productivity improvement at coast guard … · - 3 - chapter – i project objective this project...
TRANSCRIPT
PRODUCTIVITY AUDIT OF
COAST GUARD STORE DEPOT,
MANKHURD, MUMBAI
- 2 -
INDEX
Chapter No Topic Page No
(I) Project Objective 3
(II) Introduction – Coast Guard Store Depot 4
(III) Background 5
(IV) Methodology: Approach to the Problem 6
(V) SWOT Analysis of CGSD 7
(VI) Current Status 9
(VII) Improvement Initiatives 11
1. Reduction in Demand Processing Time 11
2. Transportation/Delivery of Stores 17
3. Delivery of Lubricating Oils to Outstation Ships 21
4. Inventory Handling (Machinery Stores) 24
5. Procedural Modifications w.r.t. Record Keeping 26
(VIII) Strength and Limitations of the Study 28
- 3 -
Chapter – I
PROJECT OBJECTIVE
This pro ject is an at t empt to improve the financ ia l and funct iona l
e ffic iency o f Coast Guard Sto re Depot to enable it to
(a) Reduce it s Cost of Operat ions , and
(b) Reduce the Response Time,
by app licat ion o f pr inc ip les o f Product ion Management and
Operat ions Research.
The scope o f study is limit ed to t he Store Depot s o f Ind ian Coast
Guard and spec if ica l ly t he one locat ed at Mumbai. Coast Guard is par t
o f Min ist r y o f Defence and there fo re it s operat ing and account ing
po lic ies are highly conservat ive and the re fo re d ist inct ly d if ferent from
corporat e wor ld. Many o f t he reco mmendat ions o f t his report have
a lready been implemented by Coast Guard Sto re Depot dur ing the
progress o f t his pro ject report with benef it s as list ed here in.
- 4 -
Chapter - II
INTRODUCTION – COAST GUARD STORE DEPOT
Raised in 1978, Ind ian Coast Guard is ent rust ed with the respons ib il it y
o f sa feguard ing the mar it ime int erest s of t he nat ion in peace t ime and
support ro le t o Ind ian Navy dur ing war . The ser vice is in a
deve lopmenta l st age and is gro wing a t a hect ic pace. While t he
government has been l ibera l in sanc t ioning add it iona l ships and
a ircra ft fo r surve il lance o f vast Ind ian Coast line, it has not been as
accommodat ing in meet ing Coast Guard’s requ irement s o f manpower
and suppor t fac il it ie s . As a resu lt , manpower growth and in frast ructure
deve lopment have no t kept pace with fo rward line growth. Thus, t he
service has beco me ext remely lean wit h t eeth to t ail rat io reaching
abnor mally high proport ions. (Teeth to ta il rat io is Defence equ iva lent
o f Line to St aff rat io ) . There is severe mismatch between expectat ions
o f fight ing crew on ships and suppor t ava i lable t o t hem from ground
based unit s l ike Headquar t ers, Repa ir and Maintenance Support Unit s
and Log ist ic Support Unit s.
Wit h no so lut ion in s ight in fo reseeable future fo r manag ing manpower
scarc it y and in frast ructural/st a ff suppor t problems, t echno logica l t oo ls
and product ivit y improvement s are the only opt ions ava i lable t o
mit igat e t he de fic iency in leve l o f ser vice.
- 5 -
Chapter - III
BACKGROUND
Coast Guard Sto re Depot , Mankhurd (he re ina ft er re fer red as CGSD) is
t he premier log ist ics suppor t o rganizat ion fo r Ind ian Coast Guard. It
meet s a l l log ist ic s requ irement s, t echnica l and non t echnica l, o f ships
and ground st at ions o f t he Coast Guard on t he west coast o f t he
count ry. In add it ion, it also looks aft er t he machiner y spares
requ irement s o f cer t ain c lass o f ships, some o f which are based as far
as Andaman and Nicobar Is lands. Thus, t he area o f it s respons ib il it y
st ret ches fro m Kutchh in Gu jrat to Kochin in Kera la and up to
Andaman and Nicobar Is lands inc lud ing New Delhi.
