Dam Safety & Water Resources Planning Project (DSWRPP) Procurement Plan for Consulting Services AS On 06-September-2011 (Subject to Prior Review/Post Review) IDA Credit Number : 4406-CE Project ID: 093132 Serial No Package No Description of Services Estimated Cost( US $. Millions) Method of Selection @ Advertising for short listing (EOI) date TOR/ shortlist to be finalished (date) # RFP final draft to be forwarded to the bank (date)** No objection from bank for TOR/ shortlist/ final RFP (date)** RFP Issued (date) Proposal to be received by the project Authorities (date) Evaluation to be finalised (Technical/ #Combined/Draft contract/Final contract) (Date) No objection by the bank (Technical /#Combined/Draft Contract) (Date)** Remarks Contract Number, Value and Currency Name of Consultant/ Nationality & Zip code, if USA Service to be completed (date) World Bank Referance Number EXP. Incurred to Date (US$M) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Component1 1 DSWRPP/CS/QBS/01 R A 0.7200 QBS 01-Jan-2006 01-Mar-2006 21-Mar-2006 23-Mar-2006 24-Mar-2006 05-Oct-2006 07-Jun-2006 07-Aug-2006 Completed 01-Jan-2006 01-Mar-2006 22-Mar-2006 07-Apr-2006 07-Apr-2006 19-May-2006 19-Jul-2006 21-Jul-2006 PP SMEC International (pty) ltd. Australia DSWRPP/CS/QBS/01 15-Feb-2007 Design of NAWAM project and preparation of project report and project implementation plan for world Bank Appraisal Prior Review 2 DSWRPP-1/CS/QCBS/ 02 R A 4.0890 QCBS 05-Oct-2007 04-Nov-2007 14-Nov-2007 24-Nov-2007 04-Dec-2007 18-Jan-2008 03-Mar-2008 13-Mar-2008 Contract Awarded 216,876,057.28 05-Oct-2007 10-Dec-2007 19-Mar-2008 02-May-2008 07-May-2008 10-Jul-2008 06-Nov-2008 12-Apr-2009 PP Poyry Energy ltd DSWRPP-1/CS/QCBS/02 CHF 2,391,461.00 LKR 101,000,000.00 24-May-2012 Consulting Services for Dam Safety & Operational Efficiency Improvements Prior Review 2 DSWRPP-1/CS/SSS/02 -01 R A 0.0200 SSS 28-Jan-2009 02-Feb-2009 Completed 1,574,769.01 28-Jan-2009 02-Feb-2009 PP R.K.Malhothra DSWRPP-1/CS/SSS/02-01 Per day US$ 65.00 US$ 615.00 10-Apr-2009 Individual Consultant to Review Designs Prepared by IAs-Part 1 3 DSWRPP-1/CS/QCBS/ 03 -01 R A 0.0050 QCBS 01-Jun-2007 01-Jul-2007 11-Jul-2007 21-Jul-2007 31-Jul-2007 14-Sep-2007 29-Oct-2007 Completed 10-Apr-2007 18-May-2007 25-May-2007 13-Jun-2007 PP EML Consultants (Private) Limited DSWRPP-1/CS/QCBS/03 -01 Rs 469,200.00 7-Feb-2008 Environmental Assessment - Ridiyagama 3 DSWRPP-1/CS/QCBS/ 03-02 R A 0.0050 QCBS 01-Jun-2007 01-Jul-2007 11-Jul-2007 21-Jul-2007 31-Jul-2007 14-Sep-2007 29-Oct-2007 Completed 3,182,614.67 10-Apr-2007 18-May-2007 25-May-2007 13-Jun-2007 PP EML Consultants (Private) Limited DSWRPP-1/CS/QCBS/03- 02 LKR 485,875.00 7-Feb-2008 Environmental Assessment - Tabbowa 3 DSWRPP-1/CS/QCBS/ 03-03 R A 0.0020 QCBS 01-Jun-2007 01-Jul-2007 11-Jul-2007 21-Jul-2007 31-Jul-2007 14-Sep-2007 29-Oct-2007 Completed 10-Apr-2007 18-May-2007 25-May-2007 13-Jun-2007 PP EML Consultants (Private) Limited DSWRPP-1/CS/QCBS/03- 03 Rs 230,000.00 20-Dec-2007 Environmental Assessment -Victoria 3 DSWRPP-1/CS/QCBS/ 03-04 R A 0.0050 QCBS 01-Jun-2007 01-Jul-2007 11-Jul-2007 21-Jul-2007 31-Jul-2007 14-Sep-2007 29-Oct-2007 Completed 10-Apr-2007 18-May-2007 25-May-2007 13-Jun-2007 PP EML Consultants (Private) Limited DSWRPP-1/CS/QCBS/03- 04 Rs 485,875.00 1-Feb-2008 Environmental Assessment - Inginimitiya 3 DSWRPP-1/CS/QCBS/ 03-05 R A 0.0240 QCBS 21-Apr-2008 21-May-2008 31-May-2008 10-Jun-2008 20-Jun-2008 04-Aug-2008 18-Sep-2008 Completed 2,732,410.31 21-Apr-2008 30-Sep-2008 08-Jul-2008 17-Jul-2008 15-Oct-2008 13-Nov-2008 01-Jan-2009 PP Engineering Consultants (Pvt) Ltd DSWRPP-1/CS/QCBS/03- 05 Rs 2,402,500.00 8-Mar-2010 Environmental Assessment -(Huruluwea, Tissawewa, Nachchaduwa, Nuwara wewa, Rajangana, Usgala-Siyambalangamuwa, Nalanda) 3 DSWRPP-1/CS/QCBS/ 03-06 R A 0.0250 QCBS 21-Apr-2008 21-May-2008 31-May-2008 10-Jun-2008 20-Jun-2008 04-Aug-2008 18-Sep-2008 Completed 2,850,400.00 21-Apr-2008 22-Sep-2008 08-Jul-2008 17-Jul-2008 02-Oct-2008 03-Nov-2008 30-Nov-2008 PP MG Consultants (Pvt) Ltd DSWRPP-1/CS/QCBS/03- 06 Rs 2,500,000.00 11-Jun-2010 Environmental Assessment - (Kothmale, Rantembe, Maduruoya, Kalawewa, Dambuluoya, Chandrikawewa, Kalatuwawa) 3 DSWRPP-1/CS/QCBS/ 03-07 R A 0.0040 QCBS 07-Jun-2007 07-Jul-2007 17-Jul-2007 27-Jul-2007 06-Aug-2007 20-Sep-2007 04-Nov-2007 Completed 335,104.00 05-Dec-2007 30-Jan-2008 05-Feb-2008 22-Aug-2008 PP EML Consultants (Private) Limited DSWRPP-1/CS/QCBS/03- 07 Rs 374,000.00 30-Sep-2009 Environmental Assessment - Bowatenna Page 1 of 3 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: doduong

Post on 30-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Dam Safety & Water Resources Planning Project (DSWRPP)

Procurement Plan for Consulting Services

AS On 06-September-2011

(Subject to Prior Review/Post Review)

IDA Credit Number : 4406-CE

Project ID: 093132

S

eri

al N

o

Package No Description of Services

Esti

mate

d C

ost(

US

$. M

illio

ns)

Meth

od

of

Sele

cti

on

@

Ad

vert

isin

g f

or

sh

ort

lis

tin

g (

EO

I) d

ate

TO

R/ sh

ort

list

to b

e f

inalish

ed

(d

ate

)

# R

FP

fin

al d

raft

to

be f

orw

ard

ed

to

th

e b

an

k (

date

)**

No

ob

jecti

on

fro

m b

an

k f

or

TO

R/ sh

ort

list/

fin

al R

FP

(d

ate

)**

RF

P Issu

ed

(

date

)

Pro

po

sal to

be r

eceiv

ed

by t

he p

roje

ct

Au

tho

riti

es (

date

)

Evalu

ati

on

to

be f

inalised

(T

ech

nic

al/ #

Co

mb

ined

/Dra

ft c

on

tract/

Fin

al

co

ntr

act)

(D

ate

)

No

ob

jecti

on

by t

he b

an

k (

Tech

nic

al /#

Co

mb

ined

/Dra

ft C

on

tract)

(D

ate

)**

Rem

ark

s

Co

ntr

act

Nu

mb

er,

Valu

e a

nd

Cu

rren

cy

Nam

e o

f C

on

su

ltan

t/ N

ati

on

ality

& Z

ip c

od

e, if

US

A

Serv

ice t

o b

e c

om

ple

ted

(d

ate

)

Wo

rld

Ban

k R

efe

ran

ce N

um

ber

EX

P. In

cu

rred

to

Date

(U

S$M

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Component1

1 DSWRPP/CS/QBS/01

R

A

0.7200 QBS 01-Jan-2006 01-Mar-2006 21-Mar-2006 23-Mar-2006 24-Mar-2006 05-Oct-2006 07-Jun-2006 07-Aug-2006 Completed

01-Jan-2006 01-Mar-2006 22-Mar-2006 07-Apr-2006 07-Apr-2006 19-May-2006 19-Jul-2006 21-Jul-2006

PP SMEC International (pty) ltd. AustraliaDSWRPP/CS/QBS/01

15-Feb-2007Design of NAWAM project and preparation of

project report and project implementation plan for

world Bank Appraisal

Prior Review

2 DSWRPP-1/CS/QCBS/

02R

A

4.0890 QCBS 05-Oct-2007 04-Nov-2007 14-Nov-2007 24-Nov-2007 04-Dec-2007 18-Jan-2008 03-Mar-2008 13-Mar-2008 Contract Awarded 216,876,057.28

05-Oct-2007 10-Dec-2007 19-Mar-2008 02-May-2008 07-May-2008 10-Jul-2008 06-Nov-2008 12-Apr-2009

PP Poyry Energy ltdDSWRPP-1/CS/QCBS/02

CHF 2,391,461.00

LKR 101,000,000.00

24-May-2012Consulting Services for Dam Safety & Operational

Efficiency Improvements

Prior Review

2 DSWRPP-1/CS/SSS/02

-01R

A

0.0200 SSS 28-Jan-2009 02-Feb-2009 Completed 1,574,769.01

28-Jan-2009 02-Feb-2009

PP R.K.MalhothraDSWRPP-1/CS/SSS/02-01

Per day US$ 65.00

US$ 615.00

10-Apr-2009Individual Consultant to Review Designs Prepared

by IAs-Part 1

3 DSWRPP-1/CS/QCBS/

03 -01R

A

0.0050 QCBS 01-Jun-2007 01-Jul-2007 11-Jul-2007 21-Jul-2007 31-Jul-2007 14-Sep-2007 29-Oct-2007 Completed

10-Apr-2007 18-May-2007 25-May-2007 13-Jun-2007

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/03

-01

Rs 469,200.00

7-Feb-2008Environmental Assessment - Ridiyagama

3 DSWRPP-1/CS/QCBS/

03-02R

A

0.0050 QCBS 01-Jun-2007 01-Jul-2007 11-Jul-2007 21-Jul-2007 31-Jul-2007 14-Sep-2007 29-Oct-2007 Completed 3,182,614.67

10-Apr-2007 18-May-2007 25-May-2007 13-Jun-2007

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/03-

02

LKR 485,875.00

7-Feb-2008Environmental Assessment - Tabbowa

3 DSWRPP-1/CS/QCBS/

03-03R

A

0.0020 QCBS 01-Jun-2007 01-Jul-2007 11-Jul-2007 21-Jul-2007 31-Jul-2007 14-Sep-2007 29-Oct-2007 Completed

10-Apr-2007 18-May-2007 25-May-2007 13-Jun-2007

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/03-

03

Rs 230,000.00

20-Dec-2007Environmental Assessment -Victoria

3 DSWRPP-1/CS/QCBS/

03-04R

A

0.0050 QCBS 01-Jun-2007 01-Jul-2007 11-Jul-2007 21-Jul-2007 31-Jul-2007 14-Sep-2007 29-Oct-2007 Completed

10-Apr-2007 18-May-2007 25-May-2007 13-Jun-2007

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/03-

04

Rs 485,875.00

1-Feb-2008Environmental Assessment - Inginimitiya

3 DSWRPP-1/CS/QCBS/

03-05R

A

0.0240 QCBS 21-Apr-2008 21-May-2008 31-May-2008 10-Jun-2008 20-Jun-2008 04-Aug-2008 18-Sep-2008 Completed 2,732,410.31

21-Apr-2008 30-Sep-2008 08-Jul-2008 17-Jul-2008 15-Oct-2008 13-Nov-2008 01-Jan-2009

PP Engineering Consultants (Pvt) LtdDSWRPP-1/CS/QCBS/03-

05

Rs 2,402,500.00

8-Mar-2010Environmental Assessment -(Huruluwea,

Tissawewa, Nachchaduwa, Nuwara wewa,

Rajangana, Usgala-Siyambalangamuwa, Nalanda)

3 DSWRPP-1/CS/QCBS/

03-06R

A

0.0250 QCBS 21-Apr-2008 21-May-2008 31-May-2008 10-Jun-2008 20-Jun-2008 04-Aug-2008 18-Sep-2008 Completed 2,850,400.00

21-Apr-2008 22-Sep-2008 08-Jul-2008 17-Jul-2008 02-Oct-2008 03-Nov-2008 30-Nov-2008

PP MG Consultants (Pvt) LtdDSWRPP-1/CS/QCBS/03-

06

Rs 2,500,000.00

11-Jun-2010Environmental Assessment - (Kothmale,

Rantembe, Maduruoya, Kalawewa, Dambuluoya,

Chandrikawewa, Kalatuwawa)

3 DSWRPP-1/CS/QCBS/

03-07R

A

0.0040 QCBS 07-Jun-2007 07-Jul-2007 17-Jul-2007 27-Jul-2007 06-Aug-2007 20-Sep-2007 04-Nov-2007 Completed 335,104.00

05-Dec-2007 30-Jan-2008 05-Feb-2008 22-Aug-2008

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/03-

07

Rs 374,000.00

30-Sep-2009Environmental Assessment - Bowatenna

Page 1 of 3

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb370910
Typewritten Text
64547

S

eri

al N

o

Package No Description of Services

Esti

mate

d C

ost(

US

$. M

illio

ns)

Meth

od

of

Sele

cti

on

@

Ad

vert

isin

g f

or

sh

ort

lis

tin

g (

EO

I) d

ate

TO

R/ sh

ort

list

to b

e f

inalish

ed

(d

ate

)

# R

FP

fin

al d

raft

to

be f

orw

ard

ed

to

th

e b

an

k (

date

)**

No

ob

jecti

on

fro

m b

an

k f

or

TO

R/ sh

ort

list/

fin

al R

FP

(d

ate

)**

RF

P Issu

ed

(

date

)

Pro

po

sal to

be r

eceiv

ed

by t

he p

roje

ct

Au

tho

riti

es (

date

)

Evalu

ati

on

to

be f

inalised

(T

ech

nic

al/ #

Co

mb

ined

/Dra

ft c

on

tract/

Fin

al

co

ntr

act)

(D

ate

)

No

ob

jecti

on

by t

he b

an

k (

Tech

nic

al /#

Co

mb

ined

/Dra

ft C

on

tract)

(D

ate

)**

Rem

ark

s

Co

ntr

act

Nu

mb

er,

Valu

e a

nd

Cu

rren

cy

Nam

e o

f C

on

su

ltan

t/ N

ati

on

ality

& Z

ip c

od

e, if

US

A

Serv

ice t

o b

e c

om

ple

ted

(d

ate

)

Wo

rld

Ban

k R

efe

ran

ce N

um

ber

EX

P. In

cu

rred

to

Date

(U

S$M

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

3 DSWRPP-1/CS/QCBS/

03-08R

A

0.0040 QCBS 07-Jun-2007 07-Jul-2007 17-Jul-2007 27-Jul-2007 06-Aug-2007 20-Sep-2007 04-Nov-2007 Completed 330,534.40

05-Dec-2007 30-Jan-2008 05-Feb-2008 22-Aug-2008

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/03-

08

Rs 368,900.00

30-Sep-2009Environmental Assessment - Polgolla

3 DSWRPP-1/CS/QCBS/

03-09R

A

0.0050 QCBS 07-Jun-2007 07-Jul-2007 17-Jul-2007 27-Jul-2007 06-Aug-2007 20-Sep-2007 04-Nov-2007 Completed 445,312.00

05-Dec-2007 30-Jan-2008 05-Feb-2008 22-Aug-2008

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/03-

09

Rs 497,000.00

30-Sep-2009Environmental Assessment - Kandalama

3 DSWRPP-1/CS/QCBS/

03-10R

A

0.0040 QCBS 07-Jun-2007 07-Jul-2007 17-Jul-2007 27-Jul-2007 06-Aug-2007 20-Sep-2007 04-Nov-2007 Completed 325,248.00

05-Dec-2007 30-Jan-2008 05-Feb-2008 22-Aug-2008

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/03-

10

Rs 363,000.00

30-Sep-2009Environmental Assessment - Randenigala

3 DSWRPP-1/CS/QCBS/

03-11R

A

0.0190 QCBS 21-Apr-2008 21-May-2008 31-May-2008 10-Jun-2008 20-Jun-2008 04-Aug-2008 18-Sep-2008 Completed 2,170,000.00

21-Apr-2008 30-Sep-2008 08-Jul-2008 17-Jul-2008 15-Oct-2008 13-Nov-2008 01-Jan-2009

PP Engineering Consultants (Pvt) LtdDSWRPP-1/CS/QCBS/03-

11

Rs 1,937,500.00

8-Mar-2010Environmental Assessment - (Parakrama

Samudraya, Minneriya, Giritale, Kaudulla, Kantale,

Vendarasan)

3 DSWRPP-1/CS/QCBS/

03-12R

A

0.0200 QCBS 21-Apr-2008 21-May-2008 31-May-2008 10-Jun-2008 20-Jun-2008 04-Aug-2008 18-Sep-2008 Completed 1,270,352.16

21-Apr-2008 22-Sep-2008 08-Jul-2008 17-Jul-2008 02-Oct-2008 03-Nov-2008 10-Feb-2009

PP MG Consultants (Pvt) LtdDSWRPP-1/CS/QCBS/03-

12

Rs 1,105,500.00

6-Apr-2010Environmental Assessment (Laxapana, Norton,

Castlereagh, Canyon)

4 DSWRPP-1/CS/QBS/0

4-01R

A

0.0730 QBS 01-Jan-2008 31-Jan-2008 10-Feb-2008 01-Mar-2008 15-Apr-2008 30-May-2008 Contract Awarded 6,529,484.54

03-Apr-2008 01-Jul-2008 23-Sep-2008 15-Dec-2008 20-Jan-2009 20-Feb-2009

PP Engineering Consultants (Pvt) LtdDSWRPP-1/CS/QBS/04-01

Rs 8,400,000.00

Social safeguard management program for

Tabbowa

4 DSWRPP-1/CS/QBS/0

4-02R

A

0.0910 QBS 01-Jan-2008 31-Jan-2008 10-Feb-2008 20-Feb-2008 01-Mar-2008 15-Apr-2008 30-May-2008 Contract Awarded 6,633,488.40

03-Apr-2008 01-Jul-2008 23-Sep-2008 15-Dec-2008 20-Jan-2009 20-Feb-2009

PP MG Consultants (Pvt) LtdDSWRPP-1/CS/QBS/04-02

Rs 9,991,500.00

Social safeguard management program for

Ridiyagama

Prior Review

4 DSWRPP-1/CS/QCBS/

04-04R

A

0.1030 QCBS 01-Jan-2008 31-Jan-2008 10-Feb-2008 20-Feb-2008 01-Mar-2008 15-Apr-2008 30-May-2008 09-Jun-2008 Contract Awarded 8,819,146.39

04-Dec-2009 04-Dec-2009 20-Apr-2010 25-May-2010 19-Jul-2010

PP MG Consultants (Pvt) LtdDSWRPP-1/CS/QCBS/04-

04

Rs 15,401,750.00

3-Sep-2011Social safeguard management program for

Nachchaduwa Wewa

4 DSWRPP-1/CS/QCBS/

04-06R

A

0.0540 QCBS 01-Jan-2008 31-Jan-2008 10-Feb-2008 01-Mar-2008 15-Apr-2008 30-May-2008 Contract Awarded 5,741,579.36

04-Dec-2009 04-Dec-2009 20-Apr-2010 25-May-2010 19-Jul-2010

PP Infotechs IDEAS (Pvt) LtdDSWRPP-1/CS/QCBS/04-

06

Rs. 10,006,500.00

18-Aug-2011Social safeguard management program for Usgala

Siyambalangamuwa

4 DSWRPP-1/CS/QCBS/

04-07R

A

0.0460 QCBS 01-Jan-2008 31-Jan-2008 10-Feb-2008 01-Mar-2008 15-Apr-2008 30-May-2008 09-Jun-2008 Contract Awarded 2,950,213.26

04-Dec-2009

PP EML Consultants (Private) LimitedDSWRPP-1/CS/QCBS/04-

07

Rs. 5,152,250.00

Social safeguard management program for

Vendrasan

5 DSWRPP-1/CS/QCBS/

05R

A

0.4550 QCBS 01-Jan-2011 31-Jan-2011 10-Feb-2011 20-Feb-2011 02-Mar-2011 16-Apr-2011 31-May-2011 10-Jun-2011PPSpecial Studies for Critical Dams: Samanalawewa

(CEB) and Senanayake Samudra (ID) dams

Prior Review

6 DSWRPP-1/CS/SSS/06

R

A

0.2000 Individual 03-Jan-2012 31-Jan-2012 14-Feb-2012 28-Feb-2012 06-Mar-2012 03-Apr-2012 01-May-2012 15-May-2012PPInstitutional support and training Consultants

Prior Review

7 DSWRPP-1/CS/SSS/07

-01R

A

0.5270 SSS 01-Dec-2008 22-Dec-2008 12-Jan-2009 26-Jan-2009 09-Feb-2009

22-Jan-2008 22-Feb-2008 02-Feb-2009 9-Jan-2009

PPIndividual Consultants for dam safety review panal.

