Prof Andrew McNaughtonHS2 Ltd Technical Director
1
Developing HS2
![Page 2: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/2.jpg)
2
The story so far
• Jan 2009 - HS2 Ltd established• Mar 2010 – Command paper + HS2
report• May 2010 – General Election• Dec 2010 – Consultation to commence• Feb 2011 to Jul 2011 – Consultation on
HSR and LWM route• Jan 2012 – Decision to proceed…
![Page 3: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/3.jpg)
3
We have upgraded classic rail
• Dominant mode for travel to Central London
• Growing fast
• Market share between other cities very low
• At maximum capacity by 2025
• Further upgrading extremely disruptive
![Page 4: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/4.jpg)
4
Benefits - Capacity and connectivity
• Total cost for Y network (inc Phase 1) is £32.7bn*• Compared to building a traditional line, HS2 will
deliver £4 in benefits for every additional £1 spent
• Wider benefits for jobs and regeneration• Moving intercity services onto HS2 means more
space for commuter, regional and freight services on existing lines
Y network will see up to 4.5 million air trips and 9 million road trips move to rail
Additional railfreight capacity could take 200 trucks per hour off roads, saving 500,000 tonnes of CO2 pa
• Transforms journey time between principal cities* 2011 prices
![Page 5: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/5.jpg)
5
Government gives go ahead
• 10 Jan Secretary of State green light: Y network: London to West
Midlands with extensions to Manchester and Leeds and spur to Heathrow
London to West Midlands Alignment Changes to consultation
route including changes following 2011 consultation
![Page 6: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/6.jpg)
6
HS2 Ltd mobilises
• Move from advisory role to developing phase 1 and promoting HS2
• Grow and strengthen organisation with new expertise CH2M Hill as development project management partner Framework of professional services consultants
![Page 7: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/7.jpg)
7
Hybrid bill
• The act will give powers to: Build and operate HS2 Acquire and lease land Alter roads Modify statutory
undertaker’s equipment• Deposit hybrid bill by end of
2013• Royal assent 2015
![Page 8: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/8.jpg)
8
Working towards hybrid bill for phase 1
• Design of line and stations Detailed measures e.g. earth building, landscaping Construction methods and sites Outline design of stations, viaducts and bridges etc
• Land referencing• Managing petitioners
![Page 9: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/9.jpg)
9
Working towards hybrid bill for phase 1
• Environmental impact assessment and preparation of environmental statement, for example: Ecological, geological and archaeological surveys Noise assessment Impact on water courses, flood risk etc
• Scale of work 17 work packages covering design, environment and land At times up to 1000 people working on programme
![Page 10: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/10.jpg)
10
Mitigating effects on people and nature
![Page 11: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/11.jpg)
11
“A thing of beauty”
![Page 12: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/12.jpg)
12
Noise mitigation: Landscape and barriers
Images: Arup (HS1)
![Page 13: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/13.jpg)
13
Tunnel noise and vibration control
Resilient Material
![Page 14: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/14.jpg)
14
Consultations
• Scoping of the environmental impact assessment spring 2012
• Blight consultation 2012
• Safeguarding consultation 2012
• Environmental statement consultation spring 2013
![Page 15: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/15.jpg)
15
Leeds Manchester and Heathrow
• Options report went to Secretary of State March 2012
• Informal consultation 2012
• Government decision on proposed route and station options autumn 2012
• Formal consultation 2013?
![Page 16: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/16.jpg)
16
Initial network• London to
West Midlands 1-24 to 0-49
Manchester 2-08 to 1-13 Leeds 2-15 to 1-20 Scotland 4-20 to 3-30
• Birmingham to Manchester 1-34 to 0-40 Leeds 2-05 to 1-00
• Heathrow to Manchester 1-10 Paris 2-40
London
Manchester
Birmingham
Scotland
Leeds
Heathrow
Newcastle
![Page 17: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/17.jpg)
17
1st Stage• London to
West Midlands 1-24 to 0-49
Manchester 2-08 to 1-40 Glasgow 4-20
to 4-00
• Birmingham to
Paris 4-30 to 3-00London
Manchester
Birmingham
Glasgow
![Page 18: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/18.jpg)
18
Through running – “Eurostar Mark 2”
![Page 19: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/19.jpg)
19
High speed specification
• No premium on fares
• Journey times based on 360kph (225mph) trains
• Up to 18 trains per hour
• Fully EU TSI Compliant
• Up to 1100 seats per train
![Page 20: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/20.jpg)
20
London - 2 central stations
Euston
Old Oak Common
![Page 21: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/21.jpg)
21
HS stations are large!
1070m
![Page 22: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/22.jpg)
22
London Euston
![Page 23: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/23.jpg)
23
Old Oak Common Interchange
![Page 24: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/24.jpg)
24
Old Oak Common
![Page 25: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/25.jpg)
25
New Central Birmingham Station
![Page 26: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/26.jpg)
26
West Midlands Interchange
Links to National Exhibition Centre and the Airport
‘Parkway’ feeder for the metropolitan area
People mover connection to be provided
Road connections to trunk network
![Page 27: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649e005503460f94aea281/html5/thumbnails/27.jpg)
27
HS2 timescales• 2011 Public
Consultation
• 2012 Decision to Develop
• 2013 Start Act of Parliament
• 2017 Start Physical Work
• 2026 Open to
Birmingham
• 2033 The “Y” Complete