CGSD was est ablished in 1982 as t he first log ist ic suppor t cent re o f
t he Coast Guard in two sto rage sheds bo rrowed fro m Ind ian Navy,
where it cont inues t il l dat e. In t he la st qu ar t er century, t here has been
l it t le growth in sanct ioned man power , desp it e manifo ld increase in
workload due to growth o f Coast Guard dur ing the per iod. E ffic ienc y
o f front line unit s is o ft en a d irect funct ion o f e f f ic iency o f support
unit s, espec ia l ly log ist ic s support unit s. In Ar my, t here is a famous
saying - “Army marches on i t s stomach” . In t he indust r y, product ion
f loo r’s perfo r mance is d ict at ed by the qua lit y and t imely supp ly o f raw
mater ia l and maint enance o f it s machines.
- 6 -
Chapter - IV
METHODOLOGY: APPROACH TO THE PROBLEM
As st at ed in t he object ive c lause, t his pro ject is an at t empt to improve
the financ ia l and funct iona l e f f ic iency o f Coast Guard Store Depot to
enable it t o reduce it s cost o f operat ions and response t ime while
meet ing the demands ra ised on it . Ther e fo re, t he funct ions o f CGSD
have been scrut inized with respect to fo llowing parameters: -
(a) Expend iture o f Financ ia l Resources
(b) Time
(c) Labour requirement
(d) Accuracy o f operat ions
The se lect ion o f funct ions fo r study was done on the bas is o f quantum
of one o r more o f t he above resources be ing consumed by them. Cost ,
t ime and labour int ens ive act ivit ies were chosen where in any
improvement s in procedures wil l resu lt in subst ant ia l saving o f one o f
more o f above e lement s.
- 7 -
Chapter - V
“SWOT” ANALYSIS OF CGSD
1. (St rength) Advance Stage of Computerisat ion - Inventory
management has been co mputer ized. Software has st abil ised and
is operat ing sat is facto r ily.
2 . (St rength) Support from Indian Navy - Coast Guard has an
underst and ing wit h I nd ian Navy fo r drawing essent ia l sto res
fro m Mater ia l Organisat ion on book debit bas is.
3 . (Weakness) Bureaucrat ic Procedures . Be ing a Govt
Organisat ion, it has t o adhere to many ine ff ic ient and archa ic
procedures.
4 . (Weakness) Locat ion - CGSD(MB) is locat ed at Mankhurd,
a lmost 30 Kms away fro m most o f t he dependent unit s which are
locat ed in Nava l Dockyard at Co laba o r Mumbai Por t Trust .
Thus, de l iver y/ t ransport at ion o f stores is a t ime consuming and
cost ly process.
5 . (Weakness) Storage Space - Stowage space is a majo r
const raint . There is no space ava i lable fo r lat era l expans io n.
Ver t ica l expans io n opt ion has a lr eady been exhaust ed to a limit
by const ruct ion o f mezzanine floo r in majo r par t o f t he store.
- 8 -
There is l it t le scope fo r fur ther expans io n.
6 . (Weakness) Manpower Shortage - Manpower is ano ther majo r
const raint . Manpower growth has no t kept pace with increase in
number o f ships and est abl ishment s. Thus, t here is severe crunch
o f manpower in a l l unit s o f Coast Guard. CGSD(MB) a lso su ffer s
fro m the same a ff l ict ion.
7 . (Weakness) Funds Crunch - Funds ava i labi l it y is a lso rest r ict ed.
Be ing a govt depar tment and support arm o f one o f t he Fight ing Ar ms
o f t he nat ion, t here are no threat s or opportunit ie s at present
- 9 -
Chapter - VI
CURRENT STATUS
Wit h the ske leton st a ff ava i lable fo r running the set -up, eff ic ient
procedures are required to eliminate unproduct ive work and speed up
the process. However , t he depot is a government o rganizat ion and
there fo re has t o adhere to r igo rous account ing, muster and aud it
procedures and ru les which consume great deal o f manpower and
e ffo r t . Bureaucrat ic procedures, r ig id as t hey are, have l it t le room fo r
improvement .
