Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts PE-PAG-02039 October 2016

Upload: others

Post on 26-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts PE-PAG-02039 October 2016

Page 2: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS

About TII

Transport Infrastructure Ireland (TII) is responsible for managing and improving the country’s national road and light rail networks.

About TII Publications

TII maintains an online suite of technical publications, which is managed through the TII Publications website. The contents of TII Publications is clearly split into ‘Standards’ and ‘Technical’ documentation. All documentation for implementation on TII schemes is collectively referred to as TII Publications (Standards), and all other documentation within the system is collectively referred to as TII Publications (Technical).

Document Attributes

Each document within TII Publications has a range of attributes associated with it, which allows for efficient access and retrieval of the document from the website. These attributes are also contained on the inside cover of each current document, for reference.

TII Publication Title Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

TII Publication Number PE-PAG-02039

Activity Planning & Evaluation (PE) Document Set Select Document Set

Stream Project Appraisal Guidelines (PAG)

Publication Date October 2016

Document Number

02039 Historical Reference

PAG Unit 16.1

TII Publications Website

This document is part of the TII publications system all of which is available free of charge at http://www.tiipublications.ie. For more information on the TII Publications system or to access further TII Publications documentation, please refer to the TII Publications website.

TII Authorisation and Contact Details

This document has been authorised by the Director of Professional Services, Transport Infrastructure Ireland. For any further guidance on the TII Publications system, please contact the following:

Contact: Standards and Research Section, Transport Infrastructure Ireland Postal Address: Parkgate Business Centre, Parkgate Street, Dublin 8, D08 DK10 Telephone: +353 1 646 3600 Email: [email protected]  

 

Page 3: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS

Page i

TII Publications

Activity: Planning & Evaluation (PE)

Stream: Project Appraisal Guidelines (PAG)

TII Publication Title: Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

TII Publication Number: PE-PAG-02039

Publication Date: October 2016

Set: Select Document Set

Contents Table

Glossary ............................................................................................................................... 1

1.  Overview ...................................................................................................................... 2 

2.  Factors Effecting Traffic Flow Profiles ...................................................................... 4 

3.  Overview of the Generic Expansion Factor Method ................................................. 5 

4.  Factoring by Hour of Day ........................................................................................... 6 

5.  Factoring by Day of Week ........................................................................................ 12 

6.  Factoring by Month of Year ...................................................................................... 13 

7.  Dealing with Multiple Datasets ................................................................................. 15 

Appendix A: ....................................................................................................................... 16 

Sample Traffic Flow Profiles (2015) ..................................................................................... 16 

Appendix B: ....................................................................................................................... 30 

Weekly Flow Indices ............................................................................................................ 30 

Appendix C: ....................................................................................................................... 33 

Monthly Flow Indices ........................................................................................................... 33 

 

 

Page 4: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 1

Glossary

AADT Annual Average Daily Traffic

TMU Traffic Monitoring Unit (TII Permanent Traffic Counter)

WADT Weekly Average Daily Traffic

Definitions

Annual Average Daily Traffic (AADT)

The total two-way traffic volume passing a point or segment of a road for one full calendar year, divided by the number of days in a year (365).

Weekly Average Daily Traffic (WADT)

The total two-way traffic volume passing a point or segment of a road for one full week (Monday to Sunday) divided by the number of days in the week (7).

Average Weekday Traffic

The total two-way volume passing a point or segment of a road for one full working week (Monday to Friday) divided by the number of days in the working week (5).

Generic Expansion Factor Method

A method of extrapolating short period traffic counts to longer periods, or to other count periods using a series of standard indices.

Traffic Flow Profile

The shape of a line plot of hourly traffic flow across a 24-hour period, with hourly traffic flow expressed as a proportion of the total daily flow

Page 5: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 2

1. Overview

The planning and appraisal of any proposed works on the national road network requires an understanding of the traffic demand that will be supported by such improvements. This ensures that the proposed works can accommodate the anticipated demand, and allows the quantification of benefits as part of the scheme appraisal.

