PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, GUNTUR S. No. Year Department Name of the Division Name of the Mandal Name of the Habitation Name of the Work Name of the Donor Dollors/ Pounds received Est. Cost (Rs.in Lakhs) SGRY (Cash + Rice) (Rs.inlakhs) Z.P.General funds (Rs.in lakhs) S.F.C. as 64% of the Estimated Cost/ G.P.Contribution NRI contribution received(Rs.in Lakhs) Adm. Sanction Progs.No. Date Statge of Work 1 2002- 03 P.R. Guntur Pedakakani Nambur Formation of the Uppalagunta road of Nambur village Sridhar R.Vyuur $1,650 2.20000 0.00000 1.42385 0.00000 0.77615 7306/2002-P5 20.03.2003 Completed 2 2002- 03 P.R. Guntur Prathipadu China Kondrupadu Providing Additional accomodation of Z.P.H.School at China Kondrupadu Polypop Coorporation Nadella Gangadhar $6,570 9.52000 2.32000 4.08000 0.00000 3.12000 7306/02-P5 25.03.2003 Completed 3 2002- 03 P.R. Guntur Prathipadu Chinakondrupadu Providing additional rooms to Z.P.HighSchool ,Chinakondrupadu. Polypop Coorporation Nadella Gangadhar $6,220 8.50000 2.21520 3.32284 0.00000 2.96196 7306/2002-P5 18.02.2003 Completed 4 2002- 03 P.R. Guntur Sattenapalli Gudipudi Constn.of Three additional rooms with staircase to Z.P.H.S.Building (Contribution Rs:3.00 Lakhs) Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5 22.06.2002 Completed 5 2002- 03 P.R. Guntur Sattenapalli Gudipudi Constn.of Three additional rooms to Z.P.H.S.Building (Contribution Rs:2.00 Lakhs) Gowtham Pinnamaneni 7.50000 2.25000 3.25000 0.00000 2.00000 7306/2002-P5 22.06.2002 Completed 6 2002- 03 P.R. Guntur Sattenapalli Nandigama Const. of compound wall and gate to Z.P.High School . N.Rao Kopuri $6,300 8.50000 0.00000 5.52920 0.00000 2.97080 7306/2002-P5 20.03.2003 Completed 7 2002- 03 P.R. Guntur Tadikonda Ponnekallu Construction of C.C.Road from Kpta.Raghunadha Babu (H) to B.Panaiah (H) at Ponnekallu Village (Contribution Rs.38775/-) Sudhir B.Ponnam $825 1.30000 0.00000 0.91225 0.00000 0.38775 7306/2002-P5 08.10.2002 Completed 8 2002- 03 P.R. Guntur Thulluru Rayapudi Construction of Community Hall building near Anjeneya swamy temple at Rayapudi (Contribution Rs:0.90 Lakhs) M.V.Rama Rao 1200 UK Pounds 2.80000 0.84000 1.06000 0.00000 0.90000 7306/2002-P5 14.08.2002 Completed

Upload: others

Post on 10-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, GUNTUR

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

1 2002-

03 P.R. Guntur Pedakakani Nambur

Formation of the Uppalagunta road of Nambur village

Sridhar R.Vyuur $1,650 2.20000 0.00000 1.42385 0.00000 0.77615 7306/2002-P5 20.03.2003 Completed

2 2002-

03 P.R. Guntur Prathipadu China Kondrupadu

Providing Additional accomodation of Z.P.H.School at China Kondrupadu

Polypop Coorporation Nadella Gangadhar

$6,570 9.52000 2.32000 4.08000 0.00000 3.12000 7306/02-P5 25.03.2003 Completed

3 2002-

03 P.R. Guntur Prathipadu Chinakondrupadu

Providing additional rooms to Z.P.HighSchool ,Chinakondrupadu.

Polypop Coorporation Nadella Gangadhar

$6,220 8.50000 2.21520 3.32284 0.00000 2.96196 7306/2002-P5 18.02.2003 Completed

4 2002-

03 P.R. Guntur Sattenapalli Gudipudi

Constn.of Three additional rooms with staircase to Z.P.H.S.Building (Contribution Rs:3.00 Lakhs)

Gowtham Pinnamaneni

$10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5 22.06.2002 Completed

5 2002-

03 P.R. Guntur Sattenapalli Gudipudi

Constn.of Three additional rooms to Z.P.H.S.Building (Contribution Rs:2.00 Lakhs)

Gowtham Pinnamaneni

7.50000 2.25000 3.25000 0.00000 2.00000 7306/2002-P5 22.06.2002 Completed

6 2002-

03 P.R. Guntur Sattenapalli Nandigama

Const. of compound wall and gate to Z.P.High School .

N.Rao Kopuri $6,300 8.50000 0.00000 5.52920 0.00000 2.97080 7306/2002-P5 20.03.2003 Completed

7 2002-

03 P.R. Guntur Tadikonda Ponnekallu

Construction of C.C.Road from Kpta.Raghunadha Babu (H) to B.Panaiah (H) at Ponnekallu Village (Contribution Rs.38775/-)

Sudhir B.Ponnam $825 1.30000 0.00000 0.91225 0.00000 0.38775 7306/2002-P5 08.10.2002 Completed

8 2002-

03 P.R. Guntur Thulluru Rayapudi

Construction of Community Hall building near Anjeneya swamy temple at Rayapudi (Contribution Rs:0.90 Lakhs)

M.V.Rama Rao 1200 UK Pounds

2.80000 0.84000 1.06000 0.00000 0.90000 7306/2002-P5 14.08.2002 Completed

Page 2: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

9 2002-

03 P.R. Guntur Thulluru Rayapudi

Completion of the in-complete Community Hall building with compound wall near Anjeneya swamy temple at Rayapudi of Thulluru Mandal (contribution of Pounds:850/- (nearly Rs:62050/-

M.V.Rama Rao 850

UK Pounds 1.80000 0.00000 1.17950 0.00000 0.62050 7306/2002-P5 28.12.2002 Completed

10 2002-

03 P.R. Guntur Vatticherukuru Vinjanampadu

Construction of compound wall & Ground levelling to Z.P.High School, Vinjanampadu.

Chowdary Chirumamilla

$2,150 3.00000 0.00000 1.98950 0.00000 1.01050 7306/2002-P5 21.02.2003 Completed

11 2002-

03 P.R. Narasaraopet Chilakaluripet Gopalamvaripalem

Providing C.C. Road from S.Bapaiah (H) to M.Venkateswara Rao (H) in Gopalamvaripalem (V) of Chilakaluripet (M) (Contribution Rs:1.05 Lakhs)

Gopinath Gopalam $4,000 3.50000 1.23000 1.22000 0.00000 1.05000 7306/2002-P5 31.08.2002 Completed

12 2002-

03 P.R. Narasaraopet Chilakaluripet Gopalamvaripalem

Providing C.C. Road from Maha Lakshmamma Chettu to P.Kotaiah (H) in Gopalamvaripalem (V) of Chilakaluripet (M) (Contribution Rs:0.825 Lakhs)

Gopinath Gopalam 2.75000 0.97000 0.95500 0.00000 0.82500 7306/2002-P5 31.08.2002 Completed

13 2002-

03 P.R. Narasaraopet Rompicherla Annavaram

Completion of incomplete Community Hall at Annavaram Village of Rompicherla Mandal.

Ramanjaneyulu $1,700 2.40000 0.80000 0.80000 0.00000 0.80000 7306/2002-P5 15.03.2003 Completed

14 2002-

03 P.R. Narasaraopet Vinukonda Nadigadda

Construction of 3 additional rooms to Z.P.High School at Nadigadda (Contribution Rs.350000/-)

Vijaya Kanneganti $7,200 10.00000 0.00000 6.50000 0.00000 3.50000 184/2002-P5 27.11.2002 Completed

15 2002-

03 P.R. Narasaraopet Vinukonda Pittambanda

Constn.of Sub-Mersible cause way across Konkeru Vagu at Pittambanda (Contribution Rs:3.30 Lakhs)

Srikanth K.Gudavalli $5,000 10.00000 5.14000 1.56000 0.00000 3.30000 7306/2002-P5 22.6.2002

24.09.2002 Completed

Page 3: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

16 2002-

03 P.R. Tenali Amruthaluru Amruthaluru

Providing CC road to Ambedkar Road in Amruthaluru (Contribution Rs:1.50 Lakhs)

S.R.Anjaneyulu $3,136 5.00000 1.50000 2.00000 0.00000 1.50000 7306/2002-P5 22.06.2002 Completed

17 2002-

03 P.R. Tenali Amruthaluru Amruthaluru

Construcition of CC road in Nagalingam Venkata Sastry Bazar (Contribution Rs.23500/-)

Meenakshi Paruchuri $500 0.70000 0.00000 0.46500 0.00000 0.23500 7306/2002-P5 27.11.2002 Completed

18 2002-

03 P.R. Tenali Amruthaluru Moparru

Constn.of CC roads in Moparru village (Contribution Rs:1.80 Lakhs)

Guthikonda Ravindra Babu

$4,500 6.00000 1.80000 2.40000 0.00000 1.80000 7306/2002-P5 22.06.2002 Completed

19 2002-

03 P.R. Tenali Amruthaluru Moparru

Constn.of CC roads in Harijanawada of Moparru (Contribution Rs:0.45 Lakhs)

Guthikonda Ravindra Babu

$900 1.50000 0.45000 0.60000 0.00000 0.45000 7306/2002-P5 22.06.2002 Completed

20 2002-

03 P.R. Tenali Bapatla Cheruvujammulapalem

Laying of 250 Mts. CC road from Panguluri Srinivasa Rao [H] (Society President) to Kurravari Cheruvu (Constribution Rs.156750/-)

Puvvada Tanuja $3,300 4.50000 0.00000 2.92100 0.00000 1.57900 7306/2002-P5 30.10.2002 Completed

21 2002-

03 P.R. Tenali Bhattiprolu Pedapulivarru

Constn.of community centre in Harijanawada (Ura Malapalli) (Contribution Rs:0.60 Lakhs)

Gangadhar Nadella $2,800 2.00000 0.60000 0.80000 0.00000 0.60000 7306/2002-P5 22.06.2002 Completed

22 2002-

03 P.R. Tenali Bhattiprolu Pedapulivarru

Constn.of Compound wall to Z.P.H.S., Pedapulivarru (Contribution Rs:0.63 Lakhs)