Prior Review

Component2

Page 2 of 3

S

eri

al N

o

Package No Description of Services

Esti

mate

d C

ost(

US

$. M

illio

ns)

Meth

od

of

Sele

cti

on

@

Ad

vert

isin

g f

or

sh

ort

lis

tin

g (

EO

I) d

ate

TO

R/ sh

ort

list

to b

e f

inalish

ed

(d

ate

)

# R

FP

fin

al d

raft

to

be f

orw

ard

ed

to

th

e b

an

k (

date

)**

No

ob

jecti

on

fro

m b

an

k f

or

TO

R/ sh

ort

list/

fin

al R

FP

(d

ate

)**

RF

P Issu

ed

(

date

)

Pro

po

sal to

be r

eceiv

ed

by t

he p

roje

ct

Au

tho

riti

es (

date

)

Evalu

ati

on

to

be f

inalised

(T

ech

nic

al/ #

Co

mb

ined

/Dra

ft c

on

tract/

Fin

al

co

ntr

act)

(D

ate

)

No

ob

jecti

on

by t

he b

an

k (

Tech

nic

al /#

Co

mb

ined

/Dra

ft C

on

tract)

(D

ate

)**

Rem

ark

s

Co

ntr

act

Nu

mb

er,

Valu

e a

nd

Cu

rren

cy

Nam

e o

f C

on

su

ltan

t/ N

ati

on

ality

& Z

ip c

od

e, if

US

A

Serv

ice t

o b

e c

om

ple

ted

(d

ate

)

Wo

rld

Ban

k R

efe

ran

ce N

um

ber

EX

P. In

cu

rred

to

Date

(U

S$M

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

8 DSWRPP-2/CS/QCBS/

08R

A

0.8840 QCBS 05-Oct-2007 04-Nov-2007 14-Nov-2007 24-Nov-2007 04-Dec-2007 18-Jan-2008 03-Mar-2008 13-Mar-2008 Contract Awarded 51,208,761.63

05-Oct-2007 23-Jun-2008 22-Jan-2009 16-May-2009 03-Jun-2009 12-Aug-2009

12-Sep-2009 26-Sep-2009

PP HYDROSULT IncDSWRPP-2/CS/QCBS/08

LKR 25,576,000.00

USD 637,600.00

28-Jan-2013Implementation Support for Upgrading &

Modernization of Hydrometerological Information

System

Prior Review

10 DSWRPP-2/CS/CQS/1

0R

A

0.0200 CQS 25-Oct-2010 24-Nov-2010 04-Dec-2010 14-Dec-2010 28-Jan-2011 14-Mar-2011 24-Mar-2011 Contract Awarded 273,000.00

13-Dec-2010 31-Dec-2010 07-Jan-2011 28-Jan-2011

PP Trend Tech SolutionsDSWRPP-2/CS/CQS/10

Rs 210,000.00

Consultancy Service for Restructuring of

Groundwater Data and Information

Component3

9 DSWRPP-3/CS/QCBS/

09R

A

3.7770 QCBS 05-Oct-2007 04-Nov-2007 14-Nov-2007 24-Nov-2007 04-Dec-2007 18-Jan-2008 03-Mar-2008 13-Mar-2008 Contract Awarded 98,986,223.92

05-Oct-2007 18-Mar-2008 19-Mar-2008 24-Apr-2008 25-Apr-2008 01-Jul-2008 06-Nov-2008 31-Jan-2009

PP SMEC International (pty) ltd. AustraliaDSWRPP-3/CS/QCBS/09

AUD 1,823,208.00

Rs 143,899,275.00

USD 317,225.00

Consulting Services for Multi Sector Water

Resources Planning

Prior Review

Component4

12 DSWRPP-4/CS/SSS/12

R

A

0.1980 SSS 01-Nov-2008 01-Dec-2008 11-Dec-2008 21-Dec-2008 31-Dec-2008 14-Feb-2009 31-Mar-2009 10-Apr-2009PPShort Term Consultants

Prior Review

13 DSWRPP-4/CS/SSS/13

R

A

0.0200 SSS 03-Jan-2008 02-Feb-2008 12-Feb-2008 22-Feb-2008 03-Mar-2008 17-Apr-2008 01-Jun-2008 11-Jun-2008 993,020.00

20-Feb-2008 15-Mar-2007 11-Apr-2007 19-Sep-2007 21-Nov-2007 30-Nov-2007 14-May-2008

PP Sri Lanka Institute of Information TechnologyDSWRPP-4/CS/SSS/13

Rs 1,773,250.00

Consultant for Management Information System

Prior Review

13 DSWRPP-4/CS/QCBS/

15R

A

0.0900 QCBS 02-Sep-2010 02-Oct-2010 12-Oct-2010 22-Oct-2010 01-Nov-2010 16-Dec-2010 30-Jan-2011 09-Feb-2011 Contract Awarded 6,784,428.00

11-Oct-2010 11-Jan-2011 11-Jan-2011 14-Jan-2011 08-Feb-2011

PP Resources Development Consultants(Pvt) LtdDSWRPP-4/CS/QCBS/15

Rs 5,938,750.00

Consultancy Service to Conduct Mid-Term

Evaluation

14 DSWRPP-4/CS/QCBS/

14R

A

0.0100 QCBS 15-Sep-2009 06-Oct-2009 27-Oct-2009 10-Nov-2009 01-Dec-2009 CompletedPP

Website for DSWRPP

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

Date

09/06/2011

Signature

Name & Designation

Page 3 of 3

Dam Safety and Water Resources Planning Project(DSWRPP)

PROCUREMENT PLAN FOR GOODS

(Subject to Prior Review/Post Review)

IDA Credit Number : 4406-CE

Project ID : 093132

As On 9/6/2011

Description of Good

Met

ho

d o

f P

rocu

rem

ent

ICB

/NC

B

E

stim

ated

Cos

t

(

US

$. M

illi

ons)

Im

ple

men

tin

g A

gen

cy

Package No

Seri

al N

o

Des

ign

/ In

ves

tiga

tio

n/

Sp

ecif

icat

ion

com

ple

ted

(D

ate)

Cal

lin

g P

req

ual

ific

atio

n &

Fin

ish

ing

the

Sh

ortl

ist

E

sti

mate

Pre

pare

d &

San

cti

on

ed

(D

ate

)

Pre

para

tio

n o

f B

id D

ocu

men

t -

Date

Ban

k's

No

Ob

jecti

on

to

Bid

Do

cu

men

t (D

ate

)**

Bid

In

vit

ati

on

Date

Bid

Op

en

ded

o

n

Date

Co

ntr

act

Aw

ard

decid

ed

(D

ate

/ V

alu

e / C

urr

en

cy)

Ban

k's

No

Ob

jecti

on

to

Co

ntr

act

Aw

ard

(D

ate

)**

Co

ntr

act

Sig

ned

(

Date

/V

alu

e/C

urr

en

cy)

Rem

ark

Co

ntr

act

No

.

Nam

e o

f C

on

tracto

r/N

ati

on

ality

& Z

ip C

od

e

** W

BR

No

.

Date

of

Co

mp

leti

on

of

Co

ntr

act.

Exp

en

dit

ure

in

cu

rred

to

Date

Bids

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 19 20

GOODS

18 7 21 22

Component1

1 DSWRPP-1/GOODS/IC

B/1

0.2590 02-Jan-2009 04-Mar-2009 09-Mar-2009 19-Mar-2009 29-Mar-2009 13-May-2009 07-Jul-2009 DeliveredICB

03-Dec-2008 15-Dec-2008 22-Apr-2009 02-Jun-2009 22-Jun-2009 11-Aug-2009 26-Nov-2009

14,057,385.00pp

A

R

PMU

01-Oct-2009

Lot 01

Rs 1,310,000.00

US$ 63,200.00

+Taxes

01-Oct-2009

Lot 02

Rs 3,559,000.00

04-Dec-2009

Lot 01

Rs 1,310,000.00

US$ 63,200.00

+Taxes

04-Dec-2009

Lot 02

Rs 3,559,000.00

DSWRPP-1/GOODS

/ICB/1Lot 01 Mackwoods Limited

Lot 02 E.B.Creasy &

Co.,PLC

Lot 01

31-Mar-2010

Lot 02

31-Mar-2010

27-Jun-2009 28-Jul-2009Generators (30KVA,3phase, wheel mounted diesel power -8 nos

and 5 KVA generator-20 nos)

Prior Review

2 DSWRPP-1/GOODS/IC

B/2

0.7500 01-Feb-2009 04-Mar-2010 09-Mar-2009 19-Mar-2009 14-Apr-2009 29-May-2009 23-Jul-2009 Contract AwardedICB

03-Jun-2010 14-Jun-2010 21-Jun-2010 17-Aug-2010 19-Aug-2010 07-Oct-2010 29-Nov-2010

03-Jan-2010 03-Feb-2010 08-Feb-2010 18-Feb-2010 16-Mar-2010 30-Apr-2010 24-Jun-2010

151,876,329.93pp

A

R

PMU

09-Nov-2010

JPY 88,386,225.00

LKR 2,000,000.00

+VAT +Taxes

06-Dec-2010

JPY 88,386,225.00

LKR 2,000,000.00

+VAT +Taxes

DSWRPP-1/GOODS

/ICB/2 Senok Trade Combine (Pvt)

Ltd

13-Jul-2009 13-Aug-2009Trucks (Diesel truck with crane 5KVA AC welding generator and oxy

acetalene cutter/welding set)

Prior Review

3 DSWRPP-1/GOODS/IC

B/3

0.9390 01-Feb-2009 04-Mar-2009 09-Mar-2009 19-Mar-2009 14-Apr-2009 29-May-2009 23-Jul-2009 DeliveredICB

03-Dec-2008 15-Dec-2008 26-Jan-2009 02-Jun-2009 22-Jun-2009 22-Sep-2009 04-Jan-2010

87,148,073.96pp

A

R

PMU

30-Dec-2009

GBP 456,000.00

+VAT

19-Jan-2010

GBP 456,000.00

+VAT

DSWRPP-1/GOODS

/ICB/3 Senok Trade Combine (Pvt)

Ltd

04-Jun-201013-Jul-2009 13-Aug-2009Back hoe loader (JCB 3CX class or equivalent)

Prior Review

4 DSWRPP-1/GOODS/N

CB/4

0.0840 01-Dec-2008 01-Jan-2009 06-Jan-2009 11-Feb-2009 28-Mar-2009 DeliveredNCB

03-Dec-2008 15-Dec-2008 15-Dec-2008 10-Feb-2009 11-Mar-2009

17,311,650.35pp

A

R

PMU

21-May-2009

Rs 15,144,571.46

+VAT 12%

27-May-2009

Rs 15,144,571.46

+VAT 12%

DSWRPP-1/GOODS

/NCB/4 Danusha Marine Lanka

(Pvt)Ltd

05-Nov-200912-May-2009 2-Jun-2009Boats: (19 feet fibre glass boat with 25 HP outboard motor - 26 nos)

4 DSWRPP-1/GOODS/S/

4-1

0.0060 20-Nov-2009 21-Dec-2009 26-Dec-2009 31-Jan-2010 21-Feb-2010 DeliveredSHOPP

ING

18-Dec-2009 21-Dec-2009 22-Dec-2009 28-Dec-2009 15-Jan-2010

407,680.00pp

A

R

PMU

15-Jan-2010

Rs 364,000.00

+VAT 12%

15-Feb-2010

Rs 364,000.00

+VAT 12%

DSWRPP-1/GOODS

/S/4-1 Safety International 01-Sep-20107-Apr-2010 28-Apr-2010Safety Jackets for Inspection Boats

4 DSWRPP-1/GOODS/S/

4-2

0.0020 20-Nov-2009 21-Dec-2009 26-Dec-2009 31-Jan-2010 21-Feb-2010 DeliveredSHOPP

ING

12-Nov-2009 16-Nov-2009 18-Nov-2009 20-Nov-2009 02-Dec-2009

295,540.19pp

A

R

PMU

23-Dec-2009

Rs 263,875.00

+VAT 12%

07-Jan-2010

Rs 263,875.00

+VAT 12%

DSWRPP-1/GOODS

/S/4-2 Danusha Marine Lanka

(Pvt)Ltd

03-Mar-20107-Apr-2010 28-Apr-2010Oars for Inspection Boats

5 DSWRPP-1/GOODS/N

CB/5

0.0950 01-Dec-2008 01-Jan-2009 06-Jan-2009 11-Feb-2009 28-Mar-2009 DeliveredNCB

03-Dec-2008 15-Dec-2008 15-Dec-2008 10-Feb-2009 11-Mar-2009

11,751,631.36pp

A

R

PMU

21-May-2009

Lot 01

Rs. 10,262,400.00

+VAT 12%

15-Jun-2009

Lot 01

Rs. 10,262,400.00

+VAT 12%

DSWRPP-1/GOODS

/NCB/5Lot 01 Ceyco Metal

Merchants (Pvt) Ltd

Lot 01

20-Nov-2009

12-May-2009 2-Jun-2009Basic facilities-other machineries:(80 nos of chain saws, 80 nos of

Tirfort winches)

5 DSWRPP-1/GOODS/S/

5-1

0.0240 01-Dec-2008 01-Aug-2009 10-Aug-2009 20-Aug-2009 02-Sep-2009 DeliveredSHOPP

ING

03-Dec-2008 28-Jul-2009 28-Jul-2009 20-Aug-2009 03-Sep-2009

3,886,400.00pp

A

R

PMU

17-Sep-2009

LKR 3,470,000.00

+VAT 12%

22-Sep-2009

LKR 3,470,000.00

+VAT 12%

DSWRPP-1/GOODS

/S/5-1 Diesel and Motor

Engineering Co.Ltd

02-Jan-201017-Oct-2009 7-Nov-200980 nos of portable grass cutters

6 DSWRPP-1/GOODS/IC

B/6

1.0960 11-May-2010 11-Jun-2010 16-Jun-2010 26-Jun-2010 22-Jul-2010 05-Sep-2010 30-Oct-2010ICB

03-Jul-2011 03-Aug-2011 08-Aug-2011 18-Aug-2011 13-Sep-2011 28-Sep-2011 22-Dec-2011

pp

A

R

PMU DSWRPP-1/GOODS

/ICB/6 20-Oct-2010 20-Nov-2010E & M System upgrades and SCADA system studies and

installation

Prior Review

7 DSWRPP-1/GOODS/S/

7

0.0100 01-Jan-2009 01-Feb-2009 06-Feb-2009 14-Mar-2009 04-Apr-2009SHOPP

ING 01-Oct-2011 01-Nov-2011 06-Nov-2011 12-Dec-2011 02-Jan-2012

pp

A

R

PMU DSWRPP-1/GOODS

/S/7 19-May-2009 9-Jun-2009Telecommunication equipments ( Radio hand phones)

Page 1 of 8

Description of Good

Met

ho

d o

f P

rocu

rem

ent

ICB

/NC

B

E

stim

ated

Cos

t

(

US

$. M

illi

on

s)

Im

ple

men

tin

g A

gen

cy

Package No

Seri

al N

o

Des

ign

/ In

vest

iga

tion

/ S

pec

ific

ati

on c

om

ple

ted

(D

ate)

Cal

lin

g P

req

ual

ific

ati

on &

Fin

ish

ing

th

e S

hor

tlis

t

E

sti

mate

Pre

pare

d &

San

cti

on

ed

(D

ate

)

Pre

para

tio

n o

f B

id D

ocu

men

t -

Date

Ban

k's

No

Ob

jecti

on

to

Bid

Do

cu

men

t (D

ate

)**

Bid

In

vit

ati

on

Date

Bid

Op

en

ded

o

n

Date

Co

ntr

act

Aw

ard

decid

ed

(D

ate

/ V

alu

e / C

urr

en

cy)

Ban

k's

No

Ob

jecti

on

to

Co

ntr

act

Aw

ard

(D

ate

)**

Co

ntr

act

Sig

ned

(

Date

/V

alu

e/C

urr

en

cy)

Rem

ark

Co

ntr

act

No

.

Nam

e o

f C

on

tracto

r/N

ati

on

ality

& Z

ip C

od

e

** W

BR

No

.

Date

of

Co

mp

leti

on

of

Co

ntr

act.

