Progress Energy Load Revision and Update for 2012 RA Plan   Scott M. Deitche Project Engineer. Background. Bartow plant is decommissioning on-site detention ponds and diverting process water to cooling water intake. Ultimately discharge to Old Tampa Bay. Summer 2013 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer

Progress Energy Load Revision and Update for 2012 RA Plan         Scott M. Deitche

Project Engineer

Page 2: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer

Background

Bartow plant is decommissioning on-site detention ponds and diverting process water to cooling water intake.  Ultimately discharge to Old Tampa Bay.

Summer 2013

Not a “new” discharge.  Both atmospheric and unknown groundwater contributions.

Page 3: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer

former

To be decommissioned

Page 4: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer

Allocation Request

Progress Energy is requesting a surface discharge allocation of 3 tons/year

Page 5: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer
Page 6: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer
Page 7: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer

Reductions from repowering facility

Repowering of the plant (online in 2009): average atmospheric reduction of 2,726 tons NOx from 2010-2011

For every 100 tons NOx in atmospheric discharge, 0.19% is deposited to the Bay as direct nitrogen loadings (ECT, TECO)

Progress Energy reduced their direct Bay loadings by 5.18 tons from 2010-2011

Page 8: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer

Algae sampling - FWRI

Page 9: Progress Energy Load Revision and Update for 2012 RA Plan    Scott M. Deitche Project Engineer

Requesting concurrence from Consortium on allocating 3 tons/yr surface discharge in 

Old Tampa Bay for Progress Energy