Progress on Phase 1 of the Bing Kong Tong Building Renovation
April-May 2014
![Page 2: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/2.jpg)
Forms and rebar at the front of the building ready to pour for shear walls.
![Page 3: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/3.jpg)
Rafters getting reinforcedDry rot and broken rafters were reinforced to carry new roofing material.
![Page 4: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/4.jpg)
LVLs (manufactured beams) were added at the rear and front of the building.
![Page 5: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/5.jpg)
Concrete was poured into forms at the front and rear for shear wall support.
![Page 6: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/6.jpg)
Old front parapet wall going down Main Street for storage at River Storage.It was removed due to dry rot damage.
![Page 7: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/7.jpg)
Rebuilding of the new parapet wall to exact dimensions of the original.
![Page 8: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/8.jpg)
The new parapet wall being placed
![Page 9: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/9.jpg)
Installing insulation
![Page 10: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014](https://reader035.vdocuments.us/reader035/viewer/2022062805/5697bfed1a28abf838cb9117/html5/thumbnails/10.jpg)
Installing insulation prior to roofing