Exp

en

dit

ure

in

cu

rred

to

Date

Bids

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 19 20

GOODS

18 7 21 22

8 DSWRPP-1/GOODS/N

CB/8

0.2240 01-Dec-2010 01-Jan-2011 06-Jan-2011 16-Jan-2011 11-Feb-2011 28-Mar-2011 22-May-2011NCB

15-Dec-2011 15-Jan-2012 20-Jan-2012 30-Jan-2012 25-Feb-2012 10-Apr-2012 04-Jun-2012

pp

A

R

PMU DSWRPP-1/GOODS

/NCB/8 12-May-2011 12-Jun-2011 Earthquake monitoring and early warning system

Prior Review

9 DSWRPP-1/GOODS/IC

B/9-1

0.4240 01-Feb-2011 04-Mar-2011 09-Mar-2011 19-Mar-2011 14-Apr-2011 05-May-2011 29-Jun-2011ICB

11-Nov-2011 12-Dec-2011 17-Dec-2011 27-Dec-2011 22-Jan-2012 07-Mar-2012 01-May-2012

pp

A

R

PMU DSWRPP-1/GOODS

/ICB/9-1 19-Jun-2011 20-Jul-2011Other equipments-early warning equipment

Prior Review

9 DSWRPP-1/GOODS/IC

B/9-2

0.4240 01-Jun-2010 02-Jul-2010 07-Jul-2010 17-Jul-2010 12-Aug-2010 02-Sep-2010 27-Oct-2010ICB

11-Nov-2011 12-Dec-2011 17-Dec-2011 27-Dec-2011 22-Jan-2012 07-Mar-2012 01-May-2012

pp

A

R

PMU DSWRPP-1/GOODS

/ICB/9-2 17-Oct-2010 17-Nov-2010Other equipments-sluice barrel inspection equipments

Prior Review

9 DSWRPP-1/GOODS/IC

B/9-3

0.4240 01-Nov-2009 02-Dec-2009 07-Dec-2009 17-Dec-2009 12-Jan-2010 02-Feb-2010 29-Mar-2010ICB

11-Nov-2011 12-Dec-2011 17-Dec-2011 27-Dec-2011 22-Jan-2012 07-Mar-2012 01-May-2012

pp

A

R

PMU DSWRPP-1/GOODS

/ICB/9-3 19-Mar-2010 19-Apr-2010Other equipments-Dam monitoring equipments

Prior Review

10 DSWRPP-1/GOODS/S/

10 - 1

0.0230 01-Oct-2010 01-Nov-2010 06-Nov-2010 12-Dec-2010 02-Jan-2011SHOPP

ING 10-Aug-2011 10-Sep-2011 18-Sep-2011 21-Oct-2011 11-Nov-2011

pp

A

R

PMU DSWRPP-1/GOODS

/S/10 - 1 16-Feb-2011 9-Mar-2011CCTV Systems

10 DSWRPP-1/GOODS/S/

10 - 2

0.0370 01-Jan-2009 01-Feb-2009 06-Feb-2009 14-Mar-2009 04-Apr-2009 DiliveredSHOPP

ING

02-Feb-2009 03-Feb-2009 05-Feb-2009 06-Feb-2009 04-Jul-2009

1,680,000.00pp

A

R

PMU

21-Apr-2009

Rs 1,512,000.00

24-Apr-2009

Rs 1,512,000.00

DSWRPP-1/GOODS

/S/10 - 2 Uniwalkers Pvt Ltd 22-Jun-200919-May-2009 9-Jun-2009 Digital camera

11 DSWRPP-1/GOODS/S/

11-1

0.0100 01-Apr-2008 02-May-2008 07-May-2008 12-Jun-2008 03-Jul-2008 DeliveredSHOPP

ING

07-Jan-2008 01-Jan-2008 01-Jan-2008 07-Jan-2008 28-Jan-2008

pp

A

R

PMU

11-Feb-2008

Rs 600,000.00

12-Feb-2008

Rs 600,000.00

DSWRPP-1/GOODS

/S/11-1 Scientific Business Systems

(Pvt) Ltd.

13-Feb-200817-Aug-2008 7-Sep-2008Survey equipment Lot 1

11 DSWRPP-1/GOODS/N

CB/11-2

0.0700 10-Jan-2011 10-Feb-2011 15-Feb-2011 22-Mar-2011 13-Apr-2011NCBpp

A

R

PMU DSWRPP-1/GOODS

/NCB/11-2 28-May-2011 18-Jun-2011Inspection equipment

11 DSWRPP-1/GOODS/N

CB/11-3

0.1570 29-Apr-2011 30-May-2011 04-Jun-2011 14-Jun-2011 10-Jul-2011 31-Jul-2011 24-Sep-2011NCB

10-Feb-2012 12-Mar-2012 17-Mar-2012 27-Mar-2012 22-Apr-2012 13-May-2012 07-Jul-2012

pp

A

R

PMU DSWRPP-1/GOODS

/NCB/11-3 14-Sep-2011 15-Oct-2011Instrumentation of Laxapana Complex

Prior Review

11 DSWRPP-1/GOODS/S/

11-4

0.0500 10-May-2011 10-May-2011 15-Jun-2011 21-Jul-2011 11-Aug-2011SHOPP

ING

pp

A

R

PMU DSWRPP-1/GOODS

/S/11-4 25-Sep-2011 16-Oct-2011Survey equipment Lot 2

22 DSWRPP-1/GOODS/S/

22-1

0.0080 25-Nov-2009 26-Dec-2009 31-Dec-2009 05-Feb-2010 26-Feb-2010 DeliveredSHOPP

ING

17-Jun-2010 24-Jun-2010 02-Jul-2010 05-Jul-2010 15-Jul-2010

557,510.00pp

A

R

PMU

10-Mar-2010

Lot 02

Rs 36,000.00

03-Mar-2010

Lot 01

Rs. 275,000.00

10-Mar-2010

Lot 03

Rs. 7,000.00

28-Jul-2010

Lot 04

Rs. 189,000.00 0.00

22-Mar-2010

Lot 02

Rs 36,000.00

22-Mar-2010

Lot 01

Rs. 275,000.00

22-Mar-2010

Lot 03

Rs. 7,000.00

03-Aug-2010

Lot 04

Rs. 189,000.00

0.00

DSWRPP-1/GOODS

/S/22-1Lot 02 Metropolitan Pvt Ltd

Lot 01 Ceylon Business

Appliance (Pvt) Ltd

Lot 03 Metrpoliton

Computers(Pvt)Ltd

Lot 04 Winsoft

Technologies (Pvt) Ltd

Lot 02

Lot 01

Lot 03

Lot 04

12-Apr-2010 3-May-2010IT equipments for Social Safeguard Management Programme

22 DSWRPP-1/GOODS/S/

22-2

0.0100 25-Nov-2009 26-Dec-2009 31-Dec-2009 05-Feb-2010 26-Feb-2010 DeliveredSHOPP

ING

07-Dec-2009 12-Feb-2010 24-Feb-2010

516,000.00pp

A

R

PMU

22-Mar-2010

Rs. 433,928.57

+VAT

30-Mar-2010

Rs. 433,928.57

+VAT

DSWRPP-1/GOODS

/S/22-2 Siedles (Pvt) Ltd 17-Mar-201012-Apr-2010 3-May-2010Video Camera and Accessories

22 DSWRPP-1/GOODS/S/

22-3

0.0050 25-Nov-2009 26-Dec-2009 31-Dec-2009 05-Feb-2010 26-Feb-2010 DeliveredSHOPP

ING

07-Dec-2009 09-Dec-2009 11-Dec-2009 11-Dec-2009 28-Dec-2009

509,775.05pp

A

R

PMU

15-Jan-2010

Rs. 427,486.50

+VAT

01-Feb-2010

Rs. 427,486.50

+VAT

DSWRPP-1/GOODS

/S/22-3 Siedles (Pvt) Ltd 22-Feb-201012-Apr-2010 3-May-2010Digital Cameras

Page 2 of 8

Description of Good

Met

ho

d o

f P

rocu

rem

ent

ICB

/NC

B

E

stim

ated

Cos

t

(

US

$. M

illi

on

s)

Im

ple

men

tin

g A

gen

cy

Package No

Seri

al N

o

Des

ign

/ In

vest

iga

tion

/ S

pec

ific

ati

on c

om

ple

ted

(D

ate)

Cal

lin

g P

req

ual

ific

ati

on &

Fin

ish

ing

th

e S

hor

tlis

t

E

sti

mate

Pre

pare

d &

San

cti

on

ed

(D

ate

)

Pre

para

tio

n o

f B

id D

ocu

men

t -

Date

Ban

k's

No

Ob

jecti

on

to

Bid

Do

cu

men

t (D

ate

)**

Bid

In

vit

ati

on

Date

Bid

Op

en

ded

o

n

Date

Co

ntr

act

Aw

ard

decid

ed

(D

ate

/ V

alu

e / C

urr

en

cy)

Ban

k's

No

Ob

jecti

on

to

Co

ntr

act

Aw

ard

(D

ate

)**

Co

ntr

act

Sig

ned

(

Date

/V

alu

e/C

urr

en

cy)

Rem

ark

Co

ntr

act

No

.

Nam

e o

f C

on

tracto

r/N

ati

on

ality

& Z

ip C

od

e

** W

BR

No

.

Date

of

Co

mp

leti

on

of

Co

ntr

act.

Exp

en

dit

ure

in

cu

rred

to

Date

Bids

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 19 20

GOODS

18 7 21 22

22 DSWRPP-1/GOODS/S/

22-4

0.0070 25-Nov-2009 26-Dec-2009 31-Dec-2009 05-Feb-2011 26-Feb-2011SHOPP

ING 10-Dec-2011 10-Jan-2012 15-Jan-2012 20-Feb-2012 12-Mar-2012

pp

A

R

PMU DSWRPP-1/GOODS

/S/22-4 12-Apr-2011 3-May-2011Printing of IEC materials Lot 1

22 DSWRPP-1/GOODS/S/

22-5

0.0040 15-Feb-2011 18-Mar-2011 23-Mar-2011 28-Mar-2011 19-Mar-2011SHOPP

ING 05-Feb-2012 07-Mar-2012 12-Mar-2012 17-Apr-2012 08-May-2012

pp

A

R

PMU DSWRPP-1/GOODS

/S/22-5 3-Jul-2011 24-Jul-2011Printing of IEC materials Lot 2

22 DSWRPP-1/GOODS/S/

22-6

0.0050 15-Dec-2009 15-Jan-2010 20-Jan-2010 25-Feb-2010 18-Mar-2010 DeliveredSHOPP

ING

07-Dec-2009 03-Feb-2010 12-Feb-2010 12-Feb-2010 24-Feb-2010

1,044,400.00pp

A

R

PMU

06-Apr-2010

Rs. 932,500.00

+VAT

19-Apr-2010

Rs. 932,500.00

+VAT

DSWRPP-1/GOODS

/S/22-6 Integrated Communication

System (Pvt) Ltd

17-May-20102-May-2010 23-May-2010Hand held GPS Receiver

Component2

12 DSWRPP-2/GOODS/IC

B/12

5.2990 20-Jul-2010 19-Aug-2010 19-Sep-2010 03-Oct-2010 17-Oct-2010 22-Nov-2010 06-Jan-2011 06-Mar-2011ICB

09-Sep-2010 15-Sep-2010 24-Sep-2010 12-May-2011 20-May-2011 19-Jul-2011

pp

A

R

PMU DSWRPP-2/GOODS

/ICB/12 20-Feb-2011 27-Mar-2011The Supply, Installation, and Technological Transfer of a Complete

Hydro-Meteorological Information System Including Field

Observation Sites, Data Bases, & Modelling Tools

Prior Review

13 DSWRPP-2/GOODS/N

CB/13-1

0.0900 20-Oct-2010 27-Oct-2010 10-Nov-2010 24-Nov-2010 15-Dec-2010 19-Jan-2011NCB

21-Apr-2011 24-May-2011

pp

A

R

PMU DSWRPP-2/GOODS

/NCB/13-1 5-Jan-2011 2-Feb-2011Macrobiological Laboratory Equipment

13 DSWRPP-2/GOODS/N

CB/13-2

0.2000 25-Oct-2010 01-Nov-2010 15-Nov-2010 29-Nov-2010 29-Nov-2010 20-Dec-2010 24-Jan-2011NCB

25-Jul-2011 01-Aug-2011 15-Aug-2011 29-Aug-2011 30-Aug-2011 20-Sep-2011 25-Oct-2011

pp

A

R

PMU DSWRPP-2/GOODS

/NCB/13-2 10-Jan-2011 7-Feb-2011Chemical Laboratory Equipment

Prior Review

13 DSWRPP-2/GOODS/S/

13-3

0.0300 05-Dec-2010 12-Dec-2010 09-Jan-2011 Contract awardedSHOPP

ING

21-Feb-2011 08-Mar-2011 21-Mar-2011

pp

A

R

PMU

03-Jun-2011

Lot 02

Rs 249,151.76

+VAT 0.00

Lot 01

Rs 1,256,147.24

+VAT 0.00

Lot 03

Rs 1,292,250.00

Lot 04

Rs 212,500.00

+VAT 0.00

Lot 05

Rs 254,650.88

+VAT 0.00

Lot 06

Rs 23,758.00

+VAT 0.00

Lot 02

Rs 249,151.76

+VAT 0.00

Lot 01

Rs 1,256,147.24

+VAT 0.00

Lot 03

Rs 1,292,250.00

Lot 04

Rs 212,500.00

+VAT 0.00

Lot 05

Rs 254,650.88

+VAT 0.00

Lot 06

Rs 23,758.00

+VAT 0.00

DSWRPP-2/GOODS

/S/13-3Lot 02 M/s Analytical

Instruments (Pvt) Ltd

Lot 01 M/s Analytical

Instruments (Pvt) Ltd

Lot 03 M/s Analytical

Instruments (Pvt) Ltd

Lot 04 M/s Analytical

Instruments (Pvt) Ltd

Lot 05 M/s Analytical

Instruments (Pvt) Ltd

Lot 06 M/s Analytical

Instruments (Pvt) Ltd

Lot 02

Lot 01

Lot 03

Lot 04

Lot 05

Lot 06

13-Feb-2011 27-Feb-2011Chemicals

13 DSWRPP-2/GOODS/D

C/13-4

0.0700 27-Jan-2011 01-Feb-2011 DeliveredDC 2,766,233.72pp

A

R

PMU

27-Apr-2011

USD 25,199.10

27-Apr-2011

USD 25,199.10

DSWRPP-2/GOODS

/DC/13-4 M/s Schlumberger Water

Services

15-Feb-2011Software AquaChem, Aquifer Test Pro and Visual MODFLOW

Premium

Prior Review

13 DSWRPP-2/GOODS/S/

13-5

0.0100 15-Oct-2010 22-Oct-2010 05-Nov-2010 19-Nov-2010 10-Dec-2010 DeliveredSHOPP

ING

10-Dec-2010 30-Dec-2010 09-Feb-2011 28-Feb-2011

364,000.00pp

A

R

PMU

08-Apr-2011

325,000.00 0.00

+VAT 0.00

325,000.00 0.00

+VAT 0.00

DSWRPP-2/GOODS

/S/13-5 M/s Amerasian (Pvt) Ltd24-Dec-2010 7-Jan-2011Navigation & Surveying Equipments

13 DSWRPP-2/GOODS/N

CB/13-6

0.2000 25-Sep-2011 02-Oct-2011 16-Oct-2011 30-Oct-2011 30-Oct-2011 20-Nov-2011 25-Dec-2011NCB

31-May-2011 08-Jun-2011 06-Jul-2011

pp

A

R

PMU DSWRPP-2/GOODS

/NCB/13-6 11-Dec-2011 8-Jan-2012Geophysical Measuring Equipments

Prior Review

13 DSWRPP-2/GOODS/N

CB/13-7

0.1600 25-Sep-2011 02-Oct-2011 16-Oct-2011 30-Oct-2011 30-Oct-2011 20-Nov-2011 25-Dec-2011NCB

12-Sep-2010 28-Jan-2011 31-Jan-2011 21-Mar-2011 25-Mar-2011 20-Apr-2011

pp

A

R

PMU DSWRPP-2/GOODS

/NCB/13-7 11-Dec-2011 8-Jan-2012Field Equipments

Prior Review

Page 3 of 8

Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight

Description of Good

Met

ho

d o

f P

rocu

rem

ent

ICB

/NC

B

E

stim

ated

Cos

t

(

US

$. M

illi

on

s)

Im

ple

men

tin

g A

gen

cy

Package No

Seri

al N

o

Des

ign

/ In

vest

iga

tion

/ S

pec

ific

ati

on c

om

ple

ted

(D

ate)

Cal

lin

g P

req

ual

ific

ati

on &

Fin

ish

ing

th

e S

hor

tlis

t

E

sti

mate

Pre

pare

d &

San

cti

on

ed

(D

ate

)

Pre

para

tio

n o

f B

id D

ocu

men

t -

Date

Ban

k's

No

Ob

jecti

on

to

Bid

Do

cu

men

t (D

ate

)**

Bid

In

vit

ati

on

Date

Bid

Op

en

ded

o

n

Date

Co

ntr

act

Aw

ard

decid

ed

(D

ate

/ V

alu

e / C

urr

en

cy)

Ban

k's

No

Ob

jecti

on

to

Co

ntr

act

Aw

ard

(D

ate

)**

Co

ntr

act

Sig

ned

(

Date

/V

alu

e/C

urr

en

cy)

Rem

ark

Co

ntr

act

No

.

Nam

e o

f C

on

tracto

r/N

ati

on

ality

& Z

ip C

od

e

** W

BR

No

.

Date

of

Co

mp

leti

on

of

Co

ntr

act.

Exp

en

dit

ure

in

cu

rred

to

Date

Bids

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 19 20

GOODS

18 7 21 22

13 DSWRPP-2/GOODS/N

CB/13-8

0.1700 20-Feb-2011 27-Feb-2011 13-Mar-2011 27-Mar-2011 27-Mar-2011 17-Apr-2011 22-May-2011NCBpp

A

R

PMU DSWRPP-2/GOODS

/NCB/13-8 8-May-2011 5-Jun-2011Mobile Laboratory Unit

Prior Review

13 DSWRPP-2/GOODS/S/

13-9

0.0090 15-Nov-2010 22-Nov-2010 06-Dec-2010 20-Dec-2010 10-Jan-2011 DeliveredSHOPP

ING

08-Mar-2011 21-Mar-2011

pp

A

R

PMU

09-Jun-2011

Lot 02

Rs 448,000.00

09-Jun-2011

Lot 06

Rs 331,500.00

+VAT 0.00

09-Jun-2011

Lot 03

Rs 107,700.00

09-Jun-2011

Lot 04

Rs 104,800.00

16-Jun-2011

Lot 02

Rs 448,000.00

21-Jun-2011

Lot 06

Rs 331,500.00

+VAT 0.00

21-Jun-2011

Lot 03

Rs 107,700.00

21-Jun-2011

Lot 04

Rs 104,800.00

DSWRPP-2/GOODS

/S/13-9Lot 02 E-W information

system

Lot 06 Softlogic Pvt Ltd.,

Lot 03 M/s Lapro

Technologies (Pvt) Ltd

Lot 04 John Keels Office

Automation (Pvt) Ltd.

Abans (Pvt) Ltd

Lot 02

Lot 06

Lot 03

Lot 04

24-Jan-2011 7-Feb-2011Computer & Printers

13 DSWRPP-2/GOODS/S/

13-10

0.0030 15-Nov-2010 22-Nov-2010 06-Dec-2010 20-Dec-2010 10-Jan-2011SHOPP

ING

pp

A

R

PMU DSWRPP-2/GOODS

/S/13-10 24-Jan-2011 7-Feb-2011Furnitures

13 DSWRPP-2/GOODS/S/

13-11

0.0080 15-Nov-2010 22-Nov-2010 06-Dec-2010 20-Dec-2010 10-Jan-2011 DeliveredSHOPP

ING

10-Dec-2010 28-Dec-2010 29-Dec-2011 08-Feb-2011 28-Feb-2011

2,987,040.00pp

A

R

PMU

31-Mar-2011

Lot 01

1,298,000.00 0.00

+VAT 0.00

31-Mar-2011

Lot 04

Rs 33,000.00

+VAT 0.00

31-Mar-2011

Lot 02

499,000.00 0.00

31-Mar-2011

Lot 03

837,000.00 0.00

+VAT 0.00

07-Apr-2011

Lot 01

1,298,000.00 0.00

+VAT 0.00

Lot 04

Rs 33,000.00

+VAT 0.00

07-Apr-2011

Lot 02

499,000.00 0.00

07-Apr-2011

Lot 03

837,000.00 0.00

+VAT 0.00

DSWRPP-2/GOODS

/S/13-11Lot 01 Metropolitan

Office(Pvt)Ltd

Lot 04 John Keels Office

Automation (Pvt) Ltd.