This PAG Unit has been prepared to support the conversion of Short Period Traffic Counts to AADT, or to facilitate the estimation of short period traffic flows at any point in a year using only a sample dataset of traffic information. The guidance achieves this by developing an annual traffic flow profile that considers time of day, day of week and month of year, thereby generating a series of indices to allow short period traffic counts from one period to be extrapolated to any period of the year, or to AADT. This is referred to as the Generic Expansion Factor Method.

The Generic Expansion Factor Method can be used for short period traffic counts where nearby data is not available, (however with the current network of TMU sites available, it is unlikely that data will not be available) and where the collection of localised period counts is not justified. This would normally be the case where data is required for high level studies only, and where outputs will not be used as the basis for Project Appraisal or any form of local capital investment. For all other applications, please refer to PAG Unit 16.0: Estimating AADT on National Roads.

PAG Unit 16.0: Estimating AADT on National Roads sets out a methodology for calculating AADT using short period traffic counts for input to scheme design and appraisal. That Unit describes a series of options for additional data collection in order to convert localised short period traffic counts or traffic model outputs into AADT.

This guidance acknowledges the potential for statistical error in the Generic Expansion Factor Method. Confidence limits are set out where appropriate to ensure that the variability in observations can be considered.

For the purpose of this PAG Unit, short period traffic counts are defined as counts of duration less than 14 days. The flowchart in Figure 16.1.1 should be used to inform the most appropriate means of developing AADT estimates from short period traffic counts in different circumstances.

 

Page 6: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 3

Figure 16.1.1: Approaches for estimating AADT from short period traffic counts

Page 7: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 4

2. Factors Effecting Traffic Flow Profiles

The conversion of short period traffic counts to alternative short periods or to AADT is dependent on the shape of the traffic flow profile across a defined period. Flatter traffic flow profiles indicate a more uniform distribution of traffic flow across a particular period, whilst roads with a more pronounced increase in traffic flow during particular hours, days or months will lead to increased variability in the traffic flow profile.

This is indicated below in Figure 16.1.2, with two flow counters data represented. The blue profile shows a distinct peak in traffic flow during the AM and PM Peak periods, with very low flows overnight and a notable reduction in flow during the middle of the day. The profile shown in red shows a lower peak effect, with higher proportional flows during the middle of the day and overnight. This demonstrates the impact of the daily flow profile on the validity of expansion factors used to generate daily traffic flow estimates from short period traffic counts during the day.

Figure 16.1.2: Daily Traffic Flow Profiles

In recognition of this, it is therefore necessary that this variability is considered in the development of indices to be applied to short period traffic counts. In this regard, PAG Unit 16.0: Estimating AADT on National Roads highlighted that the following factors influence the generation of indices for expansion of short period traffic counts:

Geographical Location;

Month of Year;

Day of Week; and

Seasonality.

For the Generic Expansion Factor Method, the effects of these criteria will also be incorporated into the preparation of indices.

0.00

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

0.10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Proportion of To

tal D

aily Flow

Hour Beginning

Traffic Flow Profile ‐Weekday

Page 8: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 5

3. Overview of the Generic Expansion Factor Method

The conversion of short period traffic counts to alternative periods, and to facilitate an outline estimation of AADT is based on the following datasets:

Hour of Day: A series of traffic flow profiles that are representative of weekdays for different geographical regions;

Day of Week: Indices that allow the conversion of a single 24-hour traffic flow to an average day for that week (WADT); and

Month of Year: Indices that allow the conversion of WADT into an estimate of AADT.

Although the use of these datasets has been presented to convert short period traffic counts upwards to AADT, they can equally be used to convert between different short periods thorough calculation of AADT, followed by inverted use of indices to estimate traffic flow for any short period.

Page 9: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 6

4. Factoring by Hour of Day

24-hour traffic flow profiles have been developed based on a series of geographical regions. In order to define regions, it was necessary to develop an indicator of the shape of the flow profile over a typical day.

The shape of a daily flow profile can either be described as ‘peaky’ or ‘flat’. Peaky flow profiles exhibit high traffic volumes during AM and PM Peak periods, with relatively lower flow throughout the remainder of the day (shown as blue in Figure 16.1.2). This pattern is most evident on busy commuting corridors, with a limited number of non-employment related uses to generate ongoing demand throughout the day.

