profile seaq 01
TRANSCRIPT
PREQUALIFICATION
INDEX
1. Company Profile
2. Company Structure
3. SEAQ Licenses
4. Projects List
5. Project’s Reference
6. Projects Details
7. Services
8. Quality Control Plan
9. Approvals
COMPANY PROFILE’’
SYNOPSIS
Seaq Electromechanical Works is one of the prestigious companyinterwoven with the development of the MEP & Low Current Engineeringand Contracting industry in the UAE.
Since the company have started, Seaq Electro Mechanical Works hasexcelled in engineering and executing projects in different sectorsincluding, Residential, Healthcare, Industrial, and Hospitality.
Our commitment is to execute projects with the highest quality, onschedule and within budget while adhering to excellent standards ofhealth, safety and environment. With this mindset, we are to berecognized as an icon in Electro-Mechanical Engineering.
With the professional, experienced & devoted workforce and a progressivemanagement Seaq Electro Mechanical Works is moving towards a betterfuture.
Executive Summary:
Seaq Electromechanical LLC Mechanical Electrical Plumbing (MEP)Contractor, that provides an all-encompassing design, installation,commissioning and maintenance solutions for commercial buildingrestorations and new building developments across in UAE.
There is no better way to establish an efficient workforce than tocombine the expertise within a well formulated team of designers,projects managers and engineers, who understand one another’s needswhen it comes to the design, installation and maintenance for MEPcontracts.
Because we are fortunate enough to boast some of the mostexperienced individuals within the building services industry, Synecorecan offer all mechanical, electrical and plumbing services in one tradeworks package.
We will coordinate the installation work and commission activities in themost efficient manner. Rather than waste precious project time oninefficient meetings and coordination between various servicecontractors, all of the design and planning will be meticulously carriedout by our team of professionals.
A dedicated team coordinates the intricate layout of all your mechanical, electrical and plumbing systems, without the delay of waiting on other businesses for information. This not only speeds up the estimating and design process, but also allows us to make the most effective use of the available space for services.
W O R D F R O M G E N E R A L M A N A G E R
The ethos of the business is to offer a total service based oncollaboration, non-contractual, user friendly and to provideinnovative and cost effective solutions to all our clients.
We strive to be at the forefront of all we do on a daily basis andto exceed expectations from inception, through design and tofinal completion.
We are proud of what we do, the people, the skills, theexpertise and know-how and we continue to invest, train andmentor to ensure we develop and evolve to stay abreast of ourever changing industry and its demands. Also to embrace thosechanges be it in renewables, health and safety,.
Our dedication and pursuance for client satisfaction has beenrewarded with outstanding levels of repeat business and agrowing portfolio of prestigious projects.
Mussab Zubeir Khalaf
COMPANY STRUCTURE’’
SEAQ LICENSES’’
PROJECTS LIST’’
P R O J E C T S L I ST
Project ’s Reference List - Current Projects
Reference #1 MEP Work for G + M + 6 + R Building ( 6 Buildings )
Scope of Work Procurement of Materials and Installation of MEP
Completion Date October 2021
Client Stars Development L.L.C
Location Sharjah Water Front City
Contract Value AED 42,500,000.00
Reference #4 MEP Works for G + 2 Building
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date Current
Client Mrs. Shaikhah Moudi Muhammad Alshamsi
Location Warsan, Dubai
Contract Value AED 2,750,000.00
Reference #2 MEP Work for B + G + 11 + R Building ( 4 Buildings )
Scope of Work Procurement of Materials and Installation of Electrical and Low
Current Systems
Completion Date Starting
Client Al ASHRAM Contracting
Location Oud Meitha , Dubai
Contract Value AED 20,000,000.00
Reference #3 MEP Work for G + 6 Twin Buildings
Scope of Work Procurement of Materials and Installation of MEP
Completion Date Starting
Contractor Al Hudaibah Contracting
Location Oud Meitha , Dubai
Contract Value AED 14,100,000.00
P R O J E C T S L I ST
Project ’s Reference List - Current Projects
Reference #6 MEP Work for 2B + G + 3+ R EMPOST Building
Scope of Work Procurement of Materials and Installation of MEP
Completion Date Current
Location Al Qarhoud , Dubai
Contract Value AED 3,600,000.00
Reference #7 MEP Work for B + G + 11 + R Building
