production concepts
DESCRIPTION
Production Concepts. Let’s assume we are a manufacturer of bicycles What do we need to make a bicycle?. For example, to build this bicycle (an assembly), we need:. Seat. For example, to build this bicycle (an assembly), we need:. Frame. Seat. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/1.jpg)
Production ConceptsProduction Concepts
![Page 2: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/2.jpg)
Let’s assume we are a manufacturer of bicycles
What do we need to make a bicycle?
![Page 3: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/3.jpg)
For example, to build this For example, to build this bicycle (an assembly), we bicycle (an assembly), we need:need:
Seat
![Page 4: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/4.jpg)
For example, to build this For example, to build this bicycle (an assembly), we bicycle (an assembly), we need:need:
Seat Frame
![Page 5: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/5.jpg)
For example, to build this For example, to build this bicycle (an assembly), we bicycle (an assembly), we need:need:
Seat Frame Handle Bars
![Page 6: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/6.jpg)
For example, to build this For example, to build this bicycle (an assembly), we bicycle (an assembly), we need:need:
Seat Frame Handle Bars
Brakes
![Page 7: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/7.jpg)
For example, to build this For example, to build this bicycle (an assembly), we bicycle (an assembly), we need:need:
Seat Frame Handle Bars
Wheels (2)
Brakes
![Page 8: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/8.jpg)
For example, to build this For example, to build this bicycle (an assembly), we bicycle (an assembly), we need:need:
Seat Frame Handle Bars
Wheels (2)
Brakes
Tires (2)
![Page 9: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/9.jpg)
For example, to build this For example, to build this bicycle (an assembly), we bicycle (an assembly), we need:need:
Seat Frame Handle Bars
Wheels (2)
Brakes
Tires (2)
Pedal Assembly
![Page 10: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/10.jpg)
For example, to build this For example, to build this bicycle (an assembly), we bicycle (an assembly), we need:need:
Seat Frame Handle Bars
Wheels (2)
Brakes
Tires (2)
Pedal Assembly
Chain
![Page 11: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/11.jpg)
For exampleFor example
Seat Frame Handle Bars
Wheels (2)
Brakes
Tires (2)
Pedal Assembly
Chain
Gear Assembly
![Page 12: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/12.jpg)
Bills of MaterialsBills of Materialsbill of materials (BOM) - the
term used to describe the "parts list" of components needed to build another assembled item or part.
![Page 13: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/13.jpg)
SO, my BOM for this SO, my BOM for this bicycle is:bicycle is:
Seat Frame Handle Bars
Wheels (2)
Brakes
Tires (2)
Pedal Assembly
Chain
Gear Assembly
![Page 14: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/14.jpg)
SO, my BOM for this SO, my BOM for this bicycle is:bicycle is:
Seat Frame Handle Bars
Wheels (2)
Brakes
Tires (2)
Pedal Assembly
Chain
Gear Assembly
PART How Many
Bicycle 1
•Seat 1•Frame 1•Handle Bars 1•Brakes 2•Wheels2•Tires 2•Pedal Assembly1•Chain 1•Gear Assembly1
![Page 15: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/15.jpg)
But, two of the parts in this But, two of the parts in this list are assemblies too:list are assemblies too:
Seat Frame Handle Bars
Wheels (2)
Brakes
Tires (2)
Pedal Assembly
Chain
Gear Assembly
![Page 16: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/16.jpg)
So, I have actually created 3 bills of materials So, I have actually created 3 bills of materials (BOMs)(BOMs)
Part How Many
Bicycle 1
• Seat 1• Frame 1• Handle Bars 1• Brakes 2• Wheels 2• Tires 2• Pedal Assembly1• Chain
1• Gear Assembly 1
![Page 17: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/17.jpg)
With this BOM, building 2 bicycles would With this BOM, building 2 bicycles would require:require:
Sub-assembly
Sub-assembly
![Page 18: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/18.jpg)
With this BOM, building 1000 bicycles would With this BOM, building 1000 bicycles would require:require:
![Page 19: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/19.jpg)
Now, consider the factory Now, consider the factory where we build the bicycleswhere we build the bicycles
Receiving Dock
Inventory Storeroom
General Assembly AreaShipping
Dock
Pedal Assembly
Area
Wheel Assembly
Area
RimsPedals
Seats
SpokesBrakes
Chains
Frames
Wheels
H.B.
Red denotes purchased inventory, Black denotes manufactured inventory
![Page 20: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/20.jpg)
Purchased inventory is Purchased inventory is received at the receiving received at the receiving dock:dock:Receiving
DockInventory Storeroom
General Assembly AreaShipping
Dock
Pedal Assembly
Area
Wheel Assembly
Area
RimsPedals
Seats
SpokesBrakes
Chains
Frames
Wheels
H.B.