Flat profiles exist for a number of reasons. Congested roads can exhibit relatively flat profiles. The existence of a capacity constraint during peak periods can lead to spreading of peak demand into the peak shoulders, effectively restraining the peak flow whilst increasing the off-peak flows. In the most severe cases, the existence of bottlenecks or opposing movements downstream can lead to a significant reduction in traffic flow during the peak periods. This can skew the results of any expansion of peak hour flows quite considerably, and supports the conclusion that the use of short period traffic flows during congested periods should not be used as the basis for any estimation of WADT or AADT.

Nevertheless, flat profiles may also suggest that there is a broader range of trip purposes along a corridor, with commuting demand during the peak periods overlaid with retail, leisure or other business demands during the off peak periods. As such, flatter flow profiles can easily exist where there are no significant capacity limitations.

Finally, the use of flow profiles is not appropriate on routes where variable price tolling is employed (such as the Dublin Port Tunnel). In such cases, the variable pricing of tolls influences demand and traffic volumes can deviate significantly from the traffic flow profiles presented here.

In order to represent the ‘Peakiness’ of a traffic flow profile over a particular day, the concept of a ‘p-factor’ has been derived. The p-factor simply describes the scale of the reduction in flow between the AM Peak and the quietest period of the afternoon (the Inter-Peak), and from the Inter-Peak back up to the PM Peak. It is defined as follows:

p = a + b - 2c

where:

p = the peak factor (known as p-factor)

a = the maximum hourly proportion of traffic between 0:00 and 12:00 on a weekday

b = the maximum hourly proportion of traffic between 12:00 and 24:00 on a weekday

c = the minimum hourly proportion of traffic between 08:00 and 18:00 on a weekday

Consider the example in Figure 16.1.3. The values for a, b, and c are shown on the graph. The p-factor yields a value of 0.057. Note that the maximum p-factor is 1.0, in which case all traffic flow would occur during 2 individual peak hours of the day, separated by a cessation of all traffic during the afternoon. The minimum possible theoretical value is zero.

 

Page 10: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 7

Figure 16.1.3: Calculation of p-factor

In order to understand the impact of geographical location on the p-factor, and hence the traffic flow profile, p-factors at each TII TMU have been calculated. Figure 16.1.4 presents a frequency plot of values over the range of p-factors from 0 to 0.15.

The analysis of p-factors demonstrates that the data shows a mean value of 0.071 with a standard deviation of 0.016.

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of To

tal D

aily Flow

Hour Beginning

Traffic Flow ProfileHourly Flows expressed as a proportion of Daily Flow

a = 0.077

c = 0.055

b = 0.090

Page 11: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 8

Figure 16.1.4: Distribution of p-factor at TII TMU Sites

As a further exercise, the range of p-factors has been plotted thematically to understand the influence of geography. This is presented in Figure 16.1.5 and shows high p-factor values as red/yellow, with lower values in blue. Mid-range values are shown as green.

 

0

20

40

60

80

100

120

0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.1 0.11 0.12 0.13 0.14 0.15

Frequency

p‐factor

Distribution of p‐factor at TII Sites

Mean = 0.071St Dev = 0.016

Page 12: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 9

Figure 16.1.5: Thematic Mapping of p-factors at TII TMU Sites

 

Page 13: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 10

The mapping shows an influence of geography on the p-factor, and hence on the shape of the traffic flow profile. There is a pattern of low p-factor values in the northwest and border regions, and to a lesser extent through the Greater Dublin Area. Higher values are found in the west/southwest regions.

As a result of the above findings, it is appropriate to develop a range of traffic flow profiles which reflect the different patterns across the Country, effectively reducing the standard deviation in p-factors within each area and facilitating a more accurate estimation of the 24-hour traffic flow from a short period traffic count. The following geographic regions have been identified:

Dublin;

Mid-East (Kildare, Meath & Wicklow);

Mid-West (Limerick, Clare & North Tipperary);

Midland (Laois, Longford, Offaly & Westmeath);

South-East (Carlow, Kilkenny, Wexford, South Tipperary & Waterford);

West (Galway, Mayo & Roscommon);

Border – West (Donegal, Sligo & Leitrim);

Border – East (Louth, Monaghan & Cavan);

South-West (Kerry);

South-West (Cork County); and

South-West (Cork City).

