TAHFM Sid Sanders, Sr. Vice President Project Delivery Strategies April 8 th 2013

Upload: others

Post on 25-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

TAHFM

Sid Sanders,

Sr. Vice President

Project Delivery Strategies April 8th 2013

Page 2: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Project Delivery Methods

• Design-Bid-Build

o Hard Bid

o Competitive Sealed Proposals CSP

• Construction Manager at Risk CMR

o Design Assist CMR-DA

• Construction Manager as Agent CMA

• Design/Build DB

o Design/ Build Bridging

Page 3: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Project Delivery Methods

Competitive Sealed Proposals

Owner

General

Contractor

Project

Manager

Subcontractor Subcontractor Subcontractor

A/E

• Allows selection to be

qualifications influenced

• Establishes clear market

price

• Simplest to administer

• Allows for negotiations with

best-value contractor

• No ability to fast track

• Limited ability to establish early

construction cost

• Limited ability for to perform

constructability and value engineer

• Potential for adversarial relationship

Page 4: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Project Delivery Methods

Construction Manager at Risk

Project

Manager

Construction

Manager A/E

Subcontractor Subcontractor Subcontractor

Owner

• Complex buy-out process

• Requires significant fiduciary

oversight

• Risk of early start must be

mitigated with contingency in

GMP

• Allows for fast tracking and early

delivery

• Allows delayed decision making on

program elements

• Allows for Guarantee Max Price

(GMP)

• Allows for collaboration and

constructability

Page 5: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Project Delivery Methods

Construction Manager as Agent

Project

Manager

Construction

Manager

Subcontractor Subcontractor

Subcontractor

OWNER

Subcontractor

A/E

• Gives Owner considerable flexibility

and professional expertise

• Best used in large projects with clear

divisions of subcontractor responsibility

either by phase or scope

• Owner does not have a GMP with the CMA

• Lack of budgetary accountability can be disastrous on projects

requiring high level of subcontractor coordination

Page 6: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Project

Manager

Design/Build

Team

Owner

Subcontractor Subcontractor Subcontractor

Project Delivery Methods

Design/Build

Bridging Architect

• Single source of all project delivery

• Allows for extreme fast tracking

• Industry has developed a number of

product type specialists

• Allows for high degree of

collaboration

• No independent contract with

design team

• Requires rapid decisions by

owner — “Collapsed Decision

Making”

• Early starts can result in unclear

quality/scope expectations

Page 7: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Selecting a Delivery Method

COMPLEXITY OF OWNER/DECISION MAKING

CMR

CSP

DB

Low Level

• Simple Decision

• Few User Inputs

High Level

• Multiple Decisions

Thru Life of Project

• Many Different User

Inputs

Page 8: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Selecting a Delivery Method

COMPLEXITY OF PROJECT

CMR

CSP

DB

Low Level

• Simple Bldg Technology

High Level

• Complex Bldg Systems

• Complex Functionality

• Large Scale

• Complex Phasing

Page 9: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Selecting a Delivery Method

SPEED OF PROJECT

CMR

CSP

DB

Slowest Fastest

Page 10: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Project

Manager

Design/Build

Team

Owner

Subcontractor Subcontractor Subcontractor

Design/Build - Bridging

Bridging Architect

Page 11: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

• 13,000 SF, Four OR, Ambulatory Surgery

Center

• $6.5 M TPC

• SD Bridging package began December 2011

• Bridging package issued January 2012

• D-B team selected February 2012

• Construction began May 2012

• Substantial Completion February 2012

DB-Bridging Example

Surgery Center

Page 12: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Surgery Center

Page 13: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Surgery Center

Page 14: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Surgery Center

Page 15: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

• 1250 cars

• Connecting bridge

• Miscellaneous site improvements

• $12.6M TPC

• Bridging package began December 2011

• D-B team selected February 2012

• Construction began March 2012

• Opened February 2013

DB-Bridging Example

West Houston Garage

Page 16: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner
Page 17: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Competitive Sealed Proposals

Owner

General

Contractor

Project

Manager

Subcontractor Subcontractor Subcontractor

A/E

Page 18: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

• 166,000 SF, Medical Office Building

• Connecting bridge

• Miscellaneous site improvements

• $20M TPC

• Proposals taken October 2012

• Construction began February 2013

• Substantial Completion anticipated February

2013

CSP Example

West Houston MOB 2

Page 19: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner
Page 20: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

CMR w/ Design Assist Subcontractors

Project

Management

Team

Construction

Manager A/E

Subcontractor Subcontractor Subcontractor

Methodist

Page 21: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Project Life Cycle

PROGRAM

PRELIM. DESIGN

CONCEPT

PROJECT LIFE CYCLE

PR

OJ

EC

T

EX

PE

ND

ITU

RE

S

FINAL DESIGN

BUY-OUT

CONSTRUCTION

FURN./

COMM.

