Process Safety Indicators
Gebruik van leading en lagging indicators, om de process safety performance te verbeteren.
![Page 2: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/2.jpg)
2
Workshop PSI’s (process safety indicators)
• Programma:
– Introductie
– API754
– Groep discussie, hoe verbeteren we onze process safety perfomance door het gebruik van PSI’s
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 3: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/3.jpg)
3
API 754
ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries
Part 4: Implementation of RP-754
Dawn Wurst, Member API RP-754 Drafting Committee
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 4: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/4.jpg)
4
Implementation of RP-754
• Background
• Implementation Process
• PSE Data Capture
• Introduction to Recordkeeping Spreadsheet
• Useful References & Examples
• Data Analysis Examples
• “What‟s in it for me?”
• Where to go for help
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 5: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/5.jpg)
5Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 6: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/6.jpg)
6
Process to process a PSI
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 7: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/7.jpg)
7
Voorbeeld voor het classificeren volgens API754
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 8: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/8.jpg)
8
Process to process a PSI, van het voorbeeld
Dit is de voetregel van de presentatie
![Page 9: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/9.jpg)
9
Tier 1 & Tier 2 Thresholds values
Dit is de voetregel van de presentatie
![Page 10: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/10.jpg)
10
Tier 1 & Tier 2 Thresholds values
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 11: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/11.jpg)
11
Industry Analysis• Het is logisch om de verzamelde data te gebruiken voor analyse, om behalve te
leren van het individuele event ook te leren van trends, bijv:
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 12: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/12.jpg)
12
Site Analysis
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 13: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/13.jpg)
13
Mutiple site analysis
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 14: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/14.jpg)
14
Waarom PSI classificatie & rapportage?
• Classificatie en communicatie van PSI’s is een krachtige manier om de Process Safety awareness te stimuleren
• De data kan gebruikt worden om:
– Aandacht te trekken voor gebieden van process safety waar men zichniet bewust van is.
– Analyse van incident onderzoek, trend analyses
– Alloceren van mensen en middelen, daar waar de prioriteit hoger is
– Het bespreekbaar maken incidenten en trends in de branche/ industrie
– Het aantoonbaar maken van progressie in de tijd intern en extern
– Etc.
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 15: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/15.jpg)
15
Groepsdiscussie
• Wie gebruikt PSI’s binnen zijn of haar/ bedrijf?
• Hoe worden PSI’s gebruikt?
• Wat zijn de ervaringen met het PSI’ s? Welke toegevoegde waarde ziet men?
• Is het zinvol om deze extern te delen?
Presentatie, 6 november 2014, R. Slegt (VNPI, werkgroep process veiligheid)
![Page 16: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/16.jpg)
16
API 754
• ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical IndustriesPart 4: Implementation of RP-754Dawn Wurst
• Member API RP-754 Drafting Committee
Dit is de voetregel van de presentatie
![Page 17: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/17.jpg)
V
N
P
I
Ton Jeen, Esso Raffinaderij
Peter Kuijper, Zeeland Refinery
Speciale bijeenkomst VNPI werkgroepen “Persoonlijke- en Procesveiligheid” – 7 september 2012
VNPI “Desk” Analyse
TIER 1 LOPC’s NL raffinaderijen
2009 - 2011
![Page 18: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/18.jpg)
V
N
P
I
o Actie 4 : Kwartaalrapportage RaffCie m.b.t. bevindingen, analyse,
leermomenten en verbetervoorstellen van LOPC’s
o Formele oprichting VNPI werkgroep “Procesveiligheid” eind 2009
o Werkwijze :
Indeling LOPC’s :
Definitie TIER1/TIER2 LOPC’s gebaseerd op API standaard 754 Vaststellen achterliggende oorzaken conform Tripod methodiek