The relevant Traffic Flow Profiles for these areas are outlined in Appendix A of this PAG Unit. A series of examples outlining the conversion of short period traffic counts to 24-hour weekday totals are provided:

Example 1: Conversion of Short Period Traffic Count to a 24-hour total. Consider a traffic count covering the period from 08:00 to 09:00 on the N26 between Foxford and Swinford, Cloongullane, Co. Mayo. The traffic count reports a traffic flow of 268 vehicles per hour (2-way). Step 1: Identify the relevant geographical location. For this example, the relevant profiles are

for the West. Step 2: Identify the proportion of daily traffic flow that relates to the short period count. From

Appendix A it can be seen that the proportion of the 24-hour flow occurring during the period 08:00 – 09:00 is 0.077.

Step 3: Perform the calculation. The 24-hour estimate is therefore as follows 268/0.077 = 3,480 The 24-hour estimate is therefore 3,480 vehicles

 

Page 14: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 11

Example 2: Conversion of Short Period Traffic Count to a 24-hour total. Consider a traffic count covering the period from 08:00 to 09:00 and 14:00 – 16:00 on the N11 at Ferrycarraig, Co Wexford. The traffic count reports a traffic flow of 2,988 vehicles (2-way) during the combined hours. Step 1: Identify the relevant geographical location. For this example, the relevant profiles are

for South East. Step 2: Identify the proportion of daily traffic flow that relates to the short period count. From

Appendix A it can be seen that the proportion of the 24-hour flow occurring during the period 08:00 – 09:00 and 14:00 – 16:00 is 0.225. (This is calculated as the sum of 0.086, 0.067 and 0.072 which cover the three individual time periods.

Step 3: Perform the calculation. The 24-hour estimate is therefore as follows: 2,988/0.225 = 13,280 The 24-hour estimate is therefore 13,280 vehicles.

Confidence Intervals for expansion factors for each hour to the 24-hour total are also presented in Appendix A, based on a 95% Confidence Interval. The table shows those values which yield intervals greater than +20% in grey, suggesting that use of single-hour data from these periods will not yield a reliable result. For the estimation of 24-hour flow for traffic counts from these periods, they should be combined with flows from other periods to improve the accuracy of the estimation. In the case of counts from multiple periods, the 95% Confidence Interval may be assumed as the lowest value of the various hours for which data is available.

Page 15: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 12

5. Factoring by Day of Week

Once a 24-hour estimate is derived, a further calculation can be undertaken to convert this to an average weekday (or to estimate 24-hour flows that might arise on other weekdays).

Figure 16.1.6 shows a weekly flow profile based on data from the network of TII TMU sites. The data shows a gradual increase in the 24-hour traffic flow from Monday through to a peak on Friday, with a reduction in total flows at weekends.

Figure 16.1.6: Weekly Flow Profile

Note that Weekly Average Daily Traffic (WADT) refers to the mean 24-hour traffic flow across a week. This is not to be confused with a Weekday Average, which represents a 24-hour average for the Monday to Friday period. Geography is not considered to be a significant factor in converting from a 24-hour estimate to WADT.

A series of Weekly Flow Indices have been generated using this data to enable the conversion from a specific day to a Weekly Average day. These are outlined in Appendix B of this PAG Unit. An example of a conversion from a single day to an estimate of the Weekly Average Daily Traffic is provided in Example 3.

Example 3: Conversion of 24-hour flow to a Weekly Average Day. Consider a 24-hour traffic volume collected on a Tuesday. The traffic count reports a traffic flow of 12,500 vehicles over the 24-hours. Step 1: Identify the relevant day, which in this case is a Tuesday. Step 2: Extract the correct factor to convert to Weekday Average Day. For a Tuesday,

Appendix B shows that the relevant factor is 0.99 Step 3: Perform the calculation. The WADT is therefore as follows: 12,500*0.99 = 12,375 The WADT estimate is therefore 12,375 vehicles.

