Project Administration Instructions PAI No. 2.05 Revised December 2014 Page 1 of 10 SPECIFIC REQUIREMENTS FOR RECRUITING CONSULTANTS BY THE EXECUTING AGENCY 1. This project administration instruction (PAI) explains the specific procedures for recruiting consulting services that executing agencies (EAs) administer under loan projects, grant financed projects, or delegated technical assistance (TA) of the Asian Development Bank (ADB). With respect to delegated TA projects that take the form of an enhanced partnership covered by a Memorandum of Understanding (MOU) between ADB and the recipient government, the recruitment process still follows the procedures outlined in this PAI, except when ADB signs the contract. Read this PAI with PAI 2.01 on general policies, PAI 2.02 on preparatory work, and PAI 2.03 on general procedures. A. Responsibilities of the EA, ADB’s Project Unit, and Loan Consulting Services Unit 2. PAI 2.01 defines the general responsibilities of the EA and ADB in recruiting consulting services that the EA administers. Specific responsibilities for the EA, ADB staff, and project units follow: 3. The EA prepares the (i) procurement plan for the entire project under PAI 3.01 (paras 8-11) and 1.05 (para 5); (ii) consultant recruitment plan for each recruitment under PAI 2.03; (iii) related draft terms of reference (TOR); and (iv) cost estimate. PAI 2.03 details these. undertakes recruitment actions including shortlisting, preparing and issuing requests for proposal (RFP) when applicable; evaluating the proposals when proposals are required; and negotiating and signing the contract with the selected consultants. PAI 2.03 details these actions. Under certain circumstances, when justified, the EA may request ADB to adopt the responsibilities for some recruitment actions, as in paras 12, 14 of PAI 2.01 and para 1 of this PAI. supervises and manages the implementation of the consultant contract under PAI 2.06. 4. ADB’s project unit assists the EA in preparing the procurement plan, the consultant recruitment plan, draft TOR, and cost estimate. It then incorporates these in the project administration manual (Section VI. C) for loan and grant projects, or Concept/TA Paper for delegated TAs. reviews the shortlist, draft RFP (when applicable), proposal evaluation report (when applicable), the EA’s recommendation for contract award, and draft negotiated contract. It seeks endorsement from the Operations Services and Financial Management Department (OSFMD), when required, and notifies the EA of ADB’s decisions or comments on these submissions, as in this PAI. assists the EA in managing the implementation of the consultant contract, and with OSFMD reviews and endorses the EA’s submissions on issues related to contract implementation (such as contract variations). 5. The Loan Consulting Services Unit (LCU) serves as OSFMD’s focal point for handling and communicating with project units and EAs on matters related to consulting services that EAs administer. LCU’s functional coverage includes consulting services for loan projects and for those financed by grants and delegated TAs for which the EA recruits the consultants. The LCU advises on and supports project units in reviewing EA submissions for the consulting services that EAs administer.

Upload: dodang

Post on 06-Feb-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

Project Administration Instructions

PAI No. 2.05 Revised December 2014

Page 1 of 10

SPECIFIC REQUIREMENTS FOR RECRUITING CONSULTANTS BY THE EXECUTING AGENCY

1. This project administration instruction (PAI) explains the specific procedures for recruiting consulting services that executing agencies (EAs) administer under loan projects, grant financed projects, or delegated technical assistance (TA) of the Asian Development Bank (ADB). With respect to delegated TA projects that take the form of an enhanced partnership covered by a Memorandum of Understanding (MOU) between ADB and the recipient government, the recruitment process still follows the procedures outlined in this PAI, except when ADB signs the contract. Read this PAI with PAI 2.01 on general policies, PAI 2.02 on preparatory work, and PAI 2.03 on general procedures. A. Responsibilities of the EA, ADB’s Project Unit, and Loan Consulting Services Unit 2. PAI 2.01 defines the general responsibilities of the EA and ADB in recruiting consulting services that the EA administers. Specific responsibilities for the EA, ADB staff, and project units follow: 3. The EA

• prepares the (i) procurement plan for the entire project under PAI 3.01 (paras 8-11) and 1.05 (para 5); (ii) consultant recruitment plan for each recruitment under PAI 2.03; (iii) related draft terms of reference (TOR); and (iv) cost estimate. PAI 2.03 details these.

• undertakes recruitment actions including shortlisting, preparing and issuing requests for proposal (RFP) when applicable; evaluating the proposals when proposals are required; and negotiating and signing the contract with the selected consultants. PAI 2.03 details these actions. Under certain circumstances, when justified, the EA may request ADB to adopt the responsibilities for some recruitment actions, as in paras 12, 14 of PAI 2.01 and para 1 of this PAI.

• supervises and manages the implementation of the consultant contract under PAI 2.06.

4. ADB’s project unit • assists the EA in preparing the procurement plan, the consultant recruitment plan, draft TOR,

and cost estimate. It then incorporates these in the project administration manual (Section VI. C) for loan and grant projects, or Concept/TA Paper for delegated TAs.

• reviews the shortlist, draft RFP (when applicable), proposal evaluation report (when applicable), the EA’s recommendation for contract award, and draft negotiated contract. It seeks endorsement from the Operations Services and Financial Management Department (OSFMD), when required, and notifies the EA of ADB’s decisions or comments on these submissions, as in this PAI.

• assists the EA in managing the implementation of the consultant contract, and with OSFMD reviews and endorses the EA’s submissions on issues related to contract implementation (such as contract variations).

5. The Loan Consulting Services Unit (LCU) serves as OSFMD’s focal point for handling and communicating with project units and EAs on matters related to consulting services that EAs administer. LCU’s functional coverage includes consulting services for loan projects and for those financed by grants and delegated TAs for which the EA recruits the consultants. The LCU

• advises on and supports project units in reviewing EA submissions for the consulting services that EAs administer.

Page 2: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014 Page 2 of 10

• comments on EA submissions that project units endorsed for OSFMD staff approval. If the

approval is not granted or is granted with conditions, LCU advises specific actions for that project unit or EA.

• communicates with the EA directly on actions the EA needs to take for recruiting consulting services it administers. LCU consults the project unit and updates it with any communication about such justified or emergency cases.

• assists OSFMD staff in charge of capacity building to develop training materials (including case studies) on consultant recruitment for project units and EAs.

B. Advance Contracting 6. To shorten the time for consultant recruitment, the EA may use advance contracting as part of the normal procedure if (i) ADB management approves the further processing of the project; (ii) TOR and budget for the assignment are sufficiently clear to permit consultants to submit informed expressions of interest (EOIs) and, if shortlisted, technical and financial proposals; and (iii) OSFMD has endorsed the project procurement plan for recruiting the consultants. This means that the EA may draft the RFP, shortlist consultants and evaluate them, if the recruitment advertisement has been posted and EOIs received. However, the EA may not sign a contract with a firm before the financing agreement has taken effect, unless ADB management has also approved retroactive financing. The project unit should advise the EA that advance contracting is part of the normal procedure, and that ADB’s support for advance contracting or retroactive financing does not commit ADB to approve the loan/grant project or to finance the recruitment costs. 7. When financing agreement effectivity is imminent, the EA starts contract negotiations with the selected consultant once ADB’s Board of Directors approves the project. If retroactive financing has not been approved for the project, the contract should not be signed until the financing agreement becomes effective. C. Advertising (Consulting Services Recruitment Notice) 8. PAI 2.03 outlines the general requirements for posting a consulting services recruitment notice (CSRN). The EA posts the CSRN in the Business Opportunities section of ADB’s website before shortlisting. For this purpose, the EA sends an e-mail to [email protected], with a copy to the concerned project unit staff, stating all projects under its administration. Once OSFMD receives this, it pre-registers the EA so that an account may be created for the EA for the CSRN posting. The EA’s user ID and password will be emailed to the EA. The minimum posting time for each CSRN is 30 days. The EA may also advertise the requirement in other appropriate media, including a local newspaper or international trade publication. ADB then provides the EA with a standard template for the CSRN that it could follow for the advertisement. D. Consultant’s Expression of Interest 9. To ensure that expressions of interest (EOIs) contain sufficient information to allow EAs to decide on the shortlisting. EAs request EOIs using the standard EOI form. The Business Opportunities website has a link to a standard EOI form for loans/grants that firms can download, complete, and send to the EA. The CSRN template also provides for the EA address (preferably including an e-mail address), where consultants can write to obtain a standard EOI form. The standard EOI form may be submitted as hard or electronic copy. By requiring submission of a standard EOI form, the EA can evaluate all consultants for shortlisting using uniform documents containing the same type of information. National regulations and the EA may require additional information from national firms such as company registration and tax reference numbers to be submitted at the EOI stage. This information can be included as an appendix to the standard EOI form.

Page 3: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014

Page 3 of 10

10. PAI 2.03 (paras 4-8, 10, 16-17) explains how consultants should prepare EOIs and how they should be evaluated during shortlisting. E. Recruiting Consulting Firms 11. The EA follows the general procedures in PAI 2.03 and the following specific requirements to submit the documents for each major step of the recruitment process for ADB’s review and approval.

a) Preparing Shortlist, RFP and Consultant Recruitment Activities Monitoring Sheet – Submission 1

12. The EA establishes a consultant selection committee (CSC) under PAI 2.01 (para 25) that initiates recruitment as follows:

• Generate a long list primarily based on the EOIs received, and prepare the shortlisting criteria. • Prepare a short list following the shortlisting criteria and eligibility requirement in PAI 2.01. • Prepare the narrative technical proposal evaluation criteria or EOI evaluation criteria, if the

recruitment is based on Consultants’ Qualifications Selection (CQS). • Prepare an RFP, which would include the datasheet, summary evaluation sheet form, and

personnel evaluation sheet form. • Provide the data required for the Consultant Recruitment Activities Monitoring (CRAM) sheet.

13. The EA then e-mails the following documents, usually referred to as “Submission 1”, to ADB (through the project unit) for approval: (i) budget; (ii) long list; (iii) proposed shortlist; (iv) narrative technical proposal evaluation criteria; (v) draft RFP with the data sheet, summary evaluation sheet form, personnel evaluation sheet form, and TOR; (vi) draft contract; and (vii) draft CRAM sheet. The EA uses ADB’s standard submission form (Submission 1) available on ADB’s website or provided by the project unit. The EA submits the standard submission form in MS Word version. This also includes a checklist of documents that the EA completes. This submission applies to all selection methods for recruiting firms; provided that, for CQS, the EOI evaluation criteria will be submitted instead of the narrative technical proposal evaluation criteria; and for single-source selection (SSS), the justification and approval for the use of SSS should be submitted (see PAI 2.02, paras 35-38), excluding proposed shortlist and draft CRAM sheet (as these are not applicable).

b) ADB's Review of the EA’s Submission 1

14. Subject to Section F of this PAI, upon receipt of the EA’s Submission 1, the project unit immediately forwards an electronic copy of the submission to the LCU, with a copy to the OSFMD director. The project unit ensures that the EA completed all documents required in the submission form. If the EA has not forwarded them all, the project unit immediately asks the EA to submit these to ADB. Once completed, OSFMD reviews the submission and provides comments in the comment fields of ADB’s standard submission form. OSFMD may directly input corrections in the EA’s submitted documents, provided it explains them in the comment fields. 15. The project unit conducts its own parallel review of the submission and submits its comments to the LCU for consolidation. For complex issues, OSFMD or the project unit may request a CSC to review the documents and resolve any pending issues. Once all comments have been consolidated, the authorized OSFMD staff signs the submission and forwards it to the project unit who will fax or email them to the EA.

