Date Description Location Saturday 14 th February Continue with auditions Have a first draft of the script Main concept and character list Rochester Grammar School Saturday 21 st February Final script Rochester Grammar School Saturday 28 th February Shot List Start filming Costume Rochester Grammar School Saturday 7 th March Filming Rochester Grammar School Saturday 14 th March Filming Rochester Grammar School Saturday 21 st March Have a rough cut of film If any filming left, this is the last chance to get it done Rochester Grammar School Saturday 28 th March CLOSED CLOSED Saturday 4 th April CLOSED CLOSED

Upload: stacey-lee

Post on 20-Nov-2015

31 views

Category:

Documents


1 download

DESCRIPTION

pro

TRANSCRIPT

DateDescriptionLocation

Saturday 14th February Continue with auditions Have a first draft of the script Main concept and character listRochester Grammar School

Saturday 21st February Final scriptRochester Grammar School

Saturday 28th February Shot List Start filming CostumeRochester Grammar School

Saturday 7th March FilmingRochester Grammar School

Saturday 14th March FilmingRochester Grammar School

Saturday 21st March Have a rough cut of film If any filming left, this is the last chance to get it doneRochester Grammar School

Saturday 28th MarchCLOSEDCLOSED

Saturday 4th AprilCLOSEDCLOSED