professional cost estimating - jld cost consulting

24
COST CONSULTING February 2021 Statement of Qualificaons PROFESSIONAL COST ESTIMATING PORTLAND, OR | 503.675.4383 SEATTLE, WA | 206.775.8707 Email: [email protected] Web: www.jldllc.com

Upload: others

Post on 07-Nov-2021

20 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

COSTCONSULTING

February 2021

Statement of Qualifications

PROFESSIONAL COST ESTIMATING

PORTLAND, OR | 503.675.4383

SEATTLE, WA | 206.775.8707

Email: [email protected]

Web: www.jldllc.com

Page 2: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

JLD Cost Consulting managed the budget

and project completion for a Federal

Navy Project, and estimated changes in

accordance with Federal standards. JLD was

extremely honest, fair, and always displayed

a willingness to find a solution that would

work for everyone. This professionalism,

integrity, and technical knowledge would be

a benefit to any organization.

PAUL WEYANT, U.S. NAVY, CIVIL ENGINEER CORPS

COVER: SEATAC AIRPORT CONSTRUCTION INSPECTIONS

Page 3: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

3jldllc.com

JLD COST CONSULTING WAS HONORED WITH THE 2019 SMALL BUSINESS AWARD BY CV MAGAZINE FOR OUTSTANDING ACHIEVEMENTS AND EXEMPLARY CONTRIBUTIONS TO THE AEC (ARCHITECTURAL, ENGINEERING, AND CONSTRUCTION) INDUSTRY.

JLD RANKED AMONG THE TOP 25 MANAGEMENT CONSULTING FIRMS IN THE PORTLAND BUSINESS JOURNAL, 2019 BOOK OF LISTS.

FIRM BACKGROUNDJLD Cost Consulting LLC (JLD), headquartered in Portland, Oregon, with an additional office in Seattle, Washington, is a well-established cost consulting firm, rooted in the Pacific Northwest. Founded in 2011, with the purpose of delivering high quality and accurate estimates to clients, JLD is focused on maximizing value, reducing project risk, and building confidence, value and quality in construction projects. JLD specializes in:

• Cost Estimating• Cost Control• Value Engineering• Life Cycle Costing

The firm’s professional staff of seven average between 15-30 years of construction cost estimating experience, and bring a diverse skillset of expertise in construction, engineering, architecture, and landscape architecture. This collective knowledge allows the firm to serve a variety of clients and projects.

JLD serves public agencies and multi-billion-dollar publicly held companies, as well as some of the top design firms in the U.S. and abroad. The firm’s projects range from public works facilities, fire stations, and transportation projects to new K-12 campuses and university renovations to public parks and waterfront developments to mixed-use high-rises and affordable

housing projects to hospitals, high-tech cleanrooms, and water treatment plants to recreation and entertainment centers to projects requiring historic preservation.

SMALL BUSINESS CERTIFICATIONS• State of Oregon, Emerging Small

Business (ESB) Certified: #9477• King County, Small Contractor and

Supplier (SCS) Certified: #2225

JLD Cost Consulting

Page 4: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

4 JLD Cost ConsultingCOVER: PORT OF SEATTLE

FIRM EXPERIENCEJLD has provided cost estimating services throughout the Pacific Northwest and beyond. Their territory of projects and array of experience covers nearly every corner of the country and project type—from the nation’s first LEED-Certified tea manufacturing facility in Eugene, Oregon to a high-performance, 99-story, high-rise in Manhattan, New York.

This wide spectrum of experience allows staff to draw on cost-saving solutions and value-added opportunities from a variety of project types, allowing one project type to inform another.

CIVIC/PUBLIC WORKSPORTS/WATERFRONTTRANSPORTATIONINDUSTRIALPARKS/RECREATIONOFFICE/RETAILENTERTAINMENTEDUCATIONHEALTHCAREMIXED-USE/RESIDENTIALINFRASTRUCTUREHISTORIC

civic/entertainment/historicVeterans Memorial Coliseumportland, oregon

Originally constructed in 1960 and listed on the National Register of Historic Places, Veterans Memorial Coliseum (VMC) is a 197,000 SF multi-use spectator arena, exhibit

hall, and meeting facility. JLD was recently awarded the cost estimating scope of the $80 million reinvestment project.

Page 5: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

4 5jldllc.com

civic/transportation/retailPort of Seattle, SeaTac Airport seatac, washington

JLD is providing cost estimating and construction inspection services for a variety of new construction, renovation, and upgrade projects at SeaTac Airport, including the new, expanded International Arrivals Facility (IAF). The IAF is the most complex capital development program in the history of the 70-year-old airport.

The firm is also inspecting numerous retail and restaurant renovations at the airport. This includes Starbucks, Planewear, Lou Lou Restaurant and Bar, Skychef, Uno De 50,Sourced Market, as well as the Airport Dining and Retail Infrastructure Modification Design Package, JOC noise remediation, Delta wireless backup antenna, and other smaller-scale construction projects.

waterfront/mixed-usePort of Vancouver, Terminal 1vancouver, washington

JLD is working with the Port and design team on this new waterfront development, which sits on a former industrial site. The design includes a public market, office buildings, retail space, a hotel, bike and pedestrian trails, and other mixed-use facilities.

Page 6: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

6 JLD Cost Consulting

parks/recreation/historicPortland Parks and Recreation, On-Call portland oregon

For the past eight years, JLD has provided on-call cost estimating services for Portland Parks and Recreation, with the contract recently extended, as a result of the firm’s exemplary performance record.

Recent projects include Couch Park Playground and Open Space Renovation; Gilbert Primary Park, Playground Renovation; Peninsula Park, Community Center, and Pool Renovation; Glenhaven Park, Play Area and Site Accessibly Improvements; and Kenton Park, Play Area Improvements. JLD is currently estimating the ADA improvements of four parks in the district.

Peninsula Park

Peninsula Park Community Center and Pool

Page 7: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

6 7jldllc.com

JLD’s most recent commissions of its on-call cost estimating and consulting contract with TriMet includes cost estimating, construction project management, and schedule review of two new bus base facilities, consisting of office and conference spaces, maintenance facilities, support buildings, multi-modal paths, and overall site improvements. Powell Garage: 4 Buildings, 17-Acre Site and Road Improvements. The new operations center, maintenance facility, and support buildings will serve as a home base for TriMet’s new Powell Garage location.

Columbia Boulevard: 10 Buildings, 28-Acre Site and Road Improvements. Following the success of the Powell Garage project, TriMet hired JLD for cost consulting of its new Columbia Boulevard facility. Located on a prior Caterpillar, Inc. campus, the project includes demolition, addition, and renovation of numerous buildings and site planning. JLD is also cost estimating sustainable and energy efficiency improvements, including a site-integrated geothermal heat-pump system..

transportationTriMet, Bus Base Facilitiesportland, oregon

Peninsula Park Powell Garage

Page 8: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

8 JLD Cost Consulting

Cost estimating and construction consulting of new buildings, facility renovations, systems upgrades, and the overall site planning for 10-acre the Bonneville Power Administration Ross Complex in Vancouver.