0.800

1.000

1.200

Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Day of Week 

Weekly Flow Profile

Page 16: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 13

6. Factoring by Month of Year

The final calculation is to convert WADT to AADT. This final stage recognises the significant variation that can occur in traffic flows across the year. Such variations arise as a result of:

The seasonal effects of tourism/public holidays;

Reductions in school/work trips during holiday periods;

The effect of annual leave on the volume of commuting trips during the summer months; and

Changes in the level of retail activity.

This effect is also referred to as seasonality, which describes the variability in traffic flow at different times of the year. To demonstrate the scale of the seasonality effect, Figure 16.1.7 shows WADT for each month in relation to AADT. The data shows that daily traffic flows peak during the summer period, with the lowest flows during the months of December and January.

Figure 16.1.7: Monthly Flow Profile

It is noted that the relatively low level of traffic flow during December and January is influenced by the Christmas period where traffic flows reduce significantly over a period of 2 weeks. This therefore reduces WADT for that period. Likewise, the high levels of traffic in August are driven by the increased levels of tourism and leisure movements which tend to take place outside peak periods.

 

0.800

0.900

1.000

1.100

1.200

Proportion of AADT

WADT by Month

Page 17: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 14

For the purpose of this PAG Unit, the monthly indices for December and January have been adjusted to remove the influence of the Christmas Period. In this regard, these relationships do not hold for short period traffic counts undertaken during periods of abnormal traffic flow (i.e. Christmas, Easter or Bank Holiday weekends). Furthermore, care should be taken when using short period traffic counts for July and August to extrapolate to AADT due to the influence of tourist traffic on the 24-hour traffic flow profile. Where possible, some conversion to 24-hour data using the TII TMU sites or temporary count sites should be considered.

Monthly Flow Indices to account for the influence of seasonality are outlined in Appendix C of this PAG Unit. An example of a conversion from a single day to an estimate of the Weekly Average Daily Traffic is provided in Example 4.

Example 4: Conversion of Weekly Average Day to Annual Average Day. Consider a Weekly Average Daily Traffic Flow of 10,000 vehicles on a site in Co. Roscommon during March. This is to be converted to an estimate of AADT. Step 1: Identify the relevant month, which in this case is March. Step 2: Extract the correct factor to convert to Annual Average Day. For the Month of March,

Appendix C shows that the relevant factor is 1.04. Step 3: Perform the calculation. The AADT is therefore as follows: 10,000*1.04 = 10,400. The AADT estimate is therefore 10,400 vehicles.

Page 18: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

Page 15

7. Dealing with Multiple Datasets

In some cases, a selection of data may be available to support the estimation of AADT. For example, a particular location may provide data for March and a separate dataset for May, and estimating AADT from these datasets individually will provide different results.

Whilst some variability in the results is expected, it is noted that the procedure outlined in this PAG Unit is intended to give no more than an indicative estimate of AADT based on short period traffic counts. Where more detailed estimates are required, reference should be made to PAG Unit 16.0: Estimating AADT on National Roads.

Where multiple results for a single site can be derived based on alternative data, the user should take a practical view as to the conclusions that can be inferred from them. Obviously the more data that is captured within the short period traffic count; the more robust will be the final calculation.

Page 19: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

 

Page 16

Appendix A: Sample Traffic Flow Profiles (2015)

Page 20: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 17

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowDublin Region

Page 21: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 18

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowMid East Region

Page 22: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 19

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowMid West Region

Page 23: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 20

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowMidland Region

Page 24: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 21

 

0.000

0.020

0.040

0.060

0.080

0.100

0.120

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowSouth‐East Region

Page 25: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 22

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowWest Region

Page 26: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 23

 

0

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

0.1

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowBorder (West) Region

Page 27: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 24

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowBorder (East) Region

Page 28: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 25

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowSouth‐West (Kerry) Region

Page 29: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 26

 

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowSouth‐West (Cork County) Region

Page 30: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 27

 

Hourly Traffic Flow as a Proportion of 24-hour Traffic Flow

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Proportion of Total D

aily Flow

Hour Beginning

Hourly Traffic Flow as a Proportion of 24‐Hour Traffic FlowSouth‐West (Cork City) Region

