project- dristi (belt pipe conveyor)

3
PROJECT PROPOSAL SHEET Part - 1 Project Purpose Business Requirement Transportation of coal from our coal mines to plant and Transportation of ash from power plant to mines end. Project Objective To meet the uninterrupted supply of coal to plant site and disposed ash of power to the mines end. Strategic Importance of the project To provide the non coking coal in bulk quantity to power plant and coal gasification plant from mines to plant within stipulated time period. To disposed the ash of power plant to mines end in bulk within specified time. Business processes impacted by the project Over all impact of this infrastructural facility is to reduce the time & cost. To have the smooth and uninterrupted operation. Project Constraints Land acquisition of private & reserve forest land and trees cutting through out the length of the belt pipe conveyor. Part - 2 Project Description / Details Date Order placed on 11/12/08 for supply and execution Title of the project Coal transportation by belt pipe conveyor from mines to plant site work for 6.0 MTPA integrated steel & power plant. Classification of project Infrastructure Y Cost Saving Y Manpower Reduction N Enchancing Production N Any Other N Project Description This 4.974 Km long belt pipe conveyor with a capacity of 2000 TPH shall receive coal from mines, transport to the plant site and discharge at the plant end and in the return side shall receive Ash collected from Power plant, transport to the mines site and discharge at the mines end. For pipe conveyor design & Engineering Macmet has technical collaboration with BRIDGESTONE TPE CO, JAPAN Tangible:- To have constant & consistent supply of coal for 6.0 MTPA integrated steel & power plant. Intangible:- No obstacles for getting non coking coal for 6.0 MTPA integrated steel & power plant. Pollution can be avoided, which would have occurred due to transportation through road. Form No. DPM-02 1 of 3

Upload: spnaik

Post on 18-Jul-2016

12 views

Category:

Documents


0 download

DESCRIPTION

doc

TRANSCRIPT

Page 1: Project- Dristi (Belt Pipe Conveyor)

PROJECT PROPOSAL SHEET

Part - 1 Project Purpose

Business Requirement Transportation of coal from our coal mines to plant and Transportation of ash from power plant to mines end.

Project Objective To meet the uninterrupted supply of coal to plant site and disposed ash of power to the mines end.

Strategic Importance of the project

To provide the non coking coal in bulk quantity to power plant and coal gasification plant from mines to plant within stipulated time period. To disposed the ash of power plant to mines end in bulk within specified time.

Business processes impacted by the project

Over all impact of this infrastructural facility is to reduce the time & cost. To have the smooth and uninterrupted operation.

Project Constraints Land acquisition of private & reserve forest land and trees cutting through out the length of the belt pipe conveyor.

Part - 2 Project Description / DetailsDate Order placed on 11/12/08 for supply and execution

Title of the project Coal transportation by belt pipe conveyor from mines to plant site work for 6.0 MTPA integrated steel & power plant.

Classification of project

Infrastructure Y

Cost Saving Y

Manpower Reduction N

Enchancing Production N

Any Other N

Project Description

This 4.974 Km long belt pipe conveyor with a capacity of 2000 TPH shall receive coal from mines, transport to the plant site and discharge at the plant end and in the return side shall receive Ash collected from Power plant, transport to the mines site and discharge at the mines end. For pipe conveyor design & Engineering Macmet has technical collaboration with BRIDGESTONE TPE CO, JAPAN Tangible:- To have constant & consistent supply of coal for 6.0 MTPA integrated steel & power plant.Intangible:- No obstacles for getting non coking coal for 6.0 MTPA integrated steel & power plant.Pollution can be avoided, which would have occurred due to transportation through road.

Project Priority Immediate Y

Form No. DPM-02 1 of 2

Page 2: Project- Dristi (Belt Pipe Conveyor)

Long Term Planning N

Part - 3

Part – 4 Project Timeline

Estimated time for completion of project

18 months for completion and commissioning from the date of issue of this Work Order + 3 months for demonstration of performance guarantee parameters.

Estimated start and completion dates of major milestones

Start & Completion of Survey: Dec,08 to Jan,09Start & Completion of design and engineering: Feb,09 to April,09Approval of drawing :- July,09Start & Completion of Civil work: Aug,09 to Mar,10Start & Completion of Mechanical work: June,09 to March,10Start & Completion of Mechanical erection work: Oct,09 to May,10Start & Completion of Electrical work: Nov,09 to May,10Start & Completion of testing & trial run: May,10 to June,10Commissioning, transportation of coal from mines to plant:July,10

Part – 5 Project Risks

Project Risks

To get the land clearance for Reserve forest and Private land for execution of the project.

For acquisition of reserve forest and private land necessary steps have been taken.

Part – 6 Recommendation & Signatures

Recommendation Recommendation by the Project Idea Assessment Team (PIAT)

Proposal prepared by N.Padhy

Proposal forwarded by DK Saraogi Rajesh Jha

Business Unit Head VC & CEO EVC & MD

Form No. DPM-02 2 of 2