The project includes a 36,000-SF Fleet Services Building, a secondary 7,500-SF Bronto building, and civil site improvements on 10-acres of the extensive BPA Ross Complex Campus. The new FSB facility will house fleet administration with (20) class A work stations, a conference room, training room, and break room as well as loan pool space, HMEM’s, (2) D-service bays, (6) standard duty service bays, and (3) light service bays, parts service center, and wash stations.

The project also includes campus organizational improvements including road changes, additional parking, a multi-modal path, ADA accessibility, infrastructure

improvements including power and data loops, stormwater management upgrades, and steel yard coordination. JLD’s primary goal is to shorten the schedule, enhance cost control, improve risk identification and mitigation, increase the utilization of integrated design and construction techniques, and improve construction conflict identification and management.

Specific services included: cost estimating; construction project management; project schedule review; auditing project schedule to determine compliance with industry standards; review of contractor estimates to determine if the budget aligns with market conditions; development of GMP billing and percentage of work complete auditing; change order analysis; and auditing of prior change orders.

office/infrastructureBonneville Power Administration, Ross Complexvancouver, washington

Page 9: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

8 9jldllc.com

Cost estimating and construction consulting to evaluate current and future needs for the Loon Lake, Suncrest and Clayton areas, in Stevens County, Washington.

JLD was hired to provide cost estimating to help enable the Fire District to understand its current and future needs and prepare estimates during design to ensure all needs were met within budget. The replacement stations for Suncrest and Loon Lake are both

public worksStevens County Fire Stations and Needs Assessmentstevens county, washington

single-story facilities of approximately 13,100 SF and 15,038 SF, respectively.

Each new facility provides adequate space for apparatus, support rooms for firefighter turnout gear and equipment storage, office and living quarters for staff, as well as training rooms for both District and community use. The Loon Lake Station also serve as the new District Office for Stevens County Fire District #1.

public worksTualatin Valley Fire and Rescue Stationstualatin, oregon

This 2,000 SF fire station is the first of its kind in the Portland Metro area, and a prototype for future TVF&R stations. It houses two emergency response vehicles and two EMT’s to provide targeted services to emergencies.

Page 10: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

10 JLD Cost Consulting

The City of Wilsonville acquired a 7.6-acre property to consolidate office, warehouse, equipment storage, and yard functions into a single Public Works Complex. JLD’s cost estimates include a detailed site assessment. The Master Plan will accommodate existing and future needs, and provide cost/benefit

The City of Wilsonville acquired a 7.6-acre property with

the intention of consolidating office, warehouse, equipment

storage and yard functions into a single Public Works

Complex. We have been contracted to develop a Master

Plan for the property, including a detailed site assessment,

conceptual plans, phasing diagrams and detailed cost

estimates.

Upon completion, the Master Plan will accommodate

existing and near-future needs, and provide cost/benefit

options for accommodating anticipated growth for the

next 20 years. The Plan is expected to include a 13,000 sf

Administration building, an expandable 11,000 sf warehouse

of approximately, and associated service yard functions to

include parking, maneuvering areas, material storage, de-

watering, a wash station, high-volume water distribution and

chemical and magnesium chloride containment.

LOCATION Wilsonville, OR

SIZE 24,000 sf

YEAR In Progress

TEAM Sid Scott

Andrew Kraus

REFERENCE Martin Montalvo, Public Works Ops Mgr., 541-570-1560

WILSONVILLE PUBLIC WORKS

20

public worksWilsonville Public Works Campuswilsonville, oregon

options for anticipated growth for the next 20 years. The Plan includes a 13,000 SF Administration building, an expandable 11,000 SF warehouse, and associated yard functions to include parking, maneuvering areas, material storage, dewatering, a wash station, and chemical containment.

Cost estimating for a new Public Works campus on a 3-acre site. The vehicle maintenance building consists of a 4-bay service facility, a service office and restroom. The office building’s sustainable design features include extensive use of natural daylight, photovoltaics, natural ventilation, a green roof area and site lighting generation via combination solar/wind turbines.

public worksFlorence Public Worksflorence, oregon

Page 11: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

10 11jldllc.com

waste water/infrastructure/industrialColumbia Boulevard WWTP, Cogeneration Systemportland, oregon

The Bureau of Environmental Services (BES) has embarked upon a biogas utilization strategy that will result in the highest financial return on investment and greenhouse gas emission reduction.

JLD has been retained to provide cost estimating of cogeneration alternatives analysis at the Columbia Boulevard plant. Specifically, the firm is developing capital, operation and maintenance cost estimates for the three alternatives to be considered for this study, as well as feedback on constructability/sequencing. JLD will be cost estimating the design documents as well.

Page 12: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

12 JLD Cost Consulting

Terminal 6 is a multipurpose, 419-acre facility that features five ship berths and an on-dock rail yard. Autos, containers, and breakbulk cargoes are handled at T-6.

ports/industrialPort of Portland, Terminal 6 Pavement Rehabilitationportland, oregon

