-Q4 _2016 ___4__by Dec.
2016
4 100% For NOA: 12
Mt. Province – 3 (Barlig DH, Besao
DH and Paracelis DH)
Kalinga – 3 ( Juan Duyan DH,
Kalinga DH and Western Kalinga
DH)
Ifugao – 5 (Aguinaldo PH, Potia DH,
Hungduan DH, Mayoyao DH and
Tinoc DH)
Baguio – 1 (PMA Stn)
Done (for Post-Evaluation): 4
Benguet – 2 (Kapangan MCH and
Abatan EH)
Abra – 2 (Bangued PH and Dolores
CH)
For Procurement: 2
Apayao – 1 (Amma Jadsac)
Abra – 1 (Bucay DH)
Q1-Q4 2013 No. of BEmONC-
RHUs provided
infrastructure
support through
HFEP:
9 _by Dec.
2013
Construction/renovation cost
P7,150,000
38 422% 69,250,000 Abra – 13 Apayao – 5
Benguet – 4 Baguio City – 4
Ifugao – 2 Kalinga – 7
Mt. Province – 3
Q1-Q4 2014 6 by Dec.
2014
P7,500,000 8 133% 8,416,300 Abra – 4 Benguet – 1
Kalinga – 2 Mt. Province –
1
Q1-Q4 2015 _5_ by Dec. 2015 P9,200,000 0 0% No fund downloaded from DOH
Central Office in 2015. Target was
carried over to 2016. DOH approved
budget and processed for
implementation include: Province RHU Budget
Abra (7) Bucloc 1M
Daguioman 2M
Danglas 2M
Dolores 1.5M
Lacub 1M
Langiden 1M
Tineg 4M
Apayao
(3)
Conner 0.7M
Luna 5M
Sta.
Marcela
2M
Benguet
(2)
Mankayan 1M
Tuba 2M
Ifugao (1) Hungduan 2.5M
Kalinga
(2)
Tabuk 1
(Rizal)
1M
Tabuk II (Calanan)
1.35M
Mountain
(1)
Sadanga 0.7M
Page 14 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Baguio
(2)
Asin DHC 1.5M
Irisan DHC 3.5M
TOTAL 18 33.75M
Q1-Q4 2016 __1___by Dec.
2016
8 800% For NOA: 3
Kalinga – 1 (Rizal)
Baguio – 2 (Asin DC and Irisan DC)
For Procurement: 1
Mt. Prov. – 1 (Sadanga)
Done (for Post-Evaluation): 8
Benguet – 1 (Tuba)
Apayao – 3 (Sta. Marcela, Conner
and Luna)
Abra – 4 (Danglas, Langiden, Lacub
and Dolores)
On-going: 3
Abra – 3 (Tineg, Daguioman and
Bucloc)
__0___2013 No. of BHS-
Birthing Centers
provided
infrastructure
support through
HFEP:
_0___by Dec. 2013
Construction/renovation cost
0
11 14,100,000 Abra – 2
Benguet – 3
Ifugao - 3
Mt. Province - 3
Q1-Q4 2014 _ 9_ by Dec. 2014 P 10,800,000
51 567% 50,496,600.00 Abra – 16 Apayao – 5
Benguet – 8 Kalinga – 6
Mt. Province - 8
Q1-Q4_2015 __27_by Dec. 2015 P33,900,000 0 0% No fund downloaded from DOH
Central Office in 2015. Target was
carried over to 2016. Approved
budget and processed for
implementation include: Province BHS Budget
Abra (1) Talogtog 1.5M
Apayao
(16)
Mataguisi 1M
San Luis 2.5M
Ferdinand 2.5M
Mauigi 0.7M
Ginamgaman 0.7M
Malama 0.8M
Ili 0.8M
Maragat 2.5M
San Isidro Norte
0.8M
Barocboc 1M
Nueva 1M
Panay 2.5M
San Carlos 0.8M
Malayugan 0.8M
San Jose 0.8M
Sepa 1M
Benguet (4)
Tocmo 1M
Adaoay 1M
Bobok 1M
Paoay 1M
Ifugao (37)
Balangbang 1M
Anaba 2.5M
Salamague 0.6M
Payawan 0.6M
Page 15 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Nungawa 0.6M
Pula 0.6M
Duit 1.5M
Dalligan 1.5M
Tuplac 1.5M
Pindongan 1.5M
Mappit 1.5M
Bolog 1.5M
Dengao Ahin 1.5M
Kokoy
Tuctucan
1.5M
Hulucan
Binablayan
1.5M
Upper
Luhong
1.5M
Lab-ung
Luhong
1.5M
Itab 1.5M
Damag 1.5M
Nangkatengey 1.5M
Natcak 1.5M
Lab-ong 1.5M
Numpaling 1.5M
Chaya 1.5M
Magulon 1.5M
Epeng 1.5M
Buninan 1.5M
Banao 1.5M
Guinihon 1.5M
Palaad 1.5M
Ayangan 1.5M
Aduyungan 1.5M
Mapawoy 1.5M
Mayoyao Proper
1.5M
Bongan 1.5M
Chumang 1.5M
Liwo 1.5M
Kalinga
(5)
Malin-awa 1.5M
Bolo 1.5M
Dangtalan 1.5M
Ipil 1.5M
Dugnac, Antonio
Canao
1.5M
Mountain (9)
Bila 1.5M
Latang 1.5M
Madongo
Bangaan
0.85M
Catao,
Buringal
0.85M
Bikigan 0.5M
Ogo-og 0.5M
Samoki 0.9M
Bananao 0.85M
Alunogan 1.5M
TOTAL 71 94.55M
Q1-Q4_2016 __10__by Dec.
