8/12/2019 Production Order Confirmation http://slidepdf.com/reader/full/production-order-confirmation 1/12  Project: MISSION SURE      !"#$%& ' &&( )% && End User Training Manual for SAP PP – Production Planning & Control Process Name: Production Execution – Production Order Confirmation (T-code CO11N) Process No: TRF/O2C/6.0 Control Copy No: TRF/O2C/6.0/ #*+ #  Doc Version Description Prepared by Date Reviewed by Approved by 00 Original Palani Dorai 24.12.2009 AK Anal, Sachin Kumar Rajak, Minu Singh

Upload: frettot1

Post on 03-Jun-2018

226 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 1/12

  Project: MISSION SURE 

   

!"#$%& ' &&( )% &&

End User Training Manual 

for

SAP PP – Production Planning & Control

Process Name: Production Execution – Production Order Confirmation(T-code CO11N)

Process No: TRF/O2C/6.0

Control Copy No: TRF/O2C/6.0/

#*+ # 

Doc Version Description Prepared by Date Reviewed by Approved by

00 Original Palani Dorai 24.12.2009 AK Anal,Sachin Kumar Rajak,Minu Singh

Page 2: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 2/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 2 of 12 

Introduction

The Production Planning and Control functional area in TRF has the followingbusiness processes.

%

% ,

!

" !# $ % &#$

' " ( $$ $

" !# &#$

" ) !# #

For each of the above processes, there are separate End User Training Manuals areavailable

This End user Training manual covers from sl. no. 5 of the above list, that is, theProduction Execution (Production Order Confirmation) process.

a) Production order Confirmation - Transaction code CO11N

Page 3: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 3/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 3 of 12 

1. Production Order Confirmation - Transaction code – CO11N Procedural Steps 

Menu Path

To access CO11N, use the following menu path

SAP Easy Access > SAP menu > Logistics > Production > Shop Floor control >Confirmation > Enter > For Operation > CO11N – Time Ticket

Transaction Code

CO11N

Pre-requisite before confirming an operationAll the material that are reserved against a specific Production Order, for which anoperation is being confirmed, needs to be withdrawn from the specific Sales Order stock.

Procedure

Enter the Transaction code CO11N in the command field (as shown in thebelow screen)

Page 4: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 4/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 4 of 12 

Or go as per the navigation shown below and click CO11N – Production orderCreation

Press <Enter> key or click on the check mark  icon in the top left side corner of the

Screen, the following screen Project Builder screen appears.

Page 5: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 5/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 5 of 12 

1) Key-in the Production order Number in the Order field. For our example we have enteredthe production order No 906000308.

2) Key-in the operation number to be confirmed.

Page 6: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 6/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 6 of 12 

In order to select the operation, click once on the Open / activity field, a drop down

button will appear at the end of the field, and click this drop down button; thefollowing pop up window showing all the operations for the order will appears.

For our example we have selected the operation 0010.

To select a line, Click once on the line, the colour changes as above, and then click the

check mark button of the pop up window to get the operation populate on the field.

Note: while creating this confirmation of an operation, the following points are to beremembered:

a) Confirmation of operations should be in sequence. That is after confirmingsay operation 0010, and then only we can confirm operation 0020.

With out confirming the previous operation we cannot jump  to any otheroperations.

b) Similarly while entering the quantity of an operation in the confirmationscreen; it should be in line with the previous operation quantity.

We cannot enter a quantity which is other than the previous operationsquantity. That is we cannot jump the quantity..

Also

c) Before Inspection, If a Person want to confirm a production order, the systemwill automatically launch a Inspection call in the Inspection department.

Page 7: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 7/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 7 of 12 

The material will go to Quality, they will hold the material, and then if they

clear it, then only the next operation can be confirmed.

And

d) If we are confirming the Last operation of the Production order, a Inspectioncall will be generated.

And

Click on the Goods movement push button, the

following screen appears,

Click on the movement Type field, a drop down button will appear at the end of the

field, and click this drop down button; the following pop up window showing all themovement type will appear,

Click onthis field

Page 8: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 8/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 8 of 12 

Select always movement type 101 for the last operation confirmation.

Also

Enter other required fields like storage location etc.,

3) Key-in the quantity at the Yield field 

Note: In order to enter the total Production Order quantity, click on the Actual data

push button, the system will populate in the yield field the total quantity ofthe Production order.

Page 9: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 9/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 9 of 12 

4) Under Activities, In the Std. man Minute field key-in the actual time with units.

5) Enter the employee number of the person who has executed the operation. In thePersonnel No field.

In our example, we have keyed-in check no as 2699.

6) In the Execution Start field, key-in the start Date and time of the operation

And

7) In the Execut. Finish field, key-in the end date and time of the operation

8) In the Posting date field, the system will default today’s Date (current date), if requiredwe can change this date

9) In the Break time field, key-in the total details of the time that was lost due to MachineBreak downs

Page 10: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 10/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 10 of 12 

10) If required Key-in any textual information of the operation in the Text field.

Once all the fields are keyed-in the screen will look as below

Page 11: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 11/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 

Page 11 of 12 

Click save button to save the record.

End of document on T-code CO11N – Production order Confirmation

End of document on – Production order Confirmation - (TRF/O2C/6.0) – 001

Page 12: Production Order Confirmation

8/12/2019 Production Order Confirmation

http://slidepdf.com/reader/full/production-order-confirmation 12/12

  Project: MISSION SURE 

TRF/O2C/6.0 ' &&( )% && 