C-H

646668

58

62

585957 57 57 57 57 57

55

5755 55

565656

585656

585858

6058

60 59

58

6060 595960 59

615960

61

B-K

62

63

B-LB-JB-I

65

64

62

6162

6162

6162

6364

6364

6364

6364

6566

6566

6566

6566

67

66

67

SP-BSP-B

SP-B SP-B

2423

2221

20

2423

2221

20

G-FG-EG-C G-D

G-BG-A

F-FF-EF-DF-CF-BF-A

D-FD-ED-DD-CD-BD-A

C-NC-MC-LC-KC-JC-IC -HC-GC-FC-EC-DC-CC-BC-AB-OB-NB-MB-LB-KB-JB-IB-HB-GB-FB-EB-DB-CB-BB-A

26252423222120

26252423222120

19181716151413121110987654321

19181716151413121110987654321

212019181716151413121110987654321

1615

1413

1211

109

87

65

43

21

1615

1413

1211

109

87

65

43

21

2423

2221

20

2423

2221

20

1918

1716

1514

1312

1110

98

76

54

32

1

1918

1716

1514

1312

1110

98

76

54

32

1

2423

22

2423

22

1817

1615

1413

1211

109

87

65

43

21

1817

1615

1413

1211

109

87

65

43

21

2827

2625

2423

2221

20

2827

2625

2423

2221

20

1918

1716

1514

1312

1110

98

76

54

32

1

1918

1716

1514

1312

1110

98

76

54

32

1

4443

42

4443

42

44 44

43 43

42 42

3837

3635

3433

3231

3029

2824

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

3837

3635

3433

3231

3029

2824

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

3837

3635

3433

3231

3029

28

1918

1716

1514

1312

1110

98

76

54

32

1

3837

3635

3433

3231

3029

2819

1817

1615

1413

1211

109

87

65

43

21

SP

-ES

P-E

SP

-CS

P-C

SP

-CS

P-C

SP-DSP-DSP-FSP-F

SP-ESP-E

SP-E SP-ESP-F SP-F

SP-E SP-ESP-D SP-D

SP-G SP-G

SP-GSP-G

SP-A SP-A

SP-A SP-A SP-B SP-B

SP-A SP-A SP-B SP-B

SP-ASP-B

SP-A SP-B

SP-ASP-A

SP-ASP-B

SP-ASP-B

6866

6765

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

3

2

7068

66

6967

65

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

3

2

8078

7674

7270

6866

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

7977

7573

7169

6765

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

2

8078

7674

7270

6866

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

7977

7573

7169

6765

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

3

2

1

8482

8078

7674

7270

6866

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

8381

7977

7571

6967

6563

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

119

75

3

2

8684

8280

7876

7472

7068

6664

6260

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

8583

8179

7775

7371

6967

6563

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

2

8886

8482

8078

7674

7270

6866

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

8785

8381

7977

7573

7169

6765

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

3

2

8684

8280

7876

7472

7068

6664

6260

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

8583

8179

7775

7371

6967

6563

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

2

1

8886

8482

8078

7674

7270

6866

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

8785

8381

7977

7573

7169

6765

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

3

2

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

8886

8482

8078

7674

7270

6866

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

8785

8381

7977

7573

7169

6765

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

3

6866

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

4

6765

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

3

6664

6260

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

6563

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

2

1

2

2

G-F

G-EG-DG-C

G-BG-A

F-F

F-E

F-DF-CF-BF-A

F-FF-EF-DF-CF-BF-A

95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

G-FG-EG-C G-D

G-BG-A

D-FD-ED-DD-CD-BD-A

C-NC-MC-LC-KC-JC-IC-GC-FC-EC-DC-CC-BC-AB-OB-NB-MB-HB-GB-FB-EB-DB-CB-BB-A

3634

3230

2826

2422

2018

1614

1210

86

42

3533

3129

2725

2321

1917

1513

119

75

31

3836

3432

3028

2624

2220

1816

1412

108

64

2

3735

3331

2927

2523

2119

1715

1311

97

53

3836

3432

3028

2624

2220

1816

1412

108

64

2

3735

3331

2927

2523

2119

1715

1311

97

53

3836

3432

3028

2624

2220

1816

1412

108

64

2

3735

3331

2927

2523

2119

1715

1311

97

53

1

3836

3432

3028

2624

2220

1816

1412

108

64

2

3735

3331

2927

2523

2119

1715

1311

97

53

1

3836

3432

3028

2624

2220

1816

1412

108

64

2

3735

3331

2927

2523

2119

1715

1311

97

53

1

3836

3432

3028

2624

2220

1816

1412

108

64

2

3735

3331

2927

2523

2119

1715

1311

97

53

1

4038

3634

3230

2826

2422

2018

1614

1210

86

42

3937

3533

3129

2725

2321

1917

1513

119

75

3

4038

3634

3230

2826

2422

2018

1614

1210

86

42

3937

3533

3129

2725

2321

1917

1513

119

75

3

4038

3634

3230

2826

2422

2018

1614

1210

86

42

3937

3533

3129

2725

2321

1917

1513

119

75

3

4038

3634

3230

2826

2422

2018

1614

1210

86

42

3937

3533

3129

2725

2321

1917

1513

119

75

31

4038

3634

3230

2826

2422

2018

1614

1210

86

42

3937

3533

3129

2725

2321

1917

1513

119

75

31

E-K

E-A

E-LE-KE-JE-IE-HE-GE-FE-EE-DE-CE-B

E-L

E-JE-I

E-HE-G

E-FE-E

E-DE-C

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

6260

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

6260

5856

5452

5046

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

6260

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

6260

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6260

5856

5452

5048

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

6361

5957

5553

5149

4745

4341

3937

3533

3129

2725

2321

1917

1513

119

75

31

6462

6058

5654

5248

4644

4240

3836

3432

3028

2624

2220

1816

1412

108

64

2

6563

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

6462

6058

5654

5250

4846

4442

4038

3634

3230

2826

2422

2018

1614

1210

86

42

6563

6159

5755

5351

4947

4543

4139

3735

3331

2927

2523

2119

1715

1311

97

53

1

D-FD-ED-DD-CD-BD-AC-NC-MC-LC-KC-JC-IC-HC-GC-FC-EC-DC-CC-BC-A

B-OB-NB-MB-LB-KB-JB-IB-HB-GB-FB-EB-DB-C

E-B

B-BB-A

E-A

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

8079

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

8079

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

7978

7776

7574

7372

7170

6968

6766

6564

6362

1918

1716

1514

1312

1110

98

76

54

32

1

767574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

787675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

77767574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

777675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

78777675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

787776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

787776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

80797877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

A-Y

A-YA-YA-XA-XA-WA-WA-VA-VA-UA-UA-TA-TA-SA-SA-RA-RA-QA-QA-PA-PA-OA-OA-NA-NA-MA-MA-LA-L

A-KA-K

A-JA-JA-IA-IA-HA-HA-GA-GA-FA-FA-EA-EA-DA-DA-CA-CA-B A-BA-AA-A

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

767574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

