progress chart
TRANSCRIPT
![Page 1: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/1.jpg)
1.PARTICIPATE IN WORKPLACE COMMUNICATION
1.1 Obtain and convey workplace information
1.2 Complete relevant work related documents
1.3Participate in workplace meeting and discussion
2.WORK IN A TEAM ENVIRONMENT
2.1Describe and identify team role and responsibility
2.2 Describe work as a team member
![Page 2: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/2.jpg)
3.PRACTICE CAREER PROFESSIONALISM
3.1Integrate personal objectives with organizational goals
3.2 Set and meet work priorities
3.3 Maintain professional growth and development
4. PRACTICE OCCUPATIONAL HEALTH AND SAFETY4.1 Evaluate hazard and risks
![Page 3: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/3.jpg)
4.2 Control hazards and risks
4.3 Maintain occupational health and safety awareness
1.PREPARE CONSTRUCTION MATERIALS AND TOOLS
1.1 Identify materials
1.2 Requisition materials1.3 Receive and inspect materials
2.OBSERVE PROCEDURES,SPECIFICATIONS AND MANUALS OF INSTRUCTIONS
![Page 4: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/4.jpg)
2.1 Identify and access specification/manual
3.INTERPRET TECHNICAL DRAWING
3.1 Analyze sign, symbol and data
3.2 Interpret technical drawing and plans3.3 Apply freehand sketching
4. PERFORM MENSURATION AND CALCULATION
4.1 Select measuring instruments
![Page 5: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/5.jpg)
4.2 Carry out measurement and calculations
5.MAINTAIN TOOLS AND EQUIPMENT
5.1 Check condition of tools and equipment
5.2 Perform basic preventive maintenance
5.3 Sharpen edge and tooth cutting tools
5.4 Store tools and equipment
![Page 6: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/6.jpg)
1.PREPARE ELECTRICAL POWER AND HYDRAULIC TOOLS
1.1 Select electrical power and hydraulic tools
1.2 Maintain electrical power and hydraulic tools2.PERFORM ROUGHING –IN ACTIVITIES FOR COMMUNICATION AND DISTRIBUTION SYSTEMS
2.1 Install electric metallic tubing
2.2 Instal wire ways and cable tray
![Page 7: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/7.jpg)
2.3 Install telephone terminal cabinet and distribution frame
2.4 Install cable bridge
2.5 Notify completion of work3. INSTALL WIRING DEVICES FOR FLOOR AND GROUND FAULT CURRENT INTERRUPTING OUTLETS
3.1 Select wiring devices
3.2 Install wiring devices
![Page 8: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/8.jpg)
3.3 Notify completion of work
4. INSTALL ELECTRICAL PROTECTION SYSTEM FOR LIGHTNING AND GROUNDING
4.1 Plan and prepare work4.2 Install electrical protection system
4.3 Notify completion of work
5.INSTALL ELECTRICAL LIGHTING SYSTEMS ON AUXILIARY OUTLETS AND LIGHTING FIXTURES
![Page 9: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/9.jpg)
5.1 Plan and prepare work
5.2 Install lighting fixtures
5.3 Notify completion of work
![Page 10: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/10.jpg)
P RO
![Page 11: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/11.jpg)
GRES
![Page 12: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/12.jpg)
S CH
![Page 13: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/13.jpg)
A RT
![Page 14: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/14.jpg)
T r a i n i n gM e t h o d o l
o g i e s Name
![Page 15: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/15.jpg)
ofTrainees
![Page 16: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/16.jpg)
BASIC CompetenciesCOMMON
![Page 17: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/17.jpg)
Competencies
![Page 18: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/18.jpg)
CORE CompetenciesElectrical
![Page 19: Progress Chart](https://reader036.vdocuments.us/reader036/viewer/2022082906/577cc9bc1a28aba711a4786a/html5/thumbnails/19.jpg)
Installation &Maintenance NC2