While so me o f t he bureaucrat ic procedures are necessar y evi ls
cons ider ing weak ownership st ructure in a government set up and
there fo re possibi l it y o f gross misuse, a subst ant ia l number o f ru les
have l it t le pract ica l ut il it y and can be done away wit h. However ,
government procedures are hard to change in t he short run and poss ible
only at t he highest leve l and there fo re, t hey are best le ft untouched in
t he short run. That leaves us wit h t he in t erna l procedures fo r hand l ing
the demands and mater ia ls at Depot .
The need to have e ff ic ient procedures was lo ng fe lt and qu it e a few
st eps in r ight d irect ion have a lready been t aken in t he past . A large
number o f rout ine funct ions o f is sue procedure have a lready been
computer ized which has reduced the demand hand l ing t ime a great
- 10 -
dea l. Fur ther , computer izat ion has reduced the demand o f exper ienced
personne l and many o f t he jo bs requ ir ing log ist ic s t ra ined and
exper ienced regu lar personne l are today be ing hand led by co mputer
l it erat e casua l emplo yees. I t has a lso improved the dec is io n mak ing
process due to quick and easy ava i labi l it y o f dat a.
But what has been done so far is pr imar ily conver t ing the manua l
processes to computer ized processes, like manua l search o f invento ry
to computer ized search and so on. This convers io n it se lf has improved
the funct ioning o f depo t a great deal and there is quantum jump in
sat is fact ion leve l o f dependent unit . Aver age response t ime was
brought down from 15 days in 1995 to less t han 2 days fo r 90% of t he
invento ry it ems. In emergency s it uat ions, t his t ime is co llaps ible t o
just a few hours. However , computers have only made cer t ain
processes fast er and less labor ious and less demand ing o f exper ience
and exper t ise. The procedura l ine ff ic ienc ies remain as t hey were.
Ano ther limit at ion has been bureaucrat ic procedures. Desp it e
ava i labi l it y o f co mputer ledgers and bin cards, manua l/paper ledgers
are st il l be ing maint a ined due to audit requ irement s.
- 11 -
Chapter - VII
IMPROVEMENT INITIATIVES
1. Reduction in Demand Processing Time
As st at ed ear lier , demand process ing t ime was reduced to le ss
t han 2 days by int roduct ion o f computer ised inventory
management . However , t his was st il l be low sat is facto ry leve l.
Idea lly, t he representat ive o f demand ing unit ar r iving wit h the
demand shou ld return with the it em. I n o rder to fur ther compress
t he process ing t ime to less t han a day, demand hand ling process
was ana lysed.
Internal Demand Handling Procedure
(a) Soft and Hard copies o f t he demands are brought by the
representat ives o f t he demand ing unit s and handed over t o
t he EDP sect ion. EDP sect ion generat es t he DATA SHEET
containing ava i labi l it y st atus, past is sue det ails and o ther
in fo r mat ion necessar y fo r dec is io n mak ing by the
concerned o fficer s fo r each o f t he it ems demanded.
(b) Demands, together with dat asheet , are then handed over to
- 12 -
In-Mail Sect ion who compile a l l t he mails and put up to
t he Off icer - in-Charge, CGSD fo r perusal.
(c) All t he mai ls are t herea ft er seen by the Dy Off icer - in-
Charge and two other St aff Off icers be fo re be ing handed
back to EDP sect ion fo r pr int ing “ Issue Notes” conta ining
det ails l ike quant it y author ized fo r issue, bin number ,
ba lance quant it y, et c . These issue no tes are t hen handed
over to concerned sto re houses.
(d) I t ems are drawn fro m the bins as pe r Issue Notes and
handed over to t he concerned rep resentat ive. Aft er
confir ming the quant it y by the representat ive, it ems are
t hen handed over by representat ives fo r packing. I ssue
no tes are returned to EDP sect ion fo r pr int ing o f is sue
vouchers.