75747372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

757473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

767574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

7776757473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

76757473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

20

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

27

82

82

77

78

80

80

81

81

78

78

81

81

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7978

7776

75

65

4

8281

8079

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

8079

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

8079

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7978

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

4

7978

7776

7574

7372

7170

6968

6766

6564

63

82

79

7877

A-G

A-Y

A-XA

-W

A-V

A-UA

-TA-S

A-R

A-QA

-P

A-O

A-NA-M

A-L

A-KA

-J

A-I

A-HA

-F

A-D A-E

A-C

A-B

A-A

A-G

A-Y

A-XA

-W

A-VA

-UA-TA-S

A-R

A-QA

-P

A-O

A-NA-M

A-L

A-KA

-J

A-I

A-HA

-FA-D

A-E

A-C

A-B

A-A

21321321321

321321321

321321321321

321

321321

321321321321

321321321321

321321321

82

83

81808281

83

83807982818080

8079

7979787877787777

76

7677

77

7877

7776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

78

797879

79

8079

3

8281

8079

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

424140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

8281

8079

7877

7675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

787776

7574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

78777675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

78777675

7473

7271

7069

6867

6665

6463

6261

6059

5857

5655

5453

5251

5049

4847

4645

4443

4241

4039

3837

3635

3433

3231

3029

2827

2625

2423

2221

2019

1817

1615

1413

1211

109

87

65

43

21

77767574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

767574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

4544

4342

4140

3938

3736

3534

3332

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

1

767574

7372

7170

6968

6766

6564

6362

6160

5958

5756

5554

5352

5150

4948

4746

45

3634

3230

2826

2422

2018

1614

1210

86

4

3533

3129

2725

2321

1917

1513

119

75

3

2

1

3634

3230

2826

2422

2018

1614

1210

86

4

3533

3129

2725

2321

1917

1513

119

75

3

2

1

3836

3432

3028

2624

2220

1816

1412

108

64

3735

3331

2927

2523

2119

1715

1311

97

53

2

1

3836

3432

3028

2624

2220

1816

1412

108

64

3735

3331

2927

2523

2119

1715

1311

97

53

2

1

H-I

H-H

H-GH-FH-EH-DH-CH-BH-A

H-I

H-HH-GH-FH-EH-D

H-C

H-B

H-A

T-OT-N

T-MT-L

T-KT-J

T-IT-H

T-GT-F

T-ET-D

T-CT-B

T-A

T-A

T-B

T-C

T-D

T-E

T-F

T-G

T-H

T-I

T-J

T-K

T-L

T-O

T-M

58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8

57 55 53 51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10

65 63 61 59 57 55 53 51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

65 63 61 59 57 55 53 51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

65 63 61 59 57 55 53 51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

65 63 61 59 57 55 53 51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

65 63 61 57 55 53 51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2

51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1 T-N

17

15

1311

97

53

1

2220

1816

1412

108

64

2725

2321

1917

1513

119

75

3

2

1

3230

2826

2422

2018

1614

1210

86

4

3331

2927

2523

2119

1715

1311

97

53

2

1

3432

3028

2624

2220

1816

1412

108

64

3331

2927

2523

2119

1715

1311

97

53

2

1

3432

3028

2624

2220

1816

1412

108

64

3331

2927

2523

2119

1715

1311

97

53

2

1

STOP

STOP ST

OP

STOP

STOP

STOP

STOP

STOP

STOPSTOP

STOPSTOPSTOP

STOP

STOP

STOP

STOP

STOP

STOPSTOPSTOP

STOP

STOP

STOP

STOP

STOP

STOP

STOPSTOP

STOP

STOP

STOPSTOP

STOP

STOP

STOP

STOPSTOP

STOPSTOP

STOP

STOP

STOP

STOP

STOPSTOP

STOP

STOPSTOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOPSTOP

STOPSTOP

STOPSTOP

STOPSTOP

STOPSTOP

STOPSTOP

STOP

STOP

STOP

STOPSTOP

STOP

STOPSTOP

STOP

STOP

STOP STOP STOP STOP STOP

STOPSTOP

STOP

STOP

STOP STOP

STOP

STOP

STOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOP

STOP

STOP

STOP

STOP

STOP

STOP

STOPSTOPSTOPSTOP

STOP

STOP

STOP

STOP

STOP

STOP

STOPSTOP

STOPSTOP

STOPSTOP

STOPSTOP

STOPSTOP

STOP

STOPSTOP

STOPSTOP

STOPSTOPSTOPSTOPSTOPSTOP

STOP

STOP

STOPSTOPSTOPSTOPSTOPSTOP

STOP

STOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOP

STOP

STOP STOP

STOP

STOP

STOP

STOP

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH15

SLOW

MPH 15 SLO

W

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH 15 SLO

W

MPH

15

SLOW

MPH 15 SLO

W

MPH15SLOW

MPH15SLOW

MPH

15

SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH 15 SLO

W

MPH 15 SLO

W

MPH 15 SLO

W

MPH 15 SLO

W

MPH15SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH15SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH 15 SLO

W

MPH 15 SLO

W

MPH 15 SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH15

SLOW

MPH 15 SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH

15

SLOW

MPH 15 SLO

W

MPH

15

SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH15SLOW

MPH 15 SLO

W

MPH15SLOW

MPH15SLOW

MPH 15 SLO

W

MPH

15

STOP

STOP

STOP

STOP

PORT OF PORTLANDPORTLAND, OREGON

APPV'DNO. CK'DREVISIONSBYDATE APPV'DNO. CK'DBYDATE REVISIONSDESIGN NUMBER PROJECT NUMBER

/1:16:55 PM SLAM n:\c\p\2019\1900399-pdx-terminal-6-pavement-rehab-pop-1247-to3\cad\plot\gi-5-7-staging sites and haul routes.dwg6/4/2020

01/

4"1/

2"1"

2"C

AN

YO

U S

EE

TH

E A

IRP

LAN

ES

? T

HE

AD

JAC

EN

T S

AM

PLE

S S

HO

W T

HR

EE

DIF

FE

RE

NT

LEV

ELS

OF

SH

AD

ING

.S

ETT

ING

S F

OR

VIE

WIN

G A

ND

PR

INTI

NG

DR

AW

ING

CO

NTE

NT

AR

E O

PTI

MIZ

ED

WH

EN

ALL

TH

RE

E P

LAN

ES

AR

EV

ISIB

LE.

THIS

GU

IDA

NC

E IS

PR

OV

IDE

D F

OR

RE

FE

RE

NC

E O

NLY

.G

RA

PH

IC S

CA

LE -

FO

R R

EF

ER

EN

CE

ON

LY

PRINTED:

ligh

t

gra

y

dar

k

gra

yb

lack

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".

CHECKED BY

DATE

DESIGNED BY

DRAWN BY

SUBMITTED BY DRAWING NO.TYPE

SCALE

DISC. SHT. NO.SHEET NO.

/ GI-3XXXXXX0000XX00

JUNE 2020

P. CRAIG

T. FLEMMING

42PDX XXXX-XXXCD

PORTLAND INTERNATIONAL AIRPORT

AS SHOWNPROJECT ENGINEER

TERMINAL 6 PAVEMENT REHABILITATION

ERIC HEIN

P. SCHMIDTKE

2020

111 SW Fifth Ave., Suite 2600Portland, OR 97204O:503.542.3860F: 503.224.4681www.kpff.com

STAGING SITE AND HAUL ROUTE PLAN 1

3

N. MARINE DRIVE

N. LE

AD

BE

TTER

RO

AD

N. LE

AD

BE

TTER

RO

AD

N. MARINE DRIVE

N TE

RM

INA

L 6 RO

AD

N TERMINAL 6 LOOP

BERTH 607

HONDAENTRANCE

N. B

YB

EE

LAK

E R

OA

DN

. BY

BE

E LA

KE

RO

AD

SCALE: IN FEET

0' 250' 500' 1000' 1500'

N

HAUL ROUTE NOTE(S):

1. CONTRACTOR ACCESS ALONG HAUL ROUTES WITHIN THE AOA MAY BE SUBJECT TO DELAYS DUE TO AIRPORT OPERATIONS. THE CONTRACTOR SHALL AT ALL TIMES YIELDFOR AIRCRAFT. NO CROSSING OF ACTIVE RUNWAYS WILL BE ALLOWED.