Lot 02 Metropolitan

Office(Pvt)Ltd

Lot 03 Metropolitan

Office(Pvt)Ltd

Lot 01

Lot 04

Lot 02

Lot 03

24-Jan-2011 7-Feb-2011Photocopiers and Fax Machine

13 DSWRPP-2/GOODS/S/

13-12

0.0500 15-Feb-2011 22-Feb-2011 08-Mar-2011 22-Mar-2011 12-Apr-2011SHOPP

ING

pp

A

R

PMU DSWRPP-2/GOODS

/S/13-12 26-Apr-2011 10-May-2011Referegarators & Air Conditioners

13 DSWRPP-2/GOODS/D

C/13-13

0.0030 27-Jan-2011 01-Feb-2011 DeliveredDC

27-Apr-2011

415,574.33pp

A

R

PMU

USD 3,778.00

03-May-2011

USD 3,778.00

DSWRPP-2/GOODS

/DC/13-13 Rockware Inc11-Feb-2011Software Rockworks

Prior Review

13 DSWRPP-2/GOODS/D

C/13-14

0.0500 27-Jan-2011 01-Feb-2011 DeliveredDC

27-Apr-2011

5,211,428.57pp

A

R

PMU

27-Apr-2011

Rs 5,141,472.00

+VAT 0.00

Rs 5,141,472.00

+VAT 0.00

DSWRPP-2/GOODS

/DC/13-14 EMSO (Pvt) Ltd15-Feb-2011Software ArcGIS

Prior Review

13 DSWRPP-2/GOODS/S/

13-16

0.0300 18-Apr-2011 25-Apr-2011 09-May-2011 16-May-2011 06-Jun-2011SHOPP

ING

09-Jun-2011 21-Jun-2011

pp

A

R

PMU

21-Jul-2011

Rs 4,090,000.00

01-Aug-2011

Rs 4,090,000.00

DSWRPP-2/GOODS

/S/13-16 EMSO (Pvt) Ltd20-Jun-2011 4-Jul-2011Differential GPS

Prior Review

13 DSWRPP-2/GOODS/S/

13-17

0.0400 09-Aug-2011 16-Aug-2011 30-Aug-2011 06-Sep-2011 27-Aug-2011SHOPP

ING

pp

A

R

PMU DSWRPP-2/GOODS

/S/13-17 11-Oct-2011 25-Oct-2011Glass ware & apparatus for Chemical Laboratory

13 DSWRPP-2/GOODS/S/

13-18

0.0500 20-Jul-2011 27-Jul-2011 10-Aug-2011 17-Aug-2011 07-Sep-2011SHOPP

ING

pp

A

R

PMU DSWRPP-2/GOODS

/S/13-18 21-Aug-2011 5-Oct-201105 Nos Data Loggers

Page 4 of 8

Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight

Description of Good

Met

ho

d o

f P

rocu

rem

ent

ICB

/NC

B

E

stim

ated

Cos

t

(

US

$. M

illi

on

s)

Im

ple

men

tin

g A

gen

cy

Package No

Seri

al N

o

Des

ign

/ In

vest

iga

tion

/ S

pec

ific

ati

on c

om

ple

ted

(D

ate)

Cal

lin

g P

req

ual

ific

ati

on &

Fin

ish

ing

th

e S

hor

tlis

t

E

sti

mate

Pre

pare

d &

San

cti

on

ed

(D

ate

)

Pre

para

tio

n o

f B

id D

ocu

men

t -

Date

Ban

k's

No

Ob

jecti

on

to

Bid

Do

cu

men

t (D

ate

)**

Bid

In

vit

ati

on

Date

Bid

Op

en

ded

o

n

Date

Co

ntr

act

Aw

ard

decid

ed

(D

ate

/ V

alu

e / C

urr

en

cy)

Ban

k's

No

Ob

jecti

on

to

Co

ntr

act

Aw

ard

(D

ate

)**

Co

ntr

act

Sig

ned

(

Date

/V

alu

e/C

urr

en

cy)

Rem

ark

Co

ntr

act

No

.

Nam

e o

f C

on

tracto

r/N

ati

on

ality

& Z

ip C

od

e

** W

BR

No

.

Date

of

Co

mp

leti

on

of

Co

ntr

act.

Exp

en

dit

ure

in

cu

rred

to

Date

Bids

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 19 20

GOODS

18 7 21 22

13 DSWRPP-2/GOODS/S/

13-19

0.0100 01-Aug-2011 08-Aug-2011 22-Aug-2011 29-Aug-2011 19-Sep-2011SHOPP

ING

pp

A

R

PMU DSWRPP-2/GOODS

/S/13-19 3-Oct-2011 17-Oct-2011Desktop Computers & Scanners

23 DSWRPP-2/GOODS/D

C/23

0.0100 30-Jun-2010 28-Jul-2010 08-Sep-2010 15-Sep-2010 13-Oct-2010 Contract AwardedDC 0.00pp

A

R

PMU

Rs 333,000.00

Rs 333,000.00

DSWRPP-2/GOODS

/DC/23 Survey Department17-Nov-2010 8-Dec-2010Obtaining Data for Ground Water Monitoring

Prior Review

25 DSWRPP-2/GOODS/S/

25-1

0.0300 28-Feb-2011 28-Mar-2011 09-May-2011 16-May-2011 13-Jun-2011 Contract AwardedSHOPP

ING

pp

A

R

PMU

21-Jul-2011

Lot 02

Rs 834,000.00

+VAT 0.00

21-Jul-2011

Lot 01

Rs 468,000.00

+VAT 0.00

21-Jul-2011

Lot 03

Rs 422,000.00

+VAT 0.00

21-Jul-2011

Lot 04

Rs 168,800.00

+VAT 0.00

01-Jul-2021

Lot 05

Rs 105,500.00

+VAT 0.00

21-Jul-2011

Lot 06

Rs 151,920.00

+VAT 0.00

Lot 02

Rs 834,000.00

+VAT 0.00

Lot 01

Rs 468,000.00

+VAT 0.00

Lot 03

Rs 422,000.00

+VAT 0.00

Lot 04

Rs 168,800.00

+VAT 0.00

Lot 05

Rs 105,500.00

+VAT 0.00

Lot 06

Rs 151,920.00

+VAT 0.00

DSWRPP-2/GOODS

/S/25-1Lot 02 M/s Amerasian (Pvt)

Ltd

Lot 01 M/s Trident Holding

(Pte) Ltd

Lot 03 M/s Trident Holding

(Pte) Ltd

Lot 04 M/s Trident Holding

(Pte) Ltd

Lot 05 M/s Trident Holding

(Pte) Ltd

Lot 06 M/s Trident Holding

(Pte) Ltd

Lot 02

Lot 01

Lot 03

Lot 04

Lot 05

Lot 06

18-Jul-2011 8-Aug-2011Hammers & Bits for WRB

25 DSWRPP-2/GOODS/S/

25-2

0.0050 28-Mar-2011 04-Apr-2011 18-Apr-2011 02-May-2011 23-May-2011SHOPP

ING

pp

A

R

PMU DSWRPP-2/GOODS

/S/25-2 6-Jun-2011 20-Jun-2011PVC for WRB

25 DSWRPP-2/GOODS/S/

25-3

0.0380 08-Mar-2011 05-Apr-2011 17-May-2011 24-May-2011 21-Jun-2011SHOPP

ING

pp

A

R

PMU DSWRPP-2/GOODS

/S/25-3 26-Jul-2011 16-Aug-2011Hand Pumps for 50 wells for WRB

25 DSWRPP-2/GOODS/IC

B/25-4

0.3500 05-Apr-2011 03-May-2011 14-Jun-2011 21-Jun-2011 19-Jul-2011ICBpp

A

R

PMU DSWRPP-2/GOODS

/ICB/25-4 23-Aug-2011 13-Sep-2011Truck Mounted Drilling Rig & Supporting Truck for WRB

Prior Review

25 DSWRPP-2/GOODS/D

C/25-5

0.0050 20-Apr-2011 18-May-2011 29-Jun-2011 06-Jul-2011 09-Aug-2011DCpp

A

R

PMU DSWRPP-2/GOODS

/DC/25-5 7-Sep-2011 27-Sep-2011Digital data for GW maps from Survey Department for WRB

Prior Review

25 DSWRPP-2/GOODS/D

C/25-6

0.0050 20-Apr-2011 18-May-2011 29-Jun-2011 06-Jul-2011 03-Aug-2011DCpp

A

R

PMU DSWRPP-2/GOODS

/DC/25-6 7-Sep-2011 28-Sep-2011Digital data for GW maps from Geological & Mines Bureau for

WRB

Prior Review

25 DSWRPP-2/GOODS/S/

25-7

0.0050 20-Apr-2011 18-May-2011 29-Jun-2011 06-Jul-2011 03-Aug-2011SHOPP

ING 08-Aug-2011 05-Sep-2011 17-Oct-2011 24-Oct-2011 21-Nov-2011

pp

A

R

PMU DSWRPP-2/GOODS

/S/25-7 7-Sep-2011 28-Sep-2011Oil & Lubricants for WRB

25 DSWRPP-2/GOODS/S/

25-8

0.0200 20-Apr-2011 18-May-2011 29-Jun-2011 06-Jul-2011 03-Aug-2011SHOPP

ING 25-Jul-2011 22-Aug-2011 03-Oct-2011 10-Oct-2011 07-Nov-2011

pp

A

R

PMU DSWRPP-2/GOODS

/S/25-8 7-Sep-2011 7-Sep-2011Bentonite for WRB

Component3

0 DSWRPP-3/GOODS/D

C/24

0.0710 15-Dec-2010 12-Jan-2011 23-Feb-2011 02-Mar-2011 30-Mar-2011 Contract AwardedDC 4,032,157.96pp

A

R

PMU

13-Sep-2010

EUR 27,594.00

EUR 27,594.00

DSWRPP-3/GOODS

/DC/24 DHI 20-Sep-20104-May-2011 25-May-2011Purchasing of Software- Water resources Planning Cell

Page 5 of 8

Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight

Description of Good

Met

ho

d o

f P

rocu

rem

ent

ICB

/NC

B

E

stim

ated

Cos

t

(

US

$. M

illi

on

s)

Im

ple

men

tin

g A

gen

cy

Package No

Seri

al N

o

Des

ign

/ In

vest

iga

tion

/ S

pec

ific

ati

on c

om

ple

ted

(D

ate)

Cal

lin

g P

req

ual

ific

ati

on &

Fin

ish

ing

th

e S

hor

tlis

t

E

sti

mate

Pre

pare

d &

San

cti

on

ed

(D

ate

)

Pre

para

tio

n o

f B

id D

ocu

men

t -

Date

Ban

k's

No

Ob

jecti

on

to

Bid

Do

cu

men

t (D

ate

)**

Bid

In

vit

ati

on

Date

Bid

Op

en

ded

o

n

Date

Co

ntr

act

Aw

ard

decid

ed

(D

ate

/ V

alu

e / C

urr

en

cy)

Ban

k's

No

Ob

jecti

on

to

Co

ntr

act

Aw

ard

(D

ate

)**

Co

ntr

act

Sig

ned

(

Date

/V

alu

e/C

urr

en

cy)

Rem

ark

Co

ntr

act

No

.

Nam

e o

f C

on

tracto

r/N

ati

on

ality

& Z

ip C

od

e

** W

BR

No

.

Date

of

Co

mp

leti

on

of

Co

ntr

act.

Exp

en

dit

ure

in

cu

rred

to

Date

Bids

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 19 20

GOODS

18 7 21 22

Component4

14 DSWRPP-4/GOODS/IC

B/14-1

0.7910 10-Apr-2008 11-May-2008 16-May-2008 26-May-2008 21-Jun-2008 05-Aug-2008 DeliveredICB

30-Apr-2008 07-May-2008 25-May-2008 22-Sep-2008 20-Oct-2008 03-Dec-2008 05-May-2009

230,847,552.66pp

A

R

PMU

25-Mar-2009

Lot 01

JPY 33,224,814.00

Rs 5,250,000.00

+Taxes

08-Apr-2009

Lot 02

JPY 5,478,000.00

Rs 750,000.00

+Taxes

15-May-2009

Lot 01

JPY 33,224,814.00

Rs 5,250,000.00

+Taxes

Lot 02

JPY 5,478,000.00

Rs 750,000.00

+Taxes

DSWRPP-4/GOODS

/ICB/14-1Lot 01 Associsted

Motorways PLC

Lot 02 United Motors Lanka

PLC

Lot 01

09-Dec-2009

Lot 02

19-Sep-2008 20-Oct-2008Vehicles -24 nos

Prior Review

14 DSWRPP-4/GOODS/IC

B/14-2

0.5920 15-Aug-2009 15-Sep-2009 20-Sep-2009 30-Sep-2009 26-Oct-2009 10-Dec-2009 03-Feb-2010 DeliverdICB

08-Mar-2010 08-Mar-2010 30-Apr-2010 19-Apr-2010 29-Apr-2010 14-Jun-2010 10-Mar-2011

25-Feb-2010 15-Mar-2010 10-Mar-2010 30-Mar-2010 25-Apr-2010 09-Jun-2010 03-Aug-2010

90,528,095.33pp

A

R

PMU

20-Jul-2010

Lot 02

JPY 3,592,000.00

Rs 800,000.00

+Taxes

20-Jul-2010

Lot 01

Rs 7,410,000.00

US$ 289,845.00

+Taxes

02-Sep-2010

Lot 02

JPY 3,592,000.00

Rs 800,000.00

+Taxes

02-Sep-2010

Lot 01

Rs 7,410,000.00

US$ 289,845.00

+Taxes

DSWRPP-4/GOODS

/ICB/14-2Lot 02 Associsted

Motorways PLC

Lot 01 Toyota Lanka (Pvt)

Ltd

Lot 02

20-Jan-2011

Lot 01

20-Jan-2011

24-Jan-2010 24-Feb-2010Vehicles -21 nos (19 Pickups, 02 Vans)

Prior Review

14 DSWRPP-4/GOODS/N

CB/14-3

0.2000 01-Mar-2010 08-Mar-2010 13-Mar-2010 23-Mar-2010 18-Apr-2010 02-Jun-2010 27-Jul-2010 DeliverdNCB

25-Feb-2010 08-Mar-2010 30-Apr-2010 02-Jul-2010 08-Jul-2010 03-Aug-2010 14-Sep-2010

18,799,200.00pp

A

R

PMU

20-Aug-2010

LKR 16,785,000.00

+VAT

24-Sep-2010

LKR 16,785,000.00

+VAT

DSWRPP-4/GOODS

/NCB/14-3 Micro Cars Ltd 19-Nov-201017-Jul-2010 17-Aug-2010Vehicles -03 nos (03 Passenger Field Vehicles)

Prior Review

15 DSWRPP-4/GOODS/S/

15-1

0.0230 04-Dec-2007 04-Jan-2008 09-Jan-2008 14-Feb-2008 06-Mar-2008 DeliveredSHOPP

ING

12-Dec-2007 15-Dec-2007 17-Dec-2007 18-Dec-2007 16-Jan-2008

pp

A

R

PMU

04-Mar-2008

Lot 02

Rs. 269,100.00

04-Mar-2008

Lot 03

Rs. 1,297,400.00

04-Mar-2008

Lot 04

Rs. 41,600.00

13-Mar-2008

Lot 05

Rs. 825,000.00

Lot 02

Rs. 269,100.00

Lot 03

Rs. 1,297,400.00

Lot 04

Rs. 41,600.00

Lot 05

Rs. 825,000.00

DSWRPP-4/GOODS

/S/15-1Lot 02 E-W information

system

Lot 03 PC House Pvt Ltd

Lot 04 E-W information

system

Lot 05 Metrpoliton

Computers(Pvt)Ltd

Lot 02

30-Apr-2008

Lot 03

Lot 04

18-Apr-2008

Lot 05

26-Mar-2008

20-Apr-2008 11-May-2008Computers & Accessories, necessary software, IT equipment for all

Components - Lot 1.

15 DSWRPP-4/GOODS/N

CB/15-2

0.0700 10-Feb-2008 12-Mar-2008 17-Mar-2008 22-Apr-2008 13-May-2008 DeliveredNCB

01-Jul-2008 07-Jul-2008 07-Jul-2008 19-Aug-2008 08-Jul-2008 01-Sep-2008 16-Dec-2008

2,943,700.00pp

A

R

PMU

11-Dec-2008

Lot 01

Rs. 5,604,500.00

15-Dec-2008

Lot 02

Rs. 144,200.00

12-Nov-2008

Lot 03

LKR 2,672,000.00

31-Dec-2008

Lot 01

Rs. 5,604,500.00

Lot 02

Rs. 144,200.00

30-Dec-2008

Lot 03

LKR 2,672,000.00

DSWRPP-4/GOODS

/NCB/15-2Lot 01 PC House Pvt Ltd

Lot 02 Kobian Technologies

(Pvt) Ltd

Lot 03 John Keels Office

Automation (Pvt) Ltd.

Lot 01

27-Apr-2009

Lot 02

05-Jan-2009

Lot 03

21-Jan-2009

27-Jun-2008 18-Jul-2008Computers & Accessories, necessary software, IT equipment for all

Components - Lot 2.

Prior Review

16 DSWRPP-4/GOODS/S/

16-1

0.0400 15-Jul-2008 15-Aug-2008 20-Aug-2008 25-Sep-2008 16-Oct-2008 DeliveredSHOPP

ING

01-Jul-2008 07-Jul-2008 07-Jul-2008 10-Nov-2008 25-Nov-2008

pp

A

R

PMU

12-Nov-2008

Rs 3,000,000.00

12-Nov-2008

Rs 3,000,000.00

DSWRPP-4/GOODS

/S/16-1 Premium International

Technologies (Pvt) Ltd.

31-Dec-200830-Nov-2008 21-Dec-2008Multimedia Projectors

16 DSWRPP-4/GOODS/S/

16-2

0.0350 20-Jul-2008 20-Aug-2008 25-Aug-2008 30-Sep-2008 21-Oct-2008 DeliveredSHOPP

ING

10-Sep-2008 08-Sep-2008 08-Sep-2008 10-Sep-2008 22-Sep-2008

540,762.32pp

A

R

PMU

29-Sep-2008

Lot 01

Rs. 1,514,242.50

29-Sep-2008

Lot 02

Rs. 328,000.00

29-Sep-2008

Lot 03

Rs. 152,064.00

29-Sep-2008

Lot 04

Rs. 17,250.00

29-Sep-2008

Lot 05

Rs. 1,182,645.62

30-Sep-2008

Lot 01

Rs. 1,514,242.50

02-Oct-2008

Lot 02

Rs. 328,000.00

02-Oct-2008

Lot 03

Rs. 152,064.00

02-Oct-2008

Lot 04

Rs. 17,250.00

02-Oct-2008

Lot 05

Rs. 1,182,645.62

DSWRPP-4/GOODS

/S/16-2Lot 01 Softlogic Pvt Ltd.,

Lot 02 E-W information

system

Lot 03 E-W information

system

Lot 04 E-W information

system

Lot 05 Visual Computing

System (Pvt) Ltd

Lot 01

06-Oct-2001

Lot 02

Lot 03

Lot 04

Lot 05

31-Oct-2008

5-Dec-2008 26-Dec-2008Computers & Accessories, necessary software, IT equipment for all

Components - Lot 3.

16 DSWRPP-4/GOODS/S/

16-3

0.0200 01-Jan-2011 01-Feb-2011 06-Feb-2011 14-Mar-2011 04-Apr-2011SHOPP

ING

pp

A

R

PMU DSWRPP-4/GOODS

/S/16-3 19-May-2011 9-Jun-2011Computers & Accessories, necessary software, IT equipment for all

Components - Lot 4.

Page 6 of 8

Description of Good

Met

ho

d o

f P

rocu

rem

ent

ICB

/NC

B

E

stim

ated

Cos

t

(

US

$. M

illi

on

s)

Im

ple

men

tin

g A

gen

cy

Package No

Seri

al N

o

Des

ign

/ In

vest

iga

tion

/ S

pec

ific

ati

on c

om

ple

ted

(D

ate)

Cal

lin

g P

req

ual

ific

ati

on &

Fin

ish

ing

th

e S

hor

tlis

t

E

sti

mate

Pre

pare

d &

San

cti

on

ed

(D

ate

)

Pre

para

tio

n o

f B

id D

ocu

men

t -

Date

Ban

k's

No

Ob

jecti

on

to

Bid

Do

cu

men

t (D

ate

)**

Bid

In

vit

ati

on

Date

Bid

Op

en

ded

o

n

Date

Co

ntr

act

Aw

ard

decid

ed

(D

ate

/ V

alu

e / C

urr

en

cy)

Ban

k's

No

Ob

jecti

on

to

Co

ntr

act

Aw

ard

(D

ate

)**

Co

ntr

act

Sig

ned

(

Date

/V

alu

e/C

urr

en

cy)

Rem

ark

Co

ntr

act

No

.