Gangadhar Nadella 2.00000 0.60000 0.77000 0.00000 0.63000 7306/2002-P5 22.06.2002 Completed

23 2002-

03 P.R. Tenali Bhattiprolu Pedapulivarru

Formation of CC road from High School to Gutta Radhakrishna (H) (50.0 Mtrs)(Contribution Rs:0.12 Lakhs)

Gangadhar Nadella 0.40000 0.12000 0.16000 0.00000 0.12000 7306/2002-P5 22.06.2002 Completed

24 2002-

03 P.R. Guntur Kakumanu Bodipalem

Construction of Library-cum-Community Hall in Bodipalem (Contribution Rs.180000/-)

Lakshmi Ganga Chowdary

$5,820 5.00000 0.00000 3.20000 0.00000 1.80000 7306/2002-P5 28.12.2002 Completed

25 2002-

03 P.R. Guntur Kakumanu Bodipalem

Maintenance to Z.P.High School at Bodipalem. (Contribution Rs.24000/-)

Lakshmi Ganga Chowdary

$500 0.65000 0.00000 0.41000 0.00000 0.24000 7306/2002-P5 28.12.2002 Completed

Page 4: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

26 2002-

03 P.R. Guntur Kakumanu Chinalingayapalem

Construction of Toilets to Z.P.H.School at Chinalingayapalem

Paruchuri Venkateswarallu

$725 1.00000 0.00000 0.66000 0.00000 0.34000 7306/2002-P5 20.02.2003 Completed

27 2002-

03 P.R. Tenali Nagaram Zillepalli

Providing CC road from R&B road to Bhavanam Sankara Rao house in Zillepalli (Contribution Rs.28500/-)(56,490/- +D.W.Project)

Prasad Devabhathuni $1,200 0.82000 0.00000 0.53500 0.00000 0.28500 7306/2002-P5 30.10.2002 Completed

28 2003-

04 P.R. Guntur Amaravathi Narukullapadu

Construction of Pucca side drains and C.C. road at R&B road to Gandhi Bomma at Narukullapadu vidllage

B.R.Yalamanchali $6,150 3.00000 0.96000 0.99000 0.00000 1.05000 7306/2002-P5 22.04.2003 Completed

29 2003-

04 P.R. Guntur Amaravathi Narukullapadu

Construction of Pucca side drains land C.C. road Gandhi Bommal to P.W.Scheme at Narukullapadu

B.R.Yalamanchali 5.25000 1.68000 1.74031 0.00000 1.82969 7306/2002-P5 22.04.2003 Completed

30 2003-

04 P.R. Guntur Guntur Mallavaram

Providing two additonal class rooms M.P.U.P.School in Mallavaram village

Ravuri Ramesh $1,500 1.90700 0.00000 1.23950 0.00000 0.66750 7306/2002-P5 06.02.2004 Completed

31 2003-

04 R.W.S. Guntur Pedakakani Pedakakani

Providing pipeline for supplying drinking water from Krishna water Resorvoir to Sankara Eye hospitald at Pedakakani

Sankara Eye Foundation

$7,735 9.94500 0.00000 6.46425 0.00000 3.48075 690/2004-P4 06.02.2004 Completed

32 2003-

04 P.R. Guntur Pedakakani Uppalapadu

C.C. road from Moparthi Venkateswara Rao house to Kaveti Venkateswara Rao house in Uppalapadu village

Jammula Subba Rao $1,555 2.00000 0.00000 1.30025 0.00000 0.69975 7306/2002-P5 09.06.2003 Completed

33 2003-

04 P.R. Guntur Pedakurapadu 75 Tyallur

Construction of additional class room to Z.P.H.School building in 75 tyallur

G.Padma $1,350 1.72609 0.00000 1.12196 0.00000 0.60413 7306/2002-P5 09.01.2004 Completed

34 2003-

04 P.R. Guntur Pedanandipadu Nagulapadu

Formation of C.C. road with drains from Bapatla road to Arvapalli Krishna House in Nagulapadu village

Srinivasa Rao Veleneni

$2,000 2.60000 0.00000 1.69400 0.00000 0.90600 7306/2002-P5 06.09.2003 Completed

Page 5: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

35 2003-

04 P.R. Guntur Phirangipuram Garaduchalapalem

Providing C.C. road from Ramalayam to Kaluva Babu house in Garudachalapalem H/o Takkellapalem

Gangadhar Nadella $1,110 1.40971 0.00000 0.91631 0.00000 0.49340 7306/2002-P5 01.03.2004 Completed

36 2003-

04 P.R. Guntur Sattenapalli Kattamuru

Construction of a Building for Z.P.High School, Kattamuru of Sattenapalli Mandal

M.Ramesh Babu $3,887 5.55000 1.60000 2.20000 0.00000 1.75000 7306/2002-P7 24.08.2003 Completed

37 2003-

04 P.R. Guntur Vatticherukuru Pallapadu

Construction of Gram Panchayat Office building in Pallapadu village

Rao M.Chalasani $4,875 6.26785 0.00000 4.07410 0.00000 2.19375 7306/2002-P5 03.01.2004 Completed

38 2003-

04 P.R. Narasaraopet Machavaram Chennayapalem

Providing C.C. road to the Main road from Water Tank (R&B) road to S.T. colony in Chennayapalem village

Bandla Hanumaiah $2,437 3.14071 0.00000 2.04146 0.00000 1.09925 7306/2002-P5 15.12.2003 Completed

39 2003-

04 P.R. Narasaraopet Nadendla Kanaparru

Providing C.C. Road from Kandimalla Venkateswaralu house to Z.P. road in Kanaparru Village,

N.Suresh Babu $2,300 2.95800 0.00000 1.92300 0.00000 1.03500 7306/2002-P5 15.12.2003 Completed

40 2003-

04 P.R. Narasaraopet Narasaraopet Jonnalagadda

Improvements to the Communityhall at Jonnalagadda

Ram Mohan Musunuri $3,565 4.51860 0.00000 2.93709 0.00000 1.58151 7306/2002-P5 18.12.2003 Completed

41 2003-

04 P.R. Narasaraopet Narasaraopet Jonnalagadda

Improvements to community hall building in Jonnalagadda village.

Ram Mohan Musunuri $900 1.15000 0.00000 0.74800 0.00000 0.40200 7306/2002-P5 23.11.2003 Completed

42 2003-

04 P.R. Narasaraopet Narasaraopet Kakani

Construction of four additional rooms for Z.P.H.School, Kakani village

Prasad Danda $5,000 6.42900 0.00000 4.17900 0.00000 2.25000 7306/2002-P5 19.12.2003 Completed

43 2003-

04 P.R. Narasaraopet Nekarikallu Kandlakunta

Completion of incompleted community hall in Kandlakunta village

Nalluri Nageswara Rao

$2,275 2.90485 0.00000 1.88815 0.00000 1.01670 7306/2002-P5 03.03.2004 Completed

44 2003-

04 P.R. Narasaraopet Rompicherla Annavaram

Development of Community hall building at Annavaram village

Srinivasa R. Gonuguntla

$1,700 2.19000 0.00000 1.42022 0.00000 0.76978 7306/2002-P5 07.10.2003 Completed

Page 6: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

45 2003-

04 P.R. Narasaraopet Rompicherla Karlakunta

Providing Culvert earthwork and Gravel to the road from Karlakunta to Inumella

V.Jaganmohan Reddy

$2,161 2.76000 0.00000 1.79403 0.00000 0.96597 7306/2002-P5 11.02.2004 Completed

46 2003-

04 P.R. Narasaraopet Rompicherla Karlakunta

Gravelling the road from Karlakunta to Inumella in Rompicherla Mandal

V.Jaganmohan Reddy

$2,161 2.77000 0.00000 1.80216 0.00000 0.96784 7306/2002-P5 17.10.2003 Completed

47 2003-

04 P.R. Narasaraopet Veldurthy Veldurthy

Construction of Compound wall to Z.P.H.School Veldurthi

Rao M.Chalasani $2,437 3.14071 0.00000 2.04146 0.00000 1.09925 7306/2002-P5 03.01.2004 Completed

48 2003-

04 P.R. Tenali Amruthaluru Thurumella

Providing C.C. road from R&B road to water tank via Rice Mill in Thurumella village

G.Ravindranath $1,050 1.33351 0 0.86678 0.00000 0.46673 7306/2002-P5 21.02.2004 Completed

49 2003-

04 P.R. Tenali Amruthaluru Amarthaluru

Development of Zilla Parishad High School at Amarthaluru

Raja Veeraiah Kodali $2,437 3.25000 1.04000 1.07000 0.00000 1.14000 7306/2002 P5 09.05.2003 Completed

50 2003-

04 P.R. Tenali Amruthaluru Mulpur

Providing C.C. road from Avula Subba Rao house to Movva Sreenivasa Rao house in Mulpur village.

S.R.Anjaneyulu $1,520 1.93040 0.00000 1.25476 0.00000 0.67564 7306/2002-P5 08.03.2004 Completed

51 2003-

04 P.R. Tenali Amruthaluru Thurumella

Providing C.C. road from Kosaraju Umamaheswara Rao house to west side canal bund in Thurumella village

S.Veeramasuneni $1,400 1.78000 0.00000 1.15700 0.00000 0.62300 7306/2002-P5 06.02.2004 Completed

52 2003-

04 P.R. Tenali Bhattiprolu Pedapulivarru

Prov. C.C. Road from Potharlanka Tippaiah House to Kosaraju Chandramouli House in Pedapulivarru Village

S.Rao Kosaraju $2,300 3.10000 0.00000 2.02000 0.00000 1.08000 7306/2002-P5 15.04.2003 Completed

53 2003-

04 P.R. Tenali Bhattiprolu Vellaturu

Renovation of Z.P.High School at Vellaturu

Krishna Pamidimukkala

$10,000 10.00000 0.00000 6.50000 0.00000 3.50000 7306/2002-P5 06.09.2003 Completed

54 2003-

04 P.R. Tenali Bhattiprolu Vellaturu

Renovation of Z.P.High School at Vellatur

Krishna Pamidimukkala

3.05000 0.00000 1.98489 0.00000 1.06511 7306/2002-P5 26.09.2003 Completed

Page 7: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

55 2003-

04 P.R. Guntur Chebrolu Chebrolu

Providing C.C. road with side drainsin devebhakthuni vari street in Chebrolu village

Surya devara Lakshmi Narayana Prasad

$3,000 3.85285 0.00000 2.50435 0.00000 1.34850 7306/2002-P5 02.12.2003 Completed

56 2003-

04 P.R. Tenali Cherukupalli Kavuru

Providing cement concrete pavement to the Parvataneni vari steet in Kavur Village.