Scope of Work Procurement of Materials and Installation of MEP
Contract Duration Current
Client Gayth Mohammad Ghyathi
Location Wadi Al Safa 3 , Dubai
Contract Value AED 7,550,000.00
Reference #8 MEP Work for G + 1 ( 6 Villas )
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date Current ( June 2019 )
Client Arthur Makenzy
Location Sharjah - UAE
Contract Value AED 3,190,000.00
Reference #8 MEP Works for G + 15 Building
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date Current February 2019
Client Mr. Sultan Muhammad Khalifa Alyahyaee
Location Al Nahda , Sharjah
Contract Value AED 15,465,000.00
Reference #5 MEP Works for G + 5 Building
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date 1/3/2020
Client Mr. Yousuf Ahmed Abdelaziz Ahmed
Location Sharjah , Abu Shagharah
Contract Value AED 6,900,000.00
P R O J E C T S L I ST
Project ’s Reference List – S o m e of Our C om pl eted Projects
Reference #1 MEP Works for G+5P+15+R Building
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date Complete ( January 2019 )
Client Mr. Mohammad Jaber Alharbi
Location Al Nahada - Sharjah
Contract Value AED 14,800,000.00
Reference #2 MEP Works for 134 Open Sheds ( Office + Guard RM + Ser. RMS)
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date Complete 2017
Client Mrs.Reema Odah Musabah
Location Dubai - UAE
Contract Value AED 5,300,000.00
Reference #3 MEP Works for G+M+3+R Building
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date Complete 2016
Client Sheikh Hasher Al-Maktoom
Location Dubai - UAE
Contract Value AED 4,300,000.00
P R O J E C T S L I ST
Project ’s Reference List – S o m e of Our C om pl eted Projects
Reference #4 MEP Works for G+M+3+R Building
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date Complete 2016
Client Mr. Hussain juma aljasmi
Location UM Al Quwain- UAE
Contract Value AED 3,900,000.00
Reference #5 MEP Works for G+3 Labor Accomodation
Scope of Work Procurement of Materials and Installation of MEP Work
Completion Date Complete 2015
Client Mr.Ali Fahed Ali AlRashed
Location Al Garhoud Dubai - UAE
Contract Value AED 3,100,000.00
Reference #6 MEP Works for G+2 Building
Scope of Work Procurement of Materials and Installation of MEP Works
Completion Date Complete 2016
Client Mr. Abdullah Husain Lotaah
Location Al Mamzar Dubai - UAE
Contract Value AED 4,100,000.00
Reference #7 MEP Works for G+2 Building
Scope of Work Procurement of Materials and Installation of MEP Work
Completion Date Complete 2015
Client Mr. Aqeel Abdullah Alhafidi
Location Al Garhoud Dubai - UAE
Contract Value AED 3,600,000.00
Reference Owner/Consultant Details Status
Reference # 1 Sheikh essa tower G + 30 + R Tower Completed
Reference # 2 Cairo Contracting B + G + 11 + R building Ongoing
Reference # 3 Emsqure Engineering Consultants G+P+7 Residential Building – Ongoing
Reference # 4 Almimzar contracting G+M+3 building At Al Garhoud Ongoing
Reference # 5 Khawajah SubContract G+19 BLD Completed
Reference # 6 Rajah Mohamad G+8 BLD Completed
Reference # 7 Remal Alsahraa contracting co. G+2 Building Ongoing
Reference # 8 Sayed Muhammad alhashmi G+1+ service Block Ongoing
Reference # 9 Raneen elec-mech co G+2 mousque Completed
Reference # 10 Memco engineering G+M.offices Completed
Reference # 11 Alraseen contracting G + 1 (3villas) Completed
Reference # 12 Julfar contracting co. G + 2 Building Completed
Reference # 13 Ahmed sultan alshamsi G+1 VILLA Completed
Reference # 14 Salem Abdullah Mubarak G+1 VILLA Completed
Reference # 15 JR Justin contracting B+G+1(18villas)complex Completed
Reference # 16 Elite Design & Engineering cons. Owais alqarni Mosque Completed
Reference # 17 Al-malwia co G + 2 building Completed
Reference # 18 Moushor contracting G floor (6chalet) Completed
Reference # 19 Kahramana co. G+1 building Completed
Reference # 20 I.S Lotaah contracting G + 2 building in Hor alanz Completed
Reference # 21 Power factor co G + 1(4 villas) Completed
P R O J E C T S L I ST
Project ’s Reference List – S o m e of Our HAVC Projects
Project: PROPOSED G + M + 6 + R Building 6 Buildings in Sharjah Water Front City
Owner: Stars Development L.L.C
Consultant: Sharjah Consultant
Contractor: High Star Contracting
Job: MEP Works
Project: PROPOSED G + 11+ R Building 4 Buildings in Oud Metha - Dubai
Owner: Al Naser Club
Consultant: Golden Sequare Consultant
Contractor: Al Ashram Contracting
Job: Electrical and Low Current Works
Project: PROPOSED 1B +G + 11 + R Building, Wadi Al Safa 3, DUBAI
Owner: Gyath Mohd Gyathi
Consultant: Golden Square Consultant
Contractor: Cairo Contracting
Job: MEP Works
Project: PROPOSED G + 6 + R Building, Oud Meatha , Dubai.
