prognostic health management€¦ · microsoft powerpoint - ringdown demo.pptx created date:...

12
Prognostic Health Management for CRITICAL SYSTEMS

Upload: others

Post on 15-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

Prognostic Health Management

for

CRITICAL SYSTEMS

Page 2: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv

Degradation Rates Dependant on Environmental Conditions

Usage EnvironmentUsage monitoring would provide a safety benefit if actual usage is more severe than predicted (see the red region, T1).Service life can be extended beyond normal replacement time if the actual usage severity is known (see the green region, T2).

MTBF statistical expected life

T1 T2

CBM enables replacement only upon evidence of need

Page 3: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv

Electronic Prognostic Technology

forPower Supplies

3

Page 4: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv

Ridgetop develops electronic prognostic solutions for critical systems:

Builds test beds for fault injection. Configures algorithms for “prognostics-enabling” critical systemsSentinel NetworkTM data collection software to complete solution.

Prognostic Solutions

Steps to Design a Prognostic Solution

Page 5: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv5

Failure Modes and Effects AnalysisRoot Cause Analysis used for Failure Modes and Effects Analysis (FEMA)

Customer returns

Capacitors are significant cause of power supply failures as reported here by Murata

When Capacitors fail (short to GND), they also short out diodes

Page 6: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv

Prognostic Sensor Integration

To PHM Reasoner

Page 7: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv7

Power Supply Test bed & Sensor

The connection between the SMPS regulated output voltage and the PS sensor are these two cables (red & black). The connection  is made at any convenient location along the Power Bus in a system.

Page 8: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv8

Block Diagram of Testbed & Sensor

To PHM Reasoner

Page 9: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv

Condition: Good

Thresholds set by degradation FMEA:

• VR exceeds predefined Spec

• VR as good as new

Page 10: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nvwww.ridgetopgroup.com www.qstar.be Q-Star Test nv

Power Monitoring ResultsGood Power SystemGood Power System Degraded Power SystemDegraded Power System

Both supplies provide regulated voltage, but one is degraded and will soon fail.

Performance Performance

End‐of‐LifeEnd‐of‐Life

Degraded VR Threshold 

Page 11: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

www.ridgetopgroup.com www.qstar.be Q-Star Test nv

Condition: Near to Failure

Thresholds set by degradation FMEA:

• VR exceeds predefined Spec

• VR as good as new

Power Supply is 91% degraded but still regulating output voltage

Page 12: Prognostic Health Management€¦ · Microsoft PowerPoint - RingDown Demo.pptx Created Date: 12/15/2010 8:42:20 AM

DATE CONFERENCE | 8 MARCH 2010 | Tutorial E1 Q-Star Test nv

Contact Information

Phil DaviesDirector, Prognostic DivisionOffice: [email protected]

Hans ManhaeveCEO, Q-Star TestOffice: +32 50 [email protected]

Ridgetop Group 

6595 N. Oracle Rd.Tucson, AZ  85704