Surendra Babu Parvathaneni

$2,500 3.35000 1.07000 1.11625 0.00000 1.16375 7306/2002 P5 01.05.2003 Completed

57 2003-

04 P.R. Tenali Cherukupalli Kavuru

Completion of incomplete C.C.road to the Parvatanenivari street in Kavuru village

Parvathaneni Budda Bhagavan

$1,250 1.65000 0.52000 0.55812 0.00000 0.57188 7306/2002-P5 25.06.2003 Completed

58 2003-

04 R.W.S. Tenali Cherukupalli Ponnapalli

Providing PWS Scheme to Ponnapalli village

Rama Sarma Ponnapalli

$7,625 10.00000 0.00000 6.50000 0.00000 3.50000 7751/2003-P4 15.10.2003 Completed

59 2003-

04 P.R. Guntur Duggirala Chiluvuru

Providing C.C. to S.C.

B.C.Localities in

Chilumuru village of

Duggirala Mandal.

(a) Kanchagare Sowri (H)

to M.Danamma (H)

(b)V.Jeevaratnam (H) to

Alapati Pedapurnaiah field

in H.W.

© Peruri Krishna (H) to

G.P.Oiffice (Rajaka

colony)

(d) Khadar (H) to Ma

Nannapaneni Sajana $6,870 8.90000 2.84800 2.93200 0.00000 3.12000 7306/2002-P5 22.04.2003 Completed

60 2003-

04 P.R. Guntur Duggirala Chiluvuru

Providing C.C. to village internal roads in Chiluvuru village of Duggirala Mandal (1) Alapati Hari Babu Bazar (2) Krishna Mandirama Bazar (3) Katragadda Krishna Prasad (H) (R&B Road) to Gadde Sambaiah (H) (4)Yella Sambasiva Rao (H) to Babu shop

Katragadda Krishna Prasad

$7,000 9.30000 2.97600 3.06900 0.00000 3.25500 7306/2002-P5 22.04.2003 Completed

61 2003-

04 P.R. Guntur Duggirala Chiluvuru

Construction of Yadla Seetharamaiah Nagabhushanamma Library Building in Chiluvuru village.

Yadla Hema Prasad $6,240 8.10000 0.00000 5.26739 0.00000 2.83261 7306/2002-P5 16.10.2003 Completed

Page 8: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

62 2003-

04 P.R. Guntur Kakumanu Bodipalem

Completion of incomplete Library cum communnity hall in Bodipalem village.

Chowdary OR.Lakshmi Gan ga

$2,060 2.68000 0.00000 1.75300 0.00000 0.92700 7306/2002-P5 06.09.2003 Completed

63 2003-

04 P.R. Guntur Kakumanu Bodipalem

Renovation of Burial ground in Bodipalem village

Ganga Chowdary $1,500 1.95000 0.00000 1.26591 0.00000 0.68409 7306/2002-P5 06.09.2003 Completed

64 2003-

04 P.R. Guntur Kakumanu Kommuru

Constructionof Z.P.HighSchool buildingin Kommuru village

V.Ranga Rao 6000 UK Pounds

10.00000 0.00000 6.50000 0.00000 3.50000 7306/2002-P5 21.02.2004 Completed

65 2003-

04 P.R. Guntur Kakumanu Kommuru

Providing additional accommodation to Z.P.HighSchool in Kommuruvillage

V.Ranga Rao 4.54286 0.00000 2.95286 0.00000 1.59000 7306/2002-P5 21.02.2004 Completed

66 2003-

04 P.R. Tenali Karlapalem Buddam

Metalling the internal roads in Buddam Gram Panchayat

Alluru Raju $10,000 4.00000 0.00000 2.60000 0.00000 1.40000 7306/2002-P5 15.11.2003 Completed

67 2003-

04 P.R. Tenali Karlapalem Buddam

Providing C.C. internal roads in Buddam Grampanchayat

Alluru Raju 8.85000 0.00000 5.75000 0.00000 3.10000 7306/2002-P5 15.11.2003 Completed

68 2003-

04 P.R. Tenali Karlapalem Karlapalem

Providing Addl.Accomodation tothe Z.P.HighSchool at Karlapalem

Bagya Kolli $1,100 1.50000 0.48000 0.50184 0.00000 0.51816 7306/2002-P5 23.06.2003 Completed

69 2003-

04 P.R. Tenali Kollur Kollur

Construction of Community hall at Kollur village

Chittemma Nanapaneni

$6,700 9.10000 2.91000 3.00644 0.00000 3.18356 7306/2002-P5 25.06.2003 Completed

70 2003-

04 P.R. Tenali Kollur Kollur

Construction of additional accommodation to the proposed Zilla Parishad High School(Girls) in Kollur Village.

Chittemma Nanapaneni

8.00000 0.00000 5.20000 0.00000 2.80000 7306/2002-P5 25.11.2003 Completed

Page 9: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

71 2003-

04 P.R. Tenali Kollur Kollur

Construction of Veterinary Hospitalbuilding in Kollur village(cash 219801 and rice 14.80)

Chowdary Kommineni $14,700 5.00000 3.38201 0.00000 0.00000 1.61799 3793/2003P8 01.12.2003 Completed

72 2003-

04 P.R. Tenali Kollur Kollur

Completion of incomplete Z.P.H.School (Girls) in Kollur village

Chowdary Kommineni 3.40500 0.00000 2.21323 0.00000 1.19177 7306/2002-P5 24.03.2004 Completed

73 2003-

04 P.R. Tenali P.V.Palem P.V.Palem

Construction of Rural Sports Indoor Stadium at P.V.Palem.(Z.P.General funds 5.02076+ M.P.1.00 +G.P. 1.00 Total Rs7.02076.

Narasaraju Bhagya Kolli

$6,325 10.00000 0.00000 7.02000 0.00000 2.98000 7306/2002-P5 23.06.2003 Completed

74 2003-

04 R.W.S. Guntur Ponnur Brahmanakoduru

Providing additional OHSR to PWS Scheme at Brahmanakoduru village

Dhrama Pracharak Ramineni

$9,345 8.00000 2.56000 2.64000 0.00000 2.80000 7306/2002-P5 15.05.2003 Completed

75 2003-

04 P.R. Guntur Ponnur Brahmanakoduru

Providing C.C. road from Suda Venkateswarlu House to Nerella Hari house in Brahmana Koduru Village

Dhrama Pracharak Ramineni

2.60000 0.83200 0.85800 0.00000 0.91000 7306/2002-P5 19.05.2003. Completed

76 2003-

04 P.R. Guntur Ponnur Brahmanakoduru

Providing C.C. road from Gullapudi Rambabu House to Lajapathi Rao Shop in Brahmana Koduru village.

Dhrama Pracharak Ramineni

1.00000 0.32000 0.33000 0.00000 0.35000 7306/2002-P5 19.05.2003. Completed

77 2003-

04 P.R. Guntur Ponnur Brahmanakoduru

Providing C.C. road to Bank Street in Brahmana Koduru Village

Dhrama Pracharak Ramineni

0.85000 0.27200 0.28050 0.00000 0.29750 7306/2002-P5 19.05.2003. Completed

78 2003-

04 P.R. Guntur Ponnur Nidubrolu

Construction of additional accommodation to Z.P.H.School atNidubrolu

Lakshmi Nirmala Gogineni

$2,150 2.75543 0.00000 1.79103 0.00000 0.96440 7306/2002-P5 17.01.2004 Completed

79 2003-

04 P.R. Guntur Ponnur Vellaluru

Levelling the ground work at VellaLuru Village

Sriharibabu Surineni $1,100 1.50000 0.48000 0.50261 0.00000 0.51739 7306/2002 P5 01.05.2003 Completed

Page 10: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

80 2003-

04 P.R. Tenali Repalle Peteru

Construction of additional accommodation to Z.P.H.School Peteru

Ravindra Rao Paruchuri

$11,032 4.18400 0.00000 2.71960 0.00000 1.46440 7306/2002-P5 09.01.2004 Completed

81 2003-

04 P.R. Tenali Repalle Peteru

Construction of additional accommodation to Z.P.H.School Peteru

Ravindra Rao Paruchuri

10.00000 0.00000 6.50000 0.00000 3.50000 7306/2002-P5 09.01.2004 Completed

82 2003-

04 P.R. Tenali Tenali Gudiwada

Construction of Foot Bridge on Kommuru channal at Gudiwada village

Ranga Nayiki Yalavarthi

$7,000 9.20000 2.94000 3.04000 0.00000 3.22000 7306/2002-P5 25.06.2003 Completed

83 2003-

04 P.R. Tenali Tenali Gudiwada

Completion of incomplete foot bridge at Gudivada village on Kommamur canal

Ranga Nayiki Yalavarthi

$3,000 3.89000 0.00000 2.53144 0.00000 1.35856 7306/2002-P5 09.10.2003 Completed

84 2003-

04 P.R. Tenali Tenali Gudiwada

Completion of the construction of Foot Bridge at Gudivada village on Kommamuru canal.