(e) Issue Vouchers are pr int ed in 5 cop ies and put up fo r
s ignatures o f t he concer ned sect ion’s St aff Officer . (Two
copies are sent to t he ship, one fo r retent ion and one fo r
return as rece ipt . Two copies are subsequent ly sent to
aud it author it ies and one copy is ret ained as t he o ffice
copy) .
( f) Once the it ems are packed, fo rward ing let t er, packing no te
and gat e pass are s igned by the same o ff icer .
(g) Packages are t hen loaded on the t ruck under t h e scrut iny o f
- 13 -
t he Secur it y St aff and d ispat ched to t he concerned unit s.
Ent ire process cyc le was obser ved to be approximate ly 12
working hours long, t hereby sp il l ing the process to t he next day.
Thus, demands rece ived on Monday could be d ispat ched on
Tuesday a ft ernoon sess io n only. The syst em warranted presence
of t he demand ing unit s’ representat ives t il l load ing on the t ruck.
There fo re, t he demand ing unit s’ representat ives had to vis it t he
Depot on two consecut ive days fo r one set o f demands, t hereby
fur ther st ra ining the scarce ava i labi l it y o f manpower on ships.
I t was fe lt t hat it cou ld be co mpressed to about 7 hours to enable
d ispat ch on the same day and save one ext ra t r ip o f
representat ives to depot .
Analysis of Demand Handling Procedure
Cr it ica l ana lys is o f demand hand ing process was under t aken to
det ermine the unwarranted st eps , bot t lenecks and a lso where
process t ime cou ld be shrunk. Fo llo wing was the resu lt o f
ana lys is: -
(a) All t he mai ls (demands and o ther rout ine admin ist rat ive
mai ls) rece ived on a day were put up in a s ing le fo lder
which made the vo lume o f mai l subst ant ia l and consumed
t ime fo r perusa l. T he mai l fo lder took a lmost 45 minutes
on each o ff icer ’s t able ( t ot al c ircu lat ion t ime over 3 hrs) .
- 14 -
(b) Representat ives t r ick led in t il l 1100 Hrs inst ead o f 0900
Hrs and consequent ly, t he co mpilat ion p rocess got delayed,
t hereby de laying a ll t he subsequent ly processes.
(c) Fo lder was c ircu lat ed in t he o rder o f senio r it y. I f any one
o fficer was stuck up with so me o ther job, fo lder wa it ed on
his t able t il l his return, t hereby de laying a l l t he
downst ream act ivit ies.
(d) Removing the Bot t leneck by Balancing the Flow - Pack ing
sect ion was ident ified a ser ious bo t t leneck. Wit h only one
packer and one he lper in t he sect ion, pack ing process took
approximate ly 2.5 to 3 hrs a ft er is sue o f t he it em and the
process invar iably sp il led to next day. Ana lys is revea led
that Packing Sect ion was over loaded in t he lat e
evening s/ear ly mornings and under loaded in midd le par t o f
t he day. Scrut iny o f issue procedures revea led that Stores
St aff drew the it ems aga inst approved demands from the
bins and p laced them on the ground in front o f t he bin.
Aft er drawing a ll t he it ems author ised fo r issue on the day,
t hey were then handed over to t he representat ives (problem
of big bat ch s ize) . Thus, a ll t he representat ives got t he ir
it ems a lmost at t he same t ime and approached the pack ing
sect ion within minutes o f each o ther , t hereby caus ing a
sudden over load on the pack ing sect ion in t he
- 15 -
evenings/next day ear ly mor ning , and consequent ia l
de lays.
Remedial Measures Recommended
Based on the above study, fo llowing amendment s in t he
procedure were recommended: -
(a) Rest r ict demands acceptance t ime t il l 0930 hrs in EDP
sect ion so that all t he demands can be co llect ed and put up
to O i/C by 1030 Hrs. This measure resu lt ed in saving o f
process t ime by 1½ Hrs. (Already implemented
successful ly)
(b) Make separat e fo lders fo r demands and o ther mai ls.
Demands fo lder is t o be compiled on p r io r it y and put up.