2. ALL PORTIONS OF THE HAUL ROUTE ON THE AIRFIELD SHALL BE CONTINUOUSLY SWEPT BY VACUUM SWEEPERS DURING ALL WORK HOURS.

3. DURING CONSTRUCTION ACTIVITIES ON THE AIRCRAFT APRON, THE CONTRACTOR SHALL KEEP VACUUM SWEEPER TRUCK(S) AND WATER TRUCK(S) ON SITE AT ALL TIMES DURINGWORKING AND NON-WORKING HOURS AND SHALL MAINTAIN THE SITES FREE FROM DUST AND OBJECTIONABLE DEBRIS. DURING THIS PERIODS OF TIME THAT THERE IS NOCONSTRUCTION ACTIVITY (BETWEEN WORK SHIFTS), THE VACUUM-SWEEPER TRUCK AND WATER TRUCK MUST BE READY AND ON-SITE WITH CONTRACTOR'S PERSONNEL AVAILABLE BYPHONE TO RESPOND IMMEDIATELY TO A DUST OR DEBRIS PROBLEM AS IDENTIFIED BY THE PORT. AT NO TIME SHALL THERE BE MORE THAN A 10 MINUTE RESPONSE TIME TO CALLSCONCERNING DUST/DEBRIS PROBLEMS DURING WORK HOURS AND A 90 MINUTE RESPONSE TIME AT ALL OTHER TIMES ON A 24-HOUR BASIS.

4. THE CONTRACTOR SHALL PREVENT FOREIGN OBJECTS DEBRIS (FOD) IN AIRCRAFT OPERATIONAL AREAS AND SHALL CONTROL CONSTRUCTION AREA GENERATED DUST ON A 24-HOURBASIS.

5. SECURITY PERSONNEL WILL BE PROVIDED BY THE PORT WITH USAGE AND SCHEDULING TO BE COORDINATED BETWEEN THE CONTRACTOR AND THE PORT. THE CONTRACTOR WILL NOTBE ALLOWED ACCESS THROUGH ANY AOA GATE UNLESS STAFFED BY A PORT-SUPPLIED OPERATIONS ACCESS CONTROLLER. OPERATIONS ACCESS CONTROLLERS WILL ONLY ALLOWACCESS TO AND FROM THE AOA BY PERSONS AND VEHICLES WITH THE APPROPRIATE ID/VEHICLE MARKINGS MEETING THE REQUIREMENTS OF SECTION 013513 OF THE SPECIFICATIONS.THE CONTRACTOR IS ADVISED TO EXPECT DELAYS AT GATE ENTRANCES AND TO PLAN ACTIVITIES ACCORDINGLY.

6. THE EXISTING ROADS DESIGNATED AS CONTRACTOR HAUL ROUTES MAY BE USED BY OTHER AIRPORT VEHICLES. CONTRACTORS AND THE GENERAL PUBLIC (ALONG PUBLIC ROADS).THE CONTRACTOR SHALL NOT INTERFERE WITH OTHER VEHICULAR TRAFFIC AND SHALL YIELD TO EMERGENCY VEHICLES ALONG ANY OF THE AIRPORT OR PUBLIC ROADS. THECONTRACTOR SHALL PROVIDE ALL FLAGGING, SIGNING, LIGHTING, ETC. REQUIRED BY THE CITY OF PORTLAND, MULTNOMAH COUNTY, AND THE PORT OF PORTLAND TO PROVIDE ALLREASONABLE SAFETY MEASURES TO PROTECT ALL PERSONS UTILIZING THE HAUL ROADS AND ALL PUBLIC ROADS USED BY THE CONTRACTOR. THE CONTRACTOR SHALL OBEY ALLVEHICULAR WEIGHT AND SPEED LIMITS ESTABLISHED IN SPECIFICATION SECTION 013513 OR AS POSTED ON PORT PROPERTY OR PUBLIC STREETS. THE CONTRACTOR SHALLCONTINUOUSLY SWEEP ALL ACCESS ROUTES TO THE CONSTRUCTION AREAS AND EXISTING ADJACENT PAVED AREAS AND AOA PAVEMENTS. THESE AREAS SHALL BE KEPT FREE OFDEBRIS AT ALL TIMES.

7. ALL DAMAGE ALONG THE CONTRACTOR ACCESS/HAUL ROUTES ON EXISTING ROADS DUE TO THE CONTRACTORS USE SHALL BE REPAIRED IMMEDIATELY. AT THE COMPLETION OF THEPROJECT, ALL PAVEMENTS AND SURFACES ALONG THE ACCESS ROUTES THAT WERE EXISTING AT THE START OF THE PROJECT SHALL BE RESTORED TO THE ORIGINAL CONDITIONS. THECONTRACTOR SHALL COORDINATE AND MEET THE CLEANING AND REPAIR REQUIREMENTS SET BY OTHER PUBLIC AGENCIES FOR USE OF THEIR ROADS FOR CONSTRUCTION RELATEDWORK. THE CONTRACTOR SHALL ALSO REFER TO SPECIFICATION SECTIONS 015000 AND 013513 FOR ADDITIONAL REQUIREMENTS ASSOCIATED WITH HAULING OF MATERIALS TO THEPROJECT SITES.

8. ALL VEHICLES AND EQUIPMENT SHALL BE KEPT WITHIN THE WORK AREAS ESTABLISHED FOR THAT WORK SHIFT UNLESS TRAVELING TO OR FROM THE SITE VIA APPROVED HAUL ROUTES.UNDER NO CIRCUMSTANCES SHALL VEHICLES BE PARKED OR EQUIPMENT/MATERIALS BE STORED OUTSIDE OF THESE AREAS. ALL EQUIPMENT SHALL BE KEPT OUTSIDE OF THE RUNWAYSAFETY AND TAXIWAY OBJECT FREE AREAS OF ACTIVE RUNWAYS AND TAXIWAYS.