Ranga Nayiki Yalavarthi

$2,000 2.57145 0.00000 1.67145 0.00000 0.90000 7306/2002-P5 27.02.2004 Completed

85 2003-

04 P.R. Tenali Tenali sangam Jagarlamudi

Construction of additional accommodation to the Zilla Parishad High School Building at Sangam Jagarlamudi

J.Madhavaiah $2,150 2.74000 0.00000 1.78110 0.00000 0.95890 7306/2002-P5 01.12.2003 Completed

86 2003-

04 P.R. Tenali Tsunduru Pedagadelavarru

Construction of Sachivalayam building in Pedagadelavarru village

Sridhar Reddy Gundam

$5,000 6.38300 0.00000 4.14895 0.00000 2.23405 7306/2002-P5 03.03.2004 Completed

87 2003-

04 P.R. Tenali Vemuru Zampani

Providing C.C. road in Sagarla Bazar in Zampani village

Vallabhaneni Yugandhar

$5,125 2.25000 0.00000 1.46250 0.00000 0.78750 7306/2002-P5 29.10.2003 Completed

88 2003-

04 P.R. Tenali Vemuru Zampani

Providing C.C. road in Kothapalem main road in Zampani village

Vallabhaneni Yugandhar

1.50000 0.00000 0.97500 0.00000 0.52500 7306/2002-P5 29.10.2003 Completed

89 2004-

05 R.W.S. Guntur Tadikonda Kanteru

Completion of incomplete pumping main to D.W.Tank in Kanteru Village

Bobba Siva Prakash $7,411.73 9.22000 0.00000 5.90000 0.00000 3.32000 2319/2004-P5 6-05-2004. 02.12.2004

Completed

Page 11: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

90 2004-

05 P.R. Guntur Sattenapalli Phanidem

Providing Ground Levelling and Compound wall for the Z.P.H.School in Phanidem

Prasad Podila $11,486 10.00000 0.00000 6.50000 0.00000 3.50000 2996/2004-P5 14-07-2004.

Completed

91 2004-

05 P.R. Guntur Sattenapalli Phanidem

Providing approach CC road to Z.P.H.School in Phanidem

Prasad Podila 4.71809 0.00000 3.06676 0.00000 1.65133 2996/2004-P5 14-07-2004.

Completed

92 2004-

05 P.R. Guntur Vatticherukuru Pallapadu

Completion of incomplete Panchayat Office Building in Pallapadu

Prasad Podila 2.55625 0.00000 1.66156 0.00000 0.89469 2996/2004-P5 10.08.2004 Completed

93 2004-

05 P.R. Guntur Mangalagiri Chinavadlapudi

Completion of incomplete Communtiy Hall in Chinavadlapudi Village in Mangalagiri Mandal.

Karuna Valeveti $2,500 3.28571 0.00000 2.13571 0.00000 1.15000 2996/2004-P5 10.01.2004 Completed

94 2004-

05 P.R. Guntur Vatticherukuru Pallapadu

Completion of incomplete Panchayat Office Building in Pallapadu - 36%

Krishnaiah Parimi $640 0.76847 0.00000 0.49182 0.00000 0.27665 2996/2004-P5 01.07.2005 Completed

95 2004-

05 P.R. Guntur Atchempat Ambadipudi

Construction of C.C.Drains from Karnati Nageswara Rao house to Parupalli Venkaiah House.

Smt Chava Prathi Rao P.Ganta

$700 0.84203 0.00000 0.53890 0.00000 0.30313 2996/2004-P5 02.10.2005 Completed

96 2004-

05 P.R. Guntur Thulluru Thullur

Construction of Farmers rest House at Rayapudi Lift Irrigation Scheme.

Guduru Nageswara Rao

$2,500 3.02486 0.00000 1.93591 0.00000 1.08895 2996/2004-P5 02.10.2005 Completed

97 2004-

05 P.R. Guntur Vatticherukuru Pallapadu

Const. of Veternary Hospital Building.

Tana Foundation. $3,169 3.80000 1.21253 1.21253 0.00000 1.37494 1638/2004-P8 23.03.2005 Completed

98 2004-

05 P.R. Guntur Muppalla Turakapalem

Const. of CC road from Sri Pudota Chinnaiah house to Church compound.

Puvvada Lavanya $2,250 2.69888 0.00000 1.72728 0.00000 0.97160 2996/2004-P5 24.03.2005 Completed

99 2004-

05 P.R. Guntur Mangalagiri Chinavadlapudi

Completion of incomplete compound wall to community hall.

Satyanarayana Valiveti

$1,000 1.20114 0.00000 0.76873 0.00000 0.43241 2996/2004-P5 24.03.2005 Completed

Page 12: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

100 2004-

05 P.R. Guntur Vatticherukuru Pallapadu

Const. of community hall .

Tana Foundation. $1,706 2.05606 0.00000 1.31588 0.00000 0.74018 2996/2004-P5 24.03.2005 Completed

101 2004-

05 P.R. Guntur Pedanandipadu Kopparru

Providing compound wall and fencing to Z.P.H.School

Babu N Jasti $5,000 6.02603 0.00000 0.00000 3.85666 2.16937 2996/2004-P5 24.03.2005 Completed

102 2004-

05 P.R. Guntur Krosuru utukuru

Development of Z.P.High School

Sambasiva Vadlamudi

2400 2.87250 0.00000 0.00000 1.83840 1.03410 3623/2005-P5 02.07.2005 Completed

103 2004-

05 P.R. Narasaraopet Nadendla Kanaparru

Providing C.C. Road in Kanapparru Village

N.Suresh Babu $2,370 2.95574 0.00000 1.92123 0.00000 1.03451 2996/2004-P5 05.05.2004 Completed

104 2004-

05 P.R. Narasaraopet Nadendla Kanaparru

Providing Side Drains and CC road in Kanaparru

Suneetha Mannam $1,400 1.80360 1.17234 0.00000 0.63126 2996/2004-P5 14.07.2004. Completed

105 2004-

05 P.R. Narasaraopet Chilakaluripet Boppudi

Const. of additional class rooms to Z.P.H.School

Apparao Guntu $2,213 2.66708 0.00000 0.00000 1.70693 0.96015 2996/2004-P5 24.03.2005 Completed

106 2004-

05 P.R. Narasaraopet Nekarikallu Challagundla

Const. of additional class rooms to Z.P.H.School

Gandikota Satya Lakshmi Kanth.

$6,700 8.06011 0.00000 0.00000 5.15847 2.90164 2996/2004-P5 24.03.2005 Completed

107 2004-

05 P.R. Tenali Bhattiprolu Oleru

Construction of C.C. road.

Kotapati Samba Siva Rao

$4,600 5.54261 0.00000 3.54727 0.00000 1.99534 2996/2004 P5 25-05-2004 10.02.2005

Completed

108 2004-

05 P.R. Tenali Kollur Kollur

Completion of incomplete Veternary Hospital Building in Kolluru Village& Mandal.

G.L.N.Reddy $4,900 4.50000 1.36300 1.56200 0.00000 1.57500 1638/2004-P8 1-10-2004. Completed

109 2004-

05 P.R. Tenali Kollur Kollur

Completion of incomplete Z.P.H.School (Girls) in Kollur village

G.L.N.Reddy 1.83460 1.19249 0.00000 0.64211 2996/2004-P5 04-10-2004.

Completed

Page 13: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

110 2004-

05 P.R. Guntur Duggirala Thummapudi

Renovation of Burial Ground.

Katragadda Krishna Prasad

$550 0.53035 0.34475 0.00000 0.18560 2996/2004-P5 20-10-2004.

Completed

111 2004-

05 P.R. Guntur Duggirala Thummapudi

Construction of Community Hall Near by Gram Panchayat Office at Thummapudi Village in Duggirala Mandal.

Katragadda Krishna Prasad

0.17680 0.00000 0.11490 0.00000 0.06190 2996/2004-P5 20-10-2004.

Completed

112 2004-

05 P.R. Tenali Kollur Ananthavaram

Construction of Additional Class rooms to Zilla Parishad High School Building at Ananthavaram Village of Kolluru Mandal - Phase I

Siva Sankar Kanakamedala

$7,582.50 10.00000 0.00000 6.52949 0.00000 3.47051 2996/2004-P5 20-10-2004.

Completed

113 2004-

05 P.R. Tenali Kollipara Munnagi

Construction of CC road from Kurapati Srinivasa Reddy House to Kallam Srinivasa Reddy house (Pallapugidi bazar).

Rami Reddy Alla Meka Venkata Siva Parvathi

$3,000 3.85000 0.00000 2.50000 0.00000 1.35000 2996/2004-P5 26.10.2004 Completed

114 2004-

05 P.R. Tenali Kollur Ananthavaram

Construction of additional class Rooms (Phase - II) to Z.P.H.School. - 36%

Siva Sankar Kanakamedala

$6,700 8.29180 0.00000 5.30675 0.00000 2.98505 2996/2004-P5 20.01.2005 Completed

115 2004-

05 P.R. Tenali Amruthaluru Govada

Providing CC road towards Z.P.H.School Building.

Pavuluri Krishna Babu

$1,700 2.04139 0.00000 1.30649 0.00000 0.73490 2996/2004-P5 10.01.2005 Completed

116 2004-

05 P.R. Tenali Kollur Pesarlanka

Construction of community hall .

G.Sambasiva Rao $3,915 4.56750 0.00000 2.92320 0.00000 1.64430 2996/2004-P5 10.02.2005 Completed

117 2004-

05 P.R. Tenali Bhattiprolu Pedapulivarru Providing C.C road. Nadella Gangadhar $4,587 5.47772 0.00000 0.000 3.50574 1.97198 2996/2004-P5 22.02.2005 Completed

118 2004-

05 P.R. Tenali Kollur Kollur

Construction of Additional Accomodation to Z.P.H.S.

G.L.N.Reddy ATA Foundation

$4,750 8.50131 0.00000 0.000 5.44084 3.06047 2996/2004-P5 22.02.2005 Completed

119 2004-

05 P.R. Tenali Bhattiprolu Vellaturu

Const. of Additonal Class rooms to Z.P.H.School.

Krishna Pamidimukkala

$5,406 6.51533 0.00000 4.16981 2.34552 2996/2004-P5 01.03.2005 Completed

Page 14: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

120 2004-

05 P.R. Tenali Kollur Ananthavaram

Const. of additiona class rooms (Phase - III) to Z.P.H.School.

Siva Sankar Kanakamedala

$7,000 8.44639 0.00000 5.40569 3.04070 2996/2004-P5 02.03.2005 Completed

121 2004-

05 P.R. Tenali Bapatla Narasayapalem

Providing Cc road from Z.P Road to Doppalapudi Subba Rao house.

Rajendra K Manam $2,000 2.41039 0.00000 1.54265 0.00000 0.86774 2996/2004-P5 01.03.2005 Completed

122 2004-

05 P.R. Guntur Ponnur Nidubrolu

Providing Compound wall Levelling of Play Ground and additional Amenities to Z.P.High School.