Page 4: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014 Page 4 of 10

16. The EA is requested to submit another set of Submission 1 if there are concerns with its original submission. Each version of every submission has to be dated. OSFMD states in the standard submission form if it has approved a particular submission from the EA. 17. The LCU monitors each step in the CRAM sheet and coordinates with the project unit to ensure that the review of the EA’s submission is accomplished within the allotted period.

c) Sending RFP to Consulting Firms

18. After ADB approves the EA’s submission, the EA then sends official copies of the RFP to the shortlisted consultants with a copy to the project unit. The shortlisted consultants acknowledge receiving the RFP and any notice from the EA (i.e., extension of proposal deadline submission). The shortlisted consultants also advise the EA if they intend to submit proposals. Shortlisted consultants submit any queries to the EA in writing. The EA sends any answers, information, or amendments to all shortlisted consultants, copied to the project unit, without disclosing the source of the query. Any proposed amendment needs ADB’s prior approval, issued by the project unit after consultation with OSFMD. 19. To give shortlisted firms reasonable time to address amendments to the RFP in their proposals, the EA may extend the deadline for submitting proposals, subject to ADB's prior approval.

d) Evaluating Technical Proposals and Preparing Evaluation Report – Submission 2

20. The EA forms a CSC to evaluate technical proposals received following the procedures in PAI 2.03. The CSC prepares minutes of its evaluation meeting and a report of its evaluation, describing the strengths and weaknesses of each proposal. 21. Unless the EA’s procurement plan provides otherwise, the EA e-mails the evaluation report containing the following technical evaluation documents to ADB (through the project unit) for approval: (i) completed summary evaluation sheet, highlighting any proposal that scored less than 750 points out of 1,000; (ii) completed personnel evaluation sheet for each proposal; (iii) narrative comments on the strengths and weaknesses of each proposal; (iv) minutes of the EA's CSC evaluation meeting(s); and (v) updated CRAM sheet. The EA uses ADB’s standard submission form (Submission 2) available on ADB’s website or from the ADB project unit. The EA submits ADB’s standard submission form in MS Word format. This submission applies to all selection methods for recruiting firms; provided that, for CQS and SSS, the technical evaluation documents are submitted together with the financial evaluation documents.

e) ADB's Review of the EA’s Submission 2 22. Subject to Section F of this PAI, the procedures and requirements in paras 14-17 of this PAI apply to reviewing Submission 2. However, for CQS and SSS, the review of the EA’s technical evaluation documents occurs with the review of the EA’s financial evaluation documents. For complex issues, OSFMD or the project unit may request a CSC to review the documents and resolve any pending issues.

f) Opening and Evaluating the Financial Proposal(s), and Recommending Contract Award – Submission 3

23. Cost-based selections (quality and cost-based selection [QCBS], fixed-budget selection [FBS], and least-cost selection [LCS]) require public opening of the financial proposals. These are opened and evaluated as in PAI 2.03. QBS method requires separate submission of the first ranked firm’s financial proposal, which is submitted and opened as in PAI 2.03. CQS method requires the financial proposal be submitted with the technical proposal, but is only reviewed in preparation for contract negotiations. Such proposal is opened and reviewed as in PAI 2.03. SSS method adopts the same procedure as CQS for submitting, opening, and reviewing the financial proposal.

Page 5: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014

Page 5 of 10

24. Unless the EA’s procurement plan provides otherwise, the EA e-mails the following financial evaluation documents to ADB (through the project unit) for approval: (i) completed financial evaluation and overall ranking forms; (ii) narrative comments on the financial evaluation, noting any corrections to the financial proposal(s); and (iii) updated CRAM sheet. The EA uses ADB’s standard submission form (Submission 3) available on ADB’s website or from the ADB project unit. The EA submits ADB’s standard submission form in MS Word format. This submission requirement applies to all selection methods for recruiting firms, except QBS; provided that, for CQS and SSS, the technical evaluation documents are submitted with the financial evaluation documents.

g) ADB's Review of the EA’s Submission 3 25. Subject to Section F of this PAI, the procedure and requirements in paras 14-17 of this PAI apply to reviewing Submission 3. However, for CQS and SSS, the EA’s technical evaluation documents are reviewed with the EA’s financial evaluation documents. For complex issues, OSFMD or the project unit may request a CSC to review the documents and resolve any pending issues.

h) Preparing for Contract Negotiation

26. Before contract negotiation, the EA checks the eligibility and performance records of each member of the team proposed by the selected firm. The EA obtains from ADB a copy of ADB’s sanction and suspension list due to integrity violations or poor performance, as well as the terrorism list recognized by ADB. 27. The EA invites the first-ranked consultant to negotiate a contract with the EA, as in PAI 2.03. 28. The selected consultant confirms the availability of its proposed personnel, provides clarifications and corrections to its proposal, and replaces personnel when appropriate, as in PAI 2.03.

i) Submitting the Negotiated, Unsigned Contract – Submission 4

29. The EA negotiates a contract with the first-ranked consultant as in PAI 2.03. When the negotiation is face-to-face, the EA prepares minutes of the important points of agreement. 30. If the EA and the consultant cannot agree, the EA may terminate the current negotiations with ADB’s prior approval, and start negotiations with the next-ranked consultant, and so on until an agreement is reached. The project unit requests OSFMD's endorsement each time the EA requests to terminate contract negotiations and to start negotiations with the next-ranked firm. 31. Unless the EA’s procurement plan provides otherwise, the EA emails the draft negotiated contract and the minutes of the contract negotiations to ADB (through the project unit) for approval. The EA uses ADB’s standard submission form (Submission 4) available on ADB’s website or from the project unit. The EA submits ADB’s standard submission form in MS Word format. This submission requirement applies to all selection methods for recruiting firms.

j) ADB's Review of the EA’s Submission 4

32. The project unit immediately reviews the EA’s submission to

• ascertain that the negotiated terms and conditions are satisfactory; • request comments from OSFMD, the Controller’s Department (CTL), and the Office of the

General Counsel (OGC) after identifying the specific issue/s of concern; and

Page 6: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014 Page 6 of 10

• require the EA to incorporate the revisions, changes, or amendments that the project unit

considers necessary. 33. Once the documents are considered in order, the project unit formally advises the EA of ADB’s approval.

k) Finalizing the Contract 34. After receiving ADB’s approval of the draft negotiated contract, the EA signs the contract, obtains the consultant’s signature, and submits a copy of the signed contract to ADB (through the project unit). The EA also submits the following information to ADB for posting on its website:

• names of the shortlisted consultants who submitted proposals; • scores of their technical proposals; • prices in their financial proposals (for QCBS and LCS); • overall ranking (for QCBS); • name of the consultant selected; and • cost, duration, and summary scope of the contract.

35. After receiving the signed contract, the project unit verifies that it is substantially the same as the draft negotiated contract it approved earlier. The project unit sends copies of the signed contract to OSFMD, CTL, and OGC. 36. After completing the selection, the EA debriefs the shortlisted consultants, when so requested by the consultant concerned, regarding how their ranking was determined.

l) Issuing Notice to Proceed 37. The EA then makes the contract effective by sending the consultant a written notice to proceed, copied to ADB (through the project unit). F. Approving Authorities for EA Submissions 38. Notwithstanding Section A and subsections (b), (e), and (g), of Section E, all project units shall review and approve Submission 1, Submission 2 and Submission 3 for all contracts valued at $5 million and below, provided the reviewing staff are duly accredited under PASS or have successfully completed the relevant OSFMD-LCU training module for loan consulting submissions review. This ceiling applies to any resident mission (RM) with a resident OSFMD procurement specialist or a national procurement officer. The project unit director approves the unit’s reviews of Submission 1, Submission 2 and Submission 3. RMs with no resident OSFMD procurement specialist or national procurement officer shall review and approve Submissions 1 and 2 for all contracts valued at $600,000 and below, while OSFMD shall review and approve Submission 3. 39. Approval of all submissions above the ceilings as in para 38 of this PAI remain OSFMD’s responsibility. OSFMD directors or their authorized representatives approve such submissions. 40. OSFMD regularly assesses project unit and RM capacity and performance to update the review thresholds and ascertain the readiness of project units to fully review and approve Submissions 1, 2, and 3 under specific circumstances. OSFMD periodically reviews thresholds for each project unit or RM and compares assessed project unit or RM capacity. G. Recruiting Individual Consultants

Page 7: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014

Page 7 of 10

a) Selecting and Approving the Shortlist 41. Before an individual consulting assignment is scheduled to start, the EA prepares a short list of at least three qualified candidates. At the EA’s request, the project unit may provide the names and qualifications of suitable candidates from the CMS. The EA may also advertise for suitable candidates, in addition to the CSRN posting requirement in PAI 2.03. 42. The EA ranks the candidates and submit their names and qualifications, with the draft contract, to ADB (through the project unit) for approval. The project unit

• reviews the EA’s submission documents; • consults with OSFMD, if necessary, after identifying concerns; • requests comments from CTL, OGC, and/or other department or office after identifying

concerns; • approves the EA’s submission or identifies needed revisions, changes, or amendments that

the project unit considers necessary; • prepares a note to file summarizing the issues raised and the decisions taken; and • advises the EA of ADB’s decision.

b) Negotiating the Contract

43. After ADB approves the ranked short list and the draft contract, the EA negotiates with the first-ranked candidate. If the negotiations fail, the EA obtains ADB’s approval to terminate the current negotiations and start negotiations with the next-ranked candidate, and so on until agreement is reached. The EA then sends a copy of the draft negotiated contract to ADB (through the project unit) for approval.

c) Reviewing the EA’s Draft Negotiated Contract

44. The project unit immediately reviews the EA’s submission. The project unit

• ascertains that the negotiated terms and conditions are satisfactory; • requests comments from OSFMD, CTL, and OGC after identifying concerns; and • requires the EA to incorporate any revisions that the project unit considers necessary.

45. Once the documents are considered to be in order, the project unit formally advises the EA of ADB’s approval.

Page 8: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014 Page 8 of 10

d) Finalizing the Contract

46. After receiving the signed contract, the project unit checks that it is substantially the same as the draft negotiated contract it approved earlier. The project unit sends copies of the signed contract to OSFMD, CTL, and OGC. H. Requesting ADB Assistance in Selecting the Consultant 47. When the borrower/recipient requests ADB in writing to take responsibility for selecting a consultant, the project unit consults OSFMD and submits the request to the project unit’s head of department for approval. The borrower/recipient should adequately justify such a request and explain its necessity. ADB’s proposed participation in the recruitment should be set out in the procurement plan and the RRP. If the request is made after the loan/grant is approved, it will be regarded as a change in implementation arrangements and will be dealt with as in PAI. 5.04. If approved, OSFMD informs ADB’s Board of Directors of the change in implementation arrangements in the quarterly portfolio update. In all such cases, ADB generally takes responsibility only for selecting the consultant, and the EA retains the responsibility for negotiating and signing the contract with the consultant, issuing the notice to proceed, and supervising the consultant’s services. I. Monitoring the Consultant Recruitment Process 48. The EA, the project unit, and OSFMD use CRAM for EA administered consulting services to monitor the activities in consultant recruitment and to avoid delays. A preliminary CRAM schedule for the recruitment based on the anticipated consultant mobilization timetable is included as an annex to the procurement plan. 49. The CRAM schedule identifies the main activities in the recruitment process, the responsible unit, the time normally required for each activity, and the target dates for completing each activity. The EA, project unit, and OSFMD staff complete each activity and monitor the recruitment process. They use CRAM to identify delays and to act promptly to get the recruitment process back on schedule. 50. The LCU monitors all CRAM schedules, checks the status of progress regularly, and ensures that the project unit and OSFMD update the CRAM promptly for the activities within their responsibilities. The LCU also monitors each step in the CRAM schedule and coordinates with the project unit to ensure that OSFMD, the project unit or the EA accomplish each activity within the allotted period. For this, the project unit appoints a staff as CRAM coordinator, who coordinates all CRAM related data inputs and updates with the LCU and EA. 51. When a planned activity is not completed on schedule, the LCU reminds the responsible project unit staff. The staff must explain the delay in the CRAM schedule. 52. The LCU sends a monthly report on each project unit’s CRAM status to the project unit director. The project unit directors monitor recruitment activities for all the loans/grants under their supervision, and act to overcome delays in recruitment.

a) Creating a CRAM Schedule 53. During the loan/grant fact-finding mission, the project unit officer explains to the EA how to use the CRAM system to monitor the recruitment process. The officer gives the EA a sample CRAM schedule and discusses the consultant recruitment schedule, based on the time standards set for each activity shown in the CRAM system. The officer asks the EA to assign a staff who will be responsible for maintaining the CRAM schedule and monitoring recruitment.