9. ALL CONSTRUCTION VEHICLES AND EQUIPMENT OPERATING WITHIN THE AOA SHALL BE EQUIPPED WITH YELLOW FLASHING BEACONS. CONTRACTOR ESCORTS AND VEHICLES TALLERTHAN 15' FEET SHALL ALSO BE EQUIPPED WITH A STAFF MOUNTED 3' X 3' INTERNATIONAL ORANGE AND WHITE CHECKERED FLAG. CHECKERED PATTERN TO BE ONE FOOT SQUARE. THEBEACONS ON THE EQUIPMENT AND VEHICLES SHALL BE BE ON AND OPERATIONAL AT ALL TIMES WHILE ON THE AOA. VEHICLES WITHIN THE RESTRICTED AREA SHALL DISPLAYPROFESSIONALLY MANUFACTURED COMPANY IDENTIFICATION MARKINGS ON BOTH SIDES OF THE VEHICLE. IN ACCORDANCE WITH FAA AC 150/5210-20, LETTERING SHALL BE AT LEAST 3INCHES IN HEIGHT WITH CONTRASTING BACKGROUND COLOR. VEHICLES SHALL ALSO BE EQUIPPED WITH HEADLIGHTS, TAILLIGHTS, AND FLASHERS THAT SHALL BE USED BETWEENSUNSET AND SUNRISE, OR WHEN VISIBILITY IS LOW.

10. LIGHTING PROVIDED FOR ANY NIGHT WORK SHALL NOT INTERFERE WITH AIR NAVIGATION. LIGHTS SHALL BE TRANSPORTED TO AND FROM THE WORK AREAS WITH THE LIGHTS POINTEDDOWN OR OFF.

11. THE CONTRACTOR MAY STORE EQUIPMENT AND MATERIALS ASSOCIATED WITH CONSTRUCTION WITHIN THE ESTABLISHED WORK AREA OR AT LOCATIONS DESIGNATED ON THE WORKAREA PLANS. ALL WORK AREAS ARE LOCATED WITHIN THE AOA. THE CONTRACTOR'S USE OF ANY STORAGE SITE WITHIN THE AOA IS RESTRICTED TO STORAGE OF THE CONTRACTOR'SEQUIPMENT/MATERIALS. STOCKPILE OF MATERIAL WITHIN THE AOA SHALL BE LIMITED TO A HEIGHT OF 6' UNLESS OTHERWISE APPROVED BY THE PORT.

12. NO FIELD OFFICE FOR THE CONTRACTOR ON SUBCONTRACTORS WILL BE ALLOWED WITHIN THE SECURED AREA.

13. EMPLOYEE PARKING: PARKING OF EMPLOYEES' PRIVATE VEHICLES IS RESTRICTED TO PARKING AREAS OFF THE AOA. NO EMPLOYEE VEHICLES OR FOOD VENDORS WILL BE ALLOWED ONTHE AOA. CONTRACTOR SHALL BE RESPONSIBLE FOR TRANSPORT OF EMPLOYEES TO/FROM WORK AREAS IN PORT-APPROVED VEHICLES.

14. EQUIPMENT OPERATED ON ALL ROADS WITHIN THE AIRFIELD SHALL CONFORM TO LEGAL LOAD LIMITS FOR PUBLIC HIGHWAYS. ROAD SURFACES SHALL BE SMOOTH (NON-MILLED) ANDDEBRIS FREE AT ALL TIMES.

15. LIMIT EQUIPMENT HEIGHT TO 15' UNLESS OTHERWISE ALLOWED BY THE PORT. WITH PORT APPROVAL, EQUIPMENT BETWEEN HEIGHT OF 15' AND 30' MAY BE ALLOWED DEPENDING ONWHERE AND WHEN WORK IS TO OCCUR AND IF WEATHER CONDITIONS ARE PROJECTED TO BE CLEAR FOR THE ENTIRE WORK PERIOD.

16. THE PORT WILL PROVIDE A DESIGNATED STOCKPILE SITE IN THE CONTRACTOR'S STAGING AREA. THE STOCKPILE SITE WILL BE FOR THE TEMPORARY PLACEMENT OF COMMONEXCAVATION MATERIALS NOT UTILIZED FOR THE CONSTRUCTION OF EMBANKMENT WITHIN THE WORK AREAS. PREPARATION OF THE SITE PRIOR TO USAGE AND GRADING OF THE SITESHALL BE AS DIRECTED BY THE PORT. ALL COMMON EXCAVATION MATERIAL STORED WITHIN THE STAGING AREA WILL BE EITHER USED ON THE PROJECT OR HAULED OFF PORTPROPERTY BY THE END OF THE PROJECT.

17. SEE THE CONSTRUCTION PHASING PLANS AND THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS RELATED TO SAFETY, PHASING AND STORAGE.

18. CONTRACTOR SHALL PROVIDE HAND BROOMING IN ADDITION TO VACUUM SWEEPER TRUCK(S) AS REQUIRED TO PREVENT FOD.

LEGEND:

HAUL ROUTE

WORK AREA LIMIT

SIDA SECURITY IDENTIFICATION DISPLAY AREA

SIDA

SIDA

SIDA

JLD is cost estimating a pavement rehabilitation of the terminal, which includes Berth 607, the Honda imports entrance, and staging areas for cargo.

Page 13: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

12 13jldllc.com

Corvallis School District hired JLD Cost Consulting to provide cost estimating, construction project management, and schedule auditing for the district’s 13 schools, which are slated for either new campuses, major building renovations/ additions, or building demolitions, under the May 2018, voter-approved $200 million Corvallis School Bond.

The project includes classrooms, laboratories, STEAM (science, technology, engineering, art, and mathematics) spaces, offices, auditorium, gymnasiums, sports fields, cafeterias, maintenance facilities,

and a 5,000 SF health center. JLD’s scope also includes review, analysis, reconciling, and recommendations for the sustainable and energy efficiency improvements; safety/ security upgrades; ADA compliance; seismic improvements; mechanical and electrical upgrades; and new and updated transit services.

educationCorvallis School District, Bond Projectscorvallis, oregon

Page 14: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

14 JLD Cost Consulting

Washington State University in Vancouver is a 351-acre, open campus and site emergency call stations added safety and security for students. The system was installed after new parking lots were complete. In place of saw cut and trenching, the conduits were bored under the asphalt pavement to lower costs and maintain the life cycle of the AC pavement.

JLD managed and installed a campus security system for the safety and welfare of the student body. This system was installed

under active roads and parking areas. Through JLD’s dedication to checking for utilities, staff discovered unforeseen utilities in areas that were less than 10 years old. The elevation of the utilities were verified by boring a six inch diameter hole in the pavement and excavated using pressurized water and vacuum system for less cost and more accuracy.

educationWashington State University, Emergency Call Stationsvancouver, washington

Page 15: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

14 15jldllc.com

Clackamas Community College recently completed renovation of the ground floor of Barlow Hall, resulting in an expansion of the space used by the school’s automotive department and its programs. The project is one of several from the $90-million bond passed by voters in 2014 and $32 million in matching grant money from the state.

