procurement’s role in business continuity planning

38
Procurement’s Role in Business Continuity Planning By Gregory Maynard - SLCSD Contributors: Nora Laudermilk – West Palm Beach, FL George Zsidisin – Michigan State University Robert Combs – Chandler, Arizona & Others

Upload: regis

Post on 25-Jan-2016

20 views

Category:

Documents


0 download

DESCRIPTION

Procurement’s Role in Business Continuity Planning. By Gregory Maynard - SLCSD Contributors: Nora Laudermilk – West Palm Beach, FL George Zsidisin – Michigan State University Robert Combs – Chandler, Arizona & Others. Presentation Goals:. Provide A Background Provide Ideas - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Procurement’s Role in  Business Continuity Planning

Procurement’s Role in Business Continuity

Planning

By

Gregory Maynard - SLCSD

Contributors: Nora Laudermilk – West Palm Beach, FL

George Zsidisin – Michigan State University

Robert Combs – Chandler, Arizona

&

Others

Page 2: Procurement’s Role in  Business Continuity Planning

Presentation Goals:

Provide A Background

Provide Ideas

Cause you to THINK

Page 3: Procurement’s Role in  Business Continuity Planning

What is the business of your organization?

City, County or StatePublic Services

Public Safety

Public School, College or UniversityEducation

Student/Faculty Safety

Page 4: Procurement’s Role in  Business Continuity Planning

What is your organization doing to insure that it will be around to

provide these services?

Planning

Page 5: Procurement’s Role in  Business Continuity Planning

Business Continuity Planning

What is it?

“It is having the processes, procedures, escalation paths and backup support plans in place to ensure that the organization continues to operate should an interruption and/or crisis occur.”

Page 6: Procurement’s Role in  Business Continuity Planning

Critical Elements of Continuity Planning

Top management commitment

Ongoing Preparedness

Risk Assessment

Speed and Responsiveness

Other Considerations

Page 7: Procurement’s Role in  Business Continuity Planning

Top Management Commitment

Directives communicated to employees

Commitment of Resources

Assigned Accountability and Authority

Established Measurement Metrics

Dissemination of Information

Adopting Policies and Procedures

Page 8: Procurement’s Role in  Business Continuity Planning

Ongoing Preparedness

Mandatory TrainingBriefings

Drills

Reviews and Update of plansSituations change

People come and go

Page 9: Procurement’s Role in  Business Continuity Planning

Risk Management

Examine Likelihood & Potential Manmade: Terrorism, Power Outages, Chemical Hazards

Natural: Floods, Tornadoes, Draughts, Earthquakes, Winter Blizzards

Health: Avian Flu, Anthrax, SARS

Infrastructures: Buildings and Locations

Suppliers: Their ability to survive and perform

Create a matrix

Page 10: Procurement’s Role in  Business Continuity Planning

Risk Matrix

Probability

Lik

elih

ood

1 2 3 4 5

2

3

4

5

4

6

8

10

5

6

7

5 6 7

7

8

7 8

9

9

Page 11: Procurement’s Role in  Business Continuity Planning

Speed and Responsiveness

Separate PlansEmergency Response

Disaster Recovery

Flexible ResponsesAgile Contracting

Simplified Procedures

Mutual Agreements of Understanding

FAR

Page 12: Procurement’s Role in  Business Continuity Planning

Other Considerations

Employee treatment

Manual Operations vs. Automated

Financial and Legal Impacts

Political Impacts

Page 13: Procurement’s Role in  Business Continuity Planning

What should be in it?

Chain of Succession

Pre-delegation of Emergency Authorities

Emergency Action Steps

Designation of Emergency Operating Centers (EOCs)

Designation of Alternate Work Sites and EOCs

Safeguarding Essential Records

Page 14: Procurement’s Role in  Business Continuity Planning

Contents Continued

Alert and Warning Procedures

Emergency Public Information

Protection of Resources, Facilities and Personnel

Training and Exercises

Recovery Priorities

Web Site: www.fema.gov/plan/ehp/response.shtm

Page 15: Procurement’s Role in  Business Continuity Planning

Continuity Planning Process Review

Step 1 – Analyze RiskIdentify

Do Impact Studies

Develop Mitigation Strategies

Step 2 – Prepare Plans and Train

Step 3 – Test the Plans

Step 4 – Evaluate and Modify

Step 5 – Repeat the Process

Page 16: Procurement’s Role in  Business Continuity Planning

Any Questions ?

Freeway Crash & Fire 5/07

Page 17: Procurement’s Role in  Business Continuity Planning

What is our role in continuity planning?

That Depends!

On What Step?Planning(Mitigation & Preparedness)

Response

Recovery

Page 18: Procurement’s Role in  Business Continuity Planning

PLANNING - HAVE YOUR OWN PLAN –.

Everyone should be involved

Talk about it –

Practice it –

Remember, there is a reason we should have earthquake & fire drills.

When the water is rising,

is not the time to look

for a sandbag vendor.

