Short introduction Nicolai Gayle Nygaard IEA task 31/32 workshop, 04 October 2016 Project BEACon

Upload: others

Post on 07-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

Short introduction

Nicolai Gayle Nygaard

IEA task 31/32 workshop, 04 October 2016

Project BEACon

Page 2: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

2

Page 3: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

3

Page 4: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

4

Page 5: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

Location

5

Westermost Rough

Humber Gateway (E.ON)

Radar1

Radar2

Page 6: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

Scan sectors

6

Page 7: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

Scan sectors

7

Page 8: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

Dual-Doppler processed wind speeds

8

Page 9: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

Hard targets

The return power is high from hard

targets

Locate the turbines

Used to align the coordinate system

9

Page 10: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

From statistics to dynamics

10

Page 11: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

Data products - wakes

11

Horizontal cross-section Vertical cross-sections

Page 12: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

12 31/10/2016PROJECT BEACon

Page 13: Project BEACon - IEA Wind Task 32€¦ · IEA task 31/32 workshop, 04 October 2016 Project BEACon. 2. 3. 4. Location 5 Westermost Rough Humber Gateway (E.ON) Radar1 Radar2. Scan sectors

Radar specifications

Range: up to 30 km

Beam width: 0.5°

Along beam resolution: 15 m

Transverse resolution: 87 m at 10 km

Revisit time: 60 seconds or less depending on scan pattern

Pulse repetition frequency 4000 Hz

Wave length 3 cm

Pulse width 20 µs (note pulse compression)

13