ProductionPlanning@Bertrandt - UsecasesPresentation of CoC Production PlanningSept 2020, Dr. Michael Brodmann
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Bertrandt at a glance
Bertrandt established
Approx. 13,600employees
More than 50 sites inEurope, USA, China
Total revenues FY 2018/19approx. EUR 1 billion
Main shareholdersPorsche 28.97%
Boysen 14.9%
Development services – from the initial idea to series production
Production planning – from the initial idea to series production.
"Design and optimization of factory processes as well as planning, commissioning and series support for manufacturing plants, tools, devices, machines and special machines for the
production of vehicles / aircraft and their components as well as industrial products under the premises of digitization."
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Plant planning & engineering
Supplier management
Process planning & optimization
Quality management
Digital factory
ProductionPlanning@Bertrandt | Sept20 | MB
sense analyse act
implementation
• Process data aquisitionaccording to planningspecifications (CLIFE)
• smartification
• Process analysis persuant to target values• Process consulting
• Process optimization bymeans of digital factory(simulation methods)
• Plant planing• Process planning• SCM (logistics planning,
supplier management)
• Monitoring of realization• Ramp-up support
• Quality management(process validation)
optimization
Time to marketOutcomeProcess stability
Benefit to …
ProductionPlanning@Bertrandt | Sept20 | MB
CLIFE Digital Twin SolutionCloud Live Integrated Factory Environment
ProductionPlanning@Bertrandt | Sept20 | MB
CLIFE connectivity modules enable data aggregation from industrial connectors like
MQTT or OPC, business intelligence connectors like REST or SOAP and BAPI or from PTC
ThingWorx.
DATA AGGREGATION &
AGGLOMERATION
MICROSOFT AZURE CLOUD
DATA PREPARATION & PREDICTION
CLIFE’s connectivity hub, the load balancer and its database is located in the MS Azure cloud.
The data is validated in the cloud and gateways for visualization and analytics are provided.
Use CLIFE extensions modules such as data analysis, machine learning or production
planning to optimize processes and evaluate the shop floor.
CLIFE ARCHITEKTURDepending on the customer needs, the CLIFE Digital Twin Solution is composed of
particular modules. The heart of the system is the CLIFE Basic Module (CBM). For data aggregation, CLIFE offers a wide range of connectivity modules (CCM), which gather
data, e.g. from OPC UA, SOAP or even PTC ThingWorx. Finally, several extension modules (CEM) offer additional analytic and prediction functions.
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Our solutions for…
Supply chain management Supplier nomination Supplier selection Supplier qualification Technical supplier support Supplier tracking Procurement
Virtual validation (product and process) Material flow simulation Virtual commissioning PLC programming Robot simulation Offline/online programming Ergonomics simulation
Industrialization Simultaneous Engineering Plant concept development Plant construction
(mechanical, electrical, pneumatic systems) Simulation Technical documentation
Horizontal spiegeln
Production planning Automation Industry 4.0 Logistics planning
(in-house, inbound, outbound) Industrial engineering Workplace evaluation and optimization
Requirements management Maturity level assurance Reference point system (RPS) concepts Inspection characteristics planning Process quality Component quality
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Selected references
Bounded supplier management Purchase part management -
sheet metal parts Purchase part management - piping
Virtual assembly of of a measuring cell Feasibility study for automated assembly of
attachment parts Material flow simulation for optimization
production, supermarket and assembly
electronic quality process for assembly and paint shop
Quality Planning Body-in-white purchase components
Matching management from pre-series phase to series production
Plant planning assembly rear axleactuator
Relocation of welding group production Body-in-white engineering rear door l/r
Concept development interferometerassembly site
Planning manufacturing processes for HV battery systems
Logistics concept planning for new production site (body and assembly shop)
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Plant planning assembly rear axleactuator
Relocation of welding group production Body-in-white engineering rear door l/r
Concept planning Collecting and structuring the planning proposals, under the following aspects:
interfaces, number of derivatives and data analysis Develop 3 concept layouts due to automation level, flexibility, feasibility,
investment, TCO and scalability Create budget estimations for 3 developed concepts
Detail planning Create complete process flow and a detail working sequence for each station Calculate the operative time each assembling operation or section according to
MTM UAS Assign the process steps to the resources (labour resources, stations, product
components, equipment and material) Planning labour resources, creating detail layout
Preparation functional requirements and bill of materials Conform des purchase process, especially definition of the responsibility under
the condition of RASIC-charts between contractor and the buying department of the customer
Define the equipment package
Concept planning assembly plant rear axle actuator
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Tier 1 automotive
Project team: 4 employees
12 months
Concept planning assembly
WP 1: Project leading, project management, and project controlling Documentation of the requirements for the relocation Scheduling disassembly of the non-functional production components (weeks,
daily time schedule) Overview of the relocation perimeters Layout planning (KD-area) inspection, documentation