Owner: Al Naser Club
Consultant: Golden Square Consultant
Contractor: Al Hudaibah Contracting
Job: MEP Works
Project: G+30 +R RESIDENTIAL BUILDING
Client: SHEIKH ESSA
Job: REMOVING OLD AC SYSTEM AND REINSTALL NEW AC
Project: PROPOSED G + 3 + R Building, EMPOST BUILDING ,RENOVATION
Owner: EMPOST EMITATES
Consultant: Golden Square Consultant
Contractor: ESNAD Contracting
Job: MEP Works
Project : G+2TYP+R Residential Building / Sharjah
Client : Mr. Yousuf Ahmed Abdelaziz Ahmed
Job : MEP Work
Project : G+5TYP+R Residential Building / Al Musallah - Sharjah
Client : MR. HASSAN ARAB DARWISH
Job : MEP Work
Project : G+P+7 RESIDENTIAL BUILDING- DUBAI
Client : GUL MOHAMED
Job : MEP Work
PROPOSED MASJID – AL BARSHA THIRED , DUBAI
DONOR : MOHAMED SAIF ABED BIN ABED ALMHEIRI
CONSULTANT : AL ASRI ENGINEERING CONSULTANS
Job: MEP Works
EXICUTIVE JET TERMINAL FBO 2(AL MAKTHOM AIR PORT)
CLIENT: DUBAI SOUTH
CONSULTANT : AL ASRI ENGINEERING CONSULTANS
Job: MEP Works
SERVICES’’
S E R V I C E S ’’
SEAQ ELECTROMECHANICAL WORKS L.L.C provides a full portfolio of services in
Electrical, Low Current , Plumbing, Fire Fighting and Fire Alarm. All sectors follow
the Authority departments in UAE. Our services are detailed as follows:
•ELECTRICAL WORKS:
We have a proven track record to Design, Install, Test & Commission Electrical
Services to the highest standards for the construction industry or direct to end
users.
We have the in house expertise to carry out complex engineering projects from
inception to completion with our directly employed Project Managers, Supervisors
& Electricians bringing a proactive and flexible approach to understanding our
client’s requirements, with the ultimate goal of delivering a high quality Installation
on time and within budget.
All our installations are in conformance with local authority standards and
requirements such as DEWA , SEWA ,Etisalat ,DU, Civil defense, Dubai police etc.
.
S E R V I C E S ’’PLUMBING WORKS:
Our services in this field include design, shop drawing preparation,
installation of drainage and water supply pipes in High-rise Buildings, Office
Buildings, Hospitals, Hotels, Warehouses, Industrial Projects, Villas etc …
Our Experience includes but not limited to :
a) Water supply
Cold and Hot water piping with PEX ,PPR and high pressure pipes etc.
High level , Riser and Roof Water supply piping.
Installation of Water Storage tanks.
Water Cooling Systems.
Transfer pump and pumping stations.
Booster Pump and control panel.
Installation of P.R.V stations.
Water Meter Room arrangement with meter provisions.
b) Drainage and Sewerage
Underground, raft riser and high level and drainage piping.
Installation of Grease trap, Sand traps and Catch basins etc.
Installation of External Drainage and Sewerage system.
Installation of all kinds of Sanitary Wares.
FIC termination as per municipality regulations.
c)Water Tanks Supervision of Installation & Maintenance.
