production schedule

Download Production schedule

If you can't read please download the document

Upload: franzzz101

Post on 16-Aug-2015

11 views

Category:

Social Media


0 download

TRANSCRIPT

  1. 1. Production schedule Date Time Location Task 10/11/14 30mins Todays location was outside the performing arts building. I used this location as had the most greenery around the school. Went out with my model artist to take pictures for my front cover 17/11/14 30mins Long corridor inside (white wall) the pictures before had not worked with the original background. Once more I went out to take pictures, this time it was for my contents page 24/11/14 30mins Long corridor inside (White wall) Pictures now where taken for my double page spread 01/12/14 1-2 hrs ICT 3 We started using the computers and Photoshop to create our front covers. 08/12/14 1.2 hrs ICT 3 Continuation of creating the first page, more magazine conventions have been added 15/12/14 1-2 hrs ICT 3 Now I have added even more conventions such as more feature articles, issue date, and the front cover is nearly finished. I have also started creating my contents page. 05/01/15 1-2 hrs ICT 3 During this time, I have already finished my front cover and nearly completed my contents page, a lot of work is put into the language side of the magazine. 22/01/15 1-2 hrs ICT 3 Now I have finished both my front cover and contents page. The front cover and contents pages have the images inserted from the first task. I have also started my
  2. 2. double page spread design. 16/02/15 1-2 hrs ICT 3 By now, my front cover and contents pages are completely finished, and the double page spread write up is half way done. This is a long process as I have to use language and text which will appeal to the audience. 12/3/15 All my pages have been completed, and given the final touch. From now I start my evaluation task which should be completed by 23/03/15