DATE 2015/07/27 ACTIVITY: CLEAR AND GRUB FIG 01 BUSH CLEARING FIG 02 TREE FELLING ACTIVITY: TOPSOIL STRIPPING PROGRESS PHOTO GRAPHS

Upload: ing-john-owusu-asiamah

Post on 17-Jan-2017

75 views

Category:

Documents


1 download

TRANSCRIPT

DATE 2015/07/27

ACTIVITY: CLEAR AND GRUB

FIG 01 BUSH CLEARING

FIG 02 TREE FELLING

ACTIVITY: TOPSOIL STRIPPING

PROGRESS PHOTO GRAPHS

FIG 03 TOP SOIL STRIPPING USING A DOZER

FIG 04 TOP SOIL STRIPPED

PREPARATION OF FOUNDATION BASE

FIG 05 EMBANKMENT FOUNDATION BASE PREPARED AND READY FOR FILLING

SOIL EXCAVATION IN RESERVOIR AREA

FIG 06 EXCAVATION OF SOIL FROM THE RESERVOIR AREA TO FILL EMBANKMENT

ACTIVITY : EMBANKMENT FILL

FIG 07 SPREADING OF FILL TO EMBANKMENT

ACTIVITY : WATERING AND COMPACTION OF FILL TO THE EMBANKMENT

FIG 08 : COMPATING OF FILLING TO EMBANKMENT WITH A ROLLER

ACTIVITY : EXCAVATION FOR INLET /OUTLET PIPE TRENCH

FIG 10 : TRENCH EXCAVATION

LAYING OF 630MM DIAMETER PIPES ON IN TRENCH

FIG 12 REINFORCEMENT FOR CONCRETE FOR WRAPPING PIPES

FIG 13 SHUTTERING FOR CONCRETE FOR WRAPPING PIPES

FIG 13 CONCRETE FOR WRAPPING PIPES