Page 19: Procurement’s Role in  Business Continuity Planning

Items To Be Addressed In Planning

Workers/Employees and Their Families

Facilities and DataStatus and Backup

Continuity of Business

Inventory of Building ContentsDamage

Replacement

Customers and Suppliers

Disaster - Public Information

Page 20: Procurement’s Role in  Business Continuity Planning

Disaster Manual1. Procedures2. Emergency Employee Information3. Agreements with Other Purchasing Agencies:

MOU & (PREP)4. Procurement Card Information, Generic Vouchers5. Warehouse Listing6. Vendor Listing7. Vendor Emergency Information8. Contracts and Price Agreements9. FEMA Documents10. State Resources11. Purchase Order Log12. Maps by City & County

Page 21: Procurement’s Role in  Business Continuity Planning

Other Tools

Contracts Disaster Debris Removal & Disposal Services Heavy Equipment Rental Mold Remediation (Industrial Hygiene Services)

Generator & Other Equipment Rentals Roof Repair and Replacement General Construction Building Repair Ice (in Summer); Blankets (in Winter) Rental of Portable Toilets Repair and Replacement of Fencing

Page 22: Procurement’s Role in  Business Continuity Planning

Other ContractsOptional Contracts

Canal Cleaning Food Catering Tent and Chair Rental Rental of Roll Off Trash Containers Warehouse stock of safety supplies Bottled Water Prescriptions Transportation – bus, taxi, & other Laundry supplies or services Mobile phones or phone cards Hygiene kits Plastic wrap

Page 23: Procurement’s Role in  Business Continuity Planning

Other Tools

Special set of purchase ordersP805600E800001

Listing and phones of key contractors and vendors

Equipment rental, food, water, etc. Printout of all vendors by commodity

List of essential personnel and cell phonesYour StaffKey Agency Staff

Key contracts, notify (time permitting)Debris, call and place on alertMonitoring, generators, equipment rental, etc.

Page 24: Procurement’s Role in  Business Continuity Planning

More Things to ConsiderMOU – with other agencies local & distantRent refrigerated trucks

Have 2 days before storm and fill to capacity with bagged ice and food, time permitting

Final warehouse/stock inventoryCounts and Dollar Amount

Listing of other Purchasing AgenciesNIGP - Utah Chapter Directory EdPAC Directory

Contracts and Price AgreementsCopies in Binder

Pre-printed Vouchers to give to displaced personsInventories of what is in your building

Copies in Binder For Insurance and replacement purposesPersonal items too!

Page 25: Procurement’s Role in  Business Continuity Planning

Communication PlanRadios

COWsCell sites On Wheels

Three mile radius

Place strategically

Single most important item that will fail

Page 26: Procurement’s Role in  Business Continuity Planning

PO’s, Procurement Cards & Vouchers

Manual P O system Vouchers

Medical needs Transportation needs

Procurement Cards (P-Cards) Secured until disaster or used daily Raise limits Keep list at home or a secure place Bank numbers

Page 27: Procurement’s Role in  Business Continuity Planning

Training Exercises

You must practice

Training Exercises will bring out your shortcomings and help you gain confidence.

The Process Outline

Page 28: Procurement’s Role in  Business Continuity Planning

The Exercise Development Process

ORIENTATION: Key players review plans & procedures, ask what if.DRILL – Test equipment & personnelTABLETOP: Key players react to a scenario – group problem solvingFUNCTIONAL – Evaluate a function & Measure resource adequacyFULL-SCALE – large scale, top to bottom use of equipment & personnel, multiple agencies involved.

Page 29: Procurement’s Role in  Business Continuity Planning

EVALUATION

Review what worked and what did not.

Make corrections.

Prepare for the next exercise.

Plan

Exercise

Evaluate

Page 30: Procurement’s Role in  Business Continuity Planning

Response -Stay Calm

Check to see that you and others are ok – help those needing assistance.

If able, put your

plan into effect.

Check your phones

Contact suppliers

Respond to requests

Page 31: Procurement’s Role in  Business Continuity Planning

FEMA GUIDELINES

Procurement must follow FEMA guidelines in order to ensure reimbursement from the federal government by: Retaining original receipts and documentation Making no contract or purchase contingent upon

federal reimbursement Making emergency p.o. or contracts “site specific” Rent or lease equipment instead of buying Document in detail all oral requests Require that all bid, performance and payment

bonds are issued

Page 32: Procurement’s Role in  Business Continuity Planning

FEMA GUIDELINES Continued

Encouraging contractors to support local economy by including a provision that requires contractors to use materials and supplies and hire laborers to the extent possible within the disaster area.

Utilizing contracts for removal of debris or wreckage on fixed price or unit price

Know the Rules!

Page 33: Procurement’s Role in  Business Continuity Planning

FEMA CATEGORIES Category A – Debris Removal Category B – Emergency Protective Measures Category C – Road Systems Category D – Water Control Facilities Category E – Building and Equipment Category F – Utilities Category G – Parks, Recreational, and Other

Page 34: Procurement’s Role in  Business Continuity Planning

Disaster Related Charges Was it damaged as a direct result of the disaster? Is this needed as a direct result of the disaster? Was the health, safety or welfare of people at risk? What was damaged? Item, asset #, serial number, etc. When was it damaged? Why is this needed/ Power shortage, flooding, etc. Example:

Incomplete: Floodwaters washed away a 20 foot section of road embankment. Complete: Floodwaters washed away a 20’L x 5’W x 10’H section of earthen embankment along a

secondary two-lane asphalt paved road, resulting in travel being restricted to one lane.

Page 35: Procurement’s Role in  Business Continuity Planning

RECOVERY

Any activity to return vital life-support systems to minimum operating standards and such activity designed to return life to normal or improved levels:

Crisis Counseling

Debris Removal

Reconstruction

Loans and Grants

Rebuilding

Page 36: Procurement’s Role in  Business Continuity Planning

DOCUMENT

DOCUMENT

DOCUMENT

Before, During and After

Page 37: Procurement’s Role in  Business Continuity Planning

Review

Page 38: Procurement’s Role in  Business Continuity Planning

Decisions

Remember that the most important decisions you will make with

regard to an emergency are the decisions that you make before it

happens.

Thank You