Katragadda Amarendranadh

$7,000 8.39408 0.00000 0.00000 5.37221 3.02187 2996/2004-P5 23.03.2005 Progress

123 2004-

05 P.R. Guntur Kakumanu Appapuram Const. of shelter.

Dr.Paruchuri Anjaneyulu

$1,687 2.03319 0.00000 1.30124 0.00000 0.73195 2996/2004-P5 24.03.2005 Completed

124 2004-

05 P.R. Guntur Duggirala Pedapalem

Cosntn. Of Veterinary Hospital building.

Mrs. Ghattamaneni $3,200 7.36349 2.35632 2.35631 0.00000 2.65086 2360/2005-P8 23.05.2005. Completed

125 2005-

06 P.R. Guntur Prathipadu Gottipadu

Formation of Gravel Road from Gottipadu - Prathipadu R&B road to Kondrupadu via Papannakunta towards NS Canal.

Sadasiva Rao Guntupalli.

$3,350 4.05000 0.00000 2.59141 0.00000 1.45820 3623/2005-P5 23.05.2005 Completed

126 2005-

06 P.R. Guntur Pedanandipadu Palaparru

Laying of CC road with side drains from Kommineni Nageswara Rao House to R&B road.

Sri Raj Mohan Muddna

$2,000 2.40000 0.00000 1.53532 0.00000 0.86468 3623/2005-P5 23.05.2005 Completed

127 2005-

06 P.R. Guntur Pedanandipadu Palaparru

Construction of Covering Structure in burial ground with K.L.N.Platform.

Budda Kumar Muddana

$400 0.47666 0.00000 0.30506 0.00000 0.17160 3623/2005-P5 25.05.2005 Completed

128 2005-

06 P.R. Guntur Pedanandipadu Palaparru

Construction of Shed with Platform in burial ground.

Budda Kumar Muddana

$2,500 2.97000 0.00000 1.89748 0.00000 1.07252 3623/2005-P5 25.05.2005 Completed

129 2005-

06 P.R. Guntur Pedanandipadu Palaparru

Improvements to PHC Sub -Center building.

Anjani Kalahsthi $3,800 4.40000 1.40800 1.40800 0.00000 1.58400 2360/2005-P8 25.05.2005 Completed

Page 15: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

130 2005-

06 R.W.S. Guntur Thulluru Borupalem

Cost. Of Overhead Storage Reservior .

NageswararaoGuduru $3,500 4.90000 0.00000 2.68193 0.71000 1.50807 4855/2005-P4. 18.10.2005. Completed

131 2005-

06 R.W.S. Guntur Pedakakani Ramachandrapalem

Const. of P.W.S.Scheme .

Santhi Ramanavarapu

$8,000 9.60713 0.00000 6.14856 0.00000 3.45857 4855/2005/P4 12.07.2005 Completed

132 2005-

06 P.R. Guntur Thulluru Thullur

Renovation of Hindu Funeral Ground

Sucha Kukatla $2,800 3.35000 0.00000 2.14357 0.00000 1.20643 3623/05-P5 23.08.2005 Completed

133 2005-

06 P.R. Guntur Mangalagiri Yerrabalem

Const. of Bridge on Kondaveeti Vagu.

Arakuti Rammohan Reddy

$8,300 9.97000 0.00000 6.38250 0.00000 3.58750 3623/05/P5 30.11.2005 Completed

134 2005-

06 P.R. Guntur Pedakakani Pedakakani

Const of Additioanl class rooms to Z.P.H.School.

Harish Koya $2,900 3.64400 0.00000 0.00000 2.33205 1.31195 3623/05/P5 02.12.2005 Completed

135 2005-

06 P.R. Guntur Sattenapalli Nandigama

Providing C.C.Road from milk center to K.Venkatarao house.

Venkata Rao Kamani $2,560 3.20000 0.00000 0.00000 2.04800 1.15200 3623/05/P5 02.12.2005 Completed

136 2005-

06 P.R. Guntur Pedakakani Nambur

Renovation to the Burrial Ground near well.

Subba Reddy Tamma $1,100 1.34000 0.00000 0.85820 0.00000 0.48180 3623/05/P5 14.03.2006 Completed

137 2005-

06 P.R. Guntur Pedakakani Nambur

Levelling of Site and Improvements to the Burrial Ground.

Sridhar Reddy Vuyuru $1,700 2.07000 0.00000 1.32489 0.00000 0.74511 3623/05/P5 14.03.2006 Completed

138 2005-

06 P.R. Narasaraopet Nekarikallu Turakapalem

Completion of incomplete Community hall Building.

Chinnaiah Kondaveeti $1,820 4.10408 0.00000 2.62661 0.00000 1.47747 2996/2004-P5 04.12.2005 Completed

Page 16: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

139 2005-

06 P.R. Narasaraopet Nadendla Chandavaram

Development of M.P.P.School(L E)

Venkata Krishna Parimi

$3,250 2.78000 0.00000 0.00000 1.77803 1.00197 3623/2005-P5 18.10.2005 Completed

140 2005-

06 P.R. Narasaraopet Nadendla Chandavaram

Construction of Kitchen Shed M.P.P.School(L.E.)

Venkata Krishna Parimi

1.08200 0.00000 0.00000 0.69260 0.38940 3623/2005-P5 18.10.2005 Completed

141 2005-

06 P.R. Narasaraopet Nekarikallu Challagundla

Const of Compound wall and levelling of low lying areas of play ground to Z.P.H.School

Achuyuth K.Gopisetti $6,500 8.09200 0.00000 0.00000 5.17863 2.91337 3623/05-P5 02.12.2005 Completed

142 2005-

06 P.R. Narasaraopet Nekarikallu Challagundla

Construction of incomplete class rooms of Z.P.H.School

Achuyuth K.Gopisetti $2,475 3.07500 0.00000 0.00000 1.96787 1.10713 3623/05-P5 02.12.2005 Completed

143 2005-

06 P.R. Narasaraopet Piduguralla Venkatapuram

Construction of ZPH School.

N.G.Krishna Reddy $4,000 4.95000 0.00000 3.16811 0.00000 1.78189 3623/05-P5 10.01.2006 Completed

144 2005-

06 P.R. Narasaraopet Rompicherla Paragaticherla

Construction of Community Hall.

Koteswararao Nallapati

$2,400 2.92094 0.00000 1.86940 0.00000 1.05154 3623/2005-P5 14.02.2006 Completed

145 2005-

06 P.R. Narasaraopet Rompicherla Karlakunta

Construction of CC road in Vellamvari Bazar.

Prasad V.S.Manam $2,300 2.81000 0.00000 1.79913 0.00000 1.01087 3623/2005-P5 08.04.2006 Completed

146 2005-

06 P.R. Tenali Tsunduru Pedagadelavarru

Completion of incomplete Grama Sachivalayam Building.

Si Srinivas Bikkena $1,500 1.80000 0.00000 1.15173 0.00000 0.64827 3623/2005 - P5 23.05.2005 Completed

147 2005-

06 P.R. Tenali Bhattiprolu Pedapulivarru

Completion of incompletion CC Road from Kosaraju Subba Rao (H) to Karakatta.

Kosaraju Vijaya Saradi

$5,967 2.18000 0.00000 1.39300 0.00000 0.78700 3623/2005-P5 25.05.2005 Completed

148 2005-

06 P.R. Tenali Bhattiprolu Pedapulivarru

Const of CC road from Kosaraju Subba Rao house to Karakatta

Kosaraju Vijaya Saradi

5.00000 0.00000 3.20000 0.00000 1.80000 2996/2004-P5 09.05.2005 Completed

Page 17: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

149 2005-

06 R.W.S. Guntur Ponnur Nidubrolu

Providing Drinking water and Sanitation work to Z.P.H.School

Amarendranath $1,140 1.36319 0.00000 0.87244 0.00000 0.49075 4855/05-P4 22.08.2005 Completed

150 2005-

06 P.R. Tenali Kollur Kollur

Construction of Community hall cum library

Tana Foundation. $2,769 3.30000 1.05467 1.05466 0.00000 1.19067 2360/05-P8 15.10.2005 Completed

151 2005-

06 P.R. Tenali Amruthaluru Thurumella

Const. of C.C road from R&B road to A.Veeraiah house.

Srinivas Veeramasuneni

$1,000 1.19400 0.00000 0.00000 0.76400 0.43000 3623/2005-P5 18.10.2005 Completed

152 2005-

06 P.R. Guntur Ponnur Brahmanakoduru

Construction of Veterinary Hospitalbuilding.

Dharma Pracharak $3,500 4.50000 1.44000 1.44000 0.00000 1.62000 2360/2005-P8 15.10.2005 Completed

153 2005-

06 P.R. Guntur Chebrolu Narakoduru

Maintenance to the road from Narakoduru Village to Chebrolu Donka.

Jayanth Babu $2,500 2.98600 0.00000 0.00000 1.91100 1.07500 3623/2005-P5 26.10.2005 completed

154 2005-

06 P.R. Guntur Chebrolu Chebrolu

Maintenance to the road from Tenali - Guntur R&B road to Chebrolu Donka.

Sathish Vemana $3,680 4.50000 0.00000 0.00000 2.88000 1.62000 3623/2005-P5 15.11.2005 Completed

155 2005-

06 P.R. Tenali Kollur Ananthavaram

Completion of incomplete ZPH School.

Kanakamedala Siva $8,370 10.00000 0.00000 0.00000 6.39370 3.60630 3623/2005-P5 30.11.2005 Completed

156 2005-

06 P.R. Guntur Kakumanu Returu

Providing C.C. road from Nannapaneni Durga Prasad (H) to Jenda Chettu.

Gunaranjan $2,455 3.00000 0.00000 0.00000 1.92000 1.08000 3623/05/P5 02.12.2005 Completed

157 2005-

06 P.R. Guntur Chebrolu Narakoduru

Providing metal road with side canals from Guntur - Tenali By pass Road (Via) Hindu Burial ground.

Koyi Venkata Ramana Rao

$6,570 8.32500 0.00000 0.00000 5.32777 2.99723 3623/05/P5 02.12.2005 Completed

158 2005-

06 P.R. Tenali Tenali Gudivada

Completion of approach road from foot bridge on Kommamuri Cenal

Ranga Nayiki Yalavarthi

$2,000 2.46100 0.00000 1.57500 0.00000 0.88600 3623/05/P5 02.12.2005 Completed

Page 18: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

159 2005-

06 P.R. Tenali Bhattiprolu Vellaturu

Levelling the play ground of Z.P.H.School and construction of Toilets.

