Project and Key Indicator scorecard – Q2 2014/15 results:
Basingstoke and Deane Borough Council Performance Management
Portfolio Holder
Q1 Total
Q2 Total
Q3 Total
Q4 Total
Economic
Improving economic vitality
P1 Impact of Basingstoke Town Centre Programme – Top of the Town
T Reid
P2 Regeneration of Basing View J Izett
Increasing skills and employment
P3 ESIMeC action plan
C Sanders
K1 NEET figures within the Borough
C Osselton Annual indicator.
Getting connected
P4 Junction 6 improvement work M Ruffell
K2 Broadband coverage across the Borough
R Jayawardena
Annual indicator.
Environmental
Planning policies that safeguard local distinctiveness
P5 Development of Neighbourhood Plans
M Ruffell
Protecting our environment
K3 Reduction in CO2 emissions
H Eachus 2013/14 results
Annual indicator. 2014/15 Results due in Q1 2015/16 report
K4 Open spaces managed for biodiversity
H Eachus Annual indicator.
K5 Increase in recycled household waste H Eachus
K6 Contamination rate of recycled household waste
H Eachus
K7 Clean streets – reduction in litter
H Eachus
Social
Creating neighbourhoods where people feel safe and want to live
P6 Manydown development
J Izett
K8 Reduction of crime in the borough
R Jayawardena
Annual indicator.
K9 New homes delivered in the year
M Ruffell / T Reid
Annual indicators Total new
homes
Afford -able homes
K10 Homelessness T Reid
Maintaining a reputation for quality arts and leisure
P7 Development of the Leisure Park J Izett
K11 Customer satisfaction with council funded leisure facilities and key events
C Osselton B/Stoke Festival
Anvil Arts
Sports facilities
2 of 32
Supporting active, healthy and involved communities
P8 Community plans and local decision making initiative
H Eachus
K12 Visits to council-funded sports facilities C Osselton Annual indicator.
Organisational
Operational effectiveness
K13 Customer satisfaction with the service provided by the council
H Eachus
K14 Customer Complaints
H Eachus
K15 Staff turnover rates (%)
C Sanders
K16 % workdays lost per quarter to sickness absence
C Sanders
K17 Debt collection rates (%) J Izett
K18 Treasury management J Izett Annual indicator.
K19√ Annual audit J Izett 2013/14 results
K20 Planning Development M Ruffell
Key Key projects/programmes have a reference number prefaced with a “P”
The “RAG” status for the project applies the following approach: indicators as appropriate:
1. Green: on target. Work in progress or complete in line with project plan
2. Amber: Work in progress but with some deviation to the project plan activities or schedule.
3. Red. Project has significant deviations to the project plan activities or schedule.
Corporate key performance indicators have a reference number prefaced with a “K”
The “RAG” status for the key indicators applies one of the following approaches to individual indicators as appropriate:
4. Green: on target (< 1% variance to target)/over achieved; Amber: =>1% and <10% variance on target; Red: =>10% variance on target
5. Green = 2+ periods improved trend/ Amber = stable or 1 period improved or 1 period downward trend/ Red = 2+ periods downward/reduced trend
NB Where a variance against target is shown, this is represents the percentage of under/overachievement the results are against the target. Therefore where a target is 300 and the result is 250, the variance would be 16.67% i.e. 50 as a percentage of 300 or the difference between the actual and the target, as a percentage of the target. In this case: (250-300)/300
Year end 2013/14 - Project and Key Indicator result details:
3 of 32
Improving economic vitality
Project/ Activity P1. Impact of Basingstoke Town Centre Programme - Top of Town
RAG status
Description Renew Basingstoke's Top of Town area including utilisation of the High Street innovation fund.
Current status; milestones, key deliverables
CCTV review complete and reported;
Unsuccessful at procuring market operator;
Progressing evaluation of major development sites in the Masterplan;
Christmas event planning underway;
Procurement of event programme for 2015/16 linking with Arts and Culture CoG work;
Conservation area review paused;
Procurement of expert advice on Business Improvement Districts underway.
Identified risks/issues
Market improvement - to procure expert advice to inform next steps to revitalise the market;
Recruitment of resource underway to continue conservation area review - work currently paused.
Planned completion date
2017
Return to top
Project/Activity P2. Regeneration of Basing View RAG status
Description Regenerate Basing View to establish a 21st century business destination, creating new commercial and retail space.
Current status; milestones, key deliverables
Sale completed and construction commenced for JLP/Waitrose store - completion due in Nov 2015.
Significant progress made with public realm works, with the highway works well advanced and completion due by 31 October.
Progress made with negotiating legal agreements for Landscape Licences.
Development options report prepared by Muse Developments to examine delivery strategy for future phases.
Marketing campaign commenced with launch of Basing View brand and marketing material, including new web site.
Negotiations progressed to assess development options for Normandy House and the Glasshouse.
Identified risks/issues
Public realm contracts expected to remain within anticipated budget with unspent contingency to be returned to the Basing View Reserve.
Viability of future schemes to be the subject of on-going discussions with Muse. The hotel project is a particular area of focus.