Page 9: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014

Page 9 of 10

54. When the EA schedules and advises ADB of the date for the CSRN posting, the project unit creates a CRAM schedule for the assignment by entering the following information in the system:

• loan/grant number and name; • contract budget; • selection method; • type of technical proposal; • EA’s name and contact person; • project division; • project unit officer; • EA and ADB staff responsible for maintaining the CRAM and monitoring recruitment; • responsible OSFMD officer; and • shortlisting date.

55. When the project unit enters the CSRN posting date into the CRAM schedule, the system automatically generates a recruitment schedule, including the planned dates for each activity and the cumulative number of days from shortlisting. The number of calendar days required for each activity is based on “norms” for each selection method and type of technical proposal. b) Accessing the CRAM system 56. Staff may access the CRAM system in the Consulting Services Reference database in Lotus Notes:

• Open Lotus Notes and click “file” > “Database” >”Open”. • Select ”LNADBG1/ADB” from the list of servers. • Select “Consulting Serv. Reference” from the list of databases. • Select 5. “Loan/Grants Monitoring”.

c) Monitoring the Recruitment Activities and Updating the CRAM Schedule

57. The project unit sends a copy of the preliminary CRAM schedule for the assignment to the EA. The EA’s CSC shortlisting meeting then discusses and confirms the CRAM schedule. If the EA is required to submit its CSC meeting documents to ADB for approval, the EA includes this in the CRAM. 58. If ADB approves the EA’s submissions (depending on the selection method), the project unit sends the EA an updated CRAM schedule. 59. The EA staff monitors the recruitment and reports to the ADB project unit officer the date when each activity is completed and the reason for any delays. The ADB project unit staff enters the completion dates in column 6 of the CRAM schedule. Planned dates cannot be changed. 60. Columns 8 and 9 of the CRAM schedule show the difference in days between the planned and actual dates for completing each activity, and the difference between the planned and actual days from shortlisting. When an activity is completed later than the planned date, the ADB project unit staff explains in column 11 of the CRAM the delay and the EA and ADB action needed to get recruitment back on schedule. The upper right corner of the CRAM schedule shows the date it was last updated. 61. The CRAM schedule shows different recruitment activities for each selection method and type of technical proposal. d) Maintaining CRAM Records

Page 10: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Revised December 2014 Page 10 of 10

62. When the recruitment process is completed, the project unit makes a hard copy of the CRAM and retains it in the project file. 63. OSFMD keeps completed CRAM records in the CRAM database and evaluates them annually. If required, OSFMD proposes recommendations for streamlining the recruitment process.

64. OSFMD monitors the application of CRAM and maintains the CRAM system. Staff should report any problems with the system to OSFMD.

65. List of Appendices:

� Appendix 1 is a Checklist of Actions for the Fact-Finding Missions to Help EAs Recruit Consultants.

� Appendix 2 is a Flowchart of Activities for Recruiting Consulting Firms under EA Administered Consulting Services (QCBS, QBS, FBS and LCS).

� Appendix 3 is a Flowchart of Activities for Recruiting Consulting Firms under EA Administered Consulting Services (CQS).

� Appendix 4 is a Flowchart of Activities for Recruiting Consulting Firms under EA Administered Consulting Services (SSS).

� Appendix 5 is a Flowchart of Activities for Recruiting Individual Consultants under EA Administered Consulting Services

� Appendix 6 is a Flowchart of the CRAM process for EA Administered Consulting Services. � Appendix 7 contains the various forms for the CRAM schedule, depending on the selection

method. � Appendix 8 contains ADB’s standard submission forms for Submission 1, Submission 2 and

Submission 3, depending on the selection method.

Page 11: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 1

Checklist of Actions for the Fact-Finding Missions to Help EAs Recruit Consultants

1. Explain ADB’s procedures for recruiting consultants to the EA. 2. Give the EA the following standard documents:

CRAM schedule; names of consultants from the CMS (if the borrower asks); sample RFP, including the covering letter, background information, and TOR; sample forms for evaluating consultants' technical and financial proposals, including the

narrative evaluation criteria for technical proposals; sample contracts for firms and individuals; performance evaluation forms for consulting firms and individual consultants; and Guidelines on the Use of Consultants by Asian Development Bank and Its Borrowers.

The harmonized RFP for recruiting consulting firms for loan/grant projects is available on the ADB website.

3. Agree with the EA on the scope of the services required; the number of contracts; whether consulting firms, individual consultants, or both will be engaged under each contract; and the allocation of person-months to international and national consultants. Then agree on the procedures the EA will use to recruit the consultants, including the selection method and the type of technical proposal. 4. Help the EA to prepare the CRAM, TOR, and RFP.

5. Discuss any anticipated problems and what additional help the EA will need from ADB to engage the consultants. 6. If possible and if not already done, obtain the documents required in the EA’s first submission to ADB for approval. These include the proposed

recruitment schedule;

shortlisting criteria; shortlist; RFP, together with the detailed TOR and background information; evaluation criteria for the technical proposals; contract; and format for evaluating the consultant’s performance.

Page 12: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 2a, Page 1

Page 13: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 2a, Page 2

Page 14: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 2b, Page 1

Page 15: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 2b, Page 2

Page 16: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 2c, Page 1

Page 17: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 3a, Page 1

Page 18: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 3a, Page 2

Page 19: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 3b, Page 1

Page 20: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 3b, Page 2

Page 21: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 3c, Page 1

Page 22: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 3c, Page 2

Page 23: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 4a, Page 1

Page 24: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 4a, Page 2

Page 25: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 4b, Page 1

Page 26: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 4b, Page 2

Page 27: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 4c, Page 1

Page 28: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 4c, Page 2

Page 29: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 5, Page 1

Page 30: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 5, Page 2

Page 31: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 6

Page 32: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 7a

Page 33: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 7b

Page 34: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 7c

Page 35: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 7d

Page 36: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 7e

Page 37: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 7f

Page 38: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in January 2011 Appendix 7g

Page 39: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 7h

Page 40: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 7i

Page 41: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 7j

Page 42: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 7k

Page 43: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 7l

Page 44: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 201 Appendix 7m

Page 45: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 7n

Page 46: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in January 2011 Appendix 7o

Page 47: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8a, Page 1

For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents

This is the: [indicate whether 1

st, 2

nd, 3

rd, etc.]

request for review

Executing Agency Consulting Recruitment Submission 1: Shortlisting of Consulting Firms and

Request for Proposals (QCBS/QBS/FBS/LCS)

Loan/Grant (Country) (No.): Title Package/Component: _______________

Name of Executing Agency (EA): _______________________________________________________ _______________________________________________________ Report Submitted by:

Name: ________________________________________________ Signature: _____________________________________________ Designation: ___________________________________________

Date Submitted: __________________________ Date of EA Consultant Selection Committee-Shortlisting (CSC-SL) Meeting: _________________ Checklist of Attached Documents (For 1

st Review): In case of succeeding reviews, please attach

only the information or documents requested in the latest review.

Attachment 1: Latest Uploaded Procurement Plan Yes No [Procurement plan must be within a year and for each loan, not MFF. Attach approval memo for individual changes in the procurement plan]

Attachment 2: Budget for consulting services including details of Yes No provisional sums and contingency Attachment 3: Longlist of Consulting Firms Yes No Attachment 4: Narrative Evaluation Criteria (NEC) Yes No

[EA to prepare the NEC. Provide weights for each criterion in the summary evaluation sheet and detailed information on how to apply these weights and, if necessary, to distribute them to sub-criteria in NEC.]

Attachment 5: Draft Request for Proposals (RFP) with Terms of Yes No Reference (TOR), Data Sheet, Summary and

Personnel Evaluation Sheets1

and Draft Contract

Attachment 6: Copy of Previous Communications with OSFMD Procurement Yes No Specialist related to items covered by this Submission Document (if any) Attachment 7: Minutes of EA CSC-SL Meeting Yes No Attachment 8: Updated Consultant Recruitment Activities Monitoring (CRAM) Yes No Sheet [Project Unit to update CRAM sheet in Consulting Services Reference

(Lotus Notes) before submitting this Submission 1 review to LCU. Indicate in the CRAM the reasons for any delay, and remedial action taken.]

1 The appropriate templates can be downloaded from the ADB website in the following link: http://www.adb.org/site/business-

opportunities/operational-procurement/consulting/documents. Include the Attachment: Grounds for Disqualification of an Expert.

Part A [To be completed by the Executing Agency]

Page 48: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8a, Page 2

Names of EA CSC Members*: [List the names of members according to ministry/department/agency and designation in

a table format. Please provide additional rows in the table below, if required.] Name Ministry/Department/Agency Designation

* Is there any consultant in the EA’s CSC Meeting? Yes No

If Yes, please state whether potential or actual conflict of interest exists.

1

__________________________________________________________________________________ ___________________

1. EOIs via CMS-CSRN (30 days) Yes No

Date of Posting: _________________

Deadline of EOI Submission: ________________________

[For reduced period of advertisement (less than 30 days) or waiver of advertisement, please attach the formal approval]

2. Number of EOIs Received: ________ 3. Advance Action? Yes No 4. Retroactive Financing? Yes No

(If yes, please attach the document approving retroactive financing)

5. Loan Approval Date: ___________________ 6. Loan Effective Date: ___________________ 7. Loan Closing Date: ____________________ 8. Estimated Contract Duration (in months): _______ 9. Budget for this consulting services: US$ _____________ Estimated Maximum

10. Shortlisting:

2

International Shortlist National Shortlist *

* (Please attach document approving the national shortlisting)

11. Method of Selection: FBS LCS QBS QCBS 12. (For QCBS) Quality Cost Ratio: 80:20 70:30 90:10

Document/s to support quality-cost ratio of 70:30 or 90:10: ____________________________

1 The EA should confirm that the consultant in the EA’s CSC Meeting does not have any ongoing business associations (whether

direct or indirect) with any of the firms in the shortlist. 2 The same requirements for ordinary selection still apply to national shortlisting except geographic spread as waived in the

Guidelines on the Use of Consultants by ADB and Its Borrowers, para. 2.9.

Page 49: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8a, Page 3

13. Shortlisting criteria*: [Apply the following criteria for the shortlisting of consulting firms for loan/grant projects]:

(i) Eligibility (ii) Management competence (iii) Technical competence (iv) Geographic spread (for international assignments) * Additional criteria should have ADB’s prior approval.

a) ___________________________________________________________________ ___________________________________________________________________ b) ___________________________________________________________________ ___________________________________________________________________ c) ___________________________________________________________________

_____________________________________________________________ 14. Proposed Shortlist:

Firm Name (Full Name not Acronym)/

Country of Incorporation1

Nature of Association

(Indicate if the firm is

Lead, JV Partner, or Sub-consultant)

Nature of Organization [Indicate if Private

Consulting Firm, State-Owned (SOE) or NGO]

1. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

2. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

3. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

4. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

5. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

6. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

a) Six (6) firms with wide geographic spread (no more than 2 firms from Yes No

any 1 member country, and at least 1 firm from developing member country). If No, justification/s for proposed shortlist: __________________________________________

b) Checking of Conflict of Interest [in accordance with the Guidelines on the

Use of Consultants by ADB and Its Borrower (CG)]:

i) Conflict between consulting activities [CG 1.11(a)] Yes No

ii) Conflict among consulting assignments [CG 1.11(b)] Yes No

1 Corporations or companies must be incorporated in an ADB Member Country. Partnerships or non-corporations must be duly

registered or legally established in an ADB Member Country. These include universities, institutions, public sector organizations, and NGOs.