2016
For Procurement:
Mt. Prov. – 6
Kalinga – 3
Ifugao – 4
Apayao – 8
Abra - 1
On-going:
Mt. Prov – 2
Page 16 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Benguet - 2
Bidded:
Mt. Prov. – 2
Ifugao – 3
Benguet – 9
Apayao - 10
Abra - 3
HSDC,
Prov. DOH
and PHO
Q1-Q4 2013 No. of BEmONC-
Hospitals provided
with Equipment
support through
HFEP:
16 by Dec. 2013
Equipment cost
P24,000,000
10 63% 235,400,000.00 Abra – 2 Apayao – 4
Baguio City – 1 Ifugao - 1
Kalinga – 1 Mt. Province – 1
Q1-Q4 2014 15 by Dec.
2014
P34,304,500 16 107% 51,999,800 Abra – 4 Apayao – 1
Ifugao – 6 Kalinga – 3
Mt. Province – 2
Q1-Q4 2015 _4___ by Dec. 2015 0 0% No fund downloaded from DOH
Central Office in 2015. Target was
carried over to 2016. Approved
budget and processed for
implementation include: Province Facility Budget
Abra (4) Bucay DH 0.975M
Abra PH 1.585M
Dolores CH 0.4M
La Paz DH 0.52M
Villaviciosa
CH
0.52M
Apayao(4) AJDH 0.2M
SMDH 3.26M
Apayao PH 0.52M
Flora DH 0.52M
Benguet (5)
DMMH 0.895M
Atok DH 0.695M
KMCH 0.895M
Abatan DH 0.975M
Itogon MH 1.24M
Ifugao (5) Aguinaldo DH
0.5M
Potia DH 0.5M
Hungduan
DH
0.5M
Mayoyao
DH
0.705M
Tinoc DH 2.995M
Kalinga (3)
JMDDH 3M
Kalinga DH 3M
WKDH 0.7M
Mountain (4)
Barlig DH 3M
Besao DH 1.8M
Paracelis
DH
0.98M
Bontoc GH 1.72M
TOTAL 20 33.6M
Q1-Q4 2016 __4__by Dec. 2016 For follow-up with DOH Central
Office
Q1-Q4 2013 No. of BEmONC-
RHUs provided
with Equipment
support through
HFEP:
9 by Dec. 2013
Equipment cost
P9,000,000
55 611% 46,341,000.00 Abra – 18 Apayao – 6
Baguio City – 11 Benguet - 4
Ifugao – 2 Kalinga – 5
Mt. Province – 9
Page 17 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Q1-Q4_2014 _6 __by Dec. 2014 P8,583,900 10 167% 6,366,450.00 Abra – 3 Benguet - 4
Kalinga – 1 Mt. Province –
2
Q1-Q4 2015 2 by Dec. 2015 0 0% No fund downloaded from DOH
Central Office in 2015. Target was
carried over to 2016. Approved
budget and processed for
implementation include: Province RHU Budget
Ifugao (1) Hungduan 1M
Kalinga (1)
Tabuk II (Calanan)
0.25M
Mountain
(1)
Sadanga 0.25M
TOTAL 3 1.5M
Q1-Q4 2016 _2__by Dec. 2016 For follow-up with DOH Central
Office
___0___2013 No. of BHS-
Birthing Centers
provided with
Equipment support
through HFEP:
__0_by Dec. 2013
Equipment cost
0
7 1,400,000.00 Ifugao - 5
Mt. Province – 2
Q1-Q4. 2014 9 by Dec.