Pamidimukkala Krishna

$3,000 3.50000 1.09000 1.09000 0.00000 1.32000 2360/2005-P8 10.01.2006 Completed

160 2005-

06 P.R. Guntur Ponnur Brahmanakoduru

Completion of incomplete Veternay Hospital Building.

Dharma Pracharak $1,750 2.00000 0.64000 0.64000 0.00000 0.72000 2360/2005-P8 10.01.2006 Completed

161 2005-

06 P.R. Tenali Kollur Ananthavaram

Development of ZPH School.

K.Krishnamurthy $2,220 9.17200 0.00000 0.00000 5.86993 3.30207 3623/2005-P5 13.02.2006 Completed

162 2005-

06 P.R. Tenali Amarthaluru Amarthaluru

Providing additional class rooms to ZPH School.

Syam kota $2,220 2.77200 0.00000 1.77411 0.00000 0.99789 3623/2005-P5 13.02.2006 Completed

163 2005-

06 P.R. Guntur Ponnur Jupudi

Construction of Compound wal to SC Community Hall( ZPGF 15% SC)

Venkateswara R Rayapaneni

$2,500 3.06000 0.00000 1.95825 0.00000 1.10175 3623/2005-P5 14.03.2006 Completed

164 2006-

07 P.R. Guntur Guntur Guntur

Construction of Community Hall for A.P.P.R. Class-IV Employees Community in Z.P. Compound.

Jayram Komati, Kalpana Komati

$2,250 2.78000 0.00000 1.78000 0.00000 1.00000 2578/05/P5 09.08.2006 Completed

165 2006-

07 P.R. Guntur Vatticherukuru Pallapadu

Completion of Incomplete Vererinary Hospital Building.

Raghu Korrapati $1,706 0.75000 0.41159 0.06841 0.00000 0.27000 2571/06/P8 29.09.2006 Completed

166 2006-

07 P.R. Guntur Pedanandipadu Palaparru

Providing Covering Structure and 1 KM Plotform in Burrial Ground.

Buddha kumar muddana

$2,400 3.00000 0.00000 1.92000 0.00000 1.08000 2578/05/P5 10.08.2006 Completed

167 2006-

07 P.R. Guntur Pedanandipadu Ravipadu

Construction of subcenter building

Sambaiah Kanakala $6,666 5.63872 3.09437 0.51441 0.00000 2.02994 2571/sgry-P8 29.09.2006 Not started

168 2006-

07 P.R. Guntur Pedanandipadu Ravipadu

Providing internal cc roads with side drains

Sambaiah Kanakala 2.81936 0.00000 1.80439 0.00000 1.01497 2578/05/P5 .10.2006 Completed

Page 19: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

169 2006-

07 P.R. Guntur Sattenapalli Brugubanda

Construction of Hall in the Campus of ZPH School.

Chandrasekhar Chintapalli

$8,280 7.28800 1.82200 1.82200 0.00000 3.64400 2578/05/P5 29.03.2007 Completed

170 2006-

07 R.W.S. Narasaraopet Machavaram Chennayapalem

Providing P.W.S.Scheme( Z.P. 9%)

Hanumaiah Bandla $3,000 3.65000 0.00000 2.34000 0.00000 1.31000 2360/2005-P8 06.05.2006 Completed

171 2006-

07 R.W.S. Narasaraopet Machavaram Chennayapalem

Construction of Drinking Water

Jayramkomati $1,100 1.34440 0.0000 0.86040 0.00000 0.48400 4855/2005-P4 05.05.2006 Completed

172 2006-

07 P.R. Narasaraopet Chilakaluripet Tatapudi Providing CC Roads. Ramana Gogagattu $12,489 10.00000 0.0000 0.0000 6.4000 3.6000 3623/2005-P5 08.04.2006 Completed

173 2006-

07 P.R. Narasaraopet Durgi Obulesunipalli

Improvements to ZPHSchool I.e., approach road and levelling the site in ZPH School

Jayramkomati 0.90805 0.0000 0.5812 0.0000 0.3269 2578/05-P5 11.05.2006 Completed

174 2006-

07 P.R. Narasaraopet Narasaraopet Ikkurru

Providing CC road from B. Seshaiah (H) to B.Rama Rao (H)

Nallapati Koteswara Rao

$1,300 1.63486 0.0000 1.0463 0.0000 0.5886 2578/05-P5 10.08.2006 Completed

175 2006-

07 P.R. Narasaraopet Rompicherla Paragaticherla

Formation of CC road from High School to Gutta Radhakrishna (H) (50.0 Mtrs)(Contribution Rs:0.12 Lakhs)

Koteswararao Nallapati

$2,400 1.76097 0.0000 1.1270 0.0000 0.6340 2578/05-P5 10.08.2006 Completed

176 2006-

07 P.R. Narasaraopet Chilakaluripet Lingamguntla

Construction of community hall. (ZPGF 50%- 50% NRI Share Esst.Cost)

Poleswara Rao Bethamcherla

$3,000 2.65920 0.0000 1.3296 0.0000 1.3296 2578/05-P5 24.01.2007 Completed

177 2006-

07 P.R. Narasaraopet Piduguralla Venkatapuram

Completion of incomplete ZPH School.

Gopalakrishana Reddy Radhika Rampa

$1,700 1.49600 0.0000 0.7480 0.0000 0.7480 2578/05-P5 24.01.2007 Completed

178 2006-

07 P.R. Guntur Ponnur Doppalapudi

Providing Additional Class Rooms to M.P.Elementary School.

Nannapaneni Ayyanna Rao

$3,000 3.65000 0.00000 0.00000 2.33600 1.31400 3623/2005-P5 08.04.2006 Completed

Page 20: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

179 2006-

07 P.R. Guntur Ponnur Nidubrolu Repairs to Z.P.H.School Global information $11,600 3.61000 0.00000 0.00000 2.31000 1.30000 3623/2005-P5 08.04.2006 Completed

180 2006-

07 P.R. Guntur Ponnur Nidubrolu

Providing Additional Class Rooms toZ.P.H.School.

Global information 10.00000 0.00000 0.00000 6.40000 3.60000 3623/2005-P5 08.04.2006 Completed

181 2006-

07 R.W.S. Tenali Bhattiprolu Oleru

Completion of Incomplete construction of OHSR at SC Colony of Venkata Rama Nagar

Global information $1,850 2.78000 0.00000 1.78000 0.00000 1.00000 4855/2005/P4 15.04.2006 Not started

182 2006-

07 P.R. Tenali Amruthaluru Amruthaluru

Providing CC road from R&B to Panchayat main Road.

S.R.Anjaneyulu Paruchuri

$5,686 2.57853 0.00000 1.65026 0.00000 0.92827 2578/2005-P5 11.05.2006 Completed

183 2006-

07 P.R. Tenali Repalle Nalluripalem

Providing CC road from Z.P.H.School to Dalitavada (Via) Ramalayam.

Y.Ramesh $14,000 9.50000 0.00000 6.08000 0.00000 3.42000 2578/2005-P5 20.05.2006, 10.08.2006

Completed

184 2006-

07 P.R. Guntur Duggirala Pedakonduru

Providing Addl. Class Rooms to ZPH School

Kiran Kumar Alla $6,320 7.81397 0.00000 5.00094 0.00000 2.81303 2578/2005-P5 23.05.2006 Completed

185 2006-

07 P.R. Guntur Duggirala KantamrajuKonduru

Improvements to the Burial Ground

Venkata Nimmagadda Anjani P.Nimmagadda

$2,620 3.19000 1.75059 0.28941 0.00000 1.15000 2571/sgry-P8 29.09.2006 Completed

186 2006-

07 P.R. Tenali Repalle Nalluripalem

Providing CC road from Elementary School to Gandhi Statue

Y.Ramesh $14,000 4.00000 0.00000 2.56000 0.00000 1.44000 2578/05-P5 10.08.2006 Completed

187 2006-

07 P.R. Tenali Repalle Nalluripalem

Providing CC road from Dalitavada Library to R&B Road

Y.Ramesh 3.50000 0.00000 2.24000 0.00000 1.26000 2578/05-P5 10.08.2006 Completed

188 2006-

07 P.R. Tenali Tenali Gudivada

Completion of approach road from foot bridge on Kommamuri Cenal

Ranga Nayiki Yalavarthi

$14,000 0.36653 0.00000 0.23457 0.00000 0.13196 2578/05-P5 10.08.2006 Completed

Page 21: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

189 2006-

07 P.R. Tenali Karlapalem Yazali

Construction of 3 additional class rooms, compound wall, water tank & toilet facilities to Z.P.H.School

Madhavi Kondapalli $8,100 10.00000 0.00000 6.40000 0.00000 3.60000 2578/05-P5 10.08.2006 Completed

190 2006-

07 P.R. Tenali Bhattiprolu Pesarlanka

Providing additional class rooms to ZPH School.

Mahalakshmi Gullapalli

$2,252 2.86128 0.00000 1.83122 0.00000 1.03006 2578/05-P5 .10.2006 Completed

191 2006-

07 P.R. Guntur Duggirala Munnagi

Providing road from Bonthu Venkata Reddy's house to main road iva Narapareddy house (ZPGF 35%,-25%in Esst.Cost SGRY Regular 25% of the Esst.cost)

Hima Bindu Meka $4,500 4.00680 1.00170 1.00170 0.00000 2.00340 2578/2005-P5 24.01.2007. Completed

192 2006-

07 P.R. Guntur Duggirala Pedapalem

Completion of incomplete Veternary Hospital Building.(SGRY 20% Component & ZPZF)

Dr.Mrs.Ghattamaneni 1850 UK Pounds

3.16800 0.87120 0.71280 0.00000 1.58400 2571/2006-p8 29.03.2007 Completed

193 2006-

07 P.R. Tenali Amarthaluru Amarthaluru

Construction of Hindu Law Aparakarma Sala.

Dr.S.R.Anjaneyulu paruchuri

$1,200 1.04810 0.00000 0.52405 0.00000 0.52405 2578/2006-P5 29.03.2007 Completed

194 2006-

07 P.R. Tenali Cherukupalli Ponnapalli

Construction of Library Building.