Nam

e o

f C

on

tracto

r/N

ati

on

ality

& Z

ip C

od

e

** W

BR

No

.

Date

of

Co

mp

leti

on

of

Co

ntr

act.

Exp

en

dit

ure

in

cu

rred

to

Date

Bids

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 19 20

GOODS

18 7 21 22

16 DSWRPP-4/GOODS/N

CB/16-4

0.0620 01-Mar-2010 01-Apr-2010 06-Apr-2010 12-May-2010 02-Jun-2010 DeliveredNCB

25-Sep-2009 30-Sep-2009 30-Sep-2009 08-Oct-2009 10-Nov-2009

9,316,077.79pp

A

R

PMU

23-Dec-2009

Lot 01

Rs. 2,754,000.00

23-Dec-2009

Lot 02

Rs. 104,500.00

23-Dec-2009

Lot 03

Rs 2,780,000.00

23-Dec-2009

Lot 04

Rs 2,754,000.00

+VAT

23-Dec-2009

Lot 05

Rs 104,500.00

+VAT

23-Dec-2009

Lot 06

Rs 142,040.00

+VAT

07-Jan-2010

Lot 01

Rs. 2,754,000.00

07-Jan-2010

Lot 02

Rs. 104,500.00

01-Feb-2010

Lot 03

Rs 2,780,000.00

07-Jan-2010

Lot 04

Rs 2,754,000.00

+VAT

07-Jan-2010

Lot 05

Rs 104,500.00

+VAT

07-Jan-2010

Lot 06

Rs 142,040.00

+VAT

DSWRPP-4/GOODS

/NCB/16-4Lot 01 PC House Pvt Ltd

Lot 02 Metrpoliton

Computers(Pvt)Ltd

Lot 03 E-W information

system

Lot 04 PC House Pvt Ltd

Lot 05 Metrpoliton

Computers(Pvt)Ltd

Lot 06 Open Systems

Integrated (Pvt)Ltd

Lot 01

22-Mar-2010

Lot 02

22-Feb-2010

Lot 03

22-Apr-2010

Lot 04

15-Mar-2010

Lot 05

22-Feb-2010

Lot 06

22-Feb-2010

17-Jul-2010 7-Aug-2010Computers & Accessories, necessary software, IT equipment for all

Components - Lot 5.

17 DSWRPP-4/GOODS/S/

17-1

0.0120 04-Dec-2007 04-Jan-2008 09-Jan-2008 14-Feb-2008 06-Mar-2008 DeliveredSHOPP

ING

04-Dec-2007 12-Dec-2007 04-Jan-2008 23-Jan-2008

pp

A

R

PMU

13-Mar-2008

Rs. 518,000.00

13-Mar-2008

Rs. 518,000.00

DSWRPP-4/GOODS

/S/17-1 John Keels Pvt Ltd 27-May-200820-Apr-2008 11-May-2008Photocopy, Fax and other Office Equipment for all components-

Lot1

17 DSWRPP-4/GOODS/N

CB/17-2

0.0720 02-Dec-2008 02-Jan-2009 07-Jan-2009 12-Feb-2009 05-Mar-2009 DeliveredNCB

30-Jan-2009 03-Feb-2009 03-Feb-2009 10-Feb-2009 11-Mar-2009

6,552,000.00pp

A

R

PMU

20-Mar-2009

Rs 5,850,000.00

20-Apr-2009

Rs 5,850,000.00

DSWRPP-4/GOODS

/NCB/17-2 John Keels Pvt Ltd 09-Jul-200919-Apr-2009 10-May-2009Photocopy, Fax and other Office Equipment for all components-

Lot2

18 DSWRPP-4/GOODS/S/

18-1

0.0130 31-May-2009 01-Jul-2009 06-Jul-2009 11-Aug-2009 01-Sep-2009SHOPP

ING

pp

A

R

PMU DSWRPP-4/GOODS

/S/18-1 16-Oct-2009 6-Nov-2009Photocopy, Fax and other Office Equipment for all components -

Lot 3

18 DSWRPP-4/GOODS/S/

18-2

0.0130 01-Dec-2010 01-Jan-2011 06-Jan-2011 11-Feb-2011 04-Mar-2011SHOPP

ING

pp

A

R

PMU DSWRPP-4/GOODS

/S/18-2 18-Apr-2011 9-May-2011Photocopy, Fax and other Office Equipment for all components -

Lot 4

19 DSWRPP-4/GOODS/S/

19-1

0.0020 10-Mar-2008 10-Apr-2008 15-Apr-2008 21-Mar-2008 11-Jun-2008 DeliveredSHOPP

ING

28-Dec-2007 14-Feb-2008 07-Mar-2008 11-Mar-2008 25-Mar-2008

pp

A

R

PMU

07-Apr-2008

Rs 186,304.50

+VAT

08-Apr-2008

Rs 186,304.50

+VAT

DSWRPP-4/GOODS

/S/19-1 Alpha-Sri Lankan 05-Oct-200826-Jul-2008 16-Aug-2008Office Furnitures - Lot 1

19 DSWRPP-4/GOODS/S/

19-2

0.0080 01-Jan-2009 01-Feb-2009 06-Feb-2009 14-Mar-2009 04-Apr-2009 DeliveredSHOPP

ING

30-Mar-2009 07-Apr-2008 29-May-2008 02-Jul-2008 21-Jul-2008

264,670.00pp

A

R

PMU

28-Jul-2008

Rs 1,676,930.00

05-Aug-2008

Rs 1,676,930.00

DSWRPP-4/GOODS

/S/19-2 Metropolitan Pvt Ltd 18-Dec-200819-May-2009 9-Jun-2009Office Furnitures - Lot 2

19 DSWRPP-4/GOODS/S/

19-3

0.0020 10-May-2009 10-Jun-2009 15-Jun-2009 21-Jul-2009 11-Aug-2009 DeliveredSHOPP

ING

07-Sep-2009 14-Sep-2009 14-Sep-2009 18-Sep-2009 28-Sep-2009

1,369,474.40pp

A

R

PMU

01-Oct-2009

Lot 01

Rs 683,370.00

+VAT 12%

01-Oct-2009

Lot 02

Rs 539,375.00

+VAT 12%

02-Oct-2009

Lot 01

Rs 683,370.00

+VAT 12%

02-Oct-2009

Lot 02

Rs 539,375.00

+VAT 12%

DSWRPP-4/GOODS

/S/19-3Lot 01 Alpha IndustriesLtd

Lot 02 Metropolitan

Office(Pvt)Ltd

Lot 01

29-Dec-2009

Lot 02

29-Dec-2009

25-Sep-2009 16-Oct-2009Office Furnitures - Lot 3

19 DSWRPP-4/GOODS/S/

19-4

0.0050 30-Nov-2009 31-Dec-2009 05-Jan-2010 10-Feb-2010 03-Mar-2010SHOPP

ING

pp

A

R

PMU DSWRPP-4/GOODS

/S/19-4 17-Apr-2010 8-May-2010Office Furnitures - Lot 4

19 DSWRPP-4/GOODS/S/

19-5

0.0150 15-Jan-2010 15-Feb-2010 20-Feb-2010 28-Mar-2010 18-Apr-2010SHOPP

ING

pp

A

R

PMU DSWRPP-4/GOODS

/S/19-5 2-Jun-2010 23-Jun-2010Office Furnitures - Lot 5

20 DSWRPP-4/GOODS/S/

20-1

0.0050 01-Sep-2008 02-Oct-2008 07-Oct-2008 12-Nov-2008 03-Dec-2008 DeliveredSHOPP

ING

16-Aug-2009 25-Aug-2008 18-Oct-2008 22-Oct-2008 25-Nov-2008

pp

A

R

PMU

22-Dec-2008

Rs 377,091.06

23-Dec-2008

Rs 377,091.06

DSWRPP-4/GOODS

/S/20-1 Abans (Pvt) Ltd 31-Dec-200817-Jan-2009 7-Feb-2009Office refurbishment - Supplying and installing room Air

Conditioners

Page 7 of 8

Description of Good

Met

ho

d o

f P

rocu

rem

ent

ICB

/NC

B

E

stim

ated

Cos

t

(

US

$. M

illi

on

s)

Im

ple

men

tin

g A

gen

cy

Package No

Seri

al N

o

Des

ign

/ In

vest

iga

tion

/ S

pec

ific

ati

on c

om

ple

ted

(D

ate)

Cal

lin

g P

req

ual

ific

ati

on &

Fin

ish

ing

th

e S

hor

tlis

t

E

sti

mate

Pre

pare

d &

San

cti

on

ed

(D

ate

)

Pre

para

tio

n o

f B

id D

ocu

men

t -

Date

Ban

k's

No

Ob

jecti

on

to

Bid

Do

cu

men

t (D

ate

)**

Bid

In

vit

ati

on

Date

Bid

Op

en

ded

o

n

Date

Co

ntr

act

Aw

ard

decid

ed

(D

ate

/ V

alu

e / C

urr

en

cy)

Ban

k's

No

Ob

jecti

on

to

Co

ntr

act

Aw

ard

(D

ate

)**

Co

ntr

act

Sig

ned

(

Date

/V

alu

e/C

urr

en

cy)

Rem

ark

Co

ntr

act

No

.

Nam

e o

f C

on

tracto

r/N

ati

on

ality

& Z

ip C

od

e

** W

BR

No

.

Date

of

Co

mp

leti

on

of

Co

ntr

act.

Exp

en

dit

ure

in

cu

rred

to

Date

Bids

1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 19 20

GOODS

18 7 21 22

20 DSWRPP-4/GOODS/N

CB/20-2

0.0800 01-Sep-2008 02-Oct-2008 07-Oct-2008 12-Nov-2008 03-Dec-2008 DeliveredNCB

08-Aug-2008 02-Oct-2008 20-Oct-2008 24-Oct-2008 25-Nov-2008

8,372,649.99pp

A

R

PMU

Rs 7,132,845.00

31-Dec-2008

Rs 7,132,845.00

DSWRPP-4/GOODS

/NCB/20-2 ETA Melco Engineering

(Pvt) Ltd

31-Dec-200917-Jan-2009 10-May-2009Office refurbishment - Suppying and installing elevator for dam

safety office building -ID

20 DSWRPP-4/GOODS/S/

20-3

0.0100 01-Sep-2008 02-Oct-2008 16-Oct-2008 21-Nov-2008 05-Jan-2009 DeliveredSHOPP

ING

20-Feb-2009 27-Feb-2009 06-Mar-2009 13-Mar-2009 30-Mar-2009

326,791.26pp

A

R

PMU

21-Apr-2009

Rs 272,326.05

22-Apr-2009

Rs 272,326.05

DSWRPP-4/GOODS

/S/20-3 Abans (Pvt) Ltd 03-Jun-200919-Feb-2009 12-Mar-2009Office refurbishment - Supplying and installing room Air

Conditioners- PMU

21 DSWRPP-4/GOODS/S/

21

0.0030 01-Nov-2008 08-Nov-2008 15-Nov-2008 29-Nov-2008 06-Dec-2008 DeliveredSHOPP

ING

03-Nov-2008 10-Nov-2008 15-Nov-2008 13-Mar-2009 30-Mar-2009

281,261.57pp

A

R

PMU

08-Apr-2009

Rs 248,640.00

21-Apr-2009

Rs 248,640.00

DSWRPP-4/GOODS

/S/21 DMS Electronics (Pvt) Ltd 24-Jun-200913-Dec-2008 3-Jan-2009Wireless Network-PMU

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Name & DesignationDate

Page 8 of 8

Dam Safety and Water Resources Planning Project(DSWRPP)

PROGRESS REPORT ON PROCUREMENT OF WORKS - Irrigation Department

( FOR ALL CONTRACTS)

As On 9/6/2011IDA Credit Number : 4406-CE

Project ID: 093132

Se

ria

l N

o

Package No Description of Services

Est

ima

ted

Co

st

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Est

ima

ted

, P

rep

are

d &

Sa

nct

ion

ed

(D

ate

)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tio

n

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

Component1

A

R

DSWRPP-1/WORKS/S/01 0.0090 01-Aug-2008 1-Sep-2008 15-Sep-2008 21-Oct-2008 05-Dec-2008 Completed DSWRPP-1/WORKS/S/

01

665,775.61pp 1

31-Oct-2008

Rs. 625,403.36

Rs. 625,403.36

Asalaarachchi Construction

(Pvt)Ltd

31-Jan-2009Office refurbishment - Repairs to Dam Safety Office:

Renovation of Toilets

23-Feb-2009SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/NCB/2 2.0900 23-Jan-2010

11-Oct-2010

22-Nov-2010

14-Apr-2010

03-Jan-2011

16-May-2011

29-May-2010

31-Jan-2011

14-Jun-2011

27-Jul-2010

04-Apr-2011

DSWRPP-1/WORKS/N

CB/2

pp 2

Rs 110,700,520.00

+VAT 12%27-Jul-2011

Rs 110,700,520.00

+VAT 12%

M/s K.S.J.Construction (Pvt) Ltd Remedial works of Nachchaduwa Dam NCB ID

A

R

DSWRPP-1/WORKS/NCB/3 1.1500 11-Dec-2009

06-Jun-2011

11-Jan-2010

4-Jul-2011

25-Jan-2010

1-Aug-2011

02-Mar-2010

08-Aug-2011

12-Aug-2011

23-Mar-2010

05-Sep-2011

13-Sep-2011

DSWRPP-1/WORKS/N

CB/3

pp 3 07-May-2010Remedial works of Kaudulla Dam 28-May-2010

21-Oct-201117-Oct-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/4 0.4400 09-Oct-2008

10-Feb-2010

27-Sep-2008

9-Nov-2008

10-Mar-2010

23-Nov-2008

7-Apr-2010

29-Dec-2008

24-Mar-2010

13-Jun-2011

19-Jan-2009

21-Apr-2010

12-Jul-2011

DSWRPP-1/WORKS/N

CB/4

pp 4

Rs 148,427,362.60

+VAT 0.0016-Aug-2011

Rs 148,427,362.60

+VAT 0.00

Orient Construction Co.(Pvt) Ltd. Remedial works of Minneriya Dam NCB ID

A

R

DSWRPP-1/WORKS/NCB/5 1.5600 30-Oct-2008

09-Sep-2010

30-Sep-2008

30-Nov-2008

7-Oct-2010

14-Dec-2008

4-Nov-2010

19-Jan-2009

18-Nov-2010

27-Jan-2011

05-May-2009

16-Dec-2010

25-Feb-2011

Contract Awarded DSWRPP-1/WORKS/N

CB/5

pp 5

24-Jun-2011

Rs 194,750,760.34

19-Apr-2009

Rs 194,750,760.34

M/s Arangalla Construction &

Development

4-Jul-201319-Apr-2009Remedial works of Ridiyagama Dam

Prior Review

10-May-2009

03-Mar-201103-Feb-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/6 0.1900 05-Feb-2010

25-Jul-2011

8-Mar-2010

22-Aug-2011

13-Mar-2010

19-Sep-2011

18-Apr-2010

26-Sep-2011

09-May-2010

24-Oct-2011

DSWRPP-1/WORKS/N

CB/6

pp 6 23-Jun-2010Remedial works of Nalanda Dam 14-Jul-2010

26-Dec-201112-Dec-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/7 0.4100 11-Mar-2010

15-Apr-2011

11-Apr-2010

13-May-2011

16-Apr-2010

10-Jun-2011

22-May-2010

24-Jun-2011

20-Jun-2011

12-Jun-2010

22-Jul-2011

19-Jul-2011

DSWRPP-1/WORKS/N

CB/7

pp 7 27-Jul-2010Remedial works of Nuwarawewa Dam 17-Aug-2010

07-Oct-201109-Sep-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/8 0.4000 04-Dec-2008

08-Apr-2010

19-Feb-2009

4-Jan-2009

6-May-2010

19-Apr-2009

18-Jan-2009

3-Jun-2010

8-Jul-2009

06-Sep-2010 23-Feb-2009

17-Jun-2010

05-Jul-2010

16-Mar-2009

15-Jul-2010

03-Aug-2010

06-Sep-2010 Contract Awarded DSWRPP-1/WORKS/N

CB/8

32,630,143.47pp 8

17-Sep-2010

Rs 106,113,608.40

+VAT

6-Sep-2010

Rs 106,113,608.40

+VAT

Orient Construction Co.(Pvt) Ltd. 30-Apr-2009Remedial works of Kantale Dam 21-May-2009

30-Sep-201002-Sep-2010

NCB ID

A

R

DSWRPP-1/WORKS/DC/8-1 0.0600 01-Jul-2009 1-Sep-2009 03-Sep-2009

03-Sep-2009

Completed DSWRPP-1/WORKS/D

C/8-1

6,213,866.40pp 8

9-Sep-2009

Rs. 5,840,100.00

Rs. 5,840,100.00

Government Factory Supplying & Installation of Emergency Gate to Kantale Dam

Prior Review

9-Sep-2009DC ID

A

R

DSWRPP-1/WORKS/NCB/9 0.2600 07-Sep-2009

25-Aug-2011

8-Oct-2009

22-Sep-2011

22-Oct-2009

20-Oct-2011

27-Nov-2009

03-Nov-2011

20-Jun-2011

18-Dec-2009

01-Dec-2011

21-Jul-2011

DSWRPP-1/WORKS/N

CB/9

pp 9 01-Feb-2010Remedial works of Giritale Dam 22-Feb-2010

16-Feb-201219-Jan-2012

NCB ID

A

R

DSWRPP-1/WORKS/NCB/10 0.8100 24-Aug-2009

21-Jun-2011

24-Sep-2009

19-Jul-2011

8-Oct-2009

16-Aug-2011

13-Nov-2009

23-Aug-2011

04-Dec-2009

20-Sep-2011

DSWRPP-1/WORKS/N

CB/10

pp 10 18-Jan-2010Remedial works of Vendarasan Dam 8-Feb-2010

22-Nov-201108-Nov-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/11 1.1800 27-Nov-2008

10-May-2010

25-Nov-2008

28-Dec-2008

7-Jun-2010

23-Aug-2010

11-Jan-2009

5-Jul-2010

6-Sep-2010

16-Feb-2009

08-Oct-2010

06-Oct-2010

02-Apr-2009

16-Aug-2010

26-Jan-2011

Contract Awarded DSWRPP-1/WORKS/N

CB/11

50,531,554.95pp 11

5-Apr-2011

Rs 194,794,503.90

+VAT 0.00

1-Aug-2011

Rs 194,794,503.90

+VAT 0.00

M/s Nawaloka Construction

Company (Pvt) Ltd

23-Feb-201317-May-2009Remedial works of Tabbowa Dam

Prior Review

7-Jun-2009

01-Nov-201004-Oct-2010

NCB ID

Page 1 of 4

S

eria

l N

o

Package No Description of Services

Estim

ate

d C

ost

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Estim

ate

d,

Pre

pa

red

&

Sa

nctio

ne

d (

Da

te)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tion

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

A

R

DSWRPP-1/WORKS/CP/11-1 0.0020

21-Apr-2010 14-Jun-2010

completed DSWRPP-1/WORKS/C

P/11-1

230,429.44pp 11

28-Jun-2010

Rs. 242,583.32

Rs. 242,583.32

Thenuwara FO 30-Sep-2010Clearing Downstream area of Tabbowa Dam CP ID

A

R

DSWRPP-1/WORKS/NCB/12 1.5500 20-Jul-2009

16-Aug-2010

20-Aug-2009

13-Sep-2010

3-Sep-2009

11-Oct-2010

24-Jan-2011

09-Oct-2009

25-Oct-2010

27-Jan-2011

23-Nov-2009

22-Nov-2010

02-Mar-2011

Contract Awarded DSWRPP-1/WORKS/N

CB/12

26,848,325.60pp 12

26-Apr-2011

Rs 119,858,600.75

+VAT 0.00+Taxes

5-Apr-2011

Rs 119,858,600.75

+VAT 0.00+Taxes

M/s State Development &

Construction Corporation

07-Jan-2010Remedial works of Usgala Siyambalangamuwa Dam 28-Jan-2010

07-Feb-201110-Jan-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/13 0.7200 04-Dec-2008

10-Dec-2010

30-Dec-2008

4-Jan-2009

7-Jan-2011

18-Jan-2009

4-Feb-2011

23-Feb-2009

18-Feb-2011

13-Jun-2011

16-Mar-2009

18-Mar-2011

19-Jul-2011

DSWRPP-1/WORKS/N

CB/13

pp 13

Rs 121,983,890.60

+VAT 0.0016-Aug-2011

Rs 121,983,890.60

+VAT 0.00

M/s. S.M.A. Construction (Pvt)

Ltd

30-Apr-2009Remedial works of Tissawewa Dam 21-May-2009

03-Jun-201106-May-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/14 0.2800 30-Sep-2009

25-Feb-2010

30-Sep-2008

31-Oct-2009

25-Mar-2010

14-Nov-2009

22-Apr-2010

20-Dec-2009

06-May-2010

20-Jun-2011

10-Jan-2010

03-Jun-2010

18-Jul-2011

DSWRPP-1/WORKS/N

CB/14

pp 14

Rs 132,565,121.70

+VAT 12.016-Aug-2011

Rs 132,565,121.70

+VAT 12.0

M/s K.S.J.Construction (Pvt) Ltd 24-Feb-2010Remedial works of Huruluwewa Dam 17-Mar-2010

19-Aug-201022-Jul-2010

NCB ID

A

R

DSWRPP-1/WORKS/NCB/15 1.1800 30-Mar-2009

10-Jun-2010

28-Feb-2009

27-Apr-2009

8-Jul-2010

13-Aug-2010

11-May-2009

5-Aug-2010

25-Aug-2010

16-Jun-2009

19-Aug-2010

30-Aug-2010

31-Jul-2009

16-Sep-2010

01-Oct-2010

Contract Awarded DSWRPP-1/WORKS/N

CB/15

15,530,385.03pp 15

2-Dec-2010

Rs 77,651,928.50

+VAT

Rs 77,651,928.50

+VAT

Square Mech Engineering (Pvt)

Ltd

14-Sep-2009Remedial works of Inginimitiya Dam 15-Oct-2009

02-Dec-201011-Nov-2010

NCB ID

A

R

DSWRPP-1/WORKS/NCB/16 1.0300 30-Dec-2008

08-Mar-2010

20-Feb-2009

30-Jan-2009

5-Apr-2010

19-Apr-2009

13-Feb-2009

3-May-2010

06-Sep-2010

17-May-2010

21-Mar-2009

31-May-2010

17-May-2010

05-May-2009

28-Jun-2010

28-Jun-2010

06-Sep-2010

30-Aug-2010

11-Aug-2010

Contract Awarded DSWRPP-1/WORKS/N

CB/16

48,852,506.08pp 16

6-Sep-2010

Rs. 167,753,695.00

+VAT 12%

20-Aug-2010

Rs.