Red denotes purchased inventory, Black denotes manufactured inventory
![Page 21: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/21.jpg)
Sub-assemblies need to be manufactured Sub-assemblies need to be manufactured before we begin manufacturing the bicyclebefore we begin manufacturing the bicycle
Receiving Dock
Inventory Storeroom
General Assembly AreaShipping
Dock
Pedal Assembly
Area
Wheel Assembly
Area
RimsPedals
Seats
SpokesBrakes
Chains
Frames
Wheels
H.B.
Red denotes purchased inventory, Black denotes manufactured inventory
![Page 22: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/22.jpg)
Lead TimeLead TimeFor manufactured items, lead time is the period of time between the initiation of any process of production and the completion of that process.
For vendor supplied items, lead time is the period of time between placing the order and its receipt.
![Page 23: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/23.jpg)
Let’s make a bicycle!Let’s make a bicycle!Let’s assume: ◦bicycle lead time = 7 days◦wheel assembly lead time = 4 days◦pedal assembly lead time = 6 days◦rim order lead time = 14 days◦spokes order lead time = 20 days
Need the bicycle by November 30
![Page 24: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/24.jpg)
Here is the processHere is the process Shop order is placed for a bicycle to be finished by November 30. Since lead time for the bicycle is 7 days, we need to begin the
manufacturing process for the bicycle by November 23.
October (timeline) November 31 5 10 15 20 25 30
Bicycle
![Page 25: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/25.jpg)
Here is the processHere is the process Shop order is placed for a bicycle to be finished by November 30. Since lead time for the bicycle is 7 days, we need to begin the
manufacturing process for the bicycle by November 23. Of course, all parts in the BOM need to be available as we start the
process.
October (timeline) November 31 5 10 15 20 25 30
Wheels Bicycle
![Page 26: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/26.jpg)
Here is the processHere is the process Shop order is placed for a bicycle to be finished by November 30. Since lead time for the bicycle is 7 days, we need to begin the
manufacturing process for the bicycle by November 23. Of course, all parts in the BOM need to be available as we start the
process. To insure we have the wheels available on November 23, we need
to create a shop order for the wheels on Nov. 17 since its lead time is 6 days.
October (timeline) November 31 5 10 15 20 25 30
Wheels Bicycle
![Page 27: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/27.jpg)
Here is the processHere is the process Shop order is placed for a bicycle to be finished by November 30. Since lead time for the bicycle is 7 days, we need to begin the
manufacturing process for the bicycle by November 23. Of course, all parts in the BOM need to be available as we start the
process. To insure we have the wheels available on November 23, we need
to create a shop order for the wheels on Nov. 17 since its lead time is 6 days.
To insure we have the pedal assembly available on November 23, we need to create a shop order for the assembly on Nov. 19 since it has a lead time of 4 days.
October (timeline) November 31 5 10 15 20 25 30
Wheels BicyclePed A
![Page 28: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/28.jpg)
Here is the processHere is the process Shop order is placed for a bicycle to be finished by November 30. Since lead time for the bicycle is 7 days, we need to begin the
manufacturing process for the bicycle by November 23. Of course, all parts in the BOM need to be available as we start the
process. To insure we have the wheels available on November 23, we need
to create a shop order for the wheels on Nov. 17 since its lead time is 6 days.
To insure we have the pedal assembly available on November 23, we need to create a shop order for the assembly on Nov. 19 since it has a lead time of 4 days.
To insure we have the spokes before we build the wheel, we need to place an order with the vendor on Oct. 31 since it has a lead time of 20 days.
October (timeline) November 31 5 10 15 20 25 30
Ped ASpokes Wheels Bicycle
![Page 29: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/29.jpg)
Here is the processHere is the process Shop order is placed for a bicycle to be finished by November 30. Since lead time for the bicycle is 7 days, we need to begin the
manufacturing process for the bicycle by November 23. Of course, all parts in the BOM need to be available as we start the
process. To insure we have the wheels available on November 23, we need to
create a shop order for the wheels on Nov. 17 since its lead time is 6 days.
To insure we have the pedal assembly available on November 23, we need to create a shop order for the assembly on Nov. 19 since it has a lead time of 4 days.
To insure we have the spokes before we build the wheel, we need to place an order with the vendor on Oct. 31 since it has a lead time of 20 days.
To insure we have the Rims before we build the wheel, we need to place an order with the vendor on Nov. 5 since it has a lead time of 14 days.