Planned completion date
15 year plan
Return to top
4 of 32
Increasing skills and employment
Project/Activity P3. ESIMeC action plan RAG status
Description Deliver the ESIMeC action plan, providing a range of skills initiatives in partnership with Business and educational organisations
Current status; milestones, key deliverables
Third transnational event successfully delivered in Basingstoke in September 2014. Very positive engagement from local stakeholder.
ESIMeC action plan is now being delivered by Basingstoke Employment and Skills Zone.
o Three core priorities identified: supporting people back into employment, school engagement and employability skills and promoting STEM.
o Actions currently being implemented include: careers fair, job clubs, STEM resources and support for primary school teachers, business engagement event A Question of Education.
o Next stage will be to develop and implement a performance monitoring framework for the action plan. A task and finish group has been set up to look into this.
o Next steps also include identifying funding avenues to enhance the implementation of the Local Action Plan.
Identified risks/issues
Failure to deliver project and action plan - minimal risk due to effective project management arrangements in place and regular review and monitoring of progress
Planned completion date
2016
Return to top
5 of 32
K1 NEET figures within the Borough Target Previous position
Current position
RAG
K1.1 Official NEET figure for the Borough No increase 285 Due April 2015
K1.2 Number (%) of population in the 16-18 age range (within the Borough)
No increase 3.56% Due April 2015
K1.3 Number (%) of NEETs as a percentage of the total population aged 16-18
No increase 4.76% Due April 2015
NB above target is guideline only to show performance and/or improvement against previous years
(The comments are unchanged from 2013-14 Year End report)
Comment on results
The number of NEETs has increased by 17 since the same period last year. At the same time the % of the population aged 16-18 has decreased creating a larger increase in real terms. The ‘Your Big Say’ survey highlighted that there is a lack of clarity about the training opportunities that exist and how to access them following the demise of Connections which might account for the slight increase in NEETs. To help to address this issue the council is refreshing the Youth Strategy and action plan. Enterprise M3 is also looking at this issue and is working on a project to improve careers advice and guidance for young people.
Identified issues
The annual average is calculated as an average of figures from November, December and January for each year. This is done to avoid the annual peak which is seen at the change of the academic year.
Due to a change in the way that young people are counted the figures from April 2011 onwards are not directly comparable to those before that date. This is because:
A) The parameters for defining age changed from actual age to academic age; B) The parameter for defining area changed from where people were schooled to
their home postcode.
However, as the number of NEETs is larger or smaller dependent on population size, it is recommended that the percentage of people aged 16 to 18 who are NEET is also monitored alongside the raw data.
It is also recommended that the number of young people who are NEET is monitored as a percentage of total population aged 16-18 to indicate how significant the numbers of NEETs are. The percentage of the population aged between 16 and 18 who were NEET in 2012/13 was 4.41 %. The percentage for 2013/14 was 4.76 %.
Proposed actions
To also record the percentage NEET figure
Work with Basingstoke Consortium, BCoT and QMC and Basingstoke Skills Zone to promote NEET programmes
Look at signposting as part of the Youth Strategy
Return to top
6 of 32
Getting connected
Project/Activity P4. Junction six improvement work RAG status
Description Working in partnership with HCC and the Highways agency ensure delivery of road improvements at M3 junction 6 and Black Dam
Current status; milestones, key deliverables
Work started on 12th October and is scheduled to complete in June 2015.
Identified risks/issues
Issues remain as they were in Q1 i.e. the disruption this infrastructure project could create during the implementation phase. Officers at the HA HCC and Basingstoke and Deane are working closely to proactively manage any potential impact.
Planned completion date
2017
Return to top
7 of 32
K2 Broadband coverage across the Borough Target Previous position
Current position
RAG
K2.1 Improvement (%) in overall broadband coverage - rural area
TBC
Information not yet
available from HCC
Due April 2015
K2.1.1 Total broadband coverage - rural area TBC Information not yet available from HCC
Due April 2015
K2.2 Improvement (%) in overall broadband coverage - urban area
TBC 3.90% Due April 2015
K2.2.1 Total broadband coverage - urban area TBC 86.30% Due April 2015
Comment on results
K2.1 Improvement (%) in overall broadband coverage - rural area. Figures were expected from HCC this autumn. However, HCC have stated that they are unable to provide information on rural coverage that we have requested, due to confidentiality issues imposed upon them under the terms of their contract with Openreach. Information from HCC has only been provided in the form of the number of cabinets upgraded under the scheme and the areas those cabinets cover. Information on which cabinets have been upgraded will be available each quarter, once the works are complete or the deployment phase ends.
It should also be noted that the HCC’s broadband programme is separate to the work being carried out under Openreach’s National Roll out.
K2.2 The Improvement (%) in overall broadband coverage and total broadband coverage in the urban area. The improvement (%) in overall broadband coverage and total broadband coverage for the urban areas has come through the upgrading of 7 cabinets due to BDBC's lobbying work and through Openreach's in-fill works. LIF funding can be used to enable upgrades to take place and Ashford Hill and Viables have been identified as two of the specific targets
Identified issues
As above.