Remaining mai l is t o be put up in a separat e fo lder lat er .
Approximate saving in process t ime – 30 minutes. (Already
implemented successful ly)
(c) Demands fo lder is to be o f Green co lour fo r easy
ident ificat ion and according necessar y pr io r it y in d isposa l
by the o fficers. (Already implemented successful ly)
(d) Demands fo lder is no t to wait on any t able due to absence
o f t he o fficer . I f any o ff icer is no t ava ilable due to any
reason, fo lder is t o be fo rwarded to next o fficer . (Off icers
- 16 -
have agreed to overlook the seniori ty aspect during
circulat ion of demands folder) .
(e) Store houses to process one unit ’s demands and hand over
t he it ems to t he representat ive fo r ver i ficat ion and pack ing
befo re st art ing wit h next unit ’s demands to avo id sudden
over load on pack ing sect ion and consequent ia l de lays.
Approximate saving in process t ime – 2 hours. (Already
implemented successful ly)
Gains Accrued from Above Measures
(a) Primar y object ive o f reduc ing the process t ime fo r
demands hand ling to le ss t han 8 hours was achieved. Al l
demands are processed on the same day and d ispat ched to
unit s in t he evening.
(b) Financial Savings - Cons ider ing that on each issue da y
(Monday, Wednesday) , approximate ly 6 representat ives
ar r ived in t he depot , saving o f one day process ing t ime
resu lt ed in saving o f 624 man days per year fo r Coast
Guard. At t he CTC (Cost t o Company) o f Rs 500/ - per man
day/day, it means saving o f Rs 3 ,12,000 per year .
(c) In add it ion, it a lso led to ava ilabi l it y o f more t ime with
sto re house st aff fo r other funct ions.
- 17 -
2. Transportation/Del ivery of Stores
As ind icat ed in t he SWOT ana lys is, d ist anc e o f demand ing unit s,
ra ilway st at ion and a irpo r t ( fo r d ispat ch o f sto res required by
out st at ion unit s) fro m Depo t is one o f t he weaknesses. Each
de liver y t r ip by t he t rucks is a t ime and resources consuming
a ffa ir . Owing to dist ance and s low t ra ffic cond i t ions in Mumbai,
each vehic le is u sua l ly capable o f co mplet ing only one t r ip in a
day. Thus, t here were inst ances when cer t ain evo lut ions had to
be de fer red to next day due to non-ava i labi l it y o f vehic le.
Sanct ion fo r addit iona l vehic les and dr ivers was no t ava i lable.
While it is no t feas ib le t o reduce the d ist ance by shift ing the
Store Depot nearer to t he demand ing unit s due to space
ava i labi l it y const raint s in South Mumbai , it was fe lt t hat number
o f t r ip s can be reduced by proper planning o f mo vement o f
vehic les. Accord ing ly, cr it ica l ana lys is o f t ransport department
funct ion was carr ied out .
Major Routine Transport Requirements
(a) Deliver y o f is sued it ems to loca l operat iona l ships on
Mondays and Wednesdays and to ships under p lanned
repa irs add it iona lly o n Fr idays.
(b) Collect ion o f scrap from ships ever y Tuesday a ft er noon.
- 18 -
(c) Dispatch and co llect ion o f sto res cons ignment s fro m CST,
Dadar , Mumbai Cent ral and Lokmanya T ilak Ra i lwa y
Termina ls as we ll a s Airport s and Shipp ing Docks.
(d) Vis it t o Headquart ers at Worli fo r administ rat ive work and
Co laba to CDA off ice.
(e) Collect ion o f stores fro m Nava l Sto re Depot s at Sewri and
Ghatkopar.
Analysis
(a) Once the it ems were issued, same were door delivered to
unit s on the same day. T hus, t ransport le ft in t he a ft ernoon
o r evening wit h issued it ems and returned lat e evening o r
night empt y.