Sarma ponnapalli $6,790 5.81672 1.59960 1.30876 0.00000 2.90836 2571/2006-P8 31.03.2007 Completed

195 2006-

07 P.R. Guntur Duggirala Emani

Construction of compound wall for Z.P.H.School

Vamsi M. Ancha Vibha S. Ancha.

$11,500 9.89206 0.00000 4.94603 0.00000 4.94603 2571/2006-P8 16.04.2007 Completed

196 2007-

08 P.R. Guntur Pedanandipadu

Abbineni- guntapalem

Improvements to Sri Vejandla Gangaiah Hindu Burial Ground.

Vejendla Jaya Prasad $1,600 1.27664 0.00000 0.63832 0.00000 0.63832 2578/05/P5 20.09.2007 Completed

197 2007-

08 P.R. Guntur Tadikonda Mukkamala

Providing C.C. road from Panchayat Office to Yerramreddy Lakshminarayana House.

Venu Madhav Kurra $2,700 1.08540 0.00000 0.54270 0.00000 0.54270 2578/2006-P5 03.04.2008 Completed

198 2007-

08 P.R. Guntur Tadikonda Mukkamala

Providing C.C. road form Dharmaboina Yelamandaiah house to Pusani Ranga Rao House.

Venu Madhav Kurra 1.08540 0.00000 0.54270 0.00000 0.54270 2578/2006-P5 03.04.2008 Completed

Page 22: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

199 2007-

08 P.R. Guntur Medikonduru Paladugu

Development (Completion of incomplete compound wall, construction of additional class rooms & Toilets) of Z.P.High School.

Rao Koteswara Boddu

$6,825 5.48884 0.00000 2.74442 0.00000 2.74442 2578/2006-P5 03.04.2008 Completed

200 2007-

08 R.W.S. Guntur Pedakakani

Ramachan- drapalem

constructionof individual toilets

Ramakrishna S. Moparthi

$1,650 1.28750 0.00000 0.64375 0.00000 0.64375 1337/08-P7 13.03.2008 Completed

201 2007-

08 P.R. Narasaraopet Chilakaluripet Tatapudi

Completion of the construction of internal CC roads.

Ramana Gogagattu $12,489 5.32639 0.0000 3.4089 0.0000 1.9175 3623/2005-P5 17.04.2007 Completed

202 2007-

08 P.R. Narasaraopet Nadendla Nadendla

Construction of Auditorium near Amarayya Matt.

Suresh Velagapudi $12,820 9.94264 0.0000 4.9713 0.0000 4.9713 2578/2006-P5 10.01.2008 Completed

203 2007-

08 P.R. Guntur Kakumanu Bodipalem

Constn.of compound wall and improvements to the Community hall in Bodipalem village

Dr. Ganga Chowdary $4,760 4.03838 0.00000 2.01838 0.00000 2.02000 2578/2006-P5

29.05.2007 ---------------

Revised 23.11.07

Completed

204 2007-

08 P.R. Guntur Ponnur Nidubrolu

Construction of class rooms and compound wall to Z.P.High School.

Srinivasa Palati Tannuja Palati

$4,570 4.04076 0.00000 2.02038 0.00000 2.02038 2578/2006-P5 22.09.2007 Completed

205 2008-

09 P.R. Guntur Guntur Guntur

Completion of incomplete construction of community hall for APPR Class IV employees community hall in Zilla Parishad compound,

Jaya rama rao Komati Kalpana Komati

$5,000 3.98742 0.00000 1.99371 0.00000 1.97081 2578/206-P5 04.05.2008 Completed

206 2008-

09 P.R. Guntur Prathipadu Ganikapudi

Construciton of community hall behind ramalyam.

Dr. Dandamudi Babu Rajendra Prasad, U.S.A

$15,000 10.00000 0.00000 5.00000 0.00000 5.00000 3134/2008-P5 29.05.2008 Completed

207 2008-

09 P.R. Guntur Prathipadu Ganikapudi

Completion of Construction of Community hall behind Ramalayam in Gankipudi village of Prathipadu mandal.

Dr. Dandamudi Babu Rajendra Prasad, U.S.A

2.33600 0.00000 1.16800 0.00000 1.16000 3134/2008-P5 30.12.2008 Completed

Page 23: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

208 2008-

09 P.R. Narasaraopet Machavaram Vemavaram

Providing Infrastructural facilities to Z.P.High School.

Anjaneya Reddy Dondeti

$900 0.75740 0.0000 0.3787 0.0000 0.3787 3134/2008-P5 05.07.2008 Completed

209 2008-

09 P.R. Narasaraopet Machavaram Vemavaram

Providing Benches to Z.p.H.School in Vemavaram.

Anji Reddy Gadhe Sathyanarayana Reddy Sanampudi

$600 $500

1.08708 0.00000 0.54354 0.00000 0.54354 3134/08P5 14.11.2008 Completed

210 2008-

09 P.R. Tenali Amruthaluru Gowada

Construction of PHC subcentre building

Surendra Avula Sunitha Avula

$4,600 5.55000 0.00000 3.55000 0.00000 2.00000 2572/sgry-P8 08.07.2008 ----------------

24.7.08 Completed

211 2008-

09 P.R. Tenali Cherukupalli Gudavalli

Providing C.C. Road from Kota Sambasiva Rao house to Chadalawada Venkateswara Rao hoiuse in Gudavalli village of Cherukupalli Mandal.

Madhusudan Rao Ganta

$3,200 3.13150 0.00000 1.56575 0.00000 1.56575 3134/2008 P5 30.12.2008 Completed

212 2009-

10 P.R. Guntur Guntur Guntur

Completion of incomplete construction of community hall for APPR Class IV employees community hall in Zilla Parishad compound,

Jaya rama rao Komati $2,000 1.86200 0.00000 0.93100 0.00000 0.93100 3134/2008-P5 26.06.2009 Completed

213 2009-

10 P.R. Tenali Prathipadu Ganikapudi

Construction to Complete the incomplete Ancha venkaiah&Ayyappa Community hall at Ganikapudi (v) of Prathipadu (M)

Ravi K.Chundi $10,200 9.73896 0.00000 4.86948 0.00000 4.86948 2250/2009/p5 23.10.2009 Completed

214 2009-

10 P.R. Tenali Prathipadu Ganikapudi

Construction to Complete the incomplete Ancha venkaiah&Ayyappa Community hall at Ganikapudi (v) of Prathipadu (M)

Srinivasa Rao Edara $10,200 9.73896 0.00000 4.86948 0.00000 4.86948 2250/2009/p5 23.10.2009 Completed

215 2009-

10 P.R. Tenali Bapatla Narasayapalem

Laying of CC road from D.Venkateswarlu, House to M.Sukhayamma house at village of Narasayapalem(v), Bapatla(M).

Rajendra Manam $2,510.60 2.30000 0.00000 1.15064 0.00000 1.14936 2250/2009/P5 24.12.2009 Completed

Page 24: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

216 2009-

10 P.R. Guntur Medikonduru Siripuram

Development of Hindu Burial ground at Sripuram (V) Medikonduru (M)

Madan Mohan R.Veluvolu

$4,000 3.60000 0.00000 1.80000 0.00000 1.80000 2250/09/P5 18.02.2010 Completed

217 2010-

11 P.R. Tenali Cherukupalli Rajavolu

Construction of Addl. Class Rooms at Z.P.H.School Rajavolu (V), Cherukupalli (M)

DIVI NAVEENA $4,640 4.00000 0.00000 2.00000 0.00000 2.00000 2229/10/P5 06.08.2010 Completed

218 2010-

11 P.R. Narasaraopet Krosuru Vutukoru

Construction 3 class rooms at ZPHS Vutukuru (V), Krosuru Mandal.

S.SRIHARI.G.BABU, $983.75 5.70000 0.00000 2.85000 0.00000 2.85000 2229/10/P5 27.09.2010 Completed

219 2010-

11 P.R. Narasaraopet Nadendla Nedendla

Formation of CC Road from Kacheri Vepachettu to Anjaneya Swamy Temple at Nadendla

G.Sanjeev Kumar $9,420 7.00000 0.00000 3.50000 0.00000 3.50000 2229/10/P5 09.11.2010 Completed

220 2010-

11 P.R. Narasaraopet Nadendla Nedendla

Construction of Side Drain (In Side Wall) in the way of Chellama Kondalu Hills at Nadendla

G.Sanjeev Kumar 1.36548 0.00000 0.68274 0.00000 0.68274 2229/10/P5 09.11.2010 Completed

221 2011-

12 P.R. Guntur Ponnur Gollamudi

Formation of Internal C.C Road in S.C colony from Ragula gadda Sarojini House to Deverapally Subbaiah House in Gollamudi of Ponnuru (M)

V.C.Nannapaneni $10,760 3.75000 0.00000 1.87500 0.00000 1.87500 1588/11/P5 25.04.2011 Completed

222 2011-

12 P.R. Guntur Ponnur Gollamudi

Formation of Internal C.C.Road in B.C. colony from Angire kula Venkateswarlu House to Kankipati Ankaiah House in Gollamudi (V) Ponnuru (M)

V.C.Nannapaneni 3.75000 0.00000 1.87500 0.00000 1.87500 1588/11/P5 25.04.2011 Completed

223 2011-

12 P.R. Guntur Ponnur Gollamudi

Formation of Internal CC Road in SC colony from Kankipati Raja Rao House to Kankipati Nageswara Rao House in Gollamudi (V) Ponnuru (M)

V.C.Nannapaneni 2.00000 0.00000 1.00000 0.00000 1.00000 1588/11/P5 25.04.2011 Completed

Page 25: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

224 2011-

12 P.R. Guntur Duggirala Pedakonduru

Completion of incomplete Class Rooms to the Z.P.H.School at Pedakonduru (V) Duggirala (M)

Kiran Kumar Alla $4,000 3.53320 0.00000 1.76660 0.00000 1.76660 2229/10/P5 09.05.2011 Completed

225 2011-

12 P.R. Guntur Vatticherukuru Vatticherukuru

Construction of Compound Wall to Smt.Manne Vazaramma & China Nagaiah Z.P.H.School in

Vatticherukuru (V&M)

Manne Raja Sekhar $11,500 10.00000 0.00000 5.00000 0.00000 5.04782 1588/11/P5 05.08.2011 Completed

226 2011-

12 P.R. Tenali Cherukupalli Gudavalli

Completion of incomplete C.C road from Chadalavada Venkateswara House to Substation in Gudavalli (V) Cherukupalli Mandal

G.Madhusudana Rao $2,730 2.40000 0.00000 1.20000 0.00000 1.20645 1588/11/P5 09.08.2011 Progress

227 2011-

12 P.R. Tenali Cherukupalli Rajavolu

Completion of incomplete Additional Class Rooms to Z.P.H.School in Rajavolu (V) Cherukupalli Mandal

DIVI NAVEENA $1,287 1.00000 0.00000 0.50000 0.00000 0.57593 1588/11/P5 09.09.2011 Completed

228 2011-

12 P.R. Guntur Medikonduru Siripuram

Construction of Kitchen cum Dining Hall in Z.P.H.School at Siripuram (V) Medikonduru Mandal.

