process chart and flow diagram
DESCRIPTION
TRANSCRIPT
![Page 1: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/1.jpg)
PROCESS CHART
AND FLOW DIAGRAM
BY: GROUP 5
![Page 2: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/2.jpg)
PROCESS CHART
PRESENT METHOD
![Page 3: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/3.jpg)
DIST. IN FEET TIME IN MINS. CHART
SYMBOLS PROCESS DESCRIPTIONS
18 0:10.22 methods lab. before the bottom stairs
32 0:17.35 bottom of the stairs to the top of the stairs
32 0:16.32 stairs to the entrance door of the basement
6 0:05.03 entrance door of the basement going down the stairs
5 0:06.32 bottom of the stairs to the engineering lobby
140 1:04.07 engineering lobby to the stairs of San Jose building
49 0:14.25 bottom stairs going up to the library entrance
![Page 4: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/4.jpg)
- - open the door
27 0:06.08 library entrance to OPAC
- 0:55.15 searching in OPAC
141 2:44.11 OPAC to bookshelf
- 1:11.59 finding the book
27 0:08.35 bookshelf to the counter
- 0:21.00 counter-clearing the book
![Page 5: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/5.jpg)
105 3:04.00 counter to exit library
- 0:05.00 exit library
- - open the door
69 1:09.00 exit library to hallway
23 0:30.40 top stairs going down to the entrance basement
27 0:27.00 entrance door of the basement to the top of the stairs
30 0:40.33 from the top of the stairs to the bottom of the stairs
20 0:20.22 bottom of the stairs to the Methods lab.
![Page 6: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/6.jpg)
FLOW DIAGRAM
PRESENT METHOD
![Page 7: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/7.jpg)
METHODS LAB.
STAI
RS
ENTRANCE BASEMENT
ENGINEERING LOBBY
DRIVEWAY
SAN JOSE BLDG.
![Page 8: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/8.jpg)
STAIRS
OPAC
COUNTER
ENTRANCE LIBRARY
EXIT LIBRARY
![Page 9: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/9.jpg)
ENTRANCE BASEMENT STAIRS
HALLWAY
STAI
RS
METHODS LAB
![Page 10: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/10.jpg)
PROCESS CHART
PROPOSED METHOD
![Page 11: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/11.jpg)
DIST. IN FEET
TIME IN MINS.
CHART SYMBOLS PROCESS DESCRIPTIONS
19 0:9.41 Methods lab to bottom stairs
31 0:44.30 bottom stairs to the top stairs
26 0:17.05 top stairs to the entrance basement
22 0:14.07 entrance basement to the top stairs
87 0:59.16 top stairs to the proposed entrance library
open the door
![Page 12: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/12.jpg)
5 0:04.01 entrance library to the proposed OPAC
0:15.41 searching books in OPAC
45 0:43.13 OPAC to shelves
0:08.32 finding the book
60 0:44.03 shelves to the proposed counter
0:19.12 counter clearing
20 0:12.01 counter to exit library
![Page 13: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/13.jpg)
0:05.00 exit library
open the door
80 0:41.12 exit library to hallway
26 0:13.41 top stairs going down to entrance basement
25 0:12.01 entrance basement to the top stairs
31 0:15.18 top stairs to bottom stairs
15 0:08.24 bottom stairs to methods lab.
![Page 14: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/14.jpg)
FLOW DIAGRAM
PROPOSED METHOD
![Page 15: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/15.jpg)
ENTRANCE BASEMENT STAIRS
HALLWAY
STAI
RS
METHODS LAB
![Page 16: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/16.jpg)
STAIRS
OPAC
COUNTER
ENTRANCE LIBRARY
ENTRANCE
EXIT
PROPOSED EXIT
OPAC
P CR OO UP NO TS EE RD
PROPOSED
![Page 17: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/17.jpg)
ENTRANCE BASEMENT STAIRS
HALLWAY
STAI
RS
METHODS LAB
![Page 18: Process chart and flow diagram](https://reader036.vdocuments.us/reader036/viewer/2022082416/5484893eb4af9f870d8b4be3/html5/thumbnails/18.jpg)
SUMMARYELEMENTS PRESENT METHOD PROPOSED
METHOD DIFFERENCE
STEPS TIME ALLOTTED STEPS TIME
ALLOTTED STEPS TIME ALLOTTED
OPERATION 5 2:08.14 5 0:43.25 0 1:25.29
TRANSPORTATION 16 10:23.05 14 5:37.13 2 4:46.32
INSPECTION 2 0:25.00 2 0:24.12 0 0:0.88
DELAY 4 2:33.14 4 0:48.25 0 1:45.29
STORAGE
TOTAL 27 15:29.33 25 9:33.15 2 7:58.18