Page 31: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 28

Region Hour Ending

01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00

Dublin Region 0.008 0.004 0.003 0.004 0.007 0.013 0.037 0.077 0.081 0.066 0.055 0.055

Mid East 0.006 0.004 0.003 0.003 0.005 0.012 0.044 0.071 0.078 0.062 0.053 0.053

Mid West 0.006 0.004 0.003 0.003 0.004 0.008 0.023 0.061 0.084 0.065 0.056 0.057

Midland 0.006 0.004 0.003 0.003 0.004 0.009 0.023 0.050 0.077 0.065 0.053 0.055

South East 0.005 0.004 0.002 0.002 0.003 0.009 0.027 0.060 0.086 0.067 0.058 0.059

West 0.007 0.004 0.003 0.002 0.003 0.008 0.023 0.055 0.077 0.070 0.060 0.063

Border (West) 0.006 0.003 0.002 0.002 0.003 0.005 0.014 0.042 0.073 0.064 0.056 0.060

Border (East) 0.006 0.004 0.003 0.003 0.005 0.012 0.026 0.049 0.078 0.063 0.056 0.059

South-West (Kerry) 0.005 0.003 0.002 0.002 0.002 0.005 0.016 0.040 0.068 0.063 0.062 0.067

South-West (Cork County) 0.005 0.003 0.003 0.003 0.004 0.009 0.027 0.072 0.082 0.064 0.054 0.056

South-West (Cork City) 0.006 0.003 0.003 0.003 0.004 0.009 0.023 0.069 0.082 0.063 0.052 0.053

 

Region Hour Ending

13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24:00

Dublin Region 0.059 0.062 0.063 0.069 0.083 0.088 0.075 0.054 0.039 0.031 0.022 0.014

Mid East 0.056 0.058 0.061 0.066 0.080 0.093 0.080 0.053 0.037 0.028 0.019 0.012

Mid West 0.060 0.063 0.064 0.072 0.083 0.093 0.075 0.052 0.038 0.028 0.018 0.011

Midland 0.058 0.060 0.063 0.068 0.076 0.088 0.071 0.049 0.036 0.027 0.018 0.010

South East 0.062 0.065 0.067 0.072 0.082 0.096 0.077 0.050 0.036 0.026 0.017 0.010

West 0.065 0.068 0.070 0.075 0.083 0.095 0.082 0.056 0.040 0.030 0.020 0.013

Border (West) 0.063 0.066 0.068 0.072 0.079 0.088 0.071 0.049 0.037 0.027 0.019 0.011

Border (East) 0.063 0.065 0.067 0.072 0.078 0.091 0.075 0.053 0.038 0.028 0.019 0.011

South-West (Kerry) 0.068 0.068 0.071 0.076 0.083 0.092 0.075 0.049 0.034 0.025 0.017 0.010

South-West (Cork County) 0.059 0.062 0.063 0.069 0.083 0.088 0.075 0.054 0.039 0.031 0.022 0.014

South-West (Cork City) 0.056 0.058 0.061 0.066 0.080 0.093 0.080 0.053 0.037 0.028 0.019 0.012

95% Confidence Intervals for 24-hour Flow Estimations

Page 32: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 29

Region Hour Ending

01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00

Dublin Region 11% 4% 3% 6% 17% 26% 31% 47% 38% 21% 15% 17%

Mid East 5% 4% 4% 4% 5% 11% 35% 35% 29% 18% 12% 12%

Mid West 4% 4% 5% 5% 4% 8% 20% 53% 49% 16% 16% 19%

Midland 4% 4% 4% 5% 5% 10% 24% 38% 67% 48% 36% 37%

South East 3% 5% 4% 4% 4% 9% 25% 31% 44% 14% 8% 10%

West 9% 3% 4% 5% 5% 10% 32% 57% 64% 53% 37% 44%

Border (West) 5% 4% 4% 4% 4% 8% 17% 46% 69% 44% 40% 43%

Border (East) 6% 5% 4% 5% 7% 16% 41% 33% 55% 20% 11% 13%

South-West (Kerry) 6% 4% 3% 3% 6% 12% 29% 57% 80% 24% 34% 43%

South-West (Cork County) 4% 3% 4% 4% 7% 13% 27% 64% 58% 34% 27% 27%

South-West (Cork City) 10% 6% 6% 6% 17% 32% 44% 110% 145% 93% 74% 73%

 