167,753,695.00

+VAT 12%

NEM Construction 19-Jun-2009Remedial works of Parakrama Samudra Dam

Prior Review

10-Jul-2009

27-Sep-201016-Aug-2010

NCB ID

A

R

DSWRPP-1/WORKS/NCB/17 0.8000 20-Mar-2010

12-Sep-2011

20-Apr-2010

10-Oct-2011

4-May-2010

7-Nov-2011

09-Jun-2010

21-Nov-2011

24-Jul-2010

19-Dec-2011

DSWRPP-1/WORKS/N

CB/17

pp 17 07-Sep-2010Remedial works of Rajangana Dam 28-Sep-2010

05-Mar-201206-Feb-2012

NCB ID

A

R

DSWRPP-1/WORKS/S/18 0.0200 30-Jun-2009

01-Sep-2009

01-Jul-2009

31-Jul-2009

29-Sep-2009

25-Jul-2009

14-Aug-2009

10-Nov-2009

4-Aug-2009

19-Sep-2009

17-Nov-2009

26-Jun-2009

10-Oct-2009

08-Dec-2009

01-Sep-2009

Completed DSWRPP-1/WORKS/S/

18

3,866,984.61pp 18

31-Oct-2009

Rs. 3,637,872.90

Rs. 3,637,872.90

Gamini Construction 24-Nov-2009Basic Safety facility works of Pavatakulm Dam 15-Dec-2009

02-Feb-201012-Jan-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/NCB/19

-1

0.1400 30-Jun-2010

18-Jul-2011

31-Jul-2010

15-Aug-2011

14-Aug-2010

29-Aug-2011

19-Sep-2010

05-Sep-2011

10-Oct-2010

26-Sep-2011

DSWRPP-1/WORKS/N

CB/19-1

pp 19 24-Nov-2010Basic Safety facility works of Basawakkulama Dam 15-Dec-2010

07-Nov-201124-Oct-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/19

-2

0.0600 30-Jun-2010

08-Jun-2011

31-Jul-2010

6-Jul-2011

14-Aug-2010

3-Aug-2011

19-Sep-2010

10-Aug-2011

10-Oct-2010

31-Aug-2011

DSWRPP-1/WORKS/N

CB/19-2

pp 19 24-Nov-2010Basic Safety facility works of Mahakanadarawa Dam 15-Dec-2010

12-Oct-201128-Sep-2011

NCB ID

A

R

DSWRPP-1/WORKS/NCB/19

-3

0.0600 30-Jun-2010

14-Jul-2011

31-Jul-2010

12-Jul-2011

14-Aug-2010

26-Jul-2011

19-Sep-2010

02-Aug-2011

10-Oct-2010

23-Aug-2011

DSWRPP-1/WORKS/N

CB/19-3

pp 19 24-Nov-2010 Basic Safety facility works of Mahavilachchiya Dam 15-Sep-2010

18-Oct-201127-Sep-2011

NCB ID

A

R

DSWRPP-1/WORKS/S/19-4 0.0200 30-Jun-2010

30-Apr-2010

31-Jul-2010

28-May-2010

14-Aug-2010

9-Jul-2010

19-Sep-2010

16-Jul-2010

10-Oct-2010

06-Aug-2010

DSWRPP-1/WORKS/S/

19-4

783,975.45pp 19

21-Feb-2011

Rs 3,919,877.28

28-Dec-2010

Rs 3,919,877.28

Palith Enterprises 24-Nov-2010Basic Safety facility works of Padaviya Dam 15-Dec-2010

01-Oct-201010-Sep-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/19-5 0.0200 30-Jun-2010

30-Apr-2010

31-Jul-2010

28-May-2010

14-Aug-2010

9-Jul-2010

19-Sep-2010

16-Jul-2010

10-Oct-2010

06-Aug-2010

DSWRPP-1/WORKS/S/

19-5

336,179.50pp 19

21-Feb-2011

Rs. 1,680,897.50

28-Dec-2010

Rs. 1,680,897.50

Pubudu Constructions 24-Nov-2010Basic Safety facility works of Wahalkada Dam 15-Dec-2010

01-Oct-201010-Sep-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/NCB/20

-1

0.1700 30-Jun-2009

15-Jun-2011

31-Jul-2009

8-Jul-2011

14-Aug-2009

22-Jul-2011

19-Sep-2009

29-Jul-2011

10-Oct-2009

19-Aug-2011

DSWRPP-1/WORKS/N

CB/20-1

pp 20 24-Nov-2009 Basic Safety facility works of Ambalan oya Dam 15-Dec-2009

30-Sep-201116-Sep-2011

NCB ID

Page 2 of 4

Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight

S

eria

l N

o

Package No Description of Services

Estim

ate

d C

ost

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Estim

ate

d,

Pre

pa

red

&

Sa

nctio

ne

d (

Da

te)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tion

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

A

R

DSWRPP-1/WORKS/NCB/20

-2

0.1500 30-Jun-2009

15-Jun-2011

31-Jul-2009

13-Jul-2011

14-Aug-2009

27-Jul-2011

19-Sep-2009

03-Aug-2011

10-Oct-2009

24-Aug-2011

DSWRPP-1/WORKS/N

CB/20-2

pp 20 24-Nov-2009 Basic Safety facility works of Ekgal aru Dam 5-Dec-2009

15-Oct-201121-Sep-2011

NCB ID

A

R

DSWRPP-1/WORKS/S/20-3 0.0200 30-Jun-2009

30-Jun-2010

31-Jul-2009

28-Jul-2010

14-Aug-2009

8-Sep-2010

19-Sep-2009

15-Sep-2010

10-Oct-2009

06-Oct-2010

DSWRPP-1/WORKS/S/

20-3

3,807,049.74pp 20

3-May-2011

Rs 428,177,970.00

19-Apr-2011

Rs 428,177,970.00

M/s Yoosuf Agencies 24-Nov-2009Basic Safety facility works of Senanayaka samudraya Dam 15-Dec-2009

01-Dec-201010-Nov-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/20-4 0.0200 30-Jun-2009

30-Jun-2010

31-Jul-2009

28-Jul-2010

14-Aug-2009

8-Sep-2010

19-Aug-2009

15-Sep-2010

10-Oct-2009

06-Oct-2010

DSWRPP-1/WORKS/S/

20-4

1,002,104.64pp 20

3-May-2011

Rs 4,179,910.76

19-Apr-2011

Rs 4,179,910.76

Athambawa & Sons 24-Nov-2009 Basic Safety facility works of Namal oya Dam 15-Dec-2009

01-Dec-201010-Nov-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/20-5 0.0200 30-Jun-2009

24-Jun-2011

31-Jul-2009

22-Jul-2011

14-Aug-2009

5-Aug-2011

19-Sep-2009

12-Aug-2011

10-Oct-2009

02-Sep-2011

DSWRPP-1/WORKS/S/

20-5

pp 20 24-Nov-2009 Basic Safety facility works of Pannalgama Dam 15-Dec-2009

14-Oct-201130-Sep-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/20-6 0.0200 30-Jun-2009

30-Jun-2010

31-Jul-2009

28-Jul-2010

14-Aug-2009

8-Sep-2010

19-Sep-2009

15-Sep-2010

10-Oct-2009

06-Oct-2010

DSWRPP-1/WORKS/S/

20-6

pp 20 24-Nov-2009 Basic Safety facility works of Pallang oya Dam 15-Dec-2009

01-Dec-201010-Nov-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/21-1 0.0200 30-Jun-2009

31-Jul-2010

31-Jul-2009

28-Aug-2010

14-Aug-2009

9-Oct-2010

19-Sep-2009

16-Oct-2010

10-Oct-2009

06-Nov-2010

DSWRPP-1/WORKS/S/

21-1

1,087,321.64pp 21

28-Mar-2011

Rs 3,711,948.70

Rs 3,711,948.70

Mahinda Contractors 28-Jun-201124-Nov-2009 Basic Safety facility works of Hakwatuna Dam 15-Dec-2009

01-Jan-201111-Dec-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/21-2 0.0200 30-Jun-2009

31-Jul-2010

31-Jul-2009

28-Aug-2010

23-Sep-2010

14-Aug-2009

9-Oct-2010

19-Sep-2009

16-Oct-2010

10-Oct-2009

06-Nov-2010

DSWRPP-1/WORKS/S/

21-2

1,807,788.51pp 21

28-Mar-2011

Rs 3,741,575.52

Rs 3,741,575.52

S.S.Kudavithana Contractors, 28-Jun-201124-Nov-2009 Basic Safety facility works of Kimbulwana Dam 15-Dec-2009

01-Jan-201111-Dec-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/21-3 0.0200 30-Jun-2009

15-Jun-2011

31-Jul-2009

13-Jul-2011

14-Aug-2009

27-Jul-2011

19-Sep-2009

03-Aug-2011

10-Oct-2009

24-Aug-2011

DSWRPP-1/WORKS/S/

21-3

pp 21 24-Nov-2009 Basic Safety facility works of Palukadawala Dam 15-Dec-2009

05-Oct-201121-Sep-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/22-1 0.0200 30-Jun-2009

01-Jan-2011

31-Jul-2009

29-Jan-2011

14-Aug-2009

12-Mar-2011

19-Sep-2009

19-Mar-2011

10-Oct-2009

09-Apr-2011

DSWRPP-1/WORKS/S/

22-1

pp 22 24-Nov-2009 Basic Safety facility works of Lunugamvehera Dam 15-Dec-2009

04-Jun-201114-May-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/22-2 0.0200 30-Jun-2009

10-Jun-2011

31-Jul-2009

8-Jul-2011

14-Aug-2009

22-Jul-2011

19-Sep-2009

29-Jul-2011

10-Oct-2009

19-Aug-2011

DSWRPP-1/WORKS/S/

22-2

pp 22 24-Nov-2009Basic Safety facility works of Mau ara Dam 15-Dec-2009

30-Sep-201116-Sep-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/22-3 0.0200 30-Jun-2009

01-Aug-2010

31-Jul-2009

29-Jul-2010

14-Aug-2009

10-Oct-2010

19-Sep-2009

17-Oct-2010

10-Oct-2009

07-Nov-2010

DSWRPP-1/WORKS/S/

22-3

pp 22 24-Nov-2009 Basic Safety facility works of Muruthawela Dam 15-Dec-2009

02-Jan-201112-Dec-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/23-1 0.0200 30-Jun-2009

15-Jan-2011

31-Jul-2009

12-Feb-2011

14-Aug-2009

26-Mar-2011

19-Sep-2009

02-Apr-2011

10-Oct-2009

23-Apr-2011

Contract Awarded DSWRPP-1/WORKS/S/

23-1

2,227,007.98pp 23

15-Oct-2010

Rs. 4,025,552.81

27-Sep-2010

Rs. 4,025,552.81

Manaff Construction 24-Nov-2009 Basic Safety facility works of Mahadiul wewa Dam 15-Dec-2009

18-Jun-201128-May-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/23-2 0.0200 30-Jun-2009

15-Jan-2011

31-Jul-2009

12-Feb-2011

14-Aug-2009

26-Mar-2011

19-Sep-2009

02-Apr-2011

10-Oct-2009

23-Apr-2011

DSWRPP-1/WORKS/S/

23-2

845,159.20pp 23 24-Nov-2009 Basic Safety facility works of Morawewa Dam 15-Dec-2009

18-Jun-201128-May-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/NCB/24

-1

0.0900 30-Jun-2009

17-Aug-2011

31-Jul-2009

14-Sep-2011

14-Aug-2009

28-Sep-2011

19-Sep-2009

05-Oct-2011

10-Oct-2009

26-Oct-2011

DSWRPP-1/WORKS/N

CB/24-1

pp 24 24-Nov-2009 Basic Safety facility works of Bandagiriya Dam 15-Dec-2009

07-Dec-201123-Nov-2011

NCB ID

A

R

DSWRPP-1/WORKS/S/24-2 0.0200 30-Jun-2009

31-Jan-2011

31-Jul-2009

28-Feb-2011

14-Aug-2009

11-Apr-2011

19-Sep-2009

18-Apr-2011

10-Oct-2009

09-May-2011

DSWRPP-1/WORKS/S/

24-2

pp 24 24-Nov-2009 Basic Safety facility works of Unnachchi Dam 15-Dec-2010

04-Jul-201113-Jun-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/NCB/24

-3

0.0840 30-Jun-2009

19-Aug-2011

31-Jul-2009

16-Sep-2011

14-Aug-2009

30-Sep-2011

19-Sep-2009

07-Oct-2011

10-Oct-2009

28-Oct-2011

DSWRPP-1/WORKS/N

CB/24-3

pp 24 24-Nov-2009 Basic Safety facility works of Vakaneri Dam 15-Dec-2009

09-Dec-201125-Nov-2011

NCB ID

A

R

DSWRPP-1/WORKS/S/24-4 0.0200 30-Jun-2009

31-Jul-2010

31-Jul-2009

28-Aug-2010

14-Aug-2009

9-Oct-2010

19-Sep-2009

16-Oct-2010

10-Oct-2009

06-Nov-2010

DSWRPP-1/WORKS/S/

24-4

pp 24 24-Nov-2009 Basic Safety facility works of Navakiri Dam 15-Dec-2009

01-Jan-201111-Dec-2010

SHOPPI

NG

ID

Page 3 of 4

Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight

S

eria

l N

o

Package No Description of Services

Estim

ate

d C

ost

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Estim

ate

d,

Pre

pa

red

&

Sa

nctio

ne

d (

Da

te)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tion

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

A

R

DSWRPP-1/WORKS/NCB/25 0.0700 30-Jun-2009

27-Jun-2011

31-Jul-2009

25-Jul-2011

14-Aug-2009

8-Aug-2011

19-Sep-2009

15-Aug-2011

10-Oct-2009

05-Sep-2011

DSWRPP-1/WORKS/N

CB/25

pp 25 24-Sep-2009 Basic Safety facility works of Muthukandiya Dam 15-Dec-2009

31-Oct-201110-Oct-2011

NCB ID

A

R

DSWRPP-1/WORKS/S/26 0.0200 30-Jun-2009

15-Jul-2011

31-Jul-2009

12-Aug-2011

14-Aug-2009

23-Sep-2011

19-Sep-2009

30-Sep-2011

10-Oct-2009

21-Oct-2011

DSWRPP-1/WORKS/S/

26

887,297.05pp 26 24-Nov-2009Basic Safety facility works of Dewahuwa Dam 15-Dec-2009

16-Dec-201125-Nov-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/27-1 0.0200 30-Jun-2009

01-Sep-2010

31-Jul-2009

29-Sep-2010

14-Aug-2009

10-Nov-2010

19-Sep-2009

17-Nov-2010

10-Oct-2009

08-Dec-2010

DSWRPP-1/WORKS/S/

27-1

pp 27 24-Nov-2009 Basic Safety facility works of Mapakada Dam 1-Sep-2009

02-Feb-201112-Jan-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/NCB/27

-2

0.0800 30-Jun-2009

09-Aug-2011

31-Jul-2009

6-Sep-2011

14-Aug-2009

20-Sep-2011

19-Sep-2009

27-Sep-2011

10-Oct-2009

18-Oct-2011

DSWRPP-1/WORKS/N

CB/27-2

pp 27 24-Nov-2009 Basic Safety facility works of Pahala Andarawewa Dam 1-Sep-2009

13-Sep-201122-Nov-2011

NCB ID

A

R

DSWRPP-1/WORKS/S/27-3 0.0200 30-Jun-2009

15-Sep-2010

31-Jul-2009

13-Oct-2010

14-Aug-2009

24-Nov-2010

19-Sep-2009

01-Dec-2010

10-Oct-2009

22-Dec-2010

DSWRPP-1/WORKS/S/

27-3

1,933,538.23pp 27

16-Jun-2011

Rs 4,910,192.50

9-Jun-2011

Rs 4,910,192.50

Dammika Construction 28-Sep-201124-Nov-2009 Basic Safety facility works of Sorabora wewa Dam 1-Sep-2009

16-Feb-201126-Jan-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/27-4 0.0200 30-Jun-2009

09-Aug-2011

31-Jul-2009

6-Sep-2011

14-Aug-2009

20-Sep-2011

19-Sep-2009

27-Sep-2011

10-Oct-2009

18-Oct-2011

DSWRPP-1/WORKS/S/

27-4

pp 27 24-Nov-2009Basic Safety facility works of Wewalawewa Dam 1-Sep-2009

13-Dec-201122-Nov-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/28-1 0.0200 30-Jun-2009

01-May-2010

31-Jul-2009

29-May-2010

14-Aug-2009

10-Jul-2010

19-Sep-2009

17-Jul-2010

10-Oct-2009

07-Aug-2010

DSWRPP-1/WORKS/S/

28-1

pp 28 24-Nov-2009Basic Safety facility works of Ellawela Dam 1-Sep-2009

02-Oct-201011-Sep-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/28-2 0.0200 30-Jun-2009