V.Raja Sekhara Rao $5,183.56 4.50000 0.00000 2.25000 0.00000 2.35282 1588/11/P5 09.09.2011 Progress

229 2012-

13 P.R. Tenali Cherukupalli Rajavolu

Completion of incomplet addl class rooms ZP High school in Rajavolu habitation

DIVI NAVEENA $1,088 1.75000 0.00000 0.87000 0.00000 0.56876 1988/2012/p5 17.08.2012 Completed

230 2012-

13 P.R. Guntur Vatticherukuru Katrapadu

Construction of Additional class room to ZPHS in Katrapadu village of Vatticherukuru Mandal.

Madhu Korrapati $5,150 5.00000 0.00000 2.50000 0.00000 2.50000 1988/2012/P5 17.08.2012 Completed

231 2012-

13 P.R. Guntur Vatticherukuru Vatticherukuru

Consturction of Compundwall (balance portion) to Smt Manne Vazramma and Chinna Nagaiah ZP High School of Vatticherukuru Village and Mandal

Manne Raja Sekhar $9,150 10.00000 0.00000 5.00000 0.00000 4.80869 1988/12/P5 07.09.2012 Completed

Page 26: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

232 2012-

13 P.R. Tenali Chebrolu Selapadu

Construction of community hall in Selapadu of Chebrolu mandal

Velagapudi Bapujirao 10.00000 0.00000 5.00000 0.00000 5.00000 1988/12/P5 18.12.2012 Completed

233 2012-

13 P.R. Guntur Pedakakani Takkellapadu

Construction of Additional class rooms(2 nos) to the ZPHS in Takkellapadu village of Pedakakani Mandal.

chandana Yalamanchili

$9,492 10.00000 0.00000 5.00000 0.00000 4.99849 1988/12/P5 18.03.2013 Completed

234 2013-

14 P.R. Guntur Amaravathi Karlapudi

Construction of Compound Wall to Hindu Burrial Ground at Karlapudi (V) of Amaravathi (M)

Gaddamadugu Srinivasa $4,155 4.88000 0 2.44000 0 2.44 1888/2003/P5 13.08.2013 completed

235 2014-

15 P.R. Tenali Chebrolu salapadu

Construction of Community Hall in

Salapadu of Chebrolu (M)

Velagapudi Bapujirao $8,503 10.00000 0 5.00000 0 4.99971 1888/2013/P5 .06.2014 completed

236 2014-

15 P.R. Guntur Amaravathi karlapudi

Completion of incomplete Compound Wall to Hindu Burrial

Ground at Karlapudi (V) of Amaravathi (M)

Gaddamadugu Srinivasa $3,435 4.00000 0 2.00000 0 2.02493 3333/2014/P5 01.07.2014 Progress

237 2014-

15 P.R. Guntur Vatticherukuru Katrapadu

Construction of Additional class room to

ZPHS in Katrapadu village of Vatticherukuru

Mandal.

Madhu Korrapati $2,500 3.00000 0 1.50000 0 1.507 1888/2013/P5 30.06.2014 completed

238 2014-

15 P.R. Tenali Cherukupalli Kavuru

Construction of class rooms to Govt. High

Schools at Kavuru (1st floor) (1) in Cherukupalli

Mandal

Ratnam Veluvolu $7,500 9.25000 0 4.62500 0 4.47345 3333/2014/P5 01.07.2014 Progress

239 2014-

15 P.R. Tenali Cherukupalli Kavuru

Construction of class rooms to Govt. High

Schools at Kavuru (1st floor) (2) in Cherukupalli

Mandal

Ratnam Veluvolu $7,500 9.25000 0 4.62500 0 4.47345 3333/2014/P5 01.07.2014 Progress

240 2014-

15 P.R. Guntur Ponnuru Machavaram

Constn.of Hindu Burrial ground at Machavaram

Village of Ponnuru Mandal

Sridhar Yalla $3,450 4.00000 2.00000 2.07038 Rc.No.3333/2014/P5 24.09.2014 Progress

Page 27: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

241 2014-

15 P.R. Guntur Vatticherukuru Pulladigunta

Construction of CC Roads from Shaik Rahiman (H) to Butchemma Chavidi and Shaik Janam(H) to Shaik Moulali (H)in BC Colony of Pulladigunta(V) Vatticherukuru Mandal

5.25000 2.63000

2.62000 Rc.No.3333/2014/P5 30.09.2014 Progress

242 2014-

15 P.R. Guntur Vatticherukuru Pulladigunta

Costruction of CC Road from Mannava Subba Rao Chavidi to M.Hari Babu (H) in Pulladigunta(V) Vatticheruku Mandal.

8.00000 4.00000

4.00000 Rc.No.3333/2014/P5 30.09.2014 Progress

243 2014-

15 P.R. Guntur Vatticherukuru Pulladigunta

Construction of CC road from V.Srikanth (H) to Shaik Haseena (H) and Y.Venkateswara Rao (H)toY.Basavamma (H)in Pulladigunta (V)of Vatticherukuru

Rama Koteswara Rao

Upputuri $39,990 10.00000 5.00000

5.00000 Rc.No.3333/2014/P5 30.09.2014 Progress

244 2014-

15 P.R. Guntur Vatticherukuru Pulladigunta

Construction of CC road from K.Venkata Mahalakshmi (H) to R&B Road in ST Colony of Pulladi-gunta(V)of Vatti-cherukuru Mandal

7.50000 3.75000

3.75000 Rc.No.3333/2014/P5 30.09.2014 Progress

245 2014-

15 P.R. Guntur Vatticherukuru Pulladigunta

Construction of CC Roads in ST Colony of Pulladigunta Village of Vatti-cherukuru Mandal

10.00000 5.00000

5.00000 Rc.No.3333/2014/P5 30.09.2014 Progress

246 2014-

15 P.R. Guntur Vatticherukuru Pulladigunta

Construction of CC Roads from Shaik Karimulla (H)to Shaik Ramjan Vali (H) & Butchamma Chavidi to Shaik Shamshuddin (H)in BC Colony of Pulladigunta(V)of Vatticherukuru(M)

3.50000 1.75000

1.75000 Rc.No.3333/2014/P5 30.09.2014 Progress

247 2014-

15 P.R. Guntur Vatticherukuru Pulladigunta

Side Drains and Metal road from O&M road to Syad Saida (H) in Pulladigunta village of Vatticherukuru Mandal

5.75000 0.00000 2.87000 2.88000 Rc.No.3333/2014/P5 10.10.2014 Progress

Page 28: PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD, …zpguntur.org/pdfs/nri.pdf · 2019. 8. 16. · Gowtham Pinnamaneni $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5

S. No.

Year

De

pa

rtm

en

t

Name of the

Division

Name of the Mandal

Name of the Habitation

Name of the Work Name of the

Donor

Dollors/ Pounds received

Es

t. C

os

t (R

s.i

n L

ak

hs

)

SG

RY

(C

as

h +

R

ice

) (R

s.i

nla

kh

s)

Z.P

.Ge

ne

ral

fun

ds

(R

s.in

la

kh

s)

S.F

.C.

as

64

% o

f th

e E

sti

ma

ted

C

os

t/

G.P

.Co

ntr

ibu

tio

n

NR

I c

on

trib

uti

on

re

ce

ived

(Rs

.in

L

ak

hs

)

Ad

m.

Sa

nc

tio

n

Pro

gs

.No

.

Date Statge of

Work

248 2014-

15 P.R. Tenali Chebrolu Selapadu

Completion of incomplete Community Hall (3rd Phase) in Selapadu of Chebrolu Mandal

Dr.Bapuji Rao Velagapudi

$8,253 10.00000

5.00000

4.99971

Progress

249 2014-

15 P.R. Tenali Tsunduru Vetapalem

Construction of Bicycle Shed in ZPHigh School, Vetapalem of Tsunduru Mandal

Jagarlamudi Ravibabu

$3,292 4.00000

2.00000

2.01708

Progress

250 2014-

15 P.R. Narasaraopet Nadendla Nedendla

Fencing the Hindu Burrial Ground (Kakulamatham) in Nadendla (V)&(M)

Vemulapalli Siva Vara Prasad Babu

$8,128.45 10.00000

5.00000

5.00550

Progress

251 2014-

15 P.R. Guntur Tadikonda Ravela

Improvements and repairs to ZPHSchool Ravela (V) of Tadikonda (M)

Kirankanth Nallamothu

$8,400 10.00000

5.00000

5.15599

Progress

252 2014-

15 P.R. Narasaraopet Nadendla Nadendla

Raising the Hindu Burrial Ground (Kakula Matham) and Cremation Platform

Devabhakthuni Veera Venkata Kumari

$8,006 10.00000

5.00000

4.98314

Progress

253 2014-

15 P.R. Narasaraopet Nadendla Nadendla

Fencing the Hindu Burrial Ground (Ramanujamatham) and Cremation

Platform in Nadendla (V)&(M)

Devabhakthuni Veera Venkata Kumari $8,075.65 10.00000

5.00000

4.99217

Progress

254 2014-

15 P.R. Narasaraopet Veldurthy Veldurthy

Construction of Library Building in ZPHS Veldurthy

Sambasiva Reddy Pulusu $8,400 10.00000

5.00000

5.20956

Progress

255 2014-

15 P.R. Tenali Chebrolu Selapadu

Completion of incomplete Community Hall (Final Phase) in Selapadu of Chebrolu Mandal

Dr.Bapuji Rao Velagapudi $8,253 10.00000

5.00000

4.99971

Progress