2014
3,669,300 41 456% 15,244,350 Abra – 13 Apayao – 4
Benguet – 6 Ifugao - 8
Kalinga – 4 Mt. Province – 6
Q1-Q4 2015 _17__by Dec. 2015 0 0% No fund downloaded from DOH
Central Office in 2015. Target was
carried over to 2016. Approved
budget and processed for
implementation include: Province BHS Budget
Apayao
(11)
Malubibit 0.25M
San Sebastian 0.25M
Mataguisi 0.25M
Mauigi 0.25M
Ginamgaman 0.25M
San Isidro Norte
0.25M
Barocboc 0.25M
Nueva 0.25M
Malayugan 0.25M
San Jose 0.25M
Sepa 0.25M
Benguet
(4)
Tocmo 0.25M
Adaoay 0.25M
Bobok 0.25M
Paoay 0.25M
Ifugao
(33)
Balangbang 0.25M
Anaba 0.25M
Duit 0.25M
Dalligan 0.25M
Tuplac 0.25M
Pindongan 0.25M
Mappit 0.25M
Bolog 0.25M
Dengao Ahin 0.25M
Kokoy
Tuctucan
0.25M
Hulucan
Binablayan
0.25M
Upper
Luhong
0.25M
Lab-ung 0.25M
Page 18 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Luhong
Itab 0.25M
Damag 0.25M
Nangkatengey 0.25M
Natcak 0.25M
Lab-ong 0.25M
Numpaling 0.25M
Chaya 0.25M
Magulon 0.25M
Epeng 0.25M
Buninan 0.25M
Banao 0.25M
Guinihon 0.25M
Palaad 0.25M
Ayangan 0.25M
Aduyungan 0.25M
Mapawoy 0.25M
Mayoyao
Proper
0.25M
Bongan 0.25M
Chumang 0.25M
Liwo 0.25M
Kalinga
(5)
Malin-awa 0.25M
Bolo 0.25M
Dangtalan 0.25M
Ipil 0.25M
Dugnac,
Antonio Canao
0.25M
Mountain
(9)
Bila 0.25M
Latang 0.25M
Madongo
Bangaan
0.25M
Madongo 0.25M
Catao, Buringal
0.25M
Bikigan 0.25M
Ogo-og 0.25M
Samoki 0.25M
Bananao 0.25M
Alunogan 0.25M
TOTAL 62 15.5M
Q1-Q4_2016 _0___by Dec. 2016 For follow-up with DOH Central
Office
Human
Resource
complement
Deployment of doctors (DTTB), nurses (RN heals) and midwives (RHMPP).
Baseline (as of August 2013):
Province No. of
RHUs with
no doctor
No. of
RHUs to be
provided
with NDP
No. of
RHUs to
be
provided
with
RHMPP
Abra 10 27 27
Ifugao 0 11 11
Kalinga 0 10 10
Mt. Prov. 0 11 11
Baguio
City
0 16 16
Total 10 75 75
Human
Resource
Cluster
Q1-Q4_2014 No. of RHUs
received DTTBs
support:
_ 10_ by Dec. 2014
Salary
[amount varies - Depend on
the downloaded amount from
DOH-CO]
11 110% All assigned in Abra
Q1-Q4_2015 10 _by Dec. 2015 15 150% Total of 15 doctors deployed through
DTTB (10 doctors) and UHC (2) to
the following provinces with no
doctors:
Abra: 11 doctors
Apayao: 1 doctor
Benguet: 2 doctors
Mountain: 1 doctor
Q1-Q4__2016 _ 10 by Dec. 2016 Detailed status will be reflected on
October 2016 report.
_ Q1-Q4_2014 No. of RHUs
received RNHeals
support:
75 by Dec. 2014
Salary
[amount varies - Depend on
the downloaded amount from
DOH-CO]
400 533% Deployed region-wide
Q1-Q4__2015 _ 75 by Dec. 2015 574 765% Total of 574 nurses deployed to the
following provinces as personnel
augmentation:
Page 19 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Abra: 167 nurses
Apayao: 50 nurses
Baguio City: 25 nurses
Benguet: 135 nurses
Ifugao: 67 nurses
Kalinga: 62 nurses
Mountain: 68 nurses
Q1-Q4_2016 _ 75 _by Dec. 2016 Detailed status will be reflected on
October 2016 report.
