project blood bank 1.2

10

Click here to load reader

Upload: poetawan

Post on 21-Dec-2014

641 views

Category:

Documents


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Project Blood Bank 1.2

PROJECT BLOOD BANK

-::: An Overview :::-

UMEED FOUNDATION

TRUST

Page 2: Project Blood Bank 1.2

BASIC CONCEPT

THE BIGGEST EVER BLOOD BANK,

BASED ON NETWORKING OF PEOPLE WITH THEIR

HOMES, FAMILIES, LIVING & WORKING PLACES

UMEED FOUNDATION TRUST

Page 3: Project Blood Bank 1.2

OBJECTIVE

TO LINK EACH & EVERY CITIZEN OF PAKISTAN WITH A NETWORK OF OTHER PEOPLE, BASED ON THEIR BLOOD GROUPS.

UMEED FOUNDATION TRUST

Page 4: Project Blood Bank 1.2

WORK OUTLINE

Check•Check the Blood Groups•Issue Cards

List•Provide list of immediate unit•Hard & Soft Copy

Link•Connect with Core 2 & 3•Networking with central database

UMEED FOUNDATION TRUST

Page 5: Project Blood Bank 1.2

•Doctors/Medical Staff/Dispensaries•Media Professionals•Blood banks/NGOs/Trusts•Government Setups•Masajid/Madaris•Other Stake Holders

CORES

•Home (Family living together)•Office (Any single branch/Unit)•Shop/Outlet

•Housing Society/Muhalla/Chak (in villages)•All the offices/shops in a certain Plaza•Complete organization (having more than 1 offices)

Core 1 – Single Level

Unit

Core 2- Multi Level

Unit

Individual

Core 3 – Union Council Level

UMEED FOUNDATION TRUST

Core 4 – City Level

Page 6: Project Blood Bank 1.2

LIFE SECTORS

Media Government Corporate Commercial Markets NGOs Residence Education Health Volunteers Others UMEED FOUNDATION

TRUST

Page 7: Project Blood Bank 1.2

MANAGEMENT SETUP

Official 24/7 Helpline

Medical Wing

Correspondence Wing

Operations Wing

MIS Department

Volunteer Skill Management System

Finance Wing

Media Wing UMEED FOUNDATION TRUST

Page 8: Project Blood Bank 1.2

WHY WE ? Use of adequate and state-of-the art

technology GPS driven exact locations for

mapping of areas Monitoring and evaluation by pre-

defined KPIs and Milestones Professional and experienced people

planning and running the project

UMEED FOUNDATION TRUST

Page 9: Project Blood Bank 1.2

STRATEGY Setup all the wings/departments Initial meetings Schedule/Frequencies of meetings, work plan and

Road map Every Wing will then start work in their respective

areas, such as: Contacting Doctors, stake holders Inter Departmental Coordination Designing of database, web etc. Development of Forms Mapping of areas (Union Council Wise) Defining stake holders Coordination with stake holders Arranging inbound or outbound visits Collection and compilation of maximum data

Managing medical Camps one by one.UMEED FOUNDATION TRUST

Page 10: Project Blood Bank 1.2

PROJECT DESIGNED & DEVELOPED BY:

KAMRAN ZAHID UMEED FOUNDATION TRUST

THANK YOU