LE

VE

L

of

INF

LU

EN

CE

Selection of Delivery Model

Cost

Curve

Influence

Curve

Project Delivery Selection

Page 22: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Problems with typical CM at Risk integration

More information is needed earlier in project conceptualization

Critical technical knowledge, cost and creativity exist in the Sub-contractor and Manufacturing firms

The procurement “below” the CM-R tends to become design-bid-build (slowest & least innovative procurement)

Key parts of project are redrawn in shop drawing process by selected Sub-contractor & Manufactures

Page 23: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Traditional Flows of Project Information

•Construction

Documents

•Technical

Bulletins

•RFIs

•Submittals

Page 24: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Project Life Cycle

PROGRAM

PRELIM. DESIGN

PROJECT LIFE CYCLE

PR

OJ

EC

T

EX

PE

ND

ITU

RE

S

FINAL DESIGN

BUY-OUT

CONSTRUCTION

FURN./

COMM.

LE

VE

L

of

INF

LU

EN

CE

Selection of

Construction Manager

Cost

Curve

Influence

Curve

Desired Point of Project Integration

Page 25: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

CMR w/ Design Assist Subcontractors

Project

Management

Team

Construction

Manager A/E

Subcontractor Subcontractor Subcontractor

Methodist

Goal: Move up key

subcontractors in

process as Design-

Assist agents

Project Delivery Method

Page 26: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

CMR-DA Example

West Houston Hospital

• Green field site

• 193 bed, 465,000SF Hospital

• 20,000 SF Central Thermal Plant

• 160,000 Medical Office Building

• $325M TPC

• Master planned to double capacity over time

• Design team selected October 2007

• First Patient admitted December 2010

Page 27: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

West Houston Hospital

Page 28: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner
Page 29: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

OWNER

ARCH

ENG

SUB

SUB

CM

Collaborative team selection

Design-Assist Agents

HVAC

Plumbing

Electrical

Glazing/curtain-wall

Elevator

Medical Equipment

Fire Protection

Kitchen Equipment

Specialty

Page 30: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Management teams

Meets weekly to coordinate design

and documents

Team does clash detection

Design Assist Team Field Coordination Team

Meets weekly to plan and coordinate

work to be installed

Focus is on short term: 2 to 4 weeks

CM AE

Owner

PM

Global

Push scheduling

Granular

Pull scheduling

Page 31: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Design Assist Team

• Weekly work sessions with CMR, architect, engineers

and design assist subcontractors starting at Design

Development

• 3D modeling with collision detection managed by the

HVAC subcontractor incorporated structural frame and

all above ceiling items

• Design team developed documents to Issue For Permit

(IFP) status and handed off to Design Assist Sub

• Design Assist subcontractor then completed detailed

design for Final Design documents

• Final Design documents were modeled to resolve

conflicts, reviewed by design team and then sent to

procurement or fabrication.

Page 32: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Field Coordination Team

• Weekly work sessions with CMR, architect, engineers

and subcontractors starting at beginning of construction

• Focus on procurement and construction sequencing led

by the CMR

• Purpose was to insure resolution of systems in order to

maintain construction schedule

• Typically concentrated on items that would be required

for efficient sequencing of work

• Also focused on items needed for buy-out packaging

and for building permitting in a Just-in-Time manner

Page 33: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Design Assist Building Information Modeling

One-line duct layout

3D Modeling

Page 34: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Off-site Duct Fabrication from 3D Model

Page 35: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Prefabricated plumbing fixtures from 3D Model

Page 36: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Prefabricated Window Assemblies from 3D Model

Page 37: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

CMR-DA Example

Build-out Sugar Land Hospital

• Build-out of a cold-shell bed floor

• Two nursing units of 28 beds each; total of 56

beds

• $9.8M TPC

• 39,500 SF

Page 38: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Design Assist Headwall

Page 39: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Design Assist Headwall

Page 40: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Design Assist Headwall

Page 41: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Risk transfer

Complete risk transfer

No collaboration No risk

No accountability

Risk transfer

Pro

ject

Perf

orm

an

ce

Shared and allocated

risks and rewards

Page 42: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Challenges of Design Assist Process

How to keep early selection Sub-contractor competitive

in final pricing

Design team and construction team naturally revert to

traditional roles

Reluctance to step out of traditional roles due to

unknown risk issues

Many Subcontractors do not have design assist

capability

Many CMRs and Subcontractors are reluctant to commit

to GMPs until construction documents are well

developed

How to define the appropriate Design Assist hand-off

point

Page 43: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner

Program Management 2.0 is available

from the CMAA bookstore at

www.cmaanet.org/cmaa-bookstore

Page 44: Project Delivery Strategies€¦ · • Simplest to administer • Allows for negotiations with best-value contractor ... Slowest Fastest . Project Manager Design/Build Team Owner