Region Hour Ending

13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24:00

Dublin Region 21% 22% 21% 21% 32% 41% 30% 16% 14% 11% 13% 14%

Mid East 11% 12% 15% 16% 20% 32% 30% 18% 13% 13% 8% 6%

Mid West 22% 24% 18% 17% 23% 36% 19% 12% 10% 8% 8% 5%

Midland 39% 41% 42% 45% 52% 68% 52% 35% 26% 19% 13% 7%

South East 12% 11% 14% 14% 14% 27% 20% 19% 10% 7% 7% 4%

West 44% 50% 52% 59% 65% 75% 69% 50% 41% 33% 20% 14%

Border (West) 45% 44% 45% 46% 53% 59% 48% 31% 25% 18% 14% 8%

Border (East) 15% 20% 17% 15% 20% 29% 21% 15% 11% 8% 5% 5%

South-West (Kerry) 38% 32% 33% 33% 25% 31% 28% 18% 15% 13% 12% 10%

South-West (Cork County) 28% 30% 31% 34% 43% 52% 41% 26% 20% 15% 12% 8%

South-West (Cork City) 80% 84% 85% 92% 117% 140% 110% 71% 54% 41% 32% 21%

Page 33: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

 

Page 30

Appendix B: Weekly Flow Indices

Page 34: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 31

Daily Traffic Flow as a Proportion of WADT

Region Day

Monday Tuesday Wednesday Thursday Friday Saturday Sunday Dublin Region 1.02 1.07 1.09 1.09 1.11 0.85 0.77

Mid East 1.00 1.03 1.05 1.06 1.13 0.89 0.84

Mid West 0.99 0.99 1.02 1.04 1.16 0.91 0.88

Midland 0.99 1.00 1.03 1.04 1.16 0.91 0.88

South East 0.99 1.02 1.04 1.06 1.14 0.90 0.84

West 0.99 1.02 1.04 1.05 1.14 0.92 0.84

Border (West) 0.99 1.00 1.02 1.03 1.14 0.94 0.88

Border (East) 0.99 1.01 1.03 1.04 1.14 0.94 0.85

South-West (Kerry) 0.98 0.99 1.01 1.03 1.12 0.97 0.90

South-West (Cork County) 1.00 1.04 1.07 1.08 1.14 0.87 0.80

South-West (Cork City) 1.01 1.07 1.09 1.10 1.13 0.85 0.74 Note: Proportion of WADT measures the level of the 24-hour flow for any day against the weekly average day (i.e. traffic flow for a Thursday in the Midland region is 1.04 times the Weekly Average Daily Traffic).  

 

Page 35: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

Page 32

Weekly Flow Indices – Regional Breakdown

Region Day

Monday Tuesday Wednesday Thursday Friday Saturday Sunday Dublin Region 0.98 0.94 0.92 0.92 0.90 1.18 1.29

Mid East 1.00 0.97 0.95 0.94 0.89 1.12 1.19

Mid West 1.01 1.01 0.98 0.96 0.86 1.10 1.14

Midland 1.01 1.00 0.97 0.96 0.86 1.10 1.14

South East 1.01 0.98 0.96 0.95 0.88 1.12 1.19

West 1.01 0.98 0.96 0.95 0.87 1.09 1.19

Border (West) 1.01 1.00 0.98 0.97 0.87 1.06 1.14

Border (East) 1.01 0.99 0.97 0.96 0.87 1.06 1.18

South-West (Kerry) 1.02 1.01 0.99 0.97 0.89 1.03 1.11

South-West (Cork County) 1.00 0.96 0.93 0.93 0.87 1.15 1.26

South-West (Cork City) 0.99 0.94 0.92 0.91 0.88 1.18 1.35 Note: The Index is the factor that is applied to the 24-hour total to convert it to WADT

