process diagram templatesapidp/...sap mii 15.0 production supervisor production operator send...

13
M10 SAP MII for Batch Manufacturing for Process Industry Process Diagram

Upload: phamphuc

Post on 03-Mar-2019

230 views

Category:

Documents


2 download

TRANSCRIPT

M10 – SAP MII for Batch Manufacturing for

Process Industry

Process Diagram

M10 - Manufacturing of Bulk Products without Process Management

(i.e. without Using PI Sheets), Sample Material MII-3000

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 3

M10 - Manufacturing of Bulk Products without Process Management

(i.e. without Using PI Sheets), Sample Material MII-3000

Shop Floor Scheduler

SAP ERP ECC 6.07 SAP MII 15.0

Quality Specialist Production Operator

Create Process Order

1

Record In-Process Usage Decision

C

Post Goods Movements

7

Production Supervisor

Create and Release Process Order

2 A

Record In-Process Control Result

B

Confirm Process Order

4 D

Post Goods Movements

6 D

Record Post-Process Usage Decision

C

Record Post-Process Control Results

B

Check Material and Batch (availability) in

Stock

E

3

Warehouse Specialist

Confirm Process Order

5

M10 - Manufacturing of Bulk Products with Process Management (i.e.

using PI Sheets), Sample Material MII-3200 - 1 of 4

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 5

M10 - Manufacturing of Bulk Products with Process Management (i.e.

Using PI Sheets), Sample Material MII-3200 (1/4)

SAP MII 15.0

Production Operator

Create Control Recipe

9

Determine Batches and Generate Control Recipe

F

Read Inspection Lots

11

Production Supervisor

Create and Release Process Order

A

Send Order and Control Recipe

8 G

Select Order and Identify Material Batches

D

Review Process Order

D

Show Work Instruction for Order Execution

H

Read Inspection Lot Characteristics

12

Next Page

Shop Floor Scheduler Production Supervisor

SAP ERP ECC 6.07

Quality Specialist

10

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 6

M10 - Manufacturing of Bulk Products with Process Management (i.e.

Using PI Sheets), Sample Material MII-3200 (2/4)

Shop Floor Scheduler

SAP MII 15.0

Production Supervisor Production Operator

Send Process Messages

13

Update Process Order

14

Production Supervisor

Sign off Work Instruction Execution

H

Review In-Process Result Recording

J

Review In-Process Usage Decision

L

Update Inspection Lot

16

Previous Page

Send QM Messages

15

Confirm In-Process Result Recording

17 I

Post Result Recording

18

Record In-Process Usage Decision

19 K

Post Result Recording

20

Next Page

Quality Specialist

SAP ERP ECC 6.07

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 7

M10 - Manufacturing of Bulk Products with Process Management (i.e.

Using PI Sheets), Sample Material MII-3200 (3/4)

Shop Floor Scheduler

SAP MII 15.0

Production Supervisor Production Operator

Confirm Process Order

5

Post Goods Movements

7

Production Supervisor

Confirm Process Order

4 D

Post Goods Movements

6 D

Record Post-Process Control Results

N

Review Process Order Confirmation

M

Previous Page

Next Page

SAP ERP ECC 6.07

Quality Specialist

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 8

M10 - Manufacturing of Bulk Products with Process Management (i.e.

Using PI Sheets), Sample Material MII-3200 (4/4)

Shop Floor Scheduler

SAP ERP ECC 6.06 SAP MII 15.0

Warehouse Specialist Production Operator Production Supervisor

Create Instruction from Message

P

Create a message in Shift Book

O

Review Process Order Status

Q

Previous Page

Review KPI Gauges

Q

SAP ERP ECC 6.07

Quality Specialist

Record Post-Process Usage Decision

C

Check Material and Batch (availability) in

Stock

E

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 9

M10 - Manufacturing of Bulk Products Icon Legend (1/2)

Icon Name

COR1

QE51N

QA11

Operation Cockpit -> Production

Confirmation

MMBE

COR2

CO53

Operation Cockpit - > Work Instructions

Operation Cockpit - > Quality Control ->

Results Recording

QA03

Production Supervision -> Usage

Decision

Icon Legend

A

B

C

D

E

F

G

H

I

J

K

Icon Name

QA13

COR3

QPR4

Operation Cockpit - > Shift Book->

Current Messages

Operation Cockpit - > Shift Book->

Current Instructions

Production Supervision

L

M

N

O

P

Q

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 10

M10 - Manufacturing of Bulk Products Icon Legend (2/2)

Icon Name

Transaction: LoadConfirmationTable

Synchronous RFC:

BAPI_PROCORD_GET_LIST

Synchronous RFC:

RFC_READ_TABLE

Transaction:ProcessOrderHeaderConf

Synchronous RFC:

BAPI_PROCORDCONF_CREATE_HDR

Transaction:GoodsMovementPosting

Synchronous RFC: BAPI_GOODSMVT

_CREATE

ABAP Report RCOCB006

tRFC CONTROL_RECIPE_DOWNLOAD

Transaction:

ReadControlRecipeFromQueue

Batch job: parseControlRecipe

Synchronous RFC:

QIRF_SEND_INSP_REQUIREMENTS

Icon Legend

Icon Name

Synchronous RFC:

QIRF_REQUIREMENTS_GET_DAT2

Transaction: sendInformationToSAP

Synchronous RFC:

BAPI_PROCESS_MESSAGE_CREATE

MLT

Transaction: SendQMInformationToERP

Synchronous RFC:

QIRF_GET_ALL_DATA_VALUES2

Transaction: ProcessRecordResults

Synchronous RFC:

BAPI_INSPOPER_RECORDRESULTS

Transaction: setUsageDecision

Synchronous RFC:

BAPI_INSPLOT_SET_USAGEDECISION

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 12

Integration with Other SAP Best Practice Processes and

Scope Items

The process diagram might contain links to preceding, succeeding, or other related SAP Best Practice Processes or scope items.

Note that these scope items may or may not be part of the solution package.

Refer to the Prerequisite Matrix for the definition which scope items are part of the solution package.

Note: this slide is optional. For more

information how to deal with this slide,

refer to the guideline.

Thank you

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 18

© 2015 SAP SE or an SAP affiliate company. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an

SAP affiliate company.

SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE

(or an SAP affiliate company) in Germany and other countries. Please see http://global12.sap.com/corporate-en/legal/copyright/index.epx for additional

trademark information and notices.

Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors.

National product specifications may vary.

These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind,

and SAP SE or its affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP SE or

SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and

services, if any. Nothing herein should be construed as constituting an additional warranty.

In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related

presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated

companies’ strategy and possible future developments, products, and/or platform directions and functionality are all subject to change and may be

changed by SAP SE or its affiliated companies at any time for any reason without notice. The information in this document is not a commitment,

promise, or legal obligation to deliver any material, code, or functionality. All forward-looking statements are subject to various risks and uncertainties

that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking

statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.