Days What to achieve 18/11/15 I will write and upload my ancillary task 1 and my audience research 20/11/15 I will test shoot my music video to enable me to see the lighting I will need for it. I will upload the summary to blogger. 25/11/15 I will complete my Moving Image Planning and my production Schedule 27/11/15 Start and finish my storyboard. Finish my shot list 02/12/15 I will complete my cast and crew list 04/12/15 Make a rough sketch of my production company logo. 08/12/15 I will ask for music permission 11/12/15 I will complete my location recce and complete a risk assessments for each location 15/12/15 I will think about costumes and props 18/12/15 I will do my equipment checklist and cast permissions 21/12/15 Shoot my music video. Complete the risk assessments I haven’t done 06/01/16 I will edit my music video 08/01/16 If I need to shoot again, I will shoot on this day. If not, I will edit my video 13/01/16 I will continue to edit 15/01/16 I will edit any previous work to make it better 20/01/16 Flat plans for ancillary tasks 22/01/16 I will edit my ancillary tasks 27/01/16 Rough production company logo 29/01/16 Final production company logo 03/02/16 I will check that my music video is the best it can be. Once I have done this, I will improve my ancillary tasks. 05/02/16 Video hand in date 10/02/16 I will improve my ancillary tasks 12/02/16 Ancillary task hand in date

Upload: rachmedia

Post on 17-Feb-2017

113 views

Category:

Education


0 download

TRANSCRIPT

Page 1: Production schedule

Days What to achieve18/11/15 I will write and upload my ancillary task 1 and my audience research20/11/15 I will test shoot my music video to enable me to see the lighting I will

need for it. I will upload the summary to blogger.25/11/15 I will complete my Moving Image Planning and my production Schedule27/11/15 Start and finish my storyboard. Finish my shot list02/12/15 I will complete my cast and crew list04/12/15 Make a rough sketch of my production company logo.08/12/15 I will ask for music permission11/12/15 I will complete my location recce and complete a risk assessments for

each location15/12/15 I will think about costumes and props18/12/15 I will do my equipment checklist and cast permissions21/12/15 Shoot my music video. Complete the risk assessments I haven’t done06/01/16 I will edit my music video08/01/16 If I need to shoot again, I will shoot on this day. If not, I will edit my video13/01/16 I will continue to edit15/01/16 I will edit any previous work to make it better20/01/16 Flat plans for ancillary tasks22/01/16 I will edit my ancillary tasks27/01/16 Rough production company logo29/01/16 Final production company logo03/02/16 I will check that my music video is the best it can be. Once I have done

this, I will improve my ancillary tasks.05/02/16 Video hand in date10/02/16 I will improve my ancillary tasks12/02/16 Ancillary task hand in date