Page 36: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

 

Page 33

Appendix C: Monthly Flow Indices

Page 37: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

 

Page 34

WADT for each month as a Proportion of AADT

Region Month

Jan. Feb. March April May June July Aug. Sept. Oct. Nov. Dec. Dublin Region 0.91 0.98 0.98 1.01 1.02 1.03 1.03 1.01 1.04 1.02 0.99 0.97

Mid East 0.88 0.97 0.98 1.03 1.02 1.04 1.06 1.08 0.98 1.01 1.01 0.95

Mid West 0.83 0.93 0.95 1.01 1.04 1.04 1.10 1.11 1.07 1.02 0.97 0.92

Midland 0.86 0.96 0.97 1.02 1.03 1.03 1.06 1.07 1.06 1.02 0.99 0.93

South East 0.87 0.95 0.97 1.02 1.03 1.03 1.08 1.08 1.04 1.02 0.99 0.93

West 0.85 0.94 0.95 1.02 1.03 1.04 1.10 1.11 1.05 1.02 0.97 0.91

Border (West) 0.80 0.93 0.95 1.03 1.04 1.05 1.13 1.16 1.04 1.02 0.95 0.90

Border (East) 0.86 0.97 0.98 1.02 1.02 1.03 1.07 1.07 1.02 1.02 0.99 0.96

South-West (Kerry) 0.76 0.84 0.89 1.02 1.08 1.10 1.24 1.28 1.08 1.00 0.88 0.84

South-West (Cork County) 0.76 0.84 0.89 1.02 1.08 1.10 1.24 1.28 1.08 1.00 0.88 0.84

South-West (Cork City) 0.91 0.99 0.99 1.02 1.02 1.02 1.02 1.00 1.04 1.02 1.01 0.96 Note: Proportion of AADT measures the level of the WADT for each month against AADT (i.e. WADT in March in the South East region is 0.97 times the AADT).    

Page 38: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039 Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts October 2016

 

Page 35

Monthly Flow Indices – Regional Breakdown

Region Month

Jan. Feb. March April May June July Aug. Sept. Oct. Nov. Dec. Dublin Region 1.10 1.02 1.02 0.99 0.98 0.97 0.97 0.99 0.96 0.98 1.01 1.03

Mid East 1.13 1.03 1.02 0.97 0.98 0.96 0.94 0.93 1.02 0.99 0.99 1.06

Mid West 1.20 1.07 1.05 0.99 0.96 0.96 0.91 0.90 0.94 0.98 1.03 1.09

Midland 1.16 1.05 1.03 0.98 0.97 0.97 0.94 0.93 0.94 0.98 1.01 1.08

South East 1.15 1.05 1.04 0.98 0.97 0.97 0.93 0.92 0.96 0.98 1.01 1.08

West 1.18 1.06 1.05 0.98 0.97 0.96 0.91 0.90 0.95 0.98 1.03 1.09

Border (West) 1.24 1.08 1.05 0.97 0.97 0.95 0.88 0.86 0.96 0.98 1.06 1.11

Border (East) 1.16 1.03 1.02 0.98 0.98 0.97 0.94 0.93 0.98 0.98 1.01 1.05

South-West (Kerry) 1.31 1.19 1.12 0.98 0.93 0.91 0.81 0.78 0.93 1.00 1.14 1.19

South-West (Cork County) 1.31 1.19 1.12 0.98 0.93 0.91 0.81 0.78 0.93 1.00 1.14 1.19

South-West (Cork City) 1.09 1.02 1.01 0.98 0.98 0.98 0.98 1.00 0.96 0.98 0.99 1.04 Note: The Index is the factor that is applied to WADT to convert it to AADT.

Page 39: Project Appraisal Guidelines for National Roads Unit 16.1 ...TII Publication Number PE-PAG-02039 Activity Planning & Evaluation (PE) Document Set Select Document Set Stream Project

TII Publications PE-PAG-02039Project Appraisal Guidelines for National Roads Unit 16.1 - Expansion Factors for Short Period Traffic Counts

October 2016

 

 

 

 