Overzicht 1-lijnsrapportage TIER1 LOPC’s, incl. vrijgekomenhoeveelheid en aard produkt en achterliggende oorzaken perkwartaal
Na vaststelling leermomenten TIER1 LOPC mondelingeuitwisseling “special LOPC topic” in volgende vergadering
Speciale bijeenkomst VNPI werkgroepen “Persoonlijke- en Procesveiligheid” – 7 september 2012
Opdracht in kader Actieplan “Veiligheid Voorop”
![Page 19: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/19.jpg)
V
N
P
I
Overzicht TIER 1 LOPC incidenten 2009-2011
o Aantal TIER1 LOPC’s : 23o Verdeling tankenpark/proceseenheden : 52%/48%o 4 TIER1 LOPC’s tijdens in- en uitbedrijfname, waarvan
2 met vergelijkbare oorzaken als BP Texas City
Noot 1: T1 PSER = Aantal TIER1 LOPC’s per 1 miljoen werkuren raffinaderij personeel en contractors, exclusief omvangrijke nieuwbouwwerkzaamheden
Noot 2: NL raffinaderijen zijn geanonimiseerd
Speciale bijeenkomst VNPI werkgroepen “Persoonlijke- en Procesveiligheid” – 7 september 2012
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
1 2 3 4 5 VNPI
2009
2010
2011
TIER 1 LOPC Rate
per 1,000,000 werkuren
T1 PSER
![Page 20: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/20.jpg)
V
N
P
I
Desk Analyse TIER1 LOPC’s 2009 - 2011
Speciale bijeenkomst VNPI werkgroepen “Persoonlijke- en Procesveiligheid” – 7 september 2012
Directe oorzaak %
- Falen van een instrument, afsluiter, flens, pompafdichting, etc. 45
- Openzetten (verkeerde)afsluiter, verwijderen onjuiste plug, onjuist plaatsen blind 25
- Corrosie 15
- Diverse overige directe oorzaken 15
- Totaal 100
Basis oorzaak %
- Geschiktheid engineering standaards (bijv. RTJ flens, electrical heater, etc.) 30
- Foutieve handelingen 25
- Onvoldoende werkvoorbereiding en/of volgen MoC traject 25
- Vibratie 10
- Diverse overige basis oorzaken 10
- Totaal 100
Directe oorzaken :
Basis oorzaken :
![Page 21: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/21.jpg)
V
N
P
I
Desk Analyse TIER1 LOPC’s 2009-2011
Conclusies :
o DE : Aanpassen/verbeteren ontwerp geselecteerd bij 14 LOPC’s
o PR, CO, OR of combinatie (veiligheidscultuur gerelateerd) geselecteerd bij 11 LOPC’s
o MM: Uitvoeringsaspecten niet apart benoemd, conform TRIPODopgesloten in DE, PR en CO
Speciale bijeenkomst VNPI werkgroepen “Persoonlijke- en Procesveiligheid” – 7 september 2012
0
2
4
6
8
10
12
14
16
HW DE MM PR EC HK IG CO OR TR DF
GFT
Verdeling TRIPOD General Failure Types
AantalHW Hardware
DE Design
MM Maintenance Management
PR Procedures
EC Error -enforcing conditions
HK Housekeeping
IG Incompatible goals
CO Communication
OR Organisation
TR Training
DF Defences
![Page 22: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/22.jpg)
V
N
P
I
Desk Analyse TIER1 LOPC’s 2009-2011
Verbeterproces Veiligheidscultuur(gerelateerde TRIPOD factoren (PR/EC/CO/OR/DF)
voor
A. Strikt toepassen en handhaven werkproceduresB. Herkennen en strikt volgen MoC werkwijze
Speciale bijeenkomst VNPI werkgroepen “Persoonlijke- en Procesveiligheid” – 7 september 2012
oTRAINING :
- Continueren trainingen “Risicoherkenning op werkplek” en “Gouden regels”
met name ook voor oost- en zuideuropesche instroom contractors t.b.v.
TurnArounds en omvangrijke projecten
o OPRICHTING TRAINING CENTERS (TA’s/omvangrijke projecten)
- Theoretisch - en praktisch gedeelte, incl. toets
- Extra aandacht voor specifieke activiteiten
oVERANTWOORDELIJKHEDEN :
-Nadruk op verantwoordelijke rol “leidinggevenden” voor veilig werken
van hun team. Training tevens gericht interveniëren onveilige situatie.
![Page 23: Process Safety Indicators - Veiligheid Voorop 6 R_ Slegt... · 3 API 754 ANSI / API RP-754Process Safety Performance Indicators for the Refining & Petrochemical Industries Part 4:](https://reader031.vdocuments.us/reader031/viewer/2022013120/5ac3539e7f8b9ae06c8c053e/html5/thumbnails/23.jpg)
V
N
P
I
TREND ANALYSE TIER1 EN TIER2 LOPC’s
Conclusies: Gunstiger LOPC resultaat VNPI branche vs EU industrie Aanzienlijke onderlinge verschillen tussen NL raffinaderijen
Verbetertraject voor VNPI werkgroep: Elke raffinaderij bereidt de leermomenten voor voorafgaand
aan bespreken “special LOPC topic” Speciale bijeenkomst VNPI werkgroepen “Persoonlijke- en Procesveiligheid” – 7 september 2012
0
2
4
6
8
10
12
1 2 3 4 5 VNPI CONCAWE
2009
2010
2011
1st half 2012
Total PSER
Overzicht aantal TIER+TIER2 LOPC’s
per miljoen gewerkte uren
Noot 1: Total PSER = Aantal TIER1+TIER2 LOPC’s per 1 miljoen werkuren raffinaderij personeelen contractors, exclusief omvangrijke nieuwbouwwerkzaamheden
Noot 2: NL raffinaderijen zijn geanonimiseerd