Page 50: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8a, Page 4

iii) Relationship with borrower’s staff [CG 1.11(c)] Yes No

If Yes, state relationship & whether potential or actual conflict of interest exists. ____________ ____________________________________________________________________________

c) Did any of the shortlisted firms participate in upstream assignment such Yes No

as PPTA or other assignment regardless of financing source from which the firm may derive an unfair competitive advantage to this assignment? [RFP Section 2 (ITC), para. 4, Data Sheet 4.1, and CG 1.12] If yes, state the name of the firm and complete RFP Data Sheet 4.1. ____________________________________________________________________________

15. Proposed Modifications on Contract Forms: [Revision/s for additional provision/s or deletion of certain provision/s in the General Conditions of the Contract (GCC) is not permissible. Instead, the Project Unit should advise the EA to incorporate revision/s through the Special Conditions of Contract (SCC) and changes should be reviewed by the Office of the General Counsel (OGC) prior to Submission 1.] State proposed revision/s and attach OGC’s review in this Submission 1 document. _______________________________________________________________________________ _______________________________________________________________________________

16. Type of Contract to be used: Time-Based Lump-Sum

Page 51: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8a, Page 5

Part B [ADB Comments on EA’s Submission]

1. Comments on Part A:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

2. Shortlisting Criteria:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

3. Shortlist:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

4. Narrative Evaluation Criteria (NEC):

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

5. Request for Proposals (RFP):

a) Section 1: Letter of Invitation (LOI):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________ iv) _______________________________________________________________________

b) Section 2: Data Sheet: i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________ iv) _______________________________________________________________________

c) Summary and Personnel Evaluation Sheets (SES and PES):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________ iv) _______________________________________________________________________

Page 52: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8a, Page 6

d) Section 7: Terms of Reference (TOR):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________ iv) _______________________________________________________________________

e) Special Conditions of Contract (SCC):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________ iv) _______________________________________________________________________

6. Other Issues:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

7. Advance Reminders for Submission 2 Review: Please refer to the Guide in Reviewing Submission 2 for detailed instructions. a) In reference to SRFP Section 1, LOI, para. 7(a), the Project Unit should request the EA to

secure a confirmation of withdrawal in writing from a shortlisted firm if the EA did not receive its proposal on the submission.

b) Copy of confirmation of withdrawal from the Consultant should be attached in Submission 2.

Unless the status of shortlisted Consultants which were not evaluated is clarified with evidence, ADB will not be able to process Submission 2.

c) EA should confirm approval if there is a change (dropping/removal or addition) in the original

association with reference to Section 1, LOI, paras. 4 and 7(b).

d) EA must ensure that the firm that submits the proposal is the same legal entity that submitted the EOI. If the proposal received has a different legal entity from the shortlisted one, the proposal should be rejected. This also applies when a parent company, a group of firm, a subsidiary, or a local affiliate of the shortlisted firm submits the proposal.

e) The EA should ensure that evaluation is conducted taking into account the issues on

disqualification (see “Grounds for Disqualification of an Expert” – attachment to SES/PES).

f) If there is an expert proposed by multiple firms for the same position, the EA should evaluate the expert in accordance with the CV. This may result in uniform rating for the said expert if the same CV is used or otherwise different ratings if the CVs submitted by the firms for the expert were different.

g) If there is more than 1 expert proposed by the firm for 1 position, the lowest rating among the

experts evaluated should be applied and reflected in the PES/SES.

Page 53: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8a, Page 7

Reminders for the Project Unit

8. Anticorruption Sanction/Terrorism Lists and Performance Evaluation Report (PER) Checking:

a) Any of the shortlisted firms (including their Joint Venture Yes No

Partner/s or Sub-consultant/s) in ADB Anticorruption Sanction Lists and Terrorism Lists? If Yes, state the name of the consulting firm/s: _____________________________________

b) PER of the firms in the shortlist (including their Joint Venture Yes No

Partner/s or Sub-consultant/s) checked? (Attached as Appendix 1) [Note: Results of PER Checking (Appendix 1) should be retained with the Project Unit]

c) External ADB auditor included in the shortlist? Yes No

If Yes, please obtain clearance from OAI before proceeding. 9. Checking of Conflict of Interest [in accordance with the Guidelines on the Use of

Consultants by ADB and Its Borrowers (CG)]:

a) Conflict between consulting activities [CG 1.11(a)] Yes No

b) Conflict among consulting assignments [CG 1.11(b)] Yes No c) Conflict with concerned OSFMD/Project Unit Specialists [CG 1.11(c)] Yes No

If Yes, state relationship & whether potential or actual conflict of interest exists: _______________ _______________________________________________________________________________

1. Subject to Section F of PAI 2.05, upon receipt of the EA’s Submission 1, the Project Unit ensures

that the EA submitted complete documents required (Checklist of Attached Documents) in the submission form before immediately forwarding an electronic copy of the submission to OSFMD-LCU (see PAI 2.05, paragraph 14).

2. The Project Unit should assist the EA to obtain and use the latest version of the Standard RFP

without modification or omission of the standard provisions. 3. The Project Unit should ensure that the submission is consistent with the latest/updated

procurement plan. 4. The Project Unit will send an updated CRAM sheet to the EA for its monitoring of the recruitment

activities. 5. The Project Unit will send to OSFMD a request for posting the shortlist in the ADB website with the

following information: • the names of the shortlisted firms; • the name of the EA and its contact details listed in LFIS/GFIS ALS704 under the EA Loan

Address section; and • the RFP date. 6. The Project Unit will convey the above decisions and recommendations to the EA.

Page 54: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8a, Page 8

Prepared by: _________________________________ ___________________________________ Signature above Printed Name Signature above Printed Name OSFMD (If applicable) Project Unit Note: When OSFMD review is required, the Project Unit Officer signs the _______________________ review document after the OSFMD Date Officer signs it. Approved: Yes No ____________________ Date Approved by:

_________________________________ Signature above Printed Name Director, Project Unit / Country Director, Resident Mission (Please sign as applicable) ___________________ Date

Disclaimer: The review and approval of this submission document is conducted independently and must not serve as a precedent for future reviews.

Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

Page 55: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8b, Page 1

For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents

This is the: [indicate whether 1

st, 2

nd, 3

rd

etc.] request for review

Executing Agency Consulting Recruitment

Submission 1: Evaluation of Expressions of Interest and Request for Proposals (CQS)

Loan/Grant (Country) (No.): Title

Package/Component: _______________

Name of Executing Agency (EA): _______________________________________________________ _______________________________________________________ Report Submitted by:

Name: ________________________________________________ Signature: _____________________________________________ Designation: ___________________________________________

Date Submitted: __________________________ Date of EA Consultant Selection Committee-

Expressions of Interest (CSC-EOI) Evaluation Meeting: ____________________ Checklist of Attached Documents (For 1

st Review): In case of succeeding reviews, please attach only the

information or documents requested in the latest review.

Attachment 1: Latest Uploaded Procurement Plan Yes No

[Procurement plan must be within a year and for each loan, not MFF. Attach approval memo for individual changes in the procurement plan]

Attachment 2: Budget for consulting services including details of Yes No provisional sums and contingency Attachment 3: Longlist of Consulting Firms Yes No Attachment 4: Expressions of Interest (EOI)

1 and Evaluation Criteria

2

[EA to prepare the EOI evaluation criteria. EA to provide weights for each criterion in the evaluation sheet for EOI and detailed information on how to apply these weights and, if necessary, to distribute them to sub-criteria.]

Yes No

Attachment 5: Duly Filled EOI Evaluation Sheet

3

for all EOIs Submitted Yes No

Attachment 6: Narrative Evaluation Criteria (NEC) Yes No [EA to prepare the NEC for Biodata Technical Proposal (BTP). Provide weights

for each criterion in the summary evaluation sheet and detailed information on how to apply these weights and, if necessary, to distribute them to sub-criteria in NEC.]

Attachment 7: Draft Request for Proposals (RFP) with Terms of Reference Yes No (TOR), Data Sheet, Summary and Personnel Evaluation Sheets

for BTP4

and Draft Contract

Attachment 8: Copy of approval for CQS selection method if not stated Yes No in the RRP/Procurement Plan Attachment 9: Copy of Previous Communications with OSFMD Procurement Yes No

Specialist related to items covered by this Submission Document (if any) Attachment 10: Minutes of the EA CSC-EOI Evaluation Meeting Yes No

1 EOI standard template can be downloaded from the ADB website in the following link: http://www.adb.org/site/business-

opportunities/operational-procurement/consulting/documents This may be modified to match requirements. 2 Management competence criterion includes nomination and very brief background & experience of firm’s director responsible for

this assignment, and, if applicable, the rationale for proposed Joint Venture Partnership/Sub-consulting. 3 Evaluation sheet for EOIs in MSExcel format can be obtained from ADB Project Unit upon request.

4 The template for BTP can be downloaded from the ADB website in the following link: http://www.adb.org/site/business-

opportunities/operational-procurement/consulting/documents. Include the Attachment: Grounds for Disqualification of an Expert.

Part A [To be completed by the Executing Agency]

Page 56: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8b, Page 2

Names of EA CSC Members*: [List the names of members according to ministry/department/agency and designation in

a table format. Please provide additional rows in the table below, if required.] Name Ministry/Department/Agency Designation

* Is there any consultant in the EA’s CSC Meeting? Yes No

If Yes, please state whether potential or actual conflict of interest exists.

1

__________________________________________________________________________________ ___________________

1. EOIs via CMS-CSRN (30 days) Yes No

Date of Posting: _________________ Deadline of EOI Submission: _________________________

[For reduced period of advertisement (less than 30 days) or waiver of advertisement, please attach the formal approval]

2. Number of EOIs Received: ________ 3. Advance Action? Yes No 4. Retroactive Financing? Yes No

(If yes, please attach the document approving retroactive financing)

5. Loan Approval Date: ___________________ 6. Loan Effective Date: ___________________ 7. Loan Closing Date: ____________________ 8. Estimated Contract Duration (in months): _______ 9. Budget for this consulting services (not exceeding US$200,000): US$ ___________________ Justification in special case where budget exceeds US$200,000: ________________________

_______________________________________________________________________________

1 The EA should confirm that the consultant in the EA’s CSC Meeting does not have any ongoing business associations (whether

direct or indirect) with any of the firms in the shortlist.

Page 57: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8b, Page 3

10. Result of EOI Evaluation:

[Note: EA to list the names of 3 consulting firms with highest ranked EOIs including the country and scores in the table below.]