Proposed actions
As for the last quarter update the key action is to continue to work with Openreach on the national roll out plans, HCC with the rural broadband programme and Enterprise M3 with its broadband improvement programme to deliver superfast broadband across the borough. A more accurate checking facility is now available on HCC's website. HCC is undergoing 1 of only 3 national pilots looking at improving the missing 90% to 95% coverage; more information will be available after the tendering process is complete.
Return to top
8 of 32
Planning policies that safeguard local distinctiveness
Project/Activity P5. Support the development of Neighbourhood plans
RAG status
Description Working with Parish Councils and community groups to support the development of Neighbourhood Plans
Current status; milestones, key deliverables
The council is in the process of working with communities on 12 Neighbourhood Plans/Orders. 2 of these were designated in October 2014. Each plan/order is working to a different timeframe with Bramley, Oakley and Whitchurch being the most advanced. Bramley submitted their draft plan to the council for comment in November
Identified risks/issues
The timeframes for neighbourhood plans fall outside the control of the Borough Council so planning officer support for the plans remains difficult to gauge.
Planned completion date
2017
Return to top
9 of 32
Protecting our environment
K3 Reduction in CO2 emissions Target Previous position
Current position
RAG
K3.1 Reduction (%) of CO2 emissions from our own operations by 2016 (from 2012 baseline)
15.00% 11% 5%
K3.2 Achievement (%) of CO2 emissions target N/A 73% 33%
(The comments are unchanged from Q1 report)
Comment on results
Performance has dipped slightly compared to 2013/14. Whilst operational mileage has decreased in the last 12 months resulting in an improvement in carbon emissions from this source, energy consumption has increased in several council owned buildings, including the John Arlott Pavilion, Whiteditch Depot and Pavilion and Winklebury Sports Complex / Ball Park and Russell Howard Pavilion.
Identified issues
In terms of the John Arlott Pavilion, a new electricity meter was recently installed, and the installation company are currently querying the change in consumption that has been experienced with the energy provider.
This is a similar position in respect of the Whiteditch Depot, which also had a new meter fitted when solar panels were installed. Updated meter readings are being provided, in addition to clarification of which charging rates should be applied. Winklebury Sports Complex / Ball Park has seen an increase in gas consumption over the last 12 months, which is as a result of water leak, which required additional heating (and dehumidifiers) to be in operation for a four week period. Gas consumption has also increased at the Russell Howard Pavilion, which is as a result of more intensive use of the building to support activities, meaning that the heating has been in operation on more occasions than in the previous 12 months.
Proposed actions
An update will be provided to the Performance Panel in 2015 once the metering issue has been fully identified and addressed.
The issue of energy consumption at Council owned facilities will be raised regularly with those sites managers with responsibility for the buildings, to promote the need to switch off lighting and heating when they are not required. To supplement these actions, further energy efficient features will be installed within the campus buildings when maintenance activities are undertaken, in addition to the replacement of a petrol powered pool car, with an electric vehicle, which will further assist in reducing emissions from council vehicles.
Return to top
10 of 32
K4 Open spaces managed for biodiversity Target Previous position
Current position
RAG
K4.1 Increase in the amount of council open spaces managed for biodiversity interest
+1 Ha 32.5 ha Due April 2015
NB above target is guideline only to show performance and/or improvement against previous years
(The comments are unchanged from 2013-14 Year End report)
Comment on results
An additional 3.5 ha of land at the Par 3 golf centre is now maintained on a twice a year cut and collect regime with efforts being made to attract wild flora.
Identified issues
No identified issues from annual results.
Proposed actions
To retain a target of 1ha increase for 2014/15 (the 3.5ha increase in 2013/14 was very much a “one-off “opportunity)
To adopt management plans in accordance with the GI Strategy to guide future actions, including on the council’s existing Local Nature Reserves
Return to top
11 of 32
K5 Increase in recycled household waste Target Previous
year position
Q2 position (provisional)
RAG
K5.1 Increase (%) in household waste recycled (split by dry, garden waste & glass)
30.00% 25.21% 24.76% -17.47% variance
K5.1.1 Increase (%) in household waste recycled: Dry recyclable in green bin
14.18% 13.15%
K5.1.2 Increase (%) in household waste recycled: Garden waste 2.86% 4.09%
K5.1.3 Increase (%) in household waste recycled: Glass box 6.93% 6.34%
K5.1.4 Percentage household waste recycled at bank sites across the borough
1.26% 1.19%
K5.1.5 Increase (%) in household waste recycled (year on year) -0.53% -0.45%
K5.2 Kg of waste per household (monthly average per quarter)
TBA 51.48
53.36
Comment on results
Quarter 2 figures show a slight reduction in our recycling rate to below 25% and this is mainly due to the reduction in glass being recycled. At the same time garden waste has slightly reduced mainly due to the change in weather. However, we do now have 500 more customers than last year. Figures from Salvation Army for our textiles banks are not yet included. Neither are the figures for the new mixed plastics/beverage cartons.