Q1-Q4__2014 No. of RHUs
received RHMPP
support:
75 _by Dec. 2014
Salary
[amount varies - Depend on
the downloaded amount from
DOH-CO]
118 157% Deployed region-wide
Q1-Q4_2015 75 _by Dec. 2015 179 238% Total of 179 midwives deployed to
the following provinces as personnel
augmentation:
Abra: 40 midwives
Apayao: 6 midwives
Baguio City: 7 midwives
Benguet: 34 midwives
Ifugao: 35 midwives
Kalinga: 31 midwives
Mountain: 26 midwives
Q1-Q4_2016 75 _by Dec. 2016 Detailed status will be reflected on
October 2016 report.
BEmONC
capable
health
facilities for
Issuance of
License to
Operate
[ALL provinces] Issuance of LTO to target BEmONC Capable RHUs and BHSs
Province RHUs BHS TOTAL
Abra 18 5 23
Apayao 3 19 22
Benguet 10 50 60
Ifugao 11 2 13
Kalinga 8 0 8
Mt. Prov 3 1 4
Baguio 1 1
Total 53 78 131
RLED Q1-Q4. 2015 No. of RHU-
BEmONC Capable
with LTO:
_20__by Dec. 2015
34 170% While DOH required the LTO for
Birthing Homes effective 2016, 6
RHUs got the approval before Dec.
31, 2015. To wit:
Abra: 2
Benguet: 3
Ifugao: 1
On May 18, 2016, RHUs with LTO
increases from 6 to 34 (Mankayan in
Benguet and Tinglayan in Kalinga
got a license as Infirmary).
Abra: 8
Apayao: 3
Baguio City: Atok Trail still for
renovation
Benguet: 7
Ifugao: 10
Kalinga: 4
Mountain: 2
Q1-Q4. 2015 __53__by Dec.
2016
34 64% As of August 3016
Q1-Q4. 2015 No. of BHSs-
BEmONC Capable
with LTO:
_50__by Dec. 2015
70 140% As of May 18, 2016, BHSs with LTO
as Birthing Homes are as follows:
Abra: 1
Apayao: 17
Benguet: 32
Ifugao: 18
Kalinga: 2
Q1-Q4. 2016 __78__by Dec.
2016
70 90% As of August 3016
PhilHealth-
Maternity
and Newborn
Care Package
accreditation
Monitoring of PhilHealth-Maternity and Newborn Care Package accreditation
status in the non-project site
Province RHUs BHS TOTAL
Abra 12 0 12
Ifugao 11 2 13
PhilHealth
(with
assistance of
Provincial
DOH Reps)
_Q3-Q4_2015 No. of workshop to
facilitate the MCP
accreditation of the
Target RHUs and
BHSs-Birthing
Facilities:
_6_by Dec. 2015
Meals and Lodging
Transpo of Facilitators –
c/o PhilHealth
Accreditation forms –
c/o PhilHealth
6 100% Workshop was conducted on the
following: Province Date Venue
Abra Oct. 14-
15, 2015
Bangued
Apayao Oct. 21-
22, 2015
Luna
Page 20 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Kalinga 8 0 8
Mt. Prov 3 1 4
Baguio 1 1
Total 34 4 38
Benguet Sept. 15,
2015
DMMH
Sept. 18,
2015
Tublay
Sept. 23,
2015
Buguis
Sept. 29,
2015
Kapangan
Ifugao Oct. 28-
29, 2015
Lagawe
Mountain Oct. 28-
29, 2015
Lagawe
Kalinga Oct. 22-
23, 2015
Tabuk
JICA-SSC covered the cost for
Benguet while all other provinces
were handled by DOH CAR.
_Q4__2013 [Project purpose
indicator]
No. of RHUs
accredited to
PhilHealth-
Maternity and
Newborn Care
Package:
_25_by Dec. 2013
Application fee for
accreditation
25 100% Abra –4
Ifugao – 11
Kalinga – 8
Mt. Province - 2
_ Q4 _2014 __25_by Dec. 2014 28 112% Abra –6
Ifugao – 11
Kalinga – 8
Mt. Province - 3
_ Q4 _2015 __34__by Dec.
2015
33 97% Herewith are the total RHUs
accredited to PhilHealth in the
Expansion Sites as of Dec. 31, 2015:
Abra: 10
Baguio City: 1
Ifugao: 11
Kalinga: 8
Mountain: 3
On May 18, 2016, all facilities have
renewed their accredited except with
baguio City (Atok Trail Health
Center) due to on-going renovation.