Firm Name (Full Name not Acronym)/

Country of Incorporation1

Score

Nature of Association (Indicate if the firm is

Lead, JV Partner, or Sub-consultant)

Nature of Organization [Indicate if Private

Consulting Firm, State-Owned (SOE) or NGO]

1. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

2. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

3. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

a) Checking of Conflict of Interest [in accordance with the Guidelines on the Use of Consultants by ADB and Its Borrower (CG)]:

i) Conflict between consulting activities [CG 1.11(a)] Yes No

ii) Conflict among consulting assignments [CG 1.11(b)] Yes No

iii) Relationship with borrower’s staff [CG 1.11(c)] Yes No

If Yes, state relationship & whether potential or actual conflict of interest exists. ____________ ____________________________________________________________________________

b) Did any of the shortlisted firms participate in upstream assignment such Yes No

as PPTA or other assignment regardless of financing source from which the firm may derive an unfair competitive advantage to this assignment? [RFP Section 2 (ITC), para. 4, Data Sheet 4.1, and CG 1.12] If yes, state the name of the firm and complete RFP Data Sheet 4.1. ____________________________________________________________________________

11. Name of the Consulting Firm/Country with the Highest EOI Score: ______________________ _______________________________________________________________________________ 12. Proposed Modifications on Contract Forms:

[Revision/s for additional provision/s or deletion of certain provision/s in the General Conditions of the Contract (GCC) is not permissible. Instead, the Project Unit should advise the EA to incorporate revision/s through the Special Conditions of Contract (SCC) and changes should be reviewed by the Office of the General Counsel (OGC) prior to Submission 1.] State proposed revision/s and attach OGC’s review in this Submission 1 document. _______________________________________________________________________________ _______________________________________________________________________________

13. Type of Contract to be used: Time-Based Lump-Sum

1 Corporations or companies must be incorporated in an ADB Member Country. Partnerships or non-corporations must be duly

registered or legally established in an ADB Member Country. These include universities, institutions, public sector organizations, and NGOs.

Page 58: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8b, Page 4

Part B [ADB Comments on EA’s Submission] 1. Comments on Part A:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

2. EOI Evaluation Criteria:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

3. Result of EOI Evaluation:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

4. Narrative Evaluation Criteria (NEC):

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

5. Request for Proposals (RFP):

a) Section 1: Letter of Invitation (LOI):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

b) Section 2: Data Sheet:

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

c) Summary and Personnel Evaluation Sheets (SES and PES):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

d) Section 7: Terms of Reference (TOR):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

Page 59: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8b, Page 5

Reminders for the Project Unit

e) Special Conditions of Contract (SCC):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

6. Other Issues:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

7. Advance Reminders for the Review of Submission 2-3: For detailed instructions, please refer

to the Guide in Reviewing Submission 2 and Guidance Notes on the Evaluation of Financial Proposals in ADB website.

8. Anticorruption Sanction/Terrorism Lists and Performance Evaluation Report (PER) Checking:

a) Is the consulting firm with the highest EOI score (including its Yes No Joint Venture Partner/s or Sub-consultant/s) in ADB Anticorruption Sanction Lists and Terrorism Lists?

b) PER of the consulting firm with the highest EOI score (including its Joint Yes No

Venture Partner/s or Sub-consultant/s) checked? (Attached as Appendix 1) [Note: Results of PER Checking (Appendix 1) should be retained with the Project Unit]

c) Is the consulting firm an external ADB auditor? Yes No

If Yes, please obtain clearance from OAI before proceeding. 9. Checking of Conflict of Interest [in accordance with the Guidelines on the Use of

Consultants by ADB and Its Borrowers (CG)]:

a) Conflict between consulting activities [CG 1.11(a)] Yes No

b) Conflict among consulting assignments [CG 1.11(b)] Yes No

c) Conflict with concerned OSFMD/Project Unit Specialists [CG 1.11(c)] Yes No

If Yes, state relationship & whether potential or actual conflict of interest exists: _______________

1. Subject to Section F of PAI 2.05, upon receipt of the EA’s Submission 1, the project unit ensures

that the EA completed all documents required in the submission form before immediately forwarding an electronic copy of the submission to OSFMD-LCU (see PAI 2.05, paragraph 14).

2. The Project Unit should assist the EA to obtain and use the latest version of the RFP without

modification or omission of the standard provisions. 3. The Project Unit should ensure that the submission is consistent with the latest procurement plan. 4. The Project Unit will convey the above decisions and recommendations to the EA.

Page 60: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8b, Page 6

Prepared by: ___________________________________ Signature above Printed Name Project Unit ____________________ Date

Endorsed: Yes No Approved by: ________________________________ Signature above Printed Name Director, Project Unit / Country Director, Resident Mission (Please sign as applicable) ___________________ Date

Disclaimer: The review and approval of this submission document is conducted independently and must not serve as a precedent for future reviews.

Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

Page 61: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8c, Page 1

For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents

This is the: [indicate whether 1

st, 2

nd, 3

rd, etc.]

request for review

Executing Agency Consulting Recruitment Submission 1: Request for Proposal (RFP)

(SSS)

Loan/Grant (Country) (No.): Title Package/Component: _______________

Name of Executing Agency (EA): _______________________________________________________ _______________________________________________________ Report Submitted by:

Name: ________________________________________________ Signature: _____________________________________________ Designation: ___________________________________________

Date Submitted: __________________________ Date of EA Consultant Selection Committee (CSC) Meeting: _________________ Checklist of Attached Documents (For 1

st Review): In case of succeeding reviews, please attach

only the information or documents requested in the latest review.

Attachment 1: Latest Uploaded Procurement Plan Yes No [Procurement plan must be within a year and for each loan, not MFF. Attach approval memo for individual changes in the procurement plan]

Attachment 2: Budget for consulting services including details of Yes No provisional sums and contingency Attachment 3: Narrative Evaluation Criteria (NEC) Yes No

[EA to prepare the NEC. Provide weights for each criterion in the summary evaluation sheet and detailed information on how to apply these weights and, if necessary, to distribute them to sub-criteria in NEC.]

Attachment 4: Draft Request for Proposals (RFP) with Terms of Yes No

Reference (TOR), Data Sheet, Summary and Personnel Evaluation Sheets

1

and Draft Contract

Attachment 5: Copy of approval for SSS selection method if not stated Yes No In the RRP/Procurement Plan

Attachment 6: Copy of Previous Communications with OSFMD Procurement Yes No Specialist related to items covered by this Submission Document (if any) Attachment 7: Minutes of EA CSC Meeting Yes No

1 The appropriate templates can be downloaded from the ADB website in the following link: http://www.adb.org/site/business-

opportunities/operational-procurement/consulting/documents. Include the Attachment: Grounds for Disqualification of an Expert.

Part A [To be completed by the Executing Agency]

Page 62: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8c, Page 2

Names of EA CSC Members*: [List the names of members according to ministry/department/agency and designation in a table format. Please provide additional rows in the table below, if required.]

Name Ministry/Department/Agency Designation * Is there any consultant in the EA’s CSC Meeting? Yes No

If Yes, please state whether potential or actual conflict of interest exists.

1

__________________________________________________________________________________ ___________________

1. Advance Action? Yes No 2. Retroactive Financing? Yes No

(If yes, please attach the document approving retroactive financing) 3. Loan Approval Date: ___________________ 4. Loan Effective Date: ___________________ 5. Loan Closing Date: ____________________ 6. Estimated Contract Duration (in months): _______ 7. Budget for this consulting services: US$ _____________ Estimated Maximum 8. Selection criteria: [Apply the following criteria for the selection of the consulting firm for the loan/grant project]:

(I) Eligibility (ii) Experience of the firm with projects of similar nature: (Insert further appropriate details) (iii) Experience of the firm in the project country or in the region: (Insert further appropriate details) (iv) Management competence criterion which includes nomination and a brief background & experience of firm’s director

responsible for this assignment. a) ___________________________________________________________________ ___________________________________________________________________ b) ___________________________________________________________________ ___________________________________________________________________ c) ___________________________________________________________________

_____________________________________________________________

9. Name of the Consulting Firm (Full Name not Acronym)/Country of Incorporation:2

_______________________________________________________________________________

1 The EA should confirm that the consultant in the EA’s CSC Meeting does not have any ongoing business associations (whether

direct or indirect) with the selected firm and its experts. 2 Corporations or companies must be incorporated in an ADB Member Country. Partnerships or non-corporations must be duly

registered or legally established in an ADB Member Country. These include universities, institutions, public sector organizations, and NGOs.

Page 63: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8c, Page 3

a) Checking of Conflict of Interest [in accordance with the Guidelines on the Use of Consultants by ADB and Its Borrowers (CG)]:

i) Conflict between consulting activities [CG 1.11(a)] Yes No

ii) Conflict among consulting assignments [CG 1.11(b)] Yes No

iii) Relationship with borrower’s staff [CG 1.11(c)] Yes No

If Yes, state relationship & whether potential or actual conflict of interest exists. ____________ ____________________________________________________________________________

b) Did the consulting firm participate in upstream assignment such Yes No as PPTA or other assignment regardless of financing source from which the firm may derive an unfair competitive advantage to this assignment? [RFP Section 2 (ITC), para. 4, Data Sheet 4.1, and CG 1.12]

If Yes, EA to complete RFP Data Sheet 4.1.

10. Proposed Modifications on Contract Forms:

[Revision/s for additional provision/s or deletion of certain provision/s in the General Conditions of the Contract (GCC) is not permissible. Instead, the Project Unit should advise the EA to incorporate revision/s through the Special Conditions of Contract (SCC) and changes should be reviewed by the Office of the General Counsel (OGC) prior to Submission 1.] State proposed revision/s and attach OGC’s review in this Submission 1 document. _______________________________________________________________________________ _______________________________________________________________________________

11. Type of Contract to be used: Time-Based Lump-Sum

Page 64: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8c, Page 4

Part B [ADB Comments on EA’s Submission]

1. Comments on Part A:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

2. Selection Criteria:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

3. Selected Consulting Firm:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

4. Narrative Evaluation Criteria (NEC):

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

5. Request for Proposals (RFP):

a) Section 1: Letter of Invitation (LOI): i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

b) Section 2: Data Sheet:

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

c) Summary and Personnel Evaluation Sheets (SES and PES):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

d) Section 7: Terms of Reference (TOR):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

Page 65: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8c, Page 5

Reminders for the Project Unit

e) Special Conditions of Contract (SCC):

i) _______________________________________________________________________ ii) _______________________________________________________________________ iii) _______________________________________________________________________

6. Other Issues:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

7. Advance Reminders for the Review of Submission 2-3: For detailed instructions, please refer

to the Guide in Reviewing Submission 2 and Guidance Notes on the Evaluation of Financial Proposals in ADB website.

8. Anticorruption Sanction/Terrorism Lists and Performance Evaluation Report (PER) Checking:

a) Is the consulting firm (including its Joint Venture Partner/s or Yes No Sub-consultant/s) in ADB Anticorruption Sanction Lists and Terrorism Lists?

b) PER of the consulting firm (including its Joint Venture Partner/s Yes No

or Sub-consultant/s) checked? (Attached as Appendix 1) [Note: Results of PER Checking (Appendix 1) should be retained with the Project Unit]

c) Is the consulting firm an external ADB auditor? Yes No If Yes, please obtain clearance from OAI before proceeding.

9. Checking of Conflict of Interest [in accordance with the Guidelines on the Use of

Consultants by ADB and Its Borrowers CG)]:

a) Conflict between consulting activities [CG 1.11(a)]: Yes No

b) Conflict among consulting assignments [CG 1.11(b)]: Yes No

c) Conflict with concerned OSFMD/Project Unit Specialists [CG 1.11(c)]: Yes No

If yes, state relationship & whether potential or actual conflict of interest exists: ________________ 1. Subject to Section F of PAI 2.05, upon receipt of the EA’s Submission 1, the project unit ensures

that the EA completed all documents required in the submission form before immediately forwarding an electronic copy of the submission to OSFMD-LCU (see PAI 2.05, paragraph 14).

2. The Project Unit should assist the EA to obtain and use the latest version of the RFP without

modification or omission of the standard provisions. 3. The Project Unit should ensure that the submission is consistent with the latest procurement plan. 4. The Project Unit will convey the above decisions and recommendations to the EA.

Page 66: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8c, Page 6

Prepared by: __________________________________ ___________________________________ Signature above Printed Name Signature above Printed Name OSFMD (If applicable) Project Unit Note: When OSFMD review is required, the Project Unit Officer signs the ______________________ review document after the OSFMD Date Officer signs it. Approved: Yes No ___________________ Date Approved by: _________________________________ Signature above Printed Name Director, Project Unit / Country Director, Resident Mission (Please sign as applicable) _________________ Date

Disclaimer: The review and approval of this submission document is conducted independently and must not serve as a precedent for future reviews.

Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

Page 67: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8d, Page 1

For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents

This is the: [indicate whether 1

st, 2

nd, 3

rd, etc.]

request for review

Executing Agency Consulting Recruitment Submission 2-3: Technical and Financial Proposals Evaluation

(CQS/SSS)

Loan/Grant (Country) (No.): Title Package/Component: _______________

Name of Executing Agency (EA): _______________________________________________________ _______________________________________________________ Report Submitted by:

Name: ________________________________________________ Signature: _____________________________________________ Designation: ___________________________________________

Date Submitted: __________________________ Date of EA Consultant Selection Committee-

Technical and Financial Proposals (CSC-TP & FP) Evaluation Meeting: ____________________ Checklist of Attached Documents (For 1

st Review): In case of succeeding reviews, please attach

only the information or documents requested in the latest review.

Attachment 1: Copy of approved Submission 1 Yes No Attachment 2: Issued Request for Proposal (RFP) Yes No Attachment 3: Duly filled Summary and Personnel Evaluation Sheet

1

Yes No

Attachment 4: Narrative Comments on the Evaluation of Technical Proposal2

[EA CSC should provide comments on the strengths and weaknesses of each technical proposal with special attention on criteria and personnel/expert evaluated as “excellent”, “below average” or “non-complying”.]

Yes No

Attachment 5: Completed Summary Evaluation Sheet of the Firm’s Yes No

Financial Proposal (Form EV 5)

Attachment 6: Completed Financial Proposal Price Adjustments (Form EV 6.1) Yes No Attachment 7: Narrative Comments on the Evaluation of Financial Proposals, Yes No

noting any corrections in the Financial Proposal(s). [Related information may be contained in one place to facilitate one-stop review.]

Attachment 8: Copy of Previous Communications with OSFMD Procurement Yes No Specialist related to items covered by this Submission Document (if any) Attachment 9: Minutes of the EA CSC-TP & FP Evaluation Meeting Yes No

1 The appropriate templates for the three types of proposals can be downloaded from the ADB website in the following link

http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents. 2 Use the appropriate template for FTP, STP or BTP found at the end of Submission 2 form marked as Format for Attachment 4.

Part A [To be completed by the Executing Agency]

Page 68: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8d, Page 2

Names of EA CSC Members*: [List the names of members according to ministry/department/agency and designation in

a table format. Please provide additional rows in the Table below, if required.] Name Ministry/Department/Agency Designation

* Is there any consultant in the EA’s CSC Meeting? Yes No

If Yes, please state whether potential or actual conflict of interest exists.1

__________________________________________________________________________________ ___________________

1. (For CQS) Date of EA EOI Evaluation: ___________________________________ 2. Date of Issuance of the Request for Proposal (RFP): _______________________ 3. Deadline for Submission of Technical and Financial Proposals: ________________________

4. (For CQS) Date of ADB’s Endorsement of the EOI Evaluation: _________________________ 5. Name of the Selected Consulting Firm (Full Name)/Country: ____________________________ _______________________________________________________________________________ 6. Checking of Conflict of Interest (in accordance with the Guidelines on the

Use of Consultants by ADB and Its Borrowers (CG)]:

a) Conflict between consulting activities [CG 1.11(a)] Yes No

b) Conflict among consulting assignments [CG 1.11(b)] Yes No

c) Relationship with borrower’s staff [CG 1.11(c)] Yes No If Yes, state relationship & whether potential or actual conflict of interest exists. _______________ _______________________________________________________________________________ _______________________________________________________________________________

1 The EA should confirm that the consultant in the EA’s CSC Meeting does not have any ongoing business association (whether

direct or indirect) with the firm or its proposed experts whose technical and financial proposals were evaluated.

Page 69: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8d, Page 3

Part B [ADB Comments on EA’s Submission]

1. EA’s evaluation of Summary and Personnel Evaluation Sheets (SES/PES):

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

2. EA’s Narrative Comments on the Evaluation of Technical Proposal:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

3. EA’s Financial Proposal Evaluation:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

4. EA’s Narrative Comments on the Evaluation of Financial Proposal, including

adjustments/corrections made by the EA to the Financial Proposal of the firm (if any): a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

5. Other Issues:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

6. Anticorruption Sanction/Terrorism Lists and Performance Evaluation Report (PER) Checking:

a) Is the selected consulting firm (including its Joint Venture Partner/s Yes No or Sub-consultant/s) or its experts in ADB Anticorruption Sanction Lists and Terrorism Lists?

If Yes, list the name/s of the expert/s. _____________________________________________ ____________________________________________________________________________

b) PER of the selected consulting firm (including its Joint Venture Yes No

Partner/s or Sub-consultant/s) and its experts checked? (Attached as Appendix 1) [Note: Results of PER Checking (Appendix 1) should be retained with the Project Unit]

c) External ADB auditor among the firms evaluated? Yes No

If Yes, please obtain clearance from OAI before proceeding.

Page 70: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8d, Page 4

Reminders for the Project Unit

7. Checking of Conflict of Interest [in accordance with the Guidelines on the Use of Consultants by ADB and Its Borrowers (CG)]:

a) Conflict between consulting activities [CG 1.11(a)] Yes No

b) Conflict among consulting assignments [CG 1.11(b)] Yes No

c) Conflict with concerned OSFMD/Project Unit Specialists [CG 1.11(c)] Yes No

If Yes, state relationship & whether potential or actual conflict of interest exists: _______________ _______________________________________________________________________________ _______________________________________________________________________________

1. Subject to Section F of PAI 2.05, upon receipt of the EA’s Submission 2-3, the project unit ensures

that the EA completed all documents required in the submission form before immediately forwarding an electronic copy of the submission to OSFMD-LCU (see PAI 2.05, paragraphs 22 and 25).

2. The Project Unit will advise the EA to invite the consulting firm to contract negotiations.

1

The draft negotiated contract following ADB’s standard consultant’s contract should be submitted for ADB’s approval. In case of failure of negotiations with the first-ranked firm, ADB should be advised before the EA can negotiate a contract with the second-ranked firm.

3. The Project Unit will convey the above decisions and recommendations to the EA.

1 For advance action, contract negotiations should only be scheduled if effectivity of the financing agreement is expected in the

immediate or near future unless retroactive financing has been approved. See PAI 2.05, para. 7.

Page 71: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8d, Page 5

Prepared by: __________________________________ ___________________________________ Signature above Printed Name Signature above Printed Name OSFMD (if applicable) * Project Unit Note: The Project Unit Officer signs the review document after the OSFMD ____________________ Officer signs it. Date Approved: Yes No ___________________ Date Approved by: __________________________________ Signature above Printed Name Director, Project Unit / Country Director, Resident Mission (Please sign as applicable) __________________ Date

Disclaimer: The review and approval of this submission document is conducted independently

and must not serve as a precedent for future reviews. Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

Page 72: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8d, Page 6

Format for Attachment 4 Narrative Comments on the Technical Proposals

Full Technical Proposal (FTP) (All Selection Methods)

Firm 1 I. Qualification Comment/s for ratings

1

of Excellent, Below Average and Non-complying:

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2

Please identify the names and positions of experts.

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 2 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 3 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 4 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 5 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. •

Firm 6 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

1 Rating refers to the ratings in the Summary Evaluation Sheet.

2 Please refer to the Guide in Reviewing Submission 2, para. 10-b).

Page 73: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8d, Page 7

Format for Attachment 4

Narrative Comments on the Technical Proposals Simplified Technical Proposal (STP)

(All Selection Methods)

Firm 1 I. Approach and Methodology Comment/s for ratings

1

of Excellent, Below Average and Non-complying:

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2

Please identify the names and positions of experts.

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 2 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 3 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 4 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 5 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 6 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

1 Rating refers to the ratings in the Summary Evaluation Sheet.

2 Please refer to the Guide in Reviewing Submission 2, para. 10-b).

Page 74: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8d, Page 8

Format for Attachment 4 Narrative Comments on the Technical Proposals

Biodata Technical Proposal (BTP) (All Selection Methods)

Firm 1 I. Personnel Schedule & Work Plan Comment/s for ratings

1

of Average, Below Average and Non-complying:

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2

Please identify the names and positions of experts.

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 2 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 3 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 4 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 5 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 6 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

1 Rating refers to the ratings in the Summary Evaluation Sheet.

2 Please refer to the Guide in Reviewing Submission 2, para. 10-b).

Page 75: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in January 2011

Appendix 8e, Page 1

For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents

This is the: [indicate whether 1

st, 2

nd, 3

rd, etc.]

request for review

Executing Agency Consulting Recruitment Submission 2: Evaluation of Technical Proposals

(QCBS/QBS/FBS/LCS)

Loan/Grant (Country) (No.): Title Package/Component: _____________________

Name of Executing Agency (EA): _______________________________________________________ _______________________________________________________ Report Submitted by:

Name: ________________________________________________ Signature: _____________________________________________ Designation: ___________________________________________

Date Submitted: ___________________________ Date of EA Consultant Selection Committee- Technical Proposals Evaluation (CSC-TEV) Meeting: _____________________ Checklist of Attached Documents (For 1

st Review): In case of succeeding reviews, please attach

only the information or documents requested in the latest review.

Attachment 1: Copy of approved Submission 1 Yes No Attachment 2: Issued Request for Proposal (RFP) Yes No Attachment 3: Copy of withdrawal letter/confirmation from the firm/s Yes No that did not submit proposals Attachment 4: Approval for change in association (if applicable) Yes No

[Includes dropping/removal of JV Partner or addition of JV Partner/ Sub-consultant. Ticking ‘No’ means there is no change from the original association of the firms that submitted proposals]

Attachment 5: Duly filled Summary and Personnel Evaluation Sheets

1

Yes No

Attachment 6: Narrative Comments on the Evaluation of Technical Proposals2

[EA CSC should provide comments on the strengths and weaknesses of each technical proposal with special attention on criteria and personnel/expert evaluated as “excellent”, “below average” or “non-complying”.]

Yes No

Attachment 7: Copy of Previous Communications with OSFMD Procurement Yes No Specialist related to items covered by this Submission Document (if any) Attachment 8: Minutes of the EA CSC-TEV Meeting Yes No Attachment 9: Updated Consultant Recruitment Activities Monitoring (CRAM) Yes No Sheet [Indicate in the CRAM the reasons for any delay, and

remedial action taken.]

1 The appropriate templates for the three types of proposals can be downloaded from the ADB website in the following link

http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents. 2 Use the appropriate template for FTP, STP or BTP found at the end of Submission 2 form marked as Format for Attachment 6.

Part A [To be completed by the Executing Agency]

Page 76: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8e, Page 2

Names of EA CSC Members*: [List the names of members according to ministry/department/agency and designation in a table format. Please provide additional rows in the Table below, if required.]

Name Ministry/Department/Agency Designation * Is there any consultant in the EA’s CSC Meeting? Yes No

If Yes, please state whether potential or actual conflict of interest exists.1

__________________________________________________________________________________ ___________________

1. Date of Shortlisting: ________________________ 2. Shortlisted Firms:

Firm Name (Full Name not Acronym)/ Country of Incorporation

Nature of Association (Indicate if the firm is

Lead, JV Partner, or Sub-consultant)

Nature of Organization [Indicate if Private,

State-Owned (SOE) or NGO]

1. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

2. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

3. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

4. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

5. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

6. Firm 1 Lead Private / SOE / NGO Firm 2 JV Partner / Sub-consultant Private / SOE / NGO Firm 3 JV Partner / Sub-consultant Private / SOE / NGO

3. Date of Submission of Outstanding Documents/Information required under Conditional

Approval in Submission 1 review (if applicable) _____________________________________ 4. EA confirms incorporation of ADB comments in the issued RFP? Yes No

If No, please state reason: _______________________________________________________

5. Date of Issuance of the Request for Proposal (RFP): ________________________ 6. Deadline for Submission of Technical Proposals: ____________________________

1 The EA should confirm that the consultant in the EA’s CSC Meeting does not have any ongoing business association (whether

direct or indirect) with any of the firms or its proposed experts whose technical proposals were evaluated.