October (timeline) November 31 5 10 15 20 25 30
Ped ARimsSpokes Wheels Bicycle
![Page 30: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/30.jpg)
Material Requirements PlanningMaterials Requirements Planning
(MRP) is a systematic production planning and inventory management system used to manage manufacturing processes by meeting these three objectives:◦Ensure materials and products are
available for production and delivery to customers.
◦Maintain the lowest possible level of inventory.
◦Plan manufacturing activities, delivery schedules and purchasing activities.
![Page 31: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/31.jpg)
Here is the processHere is the process Shop order is placed for a bicycle to be finished by November 30. Since lead time for the bicycle is 7 days, we need to begin the
manufacturing process for the bicycle by November 23. Of course, all parts in the BOM need to be available as we start the
process. To insure we have the wheels available on November 23, we need to
create a shop order for the wheels on Nov. 17 since its lead time is 6 days.
To insure we have the pedal assembly available on November 23, we need to create a shop order for the assembly on Nov. 19 since it has a lead time of 4 days.
To insure we have the Rims before we build the wheel, we need to place an order with the vendor on Nov. 5 since it has a lead time of 14 days.
To insure we have the spokes before we build the wheel, we need to place an order with the vendor on Oct. 31 since it has a lead time of 20 days.
October (timeline) November 31 5 10 15 20 25 30
Ped ARimsSpokes Wheels Bicycle
So if you tell your MRP system that you need a bicycle produced by
November 30…
![Page 32: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/32.jpg)
Here is the processHere is the process Shop order is placed for a bicycle to be finished by November 30. Since lead time for the bicycle is 7 days, we need to begin the
manufacturing process for the bicycle by November 23. Of course, all parts in the BOM need to be available as we start the
process. To insure we have the wheels available on November 23, we need to
create a shop order for the wheels on Nov. 17 since its lead time is 6 days.
To insure we have the pedal assembly available on November 23, we need to create a shop order for the assembly on Nov. 19 since it has a lead time of 4 days.
To insure we have the rims before we build the wheel, we need to place an order with the vendor on Nov. 5 since it has a lead time of 14 days.
To insure we have the spokes before we build the wheel, we need to place an order with the vendor on Oct. 31 since it has a lead time of 20 days.
October (timeline) November 31 5 10 15 20 25 30
Ped ARimsSpokes Wheels Bicycle
So if you tell your MRP system that you need a bicycle produced by
November 30…It will handle the remaining steps to produce that
bicycle.
![Page 33: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/33.jpg)
Master Production ScheduleThe input to your MRP system is
the Master Production Schedule (MPS).
The MPS is the list of all shop orders for the company’s “end items.”
An “end item” is an item that my company sells that is NOT used in another assembly (for example, the bicycle is an end item.)
![Page 34: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/34.jpg)
It can be quite complicated…Suppose I make two types of
bicycles, one blue and one green. PART How Many
BicycleB1
•Seat 1•FrameB1•Handle Bars 1•Brakes 2•Wheels2•Tires 2•Pedal Assembly1•Chain 1•Gear Assembly1
PART How Many
BicycleG1
•Seat 1•FrameG1•Handle Bars 1•Brakes 2•Wheels2•Tires 2•Pedal Assembly1•Chain 1•Gear Assembly1
![Page 35: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/35.jpg)
Other complicationsWhat my company makes 150 different
types of bicycles?
![Page 36: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/36.jpg)
Other complicationsWhat my company makes 150 different
types of bicycles?What if I’m a manufacturer of automobiles
that have 70-80 levels in their BOMs?
![Page 37: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/37.jpg)
Other complicationsWhat my company makes 150 different
types of bicycles?What if I’m a manufacturer of automobiles
that have 70-80 levels in their BOMs?What about items that have customer
ordered options?
![Page 38: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/38.jpg)
Other complicationsWhat my company makes 150 different
types of bicycles?What if I’m a manufacturer of automobiles
that have 70-80 levels in their BOMs?What about items that have customer
ordered options?What if there are other “end items” that are
not really “end items”? For example, spare parts….
![Page 39: Production Concepts](https://reader036.vdocuments.us/reader036/viewer/2022062810/56815c02550346895dc9ea4c/html5/thumbnails/39.jpg)
Other complicationsWhat my company makes 150 different types
of bicycles?What if I’m a manufacturer of automobiles
that have 70-80 levels in their BOMs?What about items that have customer ordered
options?What if there are other “end items” that are
not really “end items”? For example, spare parts….
I’m ultimately dependent upon my suppliers for some of the purchased items that are crucial to my production schedule. Wouldn’t it be nice if I could work closely with them to manage our relationship to mutual benefit.?