Identified issues
Industry shows there has been a large decrease in the overall usage of paper nationally which we are starting to see is affecting our material types in the green bin, particularly newspapers and magazines. At the same time our percentage of cans have also slightly reduced.
Proposed actions
Garden Waste – We are preparing for the launch of the 2015 season ready to go live in January including advertising to householders via a bin hanger.
Bring Sites - we have an issue with the bring banks in obtaining our tonnage information but this is being rectified at present and we should see these figures being added shortly and hope they will see our rate increasing.
Our main action for dry recyclables will be a householder pack containing guide to waste and recycling, recycling magnet or similar for within the home and house number stickers for bins which is proposed for early in the new year.
Return to top
NB The waste management results remain provisional until June of the following year. Both year-to-date (YTD) and individual quarter results remain subject to change throughout the year.
12 of 32
K6 Contamination rate of recycled household
waste Target
Previous year
position
Q1 position (provisional)
RAG
K6.1 Contamination rate of recycled waste 10.00% 12.70% 11.98% 19.75%
variance
Comment on results
Our contamination rate has started to rise again but remains the second lowest in Hampshire.
Identified issues
Plastic bags used for recycling then tied up before placing in bags is an area we are working on at present.
Proposed actions
Communications via householder pack.
Return to top
NB The waste management results remain provisional until June of the following year. Both year-to-date (YTD) and individual quarter results remain subject to change throughout the year.
13 of 32
K7 Clean streets Target Pro-rated
target Previous results
Current position
RAG
K7.1 Reduction (%) in litter reports made by the public
-10.00% N/A -18.75% -35.21%
K7.2 Total litter reports made by the public 222 128 247 92.00
K7.3
Impact of "deep clean" programme (% reduction in REMS requests logged two months prior to .vs. two month after deep clean). - 6 monthly programme; results available in Q1 2014/15 and Q3 2014/15
TBA N/A -19.18% 30.00%
Comment on results
Q2 results are also pleasing, showing a reduction from Q2 last year. Down from 72 to 56. Unfortunately 3 more REMs issues were recorded in the two months following the Chineham Deep Clean. This is partly due to the fact that the deep clean focused largely on cutting back vegetation following rapid growth this summer and less on cleansing issues.
Identified issues
None.
Proposed actions
Continue to monitor results of deep cleans
Return to top
14 of 32
Creating neighbourhoods where people feel safe and want to live
Project/Activity P6. Manydown development RAG status
Description As landowner, develop a vision for and achieve exemplar development of Manydown land.
Current status; milestones, key deliverables
BDBC and HCC (joint landowners of Manydown) have undertaken the following work in Q2: completed the work with URS to develop a draft Planning Strategy; completed the work with GVA Grimleys to develop a draft Delivery & Financial Strategy; held some initial discussions with DCLG about their Garden Cities Prospectus; gave initial presentations about Manydown to Wotton St Lawrence and Oakley Parish Councils and South Ham & Buckskin Neighbourhood Partnership.
Identified risks/issues
The BDBC Local Plan EIP and its subsequent approval are delayed.
Planned completion date
2017
Return to top
K8 Reduction of crime in the borough Target Previous results
Current position
RAG
K8.1 Reduction (%) in the level of crime in the borough -3% -4.00% Result due April 2015
(The comments are unchanged from 2013-14 Year End report)
Comment on results
The reduction in level of crime achieved in 2013/14 is 4%. This exceeds the target of 3% (taken from PCC target of 12% over 4 years). Figures are collated from police records.
Identified issues
Priorities for the Community Safety Partnership are identified in the 2013/14 Strategic Assessment currently being collated.
Proposed actions
The Partnership Plan for 2014/15, informed by the 2013/14 data, has recently been developed and identifies where joint action to address the issues is needed
Return to top
15 of 32
K9 New homes delivered in the year Target Previous position
Current position
RAG
K9.1 Total number of new homes delivered in the year (gross)
748.00 303.00 2013/14
results due Oct 2014
K9.2 Total number of new affordable homes (net) 300 77.00 Result due April 2015
NB K9.2 target is as outlined in the Housing and Homelessness Strategy 2013-18; to deliver “at least 300 new affordable (net) homes per annum by the end of the strategy period”.
(The comments are unchanged from 2013-14 Year End report)
16 of 32
Comment on results
New Homes Delivered:
The net number of new dwellings completed in the period was 303 homes, with 242 (net) dwellings completed on large sites (sites of 10 or more units) and 61 units completed on small sites. This was against a target of 748 dwellings per annum set by the Borough Council.
New Affordable Homes delivered:
The Council has not achieved its annual affordable housing target during 2013/14. This downturn had been forecast at the start of the Council’s new Housing and Homelessness Strategy period (2013-18), although it is anticipated that delivery levels may return to target level towards the end of the strategy timeframe.
The 2013/14 results illustrate the total number of but also pinpoints that, because of the regeneration of Freemantle/Taverner/ Westray currently under way, the net figure for 2013/2014 shows the demolition of 49 dwellings but development will not produce new units until 2014/2015. The loss of units overall will be 90 but with 190 homes delivered by the completion of the project in 2016.