_ Q4 __2016 _34_by Dec. 2016 34 100% As of Aug. 31, 2016, PhilHealth
reported with:
Abra – 11
Baguio City – 1
Ifugao – 11
Kalinga – 8
Mt. Prov. - 3
_ Q4__2013
[Project purpose
indicator]
No. of BHS-
Birthing Centers
accredited to
PhilHealth-
Maternity and
Newborn Care
Package:
__4__by Dec. 2013
Application fee for
accreditation
10 250% Ifugao – 6
Mt. Province - 4
_ Q4_2014 _4__by Dec. 2014 21 525% Ifugao – 15
Baguio City - 1
Mt. Province - 5
_ Q4 _2015 _4_by Dec. 2015 29 725% Herewith are the total BHSs
accredited to PhilHealth in the
Page 21 of 22
Output Theme Activities person in
charge
Time frame Target (goal) Input ACCOMPLISHMENTS
QTY % Amount REMARKS
Expansion Sites as of Dec. 31, 2015:
Abra: 0
Ifugao: 21
Mountain: 8
On May 18, 2016, total BHS-
Birthing Homes have maintained or
applied the accreditation:
Abra: 1
Ifugao: 24
Mountain: 5
_ Q4 _2016 _4_by Dec. 2016 30 750% As of Aug. 31, 2016, PhilHealth
reported with:
Abra – 1
Ifugao – 24
Mt. Prov. - 5
_ Q1-Q4_2014
No. of health
personnel trained on
newborn screening:
_40__by Dec. 2014
[all] meals and
accommodation
[all] training materials
[all] traveling expenses (c/o
LGU)
171 428% 614,000 Facilities were provided with
Newborn Screening kit: 9,085 kits in
2014 amounting to 4,996,750.
_ Q1-Q4_2015 _30__by Dec. 2015 72 240% Conducted on the following dates:
August 17-20, 2015 with 43 pax
August 26-28, 2015 with 29 pax.
In the first quarter of 2016, DOH
CAR has trained 78 personnel
assigned in birthing facility on
Newborn Screening.
_ Q1-Q42016 _20_by Dec. 2016 Detailed status will be reflected on
October 2016 report.
_ Q4 _2015 No. of RHUs
Certified as
Newborn Screening
Facilities:
__34__by Dec.
2015
48 141% As of April 15, 2016, total RHUs
certified by Newborn Screening
Center are:
Abra: 19
Baguio City: 1
Ifugao: 11
Kalinga: 9
Mountain: 8
_ Q4 __2016 _34_by Dec. 2016 48 141%
_ Q4 _2015 No. of BHS-
Birthing Centers s
Certified as
Newborn Screening
Facilities:
___4_by Dec. 2015
59 1,475% As of April 15, 2016, total BHSs
certified by Newborn Screening
Center are:
Abra: 10
Ifugao: 38
Mountain: 11
_ Q4 _2016 _4_by Dec. 2016 59 1,475% Note: The plan was revisited on June 2015 and retargeted in accordance to the DOH-AO 2015-003 or cancellation of BEmONC Certification and will harmonize to the target with the Project Design Matrix. The following modifications were made: (1) Specified the target ILHZ-SDN; (2) Inclusion of Referral Manual; (3)
Target of facilities for monitoring by the BEmONC MSS Team consistent to the PDM target for BEmONC capable; (4) inclusion of RHUs and BHSs for issuance of LTO; (5) Retargeting of RHUs and BHS for PhilHealth-Maternity and Newborn Care Package accreditation; (6) Specified the total number of barangays in the
non-project sites with MNCHN Emergency Plan; (7) Targeting of RHUs and BHSs certified to Newborn Screening consistent to the number of PhilHealth-Maternity and Newborn Care Package accreditation; and (8) Inclusion of workshop to facilitate the MCP accreditation of the target RHUs and BHSs’ birthing facilities .
Prepared by:
DR. MARY JANE GRACE MUÑOZ DR. VIRGINIA NARCISO DR. ERWIN BACLIG MS. EMILY QUINES MS. LILIA ROSE SAY-AWEN Chief, Women and Men’s Health Dev. Cluster Chief, Adolescent and Child Health Dev. Cluster Chief, Regulation and Licensing Enforcement Division Health Facility & Systems Dev. Cluster Planning Officer III
Date: _____________________________ Date: _____________________________ Date: _____________________________ Date: _____________________________ Date: _____________________________
Recommending Approval: DR. AMELITA M. PANGILINAN Approved by: DR. LAKSHMI I. LEGASPI Director III, DOH CAR Director IV, DOH CAR
Date: _________________________ Date: _________________________
Page 22 of 22