(b) As per t he regu lat ions o f t he Coast Guard, high va lue/ lo ng
l ife / lucrat ive nature unserviceable it ems (Scrap) are
requ ired to be returned to t he Depot to ensure
accountabil it y, avo id wast ages and recover res idua l va lue
through scrap d isposa l. E ver y Tuesday, a t ruck is sent
(empt y) to t he unit s fo r co llect ion o f such it ems.
(c) Thus, it was observed that while a t ruck came back empt y
fro m Nava l Dockyard in t he night , most ly same t ruck went
back in empt y cond it io n to same p lace next day e it her fo r
- 19 -
co llect ion o f Scrap mater ia l o r other admin ist rat ive jo bs.
Thus, one fu l l t r ip was get t ing wast ed.
(d) Other t ransport requirement s are on adhoc/rando m bas is
and only day to day p lanning can be done to c lub more
than one requ irement in a s ing le t r ip .
Remedial Measures
(a) In o rder to save the ext ra t r ip , two opt ions were examined:
( i) Retain the t ranspor t at Nava l Dockyard on Monday
night s and ut il ise t he same fo r br ing ing scrap on
Tuesday morning.
( ii) Defer despatch o f it ems t il l next day morning. Aft er
de liver y o f it ems, same t ranspor t would br ing the
scrap back on Tuesdays.
(b) On c loser scrut iny, second opt ion was found more use fu l.
S ince lat e evening/night de l iver y o f it ems d id no t serve
any use fu l purpose to t he demand ing un it s, it was found
poss ible to defer t he de liver y t r ip to next day morning
without any adverse impact any where. Such defer ment
would a l low co mbin ing onward t r ip with any ra ilwa y
st at ion t r ip/admin ist rat ive t r ip and ut il ise t he return t r ip
fo r br ing ing scrap.
- 20 -
Gains Accrued from Above Measure
Savings expected by implementat ion o f above measure are
ca lcu lat ed as fo llows: -
(a) Dist ance per t r ip - 60 Kms
(b) Operat ing expenses @ Rs 15/ - per KM - Rs 900/ - per t r ip
(c) Man power cost (Dr iver’s CTC) per day - Rs 500/ -
(d) Total Expense per t r ip - Rs 1400/ -
(e) No of t r ip s saved per weeks - 02
( f) No of t r ip s saved per annum - 104
(g) Total Savings - Rs 1,45,600/ -
(Recommendat ions have already been implemented by CGSD).
- 21 -
3. Delivery of Lubricating Oils to Outstation Ships
Being a govt department , most o f t he services are ava i lable
e it her t hrough in- house resources o r fr om o ther dep ar tment s on
book debit bas is and cost ing det a ils o f such ser vices are no t
ava i lable wit h Depo t . However , cer t ain ser vices are hired fro m
market and pa id in cash. Suc h expend it ures were scrut inised to
f ind ways to economise the same. Dur ing scrut iny o f expend iture
reco rds, it was rea l ised that expend itur e on hir ing o f t rucks fo r
t ransport ing sto res to out st at ion ships was one o f t he largest
expend iture heads be ing to t he tune o f Rs 5,00,000 per annum.
Analysis
Analys is o f despatch reco rds like bi l l o f lad ing, pack ing no tes ,
et c , revea led that lubr icat ing o il was the co mmo n and biggest
const it uent in each o f t he cons ignme nt s. Int erview o f Depot
Dispat ch Depar tment st aff brought out the fact t hat despatch o f
lubr icat ing o il is a majo r is sue s ince not ice is o ft en shor t and
be ing bu lky and in f lammable it em, it can no t be despatched by
parce l van o f t rain . T hus, o ils can be t ranspor t ed e ither by Coast
Guard ships which cou ld be vis it ing the out st at ion locat ions o r
by hired t ruck. Transport at ion by ship a lso ent a ils var ious
problems l ike requ irement o f cr ane at load ing and
d isembarkat ion po int s fo r load ing/unloading o f 250 Kg o i l
- 22 -
barre ls and a lso damage to ship ’s pa int in t he process. There fo re,
t rucks have beco me pre fer red mode o f despatch fo r o il. Other
it ems which are despatched by t rucks alo ng wit h o il are loaded
to ut il ise t he spare capac it y on t rucks. The cost o f hir ing each
t ruck is in t he range o f Rs 4000 fo r closer loc at ions l ike
Manga lo re t o Rs 27,000 fo r locat ions like Kochi. But fo r
requ irement o f o il despatch, t hey cou ld be sent by o ther cheaper
modes ava i lable fo r t he ir despatch , like ships and t ra in.