For Barlow Hall, $5.6 million was used to add new work stations and equipment to a garage area used for the automotive service technician program. Space for the autobody and collision repair program was

also expanded, and the area used for an automotive program that serves high school students was doubled in size. The project required heavy-duty interior demolition work, including asbestos abatement.

JLD’s cost estimate of the vocational building renovation, included estimates of the woodworking, automotive, painting booth, and classroom spaces, as well as HVAC, electrical, and plumbing infrastructure improvements, seismic upgrades, and the demolition work.

educationClackamas College, Barlow Halloregon city. oregon

Page 16: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

16 JLD Cost Consulting

This 50,000 SF project included the renovation of a laboratory and the addition of a rooftop mechanical penthouse enclosure. Mechanical equipment power supply is N+2. This requires primary power, +1 is power supplied by a generator and automatic transfer switch, 2+ is a 2nd generator that backups the 1st generator in case it fails.

The facility was fully operational during the upgrade. JLD estimate for the work included cost difference between phased construction with partial shut-down and cost to implement the work using the alternate sources of power.

healthcareVeterans Administration, Hospital Laboratory Renovation and HVAC Upgradesspokane, washington

Page 17: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

16 17jldllc.com

JLD prepared a life cycle costs analysis of the building envelope for this 22,000 SF full-service mental health facility in The Dalles, OR. JLD was also the lead cost consultant

healthcareMid-Columbia Center for Livingthe dalles, oregon

for the project, which included a glazed main staircase, second floor waiting rooms, office space, community room, and teaching kitchen.

Page 18: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

18 JLD Cost Consulting

Additional Experience

• Lake Oswego Aquatic and Recreation Center, Lake Oswego, OR

• LiveNation Entertainment Venue, Lloyd Center, Portland, OR

• Yogi Tea, Manufacturing Facility, Eugene, OR

• Intel, Manufacturing Complex, Hillsboro, OR

• Oregon State University Graduate Housing, Corvallis, OR

• Washington State University, Emergency Call Stations, Vancouver, WA

• City of Tualatin, New Operations Center, Tualatin, OR

• Washington County, Public Safety Training Center, Hillsboro, OR

• Port of Portland, Marine Facility Maintenance Facility, Portland, OR

• Portland Police Bureau, Training Complex, Portland, OR

• Kennewick School District, On-Call Cost Estimating, Kennewick, WA

• Condon New Elementary School, Condon, OR

Portland Police Bureau Training Complex. JLD has estimated for numerous police and fire bureaus.

CostX Drawing

Project Live Nation Drawing 1. SD - REVIT\180353_A_LiveNation_TI-full model

Building LIVE NATION File Name P:\19-2019\19047-LIVE NATION\IN\RevitSD\1803053_A_LiveNation_TI\1803053_A_LiveNation_TI\180353_A_LiveNation_TI-full model.dwfx

Details Base Unit of Measure: inRevision: 2Horizontal Scale: 1:1Vertical Scale: 1:1Drawing Multiplier: 1

1/23/2020 4:47:42 PM JLD Construction Consulting Page 1 of 1

LiveNation. Staff use multiple software platforms, according to each client’s preference, to maximize value and facilitate use of extensive cost data—including Revit 2020 for the new Live Nation project at Lloyd Center in Portland.

COPYRIGHT 2020STEELE ASSOCIATES

ARCHITECTS

All rights reserved. Reproduction or use in any form or by any means- graphic, electronic, mechanical, etc.- without written permission of STEELE ASSOCIATES ARCHITECTS is unlawful and subject to criminal prosecution.

AS

SO

CIA

TE

S A

RC

HIT

EC

TS

LLC

686 N

W Y

OR

K D

RIV

E S

UIT

E 1

50

BE

ND

, O

R 9

7703

541.3

82.9

867

FA

X 5

41.3

85.8

816

ww

w.s

teele

-arc

h.c

om

CO

ND

ON

O

RE

GO

N

JOB NO.

DATE

DRAWN BY CHECKED BY

SHEET NO.

PROJECT TEAM

NOT FO

R

CONSTRUCTI

ON

9/3

/2020

11:2

5:2

2 A

M

G001

CheckerAuthor

20120.01

SC

HE

MA

TIC

DE

SIG

N S

EP

TE

MB

ER

2,

202

0

CO

VE

R S

HE

ET

COVER SHEET

issue date

xxxx

S.

Wash

ing

ton

Str

ee

tN

EW

CO

ND

ON

GR

AD

E S

CH

OO

L

NEW CONDON GRADE SCHOOLSCHEMATIC DESIGNSEPTEMBER 2, 2020

DRAWING INDEX:

Contact:Phone:Email:

ArchitectSteele Associates Architects, LLC

Darek Olson(541) [email protected]

686 NW York Drive #150Bend, OR 97703

Contact:Phone:Email:

ClientCondon Public School District

Michelle [email protected]

210 Bayard StreetCondon, OR 97823

Contact:Phone:Email:

General ContractorGriffin Construction

xxxx(541) 447-7237xxxx

1411 NW Murphy CourtPrineville, OR 97754

Contact:Phone:Email:

Geotechnical EngineerWallace Group

xxxxx(541) 382-4707xxxx

62915 NE 18th Street, Suite 1Bend, OR 97701

Contact:Phone:Email:

Cost EstimatorACC Cost Consultants

McCabe Karcher(360) [email protected]

8060 SW Pfaffle Street, Suite 110Tigard, OR 97223

GENERALG001 COVER SHEET

CIVILC1 COMPOSITE SITE PLAN

LANDSCAPEL1.00 LANDSCAPE SITE PLAN

ARCHITECTURALA020 SITE PLANA101 LEVEL 1 PLANA130 REFLECTED CEILING PLANA140 ROOF PLANA201 ELEVATIONSA300 BUILDING SECTIONS

STRUCTURALS-1.1 TITLE SHEETS-1.2 SPECIFICATIONSS-2.1 FOUNDATION PLANS-2.2 ROOF FRAMING PLANS-2.3 UPPER GYM ROOF FRAMING PLANS-3.1 DETAILS

MECHANICALM001 SYMBOLS LIST AND GENERAL NOTESM201 LEVEL 1 - PLAN

PLUMBINGP001 SYMBOLS LIST AND GENERAL NOTESP201 LEVEL 1 - PLAN

ELECTRICALE001 SYMBOLS LIST AND GENERAL NOTESE102 SITE PLAN - POWERE201 LEVEL 1 PLAN - LIGHTINGE301 LEVEL 1 PLAN - POWERE402 ENLARGED PLAN - POWERE501 SINGLE LINE DIAGRAMS

TECHNOLOGYT001 SYMBOLS LIST AND GENERAL NOTEST201 LEVEL 1 PLANT301 ENLARGED PLANS AND SECTIONST302 ENLARGED PLAN

FOOD SERVICEFS1.1 FOOD SERVICE EQUIPMENT PLAN

Contact:Phone:Email:

Food Service DesignHalliday Associates, Inc.

