production schedule
TRANSCRIPT
![Page 1: Production schedule](https://reader036.vdocuments.us/reader036/viewer/2022082921/555a193cd8b42a7d498b5216/html5/thumbnails/1.jpg)
PRODUCTION SCHEDULEDate of scheduled filming –30th October and 7th November
Date Time Actors Location Description30/10 3-4pm Tom Lucy’s house Arrival of actor. Brief him on what
scenes we are filming. E.g. Close ups of his face and night time shots. Before any filming is to happen, actor must sign contract and permission form.
30/10 5:00-5:30pm Lauren Lucy’s house Arrival of actress. Ask to sign forms and brief her on what she must do. Try out test shots of scene between mother and son.
4/11 2:30-3:15pm All actors Lucy’s house Establishing shots of house.Continue shooting of scenes from storyboard including beginning scene of old photos.
4//11 3:30-4:00pm Nico Lucy’s house Shots of father in living room and main shot – being dragged down the stairs. Test out the dragging before filming to ensure actor is not hurt in any way.
4/11 4:00-4:15pm Tom Lucy’s house Shots of protagonist.BREAK
4/11 5:00-5:30pm Tom and Lauren
Lucy’s house and outside area
Film the scenes of son outside as it turns dark, emphasis on night time. Shots of mother returning home later that evening. (Refer to storyboard)
4/11 5:30-6:00pm Tom and Lauren
Lucy’s house Final shots of Lauren and Tom for the ending
4/11 6:15pm All actors Lucy’s house Ensure there is enough time for any re-filming of certain shots.