This reve lat ion led to focus on o il log ist ic s management . Coast
Guard Headquar t ers places supp ly o rders on var ious o il
companies l ike IOC, HPCL, et c, fo r supp ly o f par t quant it ie s o f
o il to Coast Guard Store Depot s at Mumbai, Chenna i and Port
Bla ir . These Depo t s in t urn supp ly o i l to var ious ships under
t he ir area o f jur isd ict ion. CGSD (Mumbai) is respons ib le fo r
supp ly o f o ils to a ll ships operat ing in West Coast o f Ind ia fro m
Porbandar to Kochi.
Recommendations
I t is reco mmended that annua l requ irement o f var ious o ils be
obtained fro m each st at ion and supp ly o rders be ra ised on o il
f ir ms fo r d irect supp ly o f pro ject ed quant it ies o f o ils t o base
st at ions o f Coast Guard in var ious c it ies rather t han supp lying
bu lk quant it ie s to CGSDs and then re -t ransport ing them to
- 23 -
var ious locat ions. S ince present supply o rders manda te par t
de liver ies at two o r t hree locat ions over st aggered int erva ls, no
res ist ance is envisaged from o il companies if t he list is
increased. Oil companies wou ld probably increase the ir sa le
pr ice by a smal l amount to cat er fo r addit iona l work load.
However , increase is l ike ly to be inconsequent ia l s ince they wil l
be de l iver ing o il fro m the ir loca l re finer ies/depot s.
Gains to be Accrued
(a) Inst ant ava i labi l it y o f o il t o user unit s.
(b) Saving to t he tune o f Rs 3,00,000 per annum each ( tot al
Rs 6,00,000) by CGSD (Mumbai) and CGSD (Chenna i) in
fer r ying the o il t o user locat ions.
(c) In add it io n, it w i l l a lso spare lo t o f manpower wast ed in
ext ra evo lut ion o f unload ing o f o il dr ums at CGSDs and then
re load ing on t rucks/ships fo r t ranspor t at io n to user loca t ions.
- 24 -
4. Inventory Handling (Machinery Stores)
Machiner y sto re is largest o f a l l t he s ix sect ions o f stores
account ing fo r 85% of t he tot al invento ry and 45% o f t he
demands hand led ever y year . Majo r it y o f t he machiner y spares
are sto red on mezzanine f loo r in 9 feet high open she lf a lmirahs.
The sto re is manned by one Sto re Ass is t ant , one labour and one
he lper ( casua l labour ) . Be ing the s ing le largest depar tment o f t he
depot , it was dec ided to ana lyse the funct ioning o f t he
depar tment to find any room fo r improvement .
Analysis
Funct iona l aud it o f t he sect ion revea led that t he it ems have been
sto red on fir st come f ir st served bas is wit hout applicat ion o f any
log ic wit h regard to hand ling e ff ic iency. It was found that while
many l ight we ight it ems were sto red on lower se lves, p lent y o f
heavy it ems were sto red on higher se lves requ ir ing por t able
ladder and min imum two personne l fo r drawing those it ems fro m
she lves. Also many frequent ly demanded it ems were p laced on
higher se lves requ ir ing use o f po r t able ladder and he lper t o draw
them from bins. As a resu lt , ava i labi l it y o f two personne l at a ll
t imes was mandatory fo r e ff ic ient funct ioning o f t he sect ion.
Also fast moving it ems were scat t ered al l over t he place . I t was
fe lt t hat syst emat ic sto rage o f it ems would reduce e ffo r t in
- 25 -
drawing it ems fro m bins and have int ang ible benefit s in t he lo ng
run.