Identified issues
New Homes Delivered:
This downward trend in housing delivery is likely to continue whilst no new local plan is in place and existing permissions for housing continue to be built out.
New Affordable Homes delivered:
The results are due to a combination of issues:
A downturn in all new housing delivery (which is the primary source of all new affordable housing delivery within the borough),
Changes to the Government’s affordable housing funding regime and framework from 2011/12 onwards and
The broader economic downturn factors which impact new development.
It should be noted that there is considerably more development and planning activity in 2014 which should account for an increased supply of new affordable homes in 2015
onwards.
Proposed actions
New Homes Delivered:
Moving forward with the Local Plan,
Adopting a positive approach to planning applications which help bolster the supply of housing,
Locally derived housing figure of 748 was reviewed and agreed at Full Council on 27th March 2014
New Affordable Homes delivered:
Continued promotion of potential use of the council’s Affordable Housing Reserve with partners. This has delivered 21 homes in 2013/ 2104 with Sentinel.
Increased emphasis on pursuing alternative initiatives to ameliorate the immediate negative impact of downturn in new delivery (such as homelessness).
On-going high level discussions with Registered Providers to encourage and stimulate their development activities.
Confirmation that use of council land or other resources will be considered to maximise supply identified as a strategic aim within the new Housing and Homelessness Strategy 2013-18.
Return to top
17 of 32
K10 Homelessness Target Pro-rated
target
Previous full year position
Current year to date
position RAG
K10.1 Number of homeless households placed into B&B during the year (total, excl. exceptional circumstances)
<=38 19 57 48
K10.1a Number of homeless households placed into B&B during the year (due to exceptional circumstances e.g. widespread flooding)
0 0 15 3
K10.1.1 # of nights spent in B&B per quarter (includes those place during quarter and those already in B&B when quarter begins)
<=653 327 1495 1212
K10.1.1a
# of nights spent in B&B per quarter (due to exceptional circumstances e.g. widespread flooding)
0 0 311 122
K10.2 Number of homeless households placed into B&B during the year (where unintentionally homeless)
<=12 6 16 9
K10.2a
Number of homeless households placed into B&B during the year (where unintentionally homeless due to exceptional circumstances e.g. widespread flooding)
0 0 15 3
NB above targets are guideline only to show performance and/or improvement against previous years
18 of 32
Comment on results
B&B use continues to be high and in this quarter there has been a marked increase in those who were unintentionally homeless and had to spend time in B&B accommodation. Emphasis continues to be placed on prevention options, but the difficulty in securing suitable alternative accommodation, particularly in the private sector, lies behind the increases noted. We are therefore seeking an increase in the supply of alternative accommodation via our housing association partners
Identified issues
These issues remain unchanged from last quarter
Proposed actions
As last quarter. We are now, from late September, able to make use of the first new properties from housing associations which should reduce future B&B use. Difficulties in securing private sector accommodation remain.
Return to top
Maintaining a reputation for quality arts and leisure
Project/Activity P7. Development of the Leisure Park RAG status
Description Investigate and secure a development partner for the Leisure Park
Current status; milestones, key deliverables
Procurement process drawing to a close and potential partner has presented to Cabinet, the MAP and the project team. There are still some areas yet to be clarified to the satisfaction of both parties and these are being discussed
before further, wider briefings take place. This has meant that the conclusion
of the procurement process has been delayed.
Identified risks/issues
There is a risk that a suitable and financially viable scheme may not be forthcoming and that a development partner will not be secured.
Planned completion date
2015
Return to top
19 of 32
K11 Customer satisfaction with leisure & arts Target Previous results
Current position
RAG
K11.1 Customer satisfaction with Anvil Arts (results to be taken from annual Audience Agency survey)
K11.1.1 Anvil Arts makes a positive contribution to Basingstoke's image (agree or strongly agree)
TBA 88.10% Results due in
Q3/Q4
K11.1.2 Satisfaction with the whole experience provided by Anvil Arts (good or very good)
TBA 95.00% Results due in
Q3/Q4
K11.2 Customer satisfaction with the major council funded sports facilities (Aquadrome, Tadley pool, Golf Centre and Tennis Centre) - % very & fairly satisfied
TBA 89.00% Result due April 2015
K11.3 Customer satisfaction with Basingstoke Festival 90% 93.00% 90.70%
K11.3.1 Number (%) who think that the Festival is something Basingstoke can be proud of
90% 96.20% 92.50%
K11.3.2 Number (%) who would recommend the event(s) they attended
90% 91.40% 89.00% -1.11%
K11.3.3 Number (%) who were satisfied overall with the Basingstoke Festival (total of "very" and "somewhat" satisfied)
90% 91.40% 90.60%
This chart is unchanged from Q1 report
(With the exception of Basingstoke Festival, the comments are unchanged from Q1 report)
20 of 32
Comment on results
Anvil Arts
The Anvil Arts are required to produce an annual audience satisfaction survey every year as part of their core revenue grant. The funding agreement requires results to be available to the Council by 21st April for the previous period. In 2013/14 Anvil Arts were part of a pilot for the Audience Agency and used their national survey tool which was delivered and reported back to the Council in Q3 2013/14. Anvil Arts also has audience reporting obligations to the Arts Council as part of their grant conditions. Council funded sports facilities
The satisfaction level for 2013/14 is above target of 85%. While this is marginally lower than last year, the result is considered to give a more representative view as it is the average of 3 customer surveys conducted over the course of the year across the sites whereas last year it was one year end survey. At 89%, the result still shows a high level of overall satisfaction with key facilities.
