progress review 21-07-2012 @ polannaruwa presented by: eng. vijayabalan, j. engineer (rws)...
TRANSCRIPT
NORTH & EAST PROVINCEWATER, SANITATION & HYGIENE
(WASH) PROJECT (PILOT)
MANNARPROGRESS REVIEW
21-07-2012@
POLANNARUWAPresented By:
Eng. Vijayabalan, J.Engineer (RWS)
Mannar/VavuniyaPrepared By: Rural Water and Sanitation Unit, Mannar (Murunkan)
HYGIENE AWARENESS PROGRAMME
SUB PROJECTS TARGET GROUP STATUS REMARKS
KONDACHCHISchool children 01
Community 01
PALAMPIDDYSchool children 01
Community 01
THALAIMANNARSchool children 01
Community - Scheduled
MATHAKIRAMAMSchool children - Scheduled
Community - Scheduled
KOOLANKULAMSchool children 01
Community 02
TARGET GROUP COMMUNITY
SCHOOL
# of programmes (themes) identified
05 05
SANITATION PROGRAMME
Mathakiramam
Palampiddi
Thalaimannar Village
Kondachchi
Koolankulam & Ahathimuripu
REMARKS
# of Beneficiaries 31 30 23 73 114 271
# selected for stage I 10 10 10 25 30 85
Financial Progress
# 1st installment released- 10 - 16 -
Physical Progress
# completed excavation of pit- 07 - 16 -
Financial Progress
# 2nd installment released- - - - -
Physical Progress
# completed construction of pit & room foundation - - - 01 -
Financial Progress
# 3rd installment released- - - - -
Physical Progress
# Finished construction of toilet- - - 01 -
# selected for stage II 21 20 13 25 40
# selected for stage III 23 44
Mathakiramam
Palampiddi
Thalaimannar Village
Kondachchi
Koolankulam
Identification of Water Source
Construction of well - -
Tube well
Dug well
Existing Well
Yield Tests
Demand calculation
Water Quality test
Design of WSS
Preparation of BOQ
WATER SUPPLY
ENVIRONMENTAL COMPONENT
ISSUES (FROM ENVIRONMENTAL
CHECK LIST)FINDINGS RECOMMENDATION
Removal of large trees at the project sites or access roads to site
There may be some number of trees has to be removed while laying the pipes
New plantation at the same village may require
Unsatisfactory raw water quality (excessive pathogens or mineral constituents)
It is found in the test report that considerable quality issues are there
Water treatment may require
Possible future contamination due to inadequate protection of intake wells and upstream pollution (wastewater discharge from communities, industries and agricultural activities)
At present no very large industry development in that area, But the water source in paddy field area so chemicals and fertilizer may contaminate the water in future
Keep the intake area clean, check the water quality time to time regarding chemicals and fertilizer
Noticeable permanent or seasonal reduction in volume of ground or surface water supply (consider cumulative impact)
It is noticeable that there are ground water reduction may occur in dry season
Our water source (deep well) in the second water table so no problem
Over pumping of groundwater, leading to salinization and ground subsidence
There may be over pumping Consumption rate should be within yield
Increased levels of noise and dust
during the construction , there may be noises from the machineries, and possibilities for dust too
As it is small level construction, noise and dust are minimal
KONDACHCHI/ PALAMPIDDY
ENVIRONMENTAL COMPONENT
ISSUES (FROM ENVIRONMENTAL
CHECK LIST)FINDINGS
RECOMMENDATION
Increased accidents and public safety issues due to construction work, material and machinery
There may be some kind of incident due to open trenches
Proper safety arrangements has to be done in the construction areas
Delivery of unsafe water due to poor O&M treatment and lack of WQ Monitoring
If the project has a treatment plant, then the CBO (WUA) may not be able to maintain properly in the long run
There should be some kind of arrangements for proper training periodical monitoring by RWS
KONDACHCHI/ PALAMPIDDY cont….
ENVIRONMENTAL COMPONENT
ISSUES (FROM ENVIRONMENTAL
CHECK LIST)FINDINGS RECOMMENDATION
Removal of large trees at the project sites or access roads to site
There may be some number of trees has to be removed while laying the pipes
New plantation at the same village may require
Unsatisfactory raw water quality (excessive pathogens or mineral constituents)
It is found in the test report that considerable quality issues are there
Water treatment may require
Possible future contamination due to inadequate protection of intake wells and upstream pollution (wastewater discharge from communities, industries and agricultural activities)
At present no very large industry development in that area, but there is no proper drainage system, so the excess Rain water may get in to the intake well by over flowing and may not fully filtered water.
Keep the intake area clean, check the water quality time to time regarding
Noticeable permanent or seasonal reduction in volume of ground or surface water supply (consider cumulative impact)
It is noticeable that there are ground water reduction may occur in dry season
Over pumping of groundwater, leading to salinization and ground subsidence
Over pumping can cause severe see water intrusion as it is close to see
Consumption rate should be within yield
Increased levels of noise and dust
during the construction , there may be noises from the machineries, and possibilities for dust too
As it is small level construction, noise and dust are minimal
THALAIMANNAR VILLAGE
ENVIRONMENTAL COMPONENT
ISSUES (FROM ENVIRONMENTAL
CHECK LIST)FINDINGS
RECOMMENDATION
Increased accidents and public safety issues due to construction work, material and machinery
There may be some kind of incident due to open trenches
Proper safety arrangements has to be done in the construction areas
Delivery of unsafe water due to poor O&M treatment and lack of WQ Monitoring
If the project has a treatment plant, then the CBO (WUA) may not be able to maintain properly in the long run
There should be some kind of arrangements for proper training periodical monitoring by RWS
THALAIMANNAR VILLAGE cont….
WORK PLAN FOR AUG/SEP 2012 HYGIENE PROGRAMME
- Conducting Hygiene Awareness Programmes on selected themes
SANITATION PROGRAMMEConstruction of Latrines
WATER SUPPLYClarify legal rights to use water source/Towers/ Treatment plantPreparation of feasibility reports Obtain permission for grid electricity, where necessary
TRAININGTOT for Accounting & Financial ManagementConducting Training Programme on Accounting & Financial Management to WUA
Prepared By: Rural Water and Sanitation Unit, Mannar (Murunkan)
THANK YOU