We are responsible for supervision of delivering GRP water tanks as per
approved drawing from authority departments & consultant
All our installations are in conformance with all local authorities standards and
requirements such as DEWA , SEWA ,Etisalat ,DU, Civil defense, Dubai police
etc
S E R V I C E S ’’
Fire F ight ing & Fire Al a rm Works
Seaq Electromechanical Works LLC is known for having the ability to
design a wide range of fire detection and protection systems & provide
solutions for every such need that prevent potential fire disasters. Design
management is an area that we give utmost priority and that too
complying with the DCD rules and regulations. We see that all
the installations we do are as per local authority requirements and
standards such as Dubai Civil defense, Sharjah Civil defense etc.
Our Experience in the Fire alarm and Firefighting includes but not limited
to:
•Addressable Fire alarm system & voice evacuation system.
•Central battery system.
•Firefighting sprinklers, breaching inlet, landing valves, hose reels etc .
•Fire Fighting pumps.(Both vertical and horizontal pumps)
•FM 200 SYSTEM, Pre action system, Foam system.
•Gas Deluge System.
•Testing & Commissioning Fire Alarm & Fire Fighting System.
Air Conditioning
Not only do we install the highest quality and most reliable airconditioning equipment from the world’s leading manufacturers andsuppliers, Seaq Electronical Wroks LLC also provides an air conditioningservice with full Planned Preventative Maintenance (PPM) for airconditioning in all types of businesses.
we provide a comprehensive air conditioning maintenance and servicingprogramme to ensure that if and when you suffer an air conditioningbreakdown, your equipment is back up and running as soon as possible.In fact, our regular air conditioning maintenance options will make surethat if there is a potential fault brewing, we get to it before it causes anydowntime at all.
With the high demands and legal obligations placed on commercial andindustrial premises to remain F-GAS compliant, it is critical to have areliable air conditioning maintenance team available.
S E R V I C E S ’’
LO W C U R R E N T WO R K S:
Low Current activities done by SEAQ ELECTROMECHANICAL WORKS L.L.C
includes Design, supply, installation and commissioning of the following
systems:
• Audio Video Solutions
• Video Conferencing
• Control and Digital Media Systems
• Video Walls
• Digital Signage and Kiosk Information Desk
• Display and Projection Systems
• Room Booking Systems
• Telepresence
• Interactive Television (IPTV)
*• Public Address and Voice Alarm Systems
• Audio/Video Intercom Systems
• Master Clock Systems
• SMATV
• Lighting Control Systems
• UPS Systems
• GRMS
• Structured Cabling System with Intelligent Solution
QUALITY CONTROL PLAN’’
1 . P U R P O S E
This document describes the Construction Quality Control System established to
provide the necessary supervision, control phases and tests of all items of work,
including that of suppliers and subcontractors, that will assure the compliance of
all work with the applicable specifications and drawings with respect to the equip-
ment, materials, workmanship, construction, finish, and functional performance,
which is the responsibility of our company at the construction site.
2 . P O L I C Y
As a construction subcontractor ,our company strives to obtain a uniform, high
quality level of workmanship throughout all phases of procurement, fabrication,
construction, and installation of equipment and facilities. To assure this end, the
following principles will be observed:
A.For the purposes of this Quality Control (QC) Plan, quality is defined as con-
formance to contractual requirements, specifications, and applicable standards.
B.Quality, or conformance to requirements, is the primary responsibility of con-
struction management and the persons doing the work. The QC persons are an
added resource to help construction management and the persons doing the
work in meeting this primary responsibility.
C.SEAQ ELECTROMECHANICAL WORKS L.L.C will assure the highest quality by
maintaining this QC Plan and follow its instructions governing quality control
procedures andpractices.
D.SEAQ ELECTROMECHANICAL WORKS L.L.C will conform to all contractual
requirements, specifications, and applicable standards using this Quality Control
Plan. Where a discrepancy exists between this plan and the contract require-
ments, the contract requirements shall prevail.
E.SEAQ ELECTROMECHANICAL WORKS L.L.C Co will compile accurate records of
test certifications and other required documentation and submit them to Con-
tractor.
F.SEAQ ELECTROMECHANICAL WORKS L.L.C will notify the Contractor promptly
of quality discrepancies for immediate corrective action and assure that correc-
tive action is implemented properly. We will report these in the Daily Report.
G.The Quality Control Manager (or QC Oficer or Quality Supervisor) has suf i -
cient organizational independence to perform all QC functions and has authority
to stop work to prevent non-compliant construction products.
H.The Quality Control Manager or a designated assistant shall be on site at all
times when construction activities are ongoing to make sure that all activities are
accomplished in accordance with contract specifications, drawings and proce-
dures.