Basingstoke Festival
Audience satisfaction rates continue to be high with the Basingstoke Festival now in its third year. Brand recognition continues to increase with residents being very positive about the return of the festival each year as it expands and grows. Particular highlights this year was the town centre street programme and the launch event which involved a fire breathing dragon and dancers from a local dance academy.
Identified issues
Anvil Arts
Anvil yet to decide what tool they will use this year and when
Council funded sports facilities
The greater level of engagement with customers has shown that the vast majority of customers are content with the facilities; analysis of the feedback shows the main issue of dissatisfaction is the time taken to effect repairs and maintenance works.
Basingstoke Festival
As for 2013 (Growing the festival to be regionally or nationally significant will mean needing to attract more resources)
Proposed actions
Anvil Arts
In discussion with Anvil Arts about what tool they will use this year and when the survey will be undertaken.
Council funded sports facilities
An action plan has been agreed with the operators for improving the response rate when repairs and maintenance issues have been identified.
Basingstoke Festival
As for 2013 (Review the final, consolidated results, once received, to understand further areas for improvement for consideration by the Council).
Return to top
21 of 32
Supporting active, healthy and involved communities
Project/Activity P8. Community plans and local decision making initiative
RAG status
Description Encourage communities to prepare community plans; and assess a pilot scheme for local level decision making (the Neighbourhood Partnership for South Ham, Buckskin and Working Wards)
Current status; milestones, key deliverables
The pilot South Ham and Buckskin Neighbourhood Partnership continues to consider issues affecting the two wards; evaluation data from the pilot has been collated and is due to be shared with the Members Advisory Panel by Christmas; South Ham Direct community planning group has reviewed year 1 of its community plan and is planning a refresh; Marnell and Merton community plan (Popley West) has been launched and a plan for Popley East has been consulted on with partners;
Identified risks/issues
Maintaining community involvement; resource commitment from other agencies.
Planned completion date
2014
Return to top
K12 Visits to council-funded sports facilities Target Previous results
Current position
RAG
K12.1 Increase (%) in the number of visits to council-funded sports facilities (includes facilities in 17.2 and council core funded facilities)
1.00% 1,966,774 Result due April 2015
(The comments reflect the final 2013/14 results as reported in Q1 2014-15)
Comment on results
The year-end figure represents an increase of about 13% on 2013/14 attendances, mainly attributable to growth at the Basingstoke Sports Centre.
Identified issues
Most facilities are not yet at capacity and greater footfall is clearly a success in participation and financial terms. However there are occasions where increasing attendances generates a risk of reducing the quality of the customer experience, particularly at peak times where the number of participants reach industry accepted comfort levels.
Proposed actions
At an operational level, the operators are assessing capacity issues as part of reviewing programming and marketing. At a strategic level, an audit of facility needs and participation rates is being undertaken with the Leisure and Recreation Needs Assessment which will inform recommendations for provision through the local plan and swimming strategy work.
Return to top
22 of 32
Operational effectiveness
K13 Customer satisfaction with the service
provided by the council Target
Previous results
Current position
RAG
K13.1 Customer satisfaction feedback through Exit Surveys (response given as satisfied or very satisfied)
90.00% 97.67% 97.63%
K13.1.1 Customer satisfaction with waiting time: Exit survey response given as excellent or good
90.00% 90.67% 90.23%
23 of 32
Comment on results
The results reflect the exit surveys completed July to Sept 2014. A total of 168 surveys have been completed by residents who visited BDBC. The surveys are completed randomly but the areas visited were:
o Corporate reception x 10
o To attend a meeting/supplier /contractor x 7
o Housing/Housing Benefit x 76
o Council tax x 25
o Payments x 43
o Duty Planning x 7
Feedback on wait time from the exit surveys shows that 58.58% rated it excellent and 31.22% rated it as good. Only 8.84% rated as average and 1.36% poor.
Feedback from the Customer Service Advisors is that customers who have waited over 30mins to be seen rarely want to spend time completing an exit survey after they have been seen. To rectify this from Nov the survey questions will be reduced from 12 to 3 to only focus on the performance results and equality information.
The new appointments system is expected to go live in November. This is later than expected due system issues from the supplier. The proposal is to offer time slots during the week in which appointments can be booked for Licensing and Benefits, with a small pilot running for Local Tax.
