process piping

3
DRAWING TITLE TRIANGLE TECH ERIE, PA DWG. NO. SCALE NAME DATE GRADE PIPING PLAN 3 OF 4 1/2" = 1'=0" D. A. STICHICK 07MAR08 23 CWR 2" 7 C 2" 21 CWS 3" 4 C 2" 22 CWR 2" 6 C 4" 6 C 4" V-15 V-19 V-11 V-21 V-10 V-17 V-18 V-16 V-14 TRC 133 C-212 TO COOLING TANK CWR 2" 2' 6'-7" 11'-11 1 4 " 3'-6 1 2 " 9'-5" 8'-1 1 2 " 4'-5 3 4 " 1'-6 1 2 " 9'-1" 2'-2" 7'-6 3 4 " 14'-6 3 4 " 8'-7" 1'-10 1 2 " 10'-10 1 2 " 15'-5 1 4 " TRC 133 2'-1 1 4 " 1'-7" 1' 2'-1" 2'-2" NOTES: 1. ALL NOZZLES EXTEND 6" FROM SHELL OF TANK/VESSEL. A-A N C:\Users\DA\Documents\Drafting\PIPING\DWG 3 OF 4.dwg, 7/20/2010 8:11:24 AM, DWG To PDF.pc3

Upload: donald-stichick

Post on 23-Mar-2016

213 views

Category:

Documents


0 download

DESCRIPTION

Plan, Elevation and 3D views of industrial process piping

TRANSCRIPT

Page 1: Process Piping

DRAWING TITLE

TRIANGLE TECH

ERIE, PA

DWG. NO. SCALE NAME DATE GRADE

PIPING PLAN 3 OF 4 1/2" = 1'=0" D. A. STICHICK 07MAR08

23 CWR 2"7 C 2"

21 CWS 3"

4 C 2"

22 CWR 2"

6 C 4"

6 C 4"

V-15

V-19

V-11

V-21

V-10

V-17

V-18

V-16

V-14

TRC

133

C-212

TO COOLING TANK

CWR

2"

2'

6'-7" 11'-11

1

4

"

3'-6

1

2

"

9'-5" 8'-1

1

2

"

4'-5

3

4

"

1'-6

1

2

"

9'-1"

2'-2"

7'-6

3

4

"

14'-6

3

4

" 8'-7"

1'-10

1

2

"

10'-10

1

2

"

15'-5

1

4

"

TRC

133

2'-1

1

4

"

1'-7"

1'

2'-1"

2'-2"

NOTES:

1. ALL NOZZLES EXTEND 6" FROM SHELL OF TANK/VESSEL.

A-A

N

C:\Users\DA\Documents\Drafting\PIPING\DWG 3 OF 4.dwg, 7/20/2010 8:11:24 AM, DWG To PDF.pc3

Page 2: Process Piping

DRAWING TITLE

TRIANGLE TECH

ERIE, PA

DWG. NO. SCALE NAME DATE GRADE

PIPING ELEVATION 3 OF 4 1/2" = 1'=0" D. A. STICHICK 07MAR08

SECTION A-A

N

1

N

2

N

3

N

4

N

1

N

2

ELEV. 116'-0"

ELEV. 115'-0"

N

4

ELEV. 108'-0"

N

2

N

3

R-102

N

5

ELEV. 102'-11"

NOTES:

1. ALL NOZZLES EXTEND 6" FROM SHELL OF TANK/VESSEL.

ELEV. 100'-0"

ELEV. 106'-3"

ELEV. 101'-0"

ELEV. 108'-0"

ELEV. 101'-0"

ELEV. 101'-11"

ELEV. 102'-0"

C:\Users\DA\Documents\Drafting\PIPING\DWG 3 OF 4.dwg, 7/20/2010 8:11:25 AM, DWG To PDF.pc3

Page 3: Process Piping

DRAWING TITLE

TRIANGLE TECH

ERIE, PA

DWG. NO. SCALE NAME DATE GRADE

PIPING RENDERINGS 4 OF 4 N.T.S. D. A. STICHICK 20MAR08

C:\Users\DA\Documents\Drafting\PIPING\DWG 3 OF 4.dwg, 7/20/2010 8:11:26 AM, DWG To PDF.pc3