Procedures Following Observed Damage (Structural and Non‐Structural)
Arne P. Johnson, PE (IL, IA, WI, OH, MO, IN, MN)Iowa DOT Workshop, October 29, 2015
![Page 2: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/2.jpg)
www.wje.com
SOLUTIONS FOR THE BUILT WORLD
![Page 3: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/3.jpg)
1. Clarify contractor responsibility for damage2. Contractor should change methods to lower energy methods!3. Inspection by experienced structural engineer4. Confirm and categorize the damage
Threshold damage Minor damage Major damage
5. For non‐structural damage (threshold, some minor), contractor required to repair to pre‐event condition
6. For structural damage (some minor, major), structural engineer to develop repair procedures and repair specifications/drawings
Procedures Following Observed Damage
![Page 4: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/4.jpg)
Threshold Damage:Opening of old cracks and formation of new plaster cracks, dislodging of loose objects (e.g., loose bricks in chimneys)
Minor Damage:Superficial, not affecting the strength of the structures (e.g., broken windows, loosened or fallen plaster), hairline cracks in masonry
Major Damage:Resulting in serious weakening of the structure (e.g., large cracks or shifting of foundations or bearing walls, major settlement resulting in distortion or weakening of the superstructure – walls out of plumb)
Categorizing Damage*
* Dowding, Charles, Construction Vibrations, 2000, p. 110‐111.
![Page 5: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/5.jpg)
Determine if temporary shoring or stabilization measures are needed for public safety or to prevent additional damage
Investigate extent and structural significance of damage Is damage “direct” only, or might damage manifest in future? Develop permanent repair – typically drawings and specs:
Effective (to restore structure to pre‐event condition) Practical, constructable Impact on construction schedule Contractor submittals and approvals in advance of work Coordinate with property owner (their agreement)
If Structural Damage
Structural Engineering Tasks:
![Page 6: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/6.jpg)
Examples – The Pierre, Chicago, IL
![Page 7: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/7.jpg)
Examples ‐ Iowa
![Page 8: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/8.jpg)
The Robie House (Frank Lloyd Wright)
![Page 9: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/9.jpg)
Vibration Limits:Building: 0.20 in/sec*Building roof: 0.50 in/sec** frequency dependent
The Robie House (Frank Lloyd Wright)
Heavy truck traffic (40 ft) Excavation and sheeting (70 ft) Demolition on building wall (110 ft)
![Page 10: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/10.jpg)
![Page 11: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/11.jpg)
Preconstruction Survey, 9/27/2012
![Page 12: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/12.jpg)
Preconstruction Survey, 9/27/2012
![Page 13: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/13.jpg)
![Page 14: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/14.jpg)
CM1
CM2
CM8
![Page 15: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/15.jpg)
Interim Survey, 4/19/2013 / Post‐construction Survey, 7/8/2014
![Page 16: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/16.jpg)
Interim Survey, 4/19/2013 / Post‐construction Survey, 7/8/2014
CM1: 0.040 to 0.090”
CM2: 0.030 to 0.050”
CM8: 0.050 to 0.075”
![Page 17: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/17.jpg)
![Page 18: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/18.jpg)
![Page 19: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/19.jpg)
1. Clarify contractor responsibility for damage2. Contractor should change methods!3. Inspection by structural engineer (retained by Engineer or
contractor)4. Confirm and categorize the damage
Threshold damage Minor damage Major damage
5. For non‐structural damage (threshold, some minor), contractor required to repair to pre‐event condition
6. For structural damage (some minor, major), structural engineer to develop repair procedures and repair specifications/drawings
Procedures Following Observed Damage
![Page 20: Procedures Following Observed Damage (Structural and Non](https://reader034.vdocuments.us/reader034/viewer/2022052113/628887105659781b060c09a4/html5/thumbnails/20.jpg)
Questions / Discussion