Identified issues
Customer Service teams have highlighted the current survey has too many questions and customers who have waited a long time do not always have time to provide feedback, which will affect the results
Proposed actions
A new streamline survey will be introduced in Nov to obtain the information required for these results. Full surveys can be undertaken in future at the request of the service area. On-going analysis to identify further areas of improvement continues
Return to top
24 of 32
K14 Customer Complaints Target Pro-rated
target Previous position
Current position
RAG
22.1 Total complaints received (year to date) 496 266 132 297 11.65%
22.1.1 Total complaints received (year on year) 280 297 17.00
22.1.2 Total % change year on year 5%
reduction (of 522)
95% of 280 -8.97% 6.07%
22.2 Number of complaints not responded to within 10 working days (YTD)
0 4 7 3.00
22.2.1 Number of complaints not responded to within 10 working days (year on year)
0 16 7 -9.00
22.2.2 % customer complaints responded to within 10 working days (year on year)
100.00% 94.25% 96.97% 2.72%
NB above targets are a guideline only to show performance against previous years
25 of 32
Comment on results
There has been an increase of 17 from the same period last year. Again the highest number of complaints has been received for Waste and Recycling Shared Service, Community Services and Residents Services - these business units are all customer facing units and have the highest level of contact with residents. While there is a slight increase of complaints for most BU's, the biggest increase is in Community Services. Looking by category, the biggest increase is "complaints against staff". The other main increases are for "delay in service delivery" and "council policy". However, there is a significant drop in the number of complaints logged as "poor performance" and "procedure not kept to". The number justified has also increased from 90 to 105 year on year.
Identified issues
The level of complaints responded outside the 10 working day SLA has decreased from the same period last year. This is a positive result considering the increase in the number of complaints received.
Proposed actions
Review scheduled with SLT to agree way forward on complaints management
Increased management focus on prompt resolution of all complaints
Re-introduce complaints as a standard agenda item at head of service one-to-one meetings
Return to top
26 of 32
K15 Staff turnover rates (%)
(Organisational indicator) Target
Pro-rated target
Previous full year position
Current year to
date position
RAG
K15.1 % total staff turnover (all reasons) 13.14% 6.57% 13.14% 6.70% 1.98%
K15.2 % Staff turnover due to voluntary resignation 6.48% 3.24% 6.48% 3.46% 6.79%
** Table updated to reflect amended results for 2013/14 and 2014/15 targets
NB Chart revised to reflect amended results for 2013/14
Comment on results
The small increase in turnover compared to this time last year reflects the trend nationally. The main reason for this is the improving economic situation which is causing more movement in the jobs market. The HR team analyse exit interview data from staff which are leaving the council to identify whether there are any trends which we need to be concerned about, and so that appropriate interventions can be considered.
Identified issues
To consider if the council's pay and benefits package is competitive and supporting our aspiration to attract and retain high performing, motivated and highly skilled staff.
Proposed actions
A pay benchmarking exercise will be carried out in Q3 to determine whether the council's pay and benefits package is competitive in all areas and in line with our aspiration to be in the upper quartile when compared with neighbouring councils.
Return to top
27 of 32
K16 % workdays lost per quarter to sickness
absence Target
Previous full year position
Current year to
date position
RAG
K16.1 Total work time (%) lost due to sickness absence (current Qtr = YTD)
2.73% 2.73% 1.94%
K16.1.1 Total average workdays lost due to sickness absence 7.10 7.10 2.52
Comment on results
Sickness absence rates continue to reduce in all areas of the council. We maintain our focus on this by regular meetings with the Senior Management Group and one-to-one coaching and support for line managers with their HR Business Partner to build their confidence in dealing with difficult cases. The council has a range of wellbeing interventions available and these have been promoted to staff during the last quarter, including subsidised health checks and free, confidential face-to-face and telephone counselling support.
Identified issues
None
Proposed actions
Continue to maintain the focus on positive and proactive management of sickness absence through regular discussion of performance at Senior Management Group and within Department Management Teams, facilitated by the HR team
Return to top
28 of 32
K17 Debt collection rates (%) Target Pro-rated
target Previous results
Current position
RAG
K17.1 Debt Collection rates (%) by end of next quarter- Sundry
90.00% 90.00% 78.91% 95.04% 5.60%
K17.2 Debt Collection rates (%) by end of next quarter - Property
95.00% 95.00% 99.22% 98.90% 4.11%
K17.3 Collection rates (% of annual amount due) - Council Tax
98.50% 60.00% 29.40% 56.90% -5.17%
K17.4 Collection rates (% of annual amount due) - Business Rates (NDR)
99.20% 62.00% 30.60% 56.40% -9.03%
K17.5 Aged debt outstanding (91+ days) - Total
NA None £
5,311,912.00 £4,735,568.00 -£ 576,344.00
K17.5.1 Aged debt outstanding (91+ days) - Sundry
NA None £
289,202.00 £204,793.00 -£ 84,409.00
K17.5.2 Aged debt outstanding (91+ days) - Commuted/S106
NA None £
22,244.00 £46,098.00 £ 23,854.00
K17.5.3 Aged debt outstanding (91+ days) - Property
NA None £
411,800.00 £414,700.00 £ 2,900.00
K17.5.4 Aged debt outstanding (91+ days) - Council Tax
NA None £
2,592,227.00 £2,329,081.00 -£ 263,146.00
K17.5.5 Aged debt outstanding (91+ days) - Business Rates
NA None £
1,996,439.00 £1,740,896.00 -£ 255,543.00
29 of 32
Comment on results
The quarter 2 result for Council Tax and Business Rates are both slightly below target. however the results should be viewed in the following context:
Targets were re-aligned for 2014/15 to be more challenging for the team and it’s to be noted that council tax percentage rate is on a part with the same time last year.