1. O R GANI ZATI ON
2. Quality Control Ma na ger
The QC manager reports to and receives authority directly from top \senior
management. He formulates and implements as required the procedures and
instructions contained in this plan. The Quality Control Manager has no other
assigned duties.
Q UA L I T Y C O N T R O L P L A N’’
QUAL I T Y C O N T R O L P L A N
2. Other Q C Personnel
The Quality Control Manager has suficient assistants and inspectors as neces-
sary to carry out the stated functions of this Plan. The inspectors may have other
duties but cannot inspect work that is the responsibility of the organization for
which they have other duties.
3. Daily Report
Daily Report shall be recorded using the Daily Report form provided by Contrac-
tor. Th is report shall be submitted to Contractor on a daily basis.
4. Control of Onsite Construct ion
Suficient inspections of all work, including that of subcontractors, shall be
performed to assure conformance to applicable specifications and drawings
with respect to the materials, workmanship, construction, finish, functional perfor-
mance, and identification. Results will be reported in the Daily Report.
5. Rec e i v i ng a n d Wa rehous i ng
Inspection of permanent construction materials received will be performed by
the Quality Control System Manager, or other contractor personnel. Visual inspec-
tion will be made for; identification, damage, completeness, evidence of compli-
ance with approvals, and proper documentation. Results of receiving inspection
will be recorded on an appropriate report form and reported in the Daily Report.
All material shall be identified and safely protected until used.
6. Drawing a n d D oc um ent Control
Contract drawing, work orders and change orders issued for construction will be
maintained and kept current and recorded as it is revised. No technical informa-
tion will be replaced or revised without receipt of properly authorized change
notice, revision or equal.
7. Materials Cert i ficationCopies of all purchase orders or subcontracts requiring receiving inspection will
be given to the Quality Control Manager for receiving and record purposes.
When the purchase order requires vendor certification of materials, equipment,
or supplies, such certification shall be verified as to accuracy and conformance
and may be used in lieu of a test for those properties covered by the certification.
Copies of all certifications received will be maintained in the Quality Control
folder and submitted to Contractor.
8. Work m a ns hi p Inspect ion
Items which will be embedded in the concrete placements or areas which will be
covered up by a following operation will be inspected by the Quality Control Man-
ager. The Quality Control Manager shall verify that all item installed are in accord-
ance with the contract drawings and specifications prior to the placement of
concrete or covering. Any corrective action required will be recorded.
QUAL I T Y C O N T R O L P L A N
4.9 Cal ibrat ion of Equipment
All contractors furnished measuring and test equipment shall be calibrated and
maintained to traceable government standards. Records of these calibration
certifications will be maintained by the Quality Control Manager and made availa-
ble to main contractor upon request.
a.Each instrument will be plainly and permanently numbered, the equipment will
be operated only by those persons directly responsible for the equipment or
personnel under their cognizance.
b.Each piece of equipment will be checked for accuracy as recommended by
manufacturer for frequency of calibration. Required calibration of measuring
and test equipment will be conducted by a certified laboratory.
c.Measuring and test equipment dropped, damaged, or believed to be inaccu-
rate will be removed from services and recalibrated.
14.10 F inal Inspect ion a n d Test
Prior to final inspection or start of tests, all systems being inspected or tested
shall be completed and accepted by the Quality Control Manager. After this
acceptance, the final inspection and test may proceed in accordance with the
following steps:
a.Verify the test personnel have a working knowledge of the special characteris-
tics of the instruments being used.
b.Note the particular inspection or test requirements and criteria for successful
completion of the required inspection or test.
c.Upon satisfactory verification of these requirements the test may proceed.
Test results will be verified and documented by the Quality Control Manager.
d.The general requirement of final acceptance will include, but not be limited to,
the following:
(1)General appearance
(2) Workmanship
(3) Cleanliness of areas and equipment
(4) Identification of equipment
(5) Painting
(6) Removal of unused material and temporary facilities
(7) Condition of Job files and completion of paperwork
(8) Conformance to standards and specifications.
APPROVALS’’
Tel: + 971 4 584 5169
E-mai l 1 : in [email protected]
E-mai l 2 : In fo@ases .ae
E-mai l 3 : seaq.mep@gmai l . com
-P.O.Box :57436 D uba i , U AE .
Tecom, Damac Smart Heights .,
Off ice 2005