WP 2: Planning relocation for the body-in-white production Complete bidding documents (master lists, drafts) Suppliers conventions, supplier assessment Mentoring suppliers during disassembly and set-up Regulating suppliers for completion on schedule
WP 3: Coordination of implementation and measurements tracking fortarget accomplishment regarding relocation
Dismantling by the nominated supplier of the existing production plant and its relocation
Tracking measures and defects reduction Restoration of production areas at Audi
Relocation production welding group
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
OEM automotive
Project team: 1 employee
18 months
Successful relocation planning
Engineering partner for the complete project rear door Concept planning and detail planning Digital factory Process Designer / Process Simulate Detail design equipment – CATIA V5 Availability simulation – Plant Simulation Create offline-programming Ramp-up management Documentation incl. operating instruction
Body-in-white production engineering rear door L/R
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
OEM automotive
Project team: 40 employees
6 months
Engineering Cells
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Concept development interferometerassembly site
Planning manufacturing processes for HV battery systems
Logistics concept planning for new production site (body and assembly shop)
Concept development interferometer assembly site
Creation of specifications Idea phase
Collecting and structuring the requirements; Collection of ideas and creation of simple 3D models for validation and verification in the given installation space
Concept phase Concept selection and definition, validation and verification in cooperation
with the selected suppliers Creating and elaboration of the specifications in close coordination with Zeiss
and the selected suppliers
Supervision of the elaboration and implementation Detail phase
Supplier mentoring, supporting and coordination As interface function between Zeiss and suppliers
Elaboration phase Quality assurance and supplier support
Implementation phase Coordinate and support installation and logistics Approval and coordination
Tier 1 semiconductor industry
Project team: 2 employees
12 months
From concept to implementation
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Planning manufacturing processes for HV battery systems
Increasing efficiency and planning the manufacturing processes as part of a prototype production of HV battery systems with dynamic tools and methods of digital factory
Determination of the process sequences for the installation of an HV battery Conception and selection of equipment Drafting of a production layout to implement production in existing structures Interpretation of automated robot cells for testing production-related contents as
part of prototype production Creation of a process simulation with “Plant Simulation” to validate the
production layout Execution of simulation experiments to quantify complex issues Development and maintenance of a three-dimensional representation of the
simulated production layout as a communication platform and decision-making basis for planning OEM automotive
Project team: 2 employees
16 months / 8 months
Increasing planning quality / security and ensuring planning processes
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Logistics planning for body-in-white production and assembly shop
Planning of all inbound and in-house processes across multiple scenarios(relocation, changeover driving modes, straight driving modes and integration of Spyder models)
Layout planning for incoming and outgoing goods, picking areas, supermarkets and the material positioning on the line
Planning and documenting all relevant logistics processes Planning the goods receipt based on lock allocation and unloading time Driving schedule creation of all relevant suppliers Coordination with external interfaces such as external warehouses and suppliers Implementation and monitoring of planning with operational logistics
OEM automotive
Project team: 1-3 employees
31 months
Development logistics conceptfor body/assembly shop
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Virtual assembly of of a measuring cabinet Feasibility study for automated assembly of
attachment parts Material flow simulation for optimization
production, supermarket and assembly
Virtual assembly of a measuring cabinet
Simulation of the assembly sequence of 14 modules Standardisation and optimization of workflows with Siemens Tecnomatix
Process Designer / Process Simulate Implementation and structure of already converted data Setting up the database and the eM-Server’s with test-schemes Compilation of prepared modules Developing simulations and DMU-studies on the scope of products and
resources Digital Mock-Up support on planning dates Allocation and positioning of equipment in the order of assembly
Tier 1 semiconductor industry
Project team: 6 employees
12 months
Development, kinematics and simulation of the assembly
to optimize workflows
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Feasibility Study for Automated Assembly of Attachment Parts
Actual recording of manual attachment process of the hood, hatchback and fenders
Process analysis of the automatic – doors – attachment-parts-band (ATA) Development of various automation solutions regarding the mounting
variants and the mounting sequence Evaluation of the concepts based on technical and financial criteria Detailed planning of the solution approach with related departments Fender attachment: feasibility study in VSC, tolerance chain research Documentation and implementation with planning tools of digital factory
OEM automotive
Project team: 1 project leader
3 months
Concept for automatic assembly ofattachment parts
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Simulation and optimization for production, supermarket and assembly