10-Aug-2011

31-Jul-2009

7-Sep-2011

14-Aug-2009

21-Sep-2011

19-Sep-2009

28-Sep-2011

10-Oct-2009

19-Oct-2011

DSWRPP-1/WORKS/S/

28-2

pp 28 24-Nov-2009 Basic Safety facility works of Hali Ela Dam 1-Sep-2009

30-Nov-201116-Nov-2011

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/28-3 0.0200 30-Jun-2009

31-May-2010

31-Jul-2009

28-Jun-2010

14-Aug-2009

9-Aug-2010

19-Sep-2009

16-Aug-2010

10-Oct-2009

06-Sep-2010

DSWRPP-1/WORKS/S/

28-3

pp 28 24-Nov-2009 Basic Safety facility works of Kekanadura Dam 1-Sep-2009

01-Nov-201011-Oct-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/FA/28-4 0.0250 01-May-2010 29-May-2010 10-Jul-2010 17-Jul-2010 07-Aug-2010 Work in progress DSWRPP-1/WORKS/F

A/28-4

2,500,000.00pp 28 11-Sep-2010 Grouting works of Ellawela Dam

Prior Review

2-Oct-2010CP ID

A

R

DSWRPP-1/WORKS/DC/30-1 0.0300 21-Jul-2008

21-Jul-2008

4-Aug-2008 09-Sep-2008 30-Sep-2008 Completed DSWRPP-1/WORKS/D

C/30-1

pp 30

23-Jul-2008

Rs. 2,836,992.00

Rs. 2,836,992.00

Ceylon Electricity Board 15-Mar-200914-Nov-2008

Electing Lamp posts & supplying Electricity - Parakrama

Samudra

5-Dec-2008DC ID

A

R

DSWRPP-1/WORKS/S/31 0.0150 01-Sep-2009

01-Sep-2009

2-Oct-2009

29-Sep-2009

7-Sep-2009

7-Oct-2009

17-Oct-2008

10-Dec-2007

12-Nov-2009

17-Nov-2009

24-Oct-2008

27-Dec-2009

08-Dec-2009

14-Nov-2008

Completed DSWRPP-1/WORKS/S/

31

457,849.64pp 31

15-Dec-2008

Rs. 407,267.17

Rs. 407,267.17

Gunasekara Construction 10-Feb-2010Internal painting and minor repairs to Dam Safety Office

Building-ID

3-Mar-2010

02-Feb-201012-Jan-2010

SHOPPI

NG

ID

A

R

DSWRPP-1/WORKS/S/32 0.0400 01-May-2009

01-May-2009

1-Jun-2009

29-May-2009

6-Jun-2009

10-Jul-2009

12-Jun-2009

17-Jul-2009

26-Aug-2009

07-Aug-2009

Completed DSWRPP-1/WORKS/S/

32

2,000,000.00pp 32

14-Sep-2010

Rs. 2,094,203.25

Rs. 2,094,203.25

Re-Jay Interiors 10-Oct-2009Office refurbishment - Repairs to office of consultants

component 2

31-Oct-2009

02-May-201011-Sep-2009

SHOPPI

NG

ID

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Name & Designation

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Date

Page 4 of 4

Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight

Dam Safety and Water Resources Planning Project(DSWRPP)

PROGRESS REPORT ON PROCUREMENT OF WORKS - Mahaweli Authority of Sri Lanka

( FOR ALL CONTRACTS)

As On 9/6/2011IDA Credit Number : 4406-CE

Project ID: 093132

Se

ria

l N

o

Package No Description of Services

Est

ima

ted

Co

st

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Est

ima

ted

, P

rep

are

d &

Sa

nct

ion

ed

(D

ate

)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tio

n

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

Component1

A

R

DSWRPP-1/WORKS/NCB/54 0.2300 13-Aug-2009

20-Oct-2010

12-Sep-2009

17-Nov-2010

27-Sep-2009

15-Dec-2010

02-Nov-2009

29-Dec-2010

11-Jul-2011

23-Nov-2009

26-Jan-2011

09-Aug-2011

DSWRPP-1/WORKS/N

CB/54

pp 0 07-Jan-2010Remedial Works of Maduruoya Dam 28-Jan-2010

13-Apr-201116-Mar-2011

NCB MASL

A

R

DSWRPP-1/WORKS/S/50 0.0200 06-Feb-2009

01-Jan-2010

9-Mar-2009

29-Jan-2010

23-Mar-2009

12-Mar-2010

28-Apr-2009

19-Mar-2010

19-May-2009

09-Apr-2010

DSWRPP-1/WORKS/S/

50

pp 1 03-Jul-2009Office refurbishments-DSMC Office-MASL 24-Jul-2009

04-Jun-201014-May-2010

SHOPPI

NG

MASL

A

R

DSWRPP-1/WORKS/NCB/51 0.5700 29-Apr-2009

10-Aug-2010

30-May-2009

7-Sep-2010

13-Jun-2009

5-Oct-2010

19-Jul-2009

19-Oct-2010

14-Feb-2011

09-Aug-2009

16-Nov-2010

15-Mar-2011

Contract Awarded DSWRPP-1/WORKS/N

CB/51

45,513,788.32pp 2

25-Jul-2011

Rs 203,186,555.00

+VAT 12%

10-Jun-2011

Rs 203,186,555.00

+VAT 12%

M/s Sierra Construction (Pvt.)

Ltd.

23-Sep-2009Remedial works of Chandrikawewa Dam 14-Oct-2009

01-Feb-201104-Jan-2011

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/52 0.1400 12-Jul-2008

30-Mar-2009

24-Dec-2009

2-Apr-2009

27-Apr-2009

4-May-2009

16-Apr-2009

8-Jun-2009

25-Sep-2009

22-May-2009

15-Jun-2009

01-Nov-2009

12-Jun-2009

06-Jul-2009

03-Dec-2009

Contract Awarded DSWRPP-1/WORKS/N

CB/52

35,591,253.01pp 3

16-Mar-2010

Rs 35,041,693.50

+VAT

9-Mar-2010

Rs 35,041,693.50

+VAT

Sunil Jayaratne Construction 15-Mar-201127-Jul-2009Remedial works of Kandalama Dam 17-Aug-2009

31-Aug-200910-Aug-2009

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/53 0.9800 14-May-2009

12-Jul-2011

14-Jun-2009

9-Aug-2011

28-Jun-2009

6-Sep-2011

03-Aug-2009

20-Sep-2011

24-Aug-2009

18-Oct-2011

DSWRPP-1/WORKS/N

CB/53

pp 4 08-Oct-2009Remedial works of Victoria Dam 29-Oct-2009

03-Jan-201206-Dec-2011

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/55 0.2200 14-Jul-2009

15-Aug-2011

14-Aug-2009

12-Sep-2011

28-Aug-2009

10-Oct-2011

03-Oct-2009

24-Oct-2011

17-Nov-2009

21-Nov-2011

DSWRPP-1/WORKS/N

CB/55

pp 6 01-Jan-2010Remedial works of Randenigala Dam 22-Jan-2010

06-Feb-201209-Jan-2012

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/56 0.7500 28-Feb-2009

12-Jun-2011

31-Mar-2009

10-Jul-2011

14-Apr-2009

7-Aug-2011

20-May-2009

21-Aug-2011

04-Jul-2009

18-Sep-2011

DSWRPP-1/WORKS/N

CB/56

pp 7 18-Aug-2009Remedial work of Polgolla Dam 8-Sep-2009

04-Dec-201106-Nov-2011

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/57 1.0300 01-Apr-2009

21-Jun-2011

2-May-2009

19-Jul-2011

16-May-2009

16-Aug-2011

21-Jun-2009

30-Aug-2011

05-Aug-2009

27-Sep-2011

DSWRPP-1/WORKS/N

CB/57

pp 8 19-Sep-2009Remedial work of Kothmale Dam 10-Oct-2009

13-Dec-201115-Nov-2011

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/58 0.6500 30-Jun-2009

25-May-2011

31-Jul-2009

22-Jun-2011

14-Aug-2009

20-Jul-2011

19-Sep-2009

03-Aug-2011

10-Jun-2011

03-Nov-2009

08-Jan-2011

11-Jul-2011

DSWRPP-1/WORKS/N

CB/58

pp 9 18-Dec-2009Remedial works of Kalawewa Dam 8-Jan-2010

16-Nov-201119-Oct-2011

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/59 0.1200 10-Apr-2009

12-Jul-2010

11-May-2009

9-Aug-2010

25-May-2009

6-Sep-2010

30-Jun-2009

20-Sep-2010

08-Nov-2010

14-Aug-2009

18-Oct-2010

30-Nov-2010

Contract Awarded DSWRPP-1/WORKS/N

CB/59

13,424,912.26pp 10

18-Mar-2011

Rs 59,932,644.00

+VAT 12%

Rs 59,932,644.00

+VAT 12%

Square Mech Engineering (Pvt)

Ltd

28-Sep-2009Remedial works of Bowatenna Dam 19-Oct-2009

03-Jan-201106-Dec-2010

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/60 0.1600 12-Jun-2009

29-Jul-2011

13-Jul-2009

26-Aug-2011

27-Jul-2009

23-Sep-2011

01-Sep-2009

07-Oct-2011

16-Oct-2009

04-Nov-2011

DSWRPP-1/WORKS/N

CB/60

pp 11 30-Nov-2009Remedial works of Rantambe Dam 21-Dec-2009

20-Jan-201223-Dec-2011

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/61

-1

0.2000 02-Mar-2009

30-Mar-2009

30-Mar-2009

2-Apr-2009

27-Apr-2009

11-Jun-2009

16-Apr-2009

8-Jun-2009

15-Jun-2009

22-Jun-2009

12-Aug-2009

22-May-2009

29-Jun-2009

17-Aug-2009

06-Jul-2009

20-Jul-2009

08-Sep-2009

20-Sep-2000

07-Sep-2009

17-Nov-2009

Contract Awarded DSWRPP-1/WORKS/N

CB/61-1

28,139,587.14pp 12

30-Nov-2009

Rs 26,656,370.07

+VAT 12%

30-Nov-2009

Rs 26,656,370.07

+VAT 12%

Gamini Construction 20-Aug-2009Rehabilitation of Dambulu Oya Tank

Prior Review

10-Sep-2009

28-Sep-200924-Aug-2009

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/61

-2

0.2400 02-Mar-2009

30-Mar-2009

2-Apr-2009

27-Apr-2009

16-Apr-2009

8-Jun-2009

31-Dec-2010

22-May-2009

15-Jun-2009

02-Jan-2011

06-Jul-2009

06-Jul-2009

28-Jan-2011

Contract Awarded DSWRPP-1/WORKS/N

CB/61-2

15,150,406.54pp 12

Rs 67,635,743.50

+VAT 126-Jun-2011

Rs 67,635,743.50

+VAT 12

M/s Tudawe Engineering

Services (Pvt) Ltd

20-Aug-2009Remedial works of electro-mechanical items for Dambulu

Oya & Kandalama Dams.

10-Sep-2009

31-Aug-200910-Aug-2009

NCB MASL

Page 1 of 2

S

eria

l N

o

Package No Description of Services

Estim

ate

d C

ost

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Estim

ate

d,

Pre

pa

red

&

Sa

nctio

ne

d (

Da

te)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tion

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

A

R

DSWRPP-1/WORKS/NCB/63 0.1280 01-Jul-2009

01-Jun-2010

03-Aug-2010

1-Aug-2009

28-Jul-2010

10-Aug-2010

6-Aug-2009

8-Sep-2010

26-Aug-2010

11-Sep-2009

15-Sep-2010

20-Sep-2010

26-Oct-2009

06-Oct-2010

12-Oct-2010

Contract Awarded DSWRPP-1/WORKS/N

CB/63

1,758,172.90pp 14

Rs 8,790,864.50

+VAT 12%

Rs 8,790,864.50

+VAT 12%

Sampath Construction 10-Dec-2009Improvements of Toe roads and appurtenant structures of

Ulhitiya/ Rathkinda dam

30-Dec-2009

01-Dec-201010-Nov-2010

NCB MASL

A

R

DSWRPP-1/WORKS/NCB/64 0.0000 01-Jul-2009

30-Jun-2010

1-Aug-2009

28-Jul-2010

6-Aug-2009

8-Sep-2010

11-Sep-2009

15-Sep-2010

08-Apr-2011

26-Oct-2009

06-Oct-2010

10-May-2011

DSWRPP-1/WORKS/N

CB/64

pp 15

13-Jul-2011

Rs 12,566,900.50

+VAT 12%

Rs 12,566,900.50

+VAT 12%

M/s R.M.T. Construction 7-Apr-201210-Dec-2009Basic Safety facility works of Pimburettewa Dam 31-Dec-2009

01-Dec-201010-Nov-2010

NCB MASL

A

R

DSWRPP-1/WORKS/S/67-1 0.0300 01-Apr-2009

02-Mar-2009

29-Apr-2009

1-Apr-2009

10-Jun-2009

5-Aug-2009

17-Jun-2009

12-Aug-2009

08-Jul-2009

27-Aug-2009

Contract Awarded DSWRPP-1/WORKS/S/

67-1

2,693,457.19pp 18

13-Nov-2009

Rs. 2,553,413.50

Rs. 2,553,413.50

Victoria Builders 12-Aug-2009Office refurbishments-HAO&M office- Digana 2-Sep-2009SHOPPI

NG

MASL

A

R

DSWRPP-1/WORKS/S/67-2 0.0200 01-Apr-2009

10-Mar-2009

29-Apr-2009

19-Mar-2009

10-Jun-2009

31-Mar-2010

17-Jun-2009

10-Jun-2010

08-Jul-2009 DSWRPP-1/WORKS/S/

67-2

2,118,976.53pp 18

29-Oct-2010

Rs 3,086,368.29

+VAT 12%

30-Aug-2010

Rs 3,086,368.29

+VAT 12%

M/s Sachini Builders 30-Dec-201012-Aug-2009Office refurbishments-Dam Safety Office-Dambulla 2-Sep-2009SHOPPI

NG

MASL

A

R

DSWRPP-1/WORKS/S/67-4 0.0030 15-Feb-2010 15-Mar-2010 26-Apr-2010 03-May-2010 10-May-2010

22-Feb-2010

DSWRPP-1/WORKS/S/

67-4

144,480.00pp 18 14-Jun-2010Refurbishment of Dam Safety Management Centre - MASL 5-Jul-2010SHOPPI

NG

MASL

A

R

DSWRPP-1/WORKS/NCB/68

-1

0.1570 30-Jun-2010

08-Mar-2010

28-Jul-2010

10-Aug-2010

8-Sep-2010

26-Aug-2010

15-Sep-2010

20-Sep-2010

06-Oct-2010

12-Oct-2010

Contract Awarded DSWRPP-1/WORKS/N

CB/68-1

7,681,711.53pp 19

13-Dec-2010

Rs. 14,075,782.03

+VAT 12%

Rs. 14,075,782.03

+VAT 12%

AMSK Construction 10-Nov-2010Improvements of Link Tunnel Access Road - Maduru Oya

Dam

1-Dec-2010NCB MASL

A

R

DSWRPP-1/WORKS/NCB/68

-2

0.2090 30-Jun-2010

03-Aug-2010

28-Jul-2010

10-Aug-2010

8-Sep-2010

26-Aug-2010

15-Sep-2010

20-Sep-2010

06-Oct-2010

12-Oct-2010

Contract Awarded DSWRPP-1/WORKS/N

CB/68-2

4,920,555.45pp 19

10-Dec-2010

Rs. 14,449,672.45

+VAT 12%

Rs. 14,449,672.45

+VAT 12%

Liyanage Construction 10-Nov-2010Improvements to Right Bank Access Road – Maduru Oya 1-Dec-2010NCB MASL

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Name & Designation

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Date

Page 2 of 2

Dam Safety and Water Resources Planning Project(DSWRPP)

PROGRESS REPORT ON PROCUREMENT OF WORKS - Ceylon Electricity Board

( FOR ALL CONTRACTS)

As On 9/6/2011IDA Credit Number : 4406-CE

Project ID: 093132

Se

ria

l N

o

Package No Description of Services

Est

ima

ted

Co

st

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Est

ima

ted

, P

rep

are

d &

Sa

nct

ion

ed

(D

ate

)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tio

n

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

Component1

A

R

DSWRPP-1/WORKS/S/80 0.0200 30-Aug-2009

30-Aug-2011

30-Sep-2009

27-Sep-2011

14-Oct-2009

4-Oct-2011

19-Nov-2009

11-Oct-2011

10-Dec-2009

01-Nov-2011

DSWRPP-1/WORKS/S/

80

pp 1 24-Jan-2010Basic Safety Facility works of Laxapana Dam 14-Feb-2010

13-Mar-201129-Nov-2011

SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/NCB/81 0.5040 30-Jul-2009

15-Jul-2011

30-Aug-2009

12-Aug-2011

13-Sep-2009

9-Sep-2011

19-Oct-2009

23-Sep-2011

09-Nov-2009

21-Oct-2011

DSWRPP-1/WORKS/N

CB/81

pp 2 24-Dec-2009Remedial works of Castlereigh Dam 14-Jan-2010

06-Jan-201209-Dec-2011

NCB PMU

A

R

DSWRPP-1/WORKS/NCB/82 0.1700 29-May-2009

16-May-2011

29-Jun-2009

13-Jun-2011

13-Jul-2009

11-Jul-2011

18-Aug-2009

25-Jul-2011

05-Sep-2011

08-Sep-2009

22-Aug-2011

30-Sep-2011

DSWRPP-1/WORKS/N

CB/82

pp 3 23-Oct-2009Remedial works of Laxapana, Canyon & Norton Dams 13-Nov-2009

07-Nov-201110-Oct-2011

NCB PMU

A

R

DSWRPP-1/WORKS/NCB/85

-2

0.0900 14-Jun-2009

25-May-2011

15-Jul-2009

22-Jun-2011

20-Jul-2009

3-Aug-2011

25-Aug-2009

10-Aug-2011

09-Oct-2009

31-Aug-2011

DSWRPP-1/WORKS/N

CB/85-2

pp 4 23-Nov-2009Basic Safety facility works of Samanala wewa Dam 14-Dec-2009

26-Oct-201105-Oct-2011

NCB PMU

A

R

DSWRPP-1/WORKS/S/85-1 0.0300 01-Nov-2009

05-Jun-2011

2-Dec-2009

3-Jul-2011

7-Dec-2009

14-Aug-2011

12-Jan-2010

21-Aug-2011

26-Feb-2010

11-Sep-2011

DSWRPP-1/WORKS/S/

85-1

pp 6 12-Apr-2010Basic Safety facility works of Kukele H.P 3-May-2010

06-Nov-201116-Oct-2011

SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/85-3 0.0600 14-Sep-2010

30-Jul-2010

12-Oct-2010

12-Aug-2010

23-Nov-2010

18-Aug-2010

30-Nov-2010

20-Sep-2010

21-Dec-2010

07-Oct-2010

Contract Awarded DSWRPP-1/WORKS/S/

85-3

5,998,953.77pp 6

4-Jan-2011

Rs. 7,120,171.00

+VAT 12%

6-Dec-2010

Rs. 7,120,171.00

+VAT 12%

HMND Construction 25-Jan-2011Basic Safety facility works of Maussakelle & Canyon 15-Feb-2011SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/85-4 0.0450 14-Sep-2010

30-Jul-2010

12-Oct-2010

12-Aug-2010

23-Nov-2010

18-Aug-2010

30-Nov-2010

20-Sep-2010

21-Dec-2010

07-Oct-2010

Contract Awarded DSWRPP-1/WORKS/S/

85-4

488,754.00pp 6

4-Jan-2011

Rs. 1,295,112.00

+VAT 12%

6-Dec-2010

Rs. 1,295,112.00

+VAT 12%

HMND Construction 25-Jan-2011Basic Safety facility works of Castlereigh & Norton 15-Feb-2011SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/86 0.0100 01-Jun-2009

01-Jun-2009

2-Jul-2009

29-Jun-2009

7-Jul-2009

10-Aug-2009

1-Jul-2008

12-Aug-2009

17-Aug-2009

14-Jul-2008

26-Sep-2009

07-Sep-2009

06-Aug-2008

Completed DSWRPP-1/WORKS/S/

86

560,000.00pp 7

10-Sep-2008

Jayasundara Association 31-Jul-200910-Nov-2009Preparation of as built drawings for dams of CEB 1-Dec-2009