Business Rate payments are now payable over 12 months instead of 10 and therefore previous years collection rates are not directly comparable. A number of businesses are now paying over 12 instalments.
Processes are in place for both areas to focus on debt, including debt calls which are enabling payment arrangements or direct debit to be set up and payments to be made, debt visits and offering assistance in clearing arrears and advice on the small business rate relief scheme.
There were two committal courts attended in Q2 with continued success. 8 new cases were presented for council tax customers who have not paid for 5+ years. To summarise the results:
o One case paid in full (£5,200) before the hearing
o Total £7,700 cash was received
o 2 individuals received suspended prison sentences pending adherence to payment plans
o 4 warrants of arrest issued (totalling £28,594)
Aged debt has reduced overall with Sundry, Council Tax and Business Rates all showing significant reduction. Commuted/S106 debt has increased however, as has property debt, although not significantly.
Identified issues
Proposed actions
More focus on business rates collection and analysing debt positions and serial defaults to make sure these are being progressed.
Work is continuing with our new enforcement agent in order to try and improve the rate of recovery and to increase the amount received from debtors. We are implementing a new enforcement agency framework agreement.
A further committal court for council tax is taking place in November with 8 cases being heard.
E-texts, e-billing and e-forms are all projects currently underway to improve the quality of service with a view to improving collection rates further
Return to top
30 of 32
K18 Treasury management Target Previous results
Current position
RAG
K18.1 Average portfolio return 2.28% 2.07% Due June
2015
(The comments reflect the final 2013/14 results as reported in Q1 2014-15)
Comment on results
The actual return for 2013/14 was 2.02% compared to target of 2.3%. The continued low interest rate environment and low Gilt yields have meant that very little new longer term investment had been undertaken. As a consequence there was a shortfall of £308,000 as investments were made in the shorter term (yielding 0.6%) rather than the longer term rate of 1.5% assumed in the budget. Although below target, the return is still more than twice the national average for local authorities. The forecast return for 2014/15 at Q1 is 2.18% against a target of 2.3% however due to the higher than expected level of cash balances the forecast is to achieve the target of £3.5m of interest income.
Identified issues
A new strategy has been approved but will not be in place before the start of the new financial year and the interest rate environment remains challenging.
Proposed actions
Implement the new strategy for 2014/15.
Return to top
K19 Annual audit Target Previous results
Current position
RAG
K19.1 Achievement of a clean annual audit opinion Unqualified
opinion Unqualified
Opinion Unqualified
Opinion
Comment on results
The external auditors reported their findings to the Accounts and Audit Committee on 22 September 2014 and were able to give an Unqualified Opinion on the accounts that states they are a true and fair view of the council’s finances.
Identified issues
One minor issue relating to the process for year-end accruals to which officers have given an undertaking to review for the next set of accounts.
Proposed actions
Agreed action with timescale incorporated into the Audit Recommendations maintained by the internal audit section.
Return to top
31 of 32
K20 Planning Development Target Previous results
Current achievement
RAG
K20.1 Major planning applications determined (%) within the statutory timelines, (excluding any separate Planning Performance Agreements)
72.00% 88.89% 79.06% 9.81%
K20.1.1 Total number of Major planning applications determined 9.00 22.00
K20.2 Minor planning applications determined (%) within the statutory timelines, (excluding any separate Planning Performance Agreements)
75.00% 79.37% 77.63% 3.51%
K20.2.1 Total number of Minor planning applications determined 63.00 146.00
K20.3 Other planning applications determined (%) within the statutory timelines, (excluding any separate Planning Performance Agreements)
90.00% 87.97% 89.29% -0.79%
K20.3.1 Total number of other planning applications determined 291.00 589.00
K20.4 Number of planning appeals allowed / lost (as % of overall planning appeals)
33.00% 35.71% 47.86% 45.02%
K20.4.1 Total number of planning appeals decided 14.00 24.00
32 of 32
Comment on results
Good performance has been maintained in Q2 in relation to determining planning applications despite a number of vacancies within the Planning and Development Team. This builds on measures introduced to improve performance at the beginning of the year. Number of appeals allowed exceeds performance target and work has commenced to review the appeal decisions to establish any particular trends, although it is noted that the number of appeals decided in Q2 is relatively modest
Identified issues
Performance in Q3 may be impacted on due to vacant posts (now recruited for) to be filled within the Planning and Development Team.
Proposed actions
Review of appeal decisions and discussion with Team Leaders and Principal Planning Officers to identify any themes in type of appeal being allowed.