Project scope Simulation and optimisation of production, supermarket and assembly in
partial models and as an overall model
Project content Optimisation of performance output by determining the optimal number of
work piece carriers Bottleneck analyses and batch size optimisation Examination of optimal control strategies for the material flow Capacitive design of the supermarket and development of optimal ordering
behaviour Production planning:
Layout-optimisation (material flow) Mediation of system understanding
OEM automotive
Project team: 5 employees
16 months
Simulation and optimization production, supermarket and assembly
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Bounded supplier management Purchase part management -
sheet metal parts Purchase part management - piping
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Bounded supplier management
Process recording and detailed description of specialist field or section-specific fields of action (RACI, LIPOK)
Mapping of the process steps in time sequences and transfer of the process landscape into the proactive schedule planning
Continuous linking of process steps and schedule planning in the complete schedule (critical path, cross-departmental)
Creation of a consistent complete schedule with cross-plan networking Continuous optimization of delivery quality and reduction of purchase costs Bounded project and schedule planning across different hierarchy and reporting
levels
div. OEMs and Tier 1/2
Project team: 4 employees
4 years
Transparent supplier management
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Purchase component management – sheet metal
Technical experts for the areas of tooling, body-in-white systems, gauges and measurement systems for technical evaluation of equipment
Evaluation and plausibility check of tooling methods, drawing simulations, operational sequences, plant concepts, jig designs, as well as the design of gauges and measurement systems
Recognize early risks and make recommendations to the supplier to ensure quality ramp-up
Implementation of change management and procedure management Monitoring the process of product and process optimization, and the
interactions till the component achieves quality level “Note 1” Supplier assessments based on ISO 9001/16949
div. OEMs and Tier 1/2
Project team: 5 employees
48 months
Purchase part managementand qualification
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Pipe routing
Project planning, schedule planning, supplier management Participation in regular events and organization for coordination appointments
with R&D, customers and suppliers to achieve goals Achieve cost, schedule and quality goals Analysis, evaluation and tracking of suppliers Documentation of project progress and reporting to management from LR-Pure Planning and implementation of new processes in development
Capacity planning Schedule planning Project planning
Tier 2 semiconductor industry
Project team: 5 employees
6 months
Deliver „ready for mounting“ piping systems under the criteria „gas and water“ to the customer
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
electronic quality process for assembly and paint shop
Quality Planning Body-in-white purchase components
Matching management from pre-series phase to series production
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Electronic quality process for assembly and paint shop
Plant integration for digital production using an electronic quality processes Actual manufacturing process(SW application: ARIS) Target-process definition with new technology (digital devices in production) Rollout
Hardware-/Software-Implementation (500 tablets; 150 base stations) coordination of suppliers Launch management
Qualification of more than 8000 production employees Training concept Training organisation Training delivery
Elaboration of emergency strategies Building and testing of new technologies (e.g. RFID)
OEM automotive
Project team: 3 employees
4 years
Introduction of electr. quality process toreplace the vehicle test card
in the assembly and paint shop
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Quality planning body-in-white purchase components floor assembly / headboard
Qualification and sampling of large assemblies (Floor assembly, front-end, rear-end, center-floor, A-pillar, CUV)
Quality monitoring of the individual components by suppliers Participation in sampling tests at individual components level, as well as partial
tables including print image approval in connection with press part planning Controlling loop 1-3 definition and monitoring Participation in SE / AG appointments Measuring point planning in connection with functional dimension tracking Masterbock shop of critical components PIK workshop for upgrading the facilities Complaint management on site Status reports regarding delivery quantity and quality
OEM automotive
Project team: 12 employees
32 months
Timely qualification of the components
ProductionPlanning@Bertrandt Usecases | Sept20 | MB
Matching management from pre-series phase to series production
Processing and monitoring of all quality tasks in complex single parts and assembly projects
Contact person for customers, suppliers and internally for quality issues Planning inspection concepts, creating inspection plans Creation of quality documents
(FMEA, production control plan, inspection plan, etc.) Analysis of components for quality-related issues Planning and acceptance of the equipment Sampling from suppliers Component sampling to customers Preparation and handover to series production departments at the end of the
project Special project with 1 employee: Complaint management
Tier 1 automotive
Project team: 5 employees
24 months
Quality assurance in the pre-series phaseand transfer to series production
What can we do for you?
Dr. Michael BrodmannHead of DepartmentProduction Planning