Page 77: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8e, Page 3

7. Result of EA’s CSC Technical Proposal Evaluation: [Note: EA to list the names of consulting firms, country, and scores in the Table below.]

Firm Score

8. Checking of Conflict of Interest [in accordance with the Guidelines on the

Use of Consultants by ADB and Its Borrowers (CG)]:

a) Conflict between consulting activities [CG 1.11(a)] Yes No

b) Conflict among consulting assignments [CG 1.11(b)] Yes No

c) Relationship with borrower’s staff [CG 1.11(c)] Yes No

If Yes, state relationship & whether potential or actual conflict of interest exists. _______________ _______________________________________________________________________________

9. Public Opening of Financial Proposals:

a) Proposed date of public opening: _______________________________ b) Location of public opening: ____________________________________

Page 78: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8e, Page 4

Part B [ADB Comments on EA’s Submission]

1. EA’s evaluation of Summary and Personnel Evaluation Sheets (SES/PES):

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

2. EA’s Narrative Comments on the Evaluation of Technical Proposals:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

3. Other Issues:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

4. Advance Reminder for Submission 3 Review: The following procedures apply when the old

version of the RFP is used by the EA. Otherwise, please refer to the Guidance Note on Financial Proposal Evaluation for selections that used the new Standard RFP (SRFP), by accessing the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents.

For remuneration, upload only so that:

(1) Proposed person-months (PM) in Technical Proposal (TECH 7) meets the minimum requirements in data sheet (RFP); and

(2) Consultant’s Financial Proposal (FP) supports what they propose in Technical

Proposal (TP). Please note that financial evaluation does not refer to TOR. To ensure these two elements in evaluation, please apply the following for remuneration:

• EA should upload the price when:

RFP vs. TP: look at a total PM. If it is less than the total PM in Data Sheet of RFP upload by:

[(Total PM in Data Sheet) – (Proposed total PM in TP)] x (the highest rate among proposed experts in the FP) - this applies for both international and national PM respectively [3.8(iii)(f), Section 2-RFP].

FP vs. TP: if PMs in FP do not support PMs in TP upload PM input individually to make FP to support TP - TECH-7 Personnel Schedule. [(expert’s PM in TP) – (expert’s PM in FP)] x (rate of the expert) will be added to the price - this applies for each expert individually if their PM in FP is smaller than PM in TP. However, if PM in FP is larger than the PM in TP, no need to adjust.

Page 79: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8e, Page 5

5. Anticorruption Sanction/Terrorism Lists and Performance Evaluation Report (PER) Checking:

a) Any of the firms evaluated (including the Joint Venture Partner/s Yes No

or Sub-consultant/s) in ADB Anticorruption Sanction Lists and Terrorism Lists? If Yes, state the name of the consulting firm/s: _______________________________________

(For QBS: Any of the experts of the technically evaluated first-ranked Yes No firm in ADB Anticorruption Sanction Lists and Terrorism Lists? If Yes, list the name/s of the expert/s: _____________________________________________ ____________________________________________________________________________

b) PER of the firms evaluated (including the Joint Venture Partner/s Yes No

or Sub-consultant/s) checked? (Attached as Appendix 1) [Note: Results of PER Checking (Appendix 1) should be retained with the Project Unit]

c) External ADB auditor among the firms evaluated? Yes No If Yes, please obtain clearance from OAI before proceeding.

6. Checking of Conflict of Interest [in accordance with the Guidelines on the

Use of Consultants by ADB and Its Borrowers (CG)]: a) Conflict between consulting activities [CG 1.11(a)] Yes No

b) Conflict among consulting assignments [CG 1.11(b)] Yes No

c) Conflict with concerned OSFMD/Project Unit Specialists [CG 1.11(c)] Yes No

If yes, state relationship & whether potential or actual conflict of interest exists: ____________ ____________________________________________________________________________ ____________________________________________________________________________

7. OSFMD/Project Unit endorses the evaluation results Yes No Comments: (If No) ________________________________________________________________ _______________________________________________________________________________

Page 80: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8e, Page 6

Reminders for the Project Unit 1. Subject to Section F of PAI 2.05, upon receipt of the EA’s Submission 2, the project unit ensures

that the EA completed all documents required in the submission form before immediately forwarding an electronic copy of the submission to OSFMD-LCU (see PAI 2.05, paragraph 22).

2. (For QCBS, LCS, FBS): The Project Unit will advise the EA to proceed with the public opening of

financial proposals. The EA should be reminded to return (unopened) the financial proposal/s of the firm/s that did not meet the minimum qualifying score of 750 points for technical proposals after the conclusion of the consultant selection process.

(For QBS): The Project Unit will advise the EA to invite the first ranked firm that meets the minimum qualifying score of 750 in their technical proposal to prepare and submit its financial proposal for contract negotiations. In the event of failure of negotiation with the first ranked firm, ADB’s clearance should be obtained before proceeding to contract negotiations with the second ranked firm (or subsequent firms if it becomes necessary) provided that such firm meets the minimum qualifying score of 750 in their technical proposal).

3. The Project Unit will send an updated CRAM sheet to the EA for its monitoring of the recruitment

activities. 4. The Project Unit will convey the above decisions and recommendations to the EA.

Page 81: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8e, Page 7

Prepared by: __________________________________ ___________________________________ Signature above Printed Name Signature above Printed Name OSFMD (If applicable) Project Unit Note: When OSFMD review is required, the Project Unit Officer signs the ____________________ review document after the OSFMD Date Officer signs it.

Approved: Yes No ____________________ Date Approved by: _________________________________ Signature above Printed Name Director, Project Unit / Country Director, Resident Mission (Please sign as applicable) ___________________ Date

Disclaimer: The review and approval of this submission document is conducted independently

and must not serve as a precedent for future reviews. Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

Page 82: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8e, Page 8

Format for Attachment 6 Narrative Comments on the Technical Proposals

Full Technical Proposal (FTP) (All Selection Methods)

Firm 1 I. Qualification Comment/s for ratings

1

of Excellent, Below Average and Non-complying:

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2

Please identify the names and positions of experts.

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 2 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 3 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 4 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 5 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 6 I. Qualification Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

1 Rating refers to the ratings in the Summary Evaluation Sheet.

2 Please refer to the Guide in Reviewing Submission 2, para. 10-b).

Page 83: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8e, Page 9

Format for Attachment 6

Narrative Comments on the Technical Proposals Simplified Technical Proposal (STP)

(All Selection Methods)

Firm 1 I. Approach and Methodology Comment/s for ratings

1

of Excellent, Below Average and Non-complying:

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2

Please identify the names and positions of experts.

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 2 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 3 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 4 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 5 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 6 I. Approach and Methodology Comment/s for ratings

1 of Excellent, Below Average

and Non-complying: • •

II. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

1 Rating refers to the ratings in the Summary Evaluation Sheet.

2 Please refer to the Guide in Reviewing Submission 2, para. 10-b).

Page 84: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8e, Page 10

Format for Attachment 6 Narrative Comments on the Technical Proposals

Biodata Technical Proposal (BTP) (All Selection Methods)

Firm 1 I. Personnel Schedule & Work Plan Comment/s for ratings

1

of Average, Below Average and Non-complying:

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2

Please identify the names and positions of experts.

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 2 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 3 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 4 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 5 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

Firm 6 I. Personnel Schedule & Work Plan Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

II. Proposal Presentation Comment/s for ratings

1 of Average, Below Average

and Non-complying: • •

III. Personnel (Areas of Expertise) International Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

National Consultants Comment/s for ratings

1 of Excellent, Below Average

and Non-complying.2 Please identify the names and

positions of experts. • •

1 Rating refers to the ratings in the Summary Evaluation Sheet.

2 Please refer to the Guide in Reviewing Submission 2, para. 10-b).

Page 85: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in January 2011

Appendix 8f, Page 1

For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents

This is the: [indicate whether 1

st, 2

nd, 3

rd, etc.]

request for review

Executing Agency Consulting Recruitment Submission 3: Financial Proposals Evaluation and

Overall Ranking of Proposals (QCBS/FBS/LCS)1

Loan/Grant (Country) (No.): Title Package/Component: _______________________

Name of Executing Agency (EA): _______________________________________________________ _______________________________________________________ Report Submitted by:

Name: ________________________________________________ Signature: _____________________________________________ Designation: ___________________________________________

Date Submitted: ___________________________ Date of EA Consultant Selection Committee-

Financial Proposals Evaluation-Overall Ranking (CSC-FEV/OR) Meeting: _________________ Checklist of Attached Documents (For 1

st Review): In case of succeeding reviews, please attach only

the information or documents requested in the latest review. [Note: All Forms EV 4.1 to EV 7 must be ADB standard template and duly signed as required]

Attachment 1: Record of Attendance at the Opening of the Financial Yes No Proposals (Form EV 4.1) Attachment 2: Record of Technical Score and Proposal Prices at Opening of Yes No Financial Proposals (Form EV 4.2) Attachment 3: Completed Summary Evaluation Sheet of Individual Firm’s Yes No

Financial Proposal (Form EV 5)

Attachment 4: Completed Summary Evaluation Sheet of Financial Proposals Yes No (Form EV 6) Attachment 5: Completed Financial Proposal Price Adjustments (Form EV 6.1) Yes No Attachment 6: Completed Summary Proposal Ranking Sheet (Form EV 7) Yes No Attachment 7: Narrative Comments on the Evaluation of Financial Proposals, Yes No

noting any corrections in the Financial Proposals. [Related information may be contained in one place to facilitate one-stop review.]

Attachment 8: Copy of Previous Communications with OSFMD Procurement Yes No Specialist related to items covered by this Submission Document (if any) Attachment 9 Minutes of EA CSC-FEV and Overall Ranking Meeting Yes No [The Minutes of EA’s CSC-FEV Meeting should include narrative

comments on adjustments/corrections made to the financial proposals of the firms.]

Attachment 10: Updated Consultant Recruitment Activities Monitoring (CRAM) Yes No

Sheet [Indicate in the CRAM the reasons for any delay, and any remedial action taken.]

1 Submission 3 does not apply to the QBS method.

Part A [To be completed by the Executing Agency]

Page 86: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8f, Page 2

Names of EA CSC Members*: [List the names of members according to ministry/department/agency and designation in

a table format. Please provide additional rows in the Table below, if required.] Name Ministry/Department/Agency Designation

* Is there any consultant in the EA’s CSC Meeting? Yes No

If Yes, please state whether potential or actual conflict of interest exists.

2

__________________________________________________________________________________ ___________________

1. Date of ADB’s Endorsement of the Technical Proposal Evaluation Report: _________________ 2. Results of EA’s Financial Proposal Evaluation and Final Ranking:

For QCBS

Rank Firm Technical

Points (___%)

Financial Points (___%)

Overall Points

For FBS/LCS

Rank Firm Technical

Score Financial Proposal

Price

3. Date of Submission of Outstanding Documents/Information required under Conditional

Approval in Submission 2 review (if applicable) _____________________________________ 4. Form EV 4.2: Financial proposed prices of each firm recorded as per FIN-1 Yes No

including currencies as proposed? 5. Form EV 5: Any of the firms evaluated exceeded the budget based on the Yes No

Adjusted Total Price (ATP) in Form EV 5? [For Maximum Budget, if yes, please indicate zero (0) in the firms’ financial score points in Form EV 7 (column 6).]

