Page 1: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

NORTH & EAST PROVINCEWATER, SANITATION & HYGIENE

(WASH) PROJECT (PILOT)

MANNARPROGRESS REVIEW

21-07-2012@

POLANNARUWAPresented By:

Eng. Vijayabalan, J.Engineer (RWS)

Mannar/VavuniyaPrepared By: Rural Water and Sanitation Unit, Mannar (Murunkan)

Page 2: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

HYGIENE AWARENESS PROGRAMME

SUB PROJECTS TARGET GROUP STATUS REMARKS

KONDACHCHISchool children 01

Community 01

PALAMPIDDYSchool children 01

Community 01

THALAIMANNARSchool children 01

Community - Scheduled

MATHAKIRAMAMSchool children - Scheduled

Community - Scheduled

KOOLANKULAMSchool children 01

Community 02

TARGET GROUP COMMUNITY

SCHOOL

# of programmes (themes) identified

05 05

Page 3: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

SANITATION PROGRAMME

Mathakiramam

Palampiddi

Thalaimannar Village

Kondachchi

Koolankulam & Ahathimuripu

REMARKS

# of Beneficiaries 31 30 23 73 114 271

# selected for stage I 10 10 10 25 30 85

Financial Progress

# 1st installment released- 10 - 16 -

Physical Progress

# completed excavation of pit- 07 - 16 -

Financial Progress

# 2nd installment released- - - - -

Physical Progress

# completed construction of pit & room foundation - - - 01 -

Financial Progress

# 3rd installment released- - - - -

Physical Progress

# Finished construction of toilet- - - 01 -

# selected for stage II 21 20 13 25 40

# selected for stage III 23 44

Page 4: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

Mathakiramam

Palampiddi

Thalaimannar Village

Kondachchi

Koolankulam

Identification of Water Source

Construction of well - -

Tube well

Dug well

Existing Well

Yield Tests

Demand calculation

Water Quality test

Design of WSS

Preparation of BOQ

WATER SUPPLY

Page 5: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

ENVIRONMENTAL COMPONENT

ISSUES (FROM ENVIRONMENTAL

CHECK LIST)FINDINGS RECOMMENDATION

Removal of large trees at the project sites or access roads to site

There may be some number of trees has to be removed while laying the pipes

New plantation at the same village may require

Unsatisfactory raw water quality (excessive pathogens or mineral constituents)

It is found in the test report that considerable quality issues are there

Water treatment may require

Possible future contamination due to inadequate protection of intake wells and upstream pollution (wastewater discharge from communities, industries and agricultural activities)

At present no very large industry development in that area, But the water source in paddy field area so chemicals and fertilizer may contaminate the water in future

Keep the intake area clean, check the water quality time to time regarding chemicals and fertilizer

Noticeable permanent or seasonal reduction in volume of ground or surface water supply (consider cumulative impact)

It is noticeable that there are ground water reduction may occur in dry season

Our water source (deep well) in the second water table so no problem

Over pumping of groundwater, leading to salinization and ground subsidence

There may be over pumping Consumption rate should be within yield

Increased levels of noise and dust

during the construction , there may be noises from the machineries, and possibilities for dust too

As it is small level construction, noise and dust are minimal

KONDACHCHI/ PALAMPIDDY

Page 6: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

ENVIRONMENTAL COMPONENT

ISSUES (FROM ENVIRONMENTAL

CHECK LIST)FINDINGS

RECOMMENDATION

Increased accidents and public safety issues due to construction work, material and machinery

There may be some kind of incident due to open trenches

Proper safety arrangements has to be done in the construction areas

Delivery of unsafe water due to poor O&M treatment and lack of WQ Monitoring

If the project has a treatment plant, then the CBO (WUA) may not be able to maintain properly in the long run

There should be some kind of arrangements for proper training periodical monitoring by RWS

KONDACHCHI/ PALAMPIDDY cont….

Page 7: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

ENVIRONMENTAL COMPONENT

ISSUES (FROM ENVIRONMENTAL

CHECK LIST)FINDINGS RECOMMENDATION

Removal of large trees at the project sites or access roads to site

There may be some number of trees has to be removed while laying the pipes

New plantation at the same village may require

Unsatisfactory raw water quality (excessive pathogens or mineral constituents)

It is found in the test report that considerable quality issues are there

Water treatment may require

Possible future contamination due to inadequate protection of intake wells and upstream pollution (wastewater discharge from communities, industries and agricultural activities)

At present no very large industry development in that area, but there is no proper drainage system, so the excess Rain water may get in to the intake well by over flowing and may not fully filtered water.

Keep the intake area clean, check the water quality time to time regarding

Noticeable permanent or seasonal reduction in volume of ground or surface water supply (consider cumulative impact)

It is noticeable that there are ground water reduction may occur in dry season

Over pumping of groundwater, leading to salinization and ground subsidence

Over pumping can cause severe see water intrusion as it is close to see

Consumption rate should be within yield

Increased levels of noise and dust

during the construction , there may be noises from the machineries, and possibilities for dust too

As it is small level construction, noise and dust are minimal

THALAIMANNAR VILLAGE

Page 8: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

ENVIRONMENTAL COMPONENT

ISSUES (FROM ENVIRONMENTAL

CHECK LIST)FINDINGS

RECOMMENDATION

Increased accidents and public safety issues due to construction work, material and machinery

There may be some kind of incident due to open trenches

Proper safety arrangements has to be done in the construction areas

Delivery of unsafe water due to poor O&M treatment and lack of WQ Monitoring

If the project has a treatment plant, then the CBO (WUA) may not be able to maintain properly in the long run

There should be some kind of arrangements for proper training periodical monitoring by RWS

THALAIMANNAR VILLAGE cont….

Page 9: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

WORK PLAN FOR AUG/SEP 2012 HYGIENE PROGRAMME

- Conducting Hygiene Awareness Programmes on selected themes

SANITATION PROGRAMMEConstruction of Latrines

WATER SUPPLYClarify legal rights to use water source/Towers/ Treatment plantPreparation of feasibility reports Obtain permission for grid electricity, where necessary

TRAININGTOT for Accounting & Financial ManagementConducting Training Programme on Accounting & Financial Management to WUA

Page 10: PROGRESS REVIEW 21-07-2012 @ POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,

Prepared By: Rural Water and Sanitation Unit, Mannar (Murunkan)

THANK YOU