Remedial Measures Recommended
Available so ftware was used to generat e “Demand Frequenc y
Data” to ident ify fr equent ly demanded it ems. Similar ly, phys ica l
survey o f a ll t he she lves at t ier 5 to 9 was carr ied out to ident ify
heavy it ems.
A p lan has been cha lked out to shift a l l t he fast moving it ems
c loser to deliver y po int on she lves 4 and 5 fo r ergonomic ease
and heavy it ems in lower se lves 1 t o 3 fo r ease o f hand l ing whi le
sto r ing and issue. Al l s low mo ving l ight it ems are to be shift ed
to she lves 6 to 9.
While t his rear rangement o f stock wil l no t ent a il any t ang ib le
f inanc ia l savings, it wil l make the t ask o f sto r ing and drawing
it ems fro m se lves eas ier , less labor ious and fast er int ang ib ly.
- 26 -
5. Procedural Modif ications w.r. t. Record Keeping
Record keep ing funct ions were ana lysed to find scope fo r
improvement . Fo llowing emerged from the cr it ica l ana lys is: -
(a) Format o f issue vouchers was found to be space
ine ff ic ient . More than ha lf t he page was obser ved to be
le ft out fo r signatures t hereby leaving space fo r reco rding
maximum 5 issued it ems per page. It was fe lt t hat fo rmat
could be revised to accommodate more number o f it ems per
page thereby saving on st at ioner y and pr int ing cost s as
we ll as hand ing e ffo r t s and cost s.
(b) Gate pass is a mandato ry requ irement .
(c) Pack ing no te was be ing used in mult ip les. A separat e
pack ing no te was be ing issued fo r stores o f each sect ion
(All stores are d ivided into s ix sect ions) . It was fe lt t h at a
combined pack ing no te fo r all sect ions could be issued to
save paper , pr int ing and hand l ing e ffo r t s.
(d) Forwarding let t er accompanying the issue vouchers d id no t
appear to serve any use fu l purpose.
(e) Retent ion o f one hard copy o f t he issue voucher as o ff i ce
copy a lso d id no t appear to serve any use fu l purpose. Soft
copy o f t he same is ava i lable in co mputer fo r any future
reference and one hard copy is rece ived back fro m unit as
rece ipt .
- 27 -
( f) Other processes were found to be work ing without any
apparent de lays.
Improvements Recommended
(a) Format o f issue vouchers was mod if ied to accommodate a ll
s ignatures in a s ing le row rather t han ver t ica l fo r mat
t hereby re leas ing more space fo r pr int ing list o f issued
it ems. S imilar ly, fo r mat was fur ther modified to inc lude
issue voucher fo rwarding and returning st at ement s , t hereby
obviat ing the need fo r fo rward ing let t ers from the depo t as
we ll as demand ing unit s. (Already implemented)
(b) Format o f pack ing no te was mod ified to inc lude it ems o f
a ll sect ions in a s ing le Co mbined Pac k ing no te. (Already
implemented successful ly)
(c) Pract ice o f ret ent ion o f one hard copy o f each issue
voucher was reco mmended fo r d iscont inuance. (Yet to be
implemented)
(d) Modif ied fo r mat o f is sue vouchers and pack ing no te
reduced the pr int ing load by approxima te ly 3000 sheet s o f
paper , t hereby e ffect ing a saving o f Rs 12,000 per annum.
- 28 -
Chapter - VIII
STRENGTHS AND LIMITATIONS OF THE STUDY
Most o f t he recommendat ions made in t his study have a lready been
implemented by the CGSD (Mumbai) with subst ant ia l saving s to t he
exchequer and improved sat is fact ion leve l o f it s c l ient s as we l l a s
emplo yees. So , t his study is no t a pure ly academic exerc ise but a
workable mode l which has ear ned acceptance by the subject .
However , t he subject is unique in charact er and there f o re it s problems
were a lso unique. So lut ions to t hose unique problems , t hough apt ly
su it ed to subject o f study, are hard to be genera l ised fo r wider
app licat ion in t he indust ry.