PROJECT CAMEO TIER 4 TURBOCHARGER TEST CELL MODERNIZATION / GE TRANSPORTATION / ERIE, PA Headquarters - Madison, WI - USA / Greenville, SC - USA / Troy, MI - USA / TEDA Tianjin, China / Leicester, UK / www.acscm.com / [email protected] Project Value: $1,556,000 Project Overview: GE Transportation needed to modernize the existing turbocharger test stand in their diesel engine test lab Building 18, Cell A to allow for steady state testing of both single-stage and dual-stage turbochargers for Tier IV emissions- compliant locomotive engines. ACS designed and supplied a new controls & data acquisition system, updated instrumentation and controls, water and oil supply conditioning units, and an inter-stage cooler between the low and high-pressure stage compressors. The turbocharger test cell will be capable of testing single-stage and dual-stage turbocharger arrangements as well as the Tier 4 dual-stage turbochargers for all engine families (Inline 6, Inline 8, V12, and V16.) ACS provided complete installation and commissioning of the test cell equipment. ACS Services: ACS held a single-source contract for test facility design and construction management; equipment design and component specification, equipment build, procurement, and contractor installation; integration of equipment, facility, and control systems; and commissioning. Project Duration: 13 months Completion Date: September, 2013 Key Performance Features: GE RX3i with Proficy software test cell control and safety PLC system Supply, install and commission data acquisition system Combustor air supply system capable of up to 0.2 lb/sec Compressed air turbocharger starting system Combustor diesel fuel supply system that injects up to 3.75 gpm at 600psi maximum and achieves a turbine speed up to 50,000 rpm Turbocharger water conditioning system to maintain 120F-200F cooling water Inter-stage air-to-water cooling system which cools from 425F to 110F compressor air Lube oil conditioning system to preheat and maintain 140F-215F oil temperature

Upload: ngoxuyen

Post on 27-Jun-2018

252 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: PROJECT CAMEO TIER 4 TURBOCHARGER TEST … 4 Turbocharger...TIER 4 TURBOCHARGER TEST CELL MODERNIZATION GE TRANSPORTATION / / ERIE, PA Headquarters - Madison, WI - USA / Greenville,

P R O J E C T C A M E O

T I E R 4 T U R B O C H A R G E R T E S T C E L L M O D E R N I Z AT I O N / G E T R A N S P O R TAT I O N / E R I E , PA

Headquarters - Madison, WI - USA / Greenville, SC - USA / Troy, MI - USA / TEDA Tianjin, China / Leicester, UK / www.acscm.com / [email protected]

Project Value: $1,556,000

Project Overview:

GE Transportation needed to modernize the

existing turbocharger test stand in their diesel

engine test lab Building 18, Cell A to allow for

steady state testing of both single-stage and

dual-stage turbochargers for Tier IV emissions-

compliant locomotive engines.

ACS designed and supplied a new controls & data

acquisition system, updated instrumentation

and controls, water and oil supply conditioning

units, and an inter-stage cooler between the

low and high-pressure stage compressors. The

turbocharger test cell will be capable of testing

single-stage and dual-stage turbocharger

arrangements as well as the Tier 4 dual-stage

turbochargers for all engine families (Inline 6,

Inline 8, V12, and V16.) ACS provided complete

installation and commissioning of the test cell

equipment.

ACS Services:

ACS held a single-source contract for test facility design and

construction management; equipment design and component

specification, equipment build, procurement, and contractor

installation; integration of equipment, facility, and control

systems; and commissioning.

Project Duration: 13 months

Completion Date: September, 2013

Key Performance Features:

• GE RX3i with Proficy software test cell control and safety

PLC system

• Supply, install and commission data acquisition system

• Combustor air supply system capable of up to 0.2 lb/sec

• Compressed air turbocharger starting system

• Combustor diesel fuel supply system that injects up to

3.75 gpm at 600psi maximum and achieves a turbine

speed up to 50,000 rpm

• Turbocharger water conditioning system to maintain

120F-200F cooling water

• Inter-stage air-to-water cooling system which cools from

425F to 110F compressor air

• Lube oil conditioning system to preheat and maintain

140F-215F oil temperature