2 The EA should confirm that the consultant in the EA’s CSC Meeting does not have any ongoing business associations (whether

direct or indirect) with any of the firms or its proposed experts whose financial proposals were evaluated.

Page 87: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8f, Page 3

6. Form EV 6: Figures in Column 2 consistent with the Price at the Opening Yes No

of Financial Proposals in Form EV 4.2?

7. Form EV 6.1: [Note: Details of adjustments should be expressed in US$] • Taxes required to be deducted? If yes, indicate details in Form EV 6.1 Yes No

8. Form EV 7: Financial scores of each firm based on the Evaluated Total Yes No

Price (ETP)? [Note: For Maximum Budget, if any of the firms’ financial proposals exceeded the ATP in Form EV 5 and Form EV 6, the EA should indicate zero (0) in the financial score in Form EV 7 (column 6).]

9. Please confirm if the evaluation was carried out in accordance with the Guidance Notes on

Evaluation of Financial Proposal by answering the following questions: [Note to the EA: Please ensure that all questions are cleared prior to requesting review of this Submission 3 document. ADB reserves the right not to process this Submission 3 document in the absence of EA’s confirmation to the questions set forth below.]

Arithmetic Errors: a) Adjustments applied with reference to para. 4(b) in the Guidance Notes? Yes No

If Yes, please list any problem encountered (if any). Remuneration: Financial Evaluation following the 2-Step Approach a) Comparing Technical Proposal with RFP

[Reference to para. 4-e-(i)-(a) in the Guidance Notes]

Did the EA’s CSC-FEV check if the technical proposals meet the minimum Yes No person-months inputs indicated in the Data Sheet for international and national key experts?

b) Comparing Financial Proposal (FP) with Technical Proposal of the firm [Reference to para. 4-e-(i)-(b) and (c) in the Guidance Notes]

Did the EA’s CSC-FEV compare the person-month input for each Yes No international and national positions to make the financial proposal congruent to the technical proposal of the firm? Indicate reference in the EA’s CSC-FEV Minutes ____________________________________________________________________________

c) Other expenses [Reference to para. 4-e-(ii) in the Guidance Notes]

Any items not priced or omitted in the firm’s financial proposal? Yes No Indicate reference in the EA’s CSC-FEV Minutes ______________________________________

d) Non-Competitive Component [Reference to paras. 4-c and 4-d in the Guidance Notes]

Amounts for Provisional Sums / Contingencies adjusted (+/-)? Yes No Indicate reference in the EA’s CSC-FEV Minutes ______________________________________

Page 88: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8f, Page 4

e) Discount existing in the firm’s financial proposal? Yes No

[Note: Firm’s financial proposal should be exclusive of discount.]

Indicate reference in the EA’s CSC-FEV Minutes ______________________________________

f) Any of the financial proposals evaluated contained conditional offer? Yes No [Note: A proposal with conditional offer should be rejected with reference to Para. 4-a-(ii) of the Guidance Notes] State conditions proposed and indicate reference in the EA’s CSC-FEV Minutes: ____________________________________________________________________________ ____________________________________________________________________________

g) Exchange rate: Conversion to a single currency by the exchange rate Yes No indicated in the Data Sheet? [SRFP Data Sheet 26.1]

h) Proposal Validity Period [SRFP Data Sheet 12.1]: Validity period expired? Yes No

If Yes, the EA should extend the proposal validity period and extension should be communicated to all firms that submitted proposals. Copies of EA’s letter and firms’ responses must be submitted to ADB.

10. Checking of Conflict of Interest [in accordance with the Guidelines on the

Use of Consultants by ADB and Its Borrowers (CG)]:

a) Conflict between consulting activities [CG 1.11(a)] Yes No

b) Conflict among consulting assignments [CG 1.11(b)] Yes No

c) Relationship with borrower’s staff [CG 1.11(c)] Yes No

If yes, state relationship & whether potential or actual conflict of interest exists. ________________ _______________________________________________________________________________

_______________________________________________________________________________

Page 89: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8f, Page 5

Part B [ADB Comments on EA’s Submission]

1. EA’s Financial Proposal Evaluation and Final Ranking:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

2. EA’s Narrative Comments on the Evaluation of Financial Proposals, including

adjustments/corrections made by the EA to the Financial Proposals of the firms (if any):

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

3. Other Issues:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

4. Anticorruption Sanction/Terrorism Lists and Performance Evaluation Report (PER) Checking:

a) Is the first-ranked firm (including its Joint Venture Partner/s or Yes No Sub-consultant/s) or its experts in ADB Anticorruption Sanction Lists and Terrorism Lists?

If Yes, list the name/s of the expert/s. _____________________________________________ ____________________________________________________________________________

b) PER of the first-ranked firm (including its Joint Venture Partner/s or Yes No

Sub-consultant/s) and its experts checked? (Attached as Appendix 1) [Note: Results of PER Checking (Appendix 1) should be retained with the Project Unit]

c) External ADB auditor among the firms evaluated? Yes No

If yes, please obtain clearance from OAI before proceeding.

5. Checking of Conflict of Interest [in accordance with the Guidelines on the

Use of Consultants by ADB and Its Borrowers (CG)]: a) Conflict between consulting activities [CG 1.11(a)] Yes No

b) Conflict among consulting assignments [CG 1.11(b)] Yes No

c) Conflict with concerned OSFMD/Project Unit Specialists [CG 1.11(c)] Yes No

If yes, state relationship & whether potential or actual conflict of interest exists: ________________ _______________________________________________________________________________

Page 90: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8f, Page 6

Reminders for the Project Unit 1. Subject to Section F of PAI 2.05, upon receipt of the EA’s Submission 3, the project unit ensures

that the EA completed all documents required in the submission form before immediately forwarding an electronic copy of the submission to OSFMD-LCU (see PAI 2.05, paragraph 25).

2. The Project Unit will advise the EA to invite the first-ranked firm to contract negotiations.

3

The draft negotiated contract following ADB’s standard consultant’s contract should be submitted for ADB’s approval. In case of failure of negotiations with the first-ranked firm, ADB should be advised before the EA can negotiate a contract with the second-ranked firm.

3. The Project Unit will send an updated CRAM sheet to the EA for its monitoring of the recruitment activities.

4. The Project Unit will convey the above decisions and recommendations to the EA.

3 For advance action, contract negotiations should only be scheduled if effectivity of the financing agreement is expected in the

immediate or near future unless retroactive financing has been approved. See PAI 2.05, para. 7.

Page 91: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8f, Page 7

Prepared by: ____________________________________ ___________________________________ Signature above Printed Name Signature above Printed Name OSFMD Project Unit Note: The Project Unit Officer signs the review document after the OSFMD ___________________ Officer signs it. Date Approved: Yes No ___________________ Date Approved by: ____________________________________ Signature above Printed Name Director, Project Unit / Country Director, Resident Mission (Please sign as applicable) _________________ Date

Disclaimer: The review and approval of this submission document is conducted independently

and must not serve as a precedent for future reviews. Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

Page 92: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in January 2011

Appendix 8g, Page 1

For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents

This is the: [indicate whether 1

st, 2

nd, 3

rd, etc.]

request for review

Executing Agency Consulting Recruitment Submission 4: Draft Negotiated Contract

(All Selection Methods)

Loan/Grant (Country) (No.): Title Package/Component: _______________________

Name of Executing Agency (EA): _______________________________________________________ _______________________________________________________ Report Submitted by:

Name: ________________________________________________ Signature: _____________________________________________ Designation: ___________________________________________

Date Submitted: ___________________________ Date of EA Contract Negotiations: ___________________________ Checklist of Attached Documents:

Attachment 1: Minutes of EA Contract Negotiations Yes No

Attachment 2: Draft Negotiated Contract with Appendices A, B, C, and D Yes No Attachment 3: Updated Consultant Recruitment Activities Monitoring (CRAM) Yes No

Sheet (except for CQS and SSS [Indicate in the CRAM the reasons for any delay, and any remedial action taken.]

1. EA’s Comments on Contract Negotiations:

[In case of unsuccessful negotiations, ADB is to be informed in detail on the reasons for the failure of negotiations. ADB approval must be requested before the next-ranked firm can be invited for contract negotiations.] a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________ d) ____________________________________________________________________________

2. Proposed Modifications on ADB’s Standard Contract:

[Any changes to ADB’s standard contract should be highlighted and explained with adequate justification.]

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________ d) ____________________________________________________________________________

3. EA’s Request for ADB’s Approval:

We request ADB’s approval of the negotiated contract with the successful consulting firm.

Name of the First-Ranked Firm: _____________________________

Part A [To be completed by the Executing Agency]

Page 93: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012 Appendix 8g, Page 2

Part B [ADB Comments on EA’s Submission]

Reminder for the Project Unit

1. Contract Negotiations:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

2. Draft Negotiated Contract:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

3. Other Issues:

a) ____________________________________________________________________________ b) ____________________________________________________________________________ c) ____________________________________________________________________________

4. Anticorruption Sanction/Terrorism Lists and Performance Evaluation Report (PER) Checking:

a) Is the consulting firm (including its Joint Venture Partner/s or Yes No

Sub-consultant/s) or its experts in ADB Anticorruption Sanction Lists and Terrorism Lists?

b) PER of the consulting firm (including its Joint Venture Partner/s or Yes No

Sub-consultant/s) and its experts checked? (Attached as Appendix 1) [Note: Results of PER Checking (Appendix 1) should be retained with the Project Unit]

c) Is the consulting firm an external ADB auditor? Yes No

If Yes, please obtain clearance from OAI before proceeding. The Project Unit will convey the above decisions and recommendations to the EA.

Page 94: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in December 2012

Appendix 8g, Page 3

Prepared by: __________________________________ Signature above Printed Name Project Unit __________________ Date

Endorsed: Yes No Approved by: _________________________________ Signature above Printed Name Director, Project Unit ________________ Date Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

Page 95: Project Administration Instructions - Asian Development · PDF fileProject Administration Instructions ... draft RFP (when applicable ... ADB then provides the EA with a standard template

PAI No. 2.05 Issued in January 2011

Appendix 8h, Page 1

For reference purposes only and should not be used in preparing submission documents. Please download the latest version of the forms from ADB website at the following link: http://www.adb.org/site/business-opportunities/operational-procurement/consulting/documents

Reminders for the Project Unit

Executing Agency Consulting Recruitment Signed Contract

(All Selection Methods)

Loan/Grant (Country) (No.): Title

Package/Component: _______________________

Name of Executing Agency (EA): _______________________________________________________ _______________________________________________________ Report Submitted by:

Name: ________________________________________________ Signature: _____________________________________________ Designation: ___________________________________________

Date Submitted: _____________________________________ Date of EA’s Signing of the Contract: ___________________ Checklist of Attached Documents:

Attachment 1: Signed Contract with Appendices A, B, C, and D Yes No

Attachment 2: Updated Consultant Recruitment Activities Monitoring (CRAM) Yes No Sheet [Indicate in the CRAM the reasons for any delay, and any remedial action taken.]

We are submitting a copy of the signed contract with the consulting firm for ADB’s record.

Name of Consulting Firm / Country: __________________________________ 1. The Project Unit will send a signed copy of the contract to OSFMD, CTL and OGC, including copies

of all relevant communications regarding consultants to OSFMD. 2. The Project Unit will post the following information in the ADB website:

• the names of the shortlisted consultants who submitted proposals; • scores of their technical proposals; • prices in their financial proposals (for QCBS and LCS); • overall ranking (for QCBS); • name of the selected consultant; and • cost, duration and summary scope of the contract 3. The Project Unit will coordinate with the EA in obtaining the required information enumerated above, in

accordance with PAI 2.05. Distribution: Country Director / Director (Project Unit) / (Project Unit Specialist) OSFMD-LCU

[To be completed by the Executing Agency]