02-Nov-200912-Oct-2009

SHOPPI

NG

PMU

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Name & Designation

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Date

Page 1 of 1

Dam Safety and Water Resources Planning Project(DSWRPP)

PROGRESS REPORT ON PROCUREMENT OF WORKS - National Water Supply & Drainage Board

( FOR ALL CONTRACTS)

As On 9/6/2011IDA Credit Number : 4406-CE

Project ID: 093132

Se

ria

l N

o

Package No Description of Services

Est

ima

ted

Co

st

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Est

ima

ted

, P

rep

are

d &

Sa

nct

ion

ed

(D

ate

)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tio

n

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

Component1

A

R

DSWRPP-1/WORKS/NCB/90 0.1550 10-Apr-2009

16-Sep-2010

11-May-2009

14-Oct-2010

16-May-2009

11-Nov-2010

22-Jun-2011

18-Jun-2011

21-Jun-2009

25-Nov-2010

29-Jun-2011

05-Aug-2009

23-Dec-2010

22-Jul-2011

DSWRPP-1/WORKS/N

CB/90

pp 1 19-Sep-2009Remedial works of Kalatuwawe Dam 10-Oct-2009

10-Mar-201110-Feb-2011

NCB PMU

A

R

DSWRPP-1/WORKS/NCB/91 0.0000 29-May-2009

29-May-2010

29-Jul-2009

26-Jul-2010

4-Jul-2009

7-Aug-2010

09-Aug-2009

14-Aug-2010

23-Sep-2009

04-Sep-2010

DSWRPP-1/WORKS/N

CB/91

pp 2 07-Nov-2009Basic Safety facility works of Labugama and Kalatuwawe

Dams

28-Nov-2009

30-Oct-201004-Sep-2010

NCB PMU

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Name & Designation

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Date

Page 1 of 1

Dam Safety and Water Resources Planning Project(DSWRPP)

PROGRESS REPORT ON PROCUREMENT OF WORKS - Provincial Council

( FOR ALL CONTRACTS)

As On 9/6/2011IDA Credit Number : 4406-CE

Project ID: 093132

Se

ria

l N

o

Package No Description of Services

Est

ima

ted

Co

st

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Est

ima

ted

, P

rep

are

d &

Sa

nct

ion

ed

(D

ate

)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tio

n

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

Component1

A

R

DSWRPP-1/WORKS/S/95-1 0.0400 20-Jun-2011 18-Jul-2011 1-Aug-2011 08-Aug-2011 29-Aug-2011 DSWRPP-1/WORKS/S/

95-1

pp 1 26-Sep-2011Basic Safety facility works of Iranamadu Tank 5-Aug-2011

10-Oct-2011

SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/95-2 0.0400 20-Jun-2011 18-Jul-2011 1-Aug-2011 08-Aug-2011 29-Aug-2011 DSWRPP-1/WORKS/S/

95-2

pp 1 26-Sep-2011Basic Safety facility works of Muthuiyan KadduTank 10-Oct-2011SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/95-3 0.0400 20-Jun-2011 18-Jun-2011 1-Aug-2011 08-Aug-2011 29-Aug-2011 DSWRPP-1/WORKS/S/

95-3

pp 1 26-Sep-2011Basic Safety facility works of Vaunikulam Tank 10-Oct-2011SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/95-4 0.0400 20-Jun-2011 18-Jul-2011 1-Aug-2011 08-Aug-2011 29-Aug-2011 DSWRPP-1/WORKS/S/

95-4

pp 1 26-Sep-2011Basic Safety facility works of Akkarayan, Tank 10-Oct-2011SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/96-1 0.0450 15-Sep-2011 16-Oct-2011 21-Oct-2011 28-Oct-2011 11-Nov-2011 DSWRPP-1/WORKS/S/

96-1

pp 2 09-Dec-2011Basic Safety facility works of Galamitiya Oya Dam under

East Provincial Council

23-Dec-2011SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/96-2 0.0450 15-Sep-2011 16-Oct-2011 21-Oct-2011 28-Oct-2011 11-Nov-2011 DSWRPP-1/WORKS/S/

96-2

pp 2 09-Dec-2011Basic Safety facility works of Malayadi Dam under East

Provincial Council

23-Dec-2011SHOPPI

NG

PMU

A

R

DSWRPP-1/WORKS/S/96-3 0.0450 15-Sep-2011 16-Oct-2011 21-Oct-2011 28-Oct-2011 11-Nov-2011 DSWRPP-1/WORKS/S/

96-3

pp 2 09-Dec-2011Basic Safety facility works of ParavipanchachanDam under

East Provincial Council

23-Dec-2011SHOPPI

NG

PMU

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Name & Designation

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Date

Page 1 of 1

Harshika
Highlight
Harshika
Highlight
Harshika
Highlight

Dam Safety and Water Resources Planning Project(DSWRPP)

PROGRESS REPORT ON PROCUREMENT OF WORKS - Project Management Unit

( FOR ALL CONTRACTS)

As On 9/6/2011IDA Credit Number : 4406-CE

Project ID: 093132

Se

ria

l N

o

Package No Description of Services

Est

ima

ted

Co

st

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Est

ima

ted

, P

rep

are

d &

Sa

nct

ion

ed

(D

ate

)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tio

n

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Co

ntr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

Component2

A

R

DSWRPP-2/WORKS/S/102 0.0400 28-Apr-2011 26-May-2011 7-Jul-2011 14-Jul-2011 04-Aug-2011 DSWRPP-2/WORKS/S/

102

pp 3 08-Sep-2011Pesticide Analysis for WRB 29-Sep-2011DC PMU

Component4

A

R

DSWRPP-4/WORKS/S/100 0.0200 10-Mar-2009

10-Aug-2009

10-Apr-2009

7-Sep-2009

24-Apr-2009

19-Oct-2009

30-May-2009

26-Oct-2009

20-Jun-2009

16-Nov-2009

DSWRPP-4/WORKS/S/

100

pp 1 04-Aug-2009Office refurbishments - Consultants' office 25-Aug-2009

11-Jan-201021-Dec-2009

SHOPPI

NG

PMU

A

R

DSWRPP-4/WORKS/S/101-1 0.0130 01-Oct-2008 29-Oct-2008 10-Dec-2008

7-Oct-2008

17-Dec-2008

07-Nov-2008

07-Jan-2009

20-Nov-2008

Completed DSWRPP-4/WORKS/S/

101-1

1,386,978.03pp 2

8-Dec-2008

Rs. 1,443,550.00

Rs. 1,443,550.00

Kemyo (pvt)Ltd 19-Feb-201011-Feb-2009Interior arrangement-8th Floor 4-Mar-2009SHOPPI

NG

PMU

A

R

DSWRPP-4/WORKS/S/101-2 0.0150 11-Nov-2009 9-Dec-2009 20-Jan-2010

22-Jun-2010

27-Jan-2010

29-Jul-2010

17-Feb-2010

09-Aug-2010

Completed DSWRPP-4/WORKS/S/

101-2

6,450,201.40pp 2

Rs. 5,383,261.52

+VAT 12%20-Aug-2011

Rs. 5,383,261.52

+VAT 12%

Nimal Construction 24-Mar-2010Office refurbishments - Repair 1st Floor 14-Apr-2010SHOPPI

NG

PMU

A

R

DSWRPP-4/WORKS/S/101-3 0.0100 10-May-2009

24-Apr-2009

7-Jun-2009

22-May-2009

19-Jul-2009

3-Jul-2009

26-Jul-2009

15-Jul-2009

16-Aug-2009

27-Aug-2009

Completed DSWRPP-4/WORKS/S/

101-3

632,373.35pp 2

16-Dec-2009

Rs. 559,025.75

Rs. 559,025.75

Nimal Construction 20-Sep-2009Office refurbishments - Toilet Repairing of 8th Floor 11-Oct-2009SHOPPI

NG

PMU

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Name & Designation

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Date

Page 1 of 1

As On 9/6/2011

PROCUREMENT PLAN FOR WORKS

Project ID : 093132

IDA Credit Number : 4406-CE

Dam Safety and Water Resources Planning Project(DSWRPP)

( Subject to Prior Review/Post Review)

SERVICES MASL

S

eria

l N

o

Package No Description of Services

Est

ima

ted

Co

st

( U

S $

. In

M

illio

ns)

Me

tho

d o

f

Pro

cu

me

nt

ICB

/NC

B

Imp

lem

en

tin

g

Ag

en

cy

De

sig

n/

Inve

stig

atio

n/

Sp

ecific

atio

n

co

mp

lete

d (

Da

te)

Est

ima

ted

, P

rep

are

d &

Sa

nct

ion

ed

(D

ate

)

Pre

pa

ratio

n o

f B

id

Do

cu

me

nt

Da

te

Ba

nk'

s N

o O

bje

ctio

n t

o

Bid

din

g D

ocu

me

nt

(Da

te)*

*

Bid

In

vita

tio

n

(Da

te)

Bid

Op

en

de

d o

n

(Da

te)

Ba

nk's

No

Ob

jectio

n t

o

Co

ntr

act

Aw

ard

(Da

te)*

*

Co

ntr

act

Sig

ne

d

(Da

te/V

alu

e/C

urr

en

cy)

Re

ma

rks

Contr

act

No

.

Na

me

of

Co

ntr

acto

r /

Na

tio

na

lly &

Zip

Co

de

**

WB

R N

o.

Da

te o

f C

om

ple

tio

n o

f

Co

ntr

act

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

Co

ntr

act

Aw

ard

de

cid

ed

(D

ate

/Va

lue

/Cu

rre

ncy)Bids

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 17 20 19 21

Component1

A

R

pp 0 DSWRPP-1/SER/S/75-3 0.0200 04-Sep-2010 05-Oct-2010 10-Oct-2010 15-Nov-2010 30-Dec-2010 13-Feb-2011

04-Sep-2010 02-Oct-2010 13-Nov-2010 20-Nov-2010 11-Dec-2010 15-Jan-2011

DSWRPP-1

/SER/S/75-

Reconditioning of the Existing two cranes for

Randenigala/Rantambe

MASLS

A

R

pp 1 DSWRPP-1/SER/NCB/75-1 0.0800 02-Sep-2010 03-Oct-2010 08-Oct-2010 13-Nov-2010 28-Dec-2010 11-Feb-2011

02-Sep-2010 11-Sep-2010 11-Nov-2010 18-Nov-2010 09-Dec-2010 13-Jan-2011

DSWRPP-1

/SER/NCB/

Reconditioning of the Existing Crane for Polgolla MASLNCB

A

R

pp 1 DSWRPP-1/SER/NCB/75-2 0.1000 03-Sep-2010 04-Oct-2010 09-Oct-2010 14-Nov-2010 29-Dec-2010 12-Feb-2011

03-Sep-2010 01-Oct-2010 12-Nov-2010 19-Nov-2010 10-Dec-2010 14-Jan-2011

DSWRPP-1

/SER/NCB/

Reconditioning of the Existing Crane & Motor Grader for

Maduru Oya

MASLNCB

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Name & Designation

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Date

Page 1 of 1

As On 9/6/2011IDA Credit Number : 4406-CE

Project ID : 093132

( FOR ALL CONTRACTS)

PROCUREMENT PLAN FOR TRAINING

Dam Safety and Water Resources Planning Project(DSWRPP)

S

eria

l N

o

Package No Description of Services

Estim

ate

d C

ost

( U

S $

. In

M

illio

ns)

me

the

d o

f se

lectio

n @

Ad

ve

rtis

ing

fo

r sh

ort

listin

g(E

OI)

da

te

TO

R/

sh

ort

list

to b

e

fin

alis

he

d (

da

te)

# R

FP

fin

al d

raft

to

be

forw

ard

ed

to

th

e b

an

k (

da

te)

**

No

ob

jectio

n f

rom

ba

nk

for

TO

R/

sh

ort

list/

fin

al R

FP

RF

P I

ssu

ed

(

da

te)

Pro

po

sa

l to

be

re

ce

ive

d b

y

the

pro

ject

Au

tho

ritie

s (d

ate

)

Eva

lua

tio

n t

o b

e f

ina

lise

d

(Te

chn

ica

l/ #

Co

mb

ine

d/D

raft

co

ntr

act/

Fin

al co

ntr

act)

(Da

te)

Re

ma

rks

Co

ntr

act

Nu

mb

er,

Va

lue

an

d

Cu

rre

ncy

Na

me

of

Co

nsu

lta

nt/

Na

tio

na

lity

& Z

ip c

od

e,

if

Se

rvic

e t

o b

e c

om

ple

ted

(da

te)

**

WB

R N

o.

Exp

en

ditu

re in

curr

ed

to

Da

te

No

ob

jectio

n b

y t

he

ba

nk

(Te

chn

ica

l /#

Co

mb

ine

d/D

raft

Co

ntr

act)

(D

ate

)**

1 2 3 4 5 6 7 8 9 10 11 12 13 16 15 18 17 1914

Component1

A

R

pp 1 DSWRPP-1/CS/SSS/11-1 0.0260 DSWRPP-1/CS/SSS

/11-1

Local Training & Workshops (Universities / technical

College / On the Job)

11-Jan-2010 1-Feb-2010Individual

A

R

pp 2 DSWRPP-1/CS/SSS/11-2 1.6840 DSWRPP-1/CS/SSS

/11-2

Other Training Programs for Component 01

Prior Review

12-Sep-2010 3-Oct-2010Individual

A

R

pp 6 DSWRPP-1/CS/SSS/25-1 0.0260 DSWRPP-1/CS/SSS

/25-1

Procurement / Financial Management Training

Program 01

1-Jul-2007

1-Jul-2007

10-Jul-2007

10-Jul-2007Individual

A

R

pp 6 DSWRPP-1/CS/SSS/25-2 0.0600 DSWRPP-1/CS/SSS

/25-2

Procurement / Financial Management Training

Program 02

11-Dec-2008

11-Dec-2008

1-Jan-2009

1-Jan-2009Individual

A

R

pp 7 DSWRPP-1/CS/SSS/26-1 0.0530 DSWRPP-1/CS/SSS

/26-1

Overseas Training for Dam Managers and Staff 01 23-Feb-2009 16-Mar-2009Individual

A

R

pp 7 DSWRPP-1/CS/SSS/26-2 0.0530 DSWRPP-1/CS/SSS

/26-2

Overseas Training for Dam Managers and Staff 02 31-Aug-2009 21-Sep-2009Individual

A

R

pp 8 DSWRPP-1/CS/SSS/27-1 0.0630 DSWRPP-1/CS/SSS

/27-1

Overseas Exposure Visits / Workshops for Senior

Managers 01

11-Dec-2009 1-Jan-2010Individual

A

R

pp 8 DSWRPP-1/CS/SSS/27-2 0.0620 DSWRPP-1/CS/SSS

/27-2

Overseas Exposure Visits / Workshops for Senior

Managers 02

25-May-2009 15-Jun-2009Individual

A

R

pp 10 DSWRPP-1/CS/SSS/29 0.0430 DSWRPP-1/CS/SSS

/29

Enviornment Training Program for the Irrigation

Sector Officials.

25-May-2010 15-Jun-2010Individual

A

R

pp 12 DSWRPP-1/CS/SSS/31 0.0800 Completed DSWRPP-1/CS/SSS

/31

United States Bureau

Reclamation

8,541,380.98Training on Dam Safety by USBR

Prior Review

8-Feb-2011 24-Feb-2011SSS

Component2

A

R

pp 3 DSWRPP-2/CS/SSS/17 0.0370 DSWRPP-2/CS/SSS

/17

Capacity Building Training programme for HMIS / GW

Staff

11-Mar-2010

11-Mar-2009

1-Apr-2010

1-Apr-2009Individual

A

R

pp 4 DSWRPP-2/CS/SSS/18 0.1870 DSWRPP-2/CS/SSS

/18

Other Training Programs for Component 02

21-May-2010

21-May-2009

11-Jun-2010

11-Jun-2009Individual

A

R

pp 11 DSWRPP-2/CS/SSS/30 0.0420 DSWRPP-2/CS/SSS

/30

Training on Ground Water Activities 30-Mar-2011 20-Apr-2011Individual

A

R

pp 13 DSWRPP-2/CS/SSS/32 0.0100 DSWRPP-2/CS/SSS

/32

Training on Advance Geophysical Survey for WRB-

Prior Review

4-May-2011 25-May-2011Individual

Page 1 of 2

Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight
Harshika
Highlight

S

eria

l N

o

Package No Description of Services

Estim

ate

d C

ost

( U

S $

. In

M

illio

ns)

me

the

d o

f se

lectio

n @

Ad

ve

rtis

ing

fo

r sh

ort

listin

g(E

OI)

da

te

TO

R/

sh

ort

list

to b

e

fin

alis

he

d (

da

te)

# R

FP

fin

al d

raft

to

be

forw

ard

ed

to

th

e b

an

k (

da

te)

**

No

ob

jectio

n f

rom

ba

nk f

or

TO

R/

sho

rtlis

t/ f

ina

l R

FP

RF

P I

ssu

ed

(

da

te)

Pro

po

sa

l to

be

re

ce

ive

d b

y

the

pro

ject

Au

tho

ritie

s (

da

te)

Eva

lua

tio

n t

o b

e f

ina

lise

d

(Te

ch

nic

al/ #

Co

mb

ine

d/D

raft

co

ntr

act

/Fin

al co

ntr

act

)

(Da

te)

Re

ma

rks

Co

ntr

act

Nu

mb

er,

Va

lue

an

d

Cu

rre

ncy

Na

me

of

Co

nsu

lta

nt/

Na

tio

na

lity

& Z

ip c

od

e,

if

Se

rvic

e t

o b

e c

om

ple

ted

(da

te)

**

WB

R N

o.

Exp

en

ditu

re in

cu

rre

d t

o

Da

te

No

ob

jectio

n b

y th

e b

an

k

(Te

ch

nic

al /#

Co

mb

ine

d/D

raft

Co

ntr

act)

(D

ate

)**

1 2 3 4 5 6 7 8 9 10 11 12 13 16 15 18 17 1914

A

R

pp 14 DSWRPP-2/CS/SSS/16 0.0100 Completed DSWRPP-2/CS/SSS

/16

Dr. Srihari Rao Srigiriraju 26-Aug-2011 479,534.50Training on Groundater Development Models for

WRB- Level 1

20-Jul-2011 10-Aug-2011Individual

A

R

pp 14 DSWRPP-2/CS/SSS/16-1 0.0100 DSWRPP-2/CS/SSS

/16-1

Training on Groundater Development Models for

WRB- Level 2

12-Oct-2011 2-Nov-2011Individual

A

R

pp 14 DSWRPP-2/CS/SSS/16-2 0.0100 DSWRPP-2/CS/SSS

/16-2

Training on Groundater Development Models for

WRB- Level 3

20-Dec-2011 10-Jan-2012Individual

Component3

A

R

pp 5 DSWRPP-3/CS/SSS/19 0.0840 DSWRPP-3/CS/SSS

/19

Other Training Programs for Component 03 25-Oct-2010 15-Nov-2010Individual

A

R

pp 9 DSWRPP-3/CS/SSS/28-1 0.0230 DSWRPP-3/CS/SSS

/28-1

Water Resource management Overseas Training

programme 01

11-Dec-2009 1-Jan-2010Individual

A

R

pp 9 DSWRPP-3/CS/SSS/28-2 0.0230 DSWRPP-3/CS/SSS

/28-2

Water Resource management Overseas Training

programme 02

25-May-2010 15-Jun-2010Individual

WBR No. : World Bank Registration Number # Technical and Financial ** Applicable in case of 'Prior Review' by Bank Only.

09/06/2011

Name & Designation

Signature

Note : For coloumn no.6 to 13, fill the information for all the three elements i.e., PP , R and A, at each stage as applicable,against each contact.

*PP : Target dates agreed as per procument plan R : Revision 1,2 etc.A: Actual dates * RFP (Request for proposal): Same as 'Bid Document'

Date

Page 2 of 2