production components materials inventory time & costs production systems
TRANSCRIPT
![Page 1: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/1.jpg)
Production ComponentsProduction Components
Materials InventoryMaterials Inventory
Time & CostsTime & Costs
Production SystemsProduction Systems
![Page 2: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/2.jpg)
Materials InventoryMaterials Inventory
Inventory TypesInventory Types
TransitTransit
MaterialMaterial
Work-in-process (WIP)Work-in-process (WIP)
BufferBuffer
Maintenance Repair & Operations Maintenance Repair & Operations (MRO)(MRO)
Finished Goods (FGI)Finished Goods (FGI)
![Page 3: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/3.jpg)
Materials InventoryMaterials Inventory
Inventory CostsInventory Costs
Carrying CostsCarrying Costs
Shortage CostsShortage Costs
![Page 4: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/4.jpg)
Supply Chain ManagementSupply Chain Management
Sequence that includes:Sequence that includes:
Material SuppliersMaterial Suppliers
Material InventoryMaterial Inventory
ProductionProduction
Finished Goods InventoryFinished Goods Inventory
DistributionDistribution
DeliveryDelivery
TrackingTracking
CustomerCustomer
![Page 5: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/5.jpg)
Time & CostsTime & Costs
Minimizing Production CostsMinimizing Production Costs
Managing Human ResourcesManaging Human Resources
Scheduling MaintenanceScheduling Maintenance
![Page 6: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/6.jpg)
Minimizing Production CostsMinimizing Production Costs
Minimizing DowntimeMinimizing Downtime
Reusing & RecyclingReusing & Recycling
![Page 7: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/7.jpg)
Managing Human ResourcesManaging Human Resources
Work ShiftsWork Shifts
Overtime WorkOvertime Work
Work TeamsWork Teams
![Page 8: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/8.jpg)
Scheduling MaintenanceScheduling Maintenance
Four Basic Approaches:Four Basic Approaches:
- Preventive Maintenance (PM)Preventive Maintenance (PM)
- Corrective MaintenanceCorrective Maintenance
- Predictive Maintenance (PdM)Predictive Maintenance (PdM)
- Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
![Page 9: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/9.jpg)
Production SystemsProduction Systems
Types of Production SystemsTypes of Production Systems
Push SystemPush System
Pull SystemPull System
Agile ManufacturingAgile Manufacturing
Just-in-time Production (JIT)Just-in-time Production (JIT)
![Page 10: Production Components Materials Inventory Time & Costs Production Systems](https://reader036.vdocuments.us/reader036/viewer/2022082818/56649f145503460f94c28976/html5/thumbnails/10.jpg)
Production SystemsProduction Systems
System CombinationsSystem Combinations
Lean ManufacturingLean Manufacturing
Material Requirements Planning (MRP)Material Requirements Planning (MRP)
Manufacturing Resources Planning (MRP II)Manufacturing Resources Planning (MRP II)