Laura Bourland(360) [email protected]

656 NW Norwood StreetCamas, Washington 98607

Contact:Phone:Email:

Fire Sprinkler EngineerInterface Engineering, Ince

Ethan Brown(503) [email protected]

100 SW Main Street, Suite 1600Portland, OR 97204

Contact:Phone:Email:

Technology EngineerInterface Engineering, Ince

Todd Schenbeck(503) [email protected]

100 SW Main Street, Suite 1600Portland, OR 97204

Contact:Phone:Email:

Civil EngineerFlagline Engineering

Jim Pex(541) [email protected]

686 NW York Drive, Suite 100Bend, OR 97703

Contact:Phone:Email:

Landscape ArchitectJBattleson Design

Jay Battleson(541) [email protected]

115 NW Oregon Ave #30Bend, OR 97701

Contact:Phone:Email:

Structural EngineerAshley and Vance Engineers

John Fischer(541) [email protected]

33 NW Franklin Ave, Suite 110Bend, OR 97703

Contact:Phone:Email:

Mechanical EngineerInterface Engineering, Inc.

Adam Carlson(503) [email protected]

100 SW Main Street, Suite 1600Portland, OR 97204

Contact:Phone:Email:

Plumbing EngineerInterface Engineering, Ince

Andrew Flanagan(503) [email protected]

100 SW Main Street, Suite 1600Portland, OR 97204

Contact:Phone:Email:

Electrical EngineerInterface Engineering, Ince

Mark Jackson(503) [email protected]

100 SW Main Street, Suite 1600Portland, OR 97204

REV. DATE DESCRIPTION

Condon Elementary. JLD is working with Steele Associates on this new, 17,000 SF elementary school.

Page 19: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

18 19jldllc.com

• Downtown Development Group, Affordable Housing, Portland, OR

• Hudson Yards, Mixed-Use Highrise Development, New York, NY

• Vernonia Senior Center and Food Bank, Vernonia, OR

• Rose Villa, Senior Community, Portland, OR

• Washington State Parks and Recreation, 30+ Buildings and Historic Preservation, Statewide, WA

• State of Minnesota, On-Call Construction Auditing, St. Paul, MN

Downtown Development Group, Affordable Housing. JLD has provided cost estimating services for numerous affordable housing authorities in Oregon and Washington.

Kennewick School District, The firm holds an on-call agreement with Kennewick School District in addition to other school districts and public agencies throughout Oregon and Washington.

Page 20: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

20 JLD Cost Consulting

EXPERTISE

Cost EstimatingThe cost of operating and maintaining (O&M cost) a building is as important as the initial cost to build it. This is especially true in public projects, where building lifespans can reach 50 years or more. Whether it is a new office building, a workplace tenant improvement, roadway modifications, or water resources enhancement, JLD always emphasizes the importance of providing a basis for effective cost benefit analysis, and as early in the design process as possible.

JLD’s cost estimates establish functional benchmarks for the project team. From room finish standards to high-performance equipment for energy conservation and whole life-cycle costs for equipment operation cost benchmarks, the firm’s

COST REPORTSJLD’s cost reports provide clients with correct, sound, and pragmatically based information to enable unbiased decisions from the whole project team.

Cost Estimate Report Summary

staff work closely with owners, designers, engineers, and contractors to:

• Establish cost targets or benchmarks with clear understanding of the scope;

• Identify key cost drivers that provide direction during the development process;

• Provide constructability review and share value engineering (VE) opportunities; and

• Prepare cost options for material and equipment selection.

Cost is a reality that determines the feasibility of all projects.

Page 21: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

20 21jldllc.com

JLD consistently provides a comprehensive and thorough estimate that is very user-friendly. JLD works collaboratively with us to find creative and cost-effective building solutions.

sid scott. aia, leed ap, principal scott|edwards architecture

COST CONTROLJLD’s cost control approach is ongoing, throughout the entire design and construction process—not something that occurs only at certain milestones.

From project site visits to cost planning and conceptual cost estimating to bid and contract documents,

JLD’s active and meticulous approach to cost estimating leads to significant reduction in overall project risk and the best value for clients.

Veterans Memorial Coliseum. JLD was recently awarded this high-profile project—the firm continues to receive commissions that demand responsiveness to multiple client and user groups, and withstand exceptional public scrutiny.

Page 22: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

22 JLD Cost Consulting

VALUE ENGINEERINGJLD was founded with the mission to maximize the worth of its clients’ investments, and demonstrate the value they add in tangible and measurable ways. This includes the quantification of:

• Savings achieved on the project• Value of risk mitigated • Cost analysis of needs vs wants

The firm’s staff consistently uncover opportunities to lower project costs and add value. Cost savings have been realized in environmental remediation methods; geo-technical and foundation design; reduced structure cost from relocated mechanical equipment; building envelopes; finishes; and multiple best value alternates associated with the project delivery methods and contracts. Many of these individual value engineering (VE) items saved clients several million dollars. The firm is committed to efficiency in design, and adds value in helping clients realize current market rates.

ESCALATIONJLD understands the commodity indexes, Bureau of Labor, Producer Price Index (PPI) and have thorough knowledge of the regional labor agreements, and how to assemble true fully burdened labor costs. Some local products are related to currency exchange rates. Project complexity and duration of project are important considerations to bring into cost estimates, as well.

JLD brings escalation into estimates to accurately estimate the year of expenditure (YOE) project cost. The firm’s detailed approach achieves the most efficient capital improvement for their clients’ current and future projects.

PROFESSIONAL AFFILIATIONSAs a professional cost estimating firm, JLD is an active and contributing member of numerous professional organizations. This includes institutions directly related to the cost consulting profession as well as the larger AEC industry.

JLD staff also hold certifications with and serve on local and national industry boards, in addition to holding government-appointed positions.

Page 23: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

22 23jldllc.com

JLD provided valuable service and

assistance. The work was timely,

professional, and the contribution was

of great benefit for the projects. I would

recommend JLD for other projects and

will be looking to call on their service for

future green building projects.

ROBERT SHIELDS, ECOLOGICAL INDUSTRIALIST

Page 24: PROFESSIONAL COST ESTIMATING - JLD Cost Consulting

COSTCONSULTING

[email protected]://JLDLLC.com503-675-4383

PORTLAND1020 SW Taylor Street Suite 690 Portland, OR 503.675.4383

BEND750 NW Charbonneau StSte 108Bend, OR 97703503-675-4383

SEATTLE506 2nd Avenue Suite 1400 Seattle, WA 206.775.8707